FR3150056A1 - METHOD FOR DETECTING THE PRESENCE OR ABSENCE OF A NEUTRAL CONDUCTOR LINE IN A MULTIPHASE ALTERNATING ELECTRIC VOLTAGE SOURCE - Google Patents
METHOD FOR DETECTING THE PRESENCE OR ABSENCE OF A NEUTRAL CONDUCTOR LINE IN A MULTIPHASE ALTERNATING ELECTRIC VOLTAGE SOURCE Download PDFInfo
- Publication number
- FR3150056A1 FR3150056A1 FR2305948A FR2305948A FR3150056A1 FR 3150056 A1 FR3150056 A1 FR 3150056A1 FR 2305948 A FR2305948 A FR 2305948A FR 2305948 A FR2305948 A FR 2305948A FR 3150056 A1 FR3150056 A1 FR 3150056A1
- Authority
- FR
- France
- Prior art keywords
- voltage
- synchronous rectifier
- voltage source
- bidirectional synchronous
- voltage bus
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L3/00—Electric devices on electrically-propelled vehicles for safety purposes; Monitoring operating variables, e.g. speed, deceleration or energy consumption
- B60L3/0023—Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train
- B60L3/0069—Detecting, eliminating, remedying or compensating for drive train abnormalities, e.g. failures within the drive train relating to the isolation, e.g. ground fault or leak current
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L53/00—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles
- B60L53/10—Methods of charging batteries, specially adapted for electric vehicles; Charging stations or on-board charging equipment therefor; Exchange of energy storage elements in electric vehicles characterised by the energy transfer between the charging station and the vehicle
- B60L53/14—Conductive energy transfer
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M1/00—Details of apparatus for conversion
- H02M1/10—Arrangements incorporating converting means for enabling loads to be operated at will from different kinds of power supplies, e.g. from AC or DC
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M1/00—Details of apparatus for conversion
- H02M1/36—Means for starting or stopping converters
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02M—APPARATUS FOR CONVERSION BETWEEN AC AND AC, BETWEEN AC AND DC, OR BETWEEN DC AND DC, AND FOR USE WITH MAINS OR SIMILAR POWER SUPPLY SYSTEMS; CONVERSION OF DC OR AC INPUT POWER INTO SURGE OUTPUT POWER; CONTROL OR REGULATION THEREOF
- H02M1/00—Details of apparatus for conversion
- H02M1/42—Circuits or arrangements for compensating for or adjusting power factor in converters or inverters
- H02M1/4208—Arrangements for improving power factor of AC input
- H02M1/4233—Arrangements for improving power factor of AC input using a bridge converter comprising active switches
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B60—VEHICLES IN GENERAL
- B60L—PROPULSION OF ELECTRICALLY-PROPELLED VEHICLES; SUPPLYING ELECTRIC POWER FOR AUXILIARY EQUIPMENT OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRODYNAMIC BRAKE SYSTEMS FOR VEHICLES IN GENERAL; MAGNETIC SUSPENSION OR LEVITATION FOR VEHICLES; MONITORING OPERATING VARIABLES OF ELECTRICALLY-PROPELLED VEHICLES; ELECTRIC SAFETY DEVICES FOR ELECTRICALLY-PROPELLED VEHICLES
- B60L2210/00—Converter types
- B60L2210/30—AC to DC converters
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02B—CLIMATE CHANGE MITIGATION TECHNOLOGIES RELATED TO BUILDINGS, e.g. HOUSING, HOUSE APPLIANCES OR RELATED END-USER APPLICATIONS
- Y02B70/00—Technologies for an efficient end-user side electric power management and consumption
- Y02B70/10—Technologies improving the efficiency by using switched-mode power supplies [SMPS], i.e. efficient power electronics conversion e.g. power factor correction or reduction of losses in power supplies or efficient standby modes
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Rectifiers (AREA)
Abstract
L’invention concerne un procédé, mis en œuvre par un système de pilotage d’un redresseur synchrone bidirectionnel relié à une source de tension électrique alternative multiphasée, de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension, le procédé comportant les étapes suivantes : une mesure (40) d’au moins une première grandeur relative à un courant circulant dans un bus de tension continue à la fin d’une phase de pré-charge du redresseur ;une réception (42) d’au moins une deuxième grandeur mesurée à la fin de la phase de pré-charge du redresseur ;une comparaison (44) de ladite au moins une première grandeur mesurée à une valeur seuil basée sur la deuxième grandeur mesurée ; eten fonction du résultat de la comparaison (44), une détection (46, 48) de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension. Figure de l’abrégé : Fig. 2 The invention relates to a method, implemented by a control system of a bidirectional synchronous rectifier connected to a multiphase alternating electrical voltage source, for detecting the presence or absence of a neutral conductor line in the voltage source, the method comprising the following steps: a measurement (40) of at least a first quantity relating to a current flowing in a direct voltage bus at the end of a pre-charging phase of the rectifier; a reception (42) of at least a second quantity measured at the end of the pre-charging phase of the rectifier; a comparison (44) of said at least one first measured quantity with a threshold value based on the second measured quantity; and, depending on the result of the comparison (44), a detection (46, 48) of the presence or absence of a neutral conductor line in the voltage source. Abstract figure: Fig. 2
Description
L’invention se rapporte à un procédé, mis en œuvre par un système de pilotage d’un redresseur synchrone bidirectionnel relié à une source de tension électrique alternative multiphasée, de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée. De préférence, la source de tension électrique alternative multiphasée est un réseau d’alimentation électrique à courant électrique sinusoïdal triphasé. L’invention se rapporte en outre à un ensemble comprenant un redresseur synchrone bidirectionnel et un système de pilotage du redresseur synchrone bidirectionnel configuré pour mettre en œuvre les étapes d’un tel procédé. L’invention se rapporte également à un chargeur électrique pour véhicule électrique ou hybride, comprenant un tel ensemble, ainsi qu’à un véhicule électrique ou hybride, notamment automobile, comprenant un tel chargeur électrique.The invention relates to a method, implemented by a system for controlling a bidirectional synchronous rectifier connected to a multiphase alternating electrical voltage source, for detecting the presence or absence of a neutral conductor line in the multiphase alternating electrical voltage source. Preferably, the multiphase alternating electrical voltage source is a three-phase sinusoidal electrical current power supply network. The invention further relates to an assembly comprising a bidirectional synchronous rectifier and a system for controlling the bidirectional synchronous rectifier configured to implement the steps of such a method. The invention also relates to an electric charger for an electric or hybrid vehicle, comprising such an assembly, as well as to an electric or hybrid vehicle, in particular an automobile, comprising such an electric charger.
