IN2012DN05167A - - Google Patents
Download PDFInfo
- Publication number
- IN2012DN05167A IN2012DN05167A IN5167DEN2012A IN2012DN05167A IN 2012DN05167 A IN2012DN05167 A IN 2012DN05167A IN 5167DEN2012 A IN5167DEN2012 A IN 5167DEN2012A IN 2012DN05167 A IN2012DN05167 A IN 2012DN05167A
- Authority
- IN
- India
- Prior art keywords
- weights
- topology
- topology graph
- subdomains
- processors
- Prior art date
Links
- 238000000034 method Methods 0.000 abstract 2
- 238000004088 simulation Methods 0.000 abstract 2
- 238000005192 partition Methods 0.000 abstract 1
- 238000000638 solvent extraction Methods 0.000 abstract 1
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V99/00—Subject matter not provided for in other groups of this subclass
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V11/00—Prospecting or detecting by methods combining techniques covered by two or more of main groups G01V1/00 - G01V9/00
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01V—GEOPHYSICS; GRAVITATIONAL MEASUREMENTS; DETECTING MASSES OR OBJECTS; TAGS
- G01V2210/00—Details of seismic processing or analysis
- G01V2210/60—Analysis
- G01V2210/66—Subsurface modeling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F2111/00—Details relating to CAD techniques
- G06F2111/10—Numerical modelling
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F30/00—Computer-aided design [CAD]
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Geology (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Physics & Mathematics (AREA)
- Mining & Mineral Resources (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Fluid Mechanics (AREA)
- Environmental & Geological Engineering (AREA)
- Geophysics (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
- Multi Processors (AREA)
- Complex Calculations (AREA)
Abstract
A method is presented for partitioning a simulation model into a plurality of subdomains that may each be assigned to one of a plurality of processors. The method includes creating a representation of a topology graph of a simulation model in a tangible, computer readable medium. The topology p p h includes a plurality of I I computational elements and a plurality of connections 1 between those elements. Each of the p l d t y of connec- I tions is weighted to create a plurality of weights, and ' I each of the plwlity of weights is scaled. Optionally, the 1 - weights can be mapped to diffmt interval of values. Based on the weights information the topology graph is 1 '- -- partitioned into two or more subdomains, wherein a partition boundary follows a local topographical minimum in the topology graph. A subdomain is assigned ta each of the plurality of processors.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US30405610P | 2010-02-12 | 2010-02-12 | |
PCT/US2010/053141 WO2011100002A1 (en) | 2010-02-12 | 2010-10-19 | Method and system for partitioning parallel simulation models |
Publications (1)
Publication Number | Publication Date |
---|---|
IN2012DN05167A true IN2012DN05167A (en) | 2015-10-23 |
Family
ID=44368035
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
IN5167DEN2012 IN2012DN05167A (en) | 2010-02-12 | 2010-10-19 |
Country Status (7)
Country | Link |
---|---|
US (1) | US9594186B2 (en) |
EP (1) | EP2534605B1 (en) |
CN (1) | CN102741855B (en) |
BR (1) | BR112012017275A2 (en) |
CA (1) | CA2783977C (en) |
IN (1) | IN2012DN05167A (en) |
WO (1) | WO2011100002A1 (en) |
Families Citing this family (43)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2436400A1 (en) * | 2002-07-30 | 2004-01-30 | Abel G. Wolman | Geometrization for pattern recognition, data analysis, data merging, and multiple criteria decision making |
CA2776487C (en) | 2009-11-12 | 2017-02-14 | Exxonmobil Upstream Research Company | Method and apparatus for generating a three-dimentional simulation grid for a reservoir model |
