[go: up one dir, main page]

JP2002059832A - Train signal system - Google Patents

Train signal system

Info

Publication number
JP2002059832A
JP2002059832A JP2000250815A JP2000250815A JP2002059832A JP 2002059832 A JP2002059832 A JP 2002059832A JP 2000250815 A JP2000250815 A JP 2000250815A JP 2000250815 A JP2000250815 A JP 2000250815A JP 2002059832 A JP2002059832 A JP 2002059832A
Authority
JP
Japan
Prior art keywords
switch
route
train
request
signal system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP2000250815A
Other languages
Japanese (ja)
Inventor
Keiji Maekawa
景示 前川
Yasushi Yokosuka
靖 横須賀
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hitachi Ltd
Original Assignee
Hitachi Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hitachi Ltd filed Critical Hitachi Ltd
Priority to JP2000250815A priority Critical patent/JP2002059832A/en
Publication of JP2002059832A publication Critical patent/JP2002059832A/en
Pending legal-status Critical Current

Links

Landscapes

  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

(57)【要約】 【課題】 転てつ器に複数列車を連続して進入させるこ
とを可能とする。 【解決部】 列車信号システムは、列車の運行状況に合
わせて、進路の設定および進路の取り消しを要求する進
路制御装置110と、進路制御装置110より進路の設
定および進路の取り消しの要求を受けて、列車103
a,103bの在線状態と転てつ器105の状態を確認
し進路の設定および取り消しを行う連動装置109とを
備えている。このような列車信号システムにおいて、複
数の列車が転てつ器105に進入する際、転てつ器10
5の同一方向への転換要求が連続する場合は、複数の列
車が転てつ器105を通過し終えるまで転てつ器105
を鎖錠したままとする転てつ器転換手段と、転てつ器1
05が鎖錠されたままとなることを確認してから、複数
の列車に対して転てつ器105への進入許可を与える進
路制御手段とを連動装置109の内部に設ける。
(57) [Summary] [Problem] To enable a plurality of trains to continuously enter a switch. A train signal system receives a request for route setting and route cancellation from the route control device, and a route control device for requesting route setting and route cancellation in accordance with a train operation situation. , Train 103
An interlocking device 109 is provided for confirming the on-line state of a and 103b and the state of the switch 105, and setting and canceling the course. In such a train signal system, when a plurality of trains enter the switch 105, the switch 10
If the request for turning in the same direction 5 continues, the switch 105 is used until a plurality of trains pass through the switch 105.
Switch means for keeping the lock of the switch and the switch 1
After confirming that the train 05 remains locked, route control means for permitting a plurality of trains to enter the switch 105 is provided inside the interlocking device 109.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、自動列車制御装置
を有する鉄道保安システムにおける列車信号システムに
係り、特に、先行列車に続いて後続の列車を連続して転
てつ器に進入させることを可能とした列車信号システム
に関するものである。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a train signal system in a railway security system having an automatic train control device, and more particularly, to a method in which a succeeding train follows a preceding train and continuously enters a switch. The present invention relates to a train signal system that is enabled.

【0002】[0002]

【従来の技術】従来の連動装置では進路を構成し、信号
の現示を進行にするためには、進路内に列車が在線して
いないことと、進路内の転てつ器が進路を構成するため
に必要な方向に転換されていることが必要である。した
がって、進路内に列車が在線しているときには、信号を
進行にできないため、従来の連動装置では1進路に1列
車しか進入することができない。
2. Description of the Related Art In a conventional interlocking device, a route is formed, and in order to advance the signal display, a train is not present in the route and a switch in the route forms a route. It needs to be turned in the direction needed to do so. Therefore, when a train is on the track, the signal cannot be made to proceed, so that only one train can enter the one track with the conventional interlocking device.

【0003】1進路に複数の列車の進入を許可する従来
技術として、例えば特公平7−41840号公報があ
る。この公報では、無線による精度の高い列車の位置検
知と、同じく無線による列車間隔の制御とにより、列車
走行の安全性を確保しているために、連動装置は進路内
の列車の在線状態を無視して進路を設定することができ
る。その結果、先行する列車が既に進路内に在線する場
合でも、連動装置は後続の列車に進路内に進入する許可
を与えることができ、列車間隔をつめて列車走行を制御
できるようになっている。
As a prior art for permitting a plurality of trains to enter one route, there is Japanese Patent Publication No. 7-41840, for example. In this publication, the interlocking device ignores the on-rail state of the train in the course because the safety of train running is ensured by wireless high-precision train position detection and also by wireless train interval control. To set the course. As a result, even when the preceding train is already on the route, the interlocking device can give permission for the following train to enter the route, and can control the train running by reducing the train interval. .

【0004】[0004]

【発明が解決しようとする課題】しかしながら、上記従
来の技術では、転てつ器に複数列車を連続して進入させ
ることについては配慮されておらず、列車間隔をつめて
列車走行を制御するにも限界がある。すなわち、複数の
列車を1つの転てつ器に同時に進入させるためには、転
てつ器の向きと鎖錠の管理が重要であり、先頭の列車が
転てつ器を抜けた後に転てつ器を解錠してしまうと、後
続列車の走行の安全が保証されず、反対に列車が抜けた
後に転てつ器を鎖錠したままとすると、競合する進路が
設定できないといった問題が生じるが、従来技術ではこ
の点については何も解決がなされていない。
However, in the above-mentioned prior art, no consideration is given to the continuous entry of a plurality of trains into the switch, and the train running is controlled by reducing the train interval. Also have limitations. In other words, in order to allow multiple trains to enter a single point simultaneously, it is important to control the direction and lock of the point, and after the first train leaves the point, If the lock is unlocked, the safety of the running of the following train is not guaranteed, and if the lock is locked after the train leaves, the competing route cannot be set. However, there is no solution in the prior art.

【0005】本発明の課題は、転てつ器に複数列車を連
続して進入させることが可能な列車信号システムを提供
することにある。
[0005] It is an object of the present invention to provide a train signal system that allows a plurality of trains to continuously enter a switch.

【0006】[0006]

【課題を解決するための手段】上記課題を解決するため
に、本発明は、列車の運行状況に合わせて、進路の設定
および進路の取り消しを要求する進路制御装置と、前記
進路制御装置より進路の設定および進路の取り消しの要
求を受けて、列車の在線状態と転てつ器の状態を確認し
進路の設定および取り消しを行う連動装置とを備えた列
車信号システムにおいて、複数の列車が転てつ器に進入
する際、前記転てつ器の同一方向への転換要求が連続す
る場合は、前記複数の列車が前記転てつ器を通過し終え
るまで該転てつ器を鎖錠したままとする転てつ器転換手
段と、前記転てつ器が鎖錠されたままとなることを確認
してから、前記複数の列車に対して前記転てつ器への進
入許可を与える進路制御手段とを備えたことを特徴とし
ている。
SUMMARY OF THE INVENTION In order to solve the above-mentioned problems, the present invention provides a route control device for requesting route setting and route cancellation in accordance with a train operation condition, In response to a request for setting and canceling a route, in a train signal system including an interlocking device that checks the on-rail status of the train and the state of the switch, and sets and cancels the route, a plurality of trains When entering the switch, if the turning requests of the switch in the same direction continue, the locks of the switch remain locked until the plurality of trains have passed through the switch. Switch means for changing the position and route control for permitting the plurality of trains to enter the switch after confirming that the switch remains locked. Means.

【0007】上記構成によれば、複数の列車が転てつ器
に進入する際に、転てつ器の同一方向への転換要求が連
続する場合は、転てつ器は鎖錠されたままであるから、
複数の列車を連続して転てつ器に進入させることができ
る。
[0007] According to the above configuration, when a plurality of trains enter the switch, if the request for turning the switch in the same direction continues, the switch remains locked. because there is,
A plurality of trains can enter the switch continuously.

