GB572385A - Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams - Google Patents
Improvements in the production of pre-stressed reinforced concrete sleepers and similar beamsInfo
- Publication number
- GB572385A GB572385A GB566143A GB566143A GB572385A GB 572385 A GB572385 A GB 572385A GB 566143 A GB566143 A GB 566143A GB 566143 A GB566143 A GB 566143A GB 572385 A GB572385 A GB 572385A
- Authority
- GB
- United Kingdom
- Prior art keywords
- moulds
- wires
- concrete
- production lines
- production
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B23/00—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects
- B28B23/02—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members
- B28B23/04—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed
- B28B23/06—Arrangements specially adapted for the production of shaped articles with elements wholly or partly embedded in the moulding material; Production of reinforced objects wherein the elements are reinforcing members the elements being stressed for the production of elongated articles
Landscapes
- Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Chemical & Material Sciences (AREA)
- Ceramic Engineering (AREA)
- Mechanical Engineering (AREA)
- Revetment (AREA)
- Devices For Post-Treatments, Processing, Supply, Discharge, And Other Processes (AREA)
- Jigging Conveyors (AREA)
Abstract
572,385. Moulding pre-stressed reinforced concrete sleepers, beams, &c. DOWSETT ENGINEERING CONSTRUCTION, Ltd., and BARBER, R. S. V. April 8, 1943, No. 5661. [Class 87 (ii)] A group of long reinforcing wires is stretched above a production line, and moulds, which run on a track in the line, are assembled in series around the wires and filled with concrete. Fig. 1 is a plan of part of an arrangement in which four groups of wires 18, in two pairs of groups, are stretched above tracks 16 having spaced mould-supporting rollers 17. Each mould comprises an open-ended trough 22 and end plates 23 which are slotted for the reception of the wires (see Specification 572,387). In operation, the empty troughs are fed in laterally in pairs along a runway 19 to a turntable 20 where they are turned into alignment with the production lines A, B. An elevator 21 then raises them to the level of the lines A, B, the end plates are bolted into position, bolt-pins are placed in position, and the completed empty moulds are slid to the right along the wires until they rest on a platform 12 beneath a concrete-containing hopper 15. Concrete is then fed into the moulds, which are simultaneously vibrated by means of a vibratory platform 14. The filled moulds are then slid along the wires, to the right or left, to their setting and hardening stations, the production lines being thus filled with charged moulds. When the concrete has hardened, the moulds are brought over an elevator 28, the wires are severed, and the moulds are lowered on to a lateral discharge track 26, which is stated to be a power-driven conveyer. The reinforcing wires themselves may form the haulage means for pulling the moulds into position over the elevator 28, and as shown a winch 25 is coupled by cable 29 and T -head 30 to one of the moulds, whereby the whole series can be pulled along as a train. Details.-The moulds may have rollers or wheels or skids, or each mould may be supported on a trolley having rollers, wheels or skids. The wires may be cleaned or etched, and are tensioned between standards. The final tension may be applied to the wires after the moulds have been assembled therearound. The production lines may be arranged in tiers, as described in Specification 572,388. The hopper 15, the vibratory platform 14 and the elevators 21 and 28 may move laterally between the production lines A, B and the production lines C, D. Specifications 338,864, [Class 87 (ii)], 364,621, 393,576 and 572,390 also are referred to.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB566143A GB572385A (en) | 1943-04-08 | 1943-04-08 | Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB566143A GB572385A (en) | 1943-04-08 | 1943-04-08 | Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams |
Publications (1)
Publication Number | Publication Date |
---|---|
GB572385A true GB572385A (en) | 1945-10-05 |
Family
ID=9800258
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
GB566143A Expired GB572385A (en) | 1943-04-08 | 1943-04-08 | Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams |
Country Status (1)
Country | Link |
---|---|
GB (1) | GB572385A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2386396A3 (en) * | 2010-05-11 | 2014-02-26 | LEONHARD MOLL BETONWERKE GmbH & Co KG | Method for manufacturing pre-tensioned concrete construction elements, in particular concrete railway sleepers using a forming bed |
CN111702940A (en) * | 2020-04-21 | 2020-09-25 | 中铁上海工程局集团有限公司 | Manufacturing method of double-block sleeper integral stamping model process |
CN114714497A (en) * | 2022-03-30 | 2022-07-08 | 内蒙古中铁轨枕制造有限公司 | Sleeper demoulding and transferring device in concrete sleeper production line |
-
1943
- 1943-04-08 GB GB566143A patent/GB572385A/en not_active Expired
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2386396A3 (en) * | 2010-05-11 | 2014-02-26 | LEONHARD MOLL BETONWERKE GmbH & Co KG | Method for manufacturing pre-tensioned concrete construction elements, in particular concrete railway sleepers using a forming bed |
CN111702940A (en) * | 2020-04-21 | 2020-09-25 | 中铁上海工程局集团有限公司 | Manufacturing method of double-block sleeper integral stamping model process |
CN114714497A (en) * | 2022-03-30 | 2022-07-08 | 内蒙古中铁轨枕制造有限公司 | Sleeper demoulding and transferring device in concrete sleeper production line |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
GB1131957A (en) | Apparatus for premoulding walls, panels and wall slabs, and method of use | |
US3732052A (en) | Apparatus for the continuous manufacture of precast reinforced concrete products, particularly slabs and beams | |
US3577610A (en) | Apparatus for manufacturing prestressed concrete members | |
GB1187730A (en) | Apparatus for the Production of Cast Concrete Members | |
US3055073A (en) | Method and apparatus for the continuous production of prestressed concrete members | |
US4102957A (en) | Apparatus and method for manufacturing prestressed concrete railway ties | |
US2394228A (en) | Apparatus and method for the production of prestressed concrete sleepers | |
GB572385A (en) | Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams | |
GB1475400A (en) | Combined lifting and cutting device for unhardened cellular concrete bodies | |
US3903222A (en) | Method for producing prestressed concrete | |
US2596052A (en) | Apparatus and method for molding concrete blocks | |
US3659979A (en) | Plant for manufacturing small structural elements | |
GB572388A (en) | Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams | |
US1534361A (en) | Block-making machine | |
GB1493316A (en) | Manufacture of pre-stressed concrete beams | |
US3274659A (en) | Apparatus for forming concrete articles | |
GB572390A (en) | Improvements in the production of pre-stressed reinforced concrete sleepers and similar beams | |
US3966375A (en) | Rail mounted apparatus for manufacturing concrete poles | |
GB1199070A (en) | Pre-Formed Members for use in the Formation of Substantially Planar Building Slabs | |
HU168246B (en) | Method for furthering the platform cars at the production of reinforced concrete large panels and apparatus for carrying out the method | |
GB931297A (en) | An arrangement for the construction of concrete bridges and like structures | |
JPS6078010A (en) | Method and apparatus for placement of concrete for dam construction | |
SU455006A2 (en) | Conveyor plant for the manufacture of reinforced concrete building products | |
SE8604198L (en) | PROCEDURE AND DEVICE FOR MANUFACTURING A PRESENT, CONTINUOUS CONCRETE PRODUCT | |
FR2425923A1 (en) | Plant for mfg.. precast concrete beams - uses mould and tamping beam suspended by cables from travelling gantry traversed by concrete tipper |