JP2003132203A - Budget management system - Google Patents
Budget management systemInfo
- Publication number
- JP2003132203A JP2003132203A JP2001323749A JP2001323749A JP2003132203A JP 2003132203 A JP2003132203 A JP 2003132203A JP 2001323749 A JP2001323749 A JP 2001323749A JP 2001323749 A JP2001323749 A JP 2001323749A JP 2003132203 A JP2003132203 A JP 2003132203A
- Authority
- JP
- Japan
- Prior art keywords
- budget
- work
- data
- management
- repair
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- Financial Or Insurance-Related Operations Such As Payment And Settlement (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
(57)【要約】
【課題】 修繕総費用の一元管理を行って、予算、実
績、仕掛の各情報を正確に把握することができる予算管
理システムを提供する。
【解決手段】予算マスターデータベース2に予め修繕費
用、修繕労務工数の予算データを格納し、保全工事を施
工する際に、各所管部署で、買入要求、工事要求等を行
うと、予算執行管理データベース3で、現時点での予算
執行状況を出力し、買入要求、工事要求に基づく実績が
予算管理ファイルに件名単位で修繕材料費及び修繕労務
工数の予算及び実績データとして格納され、整備作業請
負要求を行うと、仕掛データが整備作業請負仕掛データ
ベースに登録され、整備作業請負が完了したときに外注
管理実績累積ファイルに作業請負実績データが格納さ
れ、これらの各データが予算執行管理データベースで所
定部署単位での所定数の費用分類毎に予算データ、実績
データ及び仕掛データとして区分けして一元管理され
る。
(57) [Summary] [Problem] To provide a budget management system capable of centrally managing the total cost of repair and accurately grasping information on budget, performance, and work in process. A budget master database 2 stores budget data of repair costs and repair man-hours in advance, and when executing maintenance work, if a department in charge of each department issues a purchase request, a construction request, etc., budget execution management is performed. In database 3, the current budget execution status is output, and the results based on purchase requests and construction requests are stored in the budget management file as budget and actual data of repair material costs and repair man-hours by subject, and maintenance work is performed. When a request is made, the in-process data is registered in the maintenance work in-process database, and when the maintenance work is completed, the work outsourcing result data is stored in the outsourcing management results accumulation file, and these data are specified in the budget execution management database. The data is classified and managed as budget data, actual data, and work-in-process data for each of a predetermined number of expense categories in each department.
Description
【0001】[0001]
【発明の属する技術分野】本発明は、製鉄所等のプラン
トで設備の修繕を行う際の予算を管理する場合に好適な
予算管理システムに関する。BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a budget management system suitable for managing a budget for repairing equipment in a plant such as an iron mill.
【0002】[0002]
【従来の技術】この種の予算管理システムとして、従来
は修繕材料費、修繕労務工数等の予算情報を予算マスタ
ーデータベースに格納すると共に、各部署で、新規部品
の買入れを要求する買入要求、資材管理部門で所定数纏
め買いしている貯留品の出庫を要求する貯品出庫要求、
及び修繕工事要求を行う場合に、買入要求、貯品出庫要
求については、資機材購買管理システムを使用して注文
マスタファイルに買入要求品を登録とすると共に、貯品
については貯品マスタに出庫情報を登録することによ、
これら資機材購買管理システムで買入・出庫実績情報を
予算管理ファイルに登録する。この予算管理ファイルに
は、買入・出庫実績情報の他、予算マスターデータベー
スに登録されている予算情報が格納され、さらに工事要
求については工事施工マスタに登録されて、工事施工実
績が予算管理ファイルに格納され、この予算管理ファイ
ルで修繕材料費及び修繕労務工数について予算情報、実
績情報、仕掛情報が管理される。2. Description of the Related Art Conventionally, as a budget management system of this type, budget information such as repair material costs and repair labor hours is stored in a budget master database, and each department requests purchase of new parts. A request to issue a stored item that requests the issue of stored items that have been purchased in bulk by the material management department,
In addition, when making a repair work request, for purchase requests and storage delivery requests, use the materials and materials purchasing management system to register the purchase request items in the order master file, and for the savings items, save item master By registering the issue information to
The purchase / delivery record information is registered in the budget management file using these materials / materials purchase management system. In this budget management file, in addition to purchase / delivery performance information, budget information registered in the budget master database is stored. Further, construction requests are registered in the construction execution master, and the construction execution results are budget management files. The budget management file manages budget information, performance information, and work-in-process information on repair material costs and repair labor hours.
【0003】また、工事要求によって行われた一件工事
の作業請負実績については、外注管理システムの作業請
負実績ファイルに一時登録されると共に、外注管理実績
累積ファイルに格納される。そして、一つの修繕工事に
ついて、総費用を算出するためには、予算管理ファイ
ル、資機材購買管理システム、外注管理システム、外注
管理実績累積ファイルにアクセス可能なパーソナルコン
ピュータで、ベース外注管理システムの作業請負実績フ
ァイルから例えば設計製図費、塗装費などの実績データ
を読込み、予算管理ファイルから修繕材料費、修繕労務
工数の予算及び実績データを読込み、外注管理実績ファ
イルから整備作業請負費、電気修理工事費実績データを
読込み、資機材購買管理システムから築炉材料費実績デ
ータを読込み、さらに経理システムから読出した整備労
務費、修繕労務付帯費実績データを入力することによ
り、修繕総費用を集計するようにしている。Further, the work contract record of one construction work performed according to the construction request is temporarily registered in the work contract record file of the subcontract management system and stored in the subcontract management record accumulation file. Then, in order to calculate the total cost for one repair work, a personal computer that can access the budget management file, the material and equipment purchasing management system, the outsourcing management system, and the outsourcing management results cumulative file Actual data such as design and drafting costs, painting costs, etc. are read from the contract result file, repair material cost, budget of the repair labor man-hours and actual data are read from the budget control file, maintenance work contract cost, electric repair work from the outsourcing management result file The total cost of repairs should be totaled by reading the actual cost data, reading the actual data of furnace construction material costs from the materials and equipment purchasing management system, and inputting the actual labor and repair labor incident costs actual data read from the accounting system. I have to.
【0004】[0004]
【発明が解決しようとする課題】しかしながら、上記従
来の予算管理システムにあっては、予算管理ファイル、
資機材購買管理システム、外注管理システム、外注管理
実績累積ファイルの夫々にアクセス可能なパーソナルコ
ンピュータを使用して修繕総費用を集計するようにして
いるので、費用分類毎に各ファイル及びシステムにアク
セスするためのアプリケーションを一々立ち上げなけれ
ばならず、集計作業に時間が掛かると共に、修繕総費用
の一元管理を行うことができないと共に、予算管理ファ
イルでは修繕材料費、修繕労務工数について管理してい
るので、発注残仕掛データを把握する場合に、修繕材料
費及び修繕労務工数の2費目についてのみ行うことがで
き、全費用分類について発注残仕掛データを細かく把握
することができないという未解決の課題がある。However, in the above-mentioned conventional budget management system, the budget management file,
The total cost of repairs is calculated by using a personal computer that can access each of the materials and materials purchasing management system, the outsourcing management system, and the outsourcing management results cumulative file, so each file and system is accessed by cost category. Since it requires a lot of applications to be launched, it takes time to aggregate data, and it is impossible to centrally manage the total cost of repairs, and the budget management file manages repair material costs and repair labor hours. , There is an unsolved problem that when the order backlog data is grasped, it can be done only for the second cost of the repair material cost and the repair labor time, and the order backorder data cannot be grasped in detail for all the cost classifications. .
【0005】そこで、本発明は、上記従来例の未解決の
課題に着目してなされたものであり、修繕総費用の一元
管理を行って、予算、実績、仕掛の各情報を正確に把握
することができる予算管理システムを提供することを目
的としている。Therefore, the present invention has been made by paying attention to the unsolved problem of the above-mentioned conventional example, and centrally manages the total cost of repairs, and accurately grasps each information of budget, actual result and work in process. The purpose is to provide a budget control system that can.
【0006】[0006]
【課題を解決するための手段】上記目的を達成するため
に、請求項1に係る予算管理システムは、プラント等に
おける修繕費用の予算管理を行う予算管理システムであ
って、修繕材料費及び修繕労務工数の予算情報を件名単
位で格納する予算マスターデータベースと、所定部署単
位で予算情報を登録すると共に、登録した予算情報の執
行管理を行う予算執行管理データベースとを備え、前記
予算執行管理データベースで、修繕材料費、修繕労務工
数、外注実績等を修繕項目及び要求元に対応した所定識
別コードを付加して格納すると共に、所定識別コードを
もとに所定部署単位の予算データ、実績データ及び発注
したが実績データが入力される以前の仕掛データを管理
し、修繕要求時に予算残情報を出力し、且つ予算の執行
管理状況を一元管理するようにしたことを特徴としてい
る。[Means for Solving the Problems] In order to achieve the above object, a budget control system according to claim 1 is a budget control system for performing budget control of repair expenses in a plant or the like. A budget master database that stores budget information of man-hours in units of subjects, and a budget execution management database that registers budget information in units of predetermined departments and manages execution of registered budget information, and in the budget execution management database, Repair material costs, repair labor hours, outsourced results, etc. are stored with a predetermined identification code corresponding to the repair item and requester stored, and based on the predetermined identification code, budget data, actual data, and order for each predetermined department are placed. Manages work-in-progress data before actual data is input, outputs remaining budget information at the time of repair request, and centrally manages budget execution management status. It is characterized in that the the to.
【0007】また、請求項2に係る予算管理システム
は、買入要求及び貯品出庫要求を管理する資機材購買管
理システムの買入・出庫実績データと、前記予算マスタ
ーデータベースの予算データと、工事要求を管理する工
事施工マスタファイルに格納された工事施工実績データ
とをもとに修繕材料費、修繕労務工数の予算データ及び
実績データを格納する予算管理ファイルと、作業請負要
求に基づいて仕掛データを管理する作業請負仕掛データ
ベースと、作業請負実績データを管理する外注管理実績
累積ファイルとを備え、前記予算執行管理データベース
は、前記予算管理ファイルに格納された修繕材料費、修
繕労務工数の予算データ及び実績データと、前記作業請
負仕掛データベースの仕掛データと、前記外注管理ファ
イルの作業請負実績データとに基づいて予め設定した所
定数の費用分類毎に予算データ、実績データ及び仕掛デ
ータを区分けして格納するように構成されていることを
特徴としている。The budget management system according to claim 2 is the purchase / delivery performance data of a material / material purchasing management system for managing purchase requests and storage / delivery requests, budget data of the budget master database, and construction work. A budget management file that stores repair material costs, budget data of repair labor man-hours and actual data based on the construction work actual data stored in the construction work master file that manages requests, and work-in-progress data based on work contract requests. A work contract work in progress database for managing the work contract work data, and an outsourced management record cumulative file for managing the work contract record data, and the budget execution management database stores budget data of repair material costs and repair labor hours stored in the budget management file. And the actual data, the work contract data in the work contract work database, and the work contract result in the subcontract management file. Budget data every predetermined number cost classifications set in advance based on the over data, is characterized by being configured to store and dividing the actual data and the widget data.
