[go: up one dir, main page]

FR2789711A1 - Allocation case, and method, for inserting pipeline in slab of reinforced concrete has hollow body with top face sealed with cover, lateral side with aperture for protective barrel, and feet under box - Google Patents

Allocation case, and method, for inserting pipeline in slab of reinforced concrete has hollow body with top face sealed with cover, lateral side with aperture for protective barrel, and feet under box Download PDF

Info

Publication number
FR2789711A1
FR2789711A1 FR9901957A FR9901957A FR2789711A1 FR 2789711 A1 FR2789711 A1 FR 2789711A1 FR 9901957 A FR9901957 A FR 9901957A FR 9901957 A FR9901957 A FR 9901957A FR 2789711 A1 FR2789711 A1 FR 2789711A1
Authority
FR
France
Prior art keywords
box
slab
side wall
reservation
cover
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR9901957A
Other languages
French (fr)
Other versions
FR2789711B1 (en
Inventor
David Genevois
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ain-Corporation Fr
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to FR9901957A priority Critical patent/FR2789711B1/en
Publication of FR2789711A1 publication Critical patent/FR2789711A1/en
Application granted granted Critical
Publication of FR2789711B1 publication Critical patent/FR2789711B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/06Forms or shutterings for making openings, cavities, slits, or channels for cavities or channels in walls of floors, e.g. for making chimneys
    • E04G15/061Non-reusable forms
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G15/00Forms or shutterings for making openings, cavities, slits, or channels
    • E04G15/04Cores for anchor holes or the like around anchors embedded in the concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

Allocation case (1) has hollow body (2) comprising bottom face (3) with 3 feet (4); open top face (5) sealed with lid (6); lateral side (7) with apertures (8) where protective barrel for pipeline can be inserted; and rings (10) attaching case to slab armature. An Independent claim is also included for the method to insert pipeline in slab of reinforced concrete.

Description

L'invention concerne le domaine technique de l'incorporation deThe invention relates to the technical field of the incorporation of

canalisations diverses au sein d'éléments de gros oeuvre en béton coulé, in situ.  various pipes within structural elements of poured concrete, in situ.

L'invention se rapporte plus particulièrement au domaine de l'incorporation de  The invention relates more particularly to the field of the incorporation of

canalisations dans des dalles en béton armé.  pipes in reinforced concrete slabs.

Dans le domaine ci-dessus, il est connu de faire passer des canalisations électriques ou encore des tuyaux de circulation d'eau de chauffage à l'intérieur de gaines ou de fourreaux de protection qui sont disposés dans le coffrage de la dalle avant coulage du béton. Le plus généralement ces fourreaux doivent, après séchage du béton, être accessibles à partir d'une face supérieure ou inférieure de la dalle afin de permettre leur reprise pour les mettre en relation avec d'autres fourreaux et prolonger les canalisations qu'ils contiennent dans le cadre d'un réseau général de  In the above field, it is known to pass electrical conduits or pipes for circulating heating water inside sheaths or protective sleeves which are arranged in the formwork of the slab before pouring the concrete. Most generally, these sleeves must, after the concrete has dried, be accessible from an upper or lower face of the slab in order to allow them to be taken up in order to put them in contact with other sleeves and extend the pipes which they contain in as part of a general network of

communication, de chauffage ou de distribution d'énergie ou d'eau sanitaire.  communication, heating or distribution of energy or sanitary water.

