[go: up one dir, main page]

JP2004170319A - Method for constructing main steam pipe room in nuclear reactor building - Google Patents

Method for constructing main steam pipe room in nuclear reactor building Download PDF

Info

Publication number
JP2004170319A
JP2004170319A JP2002338498A JP2002338498A JP2004170319A JP 2004170319 A JP2004170319 A JP 2004170319A JP 2002338498 A JP2002338498 A JP 2002338498A JP 2002338498 A JP2002338498 A JP 2002338498A JP 2004170319 A JP2004170319 A JP 2004170319A
Authority
JP
Japan
Prior art keywords
main steam
steam pipe
room
pipe
work
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
JP2002338498A
Other languages
Japanese (ja)
Inventor
Masayuki Shirakawa
正之 白川
Katsuto Inami
克人 井波
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Mitsubishi Heavy Industries Ltd
Original Assignee
Obayashi Corp
Mitsubishi Heavy Industries Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp, Mitsubishi Heavy Industries Ltd filed Critical Obayashi Corp
Priority to JP2002338498A priority Critical patent/JP2004170319A/en
Publication of JP2004170319A publication Critical patent/JP2004170319A/en
Withdrawn legal-status Critical Current

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E30/00Energy generation of nuclear origin
    • Y02E30/30Nuclear fission reactors

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method for constructing a main steam pipe room in a reactor building which enables efficient work by resolving a pileup of the work for constructing the main steam pipe room and the work for setting up a main steam pipe. <P>SOLUTION: A body part in the upper part of the main steam (MS) pipe room 60 where an MS pipe 24 is placed is made in the form of a unit 80 and is assembled beforehand in another place. In the unit 80, a frame 81 consists of bar pedestals 82 and 84 for holding a wall bar or a pillar bar 92, a steel-frame material 86 for supporting the MS pipe 24, a deck plate 88 and a beam member 90 for supporting the deck plate 88, and the MS pipe 24, the pillar bar 92, a grating 94, a galleria steel frame 96 and a scaffold 98 for working are placed in the frame 81. The unit 80 is installed in a prescribed position where it is to be constructed to construct the MS pipe room 60. <P>COPYRIGHT: (C)2004,JPO