【0008】さらに、請求項3に係る予算管理システム
は、請求項2に係る発明において、前記予算執行管理デ
ータベースは、買入要求、貯品出庫要求、工事要求、作
業請負要求が入力されたときに、入力時点における該当
費用分類における予算残情報を提示する予算残情報提示
手段を備えていることを特徴としている。Further, in the budget management system according to claim 3, in the invention according to claim 2, when the purchase execution request, the storage delivery request, the construction request, and the work contract request are input to the budget execution management database. In addition, it is characterized by comprising a budget balance information presenting means for presenting budget balance information in the corresponding expense classification at the time of input.
【0009】[0009]
【発明の実施の形態】以下、本発明の実施の形態を図面
を伴って説明する。図1は本発明の一実施形態を製鉄所
の保全工事業務に適用した場合の一例を示す概略構成図
であり、図中、1は予算マスターデータベース2、予算
執行管理データベース3、整備作業請負仕掛データベー
ス4及び保全工事データベース5を有する保全管理サー
バーであって、この保全管理サーバー1がローカルエリ
アネットワーク6に接続されている。BEST MODE FOR CARRYING OUT THE INVENTION Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is a schematic configuration diagram showing an example in which one embodiment of the present invention is applied to a maintenance work of a steel mill. In the figure, 1 is a budget master database 2, a budget execution management database 3, and a maintenance work contract work. A maintenance management server having a database 4 and a maintenance work database 5, the maintenance management server 1 being connected to a local area network 6.
【0010】このローカルエリアネットワーク6には、
資機材購買管理を行う資機材購買管理サーバー7、外注
管理を行う外注管理サーバー8、経理を管理する経理管
理サーバー9及び保全情報を解析する保全解析サーバー
10及び各所管部署に配置されたパーソナルコンピュー
タPC1〜PCn(nは正の整数)が接続されている。
このような製鉄所では、高炉、製鋼工場、熱間圧延工
場、冷間圧延工場、棒・条鋼工場等の多数の工場で各設
備の保全工事が行われている。In this local area network 6,
Material and material purchasing management server 7 for purchasing and management of materials and equipment, outsourcing management server 8 for outsourcing management, accounting management server 9 for managing accounting, maintenance analysis server 10 for analyzing maintenance information, and personal computers arranged in each department. PC1 to PCn (n is a positive integer) are connected.
In such a steel plant, maintenance work of each facility is carried out at a number of factories such as a blast furnace, a steel mill, a hot rolling mill, a cold rolling mill, a bar and bar mill.
【0011】例えば熱間圧延工場では、加熱炉で加熱さ
れたスラブを粗圧延装置で粗圧延してから仕上げ圧延装
置で仕上げ圧延を行って巻取装置で巻き取るようにして
いる。ここで、粗圧延装置では複数台の粗圧延ミルが配
設されていると共に、仕上げ圧延装置でも複数台の仕上
げ圧延ミルが配設されており、これら各装置の保全を行
うために、多くの数の定期修理工事が行われている他、
突発的な修理工事も発生している。For example, in a hot rolling plant, a slab heated in a heating furnace is roughly rolled by a rough rolling device, then finish rolled by a finish rolling device and wound by a winding device. Here, in the rough rolling device, a plurality of rough rolling mills are arranged, and also in the finish rolling device, a plurality of finish rolling mills are arranged, and in order to maintain each of these devices, many In addition to a number of regular repair works,
Sudden repair work has also occurred.
【0012】ここで、定期修理部位としては、図2
(a),(b)に示すように、ハウジング2の上部の圧
下部A、ハウジング2の内部の圧下部B、ハウジング2
の操作側部C、ハウジング2の駆動側部D、駆動スピン
ドルE、ピニオンスタンドF、圧延ロールを脱着する際
に使用するターンテーブルG、ミル入側設備H、ミル出
側設備I及び次ミル入側設備Hの10箇所が挙げられ
る。実際の定期修理内容としては、ベアリング交換、油
圧ホース交換、油圧シリンダ交換、パッキン等の交換な
どの多数の部品交換や給油脂等がある。Here, as the regular repair part, FIG.
As shown in (a) and (b), the lower part A of the upper part of the housing 2, the lower part B of the inside of the housing 2, the housing 2
Operation side part C, drive side part D of housing 2, drive spindle E, pinion stand F, turntable G used when removing and installing the rolling rolls, mill entry side equipment H, mill exit side equipment I, and next mill entry There are 10 locations of the side equipment H. The actual contents of periodic repairs include replacement of many parts such as bearing replacement, hydraulic hose replacement, hydraulic cylinder replacement, and packing replacement, and grease supply.
【0013】このような保全工事業務では、保全管理サ
ーバー1と所管部署に配設されたパーソナルコンピュー
タPCi(i=1,2……n)との間で図3に示す処理
を実行する。すなわち、先ず、所管部署のパーソナルコ
ンピュータPCiで、工事基準登録/修正画面を表示
し、この工事基準登録/修正画面で、定期修理工事の種
別、基準周期、基準生産量、工事時間、工事要員等を工
事基準情報として入力してから登録処理を行うことによ
り、保全管理サーバー1の保全工事データベース5にお
けるの工事基準ファイル5aに工事基準情報を登録する
と共に、修正処理を行うことにより登録された工事基準
情報の修正を行う。In such maintenance work, the processing shown in FIG. 3 is executed between the maintenance management server 1 and the personal computers PCi (i = 1, 2 ... n) arranged in the department in charge. That is, first, the construction standard registration / correction screen is displayed on the personal computer PCi of the department in charge, and on this construction standard registration / correction screen, the type of regular repair work, standard cycle, standard production amount, construction time, construction personnel, etc. Is entered as construction standard information and then the registration process is performed, thereby registering the construction standard information in the construction standard file 5a of the maintenance construction database 5 of the maintenance management server 1 and performing the correction process to register the construction. Correct the reference information.
【0014】このように、工事基準情報が保全工事デー
タベース5の工事基準ファイル5aに登録されると、保
全管理データベース5で前回の定期修理工事の施工日か
ら該当工事の基準の周期乃至生産量で計算した次回の施
工予定日が近づいた定期修理工事の工事の工事計画が自
動的に立案され、立案された定期修理工事計画に必要な
工事情報が工事計画ファイル5bに格納される。この工
事計画ファイル5bに定期修理工事計画の工事情報が格
納されると、この工事情報が該当所管部署のパーソナル
コンピュータPCiに通知される。As described above, when the construction standard information is registered in the construction standard file 5a of the maintenance construction database 5, the maintenance management database 5 shows the construction cycle from the construction date of the previous regular repair work to the standard cycle or production amount of the construction. A construction plan for the construction of the regular repair construction whose calculated next construction scheduled date is approaching is automatically drafted, and construction information necessary for the drafted regular repair construction plan is stored in the construction plan file 5b. When the construction information of the regular repair construction plan is stored in the construction plan file 5b, the construction information is notified to the personal computer PCi of the relevant department.
【0015】工事情報が通知されたパーソナルコンピュ
ータPCiでは、工事計画管理表を帳票として印刷する
印刷要求を行うと共に、定期修理及び平日工事リストを
印刷する印刷要求を行い、印刷した定期修理及び平日工
事リストに基づいて必要な会議を行って、その結果をパ
ーソナルコンピュータPCiで定期修理及び平日工事リ
スト修正又は登録要求画面を表示し、この画面で修正又
は登録を選択することにより、工事計画の修正及び登録
を行う。In the personal computer PCi notified of the construction information, a print request for printing the construction plan management table as a form and a print request for printing the regular repair and weekday construction list are made, and the printed periodic repair and weekday construction are performed. A necessary meeting is held based on the list, and the result is displayed on the personal computer PCi for the periodic repair and weekday construction list correction or registration request screen, and by selecting the correction or registration on this screen, the construction plan correction and Register.
【0016】この工事計画の登録が完了すると、工事要
求画面が該当する所管部署のパーソナルコンピュータP
Ciに表示され、この工事要求画面で工事要求を行う
と、工事施工マスタファイル5cに例えば図3に示す定
期修理番号、工事件名、修理部品を特定するためのコー
ド、人員、修理時間等を表す定期修理リストが登録され
ると共に、定期修理リストから買入要求及び貯品出庫要
求を行う品名リストが抽出される。When the registration of the construction plan is completed, the construction request screen is displayed on the personal computer P of the relevant department.
When the construction request is displayed on Ci and a construction request is made on this construction request screen, the construction construction master file 5c shows, for example, the periodic repair number, construction title, code for identifying repair parts, personnel, repair time, etc. shown in FIG. The regular repair list is registered, and the item name list for which a purchase request and a stored goods delivery request are made is extracted from the regular repair list.
【0017】そして、工事要求画面で工事要求を行う
と、工事施工マスタファイル5cで、工事要求伝票及び
工数契約申請書が自動作成されて、所管部署のパーソナ
ルコンピュータPCiに表示され、これら工事要求伝票
及び工数契約申請書を印刷してから工数契約決裁が完了
すると、パーソナルコンピュータPCiから決裁完了通
知を入力することにより、これが工事施工マスタファイ
ル5cに通知される。この工事施工管理マスタファイル
5cでは、決裁完了通知を外注管理サーバー8に送信す
る。When a construction request is made on the construction request screen, the construction request master file 5c automatically creates a construction request slip and a man-hour contract application form, which are displayed on the personal computer PCi of the department in charge. When the man-hour contract approval is completed after printing the man-hour contract application form, this is notified to the construction master file 5c by inputting the approval completion notification from the personal computer PCi. The construction management master file 5c sends a notice of approval to the outsourcing management server 8.
【0018】一方、工事要求仕様書が施工会社に送付さ
れ、この工事要求仕様書に基づいて定期修理工事が施工
開始される。その後、定期修理工事が完了してから施工
会社の管理システム11で定期修理工事の完了を入力す
ると、この施工会社の管理システム11から工事施工マ
スタファイル5cに定期修理工事完了通知が送出され、
工事施工マスタファイル5cで定期修理工事完了通知を
受けると完成報告書を印刷して、施工会社に送付し、施
工会社で完成報告書を確認した後に所管部署に送付し、
所管部署で確認した後にパーソナルコンピュータPCi
の検定承認画面で検定承認を入力することにより、検定
承認情報が工事施工マスタファイル5cに格納される。On the other hand, the construction request specifications are sent to the construction company, and the regular repair work is started based on the construction request specifications. After that, when the completion of the periodic repair work is entered in the management system 11 of the construction company after the periodic repair work is completed, the periodic repair work completion notification is sent from the management system 11 of the construction company to the construction construction master file 5c,
Upon receipt of the periodic repair work completion notification in the construction master file 5c, print the completion report and send it to the construction company. After confirming the completion report at the construction company, send it to the department in charge.
After confirming in the department in charge, personal computer PCi
By inputting the verification approval on the verification approval screen of 1., the verification approval information is stored in the construction master file 5c.