Dans le cadre de l'incorporation de canalisations de circulation d'eau de chauffage ou sanitaire, qui constitue le domaine préféré d'application de l'invention, les gaines ou fourreaux de protection des canalisations doivent, pour leur reprise ultérieure, être accessibles à partir de la face supérieure de la dalle après séchage du béton. Dans ce domaine d'application préféré, il est connu d'insérer, dans un bloc de polystyrène, les extrémités des fourreaux, destinés à être incorporé dans la dalle de béton armé, afin d'en préserver la liberté en vue de leurs reprises à partir de la face supérieure de la dalle. Ce bloc de polystyrène, de forme générale sensiblement parallélépipédique, est disposé à l'intérieur du coffrage et fixé aux armatures préalablement au coulage du béton. Après séchage, le bloc de polystyrène est détruit et extrait à partir du dessus de la dalle, afin de libérer l'extrémité des fourreaux qu'il  In the context of the incorporation of pipes for circulation of heating or sanitary water, which constitutes the preferred field of application of the invention, the sheaths or sheaths for the protection of the pipes must, for their subsequent recovery, be accessible to from the upper face of the slab after the concrete has dried. In this preferred field of application, it is known to insert, into a block of polystyrene, the ends of the sleeves, intended to be incorporated in the reinforced concrete slab, in order to preserve their freedom with a view to their recovery at from the upper face of the slab. This block of polystyrene, of generally substantially parallelepipedal shape, is placed inside the formwork and fixed to the reinforcements before the concrete is poured. After drying, the polystyrene block is destroyed and extracted from the top of the slab, in order to free the end of the sheaths that it

renferme.contains.

Cette manière de procéder permet, effectivement, de préserver la liberté des extrémités d'un fourreau incorporé dans une dalle de béton et d'assurer  This procedure effectively allows the freedom of the ends of a sheath incorporated in a concrete slab to be preserved and ensures

l'accessibilité de ses extrémités à partir de la face supérieure de la dalle.  the accessibility of its ends from the upper face of the slab.

Toutefois, cette méthode présente un certain nombre d'inconvénients du fait de la nature du polystyrène utilisé. Un inconvénient réside dans la nécessité d'introduire à force l'extrémité du fourreau dans le polystyrène pour empêcher tout  However, this method has a number of drawbacks due to the nature of the polystyrene used. A disadvantage lies in the need to forcely insert the end of the sheath into the polystyrene to prevent any

contact direct entre cette extrémité et le béton constitutif de la dalle.  direct contact between this end and the concrete constituting the slab.

Un autre inconvénient tient à la fragilité et au caractère particulièrement déformable du bloc de polystyrène qui est susceptible de s'écraser au contact des armatures de sorte qu'il vient en appui contre le fond du coffrage. Or, lors du coulage du béton, compte tenu de la taille relativement importante des zones d'appui du bloc de polystyrène, ainsi que d'un encastrement relatif des armatures dans le polystyrène, le béton coulé n'est pas en mesure de venir englober les armatures ni même combler  Another drawback is due to the fragility and particularly deformable nature of the polystyrene block which is liable to be crushed in contact with the reinforcements so that it comes to bear against the bottom of the formwork. However, during the pouring of the concrete, given the relatively large size of the bearing zones of the polystyrene block, as well as a relative embedding of the reinforcements in the polystyrene, the poured concrete is not able to come to encompass the frames nor even fill

2 27897112 2789711

totalement l'espace compris entre le bloc de polystyrène et le fond du coffrage. Ainsi, après séchage de la dalle et décoffrage de cette dernière, il subsiste des éléments d'armature non complètement entourés de béton. De même, il existe des zones de la face inférieure de la dalle au niveau desquelles le bloc du polystyrène est plus ou moins visible. Il en résulte donc, tout d'abord, des zones de faiblesse de la dalle. En effet, même si le volume libéré par l'extraction du polystyrène est comblé par du béton, l'homogénéité de la dalle ne peut être totalement rétablie en raison de l'intervalle de temps espaçant le coulage initial de la dalle et le comblage de l'espace libéré par le retrait du bloc de polystyrène. De plus, même si la face inférieure de la dalle fait l'objet de réfections au niveau des défauts engendrés par le bloc de polystyrène, il n'est jamais possible d'obtenir un aspect visuel uniforme avec les parties  totally the space between the polystyrene block and the bottom of the formwork. Thus, after the slab has dried and the formwork has been stripped, there are still reinforcing elements not completely surrounded by concrete. Similarly, there are areas on the underside of the slab at which the block of polystyrene is more or less visible. This therefore results, first of all, in areas of weakness of the slab. Even if the volume released by the extraction of polystyrene is filled with concrete, the homogeneity of the slab cannot be fully restored due to the time interval between the initial pouring of the slab and the filling of the space freed up by the removal of the polystyrene block. In addition, even if the underside of the slab is being repaired at the level of the defects caused by the polystyrene block, it is never possible to obtain a uniform visual appearance with the parts.

de la face formées par le béton initialement coulé.  of the face formed by the initially poured concrete.

