[go: up one dir, main page]

FR3134589A3 - ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE - Google Patents

ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE Download PDF

Info

Publication number
FR3134589A3
FR3134589A3 FR2203413A FR2203413A FR3134589A3 FR 3134589 A3 FR3134589 A3 FR 3134589A3 FR 2203413 A FR2203413 A FR 2203413A FR 2203413 A FR2203413 A FR 2203413A FR 3134589 A3 FR3134589 A3 FR 3134589A3
Authority
FR
France
Prior art keywords
grid
width
assembly
projections
paving stone
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR2203413A
Other languages
French (fr)
Other versions
FR3134589B3 (en
Inventor
Jiri VITEK
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiri Vitek Cz
Original Assignee
Jv Projekt Vh S R O
Jv Projekt Vh SRO
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jv Projekt Vh S R O, Jv Projekt Vh SRO filed Critical Jv Projekt Vh S R O
Priority to FR2203413A priority Critical patent/FR3134589B3/en
Publication of FR3134589A3 publication Critical patent/FR3134589A3/en
Application granted granted Critical
Publication of FR3134589B3 publication Critical patent/FR3134589B3/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C2/00Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels
    • E04C2/30Building elements of relatively thin form for the construction of parts of buildings, e.g. sheet materials, slabs, or panels characterised by the shape or structure
    • E04C2/42Gratings; Grid-like panels
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/006Foundations for pavings made of prefabricated single units
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/20Pavings made of prefabricated single units made of units of plastics, e.g. concrete with plastics, linoleum
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C5/00Pavings made of prefabricated single units
    • E01C5/22Pavings made of prefabricated single units made of units composed of a mixture of materials covered by two or more of groups E01C5/008, E01C5/02 - E01C5/20 except embedded reinforcing materials
    • E01C5/223Pavings made of prefabricated single units made of units composed of a mixture of materials covered by two or more of groups E01C5/008, E01C5/02 - E01C5/20 except embedded reinforcing materials on prefabricated supporting or prefabricated foundation units, except coverings made of layers of similar elements
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C2201/00Paving elements
    • E01C2201/20Drainage details

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

Assemblage d'une grille d’infiltration en plastique et d'au moins un pavé, dans lequel la grille (9) est réalisée sous la forme d'une grille rectangulaire avec des cavités de forme cubique (10), dans lequel le cadre extérieur (11) de la grille (9) a une largeur (G') et les nervures intérieures (8) de la grille ont une largeur (H'), caractérisé en ce que le pavé (1) comprend une partie supérieure de marche (2) en forme de cube avec une surface supérieure (5), et sur la surface inférieure de laquelle sont réalisées quatre saillies (4), l'ensemble des saillies (4) étant décalé dans deux directions par rapport à la partie de marche (2) vers l'un de ses coins, de sorte que l'ensemble des saillies (4) est délimité par deux bords larges perpendiculaires adjacents (6), ayant la même largeur (G) et deux bords étroits (12) perpendiculaires adjacents opposés ayant la même largeur (H), les saillies (4) étant séparées par un espace interne (7) ayant une largeur (H) correspondant à la largeur (H') de la nervure interne (8) de la grille (9) augmentée du jeu pour l'insertion des pavés (1) dans les cavités (10) de la grille, la largeur (G) du bord large (6) étant supérieure à la largeur (h) du bord étroit (12) et, en même temps, la largeur (H) de l'espace (7) étant égale à la somme de deux fois la largeur (h) du bord étroit (12), la largeur (G) du bord large (6) du pavé (1) correspondant à la largeur (G') du cadre (11) de la grille (9). Figure pour l’abrégé : Fig 1Assembly of a plastic infiltration grid and at least one paving stone, in which the grid (9) is made in the form of a rectangular grid with cubic-shaped cavities (10), in which the outer frame (11) of the grid (9) has a width (G') and the interior ribs (8) of the grid have a width (H'), characterized in that the block (1) comprises an upper step part ( 2) in the shape of a cube with an upper surface (5), and on the lower surface of which four projections (4) are made, all of the projections (4) being offset in two directions relative to the step part ( 2) towards one of its corners, so that all of the projections (4) are delimited by two adjacent perpendicular wide edges (6), having the same width (G) and two adjacent opposite perpendicular narrow edges (12) having the same width (H), the projections (4) being separated by an internal space (7) having a width (H) corresponding to the width (H') of the internal rib (8) of the increased grid (9) of the clearance for inserting the blocks (1) into the cavities (10) of the grid, the width (G) of the wide edge (6) being greater than the width (h) of the narrow edge (12) and, at the same time time, the width (H) of the space (7) being equal to the sum of twice the width (h) of the narrow edge (12), the width (G) of the wide edge (6) of the block (1) corresponding to the width (G') of the frame (11) of the grid (9). Figure for abstract: Fig 1