CA2801382C (en) | 2010-06-29 | 2018-12-18 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
US8386227B2 (en) | 2010-09-07 | 2013-02-26 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
US8433551B2 (en) | 2010-11-29 | 2013-04-30 | Saudi Arabian Oil Company | Machine, computer program product and method to carry out parallel reservoir simulation |
EP2811112B1 (en) * | 2010-09-07 | 2019-07-24 | Saudi Arabian Oil Company | Machine, computer program product and method to generate unstructured grids and carry out parallel reservoir simulation |
US9229129B2 (en) * | 2010-12-10 | 2016-01-05 | Conocophillips Company | Reservoir geobody calculation |
EP2652669B1 (en) * | 2010-12-16 | 2020-03-04 | Landmark Graphics Corporation | Systems and methods for two-dimensional domain decomposition during parallel reservoir simulation |
GB201200498D0 (en) * | 2012-01-13 | 2012-02-22 | Optimized Systems And Solutions Ltd | Simulation modelling |
AU2012382415B2 (en) * | 2012-06-15 | 2015-08-20 | Landmark Graphics Corporation | Parallel network simulation apparatus, methods, and systems |
US8994739B2 (en) * | 2012-07-10 | 2015-03-31 | Landmark Graphics Corporation | Systems and methods for reservoir simulation |
EP2784704A1 (en) * | 2013-03-26 | 2014-10-01 | Fujitsu Limited | Multi-component computational fluid dynamics simulations |
US9576089B2 (en) * | 2013-08-30 | 2017-02-21 | Chevron U.S.A. Inc. | Unified application framework for finite-difference modeling |
GB2537769B (en) * | 2014-01-03 | 2021-04-14 | Logined Bv | Graph partitioning to distribute wells in parallel reservoir simulation |
US10184320B2 (en) * | 2014-09-02 | 2019-01-22 | Saudi Arabian Oil Company | Systems, methods, and computer medium to enhance hydrocarbon reservoir simulation |
US20160090822A1 (en) * | 2014-09-25 | 2016-03-31 | Schlumberger Technology Corporation | Collision detection method |
CA2976457A1 (en) * | 2015-02-13 | 2016-08-18 | Exxonmobil Upstream Resarch Company | Method and system to enhance computations for a physical system |
US10450825B2 (en) * | 2015-04-30 | 2019-10-22 | Schlumberger Technology Corporation | Time of arrival-based well partitioning and flow control |
CA2993293A1 (en) * | 2015-09-08 | 2017-03-16 | Halliburton Energy Services, Inc. | Simulators and simulation methods using adaptive domains |
US10657440B2 (en) | 2015-10-26 | 2020-05-19 | International Business Machines Corporation | Optical synapse for neuromorphic networks |
US10395168B2 (en) | 2015-10-26 | 2019-08-27 | International Business Machines Corporation | Tunable optical neuromorphic network |
JP6647404B2 (en) * | 2015-12-11 | 2020-02-14 | ヒューレット−パッカード デベロップメント カンパニー エル.ピー.Hewlett‐Packard Development Company, L.P. | Printing system, computer readable storage medium, and method for adjusting operation of printing device |
US10019342B2 (en) * | 2015-12-24 | 2018-07-10 | Intel Corporation | Data flow programming of computing apparatus with vector estimation-based graph partitioning |
CN105649610B (en) * | 2015-12-31 | 2019-01-18 | 中国石油天然气股份有限公司 | Method and device for acquiring oil reservoir pressure |
CN105701299A (en) * | 2016-01-15 | 2016-06-22 | 西南石油大学 | Dynamic frictional resistance torque calculating method |
CN108779669A (en) * | 2016-03-04 | 2018-11-09 | 沙特阿拉伯石油公司 | The continuous fully implicit solution well model with tridiagonal matrix structure for reservoir simulation |
US10318668B2 (en) * | 2016-06-15 | 2019-06-11 | International Business Machine Corporation | Automatic decomposition of simulation model |
US10215014B2 (en) | 2016-07-03 | 2019-02-26 | Reveal Energy Services, Inc. | Mapping of fracture geometries in a multi-well stimulation process |
WO2018026261A1 (en) * | 2016-08-03 | 2018-02-08 | Hitachi, Ltd. | Simulation methods, computing nodes and simulation systems for parallel execution |