Un autre inconvénient, attaché à l'utilisation d'un bloc de polystyrène, tient au volume considérable de déchets que sa destruction et son extraction engendrent lors de la reprise des extrémités des fourreaux. En effet, la destruction d'un bloc de polystyrène crée un volume de déchets très nettement supérieur au volume initial du bloc. Il doit, également, être relevé que la destruction et l'extraction, effectuées de manière à ne laisser subsister, autant que faire se peut, aucun déchet de polystyrène dans la dalle, conformément aux normes de construction, demandent un temps relativement important, eu égard au nombre généralement élevé de blocs incorporés  Another drawback, attached to the use of a block of polystyrene, is due to the considerable volume of waste that its destruction and its extraction generate when the ends of the sleeves are taken up. Indeed, the destruction of a block of polystyrene creates a volume of waste very much greater than the initial volume of the block. It should also be noted that the destruction and extraction, carried out in such a way as to leave as far as possible, no polystyrene waste in the slab, in accordance with construction standards, requires a relatively long time, having considering the generally high number of blocks incorporated

dans une même dalle.in the same slab.

Il apparaît donc le besoin de disposer de moyens pour l'incorporation, dans une dalle de béton, de canalisations diverses qui autorisent une reprise des canalisations par la face supérieure de la dalle et qui remplissent au moins une fonction équivalente à celle du bloc de polystyrène tout en ne présentant aucun des inconvénients liés à la mise en oeuvre de ce dernier, notamment en ce qui concerne les difficultés d'introduction des extrémités de fourreau ainsi que la répartition uniforme  It therefore appears the need to have means for incorporating, into a concrete slab, various pipes which allow the pipes to be taken up by the upper face of the slab and which fulfill at least a function equivalent to that of the polystyrene block. while not having any of the drawbacks associated with the implementation of the latter, in particular as regards the difficulties of introducing the ends of the sheath as well as the uniform distribution

du béton coulé autour des armatures et sur toute la surface du fond du coffrage.  concrete poured around the reinforcements and over the entire surface of the bottom of the formwork.

Afin d'atteindre ces objectifs, l'invention concerne une boite de réservation destinée à être placée dans le coffrage d'une dalle de béton armé pour l'incorporation  In order to achieve these objectives, the invention relates to a reservation box intended to be placed in the formwork of a reinforced concrete slab for incorporation

dans la dalle de canalisations diverses.  in the slab of various pipes.

Selon l'invention, cette boite de réservation est caractérisée en ce qu'elle comporte un corps creux présentant: - un fond pourvu extérieurement d'au moins trois pieds d'appui sur le coffrage, - à l'opposé du fond, au niveau d'une face supérieure, une ouverture destinée à être obturée par un couvercle,  According to the invention, this reservation box is characterized in that it comprises a hollow body having: - a bottom provided externally with at least three support feet on the formwork, - opposite the bottom, at the level an upper face, an opening intended to be closed by a cover,

3 27897113 2789711

- une paroi latérale pourvue de moyen de passage pour au moins un fourreau de protection d'une canalisation,  - a side wall provided with passage means for at least one protective sleeve of a pipe,

- et des moyens d'accrochage de la boite sur les armatures de la dalle.  - And means for attaching the box to the frames of the slab.

L'invention concerne également un couvercle pour une telle boîte.  The invention also relates to a cover for such a box.

Un autre inconvénient attaché à l'utilisation de blocs de polystyrène, pour la création de volumes de réservation permettant la reprise des extrémités de fourreaux d'incorporation de canalisations dans une dalle de béton, réside dans le fait que, le plus souvent, la face supérieure du bloc de polystyrène se situe au-dessus du niveau supérieur de remplissage du béton liquide dans le coffrage. Il n'est alors pas possible de procéder, dans la région o dépasse le bloc de polystyrène, à une finition de la face supérieure de la dalle au moyen d'une truelle mécanique ou hélicoptère. Il faut donc procéder à la finition de cette région à la main, après séchage de la dalle et il  Another drawback attached to the use of polystyrene blocks, for the creation of reserve volumes allowing the recovery of the ends of sheaths for incorporating pipes into a concrete slab, lies in the fact that, most often, the face upper part of the polystyrene block is located above the upper filling level of the liquid concrete in the formwork. It is then not possible to proceed, in the region where the polystyrene block exceeds, a finishing of the upper face of the slab by means of a mechanical trowel or helicopter. It is therefore necessary to finish this region by hand, after drying the slab and it

en résulte alors un surcoût de main d'oeuvre.  this then results in additional labor costs.

