JP2000230272A - Pre-assembling method for kitchen and sanitary room for building - Google Patents

Pre-assembling method for kitchen and sanitary room for building

Info

Publication number
JP2000230272A
JP2000230272A JP11032232A JP3223299A JP2000230272A JP 2000230272 A JP2000230272 A JP 2000230272A JP 11032232 A JP11032232 A JP 11032232A JP 3223299 A JP3223299 A JP 3223299A JP 2000230272 A JP2000230272 A JP 2000230272A
Authority
JP
Japan
Prior art keywords
room
slab
building
wall
kitchen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
JP11032232A
Other languages
Japanese (ja)
Inventor
Nobuhide Mori
信秀 森
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
MK KK
Original Assignee
MK KK
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by MK KK filed Critical MK KK
Priority to JP11032232A priority Critical patent/JP2000230272A/en
Publication of JP2000230272A publication Critical patent/JP2000230272A/en
Pending legal-status Critical Current

Links

Landscapes

  • Bathtubs, Showers, And Their Attachments (AREA)
  • Residential Or Office Buildings (AREA)

Abstract

PROBLEM TO BE SOLVED: To provide a construction method sharply reducing the on-site work for a kitchen and sanitary room, capable of shortening the construction period with little work error and little leak error, capable of attaining an accurate finished state, and capable of sharply reducing the construction cost in constructing a concrete structure. SOLUTION: A drain pie b11, a toilet sewage pipe b12, a feed water pipe and a power line b14 are arranged and wired on the skeleton of a kitchen and sanitary room portion B, apparatuses are installed in a bathroom b1, a dressing/washing room b3 and a toilet b2, the interior work of the kitchen and sanitary room portion B is completed in advance, then it is installed on the slab a1 of a concrete building at a site. The outer peripheral wall b26 and ceiling wall of the kitchen and sanitary room portion B are utilized as a form, and concrete is placed to construct a kitchen and sanitary room.

Description

【発明の詳細な説明】DETAILED DESCRIPTION OF THE INVENTION

【0001】[0001]

【発明の属する技術分野】本発明は、アパート・マンシ
ョン等のコンクリート建造物の構築工法であって、浴室
・トイレ室等の水廻り室が多い建造物を構築する技術に
関する。
BACKGROUND OF THE INVENTION 1. Field of the Invention The present invention relates to a method for constructing a concrete building such as an apartment or a condominium, and more particularly to a technique for constructing a building having a large number of water rooms such as bathrooms and toilets.

【0002】[0002]

【従来の技術】従来、アパート・マンション等の一般住
宅用コンクリート建造物は、一区画に少なくとも一つの
浴室、トイレ室が設けられる。これらは、建造物が躯体
構築され、各階のスラブ・建造物外周壁が構築された後
に、浴室ユニット、トイレ室ユニットが分解されて搬入
し、所定の位置で水廻りの給水管・排水管・下水管等の
管工事、給電電線工事がなされ、各浴室ユニット等が組
み立てられ、防水処理されていた。これらの水廻り室の
構築は組み立てユニットを使用するとしたとしても、現
場の配管工事・電源電線工事、組み立て後の漏水防止工
事が多く、又これらは特殊技能者が施工するので作業日
程組みが必要となって手間・時間のかかる作業となって
いる。又現場作業であるので配管・配線ミスが多くな
り、不正確な施工になり、水漏れが生じることも多々あ
る。
2. Description of the Related Art Conventionally, a concrete building for a general house such as an apartment or a condominium is provided with at least one bathroom and one toilet in one section. In these, after the building is built, the slab of each floor and the outer wall of the building are built, then the bathroom unit and toilet room unit are disassembled and carried in, and water supply pipes, drain pipes, Pipework for sewage pipes, etc., and power supply wire construction were performed, and each bathroom unit was assembled and waterproofed. Even if these watering rooms are constructed using assembling units, there are many on-site plumbing work, power supply wire work, and water leakage prevention work after assembling, and since these are performed by special technicians, work schedules are required This is a time-consuming and time-consuming task. In addition, since the work is performed on site, piping and wiring errors increase, resulting in inaccurate construction, and water leakage often occurs.

