JP2002186930A - Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor - Google Patents

Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor

Info

Publication number
JP2002186930A
JP2002186930A JP2000384351A JP2000384351A JP2002186930A JP 2002186930 A JP2002186930 A JP 2002186930A JP 2000384351 A JP2000384351 A JP 2000384351A JP 2000384351 A JP2000384351 A JP 2000384351A JP 2002186930 A JP2002186930 A JP 2002186930A
Authority
JP
Japan
Prior art keywords
asphalt
asphalt mixture
water
tape
construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000384351A
Other languages
Japanese (ja)
Inventor
Michihiko Ishida
道彦 石田
Kenji Shibata
健司 柴田
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Obayashi Corp
Original Assignee
Obayashi Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Obayashi Corp filed Critical Obayashi Corp
Priority to JP2000384351A priority Critical patent/JP2002186930A/en
Publication of JP2002186930A publication Critical patent/JP2002186930A/en
Pending legal-status Critical Current

Links

Landscapes

  • Road Paving Structures (AREA)
  • Processing Of Solid Wastes (AREA)

Abstract

PROBLEM TO BE SOLVED: To make it possible to perform a simple and secure water-adhesion joint between asphalt mixtures which are divisionally constructed, and provide a treatment method of joint portion of water barrier layers consisting of asphalt mixtures with high construction reliability. SOLUTION: This is a construction method to form a water-barrier layer through divisional application of asphalt mixtures 20 comprising asphalt and aggregates on the ground surface of the waste material disposal place and the surface of general roadbeds. The method comprises a tape pasting procedure that pastes a strip-type asphalt tape 27 onto the edge face 25a of an asphalt mixture 25 applied previously while this tape is being heated, and a water- adhesion joint procedure which performs water-adhesion joint of an asphalt mixture 28 applied later and asphalt mixtures 25 applied previously through applying the asphalt mixtures 28 applied later onto the surface of the asphalt tape 27.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、廃棄物処分場、貯
水池、或いは一般の路面に遮水処理を施すアスファルト
混合物の遮水層施工方法に関し、特に、領域的に分割し
て施工されるアスファルト混合物同士の接合部処理方法
に関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing an impermeable layer of an asphalt mixture for impermeable treatment on a waste disposal site, a reservoir, or a general road surface, and more particularly, to an asphalt constructed in a regionally divided manner. The present invention relates to a method for treating a joint between mixtures.

【0002】[0002]

【従来の技術】産業廃棄物や一般廃棄物を投棄する例え
ば埋立形の廃棄物処分場は、自然の地形を利用したり地
盤を掘削して造成された凹状の地盤の内部に、廃棄物を
埋立て貯留してゆくものである。この廃棄物処分場に埋
立てた廃棄物から浸出する汚水が、地下に浸透すること
により発生する環境汚染を防止するために、処分場の底
部地盤表面に予め遮水工を実施することが義務付けられ
ている。環境問題が何かと取り沙汰される昨今、上記の
遮水対策が処分場施工の成否の鍵を握るとも言える。
2. Description of the Related Art For example, landfill-type waste disposal sites for dumping industrial waste and general waste are disposed in a concave ground formed by utilizing natural terrain or excavating the ground. It is to be reclaimed and stored. In order to prevent environmental pollution caused by sewage leaching from the waste landfilled at this waste disposal site penetrating into the basement, it is mandatory to implement water-blocking work in advance on the bottom ground surface of the disposal site. Have been. In recent years, when environmental issues have been discussed, it can be said that the above-mentioned measures to block water are key to the success or failure of the construction of the repository.

【0003】この遮水工は、従来より経済性や遮水性の
面から、例えば軟質の合成樹脂系あるいはゴム系の遮水
シートを敷設することによって遮水性を付与するように
したものや、廃棄物処分場の底部地盤をアスファルト混
合物で覆って遮水層を形成するものなどが知られてい
る。特にアスファルト混合物を敷設施工して遮水層を形
成する手法は、施工性やコストの点から採用されること
も多かった。アスファルト混合物を敷設施工するに際し
ては、広大な処分場底面地盤に一気に敷き均しを実行し
て締め固め作業を行うことが困難な場合が多く、前施工
した所定領域端面を例えばテーパ仕上げして後施工のア
スファルト混合物を適宜重ねて接合させる分割施工が実
施されていた。
[0003] Conventionally, from the viewpoints of economy and water-blocking, the water-blocking works are provided with water-blocking by, for example, laying a soft synthetic resin-based or rubber-based water-blocking sheet, It is known that a bottom layer of a landfill is covered with an asphalt mixture to form an impermeable layer. In particular, the method of laying an asphalt mixture to form a water barrier layer has often been adopted from the viewpoint of workability and cost. When laying the asphalt mixture, it is often difficult to perform the compaction work by laying and leveling on the ground of the vast disposal site at a stretch, for example, after tapering the end face of the pre-constructed predetermined area Split construction in which the asphalt mixture of the construction is appropriately overlapped and joined has been implemented.