US10452794B2 (en) * | 2016-08-25 | 2019-10-22 | Baker Hughes, A Ge Company, Llc | Generating a script for performing a well operation job |
US10296684B2 (en) * | 2016-11-16 | 2019-05-21 | Saudi Arabian Oil Company | Parallel reservoir simulation with accelerated aquifer calculation |
CA2997822C (en) | 2017-03-08 | 2024-01-02 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
US11040329B2 (en) | 2017-03-17 | 2021-06-22 | Hewlett-Packard Development Company, L.P. | Density classifiers based on plane regions |
CA3012209C (en) | 2017-07-24 | 2023-07-04 | Reveal Energy Services, Inc. | Dynamically modeling a proppant area of a hydraulic fracture |
US10851643B2 (en) | 2017-11-02 | 2020-12-01 | Reveal Energy Services, Inc. | Determining geometries of hydraulic fractures |
CN107798125B (en) * | 2017-11-10 | 2021-03-16 | 携程旅游网络技术(上海)有限公司 | Access judgment method, system, equipment and storage medium based on intimacy model |
EP3671494A1 (en) | 2018-12-21 | 2020-06-24 | Dassault Systèmes | Multi-instanced simulations for large environments |
US11681838B2 (en) * | 2020-05-26 | 2023-06-20 | Landmark Graphics Corporation | Distributed Sequential Gaussian Simulation |
US11624277B2 (en) | 2020-07-20 | 2023-04-11 | Reveal Energy Services, Inc. | Determining fracture driven interactions between wellbores |
CN112580774B (en) * | 2020-09-01 | 2022-10-21 | 浙江大学 | Neural network layout method for reconfigurable neural network processor |
ES2996861T3 (en) * | 2020-11-11 | 2025-02-13 | Repsol Sa | Computer implemented method for manipulating a mesh for the discretization of a reservoir domain |
US20230119861A1 (en) * | 2021-10-20 | 2023-04-20 | Chevron U.S.A. Inc. | Acceleration of subsurface simulation using filtered grid connectivity graph |
CN113987840B (en) * | 2021-12-24 | 2022-03-15 | 中国汽车技术研究中心有限公司 | Modelica-based model splitting method, equipment and storage medium |
Family Cites Families (95)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US4794534A (en) | 1985-08-08 | 1988-12-27 | Amoco Corporation | Method of drilling a well utilizing predictive simulation with real time data |
US6612382B2 (en) | 1996-03-25 | 2003-09-02 | Halliburton Energy Services, Inc. | Iterative drilling simulation process for enhanced economic decision making |
US6438069B1 (en) | 1996-09-13 | 2002-08-20 | Pgs Data Processing, Inc. | Method for time lapse reservoir monitoring |
US5905657A (en) | 1996-12-19 | 1999-05-18 | Schlumberger Technology Corporation | Performing geoscience interpretation with simulated data |
US6018497A (en) * | 1997-02-27 | 2000-01-25 | Geoquest | Method and apparatus for generating more accurate earth formation grid cell property information for use by a simulator to display more accurate simulation results of the formation near a wellbore |
US6002985A (en) | 1997-05-06 | 1999-12-14 | Halliburton Energy Services, Inc. | Method of controlling development of an oil or gas reservoir |
US6049758A (en) | 1997-06-16 | 2000-04-11 | Bbn Corporation | Reservoir monitoring |
EP1036341B1 (en) | 1997-12-01 | 2005-02-16 | Schlumberger Limited | Method and apparatus for creating, testing, and modifying geological subsurface models |
US6101447A (en) | 1998-02-12 | 2000-08-08 | Schlumberger Technology Corporation | Oil and gas reservoir production analysis apparatus and method |
GB2352036B (en) * | 1998-05-04 | 2002-11-27 | Schlumberger Evaluation & Prod | Near wellbore modelling method and apparatus |
US6236942B1 (en) | 1998-09-15 | 2001-05-22 | Scientific Prediction Incorporated | System and method for delineating spatially dependent objects, such as hydrocarbon accumulations from seismic data |
US6529833B2 (en) | 1998-12-30 | 2003-03-04 | Baker Hughes Incorporated | Reservoir monitoring in a laminated reservoir using 4-D time lapse data and multicomponent induction data |
EP1151326B1 (en) | 1999-02-12 | 2005-11-02 | Schlumberger Limited | Uncertainty constrained subsurface modeling |
