GB747966A - Improvements in or relating to reinforced concrete constructions - Google Patents
Improvements in or relating to reinforced concrete constructionsInfo
- Publication number
- GB747966A GB747966A GB64253A GB64253A GB747966A GB 747966 A GB747966 A GB 747966A GB 64253 A GB64253 A GB 64253A GB 64253 A GB64253 A GB 64253A GB 747966 A GB747966 A GB 747966A
- Authority
- GB
- United Kingdom
- Prior art keywords
- towers
- ties
- sections
- section
- span
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D19/00—Structural or constructional details of bridges
- E01D19/14—Towers; Anchors ; Connection of cables to bridge parts; Saddle supports
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D11/00—Suspension or cable-stayed bridges
- E01D11/04—Cable-stayed bridges
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B7/00—Roofs; Roof construction with regard to insulation
- E04B7/14—Suspended roofs
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Bridges Or Land Bridges (AREA)
Abstract
747,966. Roofs; bridges. WILLIAMS, Sir E. 0., and WILLIAMS, 0. T. Dec. 23, 1953 [Jan. 8, 1953], No. 642/53. Classes 20(1) and 20(4). In the construction of roofs, bridges or other spanning structures, the structure is built out from a pier or column, without support from below, progressively in sections which are tied to the pier by tensioned members which are subsequently encased in concrete. Fig. 1 shows one half of a bridge construction which includes two concrete piers 20 each having an anchor span 21, a central span being suspended between the piers. Pairs of strut towers 25 are erected on each pier 20 ; there may be one pair only, or one pair for the " up " road and one pair for the " down " road may be provided. The towers are spaced by bracing 19. The road deck of the anchor span 21 is first moulded in sections, e.g., each about 15 feet of road length, each section being connected by tension members 28-33 to the towers 25. A temporary staging 22 facilitates the construction of the anchor span. The suspended span is now cast in sections, beginning from the towers, each section being cast in a mould 40 which is supported on bogies 42 and is cantilevered out from a previously moulded section 38. It is anchored at 43 to another section 36. During the casting, each section is attached by its ties 45-49 to the tops of the towers 25, the tensioning of the respective ties being effected when the mould 40 is in use for the next section. The degree of tension may be determined to accord with maximum working load by adjustment of the positions of the anchor points 43. Whilst the ties are thus tensioned, they are concreted. The shore end of the anchor span is connected, in normal manner, to a counterweight 18 to prevent compressive stresses in the back stay 33. The ties 29-33 are finally con;, creted. Stiffening or distributing girders 50 and a rail 44, extending along each side of the carriage way, are constructed after the moulding of the deck sections, the girders 50 enclosing the anchorage points of the ties. Vertical bracing members 39 are provided at intervals. In a modification, Fig. 8, a bridge is built by casting sections, step-by-step symmetrically out from each pier 70, the sections, as before, being provided with ties connecting them to the tops of the towers. The spans are made alternately continuous, as at 71, and non-continuous with short links 72.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB64253A GB747966A (en) | 1953-01-08 | 1953-01-08 | Improvements in or relating to reinforced concrete constructions |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB64253A GB747966A (en) | 1953-01-08 | 1953-01-08 | Improvements in or relating to reinforced concrete constructions |
Publications (1)
Publication Number | Publication Date |
---|---|
GB747966A true GB747966A (en) | 1956-04-18 |
Family
ID=9707927
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB64253A Expired GB747966A (en) | 1953-01-08 | 1953-01-08 | Improvements in or relating to reinforced concrete constructions |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB747966A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677052A (en) * | 2017-02-08 | 2017-05-17 | 王钰 | Closed bridge |
CN108842630A (en) * | 2018-07-19 | 2018-11-20 | 中铁大桥局集团有限公司 | Three pylon cable-stayed bridges and middle tower steadying line hang method |
CN115125837A (en) * | 2022-08-17 | 2022-09-30 | 四川公路桥梁建设集团有限公司 | Apply to anchor of bridge tower prestressed anchorage district |
CN115142340A (en) * | 2022-06-20 | 2022-10-04 | 山西省交通新技术发展有限公司 | A cantilever bridge head board |
-
1953
- 1953-01-08 GB GB64253A patent/GB747966A/en not_active Expired
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN106677052A (en) * | 2017-02-08 | 2017-05-17 | 王钰 | Closed bridge |
CN106677052B (en) * | 2017-02-08 | 2019-04-12 | 王钰 | A kind of closed bridge |
CN108842630A (en) * | 2018-07-19 | 2018-11-20 | 中铁大桥局集团有限公司 | Three pylon cable-stayed bridges and middle tower steadying line hang method |
CN115142340A (en) * | 2022-06-20 | 2022-10-04 | 山西省交通新技术发展有限公司 | A cantilever bridge head board |
CN115142340B (en) * | 2022-06-20 | 2025-01-28 | 山西省交通新技术发展有限公司 | A cantilever bridge head slab |
CN115125837A (en) * | 2022-08-17 | 2022-09-30 | 四川公路桥梁建设集团有限公司 | Apply to anchor of bridge tower prestressed anchorage district |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN109235285B (en) | Cantilever pouring system and construction method for reinforced concrete arch bridge of large-span railway | |
CN106958206B (en) | Hybrid structure of arch and beam formula continuous rigid frame bridge bilayer bottom basket bilayer button hangs constructing device and method | |
US4352220A (en) | Method for the construction of a cable-stayed or rein-girth bridge | |
CN106638259A (en) | Upper structure of prefabricated cover-beam-free type combined steel plate bridge and assembling construction method of upper structure | |
KR20130036890A (en) | Tied arched p.s.c girder for bridge and construction method for bridge by it | |
US3975476A (en) | Method for building a cable-stayed girder bridge | |
CN107419670A (en) | Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device and method | |
CN109137747B (en) | Elastic hanging bracket for large-span arch bridge girder construction | |
Podolny Jr et al. | Historical development of cable-stayed bridges | |
CN110295548A (en) | The makeshift device of mechanical balance is maintained under the bridge construction technique of fitting the arch first then fitting the girder | |
GB747966A (en) | Improvements in or relating to reinforced concrete constructions | |
US4646379A (en) | Concrete deck truss bridge and method of construction | |
CN205501788U (en) | A high-speed railway repair beam convertible to a permanent bridge structure | |
CN112239992A (en) | Novel three-tower self-anchored suspension bridge and construction method thereof | |
JP3032464B2 (en) | Side span closure support | |
RU2152475C1 (en) | Method for erection of pedestrian overpass | |
US4319374A (en) | Method of constructing a stayed girder bridge | |
KR102207785B1 (en) | PSC Decked bulb tee girder and construction method thereof | |
US3230560A (en) | Suspension bridge | |
CN210507162U (en) | Temporary device for maintaining mechanical balance under bridge construction process of arch-first and beam-second | |
CN107119583A (en) | A kind of T-shaped rigid frame bridge back of the body tower oblique pull ruggedized construction of double width and its construction method | |
GB2109040A (en) | Cable stayed bridge | |
CN209082346U (en) | A kind of LONG-SPAN RAILWAY reinforced concrete arch bridge cantilever pouring system | |
CN206693070U (en) | Hybrid structure of arch and beam formula continuous rigid frame bridge winds up walking cradle construction device | |
CN206467549U (en) | The superstructure of prefabricated uncovered beam type combined steel plate beam bridge |