【0004】[0004]

【発明が解決しようとする課題】上記のアスファルト混
合物の分割施工は、前施工アスファルト混合物が十分に
高温を保っている時間内に後施工アスファルト混合物の
接合が行われれば、漏水原因となりがちな施工ジョイン
トの発生は少ないと考えられる。しかしながら、施工面
積が大規模な施工現場となればなるほどアスファルト混
合物の分割施工の頻度は増大し、前施工アスファルト混
合物が常温化しない時間内に後施工を実施することは困
難となる。従って、前施工アスファルト混合物が冷えて
常温化した後に後施工アスファルト混合物を施工したと
しても、前施工と後施工の間の接合面は完全に溶着する
ことがなく、自ずと導水経路を形成する可能性が高い。
他に、前施工アスファルト混合物と後施工アスファルト
混合物との接合面にゴム材などの止水材を挟み込むこと
も考えられているが、各アスファルト混合物と止水材自
体との水密接合が確保されているかかえって疑わしく、
施工信頼性に乏しかった。
The above-mentioned asphalt mixture divisional construction involves a construction which tends to cause water leakage if the post-construction asphalt mixture is joined within a time period in which the pre-construction asphalt mixture is kept at a sufficiently high temperature. It is considered that the occurrence of joints is small. However, as the construction area becomes larger on a construction site, the frequency of the division work of the asphalt mixture increases, and it becomes difficult to perform the post-construction within a time when the pre-construction asphalt mixture does not reach room temperature. Therefore, even if the pre-construction asphalt mixture is cooled and cooled to room temperature, even if the post-construction asphalt mixture is applied, the joint surface between the pre-construction and post-construction is not completely welded, and there is a possibility of forming a water conveyance path naturally. Is high.
In addition, it is considered to insert a waterproof material such as rubber material into the joint surface between the pre-constructed asphalt mixture and the post-constructed asphalt mixture.However, water-tight joining between each asphalt mixture and the waterproof material itself is secured. I'm suspicious,
The construction reliability was poor.

【0005】そこで、本発明はこのような従来の課題に
着目されたもので、分割施工されるアスファルト混合物
間を簡便確実に水密接合可能にし、施工信頼性にも優れ
たアスファルト混合物からなる遮水層の接合部処理方法
を提供することを目的とするものである。
Accordingly, the present invention has been made in view of such a conventional problem, and it is possible to simply and surely perform water-tight joining between asphalt mixtures to be divided and constructed, and to provide a water shielding made of an asphalt mixture having excellent construction reliability. It is an object of the present invention to provide a method for treating a layer joint.

【0006】[0006]

【課題を解決するための手段】この発明は上記目的を達
成するためになされたもので、第1の発明はアスファル
ト及び骨材から構成されるアスファルト混合物を廃棄物
処分領域表面や一般路盤上に分割施工して遮水層を形成
する施工方法であって、前施工されたアスファルト混合
物の端面に帯状アスファルト素材からなるアスファルト
テープを加熱しつつ貼設するテープ貼設手順と、前記ア
スファルトテープ表面に後施工アスファルト混合物を施
工することで当該後施工アスファルト混合物と前施工ア
スファルト混合物との水密接合を行う水密接合手順とを
備えることを特徴とする。
SUMMARY OF THE INVENTION The present invention has been made to achieve the above object, and a first invention is to provide an asphalt mixture composed of asphalt and aggregate on a surface of a waste disposal area or a general roadbed. It is a construction method of forming a water-blocking layer by dividing construction, a tape application procedure of applying an asphalt tape made of a band-shaped asphalt material to the end face of the pre-applied asphalt mixture while heating, and a tape application procedure, A watertight joining procedure for performing watertight joining between the postprocessed asphalt mixture and the preprocessed asphalt mixture by applying the postprocessed asphalt mixture.

