JP2003336303A - Installation method of piping unit - Google Patents

Installation method of piping unit

Info

Publication number
JP2003336303A
JP2003336303A JP2002146915A JP2002146915A JP2003336303A JP 2003336303 A JP2003336303 A JP 2003336303A JP 2002146915 A JP2002146915 A JP 2002146915A JP 2002146915 A JP2002146915 A JP 2002146915A JP 2003336303 A JP2003336303 A JP 2003336303A
Authority
JP
Japan
Prior art keywords
frame
attached
piping unit
mounting member
pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2002146915A
Other languages
Japanese (ja)
Inventor
Yukahiko Fujiwara
由香彦 藤原
Kazuhiro Ito
和洋 伊藤
Tomoaki Hagi
知明 萩
Yoshichika Tanaka
義親 田中
Takashi Fukumura
貴司 福村
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inax Corp
Shimizu Construction Co Ltd
Shimizu Corp
Original Assignee
Inax Corp
Shimizu Construction Co Ltd
Shimizu Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inax Corp, Shimizu Construction Co Ltd, Shimizu Corp filed Critical Inax Corp
Priority to JP2002146915A priority Critical patent/JP2003336303A/en
Publication of JP2003336303A publication Critical patent/JP2003336303A/en
Pending legal-status Critical Current

Links

Landscapes

  • Domestic Plumbing Installations (AREA)
  • Sink And Installation For Waste Water (AREA)
  • Supports For Pipes And Cables (AREA)
  • Sanitary Device For Flush Toilet (AREA)

Abstract

<P>PROBLEM TO BE SOLVED: To provide a method of installation of a piping unit, by which a drain pipe is transported in a stable condition and is mounted to a frame easily at a construction site. <P>SOLUTION: The drain pipe 3, having mounting members 12, 12 which are mounted in advance, is transported so that the piping unit may be structured at the construction site by mounting the drain pipe 3 to the frame 2 with intervention of the mounting member 12. <P>COPYRIGHT: (C)2004,JPO

Description

【発明の詳細な説明】Detailed Description of the Invention

【0001】[0001]

【発明の属する技術分野】この発明は、配管ユニットの
施工方法に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a piping unit.

【0002】[0002]

【従来の技術及び発明が解決しようとする課題】従来、
例えば図15に示すような便器用の配管ユニット1にお
いては、フレーム2内に排水管3,給水管4,通気管
5,脱臭管6が組み付けられており、フレーム2の前面
に前板7を取り付け、フレーム2のプレート部8に対し
便器9を接続して設置できるように構成されている。し
かし、この図15のような配管ユニット1では、極めて
大型のものとなり、現場への輸送が制限されるため、フ
レーム2と排水管3,給水管4等を分離して別々に輸送
し、現場で組み付ける施工方法が提案されている。
2. Description of the Related Art Conventionally, the problems to be solved by the invention
For example, in a piping unit 1 for a toilet as shown in FIG. 15, a drain pipe 3, a water supply pipe 4, a ventilation pipe 5, and a deodorizing pipe 6 are assembled in a frame 2, and a front plate 7 is attached to the front surface of the frame 2. It is configured so that it can be attached and connected to a toilet bowl 9 with respect to the plate portion 8 of the frame 2. However, since the piping unit 1 as shown in FIG. 15 is extremely large and the transportation to the site is limited, the frame 2 and the drainage pipe 3, the water supply pipe 4, etc. are separated and transported separately. A construction method for assembling is proposed.

【0003】例えば、排水管3は図16に示すような形
態に工場で製造されて、現場へ向けて輸送される。すな
わち、図16では、底側フレーム2aに所定間隔で固設
したプレート部8,8,8に、高さ調整長孔8a,8a
を介して高さ調整して排水管3を固定し、このような状
態で現場へ輸送した後に、現場において高さ調整ボルト
10,10を調整して設置するように構成されている。
なお、図16のような状態で輸送する場合においても、
加工工数が大で、部品点数も大となってしまい、重く、
嵩張るものとなり、さらには、工場で高さ調整を行い、
現場でも高さ調整を行う必要があり、施工に手間が掛か
るという問題点があった。
For example, the drainage pipe 3 is manufactured in a factory in a form as shown in FIG. 16 and transported to the site. That is, in FIG. 16, the height adjusting elongated holes 8a, 8a are formed in the plate portions 8, 8, 8 fixed to the bottom frame 2a at predetermined intervals.
The height of the drainage pipe 3 is fixed by adjusting the height of the drainage pipe 3, and after being transported to the site in such a state, the height adjusting bolts 10, 10 are adjusted and installed at the site.
Even in the case of transportation in the state shown in FIG. 16,
The processing man-hour is large, the number of parts is also large, and it is heavy,
It becomes bulky, and further, the height is adjusted at the factory,
It is necessary to adjust the height even at the site, and there is a problem that the construction is troublesome.

【0004】また、例えば給水管4を現場の壁に取り付
ける際に、従来においては、専用の固定プレートや壁固
定材を用いており、それらの固定プレート等を別個製作
する必要があり、コスト高となってしまうという問題点
があった。また、そのような専用の固定プレート等を用
いることなく、バンドで壁面に直接給水管4等を取り付
ける施工方法も採用されているが、この場合は、図17
の平面図で、また図18の縦断面図で示すように、現場
の壁110は石膏ボード111の裏側に軽量鉄骨11
2,112,112が間隔をおいて設けられており、こ
の軽量鉄骨112,112,112の位置をねらって、
バンド113をビス114,114で軽量鉄骨112,
112,112に固定し、給水管4を壁110に取り付
ける必要があり、軽量鉄骨112,112,112が存
在しない部位では、ビス114が効かず、給水管4等の
施工が困難となるという問題点があった。
Further, for example, when the water supply pipe 4 is attached to a wall at the site, conventionally, a dedicated fixing plate or wall fixing material is used, and it is necessary to separately manufacture those fixing plates, resulting in high cost. There was a problem that became. Further, a construction method of directly attaching the water supply pipe 4 or the like to the wall surface with a band without using such a dedicated fixing plate or the like is also adopted, but in this case, FIG.
As shown in the plan view of FIG. 18 and the vertical sectional view of FIG. 18, the site wall 110 has a light steel frame 11 on the back side of the gypsum board 111.
2, 112, 112 are provided at intervals, aiming at the position of the lightweight steel frames 112, 112, 112,
Band 113 with screws 114, 114 for lightweight steel frame 112,
It is necessary to fix the water supply pipe 4 to the wall 110 by fixing the water supply pipe 112 to the wall 112, and the screw 114 does not work in a portion where the lightweight steel frames 112, 112, 112 do not exist, which makes it difficult to construct the water supply pipe 4 or the like. There was a point.