【0019】工事施工マスタファイル5cでは、検定承
認情報が格納されると、定期修理工事の完成情報を外注
管理サーバー8に送信する。外注管理サーバー8では、
定期修理工事完成情報に基づいて支払金額を計算し、計
算支払い金額を外注管理部署で確認してから支払金額を
経理管理サーバー9に送信する。経理管理サーバー9で
は、外注管理サーバー8からの支払金額を受信すると、
施工会社に対して支払処理を行う。When the verification approval information is stored in the construction master file 5c, the completion information of the periodic repair work is transmitted to the outsourcing management server 8. In the outsourcing management server 8,
The payment amount is calculated based on the periodic repair work completion information, the calculated payment amount is confirmed by the outsourcing management department, and then the payment amount is transmitted to the accounting management server 9. When the accounting management server 9 receives the payment amount from the outsourcing management server 8,
Perform payment processing to the construction company.
【0020】保全管理サーバー1は、予算マスターデー
タベース2に修繕材料費及び修繕労務工数の予算が件名
単位で登録されると共に、予算執行管理データベース3
に修繕材料費及び修繕労務工数を含む定期修理工事に必
要な予算が所定の費用分類に従って予め設定された所管
部署における所定班以上の単位で登録される。また、保
全管理サーバー1は、前述した工事基準ファイル5a、
工事計画マスタファイル5b及び工事施工マスタファイ
ル5cの他、資機材購買管理サーバー6から収集される
買入・出庫実績データ、予算マスターデータベース2に
登録されている予算データ、工事施工マスタファイル5
cに格納される工事施工実績データを収集して、工事件
名単位で修繕材料費及び修繕労務工数の予算及び実績を
管理する予算管理ファイル12と外注管理サーバー8の
作業請負実績データを累積する外注管理実績累積ファイ
ル13とが設けられ、整備作業請負仕掛データベース
4、予算管理ファイル12及び外注管理実績累積ファイ
ル13に登録されている各データが予算執行管理データ
ベース3に所定の費用分類毎に、予算、実績、仕掛デー
タに分けて登録される。In the maintenance management server 1, the budget of the repair material cost and the number of repair labor hours is registered in the budget master database 2 for each subject, and the budget execution management database 3
The budget required for regular repair work, including repair material costs and repair labor hours, is registered in units of a predetermined group or more in a pre-established department according to a predetermined cost classification. In addition, the maintenance management server 1 uses the above-mentioned construction standard file 5a,
In addition to the construction plan master file 5b and the construction construction master file 5c, the purchase / delivery result data collected from the material / material purchasing management server 6, the budget data registered in the budget master database 2, and the construction construction master file 5
Subcontracting that collects the construction result data stored in c and accumulates the work management record data of the budget management file 12 and the subcontract management server 8 that manages the budget and results of the repair material cost and the repair labor man-hour for each construction subject. A management record accumulating file 13 is provided, and each data registered in the maintenance work contract work database 4, the budget management file 12, and the outsourcing management record accumulating file 13 is stored in the budget execution management database 3 for each predetermined expense category. , Results, and in-process data are registered separately.
【0021】資機材購買管理サーバー7は、各部署に配
置されたパーソナルコンピュータPC1〜PCnから買
入要求又は貯品出庫要求が入力されたときに、買入要求
に対しては注文マスターファイル21に定期修理工事毎
に割付けられ定期修理工事IDコード、資材品名コー
ド、買入品名及び数量を登録し、貯品出庫要求に対して
は貯品マスターファイル22に定期修理工事IDコー
ド、資材品名コード、出庫部品名称及び数量を登録す
る。The material / material purchasing management server 7 stores an order master file 21 in response to a purchase request when a purchase request or a storage delivery request is input from the personal computers PC1 to PCn arranged in each department. The periodic repair work ID code, material item name code, purchase item name and quantity that are assigned for each regular repair work are registered, and the periodical repair work ID code, material item code, Register the outgoing parts name and quantity.
【0022】この資機材購買管理サーバー7は、注文マ
スターファイル21に買入品名、資材品名コード及び数
量が登録されると、該当する買入品を発注し、発注した
買入品が納品されたときに納品データを登録すると共
に、少なくとも定期修理工事IDコード、資材品名コー
ドを含む買入実績データを予算管理ファイル12に送信
する。一方、出庫部品については貯品マスタファイル2
2に出庫部品が登録されると、該当部品の在庫を確認し
て出庫日、定期修理工事IDコード、資材品名コード、
数量を登録する。When the purchase item name, the material item name code, and the quantity are registered in the order master file 21, the equipment purchasing management server 7 orders the corresponding purchase item and the ordered purchase item is delivered. At the same time, the delivery data is registered, and at the same time, the purchase record data including at least the periodic repair work ID code and the material name code is transmitted to the budget management file 12. On the other hand, for outgoing parts, the storage master file 2
When the delivery parts are registered in 2, check the inventory of the relevant parts and check the delivery date, periodic repair work ID code, material name code,
Register the quantity.
【0023】外注管理サーバー8では、作業請負工事完
了通知を受信したときに、作業請負実績情報を入力し、
入力した作業請負実績情報に基づいて施工会社への支払
金額を計算し、外注管理部門で確認した後に支払金額を
経理管理サーバー9に送信する。整備作業請負仕掛デー
タベース4には、後述する所管部署のパーソナルコンピ
ュータPCiから作業請負要求が行われたときに、作業
請負工事件名が定期修理工事IDコード及び請負工事件
名コードと共に作業請負仕掛情報として格納される。In the outsourcing management server 8, when the work contract construction completion notice is received, the work contract result information is input,
The amount of payment to the construction company is calculated based on the input work contract result information, and after confirmation by the outsourcing management department, the amount of payment is transmitted to the accounting management server 9. In the maintenance work contract work database 4, when a work contract request is issued from a personal computer PCi of a department to be described later, the work contract work subject is stored as work contract work information together with the regular repair work ID code and the contract work subject code. To be done.
【0024】したがって、この整備作業請負仕掛データ
ベース4に格納されている作業請負仕掛情報と、外注管
理サーバー8に格納される作業請負実績情報とに基づい
て、作業請負仕掛情報のうち作業請負実績情報が登録さ
れていないものを抽出することにより、工事が完了して
いない作業請負仕掛中の作業請負工事情報を抽出するこ
とができる。また、予算管理ファイル12には、予算マ
スターデータベース2からの現在までの修繕材料費及び
修繕労務工数の予算情報と、資機材購買管理サーバー7
から入力される買入・出庫実績情報と、工事施工マスタ
ファイル5cから入力される工事施工実績情報とが入力
されることにより、修繕材料費及び修繕労務工数の予算
及び実績が件名単位で格納される。Therefore, based on the work contract work in progress information stored in the maintenance work contract work in progress database 4 and the work contract work record information stored in the outsourcing management server 8, the work contract work record information among the work contract work record information. By extracting the information that is not registered, the work contract work information of the work contract work in which the work is not completed can be extracted. Further, the budget management file 12 includes budget information of the repair material cost and the repair labor time from the budget master database 2 to the present, and the material / material purchasing management server 7.
By inputting the purchase / delivery performance information input from and the construction work performance information input from the construction work master file 5c, the repair material cost and the budget of the repair labor man-hours and performance are stored in units of subjects. It
【0025】したがって、この予算管理ファイルを参照
することにより、現時点での件名単位の予算と実績との
対比を行うことができ、予算の消化状況を件名単位で把
握することができる。そして、予算管理ファイル12に
登録されている件名単位の修繕材料費及び修繕労務工数
の予算情報及び実績情報と、整備作業請負仕掛データベ
ース4に登録されている整備作業請負仕掛情報と、外注
管理サーバー8に設けられた外注管理実績累積ファイル
13に登録された作業請負実績情報と、経理管理サーバ
ー9に登録されている整備労務費、修繕労務付帯費の予
算情報及び実績情報とが予算執行管理データベース3に
入力されることにより、これらに基づいて予め設定され
た費用分類毎で且つ主管部署の所定班単位以上の単位で
予算情報、実績情報及び仕掛情報を形成すると共に、件
名単位の全費用分類の仕掛情報を仕掛明細ファイル14
に格納する。Therefore, by referring to this budget management file, it is possible to compare the current budget for each subject line with the actual result, and to grasp the progress of the budget for each subject line. Then, the budget information and the performance information of the repair material cost and the repair labor man-hour for each subject registered in the budget management file 12, the maintenance work contract work in progress information registered in the maintenance work contract work in progress database 4, and the outsourcing management server The budget execution management database is the work contract performance information registered in the outsourcing management performance cumulative file 13 provided in 8 and the budget information and performance information of maintenance labor costs and repair labor incidental costs registered in the accounting management server 9. By inputting in 3, the budget information, the performance information and the work-in-progress information are formed for each of the preset cost categories based on these and for each predetermined group unit or more of the supervising department, and all the expense categories are classified by subject. In-process information of in-process item file 14
To store.
【0026】この予算執行管理データベース3に格納さ
れた全費用分類の予算、実績及び仕掛情報が保全解析サ
ーバー10に送られ、この保全解析サーバー10で全費
用分類における予算情報、実績情報及び仕掛情報につい
て所定班以上単位及び件名単位での管理グラフを作成す
る。そして、各主管部署に配設されたパーソナルコンピ
ュータPC1〜PCnでは、図3及び図4に示す保全管
理処理を実行する。The budget, actual results and work-in-progress information of all expense categories stored in the budget execution management database 3 are sent to the maintenance analysis server 10, and the maintenance analysis server 10 budget information, actual result and work-in-progress information in all expense categories. Create a management graph in units of more than a predetermined group and subject. Then, the personal computers PC1 to PCn arranged in each supervising department execute the maintenance management process shown in FIGS. 3 and 4.
【0027】この保全管理処理は、先ず、ステップS1
で、図5に示すように、予算登録ボタン21及び買入要
求ボタン22、貯品出庫要求ボタン23、工事要求ボタ
ン24、整備作業請負要求ボタン25、リスト・グラフ
出力ボタン26及び終了ボタン27を有するメニュー画
面28を表示し、次いで、ステップS2に移行して、予
算登録ボタン21がマウス又はキーボードでカーソルを
移動させてマウスのクリック又はキーボードのエンター
キーを押下することにより選択されたか否かを判定し、
予算登録ボタン21が選択されたときには、ステップS
3aに移行して、修繕材料費及び修繕労務工数の予算を
件名単位に入力してこれらを保全管理サーバー1の予算
マスターデータベース2に登録し、次いでステップS3
bに移行して、修繕材料費及び修繕労務工数以外に予め
設定された16種類の費用分類(例えば整備作請費)に
ついて予め設定した設備管理班以上を単位として予算を
入力し、これらを保全管理サーバー1の予算執行管理デ
ータベース3に登録する予算登録処理を行ってから前記
ステップS1に戻る。In this maintenance management process, first, step S1
Then, as shown in FIG. 5, a budget registration button 21, a purchase request button 22, a stored goods delivery request button 23, a construction request button 24, a maintenance work contract request button 25, a list / graph output button 26, and an end button 27 are displayed. The menu screen 28 having the same is displayed, and then the process shifts to step S2 to check whether or not the budget registration button 21 is selected by moving the cursor with the mouse or the keyboard and clicking the mouse or pressing the enter key of the keyboard. Judge,
When the budget registration button 21 is selected, step S
3a, enter the budget of repair material cost and repair labor man-hour in units of subject, register these in the budget master database 2 of the maintenance management server 1, and then step S3
Go to b and enter the budget in units of 16 or more preset equipment management groups other than repair material costs and repair labor man-hours (for example, maintenance contract costs) and maintain them After performing the budget registration process for registering in the budget execution management database 3 of the management server 1, the process returns to step S1.