【0008】上記列車信号システムを構成するに際して
は、以下の要素を付加することができる。 (1)前記進路制御装置から、同一進路および競合する
進路に対する要求も含めて進路の設定および取り消しの
要求を複数受信し、その受信した要求を記憶する受信進
路要求記憶媒体を備える。 (2)転てつ器の複数の転換要求を転てつ器毎に記憶す
る転てつ器状態記憶媒体を備える。 (3)前記転てつ器転換手段は、前記転てつ器状態記憶
媒体に記憶されている転てつ器の複数の転換要求を参照
し、最も古い転換要求と転てつ器の向きが一致しない場
合には、転てつ器を転換、鎖錠し、転てつ器を異なる方
向に転換し、転てつ器の転換要求がなくなるまで転てつ
器を解錠しない機能を有する。 (4)前記進路制御手段は、転てつ器の鎖錠を確認する
際、当該進路の設定のための転てつ器の転換要求と最も
古い転換要求との間に異なる方向の転換要求がなく、か
つ転てつ器が鎖錠されているときには、転てつ器は鎖錠
されているとする判断する機能を有する。 (5)前記進路制御手段は、列車が転てつ器を抜けたと
きに、当該列車のための進路設定の際に要求した当該転
てつ器の転換要求を前記転てつ器状態記憶媒体から削除
する機能を有する。
[0008] In configuring the above-mentioned train signal system, the following elements can be added. (1) A reception route request storage medium for receiving a plurality of route setting and cancellation requests including requests for the same route and competing routes from the route control device, and storing the received requests. (2) A switch state storage medium for storing a plurality of switch requests for the switch for each switch. (3) The switch changing means refers to a plurality of switch requests of the switch stored in the switch state storage medium, and determines the oldest change request and the direction of the switch. If they do not match, they have the function of turning and locking the switch, turning the switch in a different direction, and not unlocking the switch until there is no request to switch the switch. (4) When the route control means confirms the lock of the switch, the switch request in the different direction between the switch request of the switch for setting the route and the oldest switch request is issued. However, when the switch is locked, the switch has a function of determining that the switch is locked. (5) The route control means, when the train passes through the switch, transmits the switch request of the switch, which is requested when setting the route for the train, to the switch status storage medium. It has a function to delete from.

【0009】[0009]

【発明の実施の形態】以下、本発明の実施の形態を図面
に基づいて説明する。図1は本発明に係る列車信号シス
テムの全体構成図である。図1に示すように、転てつ器
105の前後には列車103が在線している。ここで
は、複数ある列車103と進路112はa、bと添え字
を添えて区別することにする。また、地上側には、地上
制御装置101、地上側無線電送装置02、連動装置1
09、進路制御装置110が設けられている。以下、進
路要求時の処理の流れに従って順に説明する。
Embodiments of the present invention will be described below with reference to the drawings. FIG. 1 is an overall configuration diagram of a train signal system according to the present invention. As shown in FIG. 1, a train 103 is located before and after the switch 105. Here, the plurality of trains 103 and the courses 112 are distinguished by adding a and b and subscripts. On the ground side, a ground control device 101, a ground-side wireless transmission device 02, an interlocking device 1
09, a course control device 110 is provided. Hereinafter, the description will be given in order according to the flow of the processing at the time of the route request.

【0010】列車103は速度を積算して、移動距離を
算出する等の方法により、列車103の現在位置を算出
し、列車の現在位置を表す情報である位置情報107を
作成し、その位置情報107を無線で地上側無線電送装
置02へ送信する。位置情報107のフォーマットは本
発明の範囲外であるので省略する。
The train 103 calculates the current position of the train 103 by a method such as accumulating the speed and calculating the travel distance, and creates position information 107 which is information indicating the current position of the train. 107 is wirelessly transmitted to the ground-side wireless transmission device 02. The format of the position information 107 is out of the scope of the present invention, and will not be described.

【0011】地上側無線伝送装置102は位置情報10
7を受信して、列車103の現在位置を認識し、列車1
03に対する停止限界104を算出する。停止限界10
4とは列車が他の列車に衝突する、あるいは脱線すると
いった危険なく、安全に走行できる限界点である。停止
限界104の算出には地上制御装置101の認識してい
る他の列車の位置と、連動装置109から取り込んだ、
進路112の開通情報や、転てつ器105の向き等の情
報が用いられる。列車103の位置から当該列車前方の
未開通の進路端、または先行する列車など列車の走行の
支障となるものが見つかるまで検索する。分岐がある場
合には転てつ器105の向きから分岐先のどちらを検索
するか決定する。検索の結果、見つかった支障の位置を
停止限界104とする。
[0011] The terrestrial-side wireless transmission device 102 transmits the position information 10
7 and the current position of the train 103 is recognized.
Calculate the stop limit 104 for 03. Stop limit 10
Reference numeral 4 denotes a limit point at which the train can safely travel without danger of the train colliding with another train or derailing. For the calculation of the stop limit 104, the position of the other train recognized by the ground control device 101, and the
Information such as the opening information of the route 112 and the direction of the switch 105 are used. The search is performed from the position of the train 103 until an unopened track end in front of the train or an obstacle that hinders the running of the train such as a preceding train is found. If there is a branch, it is determined which of the branch destinations to search from the direction of the switch 105. The position of the trouble found as a result of the search is set as the stop limit 104.

【0012】地上制御装置101は算出した停止限界1
04を含み、列車の走行を制御するための情報である制
御情報106を生成し、地上側無線伝送装置102を介
して列車103に送信する。制御情報106のフォーマ
ットについては本発明の範囲外であるので、説明は省略
する。
The ground control device 101 calculates the calculated stop limit 1
04, and generates control information 106 that is information for controlling the running of the train, and transmits the generated control information 106 to the train 103 via the ground-side wireless transmission device 102. Since the format of the control information 106 is outside the scope of the present invention, the description is omitted.

【0013】停止限界104は上記の通り、進路の開通
状況及び転てつ器の向き等の情報も参照して算出される
ため、連動装置109の進路および転てつ器の制御方式
によって、その値が変化する。連動装置109は進路制
御装置110より進路要求情報111を受信し、要求さ
れた進路の制御を開始する。進路要求情報111は要求
する進路と進路要求通番からなるものとする。進路要求
情報111のフォーマットについては後述する。連動装
置109は進路制御装置110より、同一進路あるい
は、互いに競合する進路に対する複数の進路要求情報1
11を受け付けることができるものとする。連動装置1
09は受け付けた複数の進路要求情報111を順に処理
し、同一進路の進路要求の間に当該進路と競合する進路
がない場合には、当該進路内方に列車進入後も当該進路
は進行現示のままとする。同一進路の進路要求の間に当
該進路と競合する進路がある場合は、当該進路内方に列
車進入後、当該進路を停止現示とし、従来の進路区分鎖
錠と同様の処理により転てつ器の解錠を行い、競合進路
の設定に必要な転てつ器の転換処理を行った後、要求さ
れた競合進路を進行現示とする。また、連動装置109
は進路および転てつ器の制御のために、地上制御装置1
01から列車位置情報108を受信する。列車位置情報
108は地上制御装置101が把握するすべての列車位
置と列車IDからなる。列車位置情報108のフォーマ
ットは後述する。連動装置109は進路制御の結果を進
路状態情報113として地上制御装置101に送信す
る。進路状態情報113のフォーマットについては本発
明の範囲外であるので、説明は省略する。
As described above, since the stop limit 104 is calculated with reference to information such as the path opening status and the direction of the switch, the stop limit 104 is determined by the control method of the path of the interlocking device 109 and the switch. The value changes. The interlocking device 109 receives the route request information 111 from the route control device 110, and starts controlling the requested route. The route request information 111 includes a route to be requested and a route request serial number. The format of the route request information 111 will be described later. The link device 109 receives a plurality of pieces of route request information 1 for the same route or routes competing with each other from the route control device 110.
11 can be accepted. Interlocking device 1
09 sequentially processes the received plurality of route request information 111, and when there is no route competing with the route during the route request of the same route, the route is displayed even after the train enters the route. Leave as is. If there is a route competing with the relevant route during the route request for the same route, after entering the train inside the relevant route, the relevant route is set to the stop indication, and the route is switched by the same processing as the conventional route-based lock. After unlocking the device and performing the switching process of the switch necessary for setting the competing route, the requested competing route is set as the progress indication. Also, the interlocking device 109
Is the ground control unit 1 for controlling the course and the switch.
From 01, the train position information 108 is received. The train position information 108 includes all train positions and train IDs that the ground control device 101 grasps. The format of the train position information 108 will be described later. The interlocking device 109 transmits the result of the route control to the ground control device 101 as route state information 113. Since the format of the route state information 113 is out of the scope of the present invention, the description is omitted.

【0014】具体的に例をあげて説明する。図1におい
て、列車103aと列車103bが同一進路112aに
進入する場合、転てつ器105は同一方向に鎖錠するこ
とになる。連動装置109は進路制御装置110より、
同一進路112aの進路要求情報111を2つ受信し、
図1に示すように列車103bが進路112aの内方に
進入した後も進路112aを進行現示のままとする。ま
た、列車103aが進路112bに、列車103bが進
路112aと異なる進路に進入する場合、転てつ器10
5は異なる方向に鎖錠することになる。列車103bが
進路112aの内方に進入した後に進路112aを停止
現示にし、転てつ器105を転換後、進路112bを進
行現示とする。進路の設定・復位・鎖錠処理および転て
つ器の転換処理について詳細は後述する。
A specific example will be described. In FIG. 1, when the train 103a and the train 103b enter the same path 112a, the switch 105 is locked in the same direction. The interlock device 109 is provided by the route control device 110.
Two pieces of route request information 111 of the same route 112a are received,
As shown in FIG. 1, even after the train 103b has entered the inside of the course 112a, the course 112a is kept as it is. When the train 103a enters the route 112b and the train 103b enters a route different from the route 112a, the switch 10
5 will lock in different directions. After the train 103b enters the inside of the route 112a, the route 112a is set to the stop indication, the switch 105 is changed, and then the route 112b is set to the progress indication. The details of the course setting / rearranging / locking process and the switchover process will be described later.