【0003】[0003]

【発明が解決しようとする課題】本発明は、従来のこれ
らの問題点を解消し、現場での水廻り室に関する現場作
業を大巾に低減し、又工事ミス・漏水ミスが少なく工期
を短縮でき、又正確な仕上り状態にでき、施工コストを
大巾に低減できる建物の水廻り室先組み立て施工法を提
供することにある。
DISCLOSURE OF THE INVENTION The present invention solves these conventional problems, greatly reduces the on-site work related to a water circulating room at the site, and reduces the number of construction errors and water leakage errors and shortens the construction period. It is an object of the present invention to provide a method of assembling a building with a water plunger, which is capable of achieving an accurate finish and greatly reducing construction costs.

【0004】[0004]

【課題を解決するための手段】かかる課題を解決した本
発明の構成は、 1) 浴室・トイレ室等の水廻り室の室躯体に、水廻り
の配管と電源電線の配線工事を外部接続できるように工
事し、室躯体に天井部材・床部材・外周壁材及び開口建
具を取付け、室内水廻り製品を室内に取付け、内装の防
水壁材を施した組み立て状態の水廻り室部分を先に工場
で組み立て、次に現場の建物の躯体を構築し、スラブを
打設した後前記水廻り室部分を運送してスラブの所定の
位置に設置し、水廻り配管・電源電線を外部で接続し、
水廻り室部分の外周壁の一部及び天井壁の面を型枠とし
て利用して配筋し、型枠内及び室天井部分にコンクリー
トを流し込んで区画垂直壁とスラブを構築し、残りの水
廻り室部分の外周壁の外装を施して水廻り室を完成さ
せ、次の階で同様に水廻り室の構築とスラブ打設を行っ
て建物を構築することを特徴とする建物の水廻り室先組
み立て施工法にある。
Means for Solving the Problems The structure of the present invention which has solved the above problems is as follows: 1) Externally connecting a water supply pipe and a wiring work of a power supply wire to a room frame of a water supply room such as a bathroom or a toilet room. The ceiling and floor members, outer wall material and opening fittings are attached to the room skeleton, the indoor water lining product is installed inside the room, and the assembled water basin with the waterproof wall material of the interior is installed first. After assembling at the factory, constructing the frame of the building on the site, placing the slab, transporting the above-mentioned water room and installing it at the predetermined position of the slab, connecting the water piping and power supply wires externally ,
Reinforcement using part of the outer wall and the ceiling wall of the water circulating room part as a formwork, pour concrete into the formwork and the room ceiling part to construct a vertical wall and a slab, The exterior of the circling chamber is covered with the outer wall of the circulating chamber to complete the circulating chamber, and the building is constructed on the next floor by constructing the circulating chamber and slab casting in the same manner. In the pre-assembly construction method.

【0005】[0005]

【発明の実施の形態】本発明の水廻り室の型枠ともなる
天井部材・側面部材は、防水性・耐水性で充分に強度を
有するように素材・構造が選ばれる。水廻り室の躯体は
防錆処理された鋼材が使用され、又水廻り室の内装とし
てはプラスチック製のユニット内装室を用いるのが防水
性に優れ、又組み立てを容易にする。その後に室内のト
イレ便器・手洗いシンク・タンク・浴槽等を取付ける。
浴室とトイレとを一区画にして一緒に組み込む方が施工
・工事が簡単となって好ましい。
BEST MODE FOR CARRYING OUT THE INVENTION The material and structure of the ceiling member and the side member which are also used as the mold of the water basin of the present invention are selected so as to be waterproof and water-resistant and have sufficient strength. Rust-proofed steel is used for the body of the water circulating room, and a plastic unit interior room is used as the interior of the water circulating room because of its excellent waterproofness and ease of assembly. After that, install the indoor toilet bowl, hand-washing sink, tank, bathtub, etc.
It is preferable that the bathroom and the toilet are divided into one section and incorporated together because the construction and the construction are simplified.