Description

【0001】
【発明の属する技術分野】
本発明は、原子炉建屋の原子炉格納容器から延出される主蒸気配管が設置される主蒸気管室の構築工法に関する。
【0002】
【従来の技術】
原子力発電施設は、原子炉建屋とタービン建屋を備えている。原子炉建屋には、原子炉容器をはじめ、当該原子炉容器に関連する様々な設備、例えば中央制御室等が設けられている。また、タービン建屋には、タービン発電装置をはじめ、当該タービン発電装置に関連する様々な設備が設けられている。これら原子炉建屋とタービン建屋との間には、両者間を結んで、主蒸気配管と呼ばれる配管が配置される。この主蒸気配管は、原子炉建屋の原子炉格納容器内の原子炉容器で生成された蒸気をタービン建屋に送り込むための配管である。原子炉建屋には、この主蒸気配管が設置される主蒸気管室と呼ばれる部屋が原子炉格納容器に隣接して設けられている。
【0003】
このような原子力発電施設の建設工事にあっては、原子炉格納容器からタービン建屋を含めたプラント全体の各種試験を早期に実施するために、建物の建設工事と並行して、配管等の設備機器を先入れして設備関係の機電工事を進める先入れ工法が実施されている。主蒸気管室も例外ではなく、主蒸気管室の躯体工事と並行して主蒸気配管を先入れして設置する機電工事が行われる。
【0004】
図15〜図21は、従来の主蒸気管室の構築手順の一例を説明したものである。なお、ここで、主蒸気管室には、主蒸気配管(以下、MS配管ともいう)の他に、主給水配管(以下、FW配管ともいう)も設置される。主蒸気管室を構築する場合には、まず、図15に示すように、主蒸気管室の構築位置にコンクリートを打設して床部2を構築するとともに、構築した床部2の上にFW配管4を先入れして所定位置に設置する。次に、図16に示すように、床部2上に作業用足場6を設置して、その作業用足場6を利用して、主蒸気管室の壁部を構築する壁鉄筋8と、その壁鉄筋8を保持するための鉄筋架台10を設置する。さらにこれら壁鉄筋8および鉄筋架台10を取り囲むようにその周りにコンクリート型枠12を配置する。その後、配置したコンクリート型枠12内にコンクリートを打設して、その打設したコンクリートが十分硬化してから、コンクリート型枠12を解体して、1段目の壁部を構築する。
【0005】
次に、図17に示すように、構築した1段目の壁部14の上部に、当該上部から突き出た壁鉄筋8および鉄筋架台10を取り囲むようにコンクリート型枠12を配置する。そして、配置したコンクリート型枠12内にコンクリートを打設する。コンクリート硬化後、コンクリート型枠12を解体して、2段目の壁部を構築する。
【0006】
さらにその後、図18に示すように、さらに高い作業用足場6を設置して、当該作業用足場6を利用して、2段目の壁部18の上部に、壁鉄筋8と鉄筋架台10とを一体的に取り付けるとともに、作業用足場6の間に、これよりも高さの低い別の作業用足場20を設置する。そして、これら作業用足場6、20を利用して、左右両壁部18の間に、MS配管を支持するためのMS配管支持用鉄骨材22を架設する。なお、このMS配管支持用鉄骨材22は、前述した壁鉄筋8を保持する鉄筋架台10とは別に、壁部14、18内に設置された支持部(図示外)に支持される。
【0007】
また、同図に示すように、1段目および2段目の壁部14、18を構築する場合と同様に、2段目の壁部18の上方に設置された壁鉄筋8および鉄筋架台10を取り囲むようにコンクリート型枠12を設置して、当該コンクリート型枠12内にコンクリートを打設し、そして、コンクリート硬化後、コンクリート型枠12を解体して、図19に示すように、3段目および4段目の壁部を構築する。これにより、主蒸気管室60の左右両壁部29の構築を完了する。また、架設したMS配管支持用鉄骨材22上には、MS配管24を先入れして所定位置に設置する。
【0008】
次に、図20に示すように、左右両壁部29の間に、主蒸気管室60の上部床部を構築するためのデッキプレート30や梁部材32を設置する。これらのデッキプレート30または梁部材32の設置にあたっては、同図に示すように、これらの下方部にこれらを支持すべく支柱34等により支保工を行う。また、デッキプレート30上には、主蒸気管室60の上部床部を構築する床鉄筋36を配設する。その後、コンクリート型枠38を設置してから、当該コンクリート型枠38内にコンクリートを打設して、コンクリート硬化後、コンクリート型枠38を解体して、図21に示すような上部床部40を構築する。
【0009】
その後、同図に示すように、MS配管24には各種配管42等を接続したり、また弁等を設置したり、支柱34を撤去したりするとともに、主蒸気室管内には、歩廊鉄骨やグレーチング44、ダクト46などを設置する工事を行う。その後、作業用足場6,20を撤去して、主蒸気管室60の構築が完了する。
【0010】
【特許文献1】
特許第3283735号公報(第1−5頁、第3−7図)
【0011】
【特許文献2】
特許第2873139号公報(第1−6頁、第1−6図)
【0012】
【特許文献3】
特開昭61−53963号公報(第1−2頁、第1−4図)
【0013】
【特許文献4】
特開昭61−270437号公報(第1−2頁、第1−4図)
【0014】
【発明が解決しようとする課題】
このような構築工法には、次のような問題があった。すなわち、MS配管支持用鉄骨材22を設置する際には、MS配管支持用鉄骨材22を支持する支持部を、鉄筋架台とは別に壁部14、18内に設置する必要があるため、その配置の調整などに手間がかかった。また、MS配管支持用鉄骨材22の設置に際しては、当該設置作業に必要な作業用足場を設けるために、作業用足場の盛替が必要となり、これにより、仮設工事量の増加を招き、全体的に作業工程が長くなるとともに、狭隘部での作業になるため、作業が非常にし難かった。
【0015】
また、MS配管24を設置する際には、作業用足場の盛替が必要になるため、仮設工事量の増加を招き、全体的に作業工程が長くなるとともに、非常に狭隘な場所での作業になるために、作業が非常にし難かった。
【0016】
また、デッキプレートや梁部材などを支持する支柱等の支保工を設置する際には、FW配管やMS配管、作業用足場が邪魔になり、その配置調整に手間がかかるとともに、FW配管またはMS配管との干渉を回避するために、支柱等の支保工の量が増えるといった問題も生じていた。また、非常に狭隘な場所での作業になるため、支保工の組立や解体、搬入・搬出作業も困難を要した。
【0017】
さらにまた歩廊鉄骨またはグレーチング等の設置時には、既にFW配管やMS配管が設置された状態で作業を行わなければならず、非常に狭隘な場所での作業になるため、作業効率の低下を招いていた。また、歩廊鉄骨またはグレーチング等の搬入作業も困難を要した。
【0018】
つまり、配管等の設備機器を先入れして設備関係の機電工事を建物の建設工事と並行して進める先入れ工法を実施しているため、主蒸気管室の躯体を構築する建設作業と、FW配管やMS配管等の設備関係の設置作業とが輻輳し、これによって、作業工程の複雑化や仮設工事量の増大、配置調整の困難化、作業能率の低下といった問題が発生し、工事の遅れを招いていた。
【0019】
主蒸気管室の関連工事は、その工事が終了しないと原子炉設備全体の試運転等を行えないため、原子炉設備全体の建設工事内でクリティカルとなっており、厳しい工程を遵守しなければならず、主蒸気管室の工事の遅れは、原子炉設備全体の建設工事に対して大きな影響を及ぼしていた。
【0020】
本発明は、このような事情に鑑みてなされたものであって、その目的は、主蒸気管室の構築作業と、主蒸気配管の設置作業とが輻輳せずに効率的に工事を行うことが可能な原子炉建屋の主蒸気管室の構築工法を提供することにある。
【0021】
【課題を解決するための手段】
このような目的を達成するために本発明に係る原子炉建屋の主蒸気管室の構築工法にあっては、原子炉建屋の原子炉格納容器から延出される主蒸気配管が設置される主蒸気管室の構築工法であって、前記主蒸気管室を構成する躯体の骨組みを組み立てて、当該骨組みに前記主蒸気配管を取り付けて主蒸気管室ユニットを製作し、この主蒸気管室ユニットを前記主蒸気管室の構築予定位置に据え付けて、前記主蒸気管室を構築することを特徴とする。
【0022】
このような構築工法にあっては、主蒸気管室を区画形成する躯体の骨組みに主蒸気配管を設置して主蒸気管室ユニットを製作し、この主蒸気管室ユニットを主蒸気管室の構築予定位置に据え付けるから、主蒸気管室の構築作業と主蒸気配管の設置作業とが輻輳せずに済み、作業を効率的に行え、工期の短縮を図ることができる。
【0023】
また、かかる原子炉建屋の主蒸気管室の構築工法にあっては、前記主蒸気管室ユニットには、前記躯体の壁用鉄筋または柱用鉄筋の少なくともいずれか一方を保持するための鉄筋架台が設けられていても良い。この他に、前記主蒸気管室ユニットには、前記躯体の床部を構成するデッキプレートが設けられていても良い。これら鉄筋架台またはデッキプレートを主蒸気管室ユニットに設けておくことで、現場における鉄筋架台の設置作業またはデッキプレートの設置作業を簡略化することができ、作業を効率的に行うことができる。
【0024】
また、かかる原子炉建屋の主蒸気管室の構築工法にあっては、前記主蒸気管室ユニットには、前記主蒸気配管を支持するための鉄骨部材が設けられていても良い。このような鉄骨部材が設けられていれば、主蒸気配管を十分に支持することができる。
【0025】
さらに、かかる原子炉建屋の主蒸気管室の構築工法にあっては、前記主蒸気管室ユニットをクレーンにより吊り上げて前記構築予定位置に据え付けるようにしても良い。このようにクレーンを用いれば、主蒸気管室ユニットを簡単に据え付けることができる。
【0026】
【発明の実施の形態】
以下に本発明に係る原子炉建屋の主蒸気管室の構築工法の実施の形態について、添付図面を用いて説明する。なお、図15〜図21に示す前記従来例と同一の構成要素には、同一の符号を付して示してある。
【0027】
図1は、本実施形態に係る構築工法により構築される主蒸気管室を有する原子炉建屋を備えた原子力発電施設の内部構造を示した縦断面図である。この原子力発電施設は、加圧水型原子力発電プラントであり、原子炉建屋50とタービン建屋52を備えている。原子炉建屋50には、原子炉格納容器54をはじめ、当該原子炉格納容器54に関連する様々な設備等が設けられている。また、タービン建屋52には、タービン発電装置56をはじめ、当該タービン発電装置56に関連する様々な設備が設けられている。これら原子炉建屋50とタービン建屋52との間には、両者を結んで、主蒸気配管と呼ばれる配管(図示外)が配置されている。この主蒸気配管は、原子炉建屋54の原子炉格納容器内の蒸気発生装置で生成された蒸気をタービン建屋52に送り込むための配管である。そして、原子炉格納容器54に隣接して設けられた建物58には、その最上部(図中丸枠Aの部分)に、主蒸気配管が設置される主蒸気管室と呼ばれる部屋60が設けられている。
【0028】
図2(a)および(b)は、その主蒸気管室60の構造を詳しく示したものである。図2(a)は、主蒸気管室60を正面から見たときの断面図であり、図2(b)は、主蒸気管室60を側面から見たときの断面図である。本実施形態では、主蒸気管室60は、これら図2(a)および(b)に示すように、建物58のコンクリート躯体59の内部に、例えば、横幅21m×奥行き20m×高さ14mの空間部として画成されている。主蒸気管室60の上部には、4本の主蒸気配管24(以下、MS配管ともいう)が配設され、また主蒸気管室60の下部には、4本の主給水配管4(以下、FW配管ともいう)が配設されている。MS配管24は、主蒸気管室60の高さ方向中央部に架設されたMS配管支持用鉄骨材22の上に設置され、FW配管4は、主蒸気管室60の床部62上に設置されている。MS配管24およびFW配管4は、同図(b)に示すように、原子炉格納容器54内に延出されている。また、MS配管24とFW配管4との間の空間には、歩廊鉄骨64が架設されている。
【0029】
このような主蒸気管室60の構築工法の一例について説明する。図3〜図14は、その構築工法の一例を説明する図である。この構築工法では、まず、従来と同様、図3に示すように、主蒸気管室60の構築位置にコンクリートを打設して床部2を構築するとともに、構築した床部2の上にFW配管4を先入れして所定位置に設置する。
【0030】
次に、図4に示すように、床部2上に作業用足場6を設置して、その作業用足場6を利用して、主蒸気管室60の壁部または柱部を構築する壁鉄筋8および柱鉄筋70と、これら壁鉄筋8または柱鉄筋70を保持するための壁用鉄筋架台10と柱用鉄筋架台72を設置する。なお、これらの鉄筋架台10、72を設けているのは、当該建物の安全性を高めるために、壁鉄筋および柱鉄筋として太径の鉄筋を使用する関係上、それらの太径の鉄筋を保持する必要があるからである。さらにこれら壁鉄筋8または柱鉄筋70および鉄筋架台10、72を取り囲むようにその周りにコンクリート型枠12、74を配置する。その後、配置したコンクリート型枠12、74内にコンクリートを打設して、その打設したコンクリートが十分硬化してから、コンクリート型枠12、74を解体して、1段目の壁部および柱部の構築が終了する。
【0031】
次に、図5に示すように、構築した1段目の壁部14および柱部76の上部に、当該上部から突き出た壁鉄筋8、柱鉄筋70および鉄筋架台10、72を取り囲むようにコンクリート型枠12、74を配置する。そして、配置したコンクリート型枠12、74内にコンクリートを打設する。コンクリート硬化後、コンクリート型枠12、74を解体して、図6に示すように、2段目の壁部18および柱部78の構築が終了する。
【0032】
ここまでは、従来の構築工法と同様な手順により構築作業が進められる。本実施形態では、この後、従来の構築工法とは異なる手順により、構築作業を進める。つまり、図7に示すように、1段目および2段目の壁部14、18および柱部76、78の上方に、予め製作したユニット80(本発明における主蒸気管室ユニットに相当)を設置するのである。このユニット80は、主蒸気管室60の上部を構築するために製作されたユニットであり、2段目の壁部18および柱部78の上方に構築される壁部および柱部を構築するための壁鉄筋または柱鉄筋を保持するための鉄筋架台82、84と、MS配管24を支持するためのMS配管支持用鉄骨材86と、主蒸気管室60の上部床部を構築するためのデッキプレート86と、このデッキプレート88を支持するための梁部材90とを備えている。この他に、本実施形態では、MS配管支持用鉄骨材86の上には、所定位置にMS配管24が設置されているとともに、柱部用の鉄筋架台84には、柱鉄筋92が取り付けられている。また、ユニット80の内部には、グレーチング94、歩廊鉄骨96および作業用足場98が設置されている。
【0033】
図8は、この主蒸気管室ユニット80全体を示した斜視図である。この主蒸気管室ユニット80は、同図に示すように、壁部および柱部の構築に使用される壁鉄筋または柱鉄筋を保持するための鉄筋架台82、84と、MS配管24を支持するためのMS配管支持用鉄骨材86と、その他、梁部材90とにより構成された骨組み81から構築されている。当該骨組み81の上部には、主蒸気管室60の上部床部を構成するデッキプレート88が配設されているとともに、その下方部には複数の小梁部材91が梁部材90の間に架設されている。さらに、当該骨組み81の下部には、グレーチング94が敷設され、そのグレーチング94上にはMS配管24が配設されている。この他に、当該骨組み81には、歩廊鉄骨96と作業用足場98が配置されて、1つの大きなブロックとして構築されている。
【0034】
この主蒸気管室ユニット80は、同図に示すように、その上方に吊具として、当該ユニット80の上部形状に対応して成形された矩形状の枠体102をワイヤー100を介して接続し、当該枠体102を介してクレーン等により吊り上げられて設置される。
【0035】
図9は、この主蒸気管室ユニット80の製作方法の一例を説明するものである。この主蒸気管ユニット80を製作する場合には、まず、同図(a)に示すように、壁部および柱部に対応する位置に、壁鉄筋および柱鉄筋を保持するための鉄筋架台となる鉄骨材82、84を立設する。また、立設した鉄骨材82、84の下端部間に、MS配管24を支持するための支持鉄骨材86を架設する。
【0036】
次に、図9(b)に示すように、MS配管支持鉄骨材86上にグレーチング94を設置して、当該グレーチング94上にMS配管24を設置する。次に、図9(c)に示すように、壁鉄筋または柱鉄筋を保持する鉄筋架台となる鉄骨材82、84の上端部間に大梁用の鉄骨材90を架設して、当該大梁用の鉄骨材90の上方にMS配管室60の上部床部を構築するためのデッキプレート88を設置する。デッキプレート88は、壁部または柱部との取り合い部分を除いた部分に設置する。また、デッキプレート88の下面側には、大梁用の鉄骨材90の間に受梁となる小梁用の鉄骨材91を架設する。また、中央部の柱鉄筋を保持する鉄筋架台84には、その周りを取り囲むように柱筋92を組み付ける。そして、図9(d)に示すように、クレーン等により吊り上げて主蒸気管室の構築予定位置に移送するために、主蒸気管室ユニット80に、吊具となる矩形状の枠体102をワイヤー100を介して接続する。なお、本実施形態では、この主蒸気管室ユニット80の重量は約440tほどになる。
【0037】
図10は、主蒸気管室ユニット80が製作される場所、即ち地組場と、主蒸気管室ユニット80の実際の設置位置、即ち主蒸気管室60の構築予定位置との関係を示した平面図である。主蒸気管室ユニット80の製作位置110は、主蒸気配管室60の構築予定位置112の近くに設定され、クレーン114により簡単に移送できるようになっている。クレーン114は、製作位置110と設置予定位置112の間に設置される。主蒸気管室60の構築工事の進捗状況に合わせて適宜なタイミングで製作位置110から設置予定位置112へと主蒸気管室ユニット80がクレーン114により移送される。そして、移送された主蒸気管室ユニット80は、前述した図7に示すように、2段目の壁部18および柱部78の上方に設置される。
【0038】
主蒸気管室ユニット80の設置終了後、図11に示すように、壁鉄筋8の配筋を行う。ここでは、主蒸気管室ユニット80に設置した作業用足場98を利用して、壁鉄筋8を主蒸気管室ユニット80の鉄筋架台82に取り付けるとともに、2段目の壁部18の壁鉄筋8との接続作業を行う。また、主蒸気管室ユニット80に取付けた柱鉄筋92と2段目の柱部78の柱鉄筋92との接続を行う。その後、壁鉄筋8、柱鉄筋92および鉄筋架台82、84の周りにそれぞれコンクリート型枠12、74を配置して、これらコンクリート型枠12、74内にコンクリートを打設する。コンクリート硬化後、コンクリート型枠12、74を解体して、3段目の壁部および柱部の構築を完了する。