【0005】[0005]

【課題を解決するための手段】本発明は上記従来の問題
点に鑑み案出したものであって、排水管を安定した状態
で輸送でき、また、現場の壁に強固に給水管等を取り付
けて施工できる配管ユニットの施工方法を提供せんこと
を目的とし、その第1の要旨は、排水管に予め取付部材
を取り付けて輸送し、現場において前記取付部材を介し
フレームに排水管を取り付けることである。また第2の
要旨は、前記取付部材を架台として利用し、排水管のフ
ランジ部を上向きにして輸送することである。また第3
の要旨は、前記取付部材は、輸送時に架台脚となる脚部
を備えたLアングルで形成されていることである。また
第4の要旨は、前記脚部の高さが、前記取付部材を排水
管に取り付けるためのUボルトのボルト部より高くなる
ように設定されていることである。また第5の要旨は、
フレームへの取付時には排水管を回転させ、排水管のフ
ランジ部を前向きにし、該フランジ部をフレームに位置
合わせして、前記取付部材をフレームに固定することで
ある。また第6の要旨は、壁に2以上の横材を横方向に
固設し、該2以上の横材間に掛渡し状に縦方向に縦材を
固設し、該縦材に給水管を取り付けるように構成したこ
とである。また、第7の要旨は、前記給水管を取付けた
後、略L字状のフレームを壁と床に取り付け、該フレー
ムに排水管を取り付けることである。また、第8の要旨
は、前記横材と縦材が、共通の樹脂板で構成されている
ことである。
SUMMARY OF THE INVENTION The present invention has been devised in view of the above-mentioned problems of the prior art. The drainage pipe can be transported in a stable state, and a water supply pipe or the like can be firmly attached to the site wall. The purpose of the invention is not to provide a method of constructing a piping unit that can be constructed by installing a drainage pipe by attaching a mounting member in advance and transporting the drainage pipe to the frame through the mounting member on the spot. is there. A second gist is to use the mounting member as a mount and transport it with the flange portion of the drainage pipe facing upward. Also the third
The gist of is that the mounting member is formed of an L-angle having a leg portion that serves as a pedestal leg during transportation. A fourth gist is that the height of the leg portion is set to be higher than the bolt portion of the U bolt for attaching the attachment member to the drain pipe. The fifth summary is
When mounting on the frame, the drain pipe is rotated so that the flange portion of the drain pipe faces forward, the flange portion is aligned with the frame, and the mounting member is fixed to the frame. Further, a sixth gist is that two or more horizontal members are fixed to the wall in the horizontal direction, and vertical members are vertically fixed in a spanning manner between the two or more horizontal members, and the water supply pipe is attached to the vertical members. Is configured to be attached. Further, a seventh gist is that after the water supply pipe is attached, a substantially L-shaped frame is attached to a wall and a floor, and a drain pipe is attached to the frame. The eighth gist is that the horizontal member and the vertical member are made of a common resin plate.

【0006】[0006]

【発明の実施の形態】以下、本発明の実施例を図面に基
づいて説明する。図1は、配管ユニットの構成部材であ
る排水管の輸送状態の斜視構成図であり、図2は、その
正面構成図である。排水管3は、中央部に通気管5を接
続するための通気管用チーズ3aが設けられ、両端側に
は、屈曲部3b,3bが形成されて上方へ延び、それぞ
れ第1フランジ部11aと第2フランジ部11bが設け
られており、この第1フランジ部11a,第2フランジ
部11bにそれぞれ便器が接続できるように構成されて
いる。なお、小便器用では、第1フランジ部11a,第
2フランジ部11bにそれぞれ取付片19,19が突出
形成されている。フランジ部11a,11bを上向き状
態にして、破損が生じない状態で輸送するために、予め
工場で、支持バンド(Uボルト)14,14を介し取付
部材12,12が排水管3に取り付けられるものであ
る。
BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a perspective configuration diagram of a transportation state of a drainage pipe which is a component of a piping unit, and FIG. 2 is a front configuration diagram thereof. The drainage pipe 3 is provided with a ventilation pipe cheese 3a for connecting the ventilation pipe 5 at a central portion thereof, and bent portions 3b, 3b are formed on both end sides thereof to extend upward, and the first flange portion 11a and the first flange portion 11a, respectively. Two flange portions 11b are provided, and a toilet bowl can be connected to each of the first flange portion 11a and the second flange portion 11b. In the case of a urinal, mounting pieces 19 and 19 are formed on the first flange portion 11a and the second flange portion 11b, respectively. In order to transport the flanges 11a, 11b in an upward state without damage, the mounting members 12, 12 are attached to the drainage pipe 3 in advance at the factory via support bands (U bolts) 14, 14 Is.

【0007】すなわち、取付部材12は、図3に拡大斜
視図で示すような構造となっており、長さの長い垂直片
12aと短い水平片12bからなるL字状のLアングル
で構成され、水平片12bには、長手方向に沿って長孔
12cが貫通形成されており、この長孔12c内に支持
バンド(Uボルト)14,14を挿入できるように構成
されている。また、取付部材12の垂直片12aの両端
側には、ビス孔12d,12dが予め形成されている。
また、この垂直片12aには、一対の角パイプの脚部1
3,13が溶接等で固定されている。
That is, the mounting member 12 has a structure as shown in an enlarged perspective view in FIG. 3, and is composed of an L-shaped L-angle consisting of a vertical piece 12a having a long length and a horizontal piece 12b having a short length, A long hole 12c is formed through the horizontal piece 12b along the longitudinal direction, and the support bands (U bolts) 14 and 14 can be inserted into the long hole 12c. Further, screw holes 12d, 12d are formed in advance on both ends of the vertical piece 12a of the mounting member 12.
The vertical piece 12a also includes a pair of square pipe legs 1
3, 13 are fixed by welding or the like.

【0008】なお、この図3の取付部材12に代えて、
図4に斜視図で示すような取付部材12を使用すること
もでき、この図4の取付部材12においては、垂直片1
2aに、L字状のアングル脚部15,15が固設された
ものである。
In place of the mounting member 12 shown in FIG. 3,
It is also possible to use a mounting member 12 as shown in a perspective view in FIG. 4, and in this mounting member 12 in FIG.
The L-shaped angle leg portions 15 and 15 are fixed to the 2a.

【0009】図1および図2では、図3の取付部材12
を取り付けた状態を示しており、取付部材12,12を
脚部15,15を介し架台として自立させておき、その
上に排水管3を載せ、支持バンド(Uボルト)14を排
水管3の外周に配置し、取付部材12の長孔12c内に
支持バンド(Uボルト)14の先端のボルト部14aを
挿入して、水平片12bの裏側からナット16をUボル
ト14のボルト部14aに締め付けることができる。な
お、脚部13,15の高さは、取付部材12を排水管3
に取り付けるためのUボルト14のボルト部14aより
高くなるように設定されており、Uボルト14のボルト
部14a下端の下方に空間ができるようにしてあり、U
ボルト14のボルト部14aに対し下方から容易にナッ
ト16を締め付けることができ、一人の作業者により、
排水管3に一対の取付部材12,12を容易に取付固定
させることができ、この取付部材12,12を下側にし
て搬送パレットP上に載せて、取付部材12,12によ
り安定した状態で排水管3を現場へ輸送することができ
るものである。
1 and 2, the mounting member 12 of FIG.
Shows a state in which the mounting members 12 and 12 are self-supported as a stand via the legs 15 and 15, and the drainage pipe 3 is placed thereon, and the support band (U bolt) 14 is attached to the drainage pipe 3. It is arranged on the outer periphery and the bolt portion 14a at the tip of the support band (U bolt) 14 is inserted into the long hole 12c of the mounting member 12, and the nut 16 is tightened to the bolt portion 14a of the U bolt 14 from the back side of the horizontal piece 12b. be able to. In addition, the height of the legs 13 and 15 is determined by the mounting member 12
It is set to be higher than the bolt portion 14a of the U bolt 14 for attaching to the U bolt 14, and a space is formed below the lower end of the bolt portion 14a of the U bolt 14,
The nut 16 can be easily tightened from below with respect to the bolt portion 14a of the bolt 14, and by one operator,
The pair of mounting members 12, 12 can be easily mounted and fixed to the drainage pipe 3, and the mounting members 12, 12 are placed on the transport pallet P with the mounting members 12, 12 on the lower side, so that the mounting members 12, 12 can be stabilized. The drainage pipe 3 can be transported to the site.