【0006】[0006]

【実施例】以下、本発明の実施例を図面に基づいて説明
する。本実施例は、浴室とトイレ室とを一緒の水廻り室
として組み立て、内装として組み立てユニット式のプラ
スチック製浴室製品を使用している。図1は、実施例の
水廻り室の躯体の配管工事を示す斜視図である。図2
は、実施例の浴槽と外周壁構築工程を示す説明図であ
る。図3は、実施例の組み立てユニット式のプラスチッ
ク製浴室製品を組み込んだ状態の説明図である。図4
は、実施例の水洗トイレ便器を取付けた室内状態を示す
説明図である。図5は、実施例の水廻り室部分の間取り
を示す説明図である。図6は、実施例の水廻り室部分の
工場出荷状態を示す説明図である。図7は、現場の建造
物のスラブ上での実施例の水廻り部分の設置状態を示す
説明図である。図8は、現場での建造物のスラブ構築作
業状態を示す説明図である。図9は、現場での建造物の
スラブ構築作業状態を示す説明図である。図中、Aはコ
ンクリート建物、a1は床側の既打設のスラブ、a2はコ
ンクリート仕切壁、a3は外周壁、Bは水廻り室部分、
b1は浴槽室、b2はトイレ室、b3は脱衣洗面室、b10
は防錆処理済み鋼製の水廻り室部分の躯体、b11は排水
管、b12はトイレ汚水管、b13は給水管、b14は電源
線、b15は浴槽、b16はユニット式組立浴室内装壁、b
17はトイレ便器、b18はタンク、b19はトイレ室内装壁
材、b20は脱衣洗面室b3のシンク、b21は鏡台、b22
は脱衣洗面室b3の内装壁、b23、b24は扉、b25,b2
6は水廻り室部分Bの外装下地壁、b27は水廻り室部分
Bの天井壁でスラブaの底面の型枠ともなる。b28は水
廻り部分Bの床部材である。Cは鉄筋、Dは型枠であ
る。この実施例では、まず水廻り室部分Bを工場におい
て必要個数先に設計して製造する。 (1) 水廻り室部分の先組み立て作業 図1に示すように鋼製の躯体b10に、まず必要な排水管
b11,トイレ汚水管b12,給水管b13を床下部分に配管
し、又必要な電源線b14等の配線工事をし(図1参
照)、次に浴槽b15を設置し、水廻り室部分Bの躯体b
10間の外周壁の支柱材を取付け(図2参照)、浴槽室b
1,トイレ室b2,脱衣洗面室b3の間切り下地壁b29を
取付け、その後にトイレ室b2の内装部材b19、脱衣洗
面室b3の内装壁b22、これらの床部材24の取付け、
外周開口に扉b23,24の取付け、及び水廻り室部分Bの
外装下地壁b25を取付け、又トイレ便器b17,タンクb
18,シンクb20,手洗いシンク等の水廻り製品を取付
け、又排水管b11,トイレ汚水管b12,給水管b13との
管接続と、電機接続と行う。このようにして、水廻り室
部分の内装は完成状態にし、外装下地壁b25及び天井壁
b27とが下地の状態とし、又配管電源線は外部接続でき
るように外部に露出した状態までに仕上げる。従って、
この水廻り室部分Bの管・線の接続のミスはほとんどな
く、又漏水することなく内装され、正確に施工された状
態となっている。 (2) 水廻り室部分の現場設置作業 次に、現場では基礎工事と躯体が構築され、スラブa1
で床部分が形成されると、その水廻り室の位置に前記の
水廻り室部分Bの組み立て製品を運送して、クレーン等
で設置する。まずスラブa1に埋設された垂直の排水
管、トイレ汚水管に水廻り室部分Bの垂直の排水管b11
及びトイレ汚水管b12を接続する。又給水管b13をスラ
ブに埋設された給水管路と接続し、又電源線を建物側の
電源線と接続する。その後、水廻り室部分Bの一側壁の
外装下地壁b25を型枠にし、天井に構築されるスラブE
と垂直壁との鉄筋C1を配筋し、又天井壁b27と同一レ
ベルにし、スラブEの底面の残り型枠Dを構築し、その
後コンクリートを流し込んでスラブ及びこれと一体的に
形成される区画壁(コンクリート仕切壁a2 ),建物A
の外周壁a3 部分も形成される。天井のスラブが形成さ
せながら、水廻り室部分Bの外装下地壁b25,26に化粧
壁材を取付け、その他物品を取付けるだけで水廻り室が
完成する。この階の室内作業を進行させながら、天井の
スラブが充分に硬化すれば、この上階で同様な手順でこ
の上階での水廻り室部分を構築する。
Embodiments of the present invention will be described below with reference to the drawings. In the present embodiment, a bathroom and a toilet room are assembled as a watering room together, and an assembling unit type plastic bathroom product is used as an interior. FIG. 1 is a perspective view illustrating a plumbing operation of a skeleton of a water circulating chamber according to the embodiment. FIG.
FIG. 4 is an explanatory view showing a bathtub and an outer peripheral wall construction step of the example. FIG. 3 is an explanatory view showing a state in which the plastic bathroom product of the assembly unit type according to the embodiment is incorporated. FIG.
FIG. 2 is an explanatory diagram showing an indoor state in which the flush toilet of the embodiment is attached. FIG. 5 is an explanatory diagram illustrating a layout of a water-circulating chamber portion according to the embodiment. FIG. 6 is an explanatory diagram illustrating a factory shipping state of a water circulating chamber portion according to the embodiment. FIG. 7 is an explanatory diagram showing an installation state of a water circulating portion of the embodiment on a slab of a building at a site. FIG. 8 is an explanatory diagram showing a slab construction work state of a building at a site. FIG. 9 is an explanatory diagram showing a slab construction work state of a building at a site. In the figure, A is a concrete building, a1 is a slab that has been cast on the floor side, a2 is a concrete partition wall, a3 is an outer peripheral wall, B is a water basin section,
b1 is a bathtub room, b2 is a toilet room, b3 is an undressing washroom, b10
Is a rust-prevention-treated steel water supply room, b11 is a drain pipe, b12 is a toilet sewage pipe, b13 is a water supply pipe, b14 is a power line, b15 is a bathtub, b16 is a unit-type assembled bathroom interior wall, b
17 is a toilet bowl, b18 is a tank, b19 is a wall material for the interior of the toilet room, b20 is a sink of the undressing washroom b3, b21 is a mirror table, b22
