FR2979724B1 - Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer - Google Patents
Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forerInfo
- Publication number
- FR2979724B1 FR2979724B1 FR1102701A FR1102701A FR2979724B1 FR 2979724 B1 FR2979724 B1 FR 2979724B1 FR 1102701 A FR1102701 A FR 1102701A FR 1102701 A FR1102701 A FR 1102701A FR 2979724 B1 FR2979724 B1 FR 2979724B1
- Authority
- FR
- France
- Prior art keywords
- petroleum
- deposition
- operating
- selection technique
- wellbore positions
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 230000008021 deposition Effects 0.000 title 1
- 239000003208 petroleum Substances 0.000 title 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/30—Specific pattern of wells, e.g. optimising the spacing of wells
Landscapes
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Geology (AREA)
- Mining & Mineral Resources (AREA)
- Physics & Mathematics (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Priority Applications (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1102701A FR2979724B1 (fr) | 2011-09-06 | 2011-09-06 | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer |
EP12290268.7A EP2568110B1 (fr) | 2011-09-06 | 2012-08-07 | Procéde d'exploitation d'un gisement pétrolier à partir d'une technique de selection des positions des puits à forer |
US13/597,613 US9422800B2 (en) | 2011-06-09 | 2012-08-29 | Method of developing a petroleum reservoir from a technique for selecting the positions of the wells to be drilled |
CA2789537A CA2789537C (fr) | 2011-09-06 | 2012-09-04 | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1102701A FR2979724B1 (fr) | 2011-09-06 | 2011-09-06 | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer |
Publications (2)
Publication Number | Publication Date |
---|---|
FR2979724A1 FR2979724A1 (fr) | 2013-03-08 |
FR2979724B1 true FR2979724B1 (fr) | 2018-11-23 |
Family
ID=46651435
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
FR1102701A Expired - Fee Related FR2979724B1 (fr) | 2011-06-09 | 2011-09-06 | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer |
Country Status (4)
Country | Link |
---|---|
US (1) | US9422800B2 (fr) |
EP (1) | EP2568110B1 (fr) |
CA (1) | CA2789537C (fr) |
FR (1) | FR2979724B1 (fr) |
Families Citing this family (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN104885124A (zh) * | 2012-12-25 | 2015-09-02 | 因特维芯研究与发展有限公司 | 产生用于分析渗透性特征的多孔材料样本的三维特征模型的方法 |
FR3002270B1 (fr) * | 2013-02-21 | 2015-02-27 | Ifp Energies Now | Procede d'exploitation d'un reservoir geologique au moyen d'un modele de reservoir cale et coherent vis a vis des proprietes d'ecoulement |
ES2660432T3 (es) | 2013-06-06 | 2018-03-22 | Repsol, S.A. | Método para evaluar planes de estrategia de producción |
FR3023316B1 (fr) * | 2014-07-04 | 2016-08-19 | Ifp Energies Now | Procede d'exploitation d'un gisement petrolier a partir d'une technique de positionnement des puits a forer |
US10221659B2 (en) * | 2014-10-08 | 2019-03-05 | Chevron U.S.A. Inc. | Automated well placement for reservoir evaluation |
US10822922B2 (en) * | 2015-01-19 | 2020-11-03 | International Business Machines Corporation | Resource identification using historic well data |
CN106337679A (zh) * | 2015-07-10 | 2017-01-18 | 中国石油化工股份有限公司 | 测算井网加密潜力的新方法 |
WO2017053080A1 (fr) * | 2015-09-24 | 2017-03-30 | Schlumberger Technology Corporation | Évaluation de volume en subsurface |
US10060227B2 (en) * | 2016-08-02 | 2018-08-28 | Saudi Arabian Oil Company | Systems and methods for developing hydrocarbon reservoirs |
US12050981B2 (en) * | 2018-05-15 | 2024-07-30 | Landmark Graphics Corporation | Petroleum reservoir behavior prediction using a proxy flow model |
FR3101660B1 (fr) * | 2019-10-03 | 2021-10-08 | Ifp Energies Now | Procédé pour déterminer une trajectoire d'un puits dans un réservoir pétrolier |
RU2747019C1 (ru) * | 2020-06-18 | 2021-04-23 | Общество с ограниченной ответственностью "Тюменский нефтяной научный центр" (ООО "ТННЦ") | Способ обоснования технологического режима промысла |
Family Cites Families (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5757663A (en) * | 1995-09-26 | 1998-05-26 | Atlantic Richfield Company | Hydrocarbon reservoir connectivity tool using cells and pay indicators |
US6549879B1 (en) * | 1999-09-21 | 2003-04-15 | Mobil Oil Corporation | Determining optimal well locations from a 3D reservoir model |
CA2543801C (fr) * | 2004-01-30 | 2014-03-04 | Exxonmobil Upstream Research Company | Procedes de fabrication de modele de reservoir |