【0010】すなわち、取付部材12には、角パイプ状
の脚部13とか、アングル状の脚部15が設けられてい
るため、架台としての役割を果たすことができて、排水
管3のフランジ部11a,11bを上向きにして、安定
した状態で輸送することができ、フランジ部11a,1
1bが輸送中に破損するようなこともなくなる。このよ
うな状態で現場へ輸送するために、従来の図16で示し
たようなプレート部8,8は不要であり、また、高さ調
整用の長孔8aも、高さ調整ボルト10も不要であり、
軽く、嵩張らない状態で現場へ輸送することができるも
のとなる。さらに、従来の図16の形状では、小便器や
大便器の取り付けピッチ寸法に合わせて、プレート部
8,8間の横方向の長さを個別に設計する必要があった
が、本例では、その必要がなく、設計効率が良いものと
なる。
That is, since the mounting member 12 is provided with the square pipe-shaped leg portion 13 or the angle-shaped leg portion 15, it can function as a pedestal and the flange portion of the drainage pipe 3. The flange portions 11a, 1b can be transported in a stable state with 11a, 11b facing upward.
It also prevents 1b from being damaged during transportation. In order to transport it to the site in such a state, the plate portions 8 and 8 as shown in FIG. 16 of the related art are unnecessary, and the elongated hole 8a for height adjustment and the height adjustment bolt 10 are unnecessary. And
It will be light and can be transported to the site in a bulky state. Further, in the conventional shape of FIG. 16, it is necessary to individually design the lateral length between the plate portions 8 in accordance with the mounting pitch dimension of the urinal or the urinal, but in the present example, This is not necessary, and the design efficiency is good.

【0011】なお、図1および図2では、2個のフラン
ジ部11a,11bを有する形状に形成された小便器用
の排水管3を例示しているが、フランジ部が1個の場合
も、また3個以上の場合も、さらには、大便器用,洗面
器用等の排水管3においても、同様な状態で輸送するこ
とができるものである。
1 and 2, the drain pipe 3 for a urinal formed in a shape having two flange portions 11a and 11b is illustrated, but also in the case of one flange portion, Even in the case of three or more drainage pipes 3 for toilets, washbasins, etc., they can be transported in the same state.

【0012】なお、図5には、小便器用の2連のフレー
ム2の正面図を示しているが、フレーム2もシンプルな
形状に形成して、現場へ輸送することができるものであ
り、図5のフレーム2では、底フレーム2aと上フレー
ム2b間に、縦フレーム2c,2cが連結され、縦フレ
ーム2c,2c間の下方に横フレーム2dが連結され
て、横フレーム2dから一対の立設パイプ2e,2eが
立設されたものとなっており、底フレーム2a、上フレ
ーム2b、縦フレーム2c,2c、横フレーム2d、立
設パイプ2e,2eはすべて同一規格のフレーム材で安
価に構成されている。このようなシンプルな形状に形成
したフレーム2に対し、前記図1のような形態で輸送さ
れてきた排水管3を現場で取り付けることができるもの
である。
FIG. 5 shows a front view of the two frames 2 for urinals, but the frame 2 can also be formed in a simple shape and transported to the site. In the frame 2 of 5, the vertical frames 2c and 2c are connected between the bottom frame 2a and the upper frame 2b, and the horizontal frame 2d is connected below the vertical frames 2c and 2c, so that a pair of uprights is provided from the horizontal frame 2d. The pipes 2e, 2e are erected, and the bottom frame 2a, the upper frame 2b, the vertical frames 2c, 2c, the horizontal frame 2d, and the erected pipes 2e, 2e are all made of the same standard frame material at low cost. Has been done. The drainage pipe 3 transported in the form as shown in FIG. 1 can be attached to the frame 2 on the frame 2 formed in such a simple shape.

【0013】図6は、フレーム2に、排水管3を取り付
けた要部斜視図を示している。すなわち、図1の輸送状
態から、現場においてはUボルト14のナット16を緩
めて排水管3のフランジ部11bを前向きとなるように
回転させ、取付部材12を上方に移動させて、フレーム
2の一対の立設パイプ2e,2eの上端と、フランジ部
11bの取付片19,19上端を位置合わせして、ビス
17,17を前面側より取付片19,19にネジ込ん
で、取付片19,19を立設パイプ2e,2eに位置決
めして固定することができ、この位置決め固定状態で高
さが決まるものであり、現場での高さ調整は、このフラ
ンジ部11bの固定時に調整することができるものであ
る。
FIG. 6 is a perspective view of a main part in which the drainage pipe 3 is attached to the frame 2. That is, from the transportation state of FIG. 1, in the field, the nut 16 of the U bolt 14 is loosened and the flange portion 11b of the drainage pipe 3 is rotated so as to face forward, and the mounting member 12 is moved upward to move the frame 2 of the frame 2. The upper ends of the pair of standing pipes 2e, 2e and the upper ends of the mounting pieces 19, 19 of the flange portion 11b are aligned with each other, and the screws 17, 17 are screwed into the mounting pieces 19, 19 from the front side. 19 can be positioned and fixed to the standing pipes 2e, 2e, and the height is determined by this positioning and fixing state, and the height adjustment on site can be adjusted when fixing the flange portion 11b. It is possible.

【0014】その後に、取付部材12の角パイプの脚部
13を、縦フレーム2cの裏側に当接させて位置決め
し、その状態で、ビス18をビス孔12d内に入れ、縦
フレーム2cにビス18をネジ込み、縦フレーム2cに
取付部材12を固定することができ、これにより、排水
管3をフレーム2に容易に取り付けることができるもの
である。なお、脚部13が縦フレーム2cに当接されて
いるため、1本のビス18でも、取付部材12が共回り
することがなく、ビス止め作業が1ヶ所で良いため、作
業が容易なものとなる。なお、図7には、小便器の設置
状態の側面図を示しているが、フレーム2の前面に前板
7を取り付け、排水管3のフランジ部11bに対し小便
器20の排水口を接続して設置できるものである。
After that, the leg portion 13 of the square pipe of the mounting member 12 is brought into contact with the back side of the vertical frame 2c to be positioned, and in this state, the screw 18 is inserted into the screw hole 12d and screwed into the vertical frame 2c. 18 can be screwed in and the attachment member 12 can be fixed to the vertical frame 2c, whereby the drainage pipe 3 can be easily attached to the frame 2. Since the leg portion 13 is in contact with the vertical frame 2c, the mounting member 12 does not rotate together even with one screw 18, and the screw fixing work only needs to be done in one place. Becomes Although a side view of the urinal is shown in FIG. 7, the front plate 7 is attached to the front surface of the frame 2 and the drain port of the urinal 20 is connected to the flange portion 11b of the drain pipe 3. Can be installed.