Description

ASSEMBLAGE D’UNE GRILLE D’INFILTRATION EN PLASTIQUE ET D’AU MOINS UN PAVEASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE Domaine de la techniqueTechnical field

La solution technique concerne les pavés pour les grilles d’infiltration en plastique.The technical solution concerns the pavers for the plastic infiltration grids.

Actuellement, les pavés sont utilisés comme l'une des variantes du remplissage des cellules des grilles d’infiltration vendues sous la marque TTE, par exemple par Hübner & Lee.Currently, pavers are used as one of the variants of filling the cells of infiltration grids sold under the TTE brand, for example by Hübner & Lee.

Ces éléments peuvent être réalisés sous forme de gros gravier non compact, de gazon argileux recouvert d’herbe ou de bloc de béton. Il est important qu'il y ait un espace pour que l'eau puisse s'écouler entre la limite de la cavité et l'élément.These elements can be made in the form of large non-compact gravel, clay turf covered with grass or concrete block. It is important that there is space for water to drain between the cavity boundary and the element.

Si le remplissage est réalisé sous forme de pavé, il est inséré dans les cellules des grilles et aligné avec le niveau de la grille. Les grilles avec ce bloc de béton forment une surface pavée perméable et, avec la structure de support sous les grilles, qui peut être rendue perméable avec un effet de nettoyage suffisant, elles constituent un élément de construction efficace d'un système de drainage décentralisé selon les principes de la gestion des eaux pluviales. Ces surfaces perméables pavées constituent une solution avantageuse pour les parkings ordinaires, les trottoirs, les places ou les routes locales, car elles prétraitent les eaux de pluie tout en ayant une capacité d'absorption suffisante. L'inconvénient est que la surface supérieure des cubes existants n'est pas compacte, la grille en plastique est visible, ce qui n'est pas très esthétique.If the filling is made in the form of a tile, it is inserted into the grid cells and aligned with the grid level. The grids with this concrete block form a permeable paved surface and, together with the support structure under the grids, which can be made permeable with sufficient cleaning effect, they constitute an effective construction element of a decentralized drainage system according to the principles of rainwater management. These paved permeable surfaces are a beneficial solution for ordinary parking lots, sidewalks, squares or local roads, as they pre-treat rainwater while having sufficient absorption capacity. The disadvantage is that the top surface of the existing cubes is not compact, the plastic grid is visible, which is not very aesthetic.

Les structures de pavés dans les grilles plastiques peuvent remplacer les structures imperméables existantes en asphalte, en béton ou en pavés autobloquants dans des conditions appropriées et réduire de manière significative le ruissellement de surface vers les eaux de surface ou les égouts, tout en assurant le prétraitement et l'imprégnation du sous-sol.Paver structures in plastic grids can replace existing impervious structures made of asphalt, concrete or interlocking paving stones under appropriate conditions and significantly reduce surface runoff into surface waters or sewers, while providing pretreatment and impregnation of the subsoil.

L'objectif de la solution technique est de présenter un assemblage composé d'une grille d’infiltration en plastique et d'au moins un pavé qui répondrait aux exigences de la gestion des eaux de pluie et qui, une fois inséré dans la grille, formerait une surface compacte par le haut qui recouvrirait complètement la grille en plastique.The objective of the technical solution is to present an assembly composed of a plastic infiltration grid and at least one paving stone which would meet the requirements of rainwater management and which, once inserted into the grid, would form a compact surface from above which would completely cover the plastic grid.