【0015】上記のようにシステム全体を構成すること
により、同一方向の転てつ器105に次々と列車103
が進入する場合に、転てつ器105端を停止限界とする
ことなく、移動閉塞を実現したまま列車103を転てつ
器105に進入させることが可能となり、列車間隔をつ
めることができる。
By constructing the whole system as described above, the trains 103 are successively connected to the switches 105 in the same direction.
When the vehicle enters, the train 103 can enter the switch 105 without moving and closing the end of the switch 105 without the stop limit, and the train interval can be reduced.

【0016】図2は連動装置109の内部構成を示した
ブロック図である。連動装置109の内部には、地上制
御装置通信部201、列車位置変換部202、進路制御
部203、転てつ器転換部204、転てつ器・進路状態
記憶部205、進路制御装置通信部206、受信進路要
求記憶部207、進路状態情報作成部208及び現地設
備装置通信部209が設けられている。以下、連動装置
109の毎サイクルの処理の流れに従って順に説明す
る。
FIG. 2 is a block diagram showing the internal configuration of the interlocking device 109. Inside the interlocking device 109, a ground control device communication unit 201, a train position conversion unit 202, a route control unit 203, a switch unit 204, a switch / track state storage unit 205, a route control unit communication unit 206, a received route request storage unit 207, a route state information creating unit 208, and a local facility device communication unit 209 are provided. Hereinafter, the description will be given in order according to the processing flow of each cycle of the interlocking device 109.

【0017】図2において、地上制御装置通信部201
は、地上制御装置101から列車位置とIDからなる列
車位置情報108を受信し、列車位置変換部202に渡
す。列車位置変換部202は、地上制御装置101の列
車位置の表現と連動装置109の列車位置の表現が異な
る場合に、地上制御装置101の列車位置の表現を連動
装置109の列車位置の表現に変換する処理を行い、そ
の変換した列車位置を進路制御部203と転てつ器転換
部204に渡す。地上制御装置101の列車位置の表現
と連動装置109の列車位置の表現が同一の場合は、列
車位置変換部202は必要ではなく、列車位置変換部2
02のない構成も考えられる。
In FIG. 2, a ground control device communication unit 201
Receives the train position information 108 including the train position and the ID from the ground control device 101, and passes the train position information 108 to the train position conversion unit 202. The train position conversion unit 202 converts the representation of the train position of the ground control device 101 into the representation of the train position of the linkage device 109 when the representation of the train position of the ground control device 101 and the representation of the train position of the linkage device 109 are different. Then, the converted train position is passed to the route control unit 203 and the switch device switching unit 204. When the expression of the train position of the ground control device 101 and the expression of the train position of the interlocking device 109 are the same, the train position conversion unit 202 is not necessary, and the train position conversion unit 2
A configuration without 02 is also conceivable.

【0018】進路制御部203は、列車位置変換部20
2から受けた列車位置と、受信進路要求記憶部207及
び転てつ器・進路状態記憶部205の記憶情報を基に進
路制御を行う。進路制御としては進路の設定・鎖錠・復
位を行う。進路設定の際には転てつ器の鎖錠だけ確認す
るのみとし、進路内方の列車の在線状態は進路設定の条
件としない。したがって、進路構成に必要な転てつ器が
正しい向きに鎖錠されていれば進路を設定することがで
きる。進路設定処理において、転換する転てつ器がある
場合は、転換要求を転てつ器転換部204に渡す。転換
要求には転換する方向と当該進路の進路要求通番を含む
ものとする。進路の鎖錠処理は、進路内方に列車が進入
した際に行い、当該進路要求の進路要求通番に進路内方
に進入した列車のIDを関連付ける。列車のIDは地上
制御装置101から受信した列車位置情報108に含ま
れているものを使用する。従来の連動装置と同様に、列
車が鎖錠区間にいる間は鎖錠し、鎖錠区間を出た時点で
解錠する。進路の復位処理は、列車がすべての鎖錠区間
から出た場合に実施し、当該進路の当該進路要求通番で
鎖錠されているすべての転てつ器を解錠し、進路状態も
解錠とする。転てつ器を解錠する場合には、転てつ器転
換部204に解錠要求を渡す。解錠要求には当該進路の
進路要求通番が含まれるものとする。各処理の詳細につ
いては後述する。また、進路制御部203は進路制御の
結果を転てつ器・進路状態記憶部205に反映する。
The route control unit 203 includes a train position conversion unit 20
The route control is performed based on the train position received from Step 2 and the information stored in the received route request storage unit 207 and the switch / track state storage unit 205. The course control includes setting, locking, and restoring the course. At the time of setting the course, only the lock of the switch is confirmed, and the state of the train on the inside of the course is not a condition for setting the course. Therefore, the course can be set if the switch required for the course configuration is locked in the correct direction. In the course setting process, if there is a switch to be changed, the switch request is passed to the switch changing unit 204. The change request shall include the direction to change and the route request serial number of the relevant route. The route locking process is performed when the train enters the inside of the route, and the ID of the train that entered the inside of the route is associated with the route request serial number of the route request. A train ID used in the train position information 108 received from the ground control device 101 is used. As with the conventional interlocking device, the train is locked while the train is in the locked section, and unlocked when the train leaves the locked section. The route relocation process is performed when the train leaves all the locked sections, unlocks all the switches that are locked with the relevant route request serial number of the relevant route, and also unlocks the status of the route. And When unlocking the switch, an unlock request is passed to the switch conversion unit 204. It is assumed that the unlock request includes the route request serial number of the relevant route. Details of each process will be described later. The route control unit 203 reflects the result of the route control on the switch / track state storage unit 205.

【0019】転てつ器転換部204は進路制御部203
からの転てつ器転換要求と転てつ器・進路状態記憶部2
05と列車位置変換部202から受信した列車位置を基
に転てつ器の転換制御を行う。転てつ器転換部204は
進路制御部203からの転てつ器転換要求を複数受け付
けることができる。同じ方向の要求が連続する場合は、
列車が転てつ器を通過しても転てつ器は鎖錠したままと
する。異なる方向へ転換する必要が生じたときに転てつ
器の鎖錠を解き、転換終了後、再び転てつ器を鎖錠す
る。転てつ器転換処理の詳細は後述する。
The switch changing unit 204 includes a route control unit 203.
Switch request and switch / track state storage unit 2
Based on 05 and the train position received from the train position conversion unit 202, the switch control of the switch is performed. The switch unit 204 can receive a plurality of switch requests from the route control unit 203. If there are consecutive requests in the same direction,
When the train passes through the switch, the switch remains locked. Unlock the switch when it is necessary to switch to a different direction. After the switch is complete, lock the switch again. Details of the switchover process will be described later.

【0020】転てつ器・進路状態記憶部205は転てつ
器の状態として、転てつ器の向き、鎖錠の有無、複数の
転換要求を管理する。進路状態としては、進路が進行現
示か停止現示であるか、各進路要求通番に対する進路鎖
錠はどのような状態になっているかを管理する。転てつ
器・進路状態記憶部205のデータ構造については後述
する。
The switch / track state storage unit 205 manages, as the state of the switch, the direction of the switch, the presence or absence of the lock, and a plurality of conversion requests. As the route state, it manages whether the route is the progress indication or the stop indication, and the state of the route lock corresponding to each route request serial number. The data structure of the switch / track state storage unit 205 will be described later.

【0021】進路制御装置通信部206は進路制御装置
110から進路要求情報111を受信し、受信進路要求
記憶部207に格納する。受信進路要求記憶部207は
受信した進路要求の進路IDと進路要求通番を格納す
る。
The route control device communication unit 206 receives the route request information 111 from the route control device 110 and stores it in the received route request storage unit 207. The received route request storage unit 207 stores the route ID and the route request serial number of the received route request.

【0022】進路状態情報作成部208は転てつ器・進
路状態記憶部205を参照し、進路状態情報113を作
成し、地上制御装置通信部201に渡す。進路状態情報
113を受けた地上制御装置通信部201は進路状態情
報113を地上制御装置101に送信する。
The route condition information creating unit 208 creates route condition information 113 with reference to the switch / track condition storage unit 205 and transfers the route condition information 113 to the ground control unit communication unit 201. The ground control device communication unit 201 having received the route state information 113 transmits the route state information 113 to the ground control device 101.