CA2705893A1 (fr) * | 2007-12-20 | 2009-07-02 | Shell Internationale Research Maatschappij B.V. | Procede pour produire des hydrocarbures par l'intermediaire d'un puits ou d'un groupe de puits dont la trajectoire est optimisee par un algorithme d'optimisation de trajectoire |
US7894991B2 (en) * | 2008-02-01 | 2011-02-22 | Schlumberger Technology Corp. | Statistical determination of historical oilfield data |
US10060245B2 (en) * | 2009-01-09 | 2018-08-28 | Halliburton Energy Services, Inc. | Systems and methods for planning well locations with dynamic production criteria |
US20120143577A1 (en) * | 2010-12-02 | 2012-06-07 | Matthew Szyndel | Prioritizing well drilling propositions |
-
2011
- 2011-09-06 FR FR1102701A patent/FR2979724B1/fr not_active Expired - Fee Related
-
2012
- 2012-08-07 EP EP12290268.7A patent/EP2568110B1/fr not_active Not-in-force
- 2012-08-29 US US13/597,613 patent/US9422800B2/en not_active Expired - Fee Related
- 2012-09-04 CA CA2789537A patent/CA2789537C/fr not_active Expired - Fee Related
Also Published As
Publication number | Publication date |
---|---|
CA2789537C (fr) | 2019-05-07 |
FR2979724A1 (fr) | 2013-03-08 |
EP2568110A1 (fr) | 2013-03-13 |
CA2789537A1 (fr) | 2013-03-06 |
US9422800B2 (en) | 2016-08-23 |
EP2568110B1 (fr) | 2018-12-05 |
US20130020131A1 (en) | 2013-01-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
FR2979724B1 (fr) | Procede d'exploitation d'un gisement petrolier a partir d'une technique de selection des positions des puits a forer | |
FR2987149B1 (fr) | Procede d'exploitation d'un gisement a partir d'une technique de selection des positions de puits a forer | |
EP2739792A4 (fr) | Fonctionnement automatisé d'une machine d'exploitation minière | |
EP2263107A4 (fr) | Procédé pour caractériser une formation géologique traversée par un forage | |
FR2966865B1 (fr) | Procede d'exploitation d'un gisement petrolier a partir d'un calage d'historique des donnees de production et de donnees sismiques. | |
BRPI1008278A2 (pt) | método para intensificar a recuperação de óleo cru de uma formação subterrânea porosa. | |
BRPI1011890A2 (pt) | métodos para operar um furo de poço, para produzir fluidos a partir de um furo de poço, para produzir fluidos a partir de um poço, para formar um poço em uma formação subterrânea, e para instalar equipamento de furo abaixo em um furo de poço | |
BR112014003504A2 (pt) | sistema para produzir fluidos a partir de um reservatório subterrâneo de hidrocarbonetos, e sistema produtor de fluidos a partir de um reservatório subterrâneo de hidrocarbonetos atravessado por um poço de injeção e um poço de produção | |
PL3533967T3 (pl) | Sposób serwisowania odwiertu | |
BR112014025522A2 (pt) | método para recuperar hidrocarbonetos de uma formação | |
AU2012294881A1 (en) | Methods for monitoring fluids within or produced from a subterranean formation during fracturing operations using opticoanalytical devices | |
FR3023316B1 (fr) | Procede d'exploitation d'un gisement petrolier a partir d'une technique de positionnement des puits a forer | |
SG11201502458WA (en) | Drilling method for drilling a subterranean borehole | |
FR2955697B1 (fr) | Procede de recuit d'une structure | |
EP2480756A4 (fr) | Procédé de régulation de production de fluide de puits de forage à l'aide de script | |
BR112013011429A2 (pt) | método para a recuperação de óleo a partir da biomassa | |
FR2997420B1 (fr) | Procede de croissance d'au moins un nanofil a partir d'une couche d'un metal de transition nitrure obtenue en deux etapes | |
EP2618079A4 (fr) | Procédé d'exploitation d'une machine de production de glace | |
DK2859062T3 (da) | Fremgangsmåde til hæmning af stenafsætning i en geologisk formation | |
EP2815054A4 (fr) | Procédé d'établissement d'un nouveau trajet de puits à partir d'un puits existant | |
GB2510267B (en) | A subsea wellhead assembly,a subsea installation using said wellhead assembly, and a method for completing a wellhead assembly | |
AP2014007728A0 (en) | Variable asset multiphase ejector for production recovery at the wellhead | |
FR2966531B1 (fr) | Procede de commande d'une turbomachine | |
GB2481594B (en) | A method of recovering a hydrocarbon mixture from a subterranean formation | |
FR2976015B1 (fr) | Composant tubulaire pour l'exploration d'un puits d'hydrocarbures |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PLFP | Fee payment |
Year of fee payment: 5 |
|
PLFP | Fee payment |
Year of fee payment: 6 |
|
PLFP | Fee payment |
Year of fee payment: 7 |
|
PLFP | Fee payment |
Year of fee payment: 8 |
|
PLFP | Fee payment |
Year of fee payment: 9 |
|
ST | Notification of lapse |
Effective date: 20210505 |