US6266619B1 (en) | 1999-07-20 | 2001-07-24 | Halliburton Energy Services, Inc. | System and method for real time reservoir management |
US7006959B1 (en) * | 1999-10-12 | 2006-02-28 | Exxonmobil Upstream Research Company | Method and system for simulating a hydrocarbon-bearing formation |
US6826483B1 (en) | 1999-10-13 | 2004-11-30 | The Trustees Of Columbia University In The City Of New York | Petroleum reservoir simulation and characterization system and method |
US6295504B1 (en) * | 1999-10-25 | 2001-09-25 | Halliburton Energy Services, Inc. | Multi-resolution graph-based clustering |
US6980940B1 (en) | 2000-02-22 | 2005-12-27 | Schlumberger Technology Corp. | Intergrated reservoir optimization |
AU2001251019A1 (en) * | 2000-03-27 | 2001-10-08 | Peter J. Ortoleva | Method for simulation of enhanced fracture detection in sedimentary basins |
WO2001079892A1 (en) | 2000-04-14 | 2001-10-25 | Lockheed Martin Corporation | Method of determining boundary interface changes in a natural resource deposit |
US6715551B2 (en) | 2000-06-19 | 2004-04-06 | Halliburton Energy Services, Inc. | Apparatus and methods for applying time lapse VSP to monitor a reservoir |
US7369973B2 (en) * | 2000-06-29 | 2008-05-06 | Object Reservoir, Inc. | Method and system for representing reservoir systems |
CN1386200A (en) * | 2000-06-29 | 2002-12-18 | 目标储油层公司 | Feature modeling method in a finite element model |
US6801197B2 (en) | 2000-09-08 | 2004-10-05 | Landmark Graphics Corporation | System and method for attaching drilling information to three-dimensional visualizations of earth models |
DE60131181T2 (en) | 2000-09-12 | 2008-08-07 | Schlumberger Technology B.V. | EXAMINATION OF MULTILAYER STORES |
US20020049575A1 (en) | 2000-09-28 | 2002-04-25 | Younes Jalali | Well planning and design |
US6978210B1 (en) | 2000-10-26 | 2005-12-20 | Conocophillips Company | Method for automated management of hydrocarbon gathering systems |
US20020112888A1 (en) | 2000-12-18 | 2002-08-22 | Christian Leuchtenberg | Drilling system and method |
WO2002099464A1 (en) | 2001-06-06 | 2002-12-12 | Schlumberger Canada Limited | Automated system for modeling faulted multi-valued horizons |
US6772066B2 (en) | 2002-06-17 | 2004-08-03 | Schlumberger Technology Corporation | Interactive rock stability display |
AU2003297846B2 (en) | 2002-12-10 | 2008-12-04 | The Regents Of The University Of California | System and method for hydrocarbon reservoir monitoring using controlled-source electromagnetic fields |
US7899657B2 (en) | 2003-01-24 | 2011-03-01 | Rockwell Automoation Technologies, Inc. | Modeling in-situ reservoirs with derivative constraints |
FR2855631A1 (en) | 2003-06-02 | 2004-12-03 | Inst Francais Du Petrole | METHOD FOR OPTIMIZING THE PRODUCTION OF AN OIL DEPOSIT IN THE PRESENCE OF UNCERTAINTIES |
US7876705B2 (en) | 2003-06-25 | 2011-01-25 | Schlumberger Technology Corporation | Method and apparatus and program storage device for generating a workflow in response to a user objective and generating software modules in response to the workflow and executing the software modules to produce a product |
EP1668561A2 (en) | 2003-09-30 | 2006-06-14 | Exxonmobil Upstream Research Company Copr-Urc | Characterizing connectivity in reservoir models using paths of least resistance |
US7725302B2 (en) | 2003-12-02 | 2010-05-25 | Schlumberger Technology Corporation | Method and system and program storage device for generating an SWPM-MDT workflow in response to a user objective and executing the workflow to produce a reservoir response model |
US20050199391A1 (en) | 2004-02-03 | 2005-09-15 | Cudmore Julian R. | System and method for optimizing production in an artificially lifted well |
BRPI0512548A (en) | 2004-06-25 | 2008-03-25 | Shell Int Research | hydrocarbon fluid production control method from an underground formation |