【0039】
次に図12に示すように、3段目の壁部26および柱部120の上部に、当該上部から突き出た壁鉄筋8、柱鉄筋92および鉄筋架台82、84を取り囲むようにコンクリート型枠12、74を配置する。コンクリート型枠12、74内にコンクリートを打設して、コンクリート硬化後、コンクリート型枠12、74を解体して、4段目の壁部および柱部を構築する。
【0040】
図13に、4段目の壁部28および柱部122が構築されたときの様子を示した。4段目の壁部28および柱部122の構築により、主蒸気配管室60を構成する壁部29および柱部123の構築が全て完了する。
【0041】
その後、同図に示すように、壁部29および柱部123の上部間に、主蒸気配管室60の上部の床部および梁部を構築するために、主蒸気管室ユニット80の上部に配設されたデッキプレート88上に床鉄筋130を配筋するとともに、梁鉄筋(図示外)を配筋する。そして、コンクリート型枠132、134を配置した後、コンクリートを打設して、その後、コンクリート型枠132、134を解体することにより、主蒸気配管室60の上部床部および梁部を構築する。
【0042】
図14に、主蒸気配管室60の上部床部40および梁部41が構築された様子を示す。そして、同図に示すように、塗装等の仕上工事を行うとともに、作業用足場6、98の解体を行って当該作業場から撤去する。また、MS配管24には、配管42等の関係配管の接続を行うとともに、主蒸気配管室60内の上部にダクト46を配設するなどして、主蒸気管室60の構築が全て完了する。
【0043】
以上このような主蒸気管室60の構築工法によれば、主蒸気管室60の上部のMS配管24が設置される躯体部分をユニット化し、予め別の場所で組み立てるから、工期の短縮を図ることができるとともに、MS配管24の設置工事と、主蒸気管室60の構築工事との輻輳も解消することができる。これにより、作業を効率的に行うことができ、作業工程の複雑化の回避や仮設工事量の軽減、配置調整の簡略化を達成することができる。
【0044】
そして、このように主蒸気管室60の工期が短縮されることで、主蒸気管室60を構築した後に実施する諸試験等の各種作業、例えば、主蒸気管の耐圧試験や冷態機能試験(CHT)、温態機能試験(HFT)、原子炉格納容器耐圧漏洩率試験(LRT)、燃料装荷(C/L)、起動試験(加熱試験、出力上昇・負荷試験)などについては、早期に実施することができ、プラントの稼働開始時期を早めることが可能である。
【0045】
【発明の効果】
本発明によれば、主蒸気管室を区画形成する躯体の骨組みに主蒸気配管を設置して主蒸気管室ユニットを製作し、この主蒸気管室ユニットを主蒸気管室の構築予定位置に据え付けるから、主蒸気管室の構築作業と主蒸気配管の設置作業とが輻輳せずに済み、作業を効率的に行え、工期の短縮を図ることができる。
【図面の簡単な説明】
【図1】本発明に係る構築工法により構築される主蒸気管室を有する原子炉建屋を備えた原子力発電施設の一実施形態を示した縦断面図である。
【図2】本発明に係る構築工法により構築される原子炉建屋の主蒸気管室の一実施形態を示した縦断面図である。
【図3】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図4】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図5】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図6】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図7】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図8】本発明に係る原子炉建屋の主蒸気管室の構築工法で構築される主蒸気管室ユニットの一実施形態を示した斜視図である。
【図9】本発明に係る原子炉建屋の主蒸気管室の構築工法で構築される主蒸気管室ユニットの組立手順の一例を説明する図である。
【図10】本発明に係る原子炉建屋の主蒸気管室の構築工法で構築されるユニットの組立て場所と設置場所との関係を説明する図である。
【図11】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図12】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図13】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図14】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図15】本実施形態に係る原子炉建屋の主蒸気管室の構築工法を説明する図である。
【図16】従来の原子炉建屋の主蒸気管室の構築工法の一例を説明する図である。
【図17】従来の原子炉建屋の主蒸気管室の構築手順の一例を説明する図である。
【図18】従来の原子炉建屋の主蒸気管室の構築手順の一例を説明する図である。
【図19】従来の原子炉建屋の主蒸気管室の構築手順の一例を説明する図である。
【図20】従来の原子炉建屋の主蒸気管室の構築手順の一例を説明する図である。
【図21】従来の原子炉建屋の主蒸気管室の構築手順の一例を説明する図である。
【符号の説明】
2 床部 4 主給水配管(FW配管)
6 作業用足場 8 壁鉄筋
10 壁用鉄筋架台 12 コンクリート型枠
24 主蒸気配管(MS配管) 29 壁部
40 上部床部 41 梁部
46 ダクト 50 原子炉建屋
52 タービン建屋 54 原子炉格納容器
56 タービン発電装置 60 主蒸気管室
70 柱鉄筋 72 柱用鉄筋架台
80 主蒸気管室ユニット 81 骨組み
82 壁用鉄筋架台 84 柱用鉄筋架台
86 MS配管支持用鉄骨材 88 デッキプレート
90 梁部材 91 小梁部材
92 柱鉄筋 94 グレーチング
96 歩廊鉄骨 98 作業用足場
100 ワイヤー 102 枠体 123 柱部
[0001]
TECHNICAL FIELD OF THE INVENTION
The present invention relates to a method for constructing a main steam pipe room in which a main steam pipe extending from a containment vessel of a reactor building is installed.
[0002]
[Prior art]
The nuclear power plant has a reactor building and a turbine building. The reactor building is provided with various facilities related to the reactor vessel, such as a reactor vessel, for example, a central control room. Further, the turbine building is provided with various facilities related to the turbine generator, including the turbine generator. A pipe called a main steam pipe is arranged between the reactor building and the turbine building to connect the two. The main steam pipe is a pipe for sending steam generated in the reactor vessel in the reactor containment vessel of the reactor building to the turbine building. In the reactor building, a room called a main steam pipe room in which the main steam pipe is installed is provided adjacent to the containment vessel.
[0003]
In the construction of such a nuclear power plant, in order to carry out various tests of the entire plant, including the reactor containment vessel and the turbine building, at an early stage, facilities such as piping were installed in parallel with the construction of the building. A first-come-first-served method has been implemented in which equipment is installed first and equipment-related electromechanical work is performed. The main steam pipe room is no exception, and the electromechanical work to install the main steam pipes first is carried out in parallel with the construction of the main steam pipe room.
[0004]
15 to 21 illustrate an example of a conventional procedure for constructing a main steam pipe room. Here, in addition to the main steam pipe (hereinafter also referred to as MS pipe), a main water supply pipe (hereinafter also referred to as FW pipe) is installed in the main steam pipe chamber. In the case of constructing the main steam pipe room, first, as shown in FIG. 15, concrete is poured into the construction position of the main steam pipe room to construct the floor 2, and on the constructed floor 2, First, the FW pipe 4 is installed at a predetermined position. Next, as shown in FIG. 16, a work scaffold 6 is installed on the floor 2, and the wall scaffold 8 for constructing the wall of the main steam pipe room by using the work scaffold 6, A reinforcing bar base 10 for holding the wall reinforcing bar 8 is installed. Further, a concrete formwork 12 is arranged around the wall reinforcing bar 8 and the reinforcing bar base 10 so as to surround them. Thereafter, concrete is poured into the placed concrete formwork 12, and after the poured concrete is sufficiently hardened, the concrete formwork 12 is dismantled to construct a first-stage wall portion.
[0005]
Next, as shown in FIG. 17, the concrete formwork 12 is arranged on the upper portion of the constructed first-stage wall portion 14 so as to surround the wall reinforcing bar 8 and the reinforcing bar base 10 protruding from the upper portion. Then, concrete is poured into the placed concrete formwork 12. After the concrete is hardened, the concrete formwork 12 is dismantled to construct the second-stage wall.
[0006]
Furthermore, as shown in FIG. 18, a higher working scaffold 6 is installed, and by using the working scaffold 6, the wall reinforcing bar 8 and the reinforcing bar base 10 And another work scaffold 20 having a lower height than the work scaffold 6 is installed between the work scaffolds 6. Then, using the work scaffolds 6 and 20, a steel pipe material 22 for supporting the MS pipe is installed between the left and right walls 18 to support the MS pipe. The steel member 22 for supporting the MS pipe is supported by a support portion (not shown) installed in the wall portions 14 and 18 separately from the reinforcing bar base 10 that holds the wall reinforcing bar 8 described above.
[0007]
Further, as shown in the figure, similarly to the case of constructing the first and second-stage wall portions 14 and 18, the wall reinforcing bar 8 and the reinforcing bar base 10 installed above the second-stage wall portion 18 are provided. The concrete formwork 12 is set so as to surround the concrete formwork, concrete is poured into the concrete formwork form 12, and after the concrete is hardened, the concrete formwork form 12 is dismantled, and as shown in FIG. Build the eye and fourth tier walls. Thus, the construction of the left and right walls 29 of the main steam pipe chamber 60 is completed. Further, the MS pipe 24 is firstly placed on the installed MS pipe supporting steel frame member 22 and is installed at a predetermined position.
[0008]
Next, as shown in FIG. 20, a deck plate 30 and a beam member 32 for constructing the upper floor of the main steam pipe chamber 60 are installed between the left and right walls 29. When the deck plate 30 or the beam member 32 is installed, as shown in FIG. Further, on the deck plate 30, a floor reinforcing bar 36 for constructing an upper floor portion of the main steam pipe room 60 is provided. After that, the concrete formwork 38 is installed, concrete is poured into the concrete formwork 38, and after the concrete is hardened, the concrete formwork 38 is dismantled, and the upper floor 40 as shown in FIG. To construct.
[0009]