【0007】なお、アスファルトテープ表面に後施工ア
スファルト混合物を施工する前に、アスファルトテープ
を再加熱して施工してもよい。
[0007] Before asphalt mixture is applied to the surface of the asphalt tape, the asphalt tape may be reheated and applied.

【0008】第2の発明は、第1の発明に記載の接合部
処理方法に用いられるアスファルトテープであって、ア
スファルト混合物との親和性を備えたアスファルト素材
を帯状に成型したことを特徴とする。
According to a second aspect of the present invention, there is provided an asphalt tape used in the method for treating a joint according to the first aspect, wherein an asphalt material having an affinity for an asphalt mixture is formed into a belt shape. .

【0009】[0009]

【発明の実施の形態】以下、この発明の好ましい実施の
形態について添付図面を参照しつつ詳細に説明する。図
1は本発明の接合部処理方法を適用する廃棄物処分場の
構造を示す断面図である。本実施例における説明の舞台
を例えば廃棄物処分場とすれば、アスファルト混合物に
よる遮水工がこの廃棄物処分場11の底面に施されるの
である。ここでの遮水構造10はアスファルト混合物単
独によるものではなく、他の遮水層も合わせて用いられ
ている。また、遮水構造10が設けられる範囲は、廃棄
物処分場11の、斜面を含む底部地盤12全体を覆う範
囲となっている。
Preferred embodiments of the present invention will be described below in detail with reference to the accompanying drawings. FIG. 1 is a cross-sectional view showing the structure of a waste disposal site to which the joint processing method of the present invention is applied. If the stage of the description in this embodiment is, for example, a waste disposal site, a water shielding work using an asphalt mixture is performed on the bottom surface of the waste disposal site 11. The water-blocking structure 10 here is not based on the asphalt mixture alone, but also uses another water-blocking layer. The area where the water-blocking structure 10 is provided is an area that covers the entire bottom ground 12 including the slope of the waste disposal site 11.

【0010】そして、この実施形態にかかる遮水構造1
0は、底部地盤12を覆って敷設される支持力重視層と
しての砕石混合層15と、この砕石混合層15の上面に
敷設された遮水性重視層及び変形追随重視層を兼ねるア
スファルト混合物層14とからなる2層構造によって構
成されるとともに、この実施形態によれば、さらにアス
ファルト混合物層14の上面を覆って遮水シート13が
配設されている。砕石混合層15は、主に砕石や砂分を
混合してなるもので、ブルドーザー等を用いて例えば1
5cm以上の厚さでまきだして締固め転圧し、支持力を
発揮する材料である砕石や砂分が混合されていることに
より、埋め立て荷重などに対する十分な支持力が得られ
るようになっている。
[0010] The water blocking structure 1 according to this embodiment.
Numeral 0 denotes a crushed stone mixed layer 15 laid as covering the bottom ground 12 as a supporting force-oriented layer, and an asphalt mixture layer 14 laid on the upper surface of the crushed stone mixed layer 15 and also serving as a water-impervious layer and a deformation following layer. According to this embodiment, the impermeable sheet 13 is further provided so as to cover the upper surface of the asphalt mixture layer 14. The crushed stone mixed layer 15 is mainly formed by mixing crushed stones and sand, and for example, is prepared by using a bulldozer or the like.
It is rolled out with a thickness of 5 cm or more, compacted and compacted, and crushed stone or sand, which is a material that exerts a supporting force, is mixed, so that sufficient supporting force against landfill load etc. can be obtained .

【0011】一方、アスファルト混合物層14は、遮水
性舗装材料、つまりアスファルト混合物が配される。こ
のアスファルト混合物は、例えばストレートアスファル
トや改質アスファルトといったアスファルトと、砕石や
高炉スラグ等の粗骨材(例えば最大粒径で調粒)や砂等
の細骨材及び石灰粉末等のフィラーからなる骨材とから
なる。敷設施工に際しては、このアスファルト混合物は
アスファルトプラントにて十分に混合された後、例えば
180度程度に加熱され流動性及び粘性を備えた状態で
所定厚さまでまきだされ、ロードローラ等の重機により
締固め施工・締固め転圧を施される事により十分な遮水
性を発揮する。
On the other hand, the asphalt mixture layer 14 is provided with a water-blocking pavement material, that is, an asphalt mixture. This asphalt mixture is composed of, for example, asphalt such as straight asphalt or modified asphalt, fine aggregate such as crushed stone or blast furnace slag (eg, granulated with a maximum particle size), fine aggregate such as sand, and filler such as lime powder. Consists of materials. At the time of laying work, this asphalt mixture is sufficiently mixed in an asphalt plant, and then heated to, for example, about 180 degrees, rolled out to a predetermined thickness with fluidity and viscosity, and tightened by a heavy machine such as a road roller. It exhibits sufficient water shielding by being subjected to compaction and compaction rolling.