US7809537B2 (en) | 2004-10-15 | 2010-10-05 | Saudi Arabian Oil Company | Generalized well management in parallel reservoir simulation |
US7225078B2 (en) | 2004-11-03 | 2007-05-29 | Halliburton Energy Services, Inc. | Method and system for predicting production of a well |
WO2006058336A2 (en) * | 2004-11-29 | 2006-06-01 | Chevron U.S.A. Inc. | Object oriented fluid flow simulation |
US7596480B2 (en) | 2005-04-14 | 2009-09-29 | Saudi Arabian Oil Company | Solution method and apparatus for large-scale simulation of layered formations |
US7277796B2 (en) | 2005-04-26 | 2007-10-02 | Schlumberger Technology Corporation | System and methods of characterizing a hydrocarbon reservoir |
FR2886740B1 (en) | 2005-06-03 | 2007-09-28 | Inst Francais Du Petrole | METHOD FOR UPDATING A GEOLOGICAL MODEL WITH SEISMIC AND PRODUCTION DATA |
US7913190B2 (en) | 2005-07-18 | 2011-03-22 | Dassault Systèmes | Method, system and software for visualizing 3D models |
US20080133550A1 (en) | 2005-08-15 | 2008-06-05 | The University Of Southern California | Method and system for integrated asset management utilizing multi-level modeling of oil field assets |
AU2006279464B2 (en) | 2005-08-15 | 2011-11-10 | University Of Southern California | Modeling application development in the petroleum industry |
US8145463B2 (en) | 2005-09-15 | 2012-03-27 | Schlumberger Technology Corporation | Gas reservoir evaluation and assessment tool method and apparatus and program storage device |
US20070213935A1 (en) | 2005-12-29 | 2007-09-13 | Schlumberger Technology Corporation | Method and System to Display Well Properties Information |
US7340347B2 (en) | 2005-12-29 | 2008-03-04 | Schlumberger Technology Corporation | Method to visualize three dimensional log data on two dimensional media |
BRPI0706580A2 (en) | 2006-01-20 | 2011-03-29 | Landmark Graphics Corp | dynamic production system management |
US8812334B2 (en) | 2006-02-27 | 2014-08-19 | Schlumberger Technology Corporation | Well planning system and method |
US7328107B2 (en) | 2006-04-28 | 2008-02-05 | Kjt Enterprises, Inc. | Integrated earth formation evaluation method using controlled source electromagnetic survey data and seismic data |
US7716029B2 (en) | 2006-05-15 | 2010-05-11 | Schlumberger Technology Corporation | Method for optimal gridding in reservoir simulation |
US20070277115A1 (en) | 2006-05-23 | 2007-11-29 | Bhp Billiton Innovation Pty Ltd. | Method and system for providing a graphical workbench environment with intelligent plug-ins for processing and/or analyzing sub-surface data |
US20070279429A1 (en) | 2006-06-02 | 2007-12-06 | Leonhard Ganzer | System and method for rendering graphics |
US7953587B2 (en) | 2006-06-15 | 2011-05-31 | Schlumberger Technology Corp | Method for designing and optimizing drilling and completion operations in hydrocarbon reservoirs |
WO2007149766A2 (en) | 2006-06-18 | 2007-12-27 | Chevron U.S.A. Inc. | Reservoir simulation using a multi-scale finite volume including black oil modeling |
US9043188B2 (en) | 2006-09-01 | 2015-05-26 | Chevron U.S.A. Inc. | System and method for forecasting production from a hydrocarbon reservoir |
US7657494B2 (en) | 2006-09-20 | 2010-02-02 | Chevron U.S.A. Inc. | Method for forecasting the production of a petroleum reservoir utilizing genetic programming |
US8145464B2 (en) | 2006-11-02 | 2012-03-27 | Schlumberger Technology Corporation | Oilfield operational system and method |
US7467044B2 (en) | 2007-01-15 | 2008-12-16 | Chevron U.S.A. Inc | Method and system for assessing exploration prospect risk and uncertainty |
US8411952B2 (en) * | 2007-04-04 | 2013-04-02 | Siemens Aktiengesellschaft | Method for segmenting an image using constrained graph partitioning of watershed adjacency graphs |
US9175547B2 (en) | 2007-06-05 | 2015-11-03 | Schlumberger Technology Corporation | System and method for performing oilfield production operations |