L'essence de la solution techniqueThe essence of the technical solution

Les déficiences susmentionnées sont éliminées par l'assemblage d'une grille d’infiltration en plastique et d'au moins un pavé selon une solution technique dont l'essence est que le pavé est constitué d'une partie supérieure de marche en forme de cube avec une surface supérieure, et sur la surface inférieure de laquelle sont réalisées quatre saillies, l'assemblage des saillies étant repositionné dans deux directions par rapport à la partie de marche vers l'un de ses coins, de sorte que l'assemblage des saillies est délimité par deux bords larges perpendiculaires adjacents, ayant la même largeur, et deux bords étroits perpendiculaires adjacents opposés ayant la même largeur, les saillies étant séparées par un espace interne ayant une largeur égale à la largeur de la nervure intérieure de la grille augmentée du jeu pour l'insertion des cubes dans les cavités de la grille, où la largeur du bord large est supérieure à la largeur du bord étroit et où la largeur de l'espace est égale à la somme de deux fois la largeur du bord étroit, la largeur du bord large du cube étant égale à la largeur du cadre de la grille.The aforementioned deficiencies are eliminated by assembling a plastic infiltration grid and at least one paving stone according to a technical solution, the essence of which is that the paving stone consists of a cube-shaped upper step part with an upper surface, and on the lower surface of which four projections are made, the assembly of the projections being repositioned in two directions relative to the step part towards one of its corners, so that the assembly of the projections is delimited by two adjacent perpendicular wide edges, having the same width, and two opposite adjacent perpendicular narrow edges having the same width, the projections being separated by an internal space having a width equal to the width of the internal rib of the grid increased by game for inserting the cubes into the cavities of the grid, where the width of the wide edge is greater than the width of the narrow edge and where the width of the space is equal to the sum of twice the width of the narrow edge, the width of the wide edge of the cube being equal to the width of the grid frame.

Dans un mode de réalisation préféré, la surface supérieure de la partie de marche du cube est pourvue d'un ensemble de rainures qui se croisent.In a preferred embodiment, the upper surface of the walking portion of the cube is provided with a set of intersecting grooves.

Dans un mode de réalisation préféré, les rainures sur la surface supérieure du cube sont au nombre de quatre, régulièrement espacées, et se croisent à un angle de 90°.In a preferred embodiment, the grooves on the upper surface of the cube are four in number, regularly spaced, and intersect at an angle of 90°.

Dans un autre mode de réalisation préféré, les rainures sont au nombre de deux, se croisent au milieu à un angle de 90° et forment une croix symétrique, tandis que les quatre surfaces distinctes de la surface supérieure de la partie de marche du pavé qui en résultent sont gaufrées en imitation d'une surface de pierre grossièrement taillée.In another preferred embodiment, the grooves are two in number, intersect in the middle at an angle of 90° and form a symmetrical cross, while the four distinct surfaces of the upper surface of the walking part of the paving stone which The resulting stones are embossed in imitation of a roughly hewn stone surface.

Dans un autre mode de réalisation préféré, la surface supérieure de la partie de marche du pavé est solide et présente une surface avec un relief réalisé à l'imitation d'une surface de pierre finement ridée.In another preferred embodiment, the upper surface of the walking portion of the paver is solid and has a surface with a relief made in imitation of a finely wrinkled stone surface.

Dans un autre mode de réalisation préféré, les neuf surfaces distinctes de la surface supérieure de la partie de marche du pavé sont gaufrées en imitation d'une surface de pierre finement ridée.In another preferred embodiment, the nine distinct surfaces of the upper surface of the walking portion of the paver are embossed in imitation of a finely wrinkled stone surface.

Dans un autre mode de réalisation préféré, les saillies du pavé ont la forme de blocs identiques dont la forme et la taille correspondent à celles des cavités, de manière à ménager des espaces entre les saillies et les cavités pour permettre à l'eau de s'écouler.In another preferred embodiment, the projections of the paving stone are in the form of identical blocks whose shape and size correspond to those of the cavities, so as to provide spaces between the projections and the cavities to allow water to drain. 'flow out.