【0028】一方、ステップS2の判定結果が予算登録
ボタン21が選択されていないものであるときには、ス
テップS4に移行して、予算登録処理が完了しているか
否かを判定し、予算登録処理が完了していないときには
ステップS5に移行して、予算登録処理を促す旨のメッ
セージ情報を表示してから前記ステップS1に戻り、予
算登録処理が完了しているときにはステップS6に移行
して、買入要求ボタン22が選択されているか否かを判
定し、買入要求ボタン22が選択されているときにはス
テップS7に移行して、買入要求画面を表示する。この
買入要求画面は、図6に示すように、買入要求を行う品
名入力欄31、規格仕様入力欄32、図番入力欄33、
使用場所入力欄34、資材品名コード入力欄35、修理
工事IDコード入力欄36、要求元名入力欄37及び要
求者名入力欄38を少なくとも有すると共に、登録ボタ
ン39、修正ボタン40及びメニュー画面に戻る戻りボ
タン41を有する。On the other hand, if the result of determination in step S2 is that the budget registration button 21 has not been selected, the process proceeds to step S4, it is determined whether or not the budget registration process is completed, and the budget registration process is executed. If not completed, the process proceeds to step S5 to display the message information prompting the budget registration process and then returns to step S1. If the budget registration process is completed, the process proceeds to step S6 to purchase. It is determined whether the request button 22 is selected, and when the purchase request button 22 is selected, the process proceeds to step S7 and the purchase request screen is displayed. This purchase request screen is, as shown in FIG. 6, a product name input field 31, a standard specification input field 32, a drawing number input field 33 for which a purchase request is made,
It has at least a place of use input field 34, a material name code input field 35, a repair work ID code input field 36, a request source name input field 37 and a requester name input field 38, and a registration button 39, a correction button 40 and a menu screen. It has a return button 41 to return.
【0029】次いで、ステップS8に移行して、資材品
名コードが入力されたか否かを判定し、資材品名コード
が入力されたときにはステップS9に移行して、入力さ
れた資材品名コードに基づいて該当する設備管理班の資
材品名コードが含まれる費用分類における現在の予算残
高情報を表示又は印刷してからステップS10に移行
し、資材品名コードが入力されていないときには後述す
るステップS12に移行する。Next, in step S8, it is determined whether or not the material item name code is input. When the material item name code is input, the process proceeds to step S9, and it is determined based on the input material item code. After displaying or printing the current budget balance information in the expense classification including the material name code of the equipment management group, the process proceeds to step S10, and when the material name code is not input, the process proceeds to step S12 described later.
【0030】ステップS10では、登録ボタン39がマ
ウス又はキーボードによって選択されたか否かを判定
し、登録ボタン39が選択されたときには、ステップS
11に移行して、買入要求画面に入力された買入要求情
報を資機材購買管理サーバー7の注文マスタファイルに
書込んでから前記ステップS1に戻り、登録ボタン39
が選択されていないときにはステップS12に移行し
て、修正ボタン40が選択されているか否かを判定し、
修正ボタン40が選択されているときにはステップS1
3に移行して、買入要求情報を修正する修正処理を行っ
てから前記ステップS1に戻り、修正ボタン40が選択
されていないときにはステップS14に移行して、戻り
ボタン41が選択されているか否かを判定し、戻りボタ
ン41が選択されているときには前記ステップS1に戻
り、戻りボタン41が選択されていないときには前記ス
テップS8に戻る。In step S10, it is determined whether or not the registration button 39 is selected by the mouse or keyboard. If the registration button 39 is selected, step S10 is selected.
11, the purchase request information input on the purchase request screen is written in the order master file of the materials and materials purchasing management server 7, and then the process returns to step S1 to register the registration button 39.
When is not selected, the process proceeds to step S12, it is determined whether the correction button 40 is selected,
When the correction button 40 is selected, step S1
3, the correction process for correcting the purchase request information is performed, and then the process returns to step S1. If the correction button 40 is not selected, the process proceeds to step S14 and whether the return button 41 is selected or not. If the return button 41 is selected, the process returns to step S1. If the return button 41 is not selected, the process returns to step S8.
【0031】また、ステップS6の判定結果が買入要求
ボタン22が選択されていないものであるときには、ス
テップS15に移行して、貯品出庫要求ボタン23が選
択されているか否かを判定し、貯品出庫要求ボタン23
が選択されているときにはステップS16に移行して、
貯品出庫要求画面を表示する。この貯品出庫要求画面
は、図7に示すように、貯品出庫要求を行う品名入力欄
51、規格仕様入力欄52、図番入力欄53、使用場所
入力欄54、資材品名コード入力欄55、修理工事ID
コード入力欄56、要求元名入力欄57及び要求者名入
力欄58を少なくとも有すると共に、登録ボタン59、
修正ボタン60及びメニュー画面に戻る戻りボタン61
を有する。When the result of determination in step S6 is that the purchase request button 22 is not selected, the process proceeds to step S15, and it is determined whether or not the stored goods delivery request button 23 is selected. Save goods delivery request button 23
When is selected, the process proceeds to step S16,
Display the store issue request screen. As shown in FIG. 7, the storage delivery request screen is displayed as shown in FIG. 7, where a storage delivery request is made for a product name input field 51, a standard specification input field 52, a drawing number input field 53, a use location input field 54, and a material product name code input field 55. , Repair work ID
A code input field 56, a request source name input field 57, and a requester name input field 58 are provided, and a registration button 59,
Modify button 60 and return button 61 for returning to the menu screen
Have.
【0032】次いで、ステップS17に移行して、資材
品名コードが入力されたか否かを判定し、資材品名コー
ドが入力されたときにはステップS18に移行して、入
力された資材品名コードに基づいて該当する設備管理班
の資材品名コードが含まれる費用分類における現在の予
算残高情報を表示又は印刷してからステップS19に移
行し、資材品名コードが入力されていないときには後述
するステップS21に移行する。Next, in step S17, it is determined whether or not the material item name code is input. When the material item name code is input, the process proceeds to step S18, and it is determined based on the input material item name code. After displaying or printing the current budget balance information in the expense classification including the material name code of the equipment management group, the process proceeds to step S19, and when the material name code is not input, the process proceeds to step S21 described later.
【0033】ステップ19では、登録ボタン59がマウ
ス又はキーボードによって選択されたか否かを判定し、
登録ボタン59が選択されたときには、ステップS20
に移行して、貯品出庫要求画面に入力された貯品出庫要
求情報を資機材購買管理サーバー7の貯品マスタファイ
ルに書込んでから前記ステップS1に戻り、登録ボタン
59が選択されていないときにはステップS21に移行
して、修正ボタン60が選択されているか否かを判定
し、修正ボタン60が選択されているときにはステップ
S22に移行して、貯品出庫要求情報を修正する修正処
理を行ってから前記ステップS1に戻り、修正ボタン6
0が選択されていないときにはステップS23に移行し
て、戻りボタン61が選択されているか否かを判定し、
戻りボタン61が選択されているときには前記ステップ
S1に戻り、戻りボタン61が選択されていないときに
は前記ステップS17に戻る。In step 19, it is determined whether the registration button 59 has been selected with the mouse or the keyboard,
When the registration button 59 is selected, step S20
The process proceeds to step S1 to write the storage delivery request information input on the storage delivery request screen to the storage master file of the materials and materials purchasing management server 7, and then returns to step S1 and the registration button 59 is not selected. When the correction button 60 is selected, the process proceeds to step S21, and when the correction button 60 is selected, the process proceeds to step S22 to perform a correction process for correcting the stored goods delivery request information. Then, the process returns to step S1 and the correction button 6
When 0 is not selected, the process proceeds to step S23, it is determined whether the return button 61 is selected,
When the return button 61 is selected, the process returns to step S1. When the return button 61 is not selected, the process returns to step S17.
【0034】さらに、ステップS15の判定結果が貯品
出庫要求ボタン23が選択されていないものであるとき
には、ステップS24に移行して、工事要求ボタン24
が選択されているか否かを判定し、工事要求ボタン24
が選択されているときにはステップS25に移行して、
工事計画管理ファイルに登録されている定期修理工事I
Dコード、定期修理工事名を入力する工事要求画面を表
示する。この工事要求画面は、図8に示すように、定期
修理工事IDコード入力欄71、定期修理工事名入力欄
72、工事場所名入力欄73、要求元名入力欄74、要
求者名入力欄75、登録ボタン76及びメニュー画面に
戻る戻りボタン77を少なくとも有する。Furthermore, when the result of determination in step S15 is that the stored goods delivery request button 23 has not been selected, the process proceeds to step S24 and the construction request button 24.
Is selected, the construction request button 24
When is selected, the process proceeds to step S25,
Regular repair work I registered in the construction plan management file I
Display the construction request screen for entering the D code and periodic repair construction name. This construction request screen is, as shown in FIG. 8, a periodic repair construction ID code input column 71, a periodic repair construction name input column 72, a construction place name input column 73, a request source name input column 74, and a requester name input column 75. , A registration button 76 and a return button 77 for returning to the menu screen.
【0035】次いで、ステップS26に移行して、工事
要求画面で、定期修理工事IDコードが入力されたか否
かを判定し、定期修理工事IDコードが入力されたとき
にはステップS27に移行して、該当する定期修理工事
が含まれる費用分類の予算残情報を表示又は印刷し、次
いでステップS28に移行して、登録ボタン76が選択
されているか否かを判定し、登録ボタン76が選択され
ているときには、ステップS29に移行して、工事施工
マスタファイル5cに対して、工事計画ファイル5bか
ら必要な工事計画情報を収集して、これらを工事施工情
報として格納し、次いでステップS30に移行して、格
納した工事施工情報に基づいて工事要求伝票、工数契約
申請書及び工事要求仕様書を印刷してから前記ステップ
S1に戻る。Next, the process proceeds to step S26, and it is determined whether or not the regular repair work ID code is input on the construction request screen. When the regular repair work ID code is input, the process proceeds to step S27 and the corresponding The budget remaining information of the expense classification including the scheduled repair work is displayed or printed, and then the process proceeds to step S28 to determine whether or not the registration button 76 is selected. When the registration button 76 is selected, , Go to step S29, collect necessary construction plan information from the construction plan file 5b for the construction construction master file 5c, store these as construction construction information, and then move to step S30 to store. The construction request slip, the man-hour contract application form, and the construction request specification are printed on the basis of the constructed construction information, and the process returns to step S1.