Il est connu de l’état de la technique des chargeurs électriques pour véhicules électriques ou hybrides, embarqués au sein d’un tel véhicule et destinés à être connectés à une borne ou à une station de recharge électrique, elle-même reliée à une source de tension électrique sinusoïdale (tel qu’un réseau d’alimentation électrique triphasé) pour l’alimentation électrique du véhicule. Un tel chargeur électrique comporte classiquement un redresseur synchrone bidirectionnel apte à convertir une première tension électrique alternative en une deuxième tension électrique continue, un système de pilotage du redresseur synchrone bidirectionnel, ainsi qu’un convertisseur configuré pour convertir à haute fréquence la deuxième tension électrique continue en une troisième tension électrique continue. Le redresseur synchrone bidirectionnel comporte un étage de correction active de facteur de puissance et un bus de tension continue connecté en sortie de l’étage de correction active de facteur de puissance. L’étage de correction active de facteur de puissance permet de réaliser un transfert de puissance entre la source de tension électrique sinusoïdale et le bus de tension continue. Le redresseur synchrone est dit « bidirectionnel » car il permet de faire circuler le courant électrique dans les deux sens par pilotage d’interrupteurs électroniques commandables réversibles (par opposition à des diodes par exemple) agissant dans des branches de commutation du redresseur, le sens de circulation du courant étant fonction du bilan de puissance réalisé par le contrôleur de la boucle de régulation en tension agissant pour maintenir le bus de tension continue à sa tension nominale :
- si du courant provenant du convertisseur de courant continu en courant continu arrive au niveau du bus de tension continue, la tension augmente et le contrôleur agit pour faire transiter le courant en opposition de phase de la tension d’entrée afin de décharger le bus de tension continue ;
- à l’inverse, si le convertisseur de courant continu en courant continu tire du courant, le contrôleur de la boucle en tension prélève du courant au réseau électrique d’alimentation et le courant est en phase avec la tension d’entrée.
- if current from the DC to DC converter arrives at the DC voltage bus, the voltage increases and the controller acts to flow the current in phase opposition to the input voltage in order to discharge the DC voltage bus;
- conversely, if the DC to DC converter draws current, the voltage loop controller draws current from the supply grid and the current is in phase with the input voltage.
Le convertisseur haute fréquence de courant continu en courant continu (typiquement un hacheur) est connecté en sortie du redresseur.The high frequency DC to DC converter (typically a chopper) is connected to the output of the rectifier.
Il est préférable que le chargeur électrique soit compatible avec tout système ou réseau d’alimentation électrique à courant électrique alternatif multiphasé (relié à la borne ou la station de recharge électrique), que celui-ci dispose d’une ligne conductrice de neutre ou non. Or, la présence ou l'absence d’une ligne conductrice de neutre dans le système ou le réseau d’alimentation électrique a un impact très important sur la stratégie de commande de l’étage de correction active du redresseur synchrone bidirectionnel, mise en œuvre par le système de pilotage. En effet, selon qu’une ligne conductrice de neutre est présente ou non dans le système ou le réseau d’alimentation électrique, les stratégies de commande de l’étage de correction active du redresseur sont complètement différentes dans leur mise en œuvre. Par exemple, lorsqu’une ligne conductrice de neutre est présente, une stratégie de commande phase par phase du type « a, b, c » est typiquement utilisée. Au contraire, lorsque la ligne conductrice de neutre est absente, une commande vectorielle du type « dq0 » est avantageusement utilisée. En outre, lorsque la ligne conductrice de neutre est absente du réseau d’alimentation électrique, la stratégie de commande du redresseur mise en œuvre par le système de pilotage doit inclure des fonctions spéciales, qui deviennent inutiles lorsque la ligne conductrice de neutre est présente (augmentant alors inutilement la charge de calcul lorsqu’aucun moyen de détection de la présence ou de l’absence de la ligne conductrice de neutre n’est fourni). Parmi de telles fonctions spéciales on peut notamment citer :
- une compensation de la composante homopolaire du courant électrique ; et
- une injection de la troisième harmonique du courant pour permettre le démarrage de l’étage de correction active du redresseur synchrone bidirectionnel, et pour permettre au convertisseur haute fréquence de fonctionner en mode survolteur (ou « boost » en anglais).
- compensation for the homopolar component of the electric current; and
- an injection of the third harmonic of the current to allow the start-up of the active correction stage of the bidirectional synchronous rectifier, and to allow the high-frequency converter to operate in boost mode.
Enfin et surtout, l'équilibrage de la charge d'une phase à l'autre n'est pas possible lorsque la ligne conductrice de neutre n’est pas connectée au chargeur électrique, alors que cette fonctionnalité doit être fournie lorsque la ligne conductrice de neutre est connectée au chargeur électrique (afin de se conformer aux exigences normatives).Last but not least, load balancing from one phase to another is not possible when the neutral conductor line is not connected to the electrical charger, while this functionality must be provided when the neutral conductor line is connected to the electrical charger (in order to comply with normative requirements).
Or, jusqu’à maintenant, rien n’oblige la borne ou la station de recharge électrique à fournir au chargeur électrique l’information relative à la présence ou à l'absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée. Il existe donc un besoin de pouvoir disposer, au niveau du chargeur électrique et en particulier au niveau du redresseur synchrone bidirectionnel, de l’information quant à la présence ou l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée. En outre, une telle information doit être disponible très tôt après le raccordement du chargeur électrique au réseau d’alimentation électrique, afin de permettre au système de pilotage du redresseur de sélectionner la stratégie de commande qui sera utilisée, pour activer ou non des fonctions spéciales telles que la compensation de la composante homopolaire et l’injection de la troisième harmonique du courant qui sont nécessaires au tout début de la phase de charge dans le but d’alimenter l’étage de correction active de facteur de puissance du redresseur, et pour autoriser ou non l'équilibrage de la charge d'une phase à l'autre.However, until now, nothing requires the electric charging station or terminal to provide the electric charger with information relating to the presence or absence of a neutral conductor line in the multiphase AC electrical voltage source. There is therefore a need to be able to have, at the electric charger level and in particular at the bidirectional synchronous rectifier level, information as to the presence or absence of a neutral conductor line in the multiphase AC electrical voltage source. Furthermore, such information must be available very early after the electrical charger is connected to the electrical supply network, in order to allow the rectifier control system to select the control strategy that will be used, to activate or not special functions such as compensation of the homopolar component and injection of the third harmonic of the current which are necessary at the very beginning of the charging phase in order to supply the active power factor correction stage of the rectifier, and to authorize or not the balancing of the load from one phase to the other.