【0023】現地設備装置通信部209は転てつ器転換
部204から転換要求を受けて、当該転てつ器に転換の
指示を出す。また、現地設備装置通信部209は現地設
備の状態として、現地設備の転てつ器の向きを取り込ん
で、転てつ器・進路状態記憶部205に反映する。
The on-site equipment communication section 209 receives a change request from the switch changing section 204 and issues an instruction for changing to the switch. Further, the on-site equipment device communication unit 209 takes in the orientation of the on-site switch as the status of the on-site equipment and reflects the orientation on the on-point switch / track state storage unit 205.

【0024】上記のように連動装置109を構成するこ
とにより、複数の進路要求に応じて、地上制御装置10
1が把握する列車位置を参照しながら、転てつ器および
進路の制御を行うことが可能となり、同一進路が続けて
要求されている場合には進路を進行現示のままとし、競
合する進路が要求されている場合には進路を停止現示と
することができる。
By configuring the interlocking device 109 as described above, the ground control device 10 can respond to a plurality of route requests.
In this case, it is possible to control the switch and the course while referring to the train position grasped by the trainee 1. If the same course is continuously requested, the course is kept as it is and the competing course is maintained. If is required, the course can be a stop announcement.

【0025】図3は、転てつ器転換部204の転てつ器
転換時の処理フローを示している。転てつ器転換部20
4は図3の処理フローを毎周期実行することにより転て
つ器の転換の制御を行う。
FIG. 3 shows a processing flow at the time of switching of the switch of the switch 204. Pointer conversion unit 20
Reference numeral 4 controls the switching of the switch by executing the processing flow of FIG. 3 every cycle.

【0026】ステップ301:進路制御部203から転
てつ器の転換要求を受けているか調べる。転換要求を受
けていれば、ステップ302へ進む。転換要求を受けて
いなければ、ステップ303に進む。
Step 301: It is checked whether or not a change request of the switch has been received from the course control unit 203. If a conversion request has been received, the process proceeds to step 302. If the conversion request has not been received, the process proceeds to step 303.

【0027】ステップ302:ステップ301で受けて
いることを確認した転てつ器の転換要求を転換要求リス
トの末尾に追加する。転換要求には転てつ器の向きと、
対応する進路要求通番が含まれているものとする。転換
要求リストの構造については後述する。そして、ステッ
プ303へ進む。
Step 302: The change request of the switch confirmed to have been received in step 301 is added to the end of the change request list. The conversion request includes the orientation of the switch,
It is assumed that the corresponding route request serial number is included. The structure of the conversion request list will be described later. Then, the process proceeds to step 303.

【0028】ステップ303:進路制御部203から転
てつ器の解錠要求を受けているか調べる。解錠要求を受
けていれば、ステップ304へ進む。解錠要求を受けて
いなければ、ステップ305に進む。
Step 303: It is checked whether or not a request to unlock the switch has been received from the route control unit 203. If an unlock request has been received, the process proceeds to step 304. If the unlock request has not been received, the process proceeds to step 305.

【0029】ステップ304:ステップ303で受けて
いることを確認した転てつ器の解錠要求には対応する進
路要求通番が含まれているので、転換要求リストから当
該進路要求通番を含む転換要求を検索して、削除する。
そして、ステップ305に進む。
Step 304: Since the unlock request of the switch confirmed to have been received in step 303 contains the corresponding route request serial number, the conversion request including the relevant route request serial number from the conversion request list. Search for and delete.
Then, the process proceeds to step 305.

【0030】ステップ305:現地の転てつ器の状態を
転てつ器・進路状態記憶部205を参照することにより
調べ、転換要求リストの先頭の転換要求の向きとあって
いるか調べる。向きがあっていれば、ステップ306へ
進む。向きがあっていなければ、ステップ307へ進
む。
Step 305: The state of the local switch is checked by referring to the switch / track state storage unit 205, and it is checked whether it matches the direction of the head of the switch request in the switch request list. If so, the process proceeds to step 306. If not, the process proceeds to step 307.

【0031】ステップ306:転てつ器の状態を鎖錠状
態として処理を終了する。
Step 306: The state of the switch is set to the locked state, and the processing is terminated.

【0032】ステップ307:列車位置変換部202か
ら受けた列車位置をもとに、転てつ器のてっ査鎖錠の範
囲に列車が在線しているか調べる。在線していれば、処
理を終了。在線していなければ、ステップ308へ進
む。
Step 307: Based on the train position received from the train position converter 202, it is checked whether or not the train is within the range of the check lock of the switch. If there is, the process ends. If not, the process proceeds to step 308.

【0033】ステップ308:転てつ器・進路状態記憶
部205において、当該転てつ器を要求された方向に転
換中の状態とし、現地設備通信部209を介して、現地
設備の転てつ器に転換要求を出し、処理を終了する。
Step 308: In the switch / track state storage unit 205, the switch is set to a state in which the switch is being changed to the requested direction, and the local equipment communication unit 209 switches the local equipment. A conversion request is issued to the device, and the process ends.

【0034】図4は、進路制御部203の進路設定時の
処理フローを示している。 ステップ401:受信進路要求記憶部207の中に格納
されている進路要求情報111の中で、進路状態が進行
現示でない進路に対してステップ402からステップ4
08の処理を行う。進路状態が進行現示でないすべての
進路に対して処理を行えば、処理を終了する。そうでな
い間はステップ402へ進む。
FIG. 4 shows a processing flow of the course control unit 203 when setting a course. Step 401: Steps 402 to 4 in the route request information 111 stored in the received route request storage unit 207 for a route whose route status is not a progress indication.
08 is performed. If the process is performed for all routes whose route status is not the progress indication, the process ends. Otherwise, go to step 402.

【0035】ステップ402:当該進路内にあるすべて
の転てつ器に対して、ステップ403から407の処理
を行う。すべての転てつ器に対して処理を行えばステッ
プ408へ進む。そうでない間はステップ403へ進
む。
Step 402: The processing of steps 403 to 407 is performed for all the switches in the course. If the process has been performed for all the switches, the process proceeds to step 408. Otherwise, the process proceeds to step 403.

【0036】ステップ403:当該進路要求の進路要求
通番を持つ転てつ器転換要求が当該転てつ器の転換要求
リストの中にあるか調べる。あれば、既に転換要求を出
していると判断して、ステップ405で進む。なけれ
ば、転換要求はまだ出していないと判断して、ステップ
404へ進む。
Step 403: It is checked whether or not the switch request having the route request serial number of the route request is in the switch request list of the switch. If so, it is determined that a conversion request has already been issued, and the process proceeds to step 405. If not, it is determined that the conversion request has not been issued, and the process proceeds to step 404.

【0037】ステップ404:転てつ器転換部204
に、当該進路を構成するために必要な向きに転てつ器を
転換するように転てつ器の転換要求を出す。
Step 404: switch unit 204
Then, a request for turning the switch is issued so that the switch is turned in a direction necessary for forming the course.

【0038】ステップ405:当該転てつ器の転換要求
リストを参照し、転換要求リストの先頭の転換要求と当
該進路要求の進路要求通番を持つ転換要求の間に向きの
異なる転換要求があるか調べる。なければ、転てつ器は
同一方向に鎖錠されたままとなると判断し、ステップ4
06へ進む。あれば、転てつ器は当該進路要求の進路が
設定される前に逆方向に鎖錠されることになると判断
し、ステップ407へ進む。
Step 405: Referring to the change request list of the switch, whether there is a change request having a different direction between the change request at the head of the change request list and the change request having the route request serial number of the route request. Find out. If not, it is determined that the switch remains locked in the same direction.
Proceed to 06. If there is, the switch judges that the lock will be locked in the reverse direction before the route of the route request is set, and proceeds to step 407.

【0039】ステップ406:転てつ器・進路状態記憶
部205を参照し、現地設備の転てつ器の向きを調べ
る。現地設備の転てつ器が転換要求した方向に一致し、
かつ転てつ器が鎖錠状態にあるときは、転てつ器は同一
方向に鎖錠されたままとなるので、転てつ器は鎖錠され
ていると判断し、前記ステップ402へ進む。
Step 406: The orientation of the switch of the local facility is checked by referring to the switch / track state storage unit 205. The point of the local equipment's switch coincides with the direction requested for conversion,
If the switch is in the locked state, the switch remains locked in the same direction. Therefore, it is determined that the switch is locked, and the process proceeds to step 402. .

【0040】ステップ407:転てつ器は当該進路要求
の進路が設定される前に逆方向に鎖錠されることになる
ので、当該進路要求から見れば鎖錠はできていないと判
断し、ステップ402に進む。
Step 407: Since the switch is locked in the reverse direction before the route of the route request is set, it is determined that the lock has not been made from the viewpoint of the route request. Proceed to step 402.