Afin de remédier à ces inconvénients, l'invention concerne aussi un  In order to remedy these drawbacks, the invention also relates to a

procédé d'incorporation de canalisations diverses dans une dalle de béton armé.  process for incorporating various pipes into a reinforced concrete slab.

Selon l'invention, ce procédé est caractérisé en ce qu'il consiste, avant le coulage du béton, à: - disposer dans le coffrage au moins une boîte d'incorporation selon l'invention, de manière à placer les pieds de la boîte en appui sur le fond du coffrage, - régler, le cas échéant, la hauteur de la boîte pour que la face supérieure du couvercle et la partie supérieure du corps soient situées en dessous du niveau supérieur de coulage du béton, - accrocher la boîte aux armatures métalliques de la dalle, - introduire au moins un fourreau de protection d'une canalisation à l'intérieur de la boîte par les moyens de passage offerts par la paroi latérale de la boîte,  According to the invention, this method is characterized in that it consists, before pouring the concrete, in: - placing in the formwork at least one incorporation box according to the invention, so as to place the feet of the box resting on the bottom of the formwork, - adjust, if necessary, the height of the box so that the upper face of the cover and the upper part of the body are located below the upper level of concrete pouring, - hang the box on the metal reinforcements of the slab, - introduce at least one protective sheath of a pipe inside the box by the passage means offered by the side wall of the box,

- fermer la boîte au moyen d'un couvercle selon invention.  - close the box with a cover according to the invention.

Dans le même sens et selon une autre caractéristique de la boîte de réservation conforme à l'invention, chaque pied de cette dernière présente des moyens  In the same direction and according to another characteristic of the reservation box according to the invention, each foot of the latter has means

de réglage de sa hauteur.to adjust its height.

Diverses autres caractéristiques ressortent de la description faite, ci-  Various other characteristics emerge from the description given below.

dessous, en référence aux dessins annexés qui montrent, à titre d'exemples non limitatifs, des formes de réalisation et de mise en oeuvre de l'objet de l'invention La fig. 1 est une vue en perspective d'une forme de réalisation d'une boîte  below, with reference to the accompanying drawings which show, by way of nonlimiting examples, embodiments and implementation of the subject of the invention FIG. 1 is a perspective view of an embodiment of a box

de réservation selon l'invention.of reservation according to the invention.

La fig. 2 est une coupe schématique illustrant la mise en oeuvre selon un  Fig. 2 is a schematic section illustrating the implementation according to a

procédé conforme à l'invention de la boîte de réservation.  process in accordance with the invention of the reservation box.

4 27897114 2789711

La fig. 3 est une élévation, partiellement arrachée, d'un ensemble de boîtes  Fig. 3 is an elevation, partially broken away, of a set of boxes

conformes à l'invention.according to the invention.

La boîte de réservation selon l'invention, désignée dans son ensemble par la référence I à la fig. 1, comporte un corps 2 creux qui présente un fond 3 pourvu extérieurement d'au moins trois, et de préférence quatre, pieds 4 d'appui sur un coffrage comme cela apparaîtra par la suite. Le corps 2 présente, à l'opposé du fond 3, au niveau d'une face supérieure, une ouverture 5 destinée à être obturée par un couvercle 6. De manière préférée mais non nécessaire, l'ouverture 5 définit une embouchure dans laquelle le couvercle 6 est destiné à venir s'encastrer et s'immobiliser  The reservation box according to the invention, designated as a whole by the reference I in FIG. 1, comprises a hollow body 2 which has a bottom 3 provided externally with at least three, and preferably four, feet 4 of support on a formwork as will appear later. The body 2 has, opposite the bottom 3, at an upper face, an opening 5 intended to be closed by a cover 6. Preferably but not necessary, the opening 5 defines a mouth in which the cover 6 is intended to be fitted and immobilized

par coincement conique ou pyramidale.  by conical or pyramidal wedging.