Une solution dégradée qui est utilisée aujourd’hui consiste à partir du principe que la ligne conductrice de neutre est toujours absente dans la source de tension électrique alternative multiphasée. Ainsi, le chargeur électrique fonctionne toujours comme un chargeur électrique « sans neutre ». Toutefois, cette solution a comme principal inconvénient qu’un tel chargeur électrique ne peut pas gérer la puissance maximale qu’il est possible de tirer des phases de la source de tension, phase par phase. Or, une telle fonctionnalité peut s’avérer particulièrement utile par exemple dans un contexte où il est nécessaire de compléter les phases indépendamment les unes des autres (au besoin en les déséquilibrant), permettant une charge plus rapide, ou bien pour effectuer un rééquilibrage du réseau d’alimentation (d’une phase à l’autre), ou encore pour permettre une répartition de la puissance vue, un équilibrage et une homogénéisation au sein de l’étage de correction active de facteur de puissance du redresseur afin de ralentir le vieillissement des composants.A degraded solution that is used today is to assume that the neutral conductor line is always absent in the multiphase AC electrical voltage source. Thus, the electrical charger always operates as a "neutral-free" electrical charger. However, the main drawback of this solution is that such an electrical charger cannot manage the maximum power that can be drawn from the phases of the voltage source, phase by phase. However, such a feature can be particularly useful, for example, in a context where it is necessary to complete the phases independently of each other (if necessary by unbalancing them), allowing faster charging, or to rebalance the power supply network (from one phase to another), or to allow distribution of the power seen, balancing and homogenization within the active power factor correction stage of the rectifier in order to slow down the aging of the components.
Le but de l’invention est de pallier les inconvénients de l’art antérieur en proposant un procédé, mis en œuvre par un système de pilotage d’un redresseur synchrone bidirectionnel relié à une source de tension électrique alternative multiphasée, de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée, qui permette une détection précise par le système de pilotage de la présence ou de l’absence d’une ligne conductrice de neutre, tout en étant robuste aux variations d’amplitude et de fréquence de la tension électrique fournie par la source de tension.The aim of the invention is to overcome the drawbacks of the prior art by proposing a method, implemented by a control system of a bidirectional synchronous rectifier connected to a multiphase alternating electrical voltage source, for detecting the presence or absence of a neutral conductor line in the multiphase alternating electrical voltage source, which allows precise detection by the control system of the presence or absence of a neutral conductor line, while being robust to variations in amplitude and frequency of the electrical voltage supplied by the voltage source.
Pour ce faire, l’invention se rapporte ainsi, dans son acceptation la plus large, à un procédé, mis en œuvre par un système de pilotage d’un redresseur synchrone bidirectionnel relié à une source de tension électrique alternative multiphasée, de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée, le redresseur synchrone bidirectionnel comprenant une borne d’entrée de neutre apte à être reliée à une ligne conductrice de neutre de la source de tension électrique alternative multiphasée, un étage de correction active de facteur de puissance et un bus de tension continue connecté en sortie de l’étage de correction active de facteur de puissance, l’étage de correction active de facteur de puissance étant muni de plusieurs branches électroniques de commutation, au moins une demi-branche de chacune des branches électroniques de commutation comprenant au moins un organe de commutation, le nombre de branches électroniques de commutation étant égal au nombre de phases dans la source de tension électrique alternative multiphasée, le bus de tension continue comprenant deux demi-branches reliées en série en une borne intermédiaire, ladite borne intermédiaire étant reliée à la borne d’entrée de neutre, le système de pilotage comprenant des moyens de mesure d’au moins une grandeur relative à un courant propre à circuler dans le bus de tension continue, le procédé comportant les étapes suivantes :
- une étape de mesure d’au moins une première grandeur relative à un courant circulant dans le bus de tension continue à la fin d’une phase de pré-charge du redresseur synchrone bidirectionnel, au cours de laquelle aucun organe de commutation n’est piloté par le système de pilotage, ladite étape de mesure fournissant une première grandeur mesurée ;
- une étape de réception d’au moins une deuxième grandeur mesurée à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel ;
- une étape de comparaison de ladite au moins une première grandeur mesurée à une valeur seuil basée sur ladite au moins une deuxième grandeur mesurée ; et
- en fonction du résultat de la comparaison, une étape de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée.
- a step of measuring at least a first quantity relating to a current flowing in the direct voltage bus at the end of a pre-charging phase of the bidirectional synchronous rectifier, during which no switching member is controlled by the control system, said measuring step providing a first measured quantity;
- a step of receiving at least a second measured quantity at the end of the pre-charging phase of the bidirectional synchronous rectifier;
- a step of comparing said at least one first measured quantity to a threshold value based on said at least one second measured quantity; and
- depending on the result of the comparison, a step of detecting the presence or absence of a neutral conductor line in the multiphase alternating electric voltage source.
Grâce au procédé de détection selon l’invention, le système de pilotage du redresseur synchrone bidirectionnel est capable de déterminer de manière autonome et précise si une ligne conductrice de neutre est présente dans la source de tension électrique alternative multiphasée, et ce sans aucune communication avec une éventuelle borne ou station de recharge électrique reliée à la source de tension. Le procédé de détection selon l’invention est également robuste aux variations d’amplitudeet de fréquence de la tension électrique fournie par la source de tension ; et la détection peut avantageusement être effectuée par comparaison de la grandeur mesurée aussi bien à un seuil relatif qu’à un seuil absolu. Le procédé peut en outre être également utilisé pour un éventuel contrôle de plausibilité quant à la présence d’une ligne conductrice de neutre, qui seraient éventuellement fournies par une borne ou station de recharge électrique reliée à la source de tension. Le procédé peut enfin être facilement adapté à différents types de configurations matérielles et à différents types d'acquisitions disponibles : par exemple une détection basée sur le courant (par comparaison à la fréquence du courant), sur la tension, ou sur les deux à la fois.By means of the detection method according to the invention, the bidirectional synchronous rectifier control system is capable of autonomously and accurately determining whether a neutral conductor line is present in the multiphase AC electrical voltage source, without any communication with a possible electrical charging station or terminal connected to the voltage source. The detection method according to the invention is also robust to variations in the amplitude and frequency of the electrical voltage supplied by the voltage source; and the detection can advantageously be carried out by comparing the measured quantity to both a relative threshold and an absolute threshold. The method can also be used for a possible plausibility check as to the presence of a neutral conductor line, which would possibly be supplied by an electrical charging station or terminal connected to the voltage source. Finally, the method can be easily adapted to different types of hardware configurations and to different types of available acquisitions: for example, detection based on the current (by comparison with the frequency of the current), on the voltage, or on both at the same time.