After that, as shown in the figure, various pipes 42 and the like are connected to the MS pipe 24, valves and the like are installed, the columns 34 are removed, and the main steam chamber pipe has a corridor steel frame or the like. Work to install grating 44, duct 46, etc. is performed. Thereafter, the work scaffolds 6 and 20 are removed, and the construction of the main steam pipe room 60 is completed.
[0010]
[Patent Document 1]
Japanese Patent No. 3283735 (pages 1-5, FIG. 3-7)
[0011]
[Patent Document 2]
Japanese Patent No. 2873139 (pages 1-6, FIG. 1-6)
[0012]
[Patent Document 3]
JP-A-61-53963 (page 1-2, FIG. 1-4)
[0013]
[Patent Document 4]
JP-A-61-270437 (page 1-2, FIG. 1-4)
[0014]
[Problems to be solved by the invention]
Such a construction method has the following problems. That is, when installing the steel pipe material 22 for supporting the MS pipe, it is necessary to install the support portion for supporting the steel pipe material 22 for supporting the MS pipe in the walls 14 and 18 separately from the reinforcing bar base. It took time to adjust the arrangement. In addition, when the steel pipe material 22 for supporting the MS pipe is installed, it is necessary to replace the work scaffolds in order to provide the work scaffolds required for the installation work. In addition, the work process becomes longer and the work is performed in a narrow part, so that the work is very difficult.
[0015]
In addition, when installing the MS pipe 24, it is necessary to replace the work scaffolding, which leads to an increase in the amount of temporary construction work, resulting in a longer work process as a whole, and work in a very narrow place. It was very difficult to work.
[0016]
In addition, when installing a support such as a pillar for supporting a deck plate, a beam member, or the like, the FW pipe, the MS pipe, and the work scaffolding are obstructive, and the arrangement adjustment takes time and effort, and the FW pipe or the MS is required. In order to avoid interference with the piping, there has been a problem that the amount of support such as columns is increased. In addition, since the work was performed in a very narrow space, it was difficult to assemble, dismantle, and carry in and out the shoring work.
[0017]
Furthermore, when installing a corridor steel frame or grating, etc., the work must be performed with the FW pipe and the MS pipe already installed, and the work is performed in a very narrow place, resulting in a decrease in work efficiency. Was. Also, it was difficult to carry in the work such as the corridor steel frame or grating.
[0018]
In other words, the construction work to build the main steam pipe room is carried out by first-in-take construction method in which equipment such as piping is installed first and equipment-related electromechanical work is performed in parallel with building construction work. Installation work related to equipment such as FW pipes and MS pipes is congested, which causes problems such as complicated work processes, an increase in the amount of temporary work, difficulty in arrangement adjustment, and a decrease in work efficiency. Was causing a delay.
[0019]
The related work on the main steam pipe room is critical in the construction work of the entire reactor facility, since the trial operation of the entire reactor facility cannot be performed until the work is completed, and strict processes must be observed. However, the delay in the construction of the main steam pipe room had a great effect on the construction of the entire reactor facility.
[0020]
The present invention has been made in view of such circumstances, and an object of the present invention is to construct a main steam pipe room and install a main steam pipe efficiently without congestion. It is an object of the present invention to provide a method for constructing a main steam pipe room of a reactor building capable of performing the above.
[0021]
[Means for Solving the Problems]
In order to achieve such an object, in the method for constructing a main steam pipe room of a reactor building according to the present invention, a main steam pipe in which a main steam pipe extending from a reactor containment vessel of the reactor building is installed. A method of constructing a pipe room, comprising assembling a skeleton of a frame constituting the main steam pipe room, attaching the main steam pipe to the skeleton to produce a main steam pipe room unit, and The main steam pipe room is constructed by being installed at a position where the main steam pipe room is to be constructed.
[0022]
In such a construction method, a main steam pipe unit is manufactured by installing a main steam pipe in a skeleton of a frame forming a main steam pipe chamber, and this main steam pipe chamber unit is used as a main steam pipe chamber. Since the installation work is installed at the scheduled construction position, the construction work of the main steam pipe room and the installation work of the main steam pipe can be prevented from being congested, the work can be performed efficiently, and the construction period can be shortened.
[0023]
Further, in the construction method of the main steam pipe room of the nuclear reactor building, the main steam pipe room unit includes a reinforcing bar base for holding at least one of a reinforcing bar for a wall and a reinforcing bar for a column of the skeleton. May be provided. In addition, the main steam pipe room unit may be provided with a deck plate constituting a floor of the skeleton. By providing the reinforcing bar base or deck plate in the main steam pipe room unit, the installation operation of the reinforcing bar base or the deck plate at the site can be simplified, and the operation can be performed efficiently.
[0024]
Further, in the construction method of the main steam pipe room of the reactor building, the main steam pipe room unit may be provided with a steel frame member for supporting the main steam pipe. If such a steel member is provided, the main steam pipe can be sufficiently supported.
[0025]
Further, in the construction method of the main steam tube room of the reactor building, the main steam tube room unit may be lifted by a crane and installed at the planned construction position. By using the crane in this way, the main steam pipe room unit can be easily installed.
[0026]
BEST MODE FOR CARRYING OUT THE INVENTION
An embodiment of a method for constructing a main steam pipe room of a reactor building according to the present invention will be described below with reference to the accompanying drawings. The same components as those of the conventional example shown in FIGS. 15 to 21 are denoted by the same reference numerals.
[0027]
FIG. 1 is a longitudinal sectional view showing the internal structure of a nuclear power plant having a reactor building having a main steam pipe room constructed by the construction method according to the present embodiment. This nuclear power plant is a pressurized water nuclear power plant, and includes a reactor building 50 and a turbine building 52. The reactor building 50 is provided with various facilities related to the reactor containment vessel 54, such as the reactor containment vessel 54. Further, the turbine building 52 is provided with various facilities related to the turbine generator 56, including the turbine generator 56. A pipe (not shown) called a main steam pipe is arranged between the reactor building 50 and the turbine building 52 to connect them. The main steam pipe is a pipe for sending steam generated by the steam generator in the reactor containment vessel of the reactor building 54 to the turbine building 52. In a building 58 provided adjacent to the containment vessel 54, a room 60 called a main steam pipe room in which a main steam pipe is installed is provided at an uppermost portion (a portion of a round frame A in the figure). ing.
[0028]