【0041】ステップ408:すべての転てつ器が鎖錠
されている、つまりステップ407に進むことなくステ
ップ402を終了した場合は、ステップ409へ進む。
Step 408: If all the switches are locked, that is, if step 402 is terminated without proceeding to step 407, proceed to step 409.

【0042】ステップ409:進路内の転てつ器がすべ
て要求方向に鎖錠されているので、当該進路を進行現示
にし、当該進路要求通番を当該進路の進路要求リストに
追加する。そして、ステップ401へ進む。
Step 409: Since all the switches in the route are locked in the requested direction, the route is displayed as progress and the route request serial number is added to the route request list of the route. Then, the process proceeds to step 401.

【0043】図5は、前記ステップ409で用いている
進路要求リストの一例を示している。進路要求リストは
各進路ごとに持つものとし、進行現示になってから、進
路鎖錠がかかっている間は当該進路要求通番はリストの
中にあるものとする。進路鎖錠が解錠された時点でリス
トから削除する。また、進路要求リストは進路要求通番
と、当該進路要求に対する進路状態と、対応する列車I
Dを持つものとする。現示を進行にした時点では列車I
Dは空欄とする。進路要求通番と列車IDと関連づける
処理は進路復位処理で列車が進路内方に進入した時点に
行う。進路復位処理の詳細については後述する。
FIG. 5 shows an example of the route request list used in step 409. It is assumed that the route request list is provided for each route, and that the route request serial number is in the list while the route is locked after the progress notification is made. When the pathway lock is unlocked, it is deleted from the list. The route request list includes a route request serial number, a route state corresponding to the route request, and a corresponding train I.
D. At the time when the announcement was advanced, the train I
D is blank. The process of associating the route request serial number with the train ID is performed when the train enters the route in the route relocation process. The details of the course relocation processing will be described later.

【0044】図5において、列車ID1の列車のための
進路要求情報111の進路要求通番を1、列車ID2の
列車のための進路要求情報111の進路要求通番を2、
列車ID3の列車のための進路要求情報111の進路要
求通番を3とする。すると、列車ID1と2の列車が進
路内方に進入した時点で、進路要求リストは図5に示す
形になる。
In FIG. 5, the route request serial number of the route request information 111 for the train of train ID 1 is 1, the route request serial number of the route request information 111 for the train of train ID 2 is 2,
The route request serial number of the route request information 111 for the train with the train ID 3 is 3. Then, when the trains with the train IDs 1 and 2 enter the inside of the course, the course request list has the form shown in FIG.

【0045】進路要求通番と列車IDの関連付けは進路
制御装置110において、進路要求時に行う構成も考え
られる。しかし、進路復位時に連動装置で進路要求通番
と列車IDの関連付けを行う構成とすると、従来の前記
進路制御装置110をほぼそのまま用い、連動装置の変
更だけで、システムを構成することができる。
A configuration is also conceivable in which the route control device 110 associates the route request serial number with the train ID when a route request is made. However, when the route request serial number and the train ID are associated with each other by the interlocking device at the time of route relocation, the system can be configured only by changing the interlocking device, using the conventional route control device 110 almost as it is.

【0046】図6は、進路制御部203の進路復位時の
処理フローを示している。 ステップ601:各進路の状態を参照し、進行現示とな
っている進路について、ステップ602からステップ6
06の処理を行う。すべての進行現示の進路について処
理を行えば進路復位処理を終了する。そうでない間は、
ステップ602へ進む。
FIG. 6 shows a processing flow of the route control section 203 at the time of route relocation. Step 601: Steps 602 to 6 are performed on the route indicated as progress by referring to the state of each route.
06 is performed. If the process is performed for all the routes indicated by the progress, the route reversion process ends. Otherwise,
Proceed to step 602.

【0047】ステップ602:当該進路内のすべての軌
道回路についてステップ603からステップ606の処
理を行う。当該進路内のすべての軌道回路について処理
を行えば、前記ステップ601へ進む。そうでない間は
ステップ603へ進む。
Step 602: The processes of steps 603 to 606 are performed for all the track circuits in the course. If the process is performed for all the track circuits in the course, the process proceeds to step 601. Otherwise, the process proceeds to step 603.

【0048】ステップ603:当該軌道回路に列車が在
線しているか調べる。列車が在線していれば、ステップ
604へ進み、在線していなければ、前記ステップ60
2へ進む。
Step 603: It is checked whether or not a train is on the track circuit. If the train is on the line, the process proceeds to step 604;
Proceed to 2.

【0049】ステップ604:当該進路の進路要求リス
トを検索し、在線している列車のIDが進路要求リスト
に含まれているか調べる。含まれていなければ、進路内
方に列車が進入したと判断でき、進路を復位する必要が
あるため、ステップ605へ進む。含まれていれば、当
該列車に対応する進路要求通番は既に復位したと判断で
きるので、何もせずに、前記ステップ603へ進む。
Step 604: The route request list of the route is searched, and it is checked whether or not the ID of the train on the track is included in the route request list. If it is not included, it can be determined that the train has entered the inside of the course and it is necessary to return to the course, so the process proceeds to step 605. If it is included, it can be determined that the route request serial number corresponding to the train has already been restored, and the process proceeds to step 603 without doing anything.

【0050】ステップ605:当該進路を復位し、停止
現示にしてステップ606へ進む。
Step 605: The course is relocated, the stop is indicated, and the process proceeds to Step 606.

【0051】ステップ606:当該進路の進路要求リス
トの中で、進路状態が進行現示になっている進路要求通
番を検索し、進路状態を進路鎖錠状態にする。さらに、
進路要求通番に対応する列車IDを前記ステップ604
で進路要求リストに含まれないと判断された列車IDに
し、進路復位処理を終了する。
Step 606: Search the route request list of the route for the route request serial number whose route status is indicated as progress, and set the route status to the route locked state. further,
The train ID corresponding to the route request serial number is stored in the step 604.
And the train ID determined not to be included in the route request list, and the route relocation process ends.

【0052】図7は、進路制御部203の進路鎖錠時の
処理フローを示している。 ステップ701:進路要求リストを参照し、進路状態が
進路鎖錠となっている進路要求通番を検索し、その進路
要求通番と対応する列車IDを進路内列車リストに格納
する。そして、ステップ702へ進む。
FIG. 7 shows a processing flow of the course control unit 203 when the course is locked. Step 701: With reference to the route request list, a route request serial number whose route state is locked is searched, and the train ID corresponding to the route request serial number is stored in the intra-route train list. Then, the process proceeds to step 702.

【0053】ステップ702:従来の連動装置と同様に
進路区分鎖錠ごとに進路鎖錠処理を行う。各進路鎖錠ご
とにステップ703からステップ708の処理を行う。
進路区分は列車の進行方向に対して手前側から順に処理
するものとする。すべての進路区分について処理を行え
ばステップ709へ進む。そうでない間は、ステップ7
03へ進む。
Step 702: Similar to the conventional interlocking device, a route lock process is performed for each route division lock. The processing from step 703 to step 708 is performed for each track lock.
The route division is processed in order from the near side with respect to the traveling direction of the train. If the process is performed for all the route divisions, the process proceeds to step 709. Otherwise, step 7
Go to 03.

【0054】ステップ703:進路区分内のすべての軌
道回路についてステップ704の処理を行う。すべての
軌道回路について処理を行えば、ステップ705へ進
む。そうでなければ、ステップ704へ進む。
Step 703: The process of step 704 is performed for all the track circuits in the route section. If the process is performed for all the track circuits, the process proceeds to step 705. Otherwise, go to step 704.

【0055】ステップ704:当該軌道回路に在線して
いる列車IDを検索し、当該軌道回路に在線している列
車を進路内列車リストから削除する。そして、前記ステ
ップ703へ進む。
Step 704: The train ID existing on the track circuit is searched, and the train existing on the track circuit is deleted from the on-track train list. Then, the process proceeds to step 703.

【0056】ステップ705:進路内列車リストが空に
なれば、進路内列車リスト上のすべての列車が当該軌道
回路上あるいは手前に在線していると判断できるので、
これ以上進路も転てつ器も解錠できないため、進路鎖錠
処理を終了する。進路内方軌道回路リストが空でなけれ
ば、ステップ706へ進む。
Step 705: If the list of trains in the route becomes empty, it can be determined that all the trains on the list of trains in the route are on or near the track circuit.
Since the route and the switch cannot be unlocked any more, the route locking process ends. If the track inner track circuit list is not empty, the process proceeds to step 706.