Selon un premier mode de réalisation de l’invention, ladite au moins une première grandeur mesurée est l’amplitude et/ou la fréquence de la tension dans le bus de tension continue à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel, et ladite au moins une deuxième grandeur mesurée est l’amplitude efficace Ueff1et/ou la fréquence f1de la tension fournie par la source de tension électrique alternative multiphasée à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel, ladite au moins une deuxième grandeur mesurée étant fournie par un système de mesure tiers. Ce premier mode de réalisation de l’invention est avantageux lorsqu’une mesure l’amplitude efficace et/ou de la fréquence de la tension fournie par la source de tension électrique alternative multiphasée est disponible pour le système de pilotage du redresseur.According to a first embodiment of the invention, said at least one first measured quantity is the amplitude and/or the frequency of the voltage in the DC voltage bus at the end of the pre-charging phase of the bidirectional synchronous rectifier, and said at least one second measured quantity is the effective amplitude U eff1 and/or the frequency f 1 of the voltage supplied by the multiphase AC electrical voltage source at the end of the pre-charging phase of the bidirectional synchronous rectifier, said at least one second measured quantity being supplied by a third-party measuring system. This first embodiment of the invention is advantageous when a measurement of the effective amplitude and/or the frequency of the voltage supplied by the multiphase AC electrical voltage source is available for the rectifier control system.
De préférence, lors de l’étape de comparaison de ladite au moins une première grandeur mesurée à une valeur seuil, si ladite au moins une première grandeur mesurée est la tension dans le bus de tension continue à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel, la valeur seuil de tension est comprise entre une première valeur égale à
Selon une caractéristique technique particulière de ce premier mode de réalisation, si ladite au moins une première grandeur mesurée est la tension dans le bus de tension continue à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel, la présence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée est détectée si, au cours de l’étape de comparaison, la valeur mesurée de la tension dans le bus de tension continue à la fin de la phase de pré-charge est supérieure à ladite valeur seuil de tension ; et, si ladite au moins une première grandeur mesurée est la fréquence de la tension dans le bus de tension continue à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel, la présence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée est détectée si, au cours de l’étape de comparaison, la valeur mesurée de la fréquence de la tension dans le bus de tension continue à la fin de la phase de pré-charge est inférieure à ladite valeur seuil de fréquence.According to a particular technical characteristic of this first embodiment, if said at least one first measured quantity is the voltage in the DC voltage bus at the end of the pre-charging phase of the bidirectional synchronous rectifier, the presence of a neutral conductive line in the multiphase AC electrical voltage source is detected if, during the comparison step, the measured value of the voltage in the DC voltage bus at the end of the pre-charging phase is greater than said voltage threshold value; and, if said at least one first measured quantity is the frequency of the voltage in the DC voltage bus at the end of the pre-charging phase of the bidirectional synchronous rectifier, the presence of a neutral conductive line in the multiphase AC electrical voltage source is detected if, during the comparison step, the measured value of the frequency of the voltage in the DC voltage bus at the end of the pre-charging phase is less than said frequency threshold value.
Selon un deuxième mode de réalisation de l’invention, le redresseur synchrone bidirectionnel comporte en outre un interrupteur électronique commandable connecté entre la borne d’entrée de neutre et la borne intermédiaire, et apte à être piloté par le système de pilotage, et l’étape de mesure d’au moins une première grandeur relative à un courant circulant dans le bus de tension continue à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel comporte une première sous-étape au cours de laquelle l’interrupteur électronique est commandé pour être à l’état ouvert, et ladite au moins une première grandeur mesurée est la tension dans le bus de tension continue au cours de cette première sous-étape, et une seconde sous-étape au cours de laquelle l’interrupteur électronique est commandé pour être à l’état fermé, ladite au moins une deuxième grandeur mesurée à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel étant la tension dans le bus de tension continue au cours de cette seconde sous-étape. Ce deuxième mode de réalisation de l’invention est avantageux lorsqu’aucune mesure de l’amplitude efficace et de la fréquence de la tension fournie par la source de tension électrique alternative multiphasée n’est disponible pour le système de pilotage du redresseur. Dans ce deuxième mode de réalisation en effet, la détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée est indépendante de la valeur l’amplitude efficace et de la fréquence de la tension fournie par la source de tension.According to a second embodiment of the invention, the bidirectional synchronous rectifier further comprises a controllable electronic switch connected between the neutral input terminal and the intermediate terminal, and capable of being controlled by the control system, and the step of measuring at least a first quantity relating to a current flowing in the DC voltage bus at the end of the pre-charging phase of the bidirectional synchronous rectifier comprises a first sub-step during which the electronic switch is controlled to be in the open state, and said at least one first measured quantity is the voltage in the DC voltage bus during this first sub-step, and a second sub-step during which the electronic switch is controlled to be in the closed state, said at least one second measured quantity at the end of the pre-charging phase of the bidirectional synchronous rectifier being the voltage in the DC voltage bus during this second sub-step. This second embodiment of the invention is advantageous when no measurement of the effective amplitude and frequency of the voltage supplied by the multiphase AC electrical voltage source is available for the rectifier control system. In this second embodiment, in fact, the detection of the presence or absence of a neutral conductor line in the multiphase AC electrical voltage source is independent of the value of the effective amplitude and frequency of the voltage supplied by the voltage source.
Selon une caractéristique technique particulière de ce deuxième mode de réalisation, la présence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée est détectée si, au cours de l’étape de comparaison, la valeur mesurée de la tension dans le bus de tension continue au cours de la première sous-étape est distincte de la valeur mesurée de la tension dans le bus de tension continue au cours de la seconde sous-étape.According to a particular technical characteristic of this second embodiment, the presence of a neutral conductive line in the multiphase alternating electric voltage source is detected if, during the comparison step, the measured value of the voltage in the direct voltage bus during the first sub-step is distinct from the measured value of the voltage in the direct voltage bus during the second sub-step.