【0015】なお、図8には、大便器用の一連のフレー
ム2の正面図を示しているが、大便器用のフレーム2
も、すべて同一規格のフレーム材でシンプルな形状に形
成して、現場へ輸送することができるものであり、図8
のフレーム2では、底フレーム2aと上フレーム2b間
に、一対の縦フレーム2c,2cが連結され、縦フレー
ム2c,2c間に横フレーム2dが連結されて、横フレ
ーム2dの下方には、底フレーム2aから一対の立設パ
イプ2e,2eが立設されており、この一対の立設パイ
プ2e,2eには、対向状に一対の取付パイプ2f,2
fが横方向へ固設されたものとなっている。このような
シンプルな形状に形成したフレーム2に対し、前記図1
のような形態で輸送されてきた排水管3を現場で取り付
けることができるものである。
Although FIG. 8 shows a front view of a series of frames 2 for the toilet bowl, the frame 2 for the toilet bowl is shown.
Can also be formed into a simple shape using the same standard frame material and transported to the site.
In the frame 2, the pair of vertical frames 2c and 2c are connected between the bottom frame 2a and the upper frame 2b, and the horizontal frame 2d is connected between the vertical frames 2c and 2c. A pair of standing pipes 2e, 2e is erected from the frame 2a. The pair of standing pipes 2e, 2e are opposed to the pair of mounting pipes 2f, 2e.
f is laterally fixed. For the frame 2 formed in such a simple shape, as shown in FIG.
The drainage pipe 3 transported in such a form can be attached on site.

【0016】図9は、フレーム2の取付パイプ2f,2
fに、排水管3のフランジ部11bを取り付けた要部斜
視図を示している。なお、この図9では、大便器用の排
水管3のフランジ部11bを示しており、図1,図2に
おける小便器用のフランジ部11bとは多少異なる形状
のフランジ部となっている。すなわち、図1の輸送状態
から、現場においてはUボルト14のナット16を緩め
て排水管3のフランジ部11bを前向きとなるように回
転させ、取付部材12を上方に移動させて、フレーム2
の一対の取付パイプ2f,2fの下端と、フランジ部1
1bの下端を位置合わせして、ビス17,17を前面側
よりフランジ部11bにネジ込んで、フランジ部11b
を取付パイプ2f,2fに位置決めして固定することが
でき、このフランジ部11bの位置決め固定時に高さ調
整することができるものである。
FIG. 9 shows the mounting pipes 2f, 2 of the frame 2.
The main part perspective view which attached the flange part 11b of the drainage pipe 3 to f is shown. It should be noted that FIG. 9 shows the flange portion 11b of the drainage pipe 3 for the toilet bowl, which has a slightly different shape from the flange portion 11b for the toilet bowl in FIGS. That is, from the transportation state of FIG. 1, in the field, the nut 16 of the U bolt 14 is loosened and the flange portion 11b of the drainage pipe 3 is rotated so as to face forward, the mounting member 12 is moved upward, and the frame 2
Lower ends of the pair of mounting pipes 2f, 2f and the flange portion 1
Align the lower end of 1b, and screw the screws 17, 17 into the flange portion 11b from the front side to form the flange portion 11b.
Can be positioned and fixed to the mounting pipes 2f, 2f, and the height can be adjusted when the flange portion 11b is positioned and fixed.

【0017】その後に、取付部材12のアングル状の脚
部15(図4の取付部材12を使用)を、縦フレーム2
cの裏側に当接させて位置決めし、その状態で、1本の
ビス18をビス孔12d内に入れ、縦フレーム2cにビ
ス18をネジ込み、縦フレーム2cに取付部材12を固
定することができ、これにより、排水管3をフレーム2
に容易に取り付けることができるものである。
After that, the angled leg portion 15 of the mounting member 12 (using the mounting member 12 of FIG. 4) is attached to the vertical frame 2.
It is possible to fix the mounting member 12 to the vertical frame 2c by inserting one screw 18 into the screw hole 12d, screwing the screw 18 into the vertical frame 2c, by contacting with the back side of the c for positioning. This allows the drainage pipe 3 to be connected to the frame 2
It can be easily attached to.

【0018】なお、図10は、大便器の設置状態の側面
図を示しているが、フレーム2の前面に前板7を取り付
け、排水管3のフランジ部11bに対し大便器9の排水
口を接続して設置できるものである。なお、排水管3の
施工を先に説明したが、実際には、フレーム2,排水管
3とともに、分離した状態で給水管4等も現場へ搬入さ
れ、現場で、この給水管4等が壁110に固設されて、
その前側にフレーム2が固設され、フレーム2に排水管
3が取り付けられるものであるため、以下には、現場で
の施工順に、大便器の配管ユニットの施工を説明する。
Although FIG. 10 shows a side view of the toilet bowl installed, the front plate 7 is attached to the front surface of the frame 2 and the drain port of the toilet bowl 9 is attached to the flange portion 11b of the drain pipe 3. It can be connected and installed. Although the construction of the drainage pipe 3 has been described above, the water supply pipe 4 and the like are actually carried into the site together with the frame 2 and the drainage pipe 3 in a separated state, and the water supply pipe 4 and the like are walled at the site. Fixed at 110,
Since the frame 2 is fixedly installed on the front side and the drainage pipe 3 is attached to the frame 2, the construction of the piping unit of the toilet bowl will be described below in the order of construction on site.

【0019】図11に示すように、先ず、壁110に横
材35および縦材37が固設される。横材35および縦
材37は、共通の樹脂板で構成されており、例えば幅が
60mmで長さが2m程度の樹脂板を、現場で適宜長さに
切断して使用することができるものである。
As shown in FIG. 11, first, the horizontal member 35 and the vertical member 37 are fixedly mounted on the wall 110. The horizontal member 35 and the vertical member 37 are made of a common resin plate. For example, a resin plate having a width of 60 mm and a length of about 2 m can be cut to an appropriate length on site and used. is there.

