GB639829A - Improvements in or relating to walls adapted to form watertight structures - Google Patents
Improvements in or relating to walls adapted to form watertight structuresInfo
- Publication number
- GB639829A GB639829A GB28574/46A GB2857446A GB639829A GB 639829 A GB639829 A GB 639829A GB 28574/46 A GB28574/46 A GB 28574/46A GB 2857446 A GB2857446 A GB 2857446A GB 639829 A GB639829 A GB 639829A
- Authority
- GB
- United Kingdom
- Prior art keywords
- pillar
- concrete
- shields
- tubes
- piles
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/20—Bulkheads or similar walls made of prefabricated parts and concrete, including reinforced concrete, in situ
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Abstract
639,829. Piles ; subaqueous walls. OGNIBENI, T. Sept. 24, 1946, No. 28574. Convention date, Sept. 25, 1945. [Class 68 (ii)] A wall adapted to form a water-tight structure in loose or swampy ground comprises prefabricated pillars A alternating with concrete piles P<SP>1</SP> cast in situ, elements E embedded in and projecting from the pillars connecting them to the piles. As shown in Fig. 3, each reinforced concrete pillar A is inserted into a previously driven tube C and the projecting ends of the elements E are protected by shields S. The tubes C are withdrawn, and tubes C<SP>1</SP> guided by shields S, are driven between each pair of pillars. Concrete is then poured into the tubes C<SP>1</SP> and the tubes and the shields are simultaneously withdrawn to allow this concrete to envelope the elements E. The pillar shown has a central bore V for insertion of a suction pipe (not shown) into an underground filter bed for water drainage. Filter columns G are also provided in recesses in the pillar and grout may be injected into the filtering material. On the other hand, the recesses may receive flushing pipes T, Fig. 7a. The pillar may have an enlarged shoe D which may be pointed or may be as shown. Various other forms of pillar are described, e.g. the pillar may be in two separable parts and the shields similarly formed. A channel beam may be embedded in a side of the pillar or the latter may have metal or concrete extensions. A pillar may be connected to sheet-piling, Fig. 9, by a partially embedded section of sheet Y.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT639829X | 1945-09-25 |
Publications (1)
Publication Number | Publication Date |
---|---|
GB639829A true GB639829A (en) | 1950-07-05 |
Family
ID=11295194
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB28574/46A Expired GB639829A (en) | 1945-09-25 | 1946-09-24 | Improvements in or relating to walls adapted to form watertight structures |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB639829A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215959A (en) * | 2013-04-17 | 2013-07-24 | 杨众 | Support structure with combined V-shaped precast pile and stirring pile and construction method thereof |
CN109914431A (en) * | 2019-04-08 | 2019-06-21 | 中国铁建大桥工程局集团有限公司 | A kind of novel prefabrication cast-in-place combination Row Piles Supporting Structure |
-
1946
- 1946-09-24 GB GB28574/46A patent/GB639829A/en not_active Expired
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103215959A (en) * | 2013-04-17 | 2013-07-24 | 杨众 | Support structure with combined V-shaped precast pile and stirring pile and construction method thereof |
CN103215959B (en) * | 2013-04-17 | 2016-03-09 | 杨众 | The support construction method that V-arrangement preformed pile is combined with agitation pile |
CN109914431A (en) * | 2019-04-08 | 2019-06-21 | 中国铁建大桥工程局集团有限公司 | A kind of novel prefabrication cast-in-place combination Row Piles Supporting Structure |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
ES453146A1 (en) | Process for providing a foundation pile for alternating compressive and tractive stresses and a pile thus provided | |
GB639829A (en) | Improvements in or relating to walls adapted to form watertight structures | |
GB511080A (en) | Improvements relating to the construction of tunnels | |
JPS5869923A (en) | How to construct a structure using underground continuous walls | |
JPS5664028A (en) | Sheathing construction work by antecedent support framework | |
CN207193947U (en) | It is a kind of to be used for rotary digging stake and the connection buckle of Larsen steel sheet pile | |
SU771252A1 (en) | Drainage arrangement | |
SU705056A1 (en) | Method of providing an antiseepage member of an earth-filled dam | |
JPS6248011B2 (en) | ||
GB493806A (en) | Improvements in or relating to the construction of underground walls in concrete or other similar materials | |
SU1052625A1 (en) | Method of constructing a cast-in-place injector pile | |
GB496581A (en) | An improved method of driving tunnels under water or in water-bearing strata | |
GB1252244A (en) | ||
JPH0417248B2 (en) | ||
JPS56153016A (en) | Application of reinforced foundation pile | |
FR2450911A1 (en) | Construction technique for reinforcing narrow excavations - uses side grout type material instead of trench timbers | |
JPS5670322A (en) | Construction of underground wall by column strip | |
GB959660A (en) | Method of producing a concrete pile wall, pile walls produced by said method, and a piling tube adapted to be used in said method | |
GB303685A (en) | An improved method of enabling a retaining wall or dam to be constructed in waterbearing or waterlogged soil | |
US2010406A (en) | Concrete stave | |
GB628123A (en) | Improvements in or relating to structural foundations | |
JPS63304821A (en) | Construction work of underground continuous cut-off wall | |
GB521681A (en) | Improvements relating to the driving of piles | |
JPS5641924A (en) | Construction engineering for continuous underground wall | |
SU912883A1 (en) | Apparatus for constructing underground structures |