Exposé des dessinsPresentation of the drawings

La solution technique sera précisée au moyen de dessins dans lesquels :The technical solution will be specified by means of drawings in which:

est une vue en perspective du pavé dans le premier mode de réalisation selon la solution technique vue de dessus. is a perspective view of the paving stone in the first embodiment according to the technical solution seen from above.

est une vue en perspective du pavé de la vue de dessous. is a perspective view of the pavement of the bottom view.

est une vue en perspective du pavé dans le deuxième mode de réalisation. is a perspective view of the pad in the second embodiment.

est une vue en perspective du pavé dans le troisième mode de réalisation. is a perspective view of the pad in the third embodiment.

est une vue en perspective de l’assemblage du pavé et des grilles correspondantes. is a perspective view of the assembly of the block and the corresponding grids.

est une vue frontale du pavé du dessus. is a frontal view of the paving stone above.

est une vue frontale du pavé du dessus. is a frontal view of the paving stone above.

est une vue de l'assemblage des pavés insérés dans les grilles depuis le haut et en sections selon les lignes A-A et B-B. is a view of the assembly of the paving stones inserted into the grids from the top and in sections along lines AA and BB.

Exemple de mise en œuvre d'une solution techniqueExample of implementing a technical solution

La montre le pavé1selon la solution technique dans une vue en perspective depuis le haut. Le pavé 1 présente sur sa face supérieure une partie de marche 2 de forme carrée et cubique. La surface supérieure peut être généralement lisse, mais un certain relief limite la sécurité du glissement. Dans ce cas, sur la surface supérieure 5, le pavé 1 est pourvu d'un ensemble de rainures 3 se croisant mutuellement. Dans le cas présenté, il y a quatre rainures 3 à espacement régulier, se coupant les unes les autres à un angle de 90°. Toutefois, il est clair que la disposition des rainures 3 peut être quelconque. L'objectif des rainures 3 est de canaliser l'eau vers le bord de l'élément qui est espacé de l'élément suivant par une largeur d'espace d'environ 3 mm, de sorte que l'eau s'écoule vers le bas dans la grille de fond ouverte. Ceci est visible sur la . Dans le modèle présenté, la surface supérieure 5 est pourvue de neuf surfaces distinctes avec un relief réalisé à l'imitation d'une surface de pierre finement ridée.There shows block 1 according to the technical solution in a perspective view from the top. The block 1 has on its upper face a step part 2 of square and cubic shape. The upper surface may be generally smooth, but some relief limits sliding safety. In this case, on the upper surface 5, the block 1 is provided with a set of mutually crossing grooves 3. In the case presented, there are four regularly spaced grooves 3, intersecting each other at an angle of 90°. However, it is clear that the arrangement of the grooves 3 can be arbitrary. The purpose of the grooves 3 is to channel the water towards the edge of the element which is spaced from the next element by a gap width of approximately 3 mm, so that the water flows towards the down into the open bottom grill. This is visible on the . In the model presented, the upper surface 5 is provided with nine distinct surfaces with a relief made in imitation of a finely wrinkled stone surface.

La montre le pavé1dans une vue en perspective depuis le bas. On peut voir que sous la partie de marche 2, quatre saillies enfichables 4, chacune en forme de cube, sont disposées qui correspondent en taille et en forme aux ouvertures 10 dans la grille 9 de manière à fournir des espaces entre les saillies 4 et les cavités 10 pour le passage de l'eau. Ceci est à nouveau clairement visible dans la .There shows tile 1 in a perspective view from the bottom. It can be seen that under the step part 2, four plug-in projections 4, each cube-shaped, are arranged which correspond in size and shape to the openings 10 in the grille 9 so as to provide spaces between the projections 4 and the cavities 10 for the passage of water. This is again clearly visible in the .

La montre la deuxième variante du pavé1dans une vue de dessus en perspective, où toute la surface supérieure 5 est pourvue d'une surface pleine et d'un relief réalisé à l'imitation d'une surface de pierre finement ridée.There shows the second variant of the paving stone 1 in a perspective top view, where the entire upper surface 5 is provided with a solid surface and a relief made in imitation of a finely wrinkled stone surface.

La montre une troisième variante du pavé1dans une vue en perspective supérieure, où toute la surface supérieure est pourvue de deux rainures se croisant à 90°, formant une croix symétrique, tandis que la surface supérieure 5 des quatre surfaces séparées ainsi formées est pourvue d'un relief réalisé à l'imitation d'une surface de pierre grossièrement taillée.There shows a third variant of the block 1 in an upper perspective view, where the entire upper surface is provided with two grooves intersecting at 90°, forming a symmetrical cross, while the upper surface 5 of the four separate surfaces thus formed is provided with 'a relief made in imitation of a roughly cut stone surface.