【0036】また、ステップS24の判定結果が登録ボ
タン76が選択されていないときには、ステップS31
に移行して、戻るボタン77が選択されているか否かを
判定し、戻るボタン77が選択されているときには前記
ステップS1に戻り、戻るボタン77が選択されていな
いときには前記ステップS26に戻る。さらにまた、前
記ステップS24の判定結果が工事要求ボタン24が選
択されていないときには、図4のステップS32に移行
して、整備作業請負要求ボタン25が選択されているか
否かを判定し、これが選択されているときにはステップ
S33に移行して、図9に示す整備作業請負IDコード
入力欄81、整備作業請負件名入力欄82、工事場所名
入力欄83、要求仕様入力欄84、要求元名入力欄8
5、要求者名入力欄86、登録ボタン87及びメニュー
画面に戻る戻りボタン88を有する整備作業請負要求画
面を表示してからステップS34に移行する。If the result of determination in step S24 is that the registration button 76 has not been selected, step S31
Then, it is determined whether or not the return button 77 is selected. If the return button 77 is selected, the process returns to step S1. If the return button 77 is not selected, the process returns to step S26. Furthermore, when the construction request button 24 is not selected in the determination result of step S24, the process proceeds to step S32 of FIG. 4, and it is determined whether or not the maintenance work contract request button 25 is selected, and this is selected. If so, the process proceeds to step S33, and the maintenance work contract ID code input field 81, the maintenance work contract name input field 82, the construction site name input field 83, the required specification input field 84, the request source name input field shown in FIG. 8
5, the maintenance work contract request screen having the requester name input field 86, the registration button 87 and the return button 88 for returning to the menu screen is displayed and then the process proceeds to step S34.
【0037】ステップS34では、整備作業請負IDコ
ードが入力されたか否かを判定し、これが入力されたと
きにはステップS35に移行して、該当する整備作業請
負IDコードが含まれる費用分類の予算残情報を表示又
は印刷してからステップS36に移行し、登録ボタン8
7が選択されているか否かを判定し、登録ボタン87が
選択されているときには、ステップS37に移行して、
整備作業請負仕掛データベース4に対して整備作業請負
要求仕様情報を整備作業請負仕掛情報として登録してか
ら図3の前記ステップS1に戻り、登録ボタン87が選
択されていないときには、ステップS38に移行して、
戻りボタン88が選択されているか否かを判定し、これ
が選択されているときには前記ステップS1に戻り、戻
りボタン88が選択されていないときには前記ステップ
S34に戻る。In step S34, it is determined whether or not the maintenance work contract ID code is input. When this is input, the process proceeds to step S35, and the remaining budget information of the expense classification including the corresponding maintenance work contract ID code. Is displayed or printed, the process proceeds to step S36, and the registration button 8
7 is selected, and when the registration button 87 is selected, the process proceeds to step S37,
After the maintenance work contract request specification information is registered in the maintenance work contract work database 4 as the maintenance work contract work information, the process returns to step S1 in FIG. 3, and when the registration button 87 is not selected, the process proceeds to step S38. hand,
It is determined whether or not the return button 88 is selected. When the return button 88 is selected, the process returns to step S1. When the return button 88 is not selected, the process returns to step S34.
【0038】また、ステップS34の判定結果が整備作
業請負IDコードが入力されていないときには前記ステ
ップS38に移行する。なおさらに、ステップS32の
判定結果が整備作業請負要求ボタン25が選択されてい
ないときには、ステップS39に移行して、リスト・グ
ラフ出力ボタン26が選択されているか否かを判定し、
これが選択されていないときには、ステップS40に移
行して、終了ボタン27が選択されているか否かを判定
し、終了ボタン27が選択されているときには処理を終
了し、終了ボタン27が選択されていないときには図3
のステップS1に戻る。If the result of determination in step S34 is that the maintenance work contract ID code has not been input, the process proceeds to step S38. Furthermore, when the result of the determination in step S32 is that the maintenance work contract request button 25 is not selected, the process proceeds to step S39, and it is determined whether or not the list / graph output button 26 is selected.
When this is not selected, the process proceeds to step S40, and it is determined whether or not the end button 27 is selected. When the end button 27 is selected, the process is ended, and the end button 27 is not selected. Sometimes FIG.
Return to step S1.
【0039】また、ステップS39の判定結果がリスト
・グラフ出力ボタン26が選択されているときにはステ
ップS41に移行して、図10に示すように、予算執行
管理一覧/明細リスト出力ボタン91、全費用分類予算
管理リスト出力ボタン92、全費用分類予算管理グラフ
出力ボタン93及びメニュー画面に戻る戻りボタン94
を有するリスト出力画面を表示し、次いでステップS4
2に移行して、予算執行管理一覧/明細リスト出力ボタ
ン91が選択されたか否かを判定し、これが選択された
ときには、ステップS43に移行して、予算執行管理デ
ータベース4にアクセスして、現在の予算執行管理状況
を表す一覧予算執行管理一覧とその明細を表すリストを
表示又は印刷してから前記ステップS42に戻る。When the list / graph output button 26 is selected as the determination result in step S39, the process proceeds to step S41, and as shown in FIG. 10, the budget execution management list / details list output button 91, all expenses. Classification budget management list output button 92, all expense classification budget management graph output button 93, and return button 94 to return to the menu screen
Display a list output screen with, then step S4
2, it is determined whether or not the budget execution management list / details list output button 91 has been selected. When this is selected, the process moves to step S43 to access the budget execution management database 4 and The list showing the budget execution management status and the list showing the budget execution management list and the list showing the details thereof are displayed or printed, and the process returns to step S42.
【0040】前記ステップS42の判定結果が予算執行
管理一覧/明細リスト出力ボタン91が選択されていな
いときには、ステップS44に移行して、全費用分類予
算管理リスト出力ボタン92が選択されているか否かを
判定し、これが選択されているときにはステップS45
に移行して、予め設定された全費用分類の予算管理状況
を予算、実績、仕掛に区分けしたリストを表示又は印刷
してから前記ステップS42に戻り、ステップS44の
判定結果が全必要分類予算管理リスト出力ボタン92が
選択されていないときにはステップS46に移行する。When the budget execution management list / details list output button 91 is not selected as a result of the determination in step S42, the process proceeds to step S44 to determine whether the all expense classification budget management list output button 92 is selected. Is determined, and if this is selected, step S45
After displaying or printing a list in which the budget management status of all preset expense classifications is divided into budgets, actual results, and work in progress, the process returns to step S42, and the determination result of step S44 is the budget management of all required classifications. If the list output button 92 is not selected, the process proceeds to step S46.
【0041】このステップS46では、全費用分類予算
管理グラフ出力ボタン93が選択されているか否かを判
定し、これが選択されているときにはステップS47に
移行して、保全解析サーバー10にアクセスして、全必
要分類の予算管理グラフを予算、実績及び仕掛に区分け
して表示又は印刷してから前記ステップS42に戻り、
全費用分類予算管理グラフ出力ボタン93が選択されて
いないときにはステップS48に移行して、戻りボタン
94が選択されているか否かを判定し、これが選択され
ているときには前記ステップS1に戻り、戻りボタン9
4が選択されていないときには前記ステップS42に戻
る。In this step S46, it is determined whether or not the output button 93 for outputting all budget classification budget control graphs is selected. If this is selected, the process proceeds to step S47 to access the maintenance analysis server 10, After displaying or printing the budget management graphs of all necessary classifications by dividing them into budgets, actual results and work in process, the process returns to step S42,
When the output button 93 for all budget classification budget control graph is not selected, the process proceeds to step S48, and it is determined whether or not the return button 94 is selected. If this is selected, the process returns to step S1 and the return button. 9
When 4 is not selected, the process returns to step S42.
【0042】次に、上記実施形態の動作を図11を伴っ
て説明する。先ず、年度始めに所管部署に設備保全関係
の予算が通知されると、パーソナルコンピュータPCi
で、保全管理処理を立ち上げ、これに所管部署の設備管
理班以上の単位に設定されたグループ名及びパスワード
を入力してログオンすることにより、メニュー画面28
が表示され、このメニュー画面で予算登録ボタン21を
選択する。Next, the operation of the above embodiment will be described with reference to FIG. First, when the department in charge is notified of the budget related to equipment maintenance at the beginning of the year, the personal computer PCi
Then, the maintenance management process is started up, and the group name and password set in the unit of the equipment management group of the department in charge or more are input to log on and the menu screen 28
Is displayed, and the budget registration button 21 is selected on this menu screen.
【0043】これにより、所定様式の予算登録画面が表
示され、この予算登録画面で修繕材料費及び修繕労務工
数の予算を件名単位で入力し、これらを予算マスターデ
ータベース2に書込むと共に、修繕材料費及び修繕労務
工数以外の予め設定された6種類の費用分類について設
備管理班以上の所望の単位となるログオングループの予
算を入力し、これらを予算執行管理データベース3に書
込んで、予算登録を完了する。As a result, a budget registration screen of a predetermined format is displayed. On this budget registration screen, the budget for the repair material cost and the repair labor man-hour is input for each subject, and these are written in the budget master database 2, and the repair material is also written. Enter the budget of the logon group, which is the desired unit of the equipment management group or above, for the six types of preset cost categories other than expenses and repair labor hours, write these in the budget execution management database 3, and register the budget. Complete.
【0044】一方、所管部署のパーソナルコンピュータ
PCiで工事基準情報を工事基準ファイル5aに登録し
ておくことにより、この工事基準ファイル5aを参照し
て、定期修理工事計画が自動立案され、立案された定期
修理工事計画情報が工事計画ファイル5bに格納される
ことにより、工事計画管理表が印刷されると共に、定期
修理/平日工事リストが印刷され、この定期修理/平日
工事リストに基づいて所管部署で会議を行って、工事計
画修正/登録を行う。この工事計画の登録が行われる
と、定期修理工事の実施に必要な買入品、貯品出庫品、
工事依頼、整備製作請負依頼が決定される。On the other hand, by registering the construction standard information in the construction standard file 5a with the personal computer PCi of the department in charge, the regular repair construction plan is automatically drafted by referring to the construction standard file 5a. By storing the regular repair construction plan information in the construction plan file 5b, the construction plan management table is printed, and the regular repair / weekday construction list is printed. Hold a meeting to modify / register the construction plan. Once this construction plan is registered, the purchased items, stored items, and
A construction request and a maintenance production contract request are decided.
【0045】この状態で、買入要求を行うには、パーソ
ナルコンピュータPCiで、保全管理処理を立ち上げ、
これに所管部署の設備管理班以上の単位に設定されたグ
ループ名及びパスワードを入力してログオンすることに
より、メニュー画面28が表示され、このメニュー画面
28で、買入要求ボタン22を選択する。これにより、
図6に示す買入要求画面が表示され、この買入要求画面
で品名、規格仕様、図番、仕様場所、資材品名コードを
順次入力していくと、資材品名コードが入力された時点
で、買入品が決定されることになるので、ログオンして
いるグループの買入品が含まれる費用分類における現時
点の予算残高情報が表示又は印刷される(ステップS
9)。In this state, in order to make a purchase request, the personal computer PCi starts the maintenance management process,
A menu screen 28 is displayed by inputting the group name and password set in units of the equipment management group of the department in charge or more and logging on, and the purchase request button 22 is selected on the menu screen 28. This allows
The purchase request screen shown in FIG. 6 is displayed, and when the product name, the standard specification, the drawing number, the specification location, and the material item name code are sequentially input on this purchase request screen, when the material item code is input, Since the purchase item will be decided, the current budget balance information in the expense classification including the purchase item of the group that is logged on is displayed or printed (step S).