【0012】図2は前施工アスファルト混合物端面に貼
設されたアスファルトテープを溶融させつつ後施工アス
ファルト混合物の接合を行う工事状況を示す説明図であ
り、図3は本発明の接合部処理方法の実施過程を示す説
明図である。
FIG. 2 is an explanatory view showing a construction state in which the asphalt tape attached to the end face of the pre-construction asphalt mixture is joined while melting the asphalt mixture after the construction, and FIG. It is explanatory drawing which shows an implementation process.

【0013】次に、本発明を実際に適用してアスファル
ト混合物の接合部処理をする際の施工状況を見てみる。
アスファルト混合物20の敷設に用いられる施工装置2
1は、自身の移動を可能にする自走装置を備えており、
その他に、アスファルト乳剤を貯蔵計量する乳剤タンク
や混合には欠かせない水を貯蔵計量する水タンクが設け
られ、それに続いてスラリー材中に混入される砕石を貯
蔵計量する砕石ホッパ等も備えている。
[0013] Next, the construction situation when the present invention is actually applied to perform the joint processing of the asphalt mixture will be examined.
Construction equipment 2 used for laying asphalt mixture 20
1 is equipped with a self-propelled device that enables its own movement,
In addition, an emulsion tank for storing and measuring asphalt emulsion and a water tank for storing and measuring water essential for mixing are provided, followed by a crushed stone hopper for storing and measuring crushed stone mixed into the slurry material. I have.

【0014】そして、装置21最後部には上記タンク類
より供給された各種混合材料を混練するところのミキサ
21aが備えられ、それとともに各種添加剤を供給する
添加剤タンクが併設されている。また、このミキサ21
aより供給されたアスファルト混合物20を路面に敷き
均す作業を担うスプレッダ機構21bが備えられてい
る。
A mixer 21a for kneading various kinds of mixed materials supplied from the above-mentioned tanks is provided at the rear end of the apparatus 21, and an additive tank for supplying various additives is provided in addition to the mixer 21a. Also, this mixer 21
A spreader mechanism 21b is provided to spread the asphalt mixture 20 supplied from a.

【0015】施工手順としては、まず上記各種材料を施
工装置21のホッパーに十分積載し施工区域まで移動さ
せる。この施工区域は、例えば前日までに敷設施工が完
了している前施工アスファルト混合物25に隣接する未
敷設領域26である。つぎに、敷設するアスファルト混
合物20をスクリュースプレッダ21bにより適宜攪拌
しながら未敷設領域26に敷き均す。なお、前施工アス
ファルト混合物25の側部端面25aは断面がテーパ状
に成形されており、その表面にはアスファルトテープ2
7が貼設済みである(図3参照)。アスファルトテープ
の貼設は前施工アスファルト混合物を敷設した際に予め
完了していてもよいし、後施工アスファルト混合物の敷
設直前に並行作業として実施してもよい。貼設方法もト
ーチなどを用いた人手によってもよいし、加熱機構を備
えた専用の貼設装置を構成し用いても勿論よい。
In the construction procedure, first, the above-mentioned various materials are sufficiently loaded on the hopper of the construction apparatus 21 and moved to the construction area. The construction area is, for example, an unlaid area 26 adjacent to the pre-construction asphalt mixture 25 in which the construction has been completed by the previous day. Next, the asphalt mixture 20 to be laid is spread over the unlaid area 26 while being appropriately stirred by the screw spreader 21b. The side end face 25a of the pre-constructed asphalt mixture 25 has a tapered cross section.
7 is already attached (see FIG. 3). The application of the asphalt tape may be completed in advance when the pre-constructed asphalt mixture is laid, or may be performed as a parallel operation immediately before the laying of the post-constructed asphalt mixture. The attaching method may be performed manually using a torch or the like, or a dedicated attaching device provided with a heating mechanism may be used.