FIGS. 2A and 2B show the structure of the main steam pipe chamber 60 in detail. FIG. 2A is a cross-sectional view when the main steam pipe chamber 60 is viewed from the front, and FIG. 2B is a cross-sectional view when the main steam pipe chamber 60 is viewed from the side. In the present embodiment, as shown in FIGS. 2A and 2B, the main steam pipe room 60 has, for example, a space of 21 m in width × 20 m in depth × 14 m in height inside the concrete frame 59 of the building 58. It is defined as a department. Four main steam pipes 24 (hereinafter, also referred to as MS pipes) are provided above the main steam pipe chamber 60, and four main water supply pipes 4 (hereinafter, also referred to as MS pipes) below the main steam pipe chamber 60. , FW piping). The MS pipe 24 is installed on the MS pipe supporting steel frame member 22 erected at the center in the height direction of the main steam pipe chamber 60, and the FW pipe 4 is installed on the floor 62 of the main steam pipe chamber 60. Have been. The MS pipe 24 and the FW pipe 4 extend into the containment vessel 54 as shown in FIG. In the space between the MS pipe 24 and the FW pipe 4, a corridor steel frame 64 is installed.
[0029]
An example of a construction method of such a main steam pipe room 60 will be described. 3 to 14 are diagrams illustrating an example of the construction method. In this construction method, first, as in the prior art, as shown in FIG. 3, concrete is poured into the construction position of the main steam pipe room 60 to construct the floor 2, and the FW is placed on the constructed floor 2. First, the pipe 4 is installed at a predetermined position.
[0030]
Next, as shown in FIG. 4, a work scaffold 6 is installed on the floor 2, and the wall scaffold 6 is used to construct a wall or a pillar of the main steam pipe room 60 using the work scaffold 6. 8 and a column reinforcing bar 70, and a wall reinforcing bar base 10 and a column reinforcing bar base 72 for holding the wall reinforcing bar 8 or the column reinforcing bar 70. The reinforcing bars 10 and 72 are provided because, in order to enhance the safety of the building, large-diameter reinforcing bars are used as wall reinforcing bars and column reinforcing bars. It is necessary to do it. Further, concrete formwork 12, 74 is arranged around the wall reinforcing bar 8 or the column reinforcing bar 70 and the reinforcing bar bases 10, 72 so as to surround them. Then, concrete is poured into the placed concrete forms 12, 74, and after the poured concrete is sufficiently hardened, the concrete forms 12, 74 are dismantled, and the first-stage walls and columns are removed. Construction of the division is completed.
[0031]
Next, as shown in FIG. 5, concrete is formed on the upper part of the constructed first-stage wall portion 14 and column portion 76 so as to surround the wall reinforcing bar 8, the column reinforcing bar 70, and the reinforcing bar bases 10, 72 protruding from the upper portion. The molds 12, 74 are arranged. Then, concrete is poured into the arranged concrete forms 12 and 74. After the concrete is hardened, the concrete forms 12, 74 are dismantled, and as shown in FIG. 6, the construction of the second-stage wall 18 and the column 78 is completed.
[0032]
Up to this point, the construction work proceeds according to the same procedure as the conventional construction method. In the present embodiment, thereafter, the construction work proceeds according to a procedure different from the conventional construction method. That is, as shown in FIG. 7, a unit 80 (corresponding to the main steam pipe room unit in the present invention) manufactured in advance is placed above the first and second-stage walls 14, 18 and the pillars 76, 78. It is set up. This unit 80 is a unit manufactured for constructing the upper part of the main steam pipe chamber 60, and for constructing the wall and the column to be constructed above the second-stage wall 18 and the column 78. Reinforcement bases 82 and 84 for holding the wall or column reinforcer, MS pipe support steel frame 86 for supporting the MS pipe 24, and a deck for constructing the upper floor of the main steam pipe chamber 60 A plate 86 and a beam member 90 for supporting the deck plate 88 are provided. In addition, in the present embodiment, the MS pipe 24 is installed at a predetermined position on the MS pipe supporting steel frame material 86, and the column reinforcing bar 84 is provided with a column reinforcing bar 92. ing. Further, inside the unit 80, a grating 94, a corridor steel frame 96, and a work scaffold 98 are provided.
[0033]
FIG. 8 is a perspective view showing the entire main steam pipe room unit 80. As shown in the figure, the main steam pipe room unit 80 supports the reinforcing steel gantry 82, 84 for holding the wall reinforcing steel or the column reinforcing steel used for constructing the wall and the column, and the MS pipe 24. And a frame 81 composed of a steel member 86 for supporting MS pipes and a beam member 90. A deck plate 88 constituting the upper floor of the main steam pipe chamber 60 is provided above the frame 81, and a plurality of small beam members 91 are provided between the beam members 90 below the deck plate 88. Have been. Further, a grating 94 is laid below the frame 81, and the MS pipe 24 is arranged on the grating 94. In addition, the frame 81 is provided with a corridor steel frame 96 and a work scaffold 98, and is constructed as one large block.
[0034]
As shown in the figure, the main steam pipe chamber unit 80 is connected with a rectangular frame 102 formed above the unit 80 via a wire 100 as a hanger above the unit 80 as a hanger. , And is installed by being lifted by a crane or the like via the frame 102.
[0035]
FIG. 9 illustrates an example of a method of manufacturing the main steam pipe room unit 80. When the main steam pipe unit 80 is manufactured, first, as shown in FIG. 3A, a reinforcing bar base for holding the wall reinforcing bar and the column reinforcing bar at a position corresponding to the wall portion and the column portion is provided. The steel members 82 and 84 are erected. A supporting steel frame 86 for supporting the MS pipe 24 is installed between the lower ends of the standing steel frames 82 and 84.
[0036]
Next, as shown in FIG. 9B, a grating 94 is installed on the MS pipe supporting steel frame 86, and the MS pipe 24 is installed on the grating 94. Next, as shown in FIG. 9C, a steel frame material 90 for a girder is erected between the upper end portions of the steel frame members 82 and 84 serving as a reinforcing bar base for holding a wall reinforcing bar or a column reinforcing bar. A deck plate 88 for constructing the upper floor of the MS piping room 60 is installed above the steel frame material 90. The deck plate 88 is installed in a portion other than a portion where the deck plate 88 is engaged with a wall or a pillar. On the lower surface side of the deck plate 88, a steel beam material 91 for a small beam to be a receiving beam is provided between the steel beam materials 90 for a large beam. Further, the column reinforcement 92 is attached to the reinforcing bar base 84 for holding the column reinforcement at the center so as to surround the periphery thereof. Then, as shown in FIG. 9 (d), in order to be lifted by a crane or the like and transported to a position where the main steam pipe room is to be constructed, a rectangular frame body 102 serving as a hanging tool is mounted on the main steam pipe room unit 80. The connection is made via a wire 100. In the present embodiment, the weight of the main steam pipe chamber unit 80 is about 440 t.
[0037]
FIG. 10 shows a relationship between a place where the main steam pipe room unit 80 is manufactured, that is, a ground site, and an actual installation position of the main steam pipe room unit 80, that is, a planned construction position of the main steam pipe room 60. It is a top view. The production position 110 of the main steam pipe room unit 80 is set near the planned construction position 112 of the main steam pipe room 60, and can be easily transferred by the crane 114. The crane 114 is installed between the production position 110 and the planned installation position 112. The main steam pipe room unit 80 is transferred by the crane 114 from the production position 110 to the planned installation position 112 at an appropriate timing according to the progress of the construction work of the main steam pipe room 60. Then, the transferred main steam pipe chamber unit 80 is installed above the second-stage wall portion 18 and the column portion 78 as shown in FIG.