【0020】この樹脂製の一対の横材35,35を、壁
110に対しビス36,36をネジ込んで、上下方向に
間隔をおいて略平行に固設する。なお、一対の横材3
5,35は、壁110の軽量鉄骨112の位置にビス3
6,36をネジ込んで、軽量鉄骨112に強固に固設さ
せておくことができるものである。その後に、この一対
の横材35,35間に、掛渡し状にして、縦材37をビ
ス38,38で横材35,35に固定する。この縦材3
7は、適宜横方向へ移動させて任意の位置で横材35,
35間に固定できるものである。従って、横材35,3
5に対し、縦材37の取り付け位置は、現場に対応させ
て適宜調整することができるため、縦材17は軽量鉄骨
112とは無関係の位置に設置できるものである。
The pair of cross members 35, 35 made of resin are fixed in parallel to each other by screwing the screws 36, 36 into the wall 110 at intervals in the vertical direction. In addition, a pair of cross members 3
5 and 35 are screws 3 at the position of the lightweight steel frame 112 of the wall 110.
6,6, 36 can be screwed in and firmly fixed to the lightweight steel frame 112. After that, the vertical member 37 is fixed to the horizontal members 35, 35 with screws 38, 38 in a suspended state between the pair of horizontal members 35, 35. This vertical material 3
7 is a lateral member 35, which is moved at an arbitrary position by appropriately moving in the lateral direction.
It can be fixed between 35. Therefore, the cross members 35, 3
On the other hand, since the mounting position of the vertical member 37 can be appropriately adjusted depending on the site, the vertical member 17 can be installed at a position independent of the lightweight steel frame 112.

【0021】同時に、図11のように、壁110にビス
40を介して受けアングル39を固設する。この受けア
ングル39は、垂直片39aと水平片39bからなるL
字状に形成されたものであり、図11では垂直片39a
を上向きにして、この垂直片39aにビス40を打ち込
んで固定しており、ビス40は壁110の軽量鉄骨11
2にネジ込まれるものである。なお、受けアングル39
は、垂直片39aを下向きにした状態で壁110に固設
することもできる。
At the same time, as shown in FIG. 11, a receiving angle 39 is fixed to the wall 110 via a screw 40. The receiving angle 39 is L composed of a vertical piece 39a and a horizontal piece 39b.
It is formed in a letter shape, and in FIG. 11, it is a vertical piece 39a.
And the screw 40 is driven and fixed to the vertical piece 39a, and the screw 40 is attached to the lightweight steel frame 11 of the wall 110.
It is screwed into 2. The receiving angle 39
Can also be fixed to the wall 110 with the vertical piece 39a facing downward.

【0022】このように壁110に固設した受けアング
ル39に対し、図12に斜視図で示すようなフレーム2
を取り付ける。すなわち、このフレーム2は、前記図8
に示した上フレーム2bの左右端側に、壁110側へ突
出して幅決めフレーム2g,2gが溶接で一体化されて
おり、この各幅決めフレーム2g,2gの先端上面に
は、通し孔2hが形成されている。このフレーム2は、
幅決めフレーム2g,2gと縦フレーム2cにより、横
側から見た場合は、略L字状に形成されている。
With respect to the receiving angle 39 fixed to the wall 110 as described above, the frame 2 as shown in a perspective view in FIG.
Attach. That is, this frame 2 is the same as that shown in FIG.
The width determining frames 2g, 2g projecting toward the wall 110 are integrally welded to the left and right ends of the upper frame 2b shown in FIG. 1, and the through holes 2h are formed in the upper end surfaces of the width determining frames 2g, 2g. Are formed. This frame 2
The width determining frames 2g, 2g and the vertical frame 2c are formed in a substantially L shape when viewed from the lateral side.

【0023】このフレーム2の幅決めフレーム2g,2
gを、前記受けアングル39の水平片39b上に載せ
て、図13の要部拡大斜視図で示すように、幅決めフレ
ーム2g,2gの通し孔2hの上方よりビス49を入
れ、ビス49を受けアングル39のビス孔39cにネジ
込むことにより、受けアングル39に対し左右の幅決め
フレーム2g,2gを取り付けることができ、この取り
付け時に、フレーム2の壁110に対する前後の位置決
めを行うことができるものである。このようにして、フ
レーム2の上部を壁110に固定し、フレーム2の床フ
レーム2aは、床面にアンカーボルト等を介して固定す
ることができるものである。
Width-determining frames 2g, 2 for this frame 2
g is placed on the horizontal piece 39b of the receiving angle 39, and a screw 49 is inserted from above the through holes 2h of the width determining frames 2g, 2g as shown in the enlarged perspective view of the main part of FIG. The left and right width determining frames 2g, 2g can be attached to the receiving angle 39 by screwing into the screw holes 39c of the receiving angle 39, and at the time of this attachment, the front and rear positioning of the frame 2 with respect to the wall 110 can be performed. It is a thing. In this way, the upper portion of the frame 2 can be fixed to the wall 110, and the floor frame 2a of the frame 2 can be fixed to the floor surface via anchor bolts or the like.

【0024】このようにフレーム2を固定した後に、壁
110に固設した縦材37に対し、図14に示すよう
に、バンド113を用いて、給水管4をビス114で正
確な位置に縦材37に強固に取り付けることができる。
このように、縦材37を固定させて、現場に対応した位
置に良好に給水管4を配管固定することができるもので
ある。なお、給水管4の他、脱臭管6等においても、横
材35,35および縦材37を用いて良好に壁面110
に取り付けることができるものである。
After fixing the frame 2 in this way, the water supply pipe 4 is vertically fixed by screws 114 to the vertical member 37 fixed to the wall 110 by using the band 113 as shown in FIG. It can be firmly attached to the material 37.
Thus, the vertical member 37 can be fixed, and the water supply pipe 4 can be satisfactorily fixed to the position corresponding to the site. In addition to the water supply pipe 4, in the deodorizing pipe 6 and the like, the horizontal members 35, 35 and the vertical members 37 are used to favorably wall surface 110.
It can be attached to.

【0025】また、フレーム2を壁110と床に固定し
た後に、フレーム2に対し排水管3を前述したように取
り付けることができるものである。なお、フレーム2の
幅決めフレーム2g,2gの上面に、予めマジックファ
スナー48,48を設けておき、このマジックファスナ
ー48,48上にカウンター55を設置して、カウンタ
ー55をマジックファスナー48で着脱可能に固定する
ことができるものである。
Further, after fixing the frame 2 to the wall 110 and the floor, the drain pipe 3 can be attached to the frame 2 as described above. In addition, the magic fasteners 48, 48 are provided on the upper surfaces of the width determining frames 2g, 2g of the frame 2 in advance, the counter 55 is installed on the magic fasteners 48, 48, and the counter 55 can be attached and detached by the magic fastener 48. It can be fixed to.

【0026】[0026]

【発明の効果】本発明の配管ユニットの施工方法は、排
水管に予め取付部材を取り付けて輸送し、現場において
取付部材を介しフレームに排水管を取り付けることとし
たため、輸送中には取付部材を架台として利用し、安定
した状態で排水管の破損を防いで現場へ輸送することが
でき、現場においては排水管を回転させて、取付部材を
介しフレームに排水管を良好に取り付けることができ、
現場での施工が容易となる。
According to the method of constructing the piping unit of the present invention, since the mounting member is attached to the drain pipe in advance and transported, and the drain pipe is mounted to the frame via the mounting member on site, the mounting member is not attached during transportation. It can be used as a cradle and can be transported to the site while preventing damage to the drain pipe in a stable state.On the site, the drain pipe can be rotated and the drain pipe can be satisfactorily attached to the frame via the mounting member.
Construction on site becomes easy.

