GB747966A - Improvements in or relating to reinforced concrete constructions - Google Patents

Improvements in or relating to reinforced concrete constructions

Info

Publication number
GB747966A
GB747966A GB64253A GB64253A GB747966A GB 747966 A GB747966 A GB 747966A GB 64253 A GB64253 A GB 64253A GB 64253 A GB64253 A GB 64253A GB 747966 A GB747966 A GB 747966A
Authority
GB
United Kingdom
Prior art keywords
towers
ties
sections
section
span
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
GB64253A
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to GB64253A priority Critical patent/GB747966A/en
Publication of GB747966A publication Critical patent/GB747966A/en
Expired legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D19/00Structural or constructional details of bridges
    • E01D19/14Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/04Cable-stayed bridges
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B7/00Roofs; Roof construction with regard to insulation
    • E04B7/14Suspended roofs

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

747,966. Roofs; bridges. WILLIAMS, Sir E. 0., and WILLIAMS, 0. T. Dec. 23, 1953 [Jan. 8, 1953], No. 642/53. Classes 20(1) and 20(4). In the construction of roofs, bridges or other spanning structures, the structure is built out from a pier or column, without support from below, progressively in sections which are tied to the pier by tensioned members which are subsequently encased in concrete. Fig. 1 shows one half of a bridge construction which includes two concrete piers 20 each having an anchor span 21, a central span being suspended between the piers. Pairs of strut towers 25 are erected on each pier 20 ; there may be one pair only, or one pair for the " up " road and one pair for the " down " road may be provided. The towers are spaced by bracing 19. The road deck of the anchor span 21 is first moulded in sections, e.g., each about 15 feet of road length, each section being connected by tension members 28-33 to the towers 25. A temporary staging 22 facilitates the construction of the anchor span. The suspended span is now cast in sections, beginning from the towers, each section being cast in a mould 40 which is supported on bogies 42 and is cantilevered out from a previously moulded section 38. It is anchored at 43 to another section 36. During the casting, each section is attached by its ties 45-49 to the tops of the towers 25, the tensioning of the respective ties being effected when the mould 40 is in use for the next section. The degree of tension may be determined to accord with maximum working load by adjustment of the positions of the anchor points 43. Whilst the ties are thus tensioned, they are concreted. The shore end of the anchor span is connected, in normal manner, to a counterweight 18 to prevent compressive stresses in the back stay 33. The ties 29-33 are finally con;, creted. Stiffening or distributing girders 50 and a rail 44, extending along each side of the carriage way, are constructed after the moulding of the deck sections, the girders 50 enclosing the anchorage points of the ties. Vertical bracing members 39 are provided at intervals. In a modification, Fig. 8, a bridge is built by casting sections, step-by-step symmetrically out from each pier 70, the sections, as before, being provided with ties connecting them to the tops of the towers. The spans are made alternately continuous, as at 71, and non-continuous with short links 72.
GB64253A 1953-01-08 1953-01-08 Improvements in or relating to reinforced concrete constructions Expired GB747966A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
GB64253A GB747966A (en) 1953-01-08 1953-01-08 Improvements in or relating to reinforced concrete constructions

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
GB64253A GB747966A (en) 1953-01-08 1953-01-08 Improvements in or relating to reinforced concrete constructions

Publications (1)

Publication Number Publication Date
GB747966A true GB747966A (en) 1956-04-18

Family

ID=9707927

Family Applications (1)

Application Number Title Priority Date Filing Date
GB64253A Expired GB747966A (en) 1953-01-08 1953-01-08 Improvements in or relating to reinforced concrete constructions

Country Status (1)

Country Link
GB (1) GB747966A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677052A (en) * 2017-02-08 2017-05-17 王钰 Closed bridge
CN108842630A (en) * 2018-07-19 2018-11-20 中铁大桥局集团有限公司 Three pylon cable-stayed bridges and middle tower steadying line hang method
CN115125837A (en) * 2022-08-17 2022-09-30 四川公路桥梁建设集团有限公司 Apply to anchor of bridge tower prestressed anchorage district
CN115142340A (en) * 2022-06-20 2022-10-04 山西省交通新技术发展有限公司 A cantilever bridge head board

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN106677052A (en) * 2017-02-08 2017-05-17 王钰 Closed bridge
CN106677052B (en) * 2017-02-08 2019-04-12 王钰 A kind of closed bridge
CN108842630A (en) * 2018-07-19 2018-11-20 中铁大桥局集团有限公司 Three pylon cable-stayed bridges and middle tower steadying line hang method
CN115142340A (en) * 2022-06-20 2022-10-04 山西省交通新技术发展有限公司 A cantilever bridge head board
CN115142340B (en) * 2022-06-20 2025-01-28 山西省交通新技术发展有限公司 A cantilever bridge head slab
CN115125837A (en) * 2022-08-17 2022-09-30 四川公路桥梁建设集团有限公司 Apply to anchor of bridge tower prestressed anchorage district

Similar Documents

Publication Publication Date Title
CN109235285B (en) Cantilever pouring system and construction method for reinforced concrete arch bridge of large-span railway
CN106958206B (en) Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method
US4352220A (en) Method for the construction of a cable-stayed or rein-girth bridge
CN106638259A (en) Upper structure of prefabricated cover-beam-free type combined steel plate bridge and assembling construction method of upper structure
KR20130036890A (en) Tied arched p.s.c girder for bridge and construction method for bridge by it
US3975476A (en) Method for building a cable-stayed girder bridge
CN107419670A (en) Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device and method
CN109137747B (en) Elastic hanging bracket for large-span arch bridge girder construction
Podolny Jr et al. Historical development of cable-stayed bridges
CN110295548A (en) The makeshift device of mechanical balance is maintained under the bridge construction technique of fitting the arch first then fitting the girder
GB747966A (en) Improvements in or relating to reinforced concrete constructions
US4646379A (en) Concrete deck truss bridge and method of construction
CN205501788U (en) A high-speed railway repair beam convertible to a permanent bridge structure
CN112239992A (en) Novel three-tower self-anchored suspension bridge and construction method thereof
JP3032464B2 (en) Side span closure support
RU2152475C1 (en) Method for erection of pedestrian overpass
US4319374A (en) Method of constructing a stayed girder bridge
KR102207785B1 (en) PSC Decked bulb tee girder and construction method thereof
US3230560A (en) Suspension bridge
CN210507162U (en) Temporary device for maintaining mechanical balance under bridge construction process of arch-first and beam-second
CN107119583A (en) A kind of T-shaped rigid frame bridge back of the body tower oblique pull ruggedized construction of double width and its construction method
GB2109040A (en) Cable stayed bridge
CN209082346U (en) A kind of LONG-SPAN RAILWAY reinforced concrete arch bridge cantilever pouring system
CN206693070U (en) Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device
CN206467549U (en) The superstructure of prefabricated uncovered beam type combined steel plate beam bridge