[0038]
After the installation of the main steam pipe room unit 80 is completed, as shown in FIG. Here, the wall reinforcing bar 8 is attached to the reinforcing bar base 82 of the main steam pipe room unit 80 using the work scaffold 98 installed in the main steam pipe room unit 80, and the wall reinforcing bars 8 of the second-stage wall portion 18 are provided. Perform connection work with. In addition, the connection between the column reinforcing bar 92 attached to the main steam pipe room unit 80 and the column reinforcing bar 92 of the second column portion 78 is performed. After that, concrete forms 12, 74 are arranged around the wall reinforcing bar 8, the column reinforcing bar 92, and the reinforcing bars 82, 84, respectively, and concrete is poured into the concrete forms 12, 74. After the concrete is hardened, the concrete forms 12, 74 are dismantled to complete the construction of the third-stage walls and columns.
[0039]
Next, as shown in FIG. 12, the concrete form 12 is formed on the upper part of the third-stage wall portion 26 and the column portion 120 so as to surround the wall reinforcing bar 8, the column reinforcing bar 92, and the reinforcing bar bases 82 and 84 protruding from the upper portion. , 74 are arranged. Concrete is poured into the concrete forms 12 and 74, and after the concrete is hardened, the concrete forms 12 and 74 are dismantled to construct the fourth-stage walls and columns.
[0040]
FIG. 13 shows a state where the fourth-stage wall 28 and the pillar 122 are constructed. With the construction of the fourth-stage wall 28 and the pillar 122, the construction of the wall 29 and the pillar 123 constituting the main steam piping chamber 60 is all completed.
[0041]
Thereafter, as shown in the figure, between the upper part of the wall part 29 and the pillar part 123, in order to construct the floor part and the beam part of the upper part of the main steam pipe chamber 60, it is arranged above the main steam pipe chamber unit 80. Floor reinforcing bars 130 are arranged on the deck plate 88 provided, and beam reinforcing bars (not shown) are arranged. Then, after placing the concrete forms 132 and 134, concrete is poured and then the concrete forms 132 and 134 are dismantled to construct the upper floor portion and the beam portion of the main steam pipe room 60.
[0042]
FIG. 14 shows a state in which the upper floor section 40 and the beam section 41 of the main steam piping chamber 60 have been constructed. Then, as shown in the figure, finishing work such as painting is performed, and the work scaffolds 6, 98 are dismantled and removed from the work place. In addition, the MS pipe 24 is connected to related pipes such as the pipe 42, and the duct 46 is disposed at an upper portion in the main steam pipe chamber 60, so that the construction of the main steam pipe chamber 60 is completed. .
[0043]
According to the construction method of the main steam pipe chamber 60 as described above, the frame portion on which the MS pipe 24 above the main steam pipe chamber 60 is installed is unitized and assembled in another place in advance, thereby shortening the construction period. In addition, the congestion between the installation work of the MS pipe 24 and the construction work of the main steam pipe room 60 can be eliminated. Accordingly, the work can be performed efficiently, and the complexity of the work process can be avoided, the amount of temporary construction work can be reduced, and the arrangement adjustment can be simplified.
[0044]
By shortening the construction period of the main steam pipe chamber 60 in this way, various operations such as various tests performed after the main steam pipe chamber 60 is constructed, for example, a pressure test and a cold function test of the main steam pipe. (CHT), hot function test (HFT), reactor containment pressure resistance leak rate test (LRT), fuel loading (C / L), start-up test (heating test, output rise / load test), etc. It can be implemented and the operation start time of the plant can be advanced.
[0045]
【The invention's effect】
According to the present invention, a main steam pipe unit is manufactured by installing a main steam pipe in a skeleton of a frame forming a main steam pipe chamber, and the main steam pipe unit is placed at a position where the main steam pipe chamber is to be constructed. Since the installation is performed, the construction work of the main steam pipe room and the installation work of the main steam pipe do not need to be congested, the work can be performed efficiently, and the construction period can be shortened.
[Brief description of the drawings]
FIG. 1 is a longitudinal sectional view showing an embodiment of a nuclear power plant having a reactor building having a main steam pipe room constructed by a construction method according to the present invention.
FIG. 2 is a longitudinal sectional view showing one embodiment of a main steam pipe room of a reactor building constructed by a construction method according to the present invention.
FIG. 3 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 4 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 5 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 6 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 7 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 8 is a perspective view showing an embodiment of a main steam tube room unit constructed by a construction method of a main steam tube room of a reactor building according to the present invention.
FIG. 9 is a diagram illustrating an example of an assembling procedure of a main steam tube room unit constructed by a method of constructing a main steam tube room of a reactor building according to the present invention.
FIG. 10 is a diagram illustrating a relationship between an assembly location and an installation location of a unit constructed by a construction method of a main steam pipe room of a reactor building according to the present invention.
FIG. 11 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 12 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 13 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 14 is a diagram illustrating a construction method of a main steam pipe room of a reactor building according to the present embodiment.
FIG. 15 is a diagram illustrating a method of constructing a main steam pipe room of a reactor building according to the present embodiment.
FIG. 16 is a diagram illustrating an example of a conventional construction method of a main steam pipe room of a reactor building.
FIG. 17 is a diagram illustrating an example of a conventional procedure for constructing a main steam pipe room of a reactor building.
FIG. 18 is a diagram illustrating an example of a conventional procedure for constructing a main steam pipe room of a reactor building.
FIG. 19 is a diagram illustrating an example of a conventional procedure for constructing a main steam pipe room of a reactor building.
FIG. 20 is a diagram illustrating an example of a conventional procedure for constructing a main steam pipe room of a reactor building.
FIG. 21 is a view for explaining an example of a conventional procedure for constructing a main steam pipe room of a reactor building.
[Explanation of symbols]
2 Floor 4 Main water supply pipe (FW pipe)
Reference Signs List 6 work scaffolding 8 wall reinforcing bar 10 wall reinforcing bar base 12 concrete formwork 24 main steam pipe (MS pipe) 29 wall section 40 upper floor section 41 beam section 46 duct 50 reactor building 52 turbine building 54 reactor containment vessel 56 turbine Power generator 60 Main steam pipe room 70 Pillar reinforcement 72 Pillar reinforced frame 80 Main steam pipe room unit 81 Skeleton 82 Wall reinforced frame 84 Column reinforced steel frame 86 Steel pipe material for MS pipe support 88 Deck plate 90 Beam member 91 Small beam member 92 Pillar reinforcement 94 Grating 96 Corridor steel frame 98 Scaffolding for work 100 Wire 102 Frame 123 Column