L’invention se rapporte également à un ensemble comprenant un redresseur synchrone bidirectionnel et un système de pilotage du redresseur synchrone bidirectionnel, le redresseur synchrone bidirectionnel étant apte à être relié à une source de tension électrique alternative multiphasée et comprenant une borne d’entrée de neutre apte à être reliée à une ligne conductrice de neutre de la source de tension électrique alternative multiphasée, un étage de correction active de facteur de puissance et un bus de tension continue connecté en sortie de l’étage de correction active de facteur de puissance, l’étage de correction active de facteur de puissance étant muni de plusieurs branches électroniques de commutation, au moins une demi-branche de chacune des branches électroniques de commutation comprenant au moins un organe de commutation, le nombre de branches électroniques de commutation étant égal au nombre de phases dans la source de tension électrique alternative multiphasée, le bus de tension continue comprenant deux demi-branches reliées en série en une borne intermédiaire, ladite borne intermédiaire étant reliée à la borne d’entrée de neutre, le système de pilotage comprenant des moyens de mesure d’au moins une grandeur relative à un courant propre à circuler dans le bus de tension continue, le système de pilotage du redresseur synchrone bidirectionnel étant configuré pour mettre en œuvre les étapes d’un procédé de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée tel que décrit ci-dessus.The invention also relates to an assembly comprising a bidirectional synchronous rectifier and a system for controlling the bidirectional synchronous rectifier, the bidirectional synchronous rectifier being capable of being connected to a multiphase alternating electrical voltage source and comprising a neutral input terminal capable of being connected to a neutral conductor line of the multiphase alternating electrical voltage source, an active power factor correction stage and a direct voltage bus connected to the output of the active power factor correction stage, the active power factor correction stage being provided with several electronic switching branches, at least one half-branch of each of the electronic switching branches comprising at least one switching member, the number of electronic switching branches being equal to the number of phases in the multiphase alternating electrical voltage source, the direct voltage bus comprising two half-branches connected in series at an intermediate terminal, said intermediate terminal being connected to the neutral input terminal, the control system comprising means for measuring at least one quantity relating to a current capable of flowing in the bus of direct voltage, the bidirectional synchronous rectifier control system being configured to implement the steps of a method for detecting the presence or absence of a neutral conductive line in the multiphase alternating electric voltage source as described above.
L’invention se rapporte également à un chargeur électrique pour véhicule électrique ou hybride destiné à être connecté à une borne ou à une station de recharge électrique reliée à une source de tension électrique alternative multiphasée, pour l’alimentation électrique dudit véhicule électrique ou hybride, le chargeur électrique comprenant un ensemble tel que décrit ci-dessus.The invention also relates to an electric charger for an electric or hybrid vehicle intended to be connected to a terminal or to an electric charging station connected to a multi-phase alternating electric voltage source, for the electrical supply of said electric or hybrid vehicle, the electric charger comprising an assembly as described above.
L’invention se rapporte également à un véhicule électrique ou hybride, notamment automobile, comportant un chargeur électrique tel que décrit ci-dessus.The invention also relates to an electric or hybrid vehicle, in particular an automobile, comprising an electric charger as described above.
On décrira ci-après, à titre d’exemples non limitatifs, des formes d’exécution de la présente invention, en référence aux figures annexées sur lesquelles :
-
-
-
-
-
-
En référence à la
L’ensemble 2 est typiquement installé au sein d’un véhicule automobile électrique ou hybride, plus précisément au sein d’un chargeur électrique destiné à être connecté à une borne ou à une station de recharge électrique, elle-même relié à la source de tension électrique alternative 7, pour l’alimentation électrique du véhicule (ni le véhicule, ni la borne ou la station de recharge, ni le chargeur dans son ensemble n’étant représentés sur les figures pour des raisons de clarté). De préférence, la tension électrique continue U2 permet d’alimenter une batterie de stockage électrique du véhicule, après transformation par un ou plusieurs autre(s) étage(s) du chargeur électrique (tel(s) que par exemple un hacheur abaisseur et élévateur). L’ensemble 2 fournit ainsi la tension électrique continue U2 sur un bus de sortie 5 auquel est connecté la charge 8, la valeur de cette tension électrique continue U2 étant par exemple de l’ordre de 400 Vcc ou de 800 Vcc.The assembly 2 is typically installed within an electric or hybrid motor vehicle, more precisely within an electric charger intended to be connected to an electric charging station or terminal, itself connected to the AC electrical voltage source 7, for the electrical supply of the vehicle (neither the vehicle, nor the charging station or terminal, nor the charger as a whole being shown in the figures for reasons of clarity). Preferably, the DC electrical voltage U2 makes it possible to supply an electrical storage battery of the vehicle, after transformation by one or more other stages of the electric charger (such as for example a step-down and step-up chopper). The assembly 2 thus supplies the DC electrical voltage U2 on an output bus 5 to which the load 8 is connected, the value of this DC electrical voltage U2 being for example of the order of 400 Vdc or 800 Vdc.
Outre le bus de sortie 5, le redresseur synchrone bidirectionnel 4 comporte également une borne d’entrée de neutre 9 et un étage de correction active de facteur de puissance 10, le bus de sortie 5 étant connecté en sortie de l’étage de correction active de facteur de puissance 10 via au moins une résistance (en l’occurrence via deux résistances R1, R2 dans l’exemple de réalisation de la
Dans le mode de réalisation particulier représenté sur la
La borne d’entrée de neutre 9 est apte à être reliée à la ligne conductrice de neutre N1 de la source de tension électrique alternative 7, lorsque la connexion entre le chargeur électrique du véhicule et la borne ou la station de recharge électrique est effectuée. Lorsque la source de tension électrique alternative 7 ne comporte pas de ligne conductrice de neutre (ce que ne « sait » pas l’ensemble 2 embarqué au sein du chargeur électrique, la borne d’entrée de neutre 9 n’est physiquement reliée à aucun élément).The neutral input terminal 9 is capable of being connected to the neutral conductive line N1 of the AC electrical voltage source 7, when the connection between the electric charger of the vehicle and the electric charging station or terminal is made. When the AC electrical voltage source 7 does not have a neutral conductive line (which the assembly 2 embedded in the electric charger does not “know”, the neutral input terminal 9 is not physically connected to any element).
L’étage de filtrage de perturbations électromagnétiques 12 est propre à être relié à la source de tension électrique alternative 7, lorsque la connexion entre le chargeur électrique du véhicule et la borne ou la station de recharge électrique est effectuée. L’étage de filtrage de perturbations électromagnétiques 12 comporte autant de bornes d’entrée qu’il y a de lignes conductrices de phases P1, P2, P3 dans le réseau d’alimentation électrique triphasé 7. L’étage de filtrage de perturbations électromagnétiques 12 comporte autant de bornes de sortie qu’il y a de lignes conductrices de phases P1, P2, P3 dans le réseau d’alimentation électrique triphasé 7.The electromagnetic interference filtering stage 12 is suitable for being connected to the alternating electrical voltage source 7, when the connection between the electric charger of the vehicle and the electric charging station or terminal is made. The electromagnetic interference filtering stage 12 comprises as many input terminals as there are phase conductive lines P1, P2, P3 in the three-phase electrical power supply network 7. The electromagnetic interference filtering stage 12 comprises as many output terminals as there are phase conductive lines P1, P2, P3 in the three-phase electrical power supply network 7.