FR2920816B1 (en) | 2007-09-06 | 2010-02-26 | Inst Francais Du Petrole | METHOD FOR UPDATING A GEOLOGICAL MODEL USING DYNAMIC DATA AND WELL TESTS |
US20100132450A1 (en) | 2007-09-13 | 2010-06-03 | Pomerantz Andrew E | Methods for optimizing petroleum reservoir analysis |
US20110161133A1 (en) | 2007-09-29 | 2011-06-30 | Schlumberger Technology Corporation | Planning and Performing Drilling Operations |
BRPI0817402A2 (en) | 2007-11-10 | 2019-09-24 | Landmark Graphics Corp A Halliburton Company | devices and methods for workflow automation, adaptation and integration |
CA2702965C (en) | 2007-12-13 | 2014-04-01 | Exxonmobil Upstream Research Company | Parallel adaptive data partitioning on a reservoir simulation using an unstructured grid |
US9638830B2 (en) | 2007-12-14 | 2017-05-02 | Westerngeco L.L.C. | Optimizing drilling operations using petrotechnical data |
CA2703253C (en) | 2007-12-14 | 2015-06-02 | Exxonmobil Upstream Research Company | Modeling subsurface processes on unstructured grid |
US7878268B2 (en) | 2007-12-17 | 2011-02-01 | Schlumberger Technology Corporation | Oilfield well planning and operation |
WO2009079570A2 (en) | 2007-12-17 | 2009-06-25 | Landmark Graphics Corporation, A Halliburton Company | Systems and methods for optimization of real time production operations |
CA2706482A1 (en) | 2007-12-21 | 2009-07-02 | Exxonmobil Upstream Research Company | Modeling in sedimentary basins |
US9074454B2 (en) | 2008-01-15 | 2015-07-07 | Schlumberger Technology Corporation | Dynamic reservoir engineering |
US7963327B1 (en) | 2008-02-25 | 2011-06-21 | QRI Group, LLC | Method for dynamically assessing petroleum reservoir competency and increasing production and recovery through asymmetric analysis of performance metrics |
US8190414B2 (en) * | 2008-03-26 | 2012-05-29 | Exxonmobil Upstream Research Company | Modeling of hydrocarbon reservoirs containing subsurface features |
US8200465B2 (en) | 2008-06-18 | 2012-06-12 | Terratek Inc. | Heterogeneous earth models for a reservoir field |
US8577613B2 (en) | 2008-07-01 | 2013-11-05 | Schlumberger Technology Corporation | Effective hydrocarbon reservoir exploration decision making |
WO2010009310A1 (en) | 2008-07-17 | 2010-01-21 | Oseberg L.L.C. | Method for geographically displaying oil and gas related information |
US20100082724A1 (en) | 2008-09-30 | 2010-04-01 | Oleg Diyankov | Method For Solving Reservoir Simulation Matrix Equation Using Parallel Multi-Level Incomplete Factorizations |
AU2009302317A1 (en) * | 2008-10-09 | 2010-04-15 | Chevron U.S.A. Inc. | Iterative multi-scale method for flow in porous media |
GB2478875A (en) | 2008-12-15 | 2011-09-21 | Chevron Usa Inc | System and method for evaluating dynamic heterogeneity in earth models |
EP2393936A4 (en) | 2009-02-06 | 2012-08-15 | Talecris Biotherapeutics Inc | Compositions, kits, and methods for determining plasmin activity |
EP2253971A1 (en) | 2009-05-19 | 2010-11-24 | Nederlandse Organisatie voor toegepast -natuurwetenschappelijk onderzoek TNO | Method of monitoring a hydrocarbon reservoir |
FR2945879B1 (en) | 2009-05-20 | 2011-06-24 | Inst Francais Du Petrole | METHOD FOR OPERATING A POROUS MEDIUM USING MODELING FLUID FLOWS |
US8532967B2 (en) | 2009-08-14 | 2013-09-10 | Schlumberger Technology Corporation | Executing a utility in a distributed computing system based on an integrated model |
EP2464824B1 (en) * | 2009-08-14 | 2018-10-03 | BP Corporation North America Inc. | Reservoir architecture and connectivity analysis |
US8429671B2 (en) | 2009-10-21 | 2013-04-23 | Exxonmobil Upstream Research Company | Integrated workflow builder for disparate computer programs |
EP2504789A1 (en) | 2009-11-23 | 2012-10-03 | ExxonMobil Upstream Research Company | Method and system for modeling geologic properties using homogenized mixed finite elements |