Claims (5)

原子炉建屋の原子炉格納容器から延出される主蒸気配管が設置される主蒸気管室の構築工法であって、
前記主蒸気管室を構成する躯体の骨組みを組み立てて、当該骨組みに前記主蒸気配管を取り付けて主蒸気管室ユニットを製作し、この主蒸気管室ユニットを前記主蒸気管室の構築予定位置に据え付けて、前記主蒸気管室を構築することを特徴とする原子炉建屋の主蒸気管室の構築工法。
A method of constructing a main steam pipe room in which main steam pipes extending from a reactor containment vessel of a reactor building are installed,
Assembling a skeleton of a main body constituting the main steam pipe room, attaching the main steam pipe to the skeleton to produce a main steam pipe room unit, and placing the main steam tube room unit at a scheduled position of the main steam pipe room And constructing the main steam pipe room by installing the main steam pipe room in a reactor building.
前記主蒸気管室ユニットには、前記躯体の壁用鉄筋または柱用鉄筋の少なくともいずれか一方を保持するための鉄筋架台が設けられていることを特徴とする請求項1に記載の原子炉建屋の主蒸気管室の構築工法。2. The reactor building according to claim 1, wherein the main steam pipe room unit is provided with a reinforcing bar base for holding at least one of a wall reinforcing bar and a column reinforcing bar of the skeleton. 3. Construction method of main steam room. 前記主蒸気管室ユニットには、前記躯体の床部を構成するデッキプレートが設けられていることを特徴とする請求項1または2に記載の原子炉建屋の主蒸気管室の構築工法。3. The method according to claim 1, wherein the main steam pipe room unit is provided with a deck plate constituting a floor portion of the skeleton. 4. 前記主蒸気管室ユニットには、前記主蒸気配管を支持するための鉄骨部材が設けられていることを特徴とする請求項1〜3のいずれか1項に記載の原子炉建屋の主蒸気管室の構築工法。The main steam pipe of a reactor building according to any one of claims 1 to 3, wherein the main steam pipe chamber unit is provided with a steel member for supporting the main steam pipe. Room construction method. 前記主蒸気管室ユニットをクレーンにより吊り上げて前記構築予定位置に据え付けることを特徴とする請求項1〜4のいずれか1項に記載の原子炉建屋の主蒸気管室の構築工法。The method for constructing a main steam pipe room of a reactor building according to any one of claims 1 to 4, wherein the main steam pipe room unit is lifted by a crane and installed at the planned construction position.
JP2002338498A 2002-11-21 2002-11-21 Method for constructing main steam pipe room in nuclear reactor building Withdrawn JP2004170319A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002338498A JP2004170319A (en) 2002-11-21 2002-11-21 Method for constructing main steam pipe room in nuclear reactor building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002338498A JP2004170319A (en) 2002-11-21 2002-11-21 Method for constructing main steam pipe room in nuclear reactor building