L’étage de correction active de facteur de puissance 10 comporte plusieurs branches électroniques de commutation 16, 18, 20, en l’occurrence trois branches électroniques de commutation 16, 18, 20 dans l’exemple de réalisation particulier de la
Chaque branche électronique de commutation 16, 18, 20 comprend deux demi-branches de commutation 16A, 16B ; 18A, 18B ; 20A, 20B reliées en série en une borne intermédiaire 22, 24, 26. Chaque borne intermédiaire 22, 24, 26 est reliée à une extrémité d’une des inductances L1, L2, L3. Chaque demi-branche de commutation 16A, 16B, 18A, 18B, 20A, 20B comprend un organe de commutation 28. En variante non représentée, chaque demi-branche 16A, 16B, 18A, 18B, 20A, 20B comprend un nombre N2 d’organes de commutation 28, N2 étant un nombre entier supérieur ou égal à deux. La commutation des organes de commutation 28 est commandée par une unité de commande 29 du système de pilotage 6. L’unité de commande 29 est également apte à commander la commutation de l’interrupteur électronique commandable 14, comme cela sera décrit par la suite.Each electronic switching branch 16, 18, 20 comprises two switching half-branches 16A, 16B; 18A, 18B; 20A, 20B connected in series at an intermediate terminal 22, 24, 26. Each intermediate terminal 22, 24, 26 is connected to one end of one of the inductances L1, L2, L3. Each switching half-branch 16A, 16B, 18A, 18B, 20A, 20B comprises a switching member 28. In a variant not shown, each half-branch 16A, 16B, 18A, 18B, 20A, 20B comprises a number N2 of switching members 28, N2 being an integer greater than or equal to two. The switching of the switching members 28 is controlled by a control unit 29 of the control system 6. The control unit 29 is also capable of controlling the switching of the controllable electronic switch 14, as will be described later.
Comme connu en soi, chaque organe de commutation 28 est bidirectionnel en courant et unidirectionnel en tension. Chaque organe de commutation 28 comprend un interrupteur électronique commandable 30 et une diode 32 connectée en antiparallèle assurant ainsi des trajets de circulation bidirectionnelle de courant. Chaque interrupteur 30 est par exemple formé d’un transistor bipolaire à grille isolée, également appelé transistor IGBT (de l’anglais « Insulated Gate Bipolar Transistor »). Tous les transistors IGBT 30 sont, par exemple, identiques. La grille de chaque transistor IGBT 30 est reliée au système de pilotage 6 pour recevoir un signal de commande correspondant. En variante, le transistor IGBT 30 est remplacé par tout composant électronique semi-conducteur comprenant une électrode de commande et deux électrodes de conduction, tel qu’un transistor bipolaire, un transistor à effet de champ, un thyristor, un thyristor à extinction par la gâchette, un thyristor IGCT (de l’anglais « Insulated Gate Commutated Thysistor »), ou un thyristor MCT (de l’anglais « MOS Controlled Thyristor ») par exemple.As known per se, each switching member 28 is bidirectional in current and unidirectional in voltage. Each switching member 28 comprises a controllable electronic switch 30 and a diode 32 connected in antiparallel, thus ensuring bidirectional current flow paths. Each switch 30 is for example formed by an insulated gate bipolar transistor, also called an IGBT transistor (from the English “Insulated Gate Bipolar Transistor”). All the IGBT transistors 30 are, for example, identical. The gate of each IGBT transistor 30 is connected to the control system 6 to receive a corresponding control signal. Alternatively, the IGBT transistor 30 is replaced by any semiconductor electronic component comprising a control electrode and two conduction electrodes, such as a bipolar transistor, a field effect transistor, a thyristor, a gate-turn-off thyristor, an IGCT thyristor (from the English “Insulated Gate Commutated Thysistor”), or an MCT thyristor (from the English “MOS Controlled Thyristor”) for example.
Le bus de sortie 5 comporte deux demi-branches 5A, 5B reliées en série en une borne intermédiaire 34. Dans l’exemple de réalisation particulier de la
Outre l’unité de commande 29, le système de pilotage 6 comporte des moyens 26 de mesure d’au moins une grandeur relative à un courant propre à circuler dans le bus de tension continue 5. Dans un premier mode de réalisation de l’invention, correspondant à la configuration représentée sur la
Le procédé de détection de la présence ou de l’absence d’une ligne conductrice de neutre dans la source de tension électrique alternative multiphasée 7, mis en œuvre par le système 6 de pilotage du redresseur synchrone bidirectionnel 4, va maintenant être décrit.The method for detecting the presence or absence of a neutral conductor line in the multiphase alternating electric voltage source 7, implemented by the system 6 for controlling the bidirectional synchronous rectifier 4, will now be described.
On suppose que le redresseur synchrone bidirectionnel 4 est initialement dans une phase de pré-charge, au cours de laquelle aucun organe de commutation 28 n’est piloté par le système de pilotage 6 (le redresseur 4 fonctionne alors comme un pont de diodes, et la tension électrique délivrée sur le bus de tension continue 5 est amenée progressivement et naturellement à une valeur de tension intermédiaire). Après la phase de pré-charge, le redresseur synchrone bidirectionnel 4 entre ensuite dans une phase de charge « classique » au cours de laquelle le système de pilotage 6 pilote la commutation des organes de commutation 28 dans les branches 16, 18, 20 (et la tension électrique délivrée sur le bus de tension continue 5 est amenée progressivement de sa valeur intermédiaire à l’issue de la phase de pré-charge jusqu’à sa valeur nominale), une telle phase de charge n’étant pas détaillée par la suite.It is assumed that the bidirectional synchronous rectifier 4 is initially in a pre-charging phase, during which no switching member 28 is controlled by the control system 6 (the rectifier 4 then operates as a diode bridge, and the electrical voltage delivered on the DC voltage bus 5 is gradually and naturally brought to an intermediate voltage value). After the pre-charging phase, the bidirectional synchronous rectifier 4 then enters a “conventional” charging phase during which the control system 6 controls the switching of the switching members 28 in the branches 16, 18, 20 (and the electrical voltage delivered on the DC voltage bus 5 is gradually brought from its intermediate value at the end of the pre-charging phase to its nominal value), such a charging phase not being detailed subsequently.