【0027】また、脚部の高さが、取付部材を排水管に
取り付けるためのUボルトのボルト部より高くなるよう
に設定されていることにより、取付部材を脚部を介し架
台として自立させ、その上に排水管を載せ、Uボルトを
排水管の外周に配置し取付部材に挿入した状態で、Uボ
ルトのボルト部下端の下方に空間ができ、Uボルトのボ
ルト部に対し下方から容易にナットを締め付けることが
でき、一人の作業者により、排水管に取付部材を容易に
取付固定させることができるものとなる。
Further, since the height of the leg portion is set to be higher than the bolt portion of the U-bolt for attaching the mounting member to the drain pipe, the mounting member is made to stand as a stand via the leg portion, With the drain pipe placed on top of it, and with the U-bolt placed on the outer periphery of the drain pipe and inserted into the mounting member, there is a space below the lower end of the bolt of the U-bolt, and it is easy from below to the bolt of the U-bolt. The nut can be tightened, and the attachment member can be easily attached and fixed to the drain pipe by one operator.

【0028】また、壁に2以上の横材を横方向に固設
し、2以上の横材間に掛渡し状に縦方向に縦材を固設
し、縦材に給水管を取り付けるように構成したことによ
り、現場で横材と縦材を壁に固設し、軽量鉄骨等の存在
しない任意の位置に縦材を配置させて、この縦材に強固
に給水管を取り付けることができ、給水管の取付施工が
現場に対応させて容易に行えるものとなる。
Also, two or more horizontal members are fixed to the wall in the horizontal direction, vertical members are fixed in the vertical direction in a spanning manner between the two or more horizontal members, and a water supply pipe is attached to the vertical members. By configuring, horizontal members and vertical members are fixed to the wall at the site, vertical members can be placed at arbitrary positions where lightweight steel frames do not exist, and water pipes can be firmly attached to this vertical member, Installation of the water supply pipe can be easily performed according to the site.

【0029】また、給水管を取り付けた後、略L字状の
フレームを壁と床に取り付け、フレームに排水管を取り
付けることとしたため、給水管,排水管と分離してフレ
ームを現場に容易に搬入でき、この搬入したフレームを
給水管の取付後に設置して、さらにフレームに排水管を
取り付けて、効率良く配管ユニットを施工することがで
きるものとなる。
Further, after the water supply pipe is attached, the substantially L-shaped frame is attached to the wall and the floor, and the drain pipe is attached to the frame. The pipe unit can be carried in, the frame which has been carried in can be installed after the water supply pipe is attached, and the drain pipe can be further attached to the frame to efficiently construct the piping unit.

【0030】また、横材と縦材が、共通の樹脂板で構成
されていることにより、安価な樹脂板でコストを低減さ
せることができ、しかも現場で任意の長さに切断加工す
ることができ、現場での施工作業が容易となる効果を有
する。
Further, since the horizontal member and the vertical member are made of a common resin plate, the cost can be reduced with an inexpensive resin plate, and the cutting can be performed on site to an arbitrary length. This has the effect of facilitating construction work on site.

【図面の簡単な説明】[Brief description of drawings]

【図1】排水管の輸送状態の斜視構成図である。FIG. 1 is a perspective configuration view of a transportation state of a drainage pipe.

【図2】図1の正面構成図である。FIG. 2 is a front configuration diagram of FIG.

【図3】取付部材の拡大斜視構成図である。FIG. 3 is an enlarged perspective configuration diagram of a mounting member.

【図4】取付部材の変更例を示す斜視構成図である。FIG. 4 is a perspective configuration diagram showing a modified example of a mounting member.

【図5】小便器用の二連のフレームの正面構成図であ
る。
FIG. 5 is a front view of a double frame for a urinal.

【図6】小便器用のフレームに排水管を取り付けた状態
の要部斜視構成図である。
FIG. 6 is a perspective view of a main part of a state in which a drainage pipe is attached to a urinal frame.

【図7】小便器の設置状態の側面構成図である。FIG. 7 is a side view of the urinal installed.

【図8】大便器用の一連のフレームの正面構成図であ
る。
FIG. 8 is a front view of a series of frames for a toilet bowl.

【図9】大便器用のフレームに排水管を取り付けた状態
の要部斜視構成図である。
FIG. 9 is a perspective view of a main part of a state in which a drainage pipe is attached to a frame for a toilet bowl.

【図10】大便器の設置状態の側面構成図である。FIG. 10 is a side view showing a configuration of the toilet bowl in an installed state.

【図11】現場の壁に横材と縦材を固設する状態の斜視
構成図である。
FIG. 11 is a perspective configuration diagram showing a state in which a horizontal member and a vertical member are fixedly mounted on the wall at the site.

【図12】その後に設置されるフレームの斜視構成図で
ある。
FIG. 12 is a perspective configuration diagram of a frame installed thereafter.

【図13】フレームをアングルに接続する状態の要部拡
大斜視構成図である。
FIG. 13 is an enlarged perspective configuration diagram of main parts in a state where the frame is connected to the angle.

【図14】給水管,フレーム,排水管を施工した状態の
斜視構成図である。
FIG. 14 is a perspective configuration diagram showing a state in which a water supply pipe, a frame, and a drain pipe are installed.

【図15】従来の配管ユニットの施工状態の斜視構成図
である。
FIG. 15 is a perspective view showing a construction state of a conventional piping unit.

【図16】従来の排水管の輸送状態の斜視構成図であ
る。
FIG. 16 is a perspective configuration diagram of a conventional drainage pipe in a transportation state.

【図17】従来の給水管の設置状態の平面構成図であ
る。
FIG. 17 is a plan configuration diagram of a conventional water supply pipe installed.

【図18】図17の縦断面構成図である。18 is a vertical cross-sectional configuration diagram of FIG.