Is the interior wall of the undressing washroom b3, b23 and b24 are doors, b25 and b2
Reference numeral 6 denotes an exterior base wall of the water circulating chamber portion B, and b27 denotes a ceiling wall of the water circulating chamber portion B, which also serves as a formwork for the bottom surface of the slab a. b28 is a floor member of the water surrounding portion B. C is a reinforcing bar, and D is a formwork. In this embodiment, first, a water circulating chamber portion B is designed and manufactured in a factory at a required number. (1) Pre-assembly work of the water circulating chamber part As shown in Fig. 1, first, necessary drain pipe b11, toilet sewage pipe b12, and water supply pipe b13 are piped under the floor to the steel frame b10, and necessary power is supplied. Perform wiring work for the wire b14 and the like (see FIG. 1), then install the bath tub b15,
Attach the pillar material of the outer peripheral wall between 10 (see FIG. 2), bathtub room b
1. A base wall b29 for separating the toilet room b2 and the undressing washroom b3 is attached, and thereafter, an interior member b19 of the toilet room b2, an interior wall b22 of the undressing washroom b3, and mounting of these floor members 24 are provided.
Doors b23 and b24 are attached to the outer peripheral opening, and an exterior base wall b25 of the water circulating chamber part B is attached, and a toilet bowl b17 and a tank b
18, water sinks such as a sink b20, a hand-washing sink, and the like, and a pipe connection to a drain pipe b11, a toilet sewage pipe b12, a water supply pipe b13, and an electric connection. In this way, the interior of the water circulating chamber portion is completed, the exterior base wall b25 and the ceiling wall b27 are in the base state, and the piping power supply line is finished to a state where it is exposed to the outside so that it can be connected to the outside. Therefore,
There is almost no mistake in the connection of the pipes and wires in the water circulating chamber part B, and the interior is installed without leaking water, and it is in a state where it is correctly constructed. (2) On-site installation work in the water circulating room Next, foundation work and a skeleton were constructed at the site, and the slab a1
When the floor portion is formed, the assembled product of the above-mentioned water circulating chamber portion B is transported to the position of the water circulating chamber, and is installed by a crane or the like. First, the vertical drain pipe buried in the slab a1 and the vertical drain pipe b11 of the water circulating room part B are connected to the toilet sewage pipe.
And the toilet sewage pipe b12 is connected. The water supply pipe b13 is connected to a water supply pipe buried in the slab, and the power supply line is connected to a power supply line on the building side. Then, the slab E constructed on the ceiling is formed by using the exterior base wall b25 on one side wall of the water circulating chamber portion B as a formwork.
Reinforcing bar C1 with the vertical wall and the same level as the ceiling wall b27, construct the remaining formwork D on the bottom surface of the slab E, and then pour concrete into the slab and the section formed integrally therewith. Wall (concrete partition a2), building A
Is also formed. While the ceiling slab is being formed, a decorative wall material is attached to the exterior base walls b25 and b25 of the water-supplying chamber portion B, and other articles are simply attached to complete the water-supplying chamber. If the ceiling slab is sufficiently hardened while the indoor work on this floor is proceeding, the water gallery on this upper floor is constructed in the same procedure on this upper floor.