En référence à la
Dans ce premier mode de réalisation de l’invention, le procédé comporte une étape suivante 42 au cours de laquelle le système 6 de pilotage du redresseur synchrone bidirectionnel 4 reçoit la mesure de l’amplitude efficace Ueff1et/ou de la fréquence f1de la tension fournie par la source de tension électrique alternative 7 à la fin de la phase de pré-charge du redresseur 4, ces deux mesures étant fournies par les systèmes de mesure tiers 11A, 11B.In this first embodiment of the invention, the method comprises a following step 42 during which the system 6 for controlling the bidirectional synchronous rectifier 4 receives the measurement of the effective amplitude U eff1 and/or of the frequency f 1 of the voltage supplied by the alternating electrical voltage source 7 at the end of the pre-charging phase of the rectifier 4, these two measurements being supplied by the third-party measurement systems 11A, 11B.
Le procédé comporte ensuite une étape suivante 44 au cours de laquelle le système 6 de pilotage du redresseur synchrone bidirectionnel 4 compare la valeur mesurée de l’amplitude et/ou de la fréquence de la tension dans le bus de tension continue 5 à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel 4 à une valeur seuil. Pour la comparaison des valeurs de tension, la valeur seuil de tension est typiquement comprise entre une première valeur égale à
A l’issue de l’étape de comparaison 44, si la valeur mesurée de la tension dans le bus de tension continue 5 à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel 4 est supérieure à la valeur seuil de tension et/ou si la valeur mesurée de la fréquence de la tension dans le bus de tension continue 5 à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel 4 est inférieure à la valeur seuil de fréquence, alors la présence d’une ligne conductrice de neutre N1 dans la source de tension électrique alternative 7 est détectée par le système de pilotage 6 au cours d’une étape finale 46 (comme c’est le cas dans la configuration illustrée à la
En effet, lorsqu’une ligne conductrice de neutre N1 est présente dans la source de tension électrique alternative 7 (comme c’est le cas dans la configuration illustrée à la figure 1), la tension dans le bus de tension continue 5 à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel 4 est sensiblement égale à
En référence à la
Le procédé comporte ensuite une étape suivante 52 au cours de laquelle le système 6 de pilotage du redresseur synchrone bidirectionnel 4 compare la première valeur de tension (mesurée au cours de la première sous-étape 50A) à la seconde valeur de tension (mesurée au cours de la seconde sous-étape 50B).The method then comprises a following step 52 during which the system 6 for controlling the bidirectional synchronous rectifier 4 compares the first voltage value (measured during the first sub-step 50A) with the second voltage value (measured during the second sub-step 50B).
A l’issue de l’étape de comparaison 52, si la première valeur de tension mesurée est distincte de la seconde valeur de tension mesurée, alors la présence d’une ligne conductrice de neutre N1 dans la source de tension électrique alternative 7 est détectée par le système de pilotage 6 au cours d’une étape finale 56. Sinon, le système de pilotage 6 détecte une absence de ligne conductrice de neutre dans la source de tension électrique alternative 7, au cours d’une étape finale 58.At the end of the comparison step 52, if the first measured voltage value is distinct from the second measured voltage value, then the presence of a neutral conductive line N1 in the AC electrical voltage source 7 is detected by the control system 6 during a final step 56. Otherwise, the control system 6 detects an absence of a neutral conductive line in the AC electrical voltage source 7, during a final step 58.
En effet, lorsqu’une ligne conductrice de neutre N1 est présente dans la source de tension électrique alternative 7, la valeur de la tension dans le bus de tension continue 5 à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel 4 subit un brusque « saut » lors de la fermeture de l’interrupteur électronique 14, du fait de la tension électrique présente sur la ligne de neutre N1.Indeed, when a neutral conductive line N1 is present in the AC electrical voltage source 7, the value of the voltage in the DC voltage bus 5 at the end of the pre-charging phase of the bidirectional synchronous rectifier 4 undergoes a sudden “jump” when the electronic switch 14 closes, due to the electrical voltage present on the neutral line N1.
Grâce au procédé de détection selon l’invention, le système 6 de pilotage du redresseur synchrone bidirectionnel 4 est capable de déterminer de manière autonome et précise si une ligne conductrice de neutre N1 est présente dans la source de tension électrique alternative multiphasée 7, et ce sans aucune communication avec une éventuelle borne ou station de recharge électrique reliée à la source de tension 7.
Thanks to the detection method according to the invention, the system 6 for controlling the bidirectional synchronous rectifier 4 is capable of determining autonomously and precisely whether a neutral conductor line N1 is present in the multiphase alternating electric voltage source 7, and this without any communication with a possible electrical charging station or terminal connected to the voltage source 7.
Claims (9)
- une étape de mesure (40 ; 50) d’au moins une première grandeur relative à un courant circulant dans le bus de tension continue (5) à la fin d’une phase de pré-charge du redresseur synchrone bidirectionnel (4), au cours de laquelle aucun organe de commutation (28) n’est piloté par le système de pilotage (6), ladite étape de mesure (40 ; 50) fournissant une première grandeur mesurée ;
- une étape de réception (42 ; 50B) d’au moins une deuxième grandeur mesurée à la fin de la phase de pré-charge du redresseur synchrone bidirectionnel (4) ;
- une étape de comparaison (44 ; 52) de ladite au moins une première grandeur mesurée à une valeur seuil basée sur ladite au moins une deuxième grandeur mesurée ; et
- en fonction du résultat de la comparaison (44 ; 52), une étape de détection (46, 48 ; 56, 58) de la présence ou de l’absence d’une ligne conductrice de neutre (N1) dans la source de tension électrique alternative multiphasée (7).
- a step of measuring (40; 50) at least a first quantity relating to a current flowing in the direct voltage bus (5) at the end of a pre-charging phase of the bidirectional synchronous rectifier (4), during which no switching member (28) is controlled by the control system (6), said measuring step (40; 50) providing a first measured quantity;
- a reception step (42; 50B) of at least a second quantity measured at the end of the pre-charging phase of the bidirectional synchronous rectifier (4);
- a step of comparing (44; 52) said at least one first measured quantity to a threshold value based on said at least one second measured quantity; and
- depending on the result of the comparison (44; 52), a step of detecting (46, 48; 56, 58) the presence or absence of a neutral conductive line (N1) in the multiphase alternating electric voltage source (7).
Electric or hybrid vehicle, in particular an automobile, characterized in that it comprises an electric charger according to claim 8.