Bien entendu, le relief de la surface supérieure5peut être réalisé de toute autre manière.Of course, the relief of the upper surface 5 can be produced in any other way.

La montre un assemblage de pavés1avec des grilles 9. Dans ce cas, il s'agit d'un assemblage de deux grilles 9. Les grilles 9 représentent un élément en plastique qui perméabilise et pré-nettoie l'eau dans le sous-sol. Selon la conception présentée, les grilles 9 représentent une solution avantageuse comme surface de marche ou de course pour les parkings, les trottoirs et autres voies de circulation. Les grilles 9 sont réalisées sous forme de grilles avec des cavités 10, qui sont pourvues de bords partiels dans le bas pour accueillir les éléments insérés. Les grilles 9 comportent généralement quatre rangées de huit cavités 10 et peuvent être empilées côte à côte en nombre quelconque en fonction des besoins de la zone à couvrir. La grille 9 comporte un cadre 11 sur sa circonférence et les différentes cavités 10 sont séparées les unes des autres par des nervures internes 8 qui partent du cadre 11. Les bords de la grille 9 ont une largeur de G' et les nervures intérieures 8 de la grille 9 ont une largeur de H'. Les coupes à travers la grille 9 le long de la ligne A-A et le long de la ligne B-B sont illustrées à la .There shows an assembly of paving stones 1 with grids 9. In this case, it is an assembly of two grids 9. The grids 9 represent a plastic element that permeabilizes and pre-cleans the water in the basement . According to the design presented, the grids 9 represent an advantageous solution as a walking or running surface for parking lots, sidewalks and other traffic routes. The grids 9 are made in the form of grids with cavities 10, which are provided with partial edges at the bottom to accommodate the inserted elements. The grids 9 generally have four rows of eight cavities 10 and can be stacked side by side in any number depending on the needs of the area to be covered. The grid 9 has a frame 11 on its circumference and the different cavities 10 are separated from each other by internal ribs 8 which start from the frame 11. The edges of the grid 9 have a width of G' and the interior ribs 8 of grid 9 have a width of H'. The cuts through grid 9 along line AA and along line BB are shown in .

La montre le pavé1dans une vue latérale frontale et la montre une vue inférieure du pavé 1. En particulier, on peut clairement voir sur la que les saillies 4 sont disposées de manière excentrée en tant que système par rapport à la partie de marche 2. Dans la vue présentée ici, l'assemblage des saillies est repositionné vers le haut et vers la droite, en direction de l'un des coins de la partie de marche 2. C'est-à-dire que les deux bords larges perpendiculaires adjacents 6 de la partie de marche 2 du pavé 1 ont la même largeur G, et ces largeurs G sont supérieures aux largeurs h des deux bords étroits perpendiculaires adjacents opposés 12. En outre, la largeur H de l'espace 7 entre toutes les saillies 4 adjacentes du pavé 1 correspond à la largeur H' de la nervure intérieure 8 de la grille 9 augmentée d'un jeu pour permettre aux saillies 4 du pavé 1 de s'adapter parfaitement aux cavités 10 de la grille 9 et pour permettre à l'eau de s'écouler. En même temps, la largeur H de l'espace 7 entre les saillies adjacentes 4 du pavé 1 est égale à la somme de deux fois la largeur h du bord étroit 12 et de l'espace nécessaire entre les différents pavés 1 ou les parties de marche 2 des pavés 1 pour permettre la formation d'un espace pour le passage de l'eau après leur assemblage dans la grille 9. La largeur G du bord large 6 du pavé 1 correspond à la largeur du cadre 11 de la grille 9 de largeur G'.There shows pad 1 in a front side view and the shows a lower view of block 1. In particular, we can clearly see on the that the projections 4 are arranged eccentrically as a system with respect to the step part 2. In the view presented here, the assembly of the projections is repositioned upwards and to the right, towards one of the corners of the step part 2. That is to say that the two adjacent perpendicular wide edges 6 of the step part 2 of the block 1 have the same width G, and these widths G are greater than the widths h of the two edges narrow opposite adjacent perpendiculars 12. In addition, the width H of the space 7 between all the adjacent projections 4 of the block 1 corresponds to the width H' of the interior rib 8 of the grid 9 increased by a clearance to allow the projections 4 of block 1 to adapt perfectly to the cavities 10 of grid 9 and to allow water to flow. At the same time, the width H of the space 7 between the adjacent projections 4 of the block 1 is equal to the sum of twice the width h of the narrow edge 12 and the space necessary between the different blocks 1 or the parts of step 2 of the blocks 1 to allow the formation of a space for the passage of water after their assembly in the grid 9. The width G of the wide edge 6 of the block 1 corresponds to the width of the frame 11 of the grid 9 of width G'.