Publications (1)

Publication Number Publication Date
JP2004170319A true JP2004170319A (en) 2004-06-17

Family

ID=32701716

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002338498A Withdrawn JP2004170319A (en) 2002-11-21 2002-11-21 Method for constructing main steam pipe room in nuclear reactor building

Country Status (1)

Country Link
JP (1) JP2004170319A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011064580A (en) * 2009-09-17 2011-03-31 Toshiba Corp Floor construction method in machinery preceding conveyance area in nuclear power plant
JP2016003472A (en) * 2014-06-16 2016-01-12 株式会社日立プラントコンストラクション Suspended scaffolding and installation method using the same

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2011064580A (en) * 2009-09-17 2011-03-31 Toshiba Corp Floor construction method in machinery preceding conveyance area in nuclear power plant
JP2016003472A (en) * 2014-06-16 2016-01-12 株式会社日立プラントコンストラクション Suspended scaffolding and installation method using the same

Similar Documents

Publication Publication Date Title
EA006995B1 (en) Method and apparatus for precast and framed block element construction
JP2750368B2 (en) Construction method of reactor containment top slab
JP2004170319A (en) Method for constructing main steam pipe room in nuclear reactor building
JP4476096B2 (en) Construction method of large high-rise wind farm
JPH11337675A (en) Reactor containment vessel and its construction method
JP2001173227A (en) Slipping form device
JP2001295404A (en) Method for driving hollow pipe into reinforced permanent form
JP4273446B2 (en) PC building construction method applicable to narrow site
JP2003313860A (en) Vertical shaft rebar assembling method and assembling apparatus
JP5375174B2 (en) Construction method of column beam frame
JP7296175B1 (en) Remaining formwork used for construction of foot protection or bed protection
JP7151961B2 (en) Piping installation structure and piping pit construction method
JP4005259B2 (en) How to build columns and beams
JPS6326215B2 (en)
JP4872301B2 (en) Construction method of RC structure
JPH108725A (en) Constructing method for building frame
JP3187618B2 (en) How to assemble beam reinforcement
JP2004191080A (en) Method of constructing central control room in facility for nuclear reactor
JP2018178589A (en) Construction method of foundation slab
JPH0270848A (en) Floor slab
JP2002348951A (en) Steel plate concrete structure
JP2836406B2 (en) Construction method of reinforced concrete wall using PC version
JP2009084920A (en) Steel frame erection method and suspended scaffolding unit
JP2004177197A (en) Construction method for surge tank room of nuclear reactor building
JPS61212438A (en) Manufacturing method for foundation reinforced columns

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040924

A300 Withdrawal of application because of no request for examination

Free format text: JAPANESE INTERMEDIATE CODE: A300

Effective date: 20060207