【0007】[0007]

【発明の効果】以上の様に、本発明によれば、水廻り室
部分を組み立てて水廻り製品を装置し、内装し、管工事
及び電気工事を完了させ、管、電線の外部との接続のみ
とした状態に工事で予め製作させ、現場では、その接続
作業と外周・天井面を型枠の一部としての配筋作業のみ
で済み、室内は略完成しているため現場作業はほとんど
不要となり、よって現場工期が大巾に短縮でき、又配管
配線ミスがほとんどなく、又漏水もない状態にでき、し
かも側壁・天井壁を型枠の一部となることで一体的に連
結され、強度も高まる。
As described above, according to the present invention, a water supply room is assembled, a water supply product is installed and installed, pipe work and electric work are completed, and pipes and electric wires are connected to the outside. In the field, only the connection work and the arrangement work of the outer circumference and ceiling surface as a part of the formwork are required, and the indoor work is almost completed, so almost no on-site work is required Therefore, the construction period on site can be greatly reduced, there is almost no piping wiring error and there is no water leakage.In addition, the side wall and ceiling wall become part of the formwork, so they are integrally connected, Also increase.

【図面の簡単な説明】[Brief description of the drawings]

【図1】実施例の水廻り室の躯体の配管工事を示す斜視
図である。
FIG. 1 is a perspective view showing a plumbing work of a skeleton of a water circulating chamber of an embodiment.

【図2】実施例の浴槽と外周壁構築工程を示す説明図で
ある。
FIG. 2 is an explanatory view showing a bathtub and an outer peripheral wall construction step of the embodiment.

【図3】実施例の組み立てユニット式のプラスチック製
浴室製品を組み込んだ状態の説明図である。
FIG. 3 is an explanatory view showing a state in which the plastic bathroom product of the assembly unit type of the embodiment is incorporated.

【図4】実施例の水洗トイレ便器を取付けた室内状態を
示す説明図である。
FIG. 4 is an explanatory view showing an indoor state in which the flush toilet of the embodiment is attached.

【図5】実施例の水廻り室部分の間取りを示す説明図で
ある。
FIG. 5 is an explanatory view showing a layout of a water circulating chamber portion of the embodiment.

【図6】実施例の水廻り室部分の工場出荷状態を示す説
明図である。
FIG. 6 is an explanatory diagram showing a factory shipping state of a water circulating chamber portion of the embodiment.

【図7】現場の建造物のスラブ上での実施例の水廻り部
分の設置状態を示す説明図である。
FIG. 7 is an explanatory view showing an installation state of a water circulating portion of the embodiment on a slab of a building at a site.

【図8】現場での建造物のスラブ構築作業状態を示す説
明図である。
FIG. 8 is an explanatory diagram showing a slab construction work state of a building at a site.

【図9】現場での建造物のスラブ構築作業状態を示す説
明図である。
FIG. 9 is an explanatory diagram showing a slab construction work state of a building on site.