【0057】ステップ706:進路内列車リストが空で
ないということは、進路内軌道回路リストに残っている
列車は当該軌道回路より奥の軌道回路に在線していると
考えられる。そのため、進路内列車リストに残っている
列車の分については進路区分鎖錠を解除することができ
る。そこで、進路区分内の各軌道回路についてステップ
707とステップ708の処理を行う。すべての進路区
分内の軌道回路について処理を行えば、前記ステップ7
02へ進む。そうでない間はステップ707へ進む。
Step 706: The fact that the intra-track train list is not empty means that the trains remaining in the intra-track track circuit list are present on track circuits deeper than the relevant track circuit. Therefore, the route division lock can be released for the remaining trains in the intra-route train list. Therefore, the processes of step 707 and step 708 are performed for each track circuit in the route section. If the processing is performed for the track circuits in all the route sections, the above-described step 7
Go to 02. Otherwise, the process proceeds to step 707.

【0058】ステップ707:進路内列車リストに残っ
ている各列車について、当該軌道回路内の転てつ器を解
錠するために、ステップ708の処理を行う。進路内列
車リストに残っているすべての列車について処理を行え
ば前記ステップ706へ進む。そうでない間はステップ
708へ進む。
Step 707: The process of step 708 is performed for each train remaining in the on-track train list in order to unlock the switch in the track circuit. If the process is performed for all the trains remaining in the on-track train list, the process proceeds to step 706. Otherwise, go to step 708.

【0059】ステップ708:当該列車IDに対応する
進路要求通番を当該軌道回路内の転てつ器の転換要求リ
ストから検索し、削除することにより、当該列車IDに
対応する転てつ器の解錠を行う。そして、ステップ70
7へ進む。
Step 708: The path request serial number corresponding to the train ID is searched from the switch request list of the switch in the track circuit, and is deleted, so that the solution of the switch corresponding to the train ID is determined. Do the lock. And step 70
Proceed to 7.

【0060】ステップ709:すべての進路区分上の列
車を検索した後に進路内列車リストが空になれば、進路
内列車リスト上のすべての列車が当該進路内方に在線し
ていると判断でき、進路の解錠を行えないため進路鎖錠
処理を終了する。進路内列車リストが空でなければ、ス
テップ710へ進む。
Step 709: If the list of trains on the route becomes empty after searching for the trains on all the route divisions, it can be determined that all the trains on the list of trains on the route are present in the route. Since the route cannot be unlocked, the route lock process ends. If the in-route train list is not empty, the process proceeds to step 710.

【0061】ステップ710:進路内列車リストが空で
なければ、進路区分鎖錠の区間を抜けた列車がいるの
で、その列車については進路鎖錠を解錠することができ
る。進路内列車リストにある各列車についてステップ7
11からステップ713の処理を行う。進路内列車リス
ト内のすべての列車について処理を行えば、進路鎖錠処
理を終了する。そうでない間は、ステップ711へ進
む。
Step 710: If the list of trains in the route is not empty, there is a train passing through the section of the route division lock, so that the route lock can be unlocked for that train. Step 7 for each train in the train list
The processing from step 11 to step 713 is performed. When the process is performed for all the trains in the train-in-route train list, the route locking process ends. Otherwise, the process proceeds to step 711.

【0062】ステップ711:当該列車に対応する進路
要求通番の進路の処理は終了したので、当該列車に対応
する進路要求通番を進路要求リストから削除し、ステッ
プ712へ進む。
Step 711: Since the processing of the route request serial number corresponding to the train has been completed, the route request serial number corresponding to the train is deleted from the route request list, and the process proceeds to step 712.

【0063】ステップ712:解錠した進路内のすべて
の転てつ器を解錠するために、当該進路内のすべての転
てつ器について、ステップ713の処理を行う。当該進
路内のすべての転てつ器について処理を行えばステップ
710へ進む。そうでない間はステップ713へ進む。
Step 712: In order to unlock all the switches in the unlocked route, the process of step 713 is performed for all the switches in the route. If the process is performed for all the switches in the course, the process proceeds to step 710. Otherwise, the process proceeds to step 713.

【0064】ステップ713:当該列車IDに対応する
進路要求通番を当該転てつ器の転換要求リストから検索
し、削除することにより、当該列車IDに対応する転て
つ器の解錠を行う。そして、ステップ712へ進む。
Step 713: The route request serial number corresponding to the train ID is retrieved from the switch request list of the switch and deleted to unlock the switch corresponding to the train ID. Then, the process proceeds to step 712.

【0065】図8は、転てつ器転換部204の進路制御
部203が使用する転てつ器の転換要求リストのフォー
マットを示している。転換要求リストでは要求のあった
順に、進路要求通番と、転換方向を格納する。進路制御
部203が転てつ器を解錠するときに当該進路要求通番
を転換要求リストから削除する。
FIG. 8 shows a format of a switch request list of the switch used by the route control unit 203 of the switch unit 204. In the change request list, the route request serial number and the change direction are stored in the order of request. When the route control unit 203 unlocks the switch, the route request serial number is deleted from the conversion request list.

【0066】図9は、進路要求情報111のフォーマッ
トの一例を示している。図9に示すように、進路要求情
報111は進路要求情報通番と進路要求種別と、要求進
路IDからなる。進路要求情報通番は、進路の設定を要
求する進路要求情報111において、重複することがな
いように進路制御装置110がつけた番号である。進路
の設定要求時には他の進路の設定要求と重複しない新た
な番号をつける。進路の設定要求の取り消し時には、進
路要求通番としては、取り消す進路要求情報110の進
路要求通番を設定する。進路要求種別は「設定」と「取
り消し」の2種類が設定可能とする。要求進路IDには
設定の要求、または取り消しの要求をする進路のIDを
設定する。
FIG. 9 shows an example of the format of the route request information 111. As shown in FIG. 9, the route request information 111 includes a route request information serial number, a route request type, and a requested route ID. The route request information serial number is a number assigned by the route control device 110 so as not to be duplicated in the route request information 111 requesting route setting. At the time of a route setting request, a new number that does not overlap with other route setting requests is assigned. When canceling the route setting request, the route request serial number of the route request information 110 to be canceled is set as the route request serial number. Two types of route request types, “setting” and “cancellation”, can be set. In the requested route ID, the ID of a route for which a setting request or a cancellation request is made is set.

【0067】図10は、列車位置情報108のフォーマ
ットの一例を示している。図10に示すように、列車位
置情報108は列車IDと列車位置と方向からなり、地
上制御装置101が把握している全列車の情報を含むも
のとする。図10では列車位置はキロ程で表現している
が、軌道回路を基準にした表現等を用いてもよい。
FIG. 10 shows an example of the format of the train location information 108. As shown in FIG. 10, the train position information 108 includes a train ID, a train position, and a direction, and includes information on all trains recognized by the ground control device 101. In FIG. 10, the train position is expressed in kilometers, but an expression based on the track circuit or the like may be used.

【0068】図11は、転てつ器・進路状態記憶部20
5の構造を示している。図11に示すように、まず転て
つ器状態は、転てつ器名と転てつ器の向きと鎖錠状態と
転換要求リストからなる。転てつ器の向きは現地設備の
状態を取り込み毎周期現地設備装置通信部209によっ
て更新される。鎖錠状態は鎖錠と解錠の状態があり、転
てつ器転換部204により更新される。転てつ器転換リ
ストは転換要求方向と対応する進路要求通番のリストで
あり、進路制御部203が進路の設定時に転てつ器の転
換要求を出したときに更新される。次に進路状態は進路
IDと現示と鎖錠状態と進路要求リストからなる。現示
は「進行」と「停止」の状態を取る。鎖錠状態は「鎖
錠」と「解錠」の状態を取る。進路要求リストは進行現
示になってから、解錠されるまでの間の状態にある進路
要求通番のリストである。
FIG. 11 shows a switch / track state storage unit 20.
5 shows the structure of FIG. As shown in FIG. 11, the switch state first includes a switch name, a switch orientation, a locked state, and a change request list. The orientation of the switch is updated by the local equipment communication unit 209 every period by taking in the status of the local equipment. The locked state includes a locked state and an unlocked state, and is updated by the switch unit 204. The switch point change list is a list of path request serial numbers corresponding to the change request direction, and is updated when the path control unit 203 issues a switch request of the switch when setting a path. Next, the route status includes a route ID, a present status, a locked status, and a route request list. The present takes the state of "progress" and "stop". The locked state takes the states of “locked” and “unlocked”. The route request list is a list of route request serial numbers in a state from when the progress notification is made to when the route is unlocked.

【0069】また、設定の要求をした進路の取り消し
は、進路が未設定であれば、受信進路要求記憶部207
と、すべての転てつ器の転換要求リストから当該進路要
求通番を削除することで実現できる。既に進路が設定さ
れている場合は、受信進路要求記憶部207と、すべて
の転てつ器の転換要求リストと、当該進路の進路要求リ
ストから当該進路要求通番を削除し、従来の連動装置の
進路の引き戻しと同様の処理を行うことにより実現でき
る。従来連動装置の進路の引き戻しの処理については本
発明の範囲外であるので、省略する。
If the route for which the setting request has been made is canceled, if the route has not been set, the reception route request storage unit 207
Can be realized by deleting the route request serial numbers from the change request list of all the switches. When the route is already set, the route request serial number is deleted from the reception route request storage unit 207, the change request list of all the switches, and the route request list of the route, and the conventional interlocking device is deleted. This can be realized by performing the same processing as the return of the course. The process of pulling back the path of the conventional interlocking device is out of the scope of the present invention, and therefore will be omitted.