En référence à la , une vue de l'assemblage de pavés1insérés dans la grille 9 est montrée par le haut et en sections le long des lignes A-A et B-B. Les pavés 1 sont insérés au nombre de huit dans la grille 9 en insérant les bords étroits 12 au centre du quartet respectif de pavés 1, tandis que les bords larges 6 des pavés 1 se trouvent sur les bords de la grille 9. Les pavés 1 adjacents sont donc orientés en miroir les uns par rapport aux autres. Il y a un espace entre les pavés 1, respectivement entre les parties de marche adjacentes 2. Sur la , on peut également voir, dans la coupe selon la ligne A-A, que la grille 9 comporte en son milieu un renfort 14 dont la largeur correspond à la somme de deux fois la largeur des bords larges des cubes 1 et du jeu 13 entre les pavés 1.In reference to the , a view of the assembly of paving stones 1 inserted in the grid 9 is shown from above and in sections along lines AA and BB. The blocks 1 are inserted eight in number in the grid 9 by inserting the narrow edges 12 in the center of the respective quartet of blocks 1, while the wide edges 6 of the blocks 1 are on the edges of the grid 9. The blocks 1 adjacent are therefore oriented in mirror relation to each other. There is a space between the paving stones 1, respectively between the adjacent walking parts 2. On the , we can also see, in the section along line AA, that the grid 9 has in its middle a reinforcement 14 whose width corresponds to the sum of twice the width of the wide edges of the cubes 1 and the clearance 13 between the blocks 1.

Dans l'assemblage des grilles9et des pavés1, les grilles9sont recouvertes de pavés1dont les parties de marche2forment une surface supérieure compacte, esthétiquement agréable. Un pavé1couvre ainsi 1/8 de la grille et est posé dans celle-ci de manière à laisser un espace entre les pavés pour que l'eau s'infiltre dans le sous-sol.In the assembly of the grids 9 and the blocks 1 , the grids 9 are covered with blocks 1 whose walking parts 2 form a compact, aesthetically pleasing upper surface. A paving stone 1 thus covers 1/8 of the grid and is placed in it so as to leave a space between the paving stones for water to infiltrate into the basement.

Cet assemblage de pavés1permettra de répondre plus efficacement aux exigences de gestion des eaux pluviales grâce au fait que l'eau de pluie :
. est infiltrée dans le sous-sol à travers la construction de la grille9et en particulier des pavés1,
. est pré-traitée d'une manière proche de la nature,
. est prête à s'infiltrer dans le sous-sol,
. est conservée dans une installation de rétention avec un écoulement régulé, l'eau filtrée assurant un fonctionnement et un entretien sans problème.
This assembly of paving stones 1 will make it possible to respond more effectively to rainwater management requirements thanks to the fact that rainwater:
. is infiltrated into the basement through the construction of the grid 9 and in particular the paving stones 1 ,
. is pre-treated in a way close to nature,
. is ready to infiltrate the basement,
. is kept in a retention facility with regulated flow, filtered water ensuring trouble-free operation and maintenance.

Claims (7)

