FR3003583B1 - METHOD FOR CONSOLIDATING A SOIL COVERING A TUNNEL - Google Patents
METHOD FOR CONSOLIDATING A SOIL COVERING A TUNNELInfo
- Publication number
- FR3003583B1 FR3003583B1 FR1352551A FR1352551A FR3003583B1 FR 3003583 B1 FR3003583 B1 FR 3003583B1 FR 1352551 A FR1352551 A FR 1352551A FR 1352551 A FR1352551 A FR 1352551A FR 3003583 B1 FR3003583 B1 FR 3003583B1
- Authority
- FR
- France
- Prior art keywords
- consolidating
- tunnel
- soil covering
- soil
- covering
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Excavating Of Shafts Or Tunnels (AREA)
Priority Applications (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1352551A FR3003583B1 (en) | 2013-03-21 | 2013-03-21 | METHOD FOR CONSOLIDATING A SOIL COVERING A TUNNEL |
PCT/FR2014/050649 WO2014147349A1 (en) | 2013-03-21 | 2014-03-20 | Method for consolidating the ground encasing a tunnel |
EP14716899.1A EP2976465B1 (en) | 2013-03-21 | 2014-03-20 | Method for consolidating the ground encasing a tunnel |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1352551A FR3003583B1 (en) | 2013-03-21 | 2013-03-21 | METHOD FOR CONSOLIDATING A SOIL COVERING A TUNNEL |
Publications (2)
Publication Number | Publication Date |
---|---|
FR3003583A1 FR3003583A1 (en) | 2014-09-26 |
FR3003583B1 true FR3003583B1 (en) | 2015-04-17 |
Family
ID=48570352
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1352551A Expired - Fee Related FR3003583B1 (en) | 2013-03-21 | 2013-03-21 | METHOD FOR CONSOLIDATING A SOIL COVERING A TUNNEL |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2976465B1 (en) |
FR (1) | FR3003583B1 (en) |
WO (1) | WO2014147349A1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107060841B (en) * | 2017-05-31 | 2023-04-07 | 天津大学 | A segmentation formula annular water retaining device for administering tunnel percolating water problem fast |
CN109469050A (en) * | 2018-12-25 | 2019-03-15 | 高永光 | Grout pile bottom is installed by hollow (hole) doughnut-shaped steel plate capsule (chamber) Post Grouting Technique |
CN111382473A (en) * | 2020-02-13 | 2020-07-07 | 浙江大学城市学院 | Method for predicting underground pipeline settlement caused by transverse crossing of shallow tunnel |
CN115316169B (en) * | 2022-07-11 | 2024-01-09 | 北京市政路桥股份有限公司 | Pot-type ancient tree protection structure and construction method using tunnel anchors for simultaneous construction |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102006044733C5 (en) * | 2006-09-20 | 2013-03-28 | Gta Maschinensysteme Gmbh | Mobile housing with jacking units |
-
2013
- 2013-03-21 FR FR1352551A patent/FR3003583B1/en not_active Expired - Fee Related
-
2014
- 2014-03-20 WO PCT/FR2014/050649 patent/WO2014147349A1/en active Application Filing
- 2014-03-20 EP EP14716899.1A patent/EP2976465B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
EP2976465B1 (en) | 2017-05-03 |
EP2976465A1 (en) | 2016-01-27 |
WO2014147349A1 (en) | 2014-09-25 |
FR3003583A1 (en) | 2014-09-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
HRP20181540T1 (en) | Pavement system with geocell and geogrid and method for installing a pavement system | |
FR3006059B1 (en) | METHOD FOR MANAGING A RADAR-MIMO | |
EP2975273A4 (en) | Hydraulic system for construction machine | |
LT3815490T (en) | System and method for monitoring soil moisture of a trench | |
FI20135922L (en) | Method for forming a fibrous product | |
EP3004460A4 (en) | Roller plow assembly for concrete screeding machine | |
GB2512348B (en) | A Shuttering System for Excavations | |
FR3008507B1 (en) | METHOD FOR MODELING A NON-AXISYMETRIC SURFACE | |
EP2949948A4 (en) | Hydraulic driving device for construction machine | |
DK3017139T3 (en) | UNDERGROUND INTERVENTION SYSTEM | |
ZA201603954B (en) | Self-propelled work machine | |
HK1204024A1 (en) | Method for consolidating soil | |
FR3009415B1 (en) | METHOD FOR ADAPTING A GEOLOGICAL REPRESENTATION OF A BASEMENT | |
KR101363436B9 (en) | Under earth penetration type rainwater suppling apparatus | |
FR3003583B1 (en) | METHOD FOR CONSOLIDATING A SOIL COVERING A TUNNEL | |
FR3009517B1 (en) | METHOD FOR FORMING A PERFORATED COMPOSITE PANEL | |
PL2868178T3 (en) | Agricultural soil roller | |
GB201304092D0 (en) | Improved collect connector for concrete piles | |
FR3016002B1 (en) | METHOD FOR OPERATING A WINDOW FOR A BUILDING | |
SG11201508749SA (en) | Portal site system | |
GB2518376B (en) | Improved pipe laying methods | |
FR3009005B1 (en) | SYSTEM AND METHOD FOR SEALING SOIL SOIL. | |
FR3003976B1 (en) | METHOD FOR DELIVERING A LOCATION ASSERTION | |
FR3015764B1 (en) | DOUBLE-GALETTE WINDING METHOD OF A DRIVER | |
SI2976467T1 (en) | Method for waterproofing underground structures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 4 |
|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
ST | Notification of lapse |
Effective date: 20191106 |