【符号の説明】[Explanation of symbols]

1 配管ユニット 2 フレーム 2a 底フレーム 2b 上フレーム 2c 縦フレーム 2e 立設パイプ 2f 取付パイプ 2g 幅決めフレーム 2h 通し孔 3 排水管 3a 通気管用チーズ 3b 屈曲部 4 給水管 7 前板 9 大便器 11a 第1フランジ部 11b 第2フランジ部 12 取付部材 12a 垂直片 12b 水平片 12c 長孔 12d ビス孔 13 角パイプ状脚部 14 支持バンド(Uボルト) 14a ボルト部 15 アングル状脚部 16 ナット 19 取付片 20 小便器 35 横材 36 ビス 37 縦材 38 ビス 39 受けアングル 48 マジックファスナー 55 カウンター 110 壁 112 軽量鉄骨 113 バンド 114 ビス 1 piping unit 2 frames 2a bottom frame 2b upper frame 2c vertical frame 2e Standing pipe 2f mounting pipe 2g width determination frame 2h through hole 3 drainage pipes 3a Cheese for aeration pipe 3b bend 4 water supply pipe 7 front plate 9 toilet bowl 11a First flange portion 11b Second flange part 12 Mounting member 12a vertical piece 12b horizontal piece 12c long hole 12d screw hole 13 Square pipe leg 14 Support band (U bolt) 14a bolt part 15 Angled legs 16 nuts 19 mounting pieces 20 urinals 35 Horizontal material 36 screws 37 Vertical material 38 screws 39 Receiving angle 48 magic fastener 55 counter 110 walls 112 light steel 113 bands 114 screws

フロントページの続き (51)Int.Cl.7 識別記号 FI テーマコート゛(参考) F16L 3/24 F16L 3/24 B (72)発明者 伊藤 和洋 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 (72)発明者 萩 知明 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 (72)発明者 田中 義親 愛知県常滑市鯉江本町5丁目1番地 株式 会社イナックス内 (72)発明者 福村 貴司 東京都港区芝浦一丁目2番3号 清水建設 株式会社内 Fターム(参考) 2D039 CB01 CB02 CC08 2D060 AB04 AC05 2D061 AA03 AD03 AD05 3H023 AA05 AB04 AC21 AC61 AD35 AD55 Front page continuation (51) Int.Cl. 7 Identification code FI theme code (reference) F16L 3/24 F16L 3/24 B (72) Inventor Kazuhiro Ito 5-chome, Koiehoncho, Tokoname-shi, Aichi Inax Co., Ltd. (72) Inventor Tomoaki Hagi 5-1-1, Koiemotocho, Tokoname-shi, Aichi Inax Co., Ltd. (72) Inventor Yoshichika Tanaka 5-1-1, Koiehoncho, Tokoname-shi, Aichi Inax Co., Ltd. (72) Inventor Takashi Fukumura 1-3-2 Shibaura, Minato-ku, Tokyo Shimizu Corporation F-term (reference) 2D039 CB01 CB02 CC08 2D060 AB04 AC05 2D061 AA03 AD03 AD05 3H023 AA05 AB04 AC21 AC61 AD35 AD55

Claims (8)

【特許請求の範囲】[Claims] 【請求項1】 排水管に予め取付部材を取り付けて輸送
し、現場において前記取付部材を介しフレームに排水管
を取り付けることを特徴とする配管ユニットの施工方
法。
1. A method of constructing a piping unit, wherein a drain pipe is attached with a mounting member in advance and transported, and the drain pipe is attached to the frame via the mounting member on site.
【請求項2】 前記取付部材を架台として利用し、排水
管のフランジ部を上向きにして輸送することを特徴とす
る請求項1に記載の配管ユニットの施工方法。
2. The method for constructing a piping unit according to claim 1, wherein the mounting member is used as a gantry, and the flange portion of the drainage pipe is transported upward.
【請求項3】 前記取付部材は、輸送時に架台脚となる
脚部を備えたLアングルで形成されていることを特徴と
する請求項1または請求項2に記載の配管ユニットの施
工方法。
3. The method for constructing a piping unit according to claim 1, wherein the mounting member is formed of an L-angle having a leg portion that serves as a pedestal leg during transportation.
【請求項4】 前記脚部の高さが、前記取付部材を排水
管に取り付けるためのUボルトのボルト部より高くなる
ように設定されていることを特徴とする請求項3に記載
の配管ユニットの施工方法。
4. The piping unit according to claim 3, wherein a height of the leg portion is set to be higher than a bolt portion of a U bolt for attaching the attachment member to the drain pipe. Construction method.
【請求項5】 フレームへの取付時には、排水管を回転
させ、排水管のフランジ部を前向きにし、該フランジ部
をフレームに位置合わせして、前記取付部材をフレーム
に固定することを特徴とする請求項1または請求項2ま
たは請求項3に記載の配管ユニットの施工方法。
5. The mounting member is fixed to the frame by rotating the drainage pipe to make the flange portion of the drainage pipe face forward, aligning the flange portion with the frame, and attaching the mounting member to the frame. A method for constructing a piping unit according to claim 1, 2 or 3.
【請求項6】 壁に2以上の横材を横方向に固設し、該
2以上の横材間に掛渡し状に縦方向に縦材を固設し、該
縦材に給水管を取り付けるように構成したことを特徴と
する配管ユニットの施工方法。
6. A wall is provided with two or more horizontal members fixed laterally, and a vertical member is fixed vertically between the two or more horizontal members in a suspended manner, and a water supply pipe is attached to the vertical members. A construction method for a piping unit having the above-mentioned construction.
【請求項7】 前記給水管を取り付けた後、略L字状の
フレームを壁と床に取り付け、該フレームに排水管を取
り付けることを特徴とする請求項6に記載の配管ユニッ
トの施工方法。
7. The method of constructing a piping unit according to claim 6, wherein after the water supply pipe is attached, a substantially L-shaped frame is attached to a wall and a floor, and a drain pipe is attached to the frame.
【請求項8】 前記横材と縦材が、共通の樹脂板で構成
されていることを特徴とする請求項6または請求項7に
記載の配管ユニットの施工方法。
8. The method for constructing a piping unit according to claim 6, wherein the horizontal member and the vertical member are made of a common resin plate.
JP2002146915A 2002-05-21 2002-05-21 Installation method of piping unit Pending JP2003336303A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2002146915A JP2003336303A (en) 2002-05-21 2002-05-21 Installation method of piping unit

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2002146915A JP2003336303A (en) 2002-05-21 2002-05-21 Installation method of piping unit

Publications (1)

Publication Number Publication Date
JP2003336303A true JP2003336303A (en) 2003-11-28

Family

ID=29705746

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2002146915A Pending JP2003336303A (en) 2002-05-21 2002-05-21 Installation method of piping unit

Country Status (1)

Country Link
JP (1) JP2003336303A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454206A (en) * 2010-10-19 2012-05-16 曾德邻 Pipeline body and joint combination structure for multi-position medium conveying mechanism
KR101254151B1 (en) 2013-01-23 2013-04-18 이용석 Faucet establishing jig
JP2020084742A (en) * 2018-11-30 2020-06-04 パナソニックIpマネジメント株式会社 Structure, drainage facility and method of manufacturing drainage facility
JP7673632B2 (en) 2021-12-20 2025-05-09 中国電力株式会社 Cleat mounting structure

Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0285431A (en) * 1988-09-21 1990-03-26 Toto Ltd Piping unit for toilet
JPH0381453A (en) * 1989-08-22 1991-04-05 Arumasu:Kk Piping unit for building and prefabricating method for piping
JPH0442387Y2 (en) * 1987-11-24 1992-10-06
JPH0613865Y2 (en) * 1988-07-04 1994-04-13 東陶機器株式会社 Front plate lower mounting structure
JPH0640067U (en) * 1992-11-05 1994-05-27 株式会社イナックス Counter installation structure
JPH0634460Y2 (en) * 1988-11-11 1994-09-07 株式会社竹中工務店 Sanitary ware installation structure
JPH07260046A (en) * 1994-03-18 1995-10-13 Takenaka Komuten Co Ltd Supporting device for horizontal pipe
JPH0754371Y2 (en) * 1989-04-13 1995-12-18 株式会社イナックス Toilet bowl installation structure
JPH08218470A (en) * 1995-02-16 1996-08-27 Inax Corp Piping unit, piping case, and front panel
JPH10259635A (en) * 1997-03-17 1998-09-29 Agency Of Ind Science & Technol Toilet stool holding mechanism
JPH10318442A (en) * 1997-05-16 1998-12-04 Inax Corp Pipe supporting structure
JPH10318441A (en) * 1997-05-16 1998-12-04 Inax Corp Piping unit
JPH116176A (en) * 1997-06-16 1999-01-12 Shibutani:Kk Piping frame of equipment unit
JPH1113094A (en) * 1997-06-26 1999-01-19 Toto Ltd Equipment unit for washstand, and assembling construction method thereof
JPH11181868A (en) * 1997-12-24 1999-07-06 Toto Ltd Piping unit for sanitary equipment
JP2000345601A (en) * 1999-04-01 2000-12-12 Egg Puramingu:Kk Toilet construction structure
JP2001098625A (en) * 1999-10-04 2001-04-10 Egg Puramingu:Kk Construction structure for toilet room
JP2002054217A (en) * 2000-05-31 2002-02-20 Toto Ltd Frame installing structure of sanitary equipment unit
JP2002070093A (en) * 2000-09-04 2002-03-08 Tashiro Shokai:Kk Water supply / drainage / hot water supply integrated piping method
JP2002201678A (en) * 2000-12-27 2002-07-19 Inax Corp Piping unit
JP2002212984A (en) * 2001-01-19 2002-07-31 Inax Corp Front plate fixing structure of piping unit
JP2002302989A (en) * 2001-04-09 2002-10-18 Toto Ltd Floor fixing material of piping unit
JP2003074101A (en) * 2001-09-07 2003-03-12 Takenaka Komuten Co Ltd Drain pipe unit

Patent Citations (23)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0442387Y2 (en) * 1987-11-24 1992-10-06
JPH0613865Y2 (en) * 1988-07-04 1994-04-13 東陶機器株式会社 Front plate lower mounting structure
JPH0285431A (en) * 1988-09-21 1990-03-26 Toto Ltd Piping unit for toilet
JPH0634460Y2 (en) * 1988-11-11 1994-09-07 株式会社竹中工務店 Sanitary ware installation structure
JPH0754371Y2 (en) * 1989-04-13 1995-12-18 株式会社イナックス Toilet bowl installation structure
JPH0381453A (en) * 1989-08-22 1991-04-05 Arumasu:Kk Piping unit for building and prefabricating method for piping
JPH0640067U (en) * 1992-11-05 1994-05-27 株式会社イナックス Counter installation structure
JPH07260046A (en) * 1994-03-18 1995-10-13 Takenaka Komuten Co Ltd Supporting device for horizontal pipe
JPH08218470A (en) * 1995-02-16 1996-08-27 Inax Corp Piping unit, piping case, and front panel
JPH10259635A (en) * 1997-03-17 1998-09-29 Agency Of Ind Science & Technol Toilet stool holding mechanism
JPH10318442A (en) * 1997-05-16 1998-12-04 Inax Corp Pipe supporting structure
JPH10318441A (en) * 1997-05-16 1998-12-04 Inax Corp Piping unit
JPH116176A (en) * 1997-06-16 1999-01-12 Shibutani:Kk Piping frame of equipment unit
JPH1113094A (en) * 1997-06-26 1999-01-19 Toto Ltd Equipment unit for washstand, and assembling construction method thereof
JPH11181868A (en) * 1997-12-24 1999-07-06 Toto Ltd Piping unit for sanitary equipment
JP2000345601A (en) * 1999-04-01 2000-12-12 Egg Puramingu:Kk Toilet construction structure
JP2001098625A (en) * 1999-10-04 2001-04-10 Egg Puramingu:Kk Construction structure for toilet room
JP2002054217A (en) * 2000-05-31 2002-02-20 Toto Ltd Frame installing structure of sanitary equipment unit
JP2002070093A (en) * 2000-09-04 2002-03-08 Tashiro Shokai:Kk Water supply / drainage / hot water supply integrated piping method
JP2002201678A (en) * 2000-12-27 2002-07-19 Inax Corp Piping unit
JP2002212984A (en) * 2001-01-19 2002-07-31 Inax Corp Front plate fixing structure of piping unit
JP2002302989A (en) * 2001-04-09 2002-10-18 Toto Ltd Floor fixing material of piping unit
JP2003074101A (en) * 2001-09-07 2003-03-12 Takenaka Komuten Co Ltd Drain pipe unit

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102454206A (en) * 2010-10-19 2012-05-16 曾德邻 Pipeline body and joint combination structure for multi-position medium conveying mechanism
CN102454206B (en) * 2010-10-19 2016-08-24 曾德邻 The pipeline body of many just position media conveying mechanisms and joint combination structure
KR101254151B1 (en) 2013-01-23 2013-04-18 이용석 Faucet establishing jig
JP2020084742A (en) * 2018-11-30 2020-06-04 パナソニックIpマネジメント株式会社 Structure, drainage facility and method of manufacturing drainage facility
JP7673632B2 (en) 2021-12-20 2025-05-09 中国電力株式会社 Cleat mounting structure

Similar Documents

Publication Publication Date Title
CA2106030C (en) Form panel
JP5457285B2 (en) Solar panel mounting base
US11549245B2 (en) Methods and systems for plumbing fixture installations
JP2003336303A (en) Installation method of piping unit
KR20220022256A (en) Non-welding prefabricated deck stairs
JPH08145240A (en) Piping support fitment for fixing base plate alone
US5853163A (en) Post plumbing device
JP2714804B2 (en) Floor panel fixing device
JP2018084135A (en) Step floor support leg and step floor structure using the same
JPH0972096A (en) Provisionally erected handrail unit
JP2003221832A (en) Level anchor bolt
JPH0219094Y2 (en)
JP2943649B2 (en) Piping unit, its construction method and holding trolley used therefor
JP3779181B2 (en) Clamping method at corner of formwork
JPH10169850A (en) Support metal piece for piping equipment
KR200233682Y1 (en) Mold fabricated as one
KR101018353B1 (en) Building panel support with adjustable height
JP3065458U (en) Stand for high pressure booster
JP2507299Y2 (en) Waterproof pan installation stand
JP2004060254A (en) Brace unit mounting structure
JPH0544317A (en) Supporting anchor of outdoor staircase and the like
JP3006503B2 (en) Installation method of modularized integrated leg unit
JPH077488Y2 (en) Slab construction formwork hardware
KR930005582Y1 (en) Bracket for supporting forms
JP2000336740A (en) Pre-swirling tank support structure

Legal Events

Date Code Title Description
A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20040622

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20060426

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20060516

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20060628

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20061027

A521 Written amendment

Free format text: JAPANESE INTERMEDIATE CODE: A523

Effective date: 20061208

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02