Assemblage d'une grille d’infiltration en plastique et d'au moins un pavé, dans lequel la grille (9) est réalisée sous la forme d'une grille rectangulaire avec des cavités de forme cubique (10), dans lequel le cadre extérieur (11) de la grille (9) a une largeur (G') et les nervures intérieures (8) de la grille ont une largeur (H'),caractérisé en ce quele pavé (1) comprend une partie supérieure de marche (2) en forme de cube avec une surface supérieure (5), et sur la surface inférieure de laquelle sont réalisées quatre saillies (4), l'ensemble des saillies (4) étant décalé dans deux directions par rapport à la partie de marche (2) vers l'un de ses coins, de sorte que l'ensemble des saillies (4) est délimité par deux bords larges perpendiculaires adjacents (6), ayant la même largeur (G) et deux bords étroits (12) perpendiculaires adjacents opposés ayant la même largeur (H), les saillies (4) étant séparées par un espace interne (7) ayant une largeur (H) correspondant à la largeur (H') de la nervure interne (8) de la grille (9) augmentée du jeu pour l'insertion des pavés (1) dans les cavités (10) de la grille, la largeur (G) du bord large (6) étant supérieure à la largeur (h) du bord étroit (12) et, en même temps, la largeur (H) de l'espace (7) étant égale à la somme de deux fois la largeur (h) du bord étroit (12), la largeur (G) du bord large (6) du pavé (1) correspondant à la largeur (G') du cadre (11) de la grille (9).Assembly of a plastic infiltration grid and at least one paving stone, in which the grid (9) is made in the form of a rectangular grid with cubic-shaped cavities (10), in which the outer frame (11) of the grid (9) has a width (G') and the interior ribs (8) of the grid have a width (H'), characterized in that the block (1) comprises an upper step part ( 2) in the shape of a cube with an upper surface (5), and on the lower surface of which four projections (4) are made, all of the projections (4) being offset in two directions relative to the step part ( 2) towards one of its corners, so that all of the projections (4) are delimited by two adjacent perpendicular wide edges (6), having the same width (G) and two adjacent opposite perpendicular narrow edges (12) having the same width (H), the projections (4) being separated by an internal space (7) having a width (H) corresponding to the width (H') of the internal rib (8) of the increased grid (9) of the clearance for inserting the blocks (1) into the cavities (10) of the grid, the width (G) of the wide edge (6) being greater than the width (h) of the narrow edge (12) and, at the same time time, the width (H) of the space (7) being equal to the sum of twice the width (h) of the narrow edge (12), the width (G) of the wide edge (6) of the block (1) corresponding to the width (G') of the frame (11) of the grid (9). Assemblage de la grille d’infiltration en plastique et d'au moins un pavé selon la revendication 1,caractérisé en ce quela surface supérieure (5) de la partie de marche (2) du pavé (1) est pourvue d'un ensemble de rainures entrecroisées (3).Assembly of the plastic infiltration grid and at least one paving stone according to claim 1, characterized in that the upper surface (5) of the walking part (2) of the paving stone (1) is provided with an assembly of intersecting grooves (3). Assemblage d'une grille d’infiltration en plastique et d'au moins un pavé selon la revendication 2,caractérisé en ce queles rainures (3) sont au nombre de quatre à espacement régulier et se croisent à un angle de 90°.Assembly of a plastic infiltration grid and at least one paving stone according to claim 2, characterized in that the grooves (3) are four in number at regular spacing and intersect at an angle of 90°. Assemblage de la grille d’infiltration en plastique et d'au moins un pavé selon la revendication 2,caractérisé en ce queles rainures (3) sont au nombre de deux, se croisent au milieu à un angle de 90° et forment une croix symétrique, les quatre surfaces séparées résultantes de la surface supérieure (5) de la surface de marche (2) du pavé (1) étant pourvues d'un gaufrage imitant une surface de pierre grossièrement taillée.Assembly of the plastic infiltration grid and at least one paving stone according to claim 2, characterized in that the grooves (3) are two in number, intersect in the middle at an angle of 90° and form a cross symmetrical, the resulting four separate surfaces of the upper surface (5) of the walking surface (2) of the paving stone (1) being provided with an embossing imitating a roughly cut stone surface. Assemblage d'une grille d’infiltration en plastique et d'au moins un pavé selon la revendication 1,caractérisé en ce quela surface supérieure (5) de la partie de marche (2) du pavé (1) est pleine et pourvue d'une surface présentant un relief réalisé à l'imitation d'une surface de pierre finement ridée.Assembly of a plastic infiltration grid and at least one paving stone according to claim 1, characterized in that the upper surface (5) of the walking part (2) of the paving stone (1) is solid and provided with 'a surface presenting a relief made in imitation of a finely wrinkled stone surface. Assemblage de la grille d’infiltration en plastique et d'au moins un pavé selon la revendication 3,caractériséen ce que les neuf surfaces séparées résultantes de la surface supérieure (5) de la partie de marche (2) du pavé sont pourvues d'un gaufrage réalisé à l'imitation d'une surface de pierre finement plissée.Assembly of the plastic infiltration grid and at least one paving stone according to claim 3, characterized in that the resulting nine separate surfaces of the upper surface (5) of the walking part (2) of the paving stone are provided with 'an embossing made in imitation of a finely pleated stone surface. Assemblage d'une grille d’infiltration en matière plastique et d'au moins un pavé selon l'une quelconque des revendications précédentes,caractérisé en ce queles saillies (4) du pavé (1) ont la forme de blocs identiques correspondant en forme et en taille aux cavités (10) de la grille (9), de sorte que des espaces sont prévus entre les saillies (4) et les cavités (10) pour le passage de l'eau.Assembly of a plastic infiltration grid and at least one block according to any one of the preceding claims, characterized in that the projections (4) of the block (1) have the shape of identical blocks corresponding in shape and in size to the cavities (10) of the grid (9), so that spaces are provided between the projections (4) and the cavities (10) for the passage of water.
FR2203413A 2022-04-13 2022-04-13 ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE Active FR3134589B3 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR2203413A FR3134589B3 (en) 2022-04-13 2022-04-13 ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
FR2203413 2022-04-13
FR2203413A FR3134589B3 (en) 2022-04-13 2022-04-13 ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE

Publications (2)

Publication Number Publication Date
FR3134589A3 true FR3134589A3 (en) 2023-10-20
FR3134589B3 FR3134589B3 (en) 2024-04-12

Family

ID=88330473

Family Applications (1)

Application Number Title Priority Date Filing Date
FR2203413A Active FR3134589B3 (en) 2022-04-13 2022-04-13 ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE

Country Status (1)

Country Link
FR (1) FR3134589B3 (en)

Also Published As

Publication number Publication date
FR3134589B3 (en) 2024-04-12

Similar Documents

Publication Publication Date Title
FR2483484A1 (en) COATING TO PROTECT INCLINED SURFACES AGAINST WAVES AND FLOWING WATER EROSION
EP0607349B1 (en) Water retaining reservoir structure
FR2615877A1 (en) Paving stone made of concrete with polygonal or circular section
KR101333467B1 (en) Assemble Footpath Block Case
FR2713254A1 (en) Drain for collection and transfer of rain water from flat surface
FR3134589A3 (en) ASSEMBLY OF A PLASTIC INFILTRATION GRID AND AT LEAST ONE PAVE
DE3828209A1 (en) FIXED GROUND SURFACE
FR2616458A1 (en) ALVEOLED CONCRETE SLAB, IN PARTICULAR FOR COVERING PLANT SITES ON PUBLIC SITES
EP2712970B1 (en) Collapsible self-supporting modular structure and method for creating terraced vegetated and possibly pedestrian surfaces
FR2581101A1 (en) Prefabricated end part called bridge head limiting a crossing of a ditch
FR2515232A1 (en) CONSTRUCTION ELEMENT SUCH AS BRICK, PLATE, PAVER OR THE LIKE
EP1380689A1 (en) Interlocking concrete paving element
KR102252400B1 (en) Water retaining paver block
FR2708297A1 (en) Lawn pavers.
EP2851469B1 (en) Improved self-locking concrete tile
KR100888947B1 (en) Space pitcher block
EP4056756A1 (en) Module for filling cavity for honeycomb paving and honeycomb paving comprising such modules
FR2530692A1 (en) CONCRETE STONE AND PAVING THAT IT ALLOWS TO MAKE
BE817033A (en) SLABS INTENDED FOR THE FORMATION OF CHECKERS, ESPECIALLY CONCRETE-GRASS CHECKS.
KR20190132093A (en) Rainwater harvest, penetration, drainage curbs
EP3864221B1 (en) Device for producing a ground surface cover by embedding pavestones
BE526761A (en)
FR2596780A1 (en) Element for the formation of pavements
KR200404203Y1 (en) Drain block for water sink into
KR100505995B1 (en) Breast mounting structure

Legal Events

Date Code Title Description
PLFP Fee payment

Year of fee payment: 2

TP Transmission of property

Owner name: JIRI VITEK, CZ

Effective date: 20240205

PLFP Fee payment

Year of fee payment: 3