9).
【0046】したがって、表示又は印刷された予算残高
情報を参照することにより、現在までの予算の消化状況
を正確に把握することができ、予算残高に余裕がある場
合には買入品を購入することができるが、予算残高が少
ない場合には、本当に必要とする買入品であるか否かを
検討することになり、単位グループでの発注抑止を容易
に行うことができる。この予算残高情報を確認した後
に、買入要求を行う場合には、買入要求画面で登録ボタ
ン39を選択することにより、入力された買入要求情報
が資機材購買管理サーバー7の注文マスタファイルに書
込まれる。資機材サーバー7では、注文マスタファイル
に書込まれた買入品について買入決裁が行われているか
否かを判断し、所管部署で買入決裁が行われている場合
には、予め作成されている照会用リストから買入先を決
定して納品先を要求元として発注を行う。Therefore, by referring to the displayed or printed budget balance information, it is possible to accurately comprehend how much the budget has been consumed up to the present time, and if the budget balance has a margin, purchase the purchased product. However, if the budget balance is small, it is necessary to consider whether or not the product is a purchase item that is really needed, and it is possible to easily suppress orders in the unit group. When making a purchase request after confirming the budget balance information, by selecting the registration button 39 on the purchase request screen, the input purchase request information is stored in the order master file of the material and material purchasing management server 7. Written in. The equipment server 7 judges whether or not the purchase decision has been made for the purchase item written in the order master file, and if the purchase decision is made by the department in charge, it is created in advance. The supplier is determined from the inquiry list and the order is placed using the delivery destination as the request source.
【0047】そして、買入品が所管部署に納品されたと
きには、所管部署でパーソナルコンピュータPCiを使
用して入荷入力を行って、資機材購買管理サーバー7の
注文マスタファイルに入荷情報を書込むことにより、買
入処理を完了する。また、所管部署の単位グループが資
機材購買管理部門で予め購入している貯品について貯品
出庫要求を行う場合も、上記買入要求と同様に、保全管
理処理にログオンしてからメニュー画面28で、貯品出
庫要求ボタン23を選択することにより、図7の貯品出
庫要求画面が表示され、この貯品出庫要求画面で資材品
名コードを入力することにより、貯品が含まれる費用分
類における予算残高情報が表示又は印刷され(ステップ
S18)、この予算残高情報を参照することにより、貯
品出庫を行うか否かを判断し、貯品出庫を行う場合に
は、登録ボタン59を選択することにより、入力した貯
品出庫要求情報を資機材購買管理サーバー7の貯品マス
タファイルに書込む。これによって、資機材購買管理部
門で、貯品リストから該当する貯品を探し出し、これを
要求元に配送し、配送が完了したときに、貯品マスタフ
ァイルに配送完了情報を書き込んで貯品出庫処理を終了
する。このとき、貯品を出庫することにより、貯品数が
設定数以下となったときには、該当する貯品を注文マス
タファイルに書込んで発注処理を行う。When the purchased product is delivered to the department in charge, the department in charge uses the personal computer PCi to input the arrival of goods and write the arrival information into the order master file of the materials and materials purchasing management server 7. This completes the purchase process. Also, when the unit group of the department in charge makes a request to store goods for the goods purchased in advance in the materials and equipment purchasing management department, the menu screen 28 is displayed after logging on to the maintenance management process as in the case of the purchasing request. Then, by selecting the stored goods delivery request button 23, the stored goods delivery request screen of FIG. 7 is displayed. By inputting the material name code on this stored goods delivery request screen, the cost classification in which the stored goods are included. The budget balance information is displayed or printed (step S18). By referring to this budget balance information, it is determined whether or not the stored goods are to be delivered. When the stored goods are to be delivered, the registration button 59 is selected. As a result, the input storage delivery request information is written in the storage master file of the materials and materials purchasing management server 7. In this way, the materials and equipment purchasing management department searches for the corresponding stored item from the stored item list, delivers it to the request source, and when the delivery is completed, writes delivery completion information in the stored item master file and outputs the stored item. The process ends. At this time, when the number of stored items becomes equal to or less than the set number by issuing the stored items, the corresponding stored items are written in the order master file and the order processing is performed.
【0048】また、定期修理工事を要求する場合には、
保全管理処理にログオンしてからメニュー画面28で、
工事要求ボタン24を選択することにより、図8の工事
要求画面が表示され、この工事要求画面で定期修理工事
IDコード入力欄71に定期修理工事IDコードを入力
したときに、該当する費用分類の予算残高情報が表示又
は印刷されることにより、この予算残高情報を参照して
要求する工事の規模を見直すことができる。When requesting regular repair work,
After logging on to the maintenance management process, on the menu screen 28,
When the construction request button 24 is selected, the construction request screen of FIG. 8 is displayed, and when the periodic repair construction ID code is entered in the regular repair construction ID code input field 71 on this construction request screen, the corresponding cost classification is displayed. By displaying or printing the budget balance information, the scale of the requested construction can be reviewed with reference to the budget balance information.
【0049】そして、工事規模を見直して工事計画ファ
イルに格納されている工事計画を修正する必要が有る場
合には、工事計画ファイル5bにアクセスして、工事計
画情報を修正してから再度保全管理処理にログインし
て、メニュー画面から工事要求ボタン24を選択して工
事要求画面を表示して登録ボタン75を選択し、工事規
模の見直しの必要がないときには、工事要求画面で登録
ボタン75を選択する。これにより、工事計画ファイル
5bから工事施工情報が工事施工マスタファイルに転送
され、この工事施工マスタファイル5cで、工事要求伝
票及び工数契約申請書を印刷すると共に、工事要求仕様
書を印刷して工数契約決裁を行ってから施工会社に送付
して定期修理工事を依頼する。このとき、工事施工マス
タファイル5cから注文情報が施工会社の管理システム
11及び外注管理サーバー8に転送される。When it is necessary to review the construction scale and correct the construction plan stored in the construction plan file, the construction plan file 5b is accessed to correct the construction plan information and then maintenance management is performed again. Log in to the process, select the construction request button 24 from the menu screen to display the construction request screen and select the registration button 75. When there is no need to review the construction scale, select the registration button 75 on the construction request screen. To do. As a result, the construction information is transferred from the construction plan file 5b to the construction master file, and the construction request master file 5c is used to print the construction request slip and the man-hour contract application form, as well as the construction request specification sheet and the man-hour. After the contract is approved, it is sent to the construction company for regular repair work. At this time, the order information is transferred from the construction work master file 5c to the management system 11 and the outsourcing management server 8 of the construction company.
【0050】施工会社では、工事要求仕様書及び管理シ
ステム11に転送された注文情報に従って定期修理工事
を施工し、施工が完了すると、施工会社の管理システム
11に施工完了を入力し、この管理システム11から工
事施工マスタファイル5cに施工完了通知が入力され
る。この工事施工マスタファイル5cでは施工完了通知
が入力されると、完成報告書を印刷して施工会社に送付
し、施工会社で完成報告書に所定事項を記入してから所
管部署に送付することにより、所管部署で検定を行って
から検定承認情報を工事施工マスタファイル5cに登録
する。The construction company carries out the periodic repair work in accordance with the construction request specifications and the order information transferred to the management system 11. When the construction is completed, the construction company inputs the construction completion to the management system 11 and the management system The notification of construction completion is input from 11 to the construction master file 5c. When a construction completion notification is input in this construction master file 5c, a completion report is printed and sent to the construction company, and the construction company fills in the completion report with predetermined items and then sends it to the department in charge. After the inspection is conducted by the department in charge, the inspection approval information is registered in the construction master file 5c.
【0051】工事施工マスタファイル5cでは、検定承
認情報が入力されると、工事完成情報を外注管理サーバ
ー8に通知し、外注管理サーバー8で格納されている注
文情報に基づいて支払金額を算出し、算出した支払金額
を外注管理部門で確認した後に、経理管理サーバー9に
転送して、支払いやその他の経理処理を行う。そして、
定期修理工事が完了すると、工事施工マスタファイル5
cに格納されている工事施工実績が予算管理ファイルに
書込まれることにより、この予算管理ファイルで、先に
書込まれている資機材購買管理サーバー7での買入・貯
品出庫実績データと、予算マスタデータベース2に登録
されている修繕材料費及び修繕労務工数の予算データ
と、工事施工実績とに基づいて修繕材料費及び修繕労務
工数の予算及び実績データが件名単位で蓄積され、これ
ら修繕材料費及び修繕労務工数の予算及び実績データが
予算執行管理データベース3に書込まれる。In the construction master file 5c, when the verification approval information is input, the construction completion information is notified to the subcontract management server 8 and the payment amount is calculated based on the order information stored in the subcontract management server 8. After the calculated payment amount is confirmed by the outsourcing management department, it is transferred to the accounting management server 9 for payment and other accounting processing. And
When the periodic repair work is completed, the construction work master file 5
By writing the construction and construction results stored in c in the budget management file, the budget management file can be used to record the purchase / save / delivery result data in the equipment / material purchasing management server 7 previously written. , Budget data of repair material cost and repair labor time registered in the budget master database 2 and budget and actual data of repair material cost and repair labor time are accumulated based on the subject based on the construction result, and these repairs are performed. The budget and actual data of the material cost and the repair labor time are written in the budget execution management database 3.
【0052】さらに、定期修理工事を行う際に、設計製
図、塗装、電気修理/工事を伴う場合には、単位グルー
プが保全管理処理にログオンしてからメニュー画面28
で、整備作業請負要求ボタン25を選択することによ
り、整備作業請負要求画面を表示し、これに所定項目を
入力する。このとき、整備作業請負IDコードを入力し
たときに、該当する費用分類の予算残高情報が表示又は
印刷されることにより、この予算残高情報を参照するこ
とにより、整備作業請負の予算消化状況を判断し、適正
な整備作業請負要求を決定する。Further, when the periodical repair work involves design drawing, painting, electrical repair / work, the menu screen 28 is displayed after the unit group logs on to the maintenance management process.
Then, by selecting the maintenance work contract request button 25, a maintenance work contract request screen is displayed, and predetermined items are input therein. At this time, when the maintenance work contract ID code is entered, the budget balance information of the corresponding expense classification is displayed or printed. By referring to this budget balance information, the budget consumption status of the maintenance work contract is determined. The appropriate maintenance work contract request.