Priority Applications (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR2305948A FR3150056A1 (en) | 2023-06-13 | 2023-06-13 | METHOD FOR DETECTING THE PRESENCE OR ABSENCE OF A NEUTRAL CONDUCTOR LINE IN A MULTIPHASE ALTERNATING ELECTRIC VOLTAGE SOURCE |
PCT/EP2024/065869 WO2024256310A1 (en) | 2023-06-13 | 2024-06-10 | Method for detecting the presence or absence of a neutral conductive line in a multiphase ac voltage source |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR2305948 | 2023-06-13 | ||
FR2305948A FR3150056A1 (en) | 2023-06-13 | 2023-06-13 | METHOD FOR DETECTING THE PRESENCE OR ABSENCE OF A NEUTRAL CONDUCTOR LINE IN A MULTIPHASE ALTERNATING ELECTRIC VOLTAGE SOURCE |
Publications (1)
Publication Number | Publication Date |
---|---|
FR3150056A1 true FR3150056A1 (en) | 2024-12-20 |
Family
ID=88413206
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR2305948A Pending FR3150056A1 (en) | 2023-06-13 | 2023-06-13 | METHOD FOR DETECTING THE PRESENCE OR ABSENCE OF A NEUTRAL CONDUCTOR LINE IN A MULTIPHASE ALTERNATING ELECTRIC VOLTAGE SOURCE |
Country Status (2)
Country | Link |
---|---|
FR (1) | FR3150056A1 (en) |
WO (1) | WO2024256310A1 (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5485413B2 (en) * | 2010-12-14 | 2014-05-07 | 本田技研工業株式会社 | vehicle |
US20170117749A1 (en) * | 2014-06-27 | 2017-04-27 | Huawei Technologies Co., Ltd. | Three-Phase Uninterruptible Power Supply Control Method and Apparatus, and Three-Phase Uninterruptible Power Supply |
US20170131341A1 (en) * | 2013-10-08 | 2017-05-11 | Rockwell Automation Technologies, Inc. | System and method for ground fault detection |
DE102019131410A1 (en) * | 2019-11-21 | 2021-05-27 | Ebm-Papst Mulfingen Gmbh & Co. Kg | Device for efficient network-type-independent intermediate circuit processing |
CN114717604A (en) * | 2022-03-17 | 2022-07-08 | 北京雷动智创科技有限公司 | Bipolar water electrolysis hydrogen production device and control method thereof |
-
2023
- 2023-06-13 FR FR2305948A patent/FR3150056A1/en active Pending
-
2024
- 2024-06-10 WO PCT/EP2024/065869 patent/WO2024256310A1/en unknown
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP5485413B2 (en) * | 2010-12-14 | 2014-05-07 | 本田技研工業株式会社 | vehicle |
US20170131341A1 (en) * | 2013-10-08 | 2017-05-11 | Rockwell Automation Technologies, Inc. | System and method for ground fault detection |
US20170117749A1 (en) * | 2014-06-27 | 2017-04-27 | Huawei Technologies Co., Ltd. | Three-Phase Uninterruptible Power Supply Control Method and Apparatus, and Three-Phase Uninterruptible Power Supply |
DE102019131410A1 (en) * | 2019-11-21 | 2021-05-27 | Ebm-Papst Mulfingen Gmbh & Co. Kg | Device for efficient network-type-independent intermediate circuit processing |
CN114717604A (en) * | 2022-03-17 | 2022-07-08 | 北京雷动智创科技有限公司 | Bipolar water electrolysis hydrogen production device and control method thereof |
Also Published As
Publication number | Publication date |
---|---|
WO2024256310A1 (en) | 2024-12-19 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0654887B1 (en) | Uninterruptible power supply with common neutral line comprising a double boost switching converter | |
EP3105845B1 (en) | Dc voltage supply system configured to precharge a smoothing capacitor before supplying a load | |
EP2695279B1 (en) | Charge transfer device and associated management method | |
FR2943188A1 (en) | FAST CHARGING DEVICE FOR AN ELECTRIC VEHICLE. | |
EP3053247B1 (en) | System and method for charging a traction battery limiting the current draw of parasitic capacitances | |
FR3000322A1 (en) | DEVICE FOR PROTECTING AN ELECTRONIC OVERCURRENT OF AT LEAST ONE ELECTRONIC SWITCHING BRANCH, A CONVERSION SYSTEM COMPRISING SUCH A PROTECTIVE DEVICE, AND A CONTROL METHOD THEREFOR | |
EP3707815B1 (en) | Method for controlling a three-phase vienna rectifier when a power switch is faulty | |
EP3389175B1 (en) | Conversion device, associated control method and vehicle | |
EP3183795B1 (en) | Battery charger for high-integration electric or hybrid motor vehicle | |
EP3412500B1 (en) | Method of exchanging electrical energy between an electrical network conveying a dc or ac electrical quantity and an electrical energy storage unit for hybrid or electric vehicle | |
FR3150056A1 (en) | METHOD FOR DETECTING THE PRESENCE OR ABSENCE OF A NEUTRAL CONDUCTOR LINE IN A MULTIPHASE ALTERNATING ELECTRIC VOLTAGE SOURCE | |
FR2961966A1 (en) | METHOD OF CHARGING ACCUMULATION MEANS AND CORRESPONDING CHARGE DEVICE | |
EP3539203B1 (en) | Method for controlling a three-phase rectifier for a charging device on board an electrical or hybrid vehicle | |
EP4315577A1 (en) | Title: isolated voltage converter | |
EP3082241B1 (en) | Battery charger, electrical installation and motor vehicle | |
EP4014309B1 (en) | Inductive holding circuit | |
EP3047562B1 (en) | Device for charging an automotive vehicle battery making it possible to compensate for the harmonics, automotive vehicle furnished with such a charging device and corresponding method of charging | |
FR3150665A1 (en) | METHOD FOR CONTROLLING A CONVERTER FROM A FIRST ELECTRICAL VOLTAGE TO A SECOND ELECTRICAL VOLTAGE | |
FR3053174A1 (en) | METHOD FOR GENERATING A SHORT-CIRCUIT CURRENT FOR TRIGGERING AN ELECTRICAL PROTECTION ELEMENT | |
EP4068601A1 (en) | Isolated voltage converter | |
WO2025098899A1 (en) | Control device for a three-phase rectifier | |
FR3083391A1 (en) | METHOD FOR DIAGNOSING A POWER BRIDGE CONNECTED TO A ROTATING ELECTRIC MACHINE | |
FR3069110A1 (en) | METHOD FOR CONTROLLING A PLURALITY OF ACCUMULATORS | |
FR3083390A1 (en) | METHOD FOR DIAGNOSING A POWER BRIDGE CONNECTED TO A ROTATING ELECTRIC MACHINE | |
FR3045241A1 (en) | IMPROVED RECHARGING DEVICE FOR RECHARGING AN ELECTRICAL EQUIPMENT, IN PARTICULAR AN ELECTRIC VEHICLE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 2 |
|
PLSC | Publication of the preliminary search report |
Effective date: 20241220 |
|
PLFP | Fee payment |
Year of fee payment: 3 |