AU2011213261B2 (en) * | 2010-02-02 | 2015-04-02 | Conocophillips Company | Multilevel percolation aggregation solver for petroleum reservoir simulations |
CA2801382C (en) | 2010-06-29 | 2018-12-18 | Exxonmobil Upstream Research Company | Method and system for parallel simulation models |
CA2801387A1 (en) | 2010-07-26 | 2012-02-02 | Exxonmobil Upstream Research Company | Method and system for parallel multilevel simulation |
US20120271609A1 (en) | 2011-04-20 | 2012-10-25 | Westerngeco L.L.C. | Methods and computing systems for hydrocarbon exploration |
WO2012158218A1 (en) | 2011-05-17 | 2012-11-22 | Exxonmobil Upstream Research Company | Method for partitioning parallel reservoir simulations in the presence of wells |
-
2010
- 2010-10-19 US US13/509,527 patent/US9594186B2/en active Active
- 2010-10-19 WO PCT/US2010/053141 patent/WO2011100002A1/en active Application Filing
- 2010-10-19 BR BR112012017275A patent/BR112012017275A2/en active Search and Examination
- 2010-10-19 CN CN201080062815.2A patent/CN102741855B/en not_active Expired - Fee Related
- 2010-10-19 IN IN5167DEN2012 patent/IN2012DN05167A/en unknown
- 2010-10-19 EP EP10845937.1A patent/EP2534605B1/en active Active
- 2010-10-19 CA CA2783977A patent/CA2783977C/en not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CN102741855B (en) | 2016-10-26 |
BR112012017275A2 (en) | 2016-04-19 |
EP2534605B1 (en) | 2020-06-17 |
CA2783977A1 (en) | 2011-08-18 |
US20120296619A1 (en) | 2012-11-22 |
EP2534605A1 (en) | 2012-12-19 |
US9594186B2 (en) | 2017-03-14 |
CN102741855A (en) | 2012-10-17 |
EP2534605A4 (en) | 2017-07-05 |
WO2011100002A1 (en) | 2011-08-18 |
CA2783977C (en) | 2018-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
IN2012DN05167A (en) | ||
Lovreglio et al. | A modelling framework for householder decision-making for wildfire emergencies | |
Vardakas et al. | Power demand control scenarios for smart grid applications with finite number of appliances | |
GB2527009A (en) | Simulation of production systems | |
WO2012015518A3 (en) | Methods and systems for machine-learning based simulation of flow | |
MX2015005627A (en) | Systems and methods for 3d seismic data depth conversion utilizing artificial neural networks. | |
MX336020B (en) | System and method for coarsening in reservoir simulation system. | |
WO2014022317A3 (en) | Multi-level reservoir history matching | |
GB201217271D0 (en) | Traffic sensor management | |
EP2363794A3 (en) | Systems and methods for simulations utilizing a virtual coupling | |
WO2012033693A3 (en) | Machine, computer program product and method to carry out parallel reservoir simulation | |
BR112014014382A2 (en) | system and method for flexible and efficient simulation of varying fracture density in a reservoir simulator | |
WO2013096640A8 (en) | Tessellation patterns | |
WO2016128708A3 (en) | Provision, configuration, and use of a telecommunications network | |
WO2017106293A3 (en) | Dynamic design of complex system-of-systems for planning and adaptation to unplanned scenarios | |
EP2860343A3 (en) | Method for efficient dynamic gridding | |
MX341255B (en) | System and method for simulation of gas desorption in a reservoir using a multi-porosity approach. | |
IN2015CH01270A (en) | ||
CN105809264A (en) | Electrical load predicting method and device | |
WO2015104633A3 (en) | System and method for two dimensional gravity modeling with variable densities | |
WO2014036306A3 (en) | System and method for determining a value of information metric from a posterior distribution generated through stochastic inversion | |
WO2016007974A3 (en) | Position-centric personnel assessment apparatus and method | |
MX371394B (en) | Perspective-based modeling of a subterranean space | |
WO2015025338A3 (en) | User performance skill enhancement based on curricular mapping | |
Pagallo | Teaching “Consumer Robots” respect for informational privacy: A legal stance on HRI |