【0053】適正な整備作業請負要求が決定されたとき
には、整備作業請負要求画面で、所定項目を入力してか
ら登録ボタン86を選択することにより、整備作業請負
情報が整備作業請負仕掛データベース4に登録され、こ
の整備作業請負情報に必要とする予算が予算執行管理デ
ータベース3に書込まれ、この予算執行管理データベー
ス3で、単位グループでの該当する費用分類における仕
掛中の予算が累積されると共に、その件名単位の全費用
分類における仕掛中予算が仕掛明細ファイルに登録され
る。When an appropriate maintenance work contract request is determined, the maintenance work contract information is stored in the maintenance work contract work database 4 by inputting predetermined items and then selecting the register button 86 on the maintenance work contract request screen. The budget that is registered and required for this maintenance work contract information is written in the budget execution management database 3, and in this budget execution management database 3, the in-process budget in the corresponding expense classification in the unit group is accumulated. , The in-process budget for all the expense classifications for each subject is registered in the in-process item file.
【0054】したがって、予算執行管理データベース3
では、予算管理ファイルから書込まれる件名単位の修繕
材料費及び修繕労務工数の予算及び実績及び仕掛データ
と、整備作業請負仕掛データベース4に格納されている
仕掛データと、外注管理実績累積ファイルに格納されて
いる整備作業請負実績データとに基づいて、整備管理班
以上の単位で全費用分類毎の予算、実績及び仕掛データ
を形成すると共に、件名単位の全費用分類毎の仕掛デー
タを形成し、これを仕掛明細ファイルに書込む。Therefore, the budget execution management database 3
Then, it is stored in the budget management file, the repair material cost for each subject and the budget, actual results and work-in-progress data of the repair labor hours, the work-in-process data stored in the maintenance work contract work-in-progress database 4, and the outsourcing management actual cumulative file. Based on the maintenance work contract actual data, the budget, actual results and work-in-progress data for all expense categories are formed in units of the maintenance management group and above, and work-in-process data for all expense categories by subject are formed. Write this in the work in process file.
【0055】この結果、各所管部署に配設されたパーソ
ナルコンピュータPCiから予算執行管理データベース
4に、部署のIDコードとパスワードとを入力してログ
インすることにより、予算執行管理データベース4に格
納されている予算執行管理一覧及び明細及び整備管理班
以上の単位及び件名単位の全費用分類毎における予算、
実績及び仕掛データを画面表示するか又はプリンタでリ
スト印刷することがきる。As a result, by entering the ID code and password of the department into the budget execution management database 4 from the personal computer PCi arranged in each department, the data is stored in the budget execution management database 4. List of budget execution management and details and budget for each expense category by item and maintenance management group
The results and work-in-progress data can be displayed on the screen or printed as a list on a printer.
【0056】また、保全解析サーバー10に設備管理班
以上の単位のIDコード及びパスワードを入力してログ
インすることにより、設備管理班以上の単位及び件名単
位での全費用分類毎の予算、実績及び仕掛データの予算
管理グラフを表示又は印刷することができる。このよう
に、上記実施形態によると、予算執行管理データベース
3に設備管理班以上の単位で予め設定した所定数の費用
分類毎に予算データ、実績データ及び仕掛データが区分
けされて格納されているので、修繕総費用を一元管理す
ることができると共に、各所管部署に配設さたパーソナ
ルコンピュータPC1〜PCnから予算執行管理データ
ベース3にログオンすることにより、IDコードで表さ
れる設備管理班以上の単位における予め設定された所定
数の費用分類毎に区分けされた予算データ、実績データ
及び仕掛データをリスト形式で容易・迅速に表示又は印
刷することができる。Further, by inputting the ID code and the password of the unit of the equipment management group or more to the maintenance analysis server 10 and logging in, the budget, the actual result and the budget of each expense classification in the unit of the equipment management group or more and the subject unit can be obtained. A budget control graph of in-process data can be displayed or printed. As described above, according to the above embodiment, the budget data, the actual result data, and the work-in-progress data are stored separately in the budget execution management database 3 for each predetermined number of expense categories preset in units of the equipment management group or more. , The total cost of repairs can be centrally managed, and by logging on to the budget execution management database 3 from the personal computers PC1 to PCn arranged in each department, the unit of equipment management group or more represented by an ID code It is possible to easily or quickly display or print the budget data, the actual result data, and the work-in-progress data in a list format, which are divided for each of a predetermined number of expense categories set in advance.
【0057】さらに、各所管部署に配設さたパーソナル
コンピュータPC1〜PCnからIDコード及びパスワ
ードを入力して保全解析サーバー10にログインするこ
とにより、整備管理班以上の単位での全費用分類におけ
る予算データ、実績データ及び仕掛データの予算管理グ
ラフを容易・迅速に画面表示するか又はプリンタで印刷
することができる。しかも、作業請負要求を行う毎に仕
掛データが整備作業仕掛データベース4に格納されるの
で、発注仕掛情報をリアルタイムに把握することがで
き、予算管理をより正確に行うことができる。Furthermore, by inputting the ID code and password from the personal computers PC1 to PCn provided in each department and logging in to the maintenance analysis server 10, the budget for all cost classification in units of the maintenance management group or higher is obtained. Budget control graphs of data, actual data and work-in-progress data can be easily and quickly displayed on the screen or printed by a printer. Moreover, since the in-process data is stored in the maintenance work in-process database 4 every time the work contract request is made, the order in-process information can be grasped in real time, and the budget control can be performed more accurately.
【0058】なお、上記実施形態では、保全管理サーバ
ー1、資機材購買管理サーバー7、外注管理サーバー
8、経理管理サーバー9及び保全解析サーバ10を使用
して分散処理する場合について説明したが、これに限定
されるものではなく、1台の管理サーバーに2以上のデ
ータベースを格納して、各サーバー機能を統合して管理
するようにしてもよい。また、上記実施形態において
は、保全工事として定期修理工事を行う場合について説
明したが、これに限定されるものではなく、事後修理工
事、突発修理工事、運転対応工事、予防修理工事、保全
改良工事、運転改良工事、一般補修工事等の各種保全工
事を行う場合にも、予算データ、実績データ及び仕掛デ
ータを予算執行管理データベース3で予算の一元管理を
行うことができる。In the above embodiment, the case where the maintenance management server 1, the material / material purchasing management server 7, the outsourcing management server 8, the accounting management server 9 and the maintenance analysis server 10 are used for distributed processing has been described. However, the present invention is not limited to this, and two or more databases may be stored in one management server to integrate and manage the server functions. Further, in the above-described embodiment, the case where the periodic repair work is performed as the maintenance work has been described, but the present invention is not limited to this, and subsequent repair work, sudden repair work, operation response work, preventive repair work, maintenance improvement work. Even when performing various maintenance works such as operation improvement work and general repair work, the budget data, the actual result data, and the work-in-progress data can be centrally managed in the budget execution management database 3.
【0059】さらに、上記実施形態においては、資機材
購買管理サーバー7で貯品出庫管理を行う場合に在庫量
が所定数以下となったときに発注を行う定量発注方式を
採用している場合について説明したが、これに限定され
るものではなく、最高在庫量を必要最小限に設定してお
き、使用の都度又は比較的短期間内において、使用量を
注文する定数発注方式や注文周期を定期的に決めてお
き、注文量はその都度必要数を決める定期発注方式を採
用するようにしてもよい。Further, in the above embodiment, the case where the fixed-quantity ordering system is employed in which the stocking of goods and materials is managed by the server 7 for purchasing and managing materials and materials when the stock quantity becomes less than a predetermined number is placed. As explained above, the present invention is not limited to this, and the maximum inventory amount is set to the required minimum amount, and the constant ordering method for ordering the usage amount or the order cycle for ordering the usage amount is set every time it is used or within a relatively short period of time. Alternatively, a regular ordering method may be adopted in which the required quantity of the order quantity is determined each time.
【0060】[0060]
【発明の効果】以上説明したように、請求項1に係る発
明によれば、前記予算執行管理データベースで、修繕材
料費、修繕労務工数、外注実績等を修繕項目及び要求元
に対応した所定識別コードを付加して格納すると共に、
所定識別コードをもとに所定部署単位の予算データ、実
績データ及び発注したが実績データが入力される以前の
仕掛データを管理し、修繕要求時に予算残情報を出力
し、且つ予算の執行管理状況を一元管理するようにして
いるので、修繕要求時に予算残高を把握することができ
ると共に、予算の執行管理状況を容易且つ迅速に把握す
ることができるという効果が得られる。As described above, according to the invention according to claim 1, in the budget execution management database, the repair material cost, the repair man-hour, the outsourcing record, etc. are identified according to the repair item and the request source. While adding and storing the code,
Manages budget data, actual data, and work-in-process data before the actual data is ordered, based on the specified identification code, for each department, outputs budget balance information when a repair request is made, and budget execution management status Since centralized management is carried out, it is possible to obtain an effect that the budget balance can be grasped when a repair request is made, and the budget execution management situation can be grasped easily and promptly.
【0061】また、請求項2に係る発明によれば、買入
要求及び貯品出庫要求を管理する資機材購買管理システ
ムの買入・出庫実績データと、前記予算マスターデータ
ベースの予算データと、工事要求を管理する工事施工マ
スタファイルに格納された工事施工実績データとをもと
に修繕材料費、修繕労務工数の予算データ及び実績デー
タを格納する予算管理ファイルと、作業請負要求に基づ
いて仕掛データを管理する作業請負仕掛データベース
と、作業請負実績データを管理する外注管理実績累積フ
ァイルとを備え、前記予算執行管理データベースは、前
記予算管理ファイルに格納された修繕材料費、修繕労務
工数の予算データ及び実績データと、前記作業請負仕掛
データベースの仕掛データと、前記外注管理ファイルの
作業請負実績データとに基づいて予め設定した所定数の
費用分類毎に予算データ、実績データ及び仕掛データを
区分けして格納するように構成されているので、所定部
署単位における所定数の費用分類毎の予算データ、実績
データ及び仕掛データを容易且つ迅速に把握することが
できるという効果が得られる。Further, according to the invention of claim 2, the purchase / delivery performance data of the material / material purchasing management system for managing the purchase request and the storage / delivery request, the budget data of the budget master database, and the construction work. A budget management file that stores repair material costs, budget data of repair labor man-hours and actual data based on the construction work actual data stored in the construction work master file that manages requests, and work-in-progress data based on work contract requests. A work contract work in progress database for managing the work contract work data, and an outsourced management record cumulative file for managing the work contract record data, and the budget execution management database stores budget data of repair material costs and repair labor hours stored in the budget management file. And actual data, in-process data in the work contract work in progress database, and work contract result data in the outsourcing management file. It is configured to store the budget data, actual data and work-in-progress data separately for each predetermined number of expense categories preset based on An effect is obtained that data and work-in-progress data can be grasped easily and quickly.
【0062】さらに、請求項3に係る発明によれば、前
記予算執行管理データベースは、買入要求、貯品出庫要
求、工事要求、作業請負要求が入力されたときに、入力
時点における該当費用分類における予算残情報を提示す
る予算残情報提示手段を備えているので、買入要求、工
事要求等の保全要求を行ったときに予算残情報を把握す
ることができ、予算残情報に見合った保全工事の見直し
を行って、適正な保全工事を行うことができるという効
果が得られる。Further, according to the invention of claim 3, the budget execution management database is such that, when a purchase request, a storage issue request, a construction request, and a work contract request are input, the corresponding expense classification at the time of input. The budget balance information presenting means for presenting the budget balance information is provided so that the budget balance information can be grasped when a maintenance request such as a purchase request or a construction request is made, and the maintenance corresponding to the budget balance information can be performed. The effect is that the work can be reviewed and appropriate maintenance work can be performed.