Le corps 2 présente, entre son fond 3 et son ouverture 5, une paroi latérale 7 pourvue de moyens 8 de passage pour au moins un fourreau de protection d'une canalisation. Le corps creux 2 pourrait présenter toute forme extérieure appropriée à sa fonction et présente, de manière préférée, une forme sensiblement  The body 2 has, between its bottom 3 and its opening 5, a side wall 7 provided with passage means 8 for at least one protective sleeve of a pipe. The hollow body 2 could have any external shape suitable for its function and preferably has a substantially

hexaédrique, de sorte que la paroi latérale 7 comporte quatre faces 7,, 72, 73 et 74.  hexahedral, so that the side wall 7 has four faces 7 ,, 72, 73 and 74.

De manière préférée, une seule face 72 de la paroi latérale présente des moyens 8 pour le passage de plusieurs fourreaux de protection par exemple au moins trois. Bien entendu, cette face pourrait présenter des moyens 8 de passage pour un nombre supérieur ou inférieur de canalisations. De même, chacune des faces 73 à 74 de la paroi latérale 7 peuvent présenter de tels moyens 8 de passage pour un ou plusieurs  Preferably, a single face 72 of the side wall has means 8 for the passage of several protective sleeves, for example at least three. Of course, this face could have passage means 8 for a higher or lower number of pipes. Similarly, each of the faces 73 to 74 of the side wall 7 may have such passage means 8 for one or more

fourreaux de protection de canalisations.  pipe protection sleeves.

Les moyens de passage 8 sont, par exemple, constitués, pour chaque fourreau, par une région perforable aménagée dans la paroi latérale 7 pour présenter une moindre résistance à la rupture que le reste de la paroi latérale. De manière préférée mais non exclusive, cette région perforable définit une forme annulaire d'un diamètre inférieur ou égal au diamètre nominal du fourreau à y passer, de façon à permettre, après ouverture de la région perforable, un blocage relatif du fourreau par coincement. De même, la région perforable peut prédéfinir plusieurs diamètres de perçage pour autoriser l'usage, avec la boîte selon l'invention, de fourreaux de divers  The passage means 8 are, for example, constituted, for each sheath, by a perforable region arranged in the side wall 7 to have less resistance to rupture than the rest of the side wall. Preferably but not exclusively, this perforable region defines an annular shape with a diameter less than or equal to the nominal diameter of the sleeve to pass therein, so as to allow, after opening of the perforable region, relative locking of the sleeve by wedging. Similarly, the perforable region can predefine several drilling diameters to allow the use, with the box according to the invention, of sheaths of various

diamètres.diameters.

Les moyens 8 de passage pourraient être réalisés de toute autre manière appropriée, telle que par exemple un perçage directement exécuté dans la paroi latérale 7 et obturé au moyen d'un bouchon amovible réalisé, par exemple, dans un  The passage means 8 could be made in any other appropriate manner, such as for example a drilling directly executed in the side wall 7 and closed by means of a removable plug made, for example, in a

matériau élastiquement déformable.  elastically deformable material.

Le corps creux 2 présente également des moyens 10 d'accrochage de la boîte I sur les armatures d'une dalle dans laquelle la boîte I est destinée à être incorporée comme cela apparaîtra par la suite. Les moyens d'accrochagelo pourraient être réalisés de toutes manières appropriées et sont constitués, de manière préférée  The hollow body 2 also has means 10 for hooking the box I onto the reinforcements of a slab in which the box I is intended to be incorporated as will appear later. The attachment means could be carried out in any suitable manner and are constituted, in a preferred manner

27897112789711

mais non exclusive, sous la forme d'un anneau 10 pour le passage d'un lien. De manière préférée, la boite 1 comporte de tels moyens d'accrochage 10 au niveau du  but not exclusive, in the form of a ring 10 for the passage of a link. Preferably, the box 1 includes such attachment means 10 at the level of the

fond 3 et sensiblement dans le prolongement de chacune des faces latérales 7, à 74.  bottom 3 and substantially in the extension of each of the lateral faces 7, 74.