【0016】アスファルトテープは、アスファルト混合
物との親和性を備えたアスファルト素材を帯状に成型し
たものであり、トーチやバーナー等による加熱によって
溶融する性質を備えている。本実施例における施工装置
21は、スプレッダ機構21bによりアスファルト混合
物20を敷き均しつつも、その施工直前領域のアスファ
ルトテープ27を加熱バーナー21cにより溶融化させ
ている。アスファルトテープ27はその貼設時に前施工
アスファルト混合物25の側部端面25aの表面凹凸を
充填・平滑化しているとともに、溶融化作業により液化
して、接合されてくる後施工のアスファルト混合物20
(以下、後施工アスファルト混合物28)の端面とも同
様に絡み結びついて、前施工アスファルト混合物25と
後施工アスファルト混合物28とを水密接合するのであ
る。このようにして前施工アスファルト混合物25と後
施工アスファルト混合物28とは水密に接合処理が施さ
れ、施工後時間が経過してしまい常温化した前施工アス
ファルト混合物25に対しても遮水性の問題なく後施工
アスファルト混合物28が接合される。
The asphalt tape is formed by molding an asphalt material having an affinity for the asphalt mixture into a belt shape, and has a property of being melted by heating with a torch or a burner. The construction apparatus 21 in the present embodiment spreads the asphalt mixture 20 by the spreader mechanism 21b, while melting the asphalt tape 27 in the area immediately before the construction by the heating burner 21c. The asphalt tape 27 fills and smoothes the surface irregularities of the side end face 25a of the pre-constructed asphalt mixture 25 at the time of the application, and is liquefied by a melting operation to be joined to the post-construction asphalt mixture 20.
(Hereinafter, the post-processed asphalt mixture 28) is also entangled and tied to the end face of the post-processed asphalt mixture 28 to water-tightly join the pre-processed asphalt mixture 25 and the post-processed asphalt mixture 28. In this way, the pre-constructed asphalt mixture 25 and the post-constructed asphalt mixture 28 are subjected to a water-tight joining process, and the passage of time after the construction has passed and the pre-constructed asphalt mixture 25 has been cooled to room temperature without any water barrier problem. The post-work asphalt mixture 28 is joined.

【0017】[0017]

【発明の効果】以上詳細に説明したように、本発明のア
スファルト混合物からなる遮水層の接合部処理方法は、
アスファルト及び骨材から構成されるアスファルト混合
物を廃棄物処分領域表面や一般路盤上に分割施工して遮
水層を形成する施工方法であって、前施工されたアスフ
ァルト混合物の端面に帯状アスファルト素材からなるア
スファルトテープを加熱しつつ貼設するテープ貼設手順
と、前記アスファルトテープ表面に後施工アスファルト
混合物を施工することで当該後施工アスファルト混合物
と前施工アスファルト混合物との水密接合を行う水密接
合手順とを備えることを特徴とする。
As described above in detail, the method for treating a joint of a water-impervious layer comprising an asphalt mixture according to the present invention comprises:
This is a construction method in which an asphalt mixture composed of asphalt and aggregate is divided and applied on the surface of a waste disposal area or on a general roadbed to form a water barrier layer, and a belt-like asphalt material is applied to the end face of the pre-constructed asphalt mixture. A tape application procedure for applying the asphalt tape while heating the asphalt tape, and a water-tight joining procedure for performing water-tight joining between the post-construction asphalt mixture and the pre-construction asphalt mixture by constructing the post-construction asphalt mixture on the surface of the asphalt tape. It is characterized by having.

【0018】したがって本発明によれば、アスファルト
混合物の分割施工に際し、前施工アスファルト混合物が
冷えて常温化した後に後施工アスファルト混合物を施工
することとなっても、前施工と後施工の間の接合面は液
状化したアスファルトテープでもって完全に溶着するこ
ととなり、そこで完全に水密な状態をなすこととなる。
勿論、アスファルトテープの溶融具合を確認しつつ後施
工が実施されるため水密接合の確実化が図られて止水性
管理の点からも優れた工法であると言える。
Therefore, according to the present invention, when dividing the asphalt mixture, the pre-construction asphalt mixture is cooled and cooled to room temperature, and then the post-construction asphalt mixture is applied. The surface will be completely welded with the liquefied asphalt tape, where it will be completely watertight.
Of course, since post-processing is carried out while checking the melting condition of the asphalt tape, it can be said that this is an excellent construction method from the viewpoint of water-tightness control, assuring reliable water-tight joining.