【符号の説明】[Explanation of symbols]

A 建物 a1 スラブ a2 コンクリート仕切壁 a3 外周壁 B 水廻り室部分 b1 浴槽室 b2 トイレ室 b3 脱衣洗面室 b10 躯体 b11 排水管 b12 トイレ汚水管 b13 給水管 b14 電源線 b15 浴槽 b16 組立浴室内装壁 b17 トイレ便器 b18 タンク b19 トイレ室内装壁材 b20 シンク b21 鏡台 b22 内装壁 b23,b24 扉 b25,b26 外装下地壁 b27 天井壁 b28 床部材 b29 間切り下地壁 C 鉄筋 D 型枠 E 上方のスラブ A Building a1 Slab a2 Concrete partition wall a3 Peripheral wall B Water area b1 Bath tub b2 Toilet room b3 Undressing washroom b10 Frame b11 Drain pipe b12 Toilet sewage pipe b13 Water supply pipe b14 Power line b15 Bath tub b17 Bathroom wall interior Toilet bowl b18 tank b19 toilet room interior wall material b20 sink b21 mirror stand b22 interior wall b23, b24 door b25, b26 exterior base wall b27 ceiling wall b28 floor member b29 partition base wall C rebar D form E upper slab

Claims (1)

【特許請求の範囲】[Claims] 【請求項1】 浴室・トイレ室等の水廻り室の室躯体
に、水廻りの配管と電源電線の配線工事を外部接続でき
るように工事し、室躯体に天井部材・床部材・外周壁材
及び開口建具を取付け、室内水廻り製品を室内に取付
け、内装の防水壁材を施した組み立て状態の水廻り室部
分を先に工場で組み立て、次に現場の建物の躯体を構築
し、スラブを打設した後前記水廻り室部分を運送してス
ラブの所定の位置に設置し、水廻り配管・電源電線を外
部で接続し、水廻り室部分の外周壁の一部及び天井壁の
面を型枠として利用して配筋し、型枠内及び室天井部分
にコンクリートを流し込んで区画垂直壁とスラブを構築
し、残りの水廻り室部分の外周壁の外装を施して水廻り
室を完成させ、次の階で同様に水廻り室の構築とスラブ
打設を行って建物を構築することを特徴とする建物の水
廻り室先組み立て施工法。
Claims: 1. Construction of a water frame such as a bathroom or a toilet room so as to allow external connection of a water pipe and a wiring of a power supply line, and a ceiling member, a floor member and an outer peripheral wall material in the room frame. Attach the opening fittings, install the indoor plumbing product inside the room, first assemble the assembled plumbing room part with the waterproof wall material of the interior at the factory, and then build the slab of the building on the site, After the casting, the above-mentioned watering room is transported and installed at a predetermined position of the slab, and the watering piping and power supply wires are connected outside, and a part of the outer peripheral wall of the watering room and the surface of the ceiling wall are removed. Arrange the reinforcement by using it as a formwork, pour concrete into the formwork and the ceiling of the room, build a vertical wall and slab, and complete the outer wall of the remaining watering room part to complete the watering room Then, on the next floor, build a watering room and slab casting in the same way to build a building A method of assembling a building's plumbing room.
JP11032232A 1999-02-10 1999-02-10 Pre-assembling method for kitchen and sanitary room for building Pending JP2000230272A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
JP11032232A JP2000230272A (en) 1999-02-10 1999-02-10 Pre-assembling method for kitchen and sanitary room for building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
JP11032232A JP2000230272A (en) 1999-02-10 1999-02-10 Pre-assembling method for kitchen and sanitary room for building

Publications (1)

Publication Number Publication Date
JP2000230272A true JP2000230272A (en) 2000-08-22

Family

ID=12353243

Family Applications (1)

Application Number Title Priority Date Filing Date
JP11032232A Pending JP2000230272A (en) 1999-02-10 1999-02-10 Pre-assembling method for kitchen and sanitary room for building

Country Status (1)

Country Link
JP (1) JP2000230272A (en)