【0070】以上のように本実施の形態では、連動装置
109は進路制御装置110より同一進路あるいは競合
する進路に対する設定要求を受け付け、地上制御装置1
01から受信する列車IDと位置をもとに進路制御を行
う。これにより、同一方向の転てつ器にに次々と列車が
進入する場合に、転てつ器端を停止限界とすることな
く、移動閉塞を実現したまま列車を転てつ器に進入させ
ることが可能となり、列車間隔をつめることができる。
具体的には、複数の進路要求に応じて、順に転てつ器に
転換要求を出す。各転てつ器は転換要求をリストで保存
し、転てつ器転換部204はリストを参照しながら、転
換の必要の有無、鎖錠が可能かどうかの判断を行い、転
てつ器の制御を行う。進路制御部203は進路要求をリ
ストで保存し、リストの順に地上制御装置101が把握
する列車位置と転てつ器の状態を参照しながら、進路の
設定・復位・鎖錠の処理を行う。同一進路が続けて要求
されている場合には転てつ器の転換要求は同じ要求が連
続するため、転てつ器転換部204は転てつ器を鎖錠状
態のままとし、進路制御部203は転てつ器が鎖錠され
ているため続けて同一進路を進路を進行現示のままとす
る。競合する進路が要求されている場合には、転てつ器
に異なる方向への転換要求が連続して出されるため、進
路制御部203は異なる方向への転換要求がある場合に
は転てつ器は鎖錠されていないと判断し、競合する進路
については進路を構成することができず、停止現示とす
る。
As described above, in the present embodiment, the interlocking device 109 receives the setting request for the same route or the competing route from the route control device 110, and
Route control is performed based on the train ID and position received from 01. As a result, when a train successively enters a switch in the same direction, the train can enter the switch with the moving blockage realized without making the switch end the stop limit. It is possible to reduce train intervals.
Specifically, in response to a plurality of route requests, a change request is sequentially issued to the switch. Each switch saves the switch request in a list, and the switch converter 204 determines whether or not the switch is necessary and whether the lock is possible with reference to the list. Perform control. The route control unit 203 stores the route requests in a list, and performs the process of setting, restoring, and locking the route while referring to the train position and the state of the switch grasped by the ground control device 101 in the order of the list. When the same route is continuously requested, the same request is continuously made for the switching request of the switch. Therefore, the switch conversion unit 204 keeps the switch in the locked state and the route control unit. Reference numeral 203 indicates that the switch is locked, so that the same route is kept as it is. When a competing course is requested, a change request in a different direction is continuously issued to the switch. Therefore, the course control unit 203 sets the switch when there is a change request in a different direction. The device is determined not to be locked, and a competing route cannot be configured, and the stop is indicated.

【0071】また、本実施の形態においては、地上制御
装置101が列車位置を把握するのに、地上側無線伝送
装置102を用いて、列車103から無線で送信される
位置情報を受信しているが、位置情報は漏洩同軸ケーブ
ルを用いて受信してもよい。
Further, in the present embodiment, the ground control device 101 uses the ground-side radio transmission device 102 to receive the position information transmitted wirelessly from the train 103 in order to grasp the position of the train. However, the position information may be received using a leaky coaxial cable.

【0072】さらに連動装置109は地上制御装置10
1から受信した列車位置情報108を軌道回路内に在線
する列車IDを検索するために用いている。そこで、複
数の列車からの電文を受信できる軌道回路を用いて、軌
道回路内に在線する列車IDは軌道回路から受信するよ
うにし、地上制御装置101から列車位置情報108受
信しないようにしてもよい。
Further, the interlocking device 109 is provided with the ground control device 10.
The train position information 108 received from No. 1 is used to search for a train ID located in the track circuit. Therefore, by using a track circuit that can receive messages from a plurality of trains, the train ID existing in the track circuit may be received from the track circuit, and the train position information 108 may not be received from the ground control device 101. .

【0073】つまり、本発明の技術を構築するにあた
り、ある程度自由度がある。どのような構成とするか
は、各線区毎に最適となるように選択すればよい。
That is, there is a certain degree of freedom in constructing the technology of the present invention. The configuration may be selected so as to be optimal for each line section.

【0074】[0074]

【発明の効果】以上説明したように、本発明によれば、
複数の列車が転てつ器に進入する際に、転てつ器の同一
方向への転換要求が連続する場合は、転てつ器を鎖錠し
たまま、複数の列車を連続して転てつ器に進入させるこ
とができる。
As described above, according to the present invention,
When multiple trains enter the switch, if the request for turning the switch in the same direction is continuous, switch the trains continuously while keeping the switch locked. You can enter the vessel.

【0075】また、先行する列車が進路内方の転てつ器
上に在線する場合でも、後続の列車を転てつ器に進入さ
せることが可能となり、これにより、列車間隔をつめる
ことができ、列車運行の効率および利便性が向上する。
Further, even when the preceding train is on a switch on the inside of the course, it is possible to make the following train enter the switch, thereby reducing the train interval. Thus, the efficiency and convenience of train operation are improved.

【図面の簡単な説明】[Brief description of the drawings]

【図1】本発明に係る列車信号システムの全体構成図で
ある。
FIG. 1 is an overall configuration diagram of a train signal system according to the present invention.

【図2】連動装置の内部構成を示したブロック図であ
る。
FIG. 2 is a block diagram showing an internal configuration of the interlocking device.

【図3】転てつ器転換部の転てつ器転換時における処理
フローを示した図である。
FIG. 3 is a diagram showing a processing flow at the time of a switchover of a switchover unit.

【図4】進路制御部の進路設定時における処理フローを
示した図である。
FIG. 4 is a diagram showing a processing flow when a route is set by a route control unit.

【図5】進路制御部で使用する進路要求リストの具体例
を示した図である。
FIG. 5 is a diagram showing a specific example of a route request list used in a route control unit.

【図6】進路制御部の進路復位時における処理フローを
示した図である。
FIG. 6 is a diagram showing a processing flow of a route control unit at the time of route relocation.

【図7】進路制御部の進路鎖錠時における処理フローを
示した図である。
FIG. 7 is a diagram showing a processing flow when the route control unit locks the route.

【図8】転てつ器転換処理と進路制御処理が使用する転
てつ器の転換要求リストのフォーマットを示した図であ
る。
FIG. 8 is a diagram showing a format of a switch request list of the switch used in the switch processing and the course control processing.

【図9】進路要求情報のフォーマットを示した図であ
る。
FIG. 9 is a diagram showing a format of route request information.

【図10】列車位置情報のフォーマットを示した図であ
る。
FIG. 10 is a diagram showing a format of train position information.

【図11】転てつ器・進路状態記憶部のフォーマットを
示した図である。
FIG. 11 is a diagram showing a format of a switch / track state storage unit.

【符号の説明】[Explanation of symbols]

101 地上制御装置 102 地上側無線伝送装置 103 列車 104 停止限界 105 転てつ器 106 制御情報 107 位置情報 108 列車位置情報 109 連動装置 110 進路制御装置 111 進路要求情報 112a,112b 進路 113 進路状態情報 201 地上制御装置通信部 202 列車位置変換部 203 進路制御部(進路制御手段) 204 転てつ器転換部(転てつ器転換手段) 205 転てつ器・進路状態記憶部(転てつ器状態記憶
媒体) 206 進路制御装置通信部 207 受信進路要求記憶部(受信進路要求記憶媒体) 208 進路状態情報作成部 209 現地設備装置通信部
Reference Signs List 101 ground control device 102 ground side wireless transmission device 103 train 104 stop limit 105 switch 106 control information 107 position information 108 train position information 109 link device 110 route control device 111 route request information 112a, 112b route 113 route status information 201 Ground control device communication unit 202 Train position conversion unit 203 Track control unit (track control means) 204 Point switch unit (point switch unit) 205 Point switch / track state storage unit (point state) Storage medium) 206 Route control device communication unit 207 Received route request storage unit (received route request storage medium) 208 Route state information creation unit 209 Local facility device communication unit

Claims (6)