【0019】しかして、分割施工されるアスファルト混
合物間を簡便確実に水密接合可能にし、施工信頼性にも
優れたアスファルト混合物からなる遮水層の接合部処理
方法を提供可能となる。
Thus, it is possible to provide a method for treating a joint of a water-blocking layer made of an asphalt mixture excellent in construction reliability, which enables simple and reliable water-tight joining between asphalt mixtures to be divided and constructed.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明の接合部処理方法を適用する廃棄物処分
場の構造を示す断面図である。
FIG. 1 is a cross-sectional view showing a structure of a waste disposal site to which a joint processing method of the present invention is applied.

【図2】前施工アスファルト混合物端面に貼設されたア
スファルトテープを溶融させつつ後施工アスファルト混
合物の接合を行う工事状況を示す説明図である。
FIG. 2 is an explanatory diagram showing a construction situation in which a post-construction asphalt mixture is joined while melting an asphalt tape stuck on an end face of a pre-construction asphalt mixture.

【図3】本発明の接合部処理方法の実施過程を示す説明
図である。
FIG. 3 is an explanatory diagram showing an implementation process of a joint processing method of the present invention.

【符号の説明】[Explanation of symbols]

20 アスファルト混合物 25 前施工アスファルト混合物 25a 前施工アスファルト混合物(側部)端面 27 アスファルトテープ 28 後施工アスファルト混合物 Reference Signs List 20 asphalt mixture 25 pre-construction asphalt mixture 25a pre-construction asphalt mixture (side) end face 27 asphalt tape 28 post-construction asphalt mixture

Claims (2)

【特許請求の範囲】[Claims] 【請求項1】 アスファルト及び骨材から構成されるア
スファルト混合物を廃棄物処分領域表面や一般路盤上に
分割施工して遮水層を形成する施工方法であって、前施
工されたアスファルト混合物の端面に帯状アスファルト
素材からなるアスファルトテープを加熱しつつ貼設する
テープ貼設手順と、前記アスファルトテープ表面に後施
工アスファルト混合物を施工することで当該後施工アス
ファルト混合物と前施工アスファルト混合物との水密接
合を行う水密接合手順とを備えることを特徴とするアス
ファルト混合物からなる遮水層の接合部処理方法。
1. A method of forming an impermeable layer by dividing an asphalt mixture composed of asphalt and an aggregate on a surface of a waste disposal area or on a general roadbed, wherein an end face of a pre-constructed asphalt mixture is provided. A tape application procedure of applying an asphalt tape made of a strip-shaped asphalt material to the tape while applying the post-application asphalt mixture to the surface of the asphalt tape, thereby performing watertight bonding between the post-application asphalt mixture and the pre-application asphalt mixture. And performing a watertight bonding procedure.
【請求項2】 請求項1に記載の接合部処理方法に用い
られるものであって、アスファルト混合物との親和性を
備えたアスファルト素材を帯状に成型したことを特徴と
するアスファルトテープ。
2. An asphalt tape used in the method for treating a joint portion according to claim 1, wherein an asphalt material having an affinity for an asphalt mixture is molded into a belt shape.
JP2000384351A 2000-12-18 2000-12-18 Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor Pending JP2002186930A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000384351A JP2002186930A (en) 2000-12-18 2000-12-18 Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000384351A JP2002186930A (en) 2000-12-18 2000-12-18 Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor

Publications (1)

Publication Number Publication Date
JP2002186930A true JP2002186930A (en) 2002-07-02

Family

ID=18851828

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000384351A Pending JP2002186930A (en) 2000-12-18 2000-12-18 Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor

Country Status (1)

Country Link
JP (1) JP2002186930A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005161201A (en) * 2003-12-02 2005-06-23 Ohbayashi Corp Asphalt composition in impermeable works
JP2008082147A (en) * 2006-08-31 2008-04-10 Taisei Rotec Corp Asphalt finisher and asphalt paving method using the same

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60129304A (en) * 1983-12-17 1985-07-10 日瀝化学工業株式会社 Construction of joint such as center joint of asphalt pavement
JPS60208503A (en) * 1984-04-02 1985-10-21 道建コンサルタント株式会社 Constructon method for connecting structure comprising concrete material, steel material or stone material and asphalt pavement laid on road
JPS63255402A (en) * 1987-04-13 1988-10-21 日東建設株式会社 Joint construction method of asphalt pavement
JPH0598507A (en) * 1991-10-02 1993-04-20 Nippon Shokubai Co Ltd Black rayon fiber
JPH05508458A (en) * 1991-05-15 1993-11-25 キャタピラー・ペイビング・プロダクツ・インク Paving material distribution system
JPH10151426A (en) * 1996-11-26 1998-06-09 Ohbayashi Corp Water interception structure in waste disposal site
JP3062202U (en) * 1999-03-16 1999-09-28 株式会社三協メカニック Joint seal tape attaching machine
JP2000140787A (en) * 1998-11-04 2000-05-23 World Engineering Kk Cut-off protecting construction of slope