La boite I et le couvercle 6 sont réalisés en tous matériaux appropriés et, de préférence, en matière plastique injectée. Lorsque la boite I et son couvercle 6 sont réalisés en matière plastique, ils peuvent, bien entendu, comporter des nervures  The box I and the cover 6 are made of all suitable materials and, preferably, of injected plastic. When the box I and its cover 6 are made of plastic, they can, of course, include ribs

internes ou externes assurant une fonction de raidissement de leur structure.  internal or external ensuring a stiffening function of their structure.

Selon une forme de réalisation préférée mais non strictement nécessaire, chaque pied 4 comporte des moyens 15 pour le réglage de leur longueur ou hauteur et donc de la hauteur totale de la boîte. Ces moyens 15 sont, par exemple, constitués par au moins un repère définissant une hauteur de coupe du pied. Un tel repère pourrait également matérialiser une région de plus faible résistance au niveau de laquelle il serait possible de rompre le pied. Afin de pouvoir être facilement coupés tout en présentant une grande résistance, les pieds 4 présentent, de préférence mais non exclusivement une section droite transversale cruciforme. Dans le même sens, pour résister à des charges importantes appliquées sur le corps 2, les pieds s'inscrivent dans la projection du fond 3 et sont de préférence disposés dans le prolongement des angles formés par les faces latérales. Les moyens de réglage peuvent aussi être constitués pour chaque pied par une rallonge 16 destinée à venir s'adapter par emboîtement sur ou dans le pied 4 lorsque ce dernier ne présente pas une longueur ou  According to a preferred but not strictly necessary embodiment, each leg 4 has means 15 for adjusting their length or height and therefore the total height of the box. These means 15 are, for example, constituted by at least one mark defining a cutting height of the foot. Such a mark could also materialize a region of weaker resistance at the level of which it would be possible to break the foot. In order to be able to be easily cut while having great resistance, the legs 4 preferably, but not exclusively, have a cross-shaped cross section. In the same direction, to resist significant loads applied to the body 2, the feet are part of the projection of the bottom 3 and are preferably arranged in the extension of the angles formed by the side faces. The adjustment means can also be constituted for each foot by an extension 16 intended to be adapted by fitting on or in the foot 4 when the latter does not have a length or

hauteur suffisante.sufficient height.

La boîte 1 ainsi constituée est mise en oeuvre, conformément à l'invention, selon un procédé, plus particulièrement illustré à la fig. 2, d'incorporation de  The box 1 thus formed is implemented, in accordance with the invention, according to a process, more particularly illustrated in FIG. 2, incorporation of

canalisation diverses dans une dalle de béton armé.  various pipes in a reinforced concrete slab.

Avant coulage du béton et après mise en place d'un coffrage 20 et des armatures métalliques 21 de la dalle, la boîte I est disposée à l'intérieur du coffrage 20 de manière à placer ses pieds 4 en appui sur le fond dudit coffrage. La boîte 1 est immobilisée au moyen de liens 22 passés dans les moyens d'accrochage 10 et autour  Before pouring the concrete and after placing a formwork 20 and the metal reinforcements 21 of the slab, the box I is placed inside the formwork 20 so as to place its feet 4 resting on the bottom of said formwork. The box 1 is immobilized by means of links 22 passed through the attachment means 10 and around

des armatures métalliques 21.metal reinforcements 21.

Le cas échéant, la hauteur de la boîte I est réglée pour que la face supérieure du couvercle 6 adapté sur la boîte et la partie supérieure du corps 2 soient situées en dessous du niveau supérieur 23 de coulage du béton et donc de la face supérieure de la dalle finie. A cet effet, le réglage de la hauteur de la boîte est effectué, de préférence mais non exclusivement, en agissant sur la hauteur des pieds par la mise en oeuvre des moyens de réglage 15, 16 qui représentent une forme préférée de réalisation de l'invention. Il doit être noté que le réglage de la hauteur des pieds permet également un réglage de la distance séparant le fond 3 de la boîte du fond du  If necessary, the height of the box I is adjusted so that the upper face of the cover 6 fitted on the box and the upper part of the body 2 are located below the upper level 23 of concrete pouring and therefore of the upper face of the finished slab. To this end, the height of the box is adjusted, preferably but not exclusively, by acting on the height of the feet by the use of adjustment means 15, 16 which represent a preferred embodiment of the invention. It should be noted that the adjustment of the height of the feet also allows an adjustment of the distance separating the bottom 3 of the box from the bottom of the