【図1】本発明の一実施形態を示すシステム構成図であ
る。FIG. 1 is a system configuration diagram showing an embodiment of the present invention.
【図2】保全工事の流れを示す説明図である。FIG. 2 is an explanatory diagram showing a flow of maintenance work.
【図3】予算執行管理データベースの保全管理処理手順
の前半部を示すフローチャートである。FIG. 3 is a flowchart showing the first half of the maintenance management processing procedure of the budget execution management database.
【図4】図3の保全管理処理手順の後半部を示すフロー
チャートである。FIG. 4 is a flowchart showing the latter half of the maintenance management processing procedure of FIG.
【図5】メニュー画面の一例を示す説明図である。FIG. 5 is an explanatory diagram showing an example of a menu screen.
【図6】買入要求画面の一例を示す説明図である。FIG. 6 is an explanatory diagram showing an example of a purchase request screen.
【図7】貯品出庫要求画面の一例を示す説明図である。FIG. 7 is an explanatory diagram showing an example of a stored goods delivery request screen.
【図8】工事要求画面の一例を示す説明図である。FIG. 8 is an explanatory diagram showing an example of a construction request screen.
【図9】整備作業請負要求画面の一例を示す説明図であ
る。FIG. 9 is an explanatory diagram showing an example of a maintenance work contract request screen.
【図10】リスト・グラフ出力画面の一例を示す説明図
である。FIG. 10 is an explanatory diagram showing an example of a list / graph output screen.
【図11】本発明の動作の説明に供する流れ図である。FIG. 11 is a flowchart for explaining the operation of the present invention.
1 保全管理サーバー 2 予算マスターデータベース 3 予算執行管理データベース 4 整備作業請負仕掛データベース 5 保全工事データベース 6 ローカルエリアネットワーク 7 資機材購買管理サーバー 8 外注管理サーバー 9 経理管理サーバー 10 保全解析サーバー 1 Maintenance management server 2 budget master database 3 budget execution management database 4 Maintenance work contract work database 5 Maintenance work database 6 Local Area Network 7 Equipment purchasing management server 8 Outsourcing management server 9 Accounting management server 10 Maintenance analysis server
フロントページの続き (72)発明者 佐倉 浩 岡山県倉敷市水島川崎通1丁目(番地な し) 川崎製鉄株式会社水島製鉄所内Continued front page (72) Inventor Hiroshi Sakura 1-chome, Mizushima Kawasaki-dori, Kurashiki-shi, Okayama Shi) Kawasaki Steel Co., Ltd. Mizushima Steel Works
Claims (3)
を行う予算管理システムであって、修繕材料費及び修繕
労務工数の予算情報を件名単位で格納する予算マスター
データベースと、所定部署単位で予算情報を登録すると
共に、登録した予算情報の執行管理を行う予算執行管理
データベースとを備え、前記予算執行管理データベース
で、修繕材料費、修繕労務工数、外注実績等を修繕項目
及び要求元に対応した所定識別コードを付加して格納す
ると共に、所定識別コードをもとに所定部署単位の予算
データ、実績データ及び発注したが実績データが入力さ
れる以前の仕掛データを管理し、修繕要求時に予算残情
報を出力し、且つ予算の執行管理状況を一元管理するよ
うにしたことを特徴とする予算管理システム。[Claim 1] A budget management system for budget management of repair expenses in plants, etc., comprising: a budget master database that stores budget information of repair material costs and repair labor hours by subject; and budget information by predetermined departments. It has a budget execution management database for registering and executing management of registered budget information, and in the budget execution management database, a predetermined identification corresponding to the repair item and request source such as repair material cost, repair labor man-hours, outsourcing results, etc. In addition to storing a code, it manages budget data, actual data, and work-in-progress data prior to the actual data being ordered, based on the specific identification code, based on the specific identification code, and stores the remaining budget information when a repair request is made. A budget management system characterized in that it outputs and centrally manages the budget management status.
機材購買管理システムの買入・出庫実績データと、前記
予算マスターデータベースの予算データと、工事要求を
管理する工事施工マスタファイルに格納された工事施工
実績データとをもとに修繕材料費、修繕労務工数の予算
データ及び実績データを格納する予算管理ファイルと、
作業請負要求に基づいて仕掛データを管理する作業請負
仕掛データベースと、作業請負実績データを管理する外
注管理実績累積ファイルとを備え、前記予算執行管理デ
ータベースは、前記予算管理ファイルに格納された修繕
材料費、修繕労務工数の予算データ及び実績データと、
前記作業請負仕掛データベースの仕掛データと、前記外
注管理ファイルの作業請負実績データとに基づいて予め
設定した所定数の費用分類毎に予算データ、実績データ
及び仕掛データを区分けして格納するように構成されて
いることを特徴とする請求項1記載の予算管理システ
ム。2. The purchase / delivery result data of a material / material purchasing management system that manages purchase requests and storage / delivery requests, the budget data of the budget master database, and a construction execution master file that manages construction requests. A budget management file that stores the repair material cost, the budget data of the repair labor hours and the actual data based on the performed construction result data,
A work contract work database that manages work in process data based on a work contract request, and an outsourced management record cumulative file that manages work contract record data. The budget execution management database is a repair material stored in the budget management file. Budget data of expenses and repair labor hours and actual data,
The budget data, the actual data, and the work-in-progress data are divided and stored for each predetermined number of expense categories set in advance based on the work-in-process data in the work-contract work-in-progress database and the work contract result data in the outsourcing management file. The budget management system according to claim 1, wherein the budget management system is provided.
要求、貯品出庫要求、工事要求、作業請負要求が入力さ
れたときに、入力時点における該当費用分類における予
算残情報を提示する予算残情報提示手段を備えているこ
とを特徴とする請求項2記載の予算管理システム。3. The budget balance management database presents budget balance information for presenting budget balance information in a corresponding cost category at the time of input when a purchase request, a storage delivery request, a construction request, and a work contract request are input. The budget management system according to claim 2, further comprising a presentation unit.
Priority Applications (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001323749A JP2003132203A (en) | 2001-10-22 | 2001-10-22 | Budget management system |
Applications Claiming Priority (1)
| Application Number | Priority Date | Filing Date | Title |
|---|---|---|---|
| JP2001323749A JP2003132203A (en) | 2001-10-22 | 2001-10-22 | Budget management system |
Publications (1)
| Publication Number | Publication Date |
|---|---|
| JP2003132203A true JP2003132203A (en) | 2003-05-09 |
Family
ID=19140593
Family Applications (1)
| Application Number | Title | Priority Date | Filing Date |
|---|---|---|---|
| JP2001323749A Pending JP2003132203A (en) | 2001-10-22 | 2001-10-22 | Budget management system |
Country Status (1)
| Country | Link |
|---|---|
| JP (1) | JP2003132203A (en) |
Cited By (5)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007043629A (en) * | 2005-06-30 | 2007-02-15 | Sony Corp | Graphic user interface device, operation input processing method, and bidirectional communication device |
| KR101070119B1 (en) | 2009-08-24 | 2011-10-05 | 주식회사아프로텍 | Management system of budget |
| CN110414925A (en) * | 2019-07-02 | 2019-11-05 | 北京科技大学 | A digital production management system and method based on mining enterprises |
| CN111833165A (en) * | 2020-05-27 | 2020-10-27 | 福建亿能达信息技术股份有限公司 | Expenditure budget management system, device and medium |
| JP2021047912A (en) * | 2016-03-16 | 2021-03-25 | 株式会社オービック | Work completion control device, work completion control method, and work completion control program |
-
2001
- 2001-10-22 JP JP2001323749A patent/JP2003132203A/en active Pending
Cited By (6)
| Publication number | Priority date | Publication date | Assignee | Title |
|---|---|---|---|---|
| JP2007043629A (en) * | 2005-06-30 | 2007-02-15 | Sony Corp | Graphic user interface device, operation input processing method, and bidirectional communication device |
| KR101070119B1 (en) | 2009-08-24 | 2011-10-05 | 주식회사아프로텍 | Management system of budget |
| JP2021047912A (en) * | 2016-03-16 | 2021-03-25 | 株式会社オービック | Work completion control device, work completion control method, and work completion control program |
| JP7046153B2 (en) | 2016-03-16 | 2022-04-01 | 株式会社オービック | Work completion control device, work completion control method, and work completion control program |
| CN110414925A (en) * | 2019-07-02 | 2019-11-05 | 北京科技大学 | A digital production management system and method based on mining enterprises |
| CN111833165A (en) * | 2020-05-27 | 2020-10-27 | 福建亿能达信息技术股份有限公司 | Expenditure budget management system, device and medium |
Similar Documents
| Publication | Publication Date | Title |
|---|---|---|
| JP6839521B2 (en) | Project progress management system | |
| EP1345192A2 (en) | System and method for tracking user certification and training | |
| Bernold et al. | Vendor analysis for best buy in construction | |
| JPH02155067A (en) | Stock warning method and stock warning system using the same | |
| JP2005222451A (en) | Profit / loss management information presentation method, profit / loss management information presentation device, and profit / loss management information presentation processing program | |
| US20110093365A1 (en) | System and Process for Monitoring, Control and Withdrawal of Consumable Items in a Production Environment | |
| CN116911830A (en) | An automated operation and maintenance management system for office equipment maintenance and consumables | |
| JP2005100298A (en) | Throughput maximizing system using rfid | |
| EP1259889A2 (en) | Apparatus and method for tracking and managing physical assets | |
| JP2003132203A (en) | Budget management system | |
| JP2008295549A (en) | Amusement stand distribution management system | |
| JP2024044063A (en) | Income and expenditure management device, income and expenditure management method, and income and expenditure management program | |
| JP2005346362A (en) | Automobile-related article/service sales promoting method, system, and program | |
| Gil-Goyzueta et al. | Process improvement proposal storage to increase the service level using lean warehousing in commerce companies | |
| JP2006072547A (en) | Construction management system, construction management method, and construction management program | |
| Pebriadi et al. | Design of Inventory Card Simulation Application for MSMEs Using Extreme Programming | |
| Reinkemeyer | Purpose: Identifying the right use cases | |
| Lawrenson | Effective spares management | |
| JP6242362B2 (en) | Profit / loss prediction apparatus and profit / loss prediction program | |
| JP2023153586A (en) | Inventory management device, inventory management method, and inventory management program | |
| JP2008171184A (en) | Vehicle management system | |
| JP2004310564A (en) | Physical distribution operation analysis system | |
| Wu et al. | Multiple criteria decision support system for production management | |
| JPH11338919A (en) | Production control system | |
| AU2021107090A4 (en) | Computer implemented system and method for vendor invoice management in integrated enterprise environment for construction companies |