【特許請求の範囲】[Claims] 【請求項1】 列車の運行状況に合わせて、進路の設定
および進路の取り消しを要求する進路制御装置と、前記
進路制御装置より進路の設定および進路の取り消しの要
求を受けて、列車の在線状態と転てつ器の状態を確認し
進路の設定および取り消しを行う連動装置と、を備えた
列車信号システムにおいて、 複数の列車が転てつ器に進入する際、前記転てつ器の同
一方向への転換要求が連続する場合は、前記複数の列車
が前記転てつ器を通過し終えるまで該転てつ器を鎖錠し
たままとする転てつ器転換手段と、 前記転てつ器が鎖錠されたままとなることを確認してか
ら、前記複数の列車に対して前記転てつ器への進入許可
を与える進路制御手段と、を備えたことを特徴とする列
車信号システム。
1. A route control device for requesting route setting and route cancellation in accordance with the operation status of a train, and receiving a request for route setting and route cancellation from the route control device, Interlocking device for checking the state of the switch and setting and canceling the course, in a train signal system, when a plurality of trains enter the switch, the same direction of the switch If the request for switching to the continuous train is continuous, the switch means for keeping the switches locked until the plurality of trains have passed through the switches, A route control unit that, after confirming that the trains remain locked, gives permission for the plurality of trains to enter the switch.
【請求項2】 請求項1に記載の列車信号システムにお
いて、 前記進路制御装置から、同一進路および競合する進路に
対する要求も含めて進路の設定および取り消しの要求を
複数受信し、その受信した要求を記憶する受信進路要求
記憶媒体を備えたことを特徴とする列車信号システム。
2. The train signal system according to claim 1, wherein a plurality of route setting and cancellation requests, including requests for the same route and a competing route, are received from the route control device, and the received requests are received. A train signal system comprising a received route request storage medium for storing.
【請求項3】 請求項1又は2に記載の列車信号システ
ムにおいて、 転てつ器の複数の転換要求を転てつ器毎に記憶する転て
つ器状態記憶媒体を備えたことを特徴とする列車信号シ
ステム。
3. The train signal system according to claim 1, further comprising a switch state storage medium for storing a plurality of switch requests for the switch for each switch. Train signal system.
【請求項4】 請求項3に記載の列車信号システムにお
いて、 前記転てつ器転換手段は、前記転てつ器状態記憶媒体に
記憶されている転てつ器の複数の転換要求を参照し、最
も古い転換要求と転てつ器の向きが一致しない場合に
は、転てつ器を転換、鎖錠し、転てつ器を異なる方向に
転換し、転てつ器の転換要求がなくなるまで転てつ器を
解錠しないことを特徴とする列車信号システム。
4. The train signal system according to claim 3, wherein said switch means refers to a plurality of switch requests of the switch stored in said switch state storage medium. If the orientation of the switch does not match the oldest switch request, switch the switch, lock it, switch the switch to a different direction, and eliminate the switch request. A train signal system characterized by not unlocking the switch until
【請求項5】 請求項3又は4に記載の列車信号システ
ムにおいて、 前記進路制御手段は、転てつ器の鎖錠を確認する際、当
該進路の設定のための転てつ器の転換要求と最も古い転
換要求との間に異なる方向の転換要求がなく、かつ転て
つ器が鎖錠されているときには、転てつ器は鎖錠されて
いるとする判断することを特徴とする列車信号システ
ム。
5. The train signal system according to claim 3, wherein the route control unit, when confirming the lock of the switch, requests the switch of the switch for setting the route. A train characterized by determining that the switch is locked when there is no turn request in a different direction between the switch and the oldest switch request and the switch is locked. Signal system.
【請求項6】 請求項3,4又は5に記載の列車信号シ
ステムにおいて、 前記進路制御手段は、列車が転てつ器を抜けたときに、
当該列車のための進路設定の際に要求した当該転てつ器
の転換要求を前記転てつ器状態記憶媒体から削除するこ
とを特徴とする列車信号システム。
6. The train signal system according to claim 3,4, or 5, wherein the course control means, when the train passes through a switch,
A train signal system, wherein a change request of the switch requested at the time of setting a route for the train is deleted from the switch state storage medium.
JP2000250815A 2000-08-22 2000-08-22 Train signal system Pending JP2002059832A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP2000250815A JP2002059832A (en) 2000-08-22 2000-08-22 Train signal system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP2000250815A JP2002059832A (en) 2000-08-22 2000-08-22 Train signal system

Publications (1)

Publication Number Publication Date
JP2002059832A true JP2002059832A (en) 2002-02-26

Family

ID=18740326

Family Applications (1)

Application Number Title Priority Date Filing Date
JP2000250815A Pending JP2002059832A (en) 2000-08-22 2000-08-22 Train signal system

Country Status (1)

Country Link
JP (1) JP2002059832A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100928454B1 (en) * 2008-04-03 2009-11-25 한국철도기술연구원 Safety route guidance device and method for preventing accidental entry of train
JP2013075644A (en) * 2011-09-30 2013-04-25 Nippon Signal Co Ltd:The Train control system
JP2014148260A (en) * 2013-02-01 2014-08-21 Railway Technical Research Institute Ganged control method, ground device, and onboard apparatus
JP2017105369A (en) * 2015-12-10 2017-06-15 株式会社日立製作所 Railway security system and interlocking device
CN110341759A (en) * 2019-05-31 2019-10-18 北京全路通信信号研究设计院集团有限公司 Station inner side line vehicle receiving control method
WO2020112165A1 (en) * 2018-11-30 2020-06-04 Westinghouse Air Brake Technologies Corporation Method and apparatus for vehicle-based switch locking in a rail network
CN111994130B (en) * 2020-10-29 2021-02-09 北京全路通信信号研究设计院集团有限公司 Self-networking based departure method and system and group computer interlocking
CN111994131B (en) * 2020-10-29 2021-02-09 北京全路通信信号研究设计院集团有限公司 Ad hoc network-based vehicle receiving method and system and group computer interlock

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR100928454B1 (en) * 2008-04-03 2009-11-25 한국철도기술연구원 Safety route guidance device and method for preventing accidental entry of train
JP2013075644A (en) * 2011-09-30 2013-04-25 Nippon Signal Co Ltd:The Train control system
EP2752354A4 (en) * 2011-09-30 2016-01-20 Nippon Signal Co Ltd Train control system
US9669853B2 (en) 2011-09-30 2017-06-06 The Nippon Signal Co., Ltd. Train control system
JP2014148260A (en) * 2013-02-01 2014-08-21 Railway Technical Research Institute Ganged control method, ground device, and onboard apparatus
JP2017105369A (en) * 2015-12-10 2017-06-15 株式会社日立製作所 Railway security system and interlocking device
WO2020112165A1 (en) * 2018-11-30 2020-06-04 Westinghouse Air Brake Technologies Corporation Method and apparatus for vehicle-based switch locking in a rail network
US11772692B2 (en) 2018-11-30 2023-10-03 Westinghouse Air Brake Technologies Corporation Method and apparatus for vehicle-based switch locking in a rail network
CN110341759A (en) * 2019-05-31 2019-10-18 北京全路通信信号研究设计院集团有限公司 Station inner side line vehicle receiving control method
CN110341759B (en) * 2019-05-31 2021-07-20 北京全路通信信号研究设计院集团有限公司 Station inner side line vehicle receiving control method
CN111994130B (en) * 2020-10-29 2021-02-09 北京全路通信信号研究设计院集团有限公司 Self-networking based departure method and system and group computer interlocking
CN111994131B (en) * 2020-10-29 2021-02-09 北京全路通信信号研究设计院集团有限公司 Ad hoc network-based vehicle receiving method and system and group computer interlock

Similar Documents

Publication Publication Date Title
JP5885654B2 (en) Train control system
US5390880A (en) Train traffic control system with diagram preparation
US8967553B2 (en) Train operation control system
JP5683254B2 (en) Driving security method, driving security system and management device
KR20200108871A (en) Wireless train management system
US20070162199A1 (en) Signaling system
JP5023685B2 (en) Signal security system
JP2010149673A (en) Signal security system
JP2002059832A (en) Train signal system
JP2007276626A (en) Dual mode traffic system
CN115402375B (en) Driving electronic map acquisition method and system
JP3920765B2 (en) Train control system
CN114348059B (en) Route segmentation unlocking and logic processing method and system based on ad hoc network
JP3829031B2 (en) Train control system, train operation support system
JPH0729606B2 (en) Automatic train control device by radio
CN112907116B (en) Method and system for scheduling multiple trackless vehicles of amusement item
JP2022124241A (en) Train control system and control method
CN115923883B (en) Implementation method for configurable interlocking condition, interlocking system and electronic equipment
KR100877531B1 (en) Train obstruction control system of mobile occlusion method, train track control method and train operation management method using same
JP6799432B2 (en) Railroad vehicle mileage record grasping system
TWI715987B (en) Train operation management system
JP2700291B2 (en) Train operation control system
JPH0435389B2 (en)
JP2001100840A (en) Vehicle travel control system
JPH0891221A (en) Total traffic control system