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS60129304A (en) * 1983-12-17 1985-07-10 日瀝化学工業株式会社 Construction of joint such as center joint of asphalt pavement
JPS60208503A (en) * 1984-04-02 1985-10-21 道建コンサルタント株式会社 Constructon method for connecting structure comprising concrete material, steel material or stone material and asphalt pavement laid on road
JPS63255402A (en) * 1987-04-13 1988-10-21 日東建設株式会社 Joint construction method of asphalt pavement
JPH05508458A (en) * 1991-05-15 1993-11-25 キャタピラー・ペイビング・プロダクツ・インク Paving material distribution system
JPH0598507A (en) * 1991-10-02 1993-04-20 Nippon Shokubai Co Ltd Black rayon fiber
JPH10151426A (en) * 1996-11-26 1998-06-09 Ohbayashi Corp Water interception structure in waste disposal site
JP2000140787A (en) * 1998-11-04 2000-05-23 World Engineering Kk Cut-off protecting construction of slope
JP3062202U (en) * 1999-03-16 1999-09-28 株式会社三協メカニック Joint seal tape attaching machine

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2005161201A (en) * 2003-12-02 2005-06-23 Ohbayashi Corp Asphalt composition in impermeable works
JP2008082147A (en) * 2006-08-31 2008-04-10 Taisei Rotec Corp Asphalt finisher and asphalt paving method using the same

Similar Documents

Publication Publication Date Title
CN214090643U (en) Waterproof structure of concrete roof layer
JP3144321B2 (en) Fluidization method
JP2002186930A (en) Treatment method of joint portion of water-barrier layers consisting of asphalt compound and asphalt tape to be applied therefor
JP2000328544A (en) Method of laying impervious layer in bottom of final disposal ground
KR100426796B1 (en) Road-paving material comprising slag powder which comes into being in steel making process, and the method of paving road therewith
GB2175032A (en) A method of resurfacing a road
JP2004060261A (en) Construction method and construction device for slope seepage control work and apparatus carrying device
CN209636583U (en) A kind of pitch composite seal coat for road in airport
JP2003105738A (en) Installation method for impervious layer and impervious layer forming block
JP3996837B2 (en) Improvement method for soft ground
CN212895754U (en) Novel compound road surface construction banding structure of grout
CN108755362A (en) Base cures cold regeneration construction method
KR20010079130A (en) How to repair or overlay road asphalt by heating with microwave
JP3769521B2 (en) Civil engineering groundwork, civil engineering methods using this civil engineering groundwork
CN215668926U (en) Pavement repairing structure
KR20020024486A (en) A mothod of preparation for a coagulating soil and a coagulating soil thereby
JPH10140555A (en) Execution structural body formed of fluidization treated soil
JPS59643B2 (en) Excavated soil improvement method
AU2021303585A1 (en) Apparatus and method of treating soil
JP2001240444A (en) Impervious paving material and paving method
JP2007131805A (en) Improved ground material
JPH07102510A (en) Sheet pavement
JPH07180138A (en) Soil improver and soil improvement body
JP2004060384A (en) Paving method
JP2000212908A (en) How to store pavement waste

Legal Events

Date Code Title Description
RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20040924

A621 Written request for application examination

Free format text: JAPANESE INTERMEDIATE CODE: A621

Effective date: 20071120

RD02 Notification of acceptance of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7422

Effective date: 20071120

RD04 Notification of resignation of power of attorney

Free format text: JAPANESE INTERMEDIATE CODE: A7424

Effective date: 20071120

A977 Report on retrieval

Free format text: JAPANESE INTERMEDIATE CODE: A971007

Effective date: 20100114

A131 Notification of reasons for refusal

Free format text: JAPANESE INTERMEDIATE CODE: A131

Effective date: 20100126

A02 Decision of refusal

Free format text: JAPANESE INTERMEDIATE CODE: A02

Effective date: 20100525