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT106714A (en) * 2012-12-29 2016-06-08 Maria Rosário Ribeiro TECHNICAL WALL
CN105888198A (en) * 2015-01-02 2016-08-24 华恒建设集团有限公司 Mounting structure of pipeline in pipeline shaft
CN109812074A (en) * 2019-02-21 2019-05-28 北京工业大学 A prefabricated hardcover integrated kitchen with pipeline grooves arranged on the inner side of the wall and prefabricated in sections
CN112031476A (en) * 2020-09-07 2020-12-04 福建省高华建设工程有限公司 Metal plate combined type toilet and manufacturing and mounting method thereof
CN113622573A (en) * 2021-08-31 2021-11-09 中国二十二冶集团有限公司 Construction method of toilet sinking room in house construction project
CN113931495A (en) * 2021-11-29 2022-01-14 中国建筑工程(澳门)有限公司 A kind of prefabricated concrete toilet chassis, production method and installation method
CN115324249A (en) * 2022-08-01 2022-11-11 中海建筑有限公司 Construction method of integral pouring of fully prefabricated kitchen and bathroom floors and anti-sills

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
PT106714A (en) * 2012-12-29 2016-06-08 Maria Rosário Ribeiro TECHNICAL WALL
CN105888198A (en) * 2015-01-02 2016-08-24 华恒建设集团有限公司 Mounting structure of pipeline in pipeline shaft
CN109812074A (en) * 2019-02-21 2019-05-28 北京工业大学 A prefabricated hardcover integrated kitchen with pipeline grooves arranged on the inner side of the wall and prefabricated in sections
CN112031476A (en) * 2020-09-07 2020-12-04 福建省高华建设工程有限公司 Metal plate combined type toilet and manufacturing and mounting method thereof
CN113622573A (en) * 2021-08-31 2021-11-09 中国二十二冶集团有限公司 Construction method of toilet sinking room in house construction project
CN113931495A (en) * 2021-11-29 2022-01-14 中国建筑工程(澳门)有限公司 A kind of prefabricated concrete toilet chassis, production method and installation method
CN115324249A (en) * 2022-08-01 2022-11-11 中海建筑有限公司 Construction method of integral pouring of fully prefabricated kitchen and bathroom floors and anti-sills
CN115324249B (en) * 2022-08-01 2023-10-20 中海建筑有限公司 Full-prefabricated kitchen and bathroom floor slab and inverse sill integral pouring construction method

Similar Documents

Publication Publication Date Title
US5459966A (en) Prefabricated bathroom walls
US4341052A (en) Building utility core
US3774631A (en) Prefabricated modular rough plumbing
JP2000230272A (en) Pre-assembling method for kitchen and sanitary room for building
CN106414867A (en) Drainage integrated bathroom floor slab
KR101219145B1 (en) Piping System For Bathroom Having Double Pipe Structure
KR101064614B1 (en) Structure of prefabricated bathroom
KR20080017112A (en) Waterproof Low Noise Toilet Integrated Independent Sliver Integrated Trap (Air Duct, Wall Toilet Seat Attached) (KKTTSS)
JP4863899B2 (en) Building drainage system and building drainage system construction method
KR101313848B1 (en) Drainage System on Floor of Flat Slab Type and Toilet Stool Sleeve Using the Same
JP3038195U (en) Wet area unit
JP2001123681A (en) Unit type kitchen and sanitary space facility
KR102751677B1 (en) Method for constructing precast bathroom
JPH0439966Y2 (en)
KR20140134193A (en) Execution Method Bathroom Above Floor Pipe of Remodel a House
JP2001254413A (en) Piping structure of multiple dwelling house
EP3399113A1 (en) Plumbing unit
KR101677028B1 (en) Drainage System on Floor of Flat Slab Type and Toilet Stool Institution Cast Using the Same
KR101050191B1 (en) How to install the faucet
JP2002322695A (en) Dwelling house and method for piping of dwelling house
KR100259422B1 (en) Construction method of prefabricated bathroom
ITMI970213A1 (en) PREFABRICATED BUILDING MODULE FOR THE INSTALLATION OF HYDRAULIC-SANITARY COMPONENTS
JP2002317566A (en) Dwelling unit basic structure in apartment house and method for designing the same
JP2001173055A (en) Piping structure of building and piping structure of unit building
KR101192942B1 (en) Korea Ko Total Toilet System (KKTTS)