6 27897116 2789711

coffrage 20 et aussi de la distance séparant le fond 3 de la boîte des armatures 21 de la dalle. Le réglage de la hauteur de la boîte est, de préférence mais non nécessairement, assuré de manière à laisser subsister, au-dessus du couvercle de la boîte, une faible épaisseur de béton qui sera facile à casser après séchage. Le procédé conforme à l'invention fait également intervenir une étape de passage d'au moins un fourreau 27 de protection d'une canalisation à l'intérieur de la  formwork 20 and also the distance separating the bottom 3 of the frame box 21 from the slab. The height of the box is preferably, but not necessarily, adjusted so as to leave a small thickness of concrete above the cover of the box which will be easy to break after drying. The method according to the invention also involves a step of passing at least one sheath 27 for protecting a pipe inside the

boîte par les moyens de passage 8 aménagés dans la paroi latérale 7 de cette dernière.  box by the passage means 8 arranged in the side wall 7 of the latter.

Après mise en place du fourreau 27, le couvercle 6 est adapté pour  After fitting the sheath 27, the cover 6 is adapted to

obturer l'ouverture 5 de la boite 1.  close the opening 5 of the box 1.

Le béton 28 destiné à former la dalle peut alors être coulé de manière que la boîte 1 s'y trouve entièrement noyée. Afin d'éviter des infiltrations de liquide trop importantes dans la boîte 1, le couvercle 6 est adapté sur le corps 2 de façon à ne pas s'en détacher sous l'effet de la poussée d'Archimède, de manière à assurer une certaine étanchéité. Dans le même sens, les moyens de passage 8 épousent suffisamment les  The concrete 28 intended to form the slab can then be poured so that the box 1 is completely embedded there. In order to avoid excessive liquid infiltration into the box 1, the cover 6 is fitted on the body 2 so as not to detach from it under the effect of Archimedes' push, so as to ensure a certain sealing. In the same direction, the passage means 8 sufficiently follow the

contours du fourreau 27 pour limiter de telles infiltrations.  contours of the sheath 27 to limit such infiltration.

Compte tenu de l'existence des pieds 4, la boîte est maintenue à une distance suffisante du fond du coffrage pour ne pas faire obstacle au passage du béton et au recouvrement complet du fond du coffrage. Dans le même sens, le faible volume relatif des pieds par rapport au volume existant entre le fond 3 et le coffrage 20 permet, lors du vibrage du béton, une répartition homogène de ce dernier sur toute la surface du coffrage de sorte que, après séchage et décoffrage, il n'apparaîtra pas de défaut de surface au niveau de la face inférieure de la dalle. De plus, les pieds 4 permettent de laisser subsister, entre le fond 3 de la boîte et les armatures métalliques 21, un espace suffisant pour permettre un entourage convenable des armatures 21 par le béton 28, de sorte que la cohérence de la dalle est préservée. De même, les pieds 4, en contact direct avec le fond du coffrage, empêchent tout affaissement de la boîte en cas de choc ou d'appui sur celle-ci. Ainsi, la boîte conforme à l'invention peut de manière avantageuse supporter la station d'un opérateur, pendant le coulage du béton  Given the existence of the feet 4, the box is kept at a sufficient distance from the bottom of the formwork so as not to obstruct the passage of the concrete and the complete covering of the bottom of the formwork. In the same direction, the small relative volume of the feet relative to the volume existing between the bottom 3 and the formwork 20 allows, during the vibration of the concrete, a homogeneous distribution of the latter over the entire surface of the formwork so that, after drying and formwork, there will be no surface defect at the underside of the slab. In addition, the feet 4 allow to leave, between the bottom 3 of the box and the metal frames 21, sufficient space to allow a suitable surrounding of the frames 21 by the concrete 28, so that the consistency of the slab is preserved . Likewise, the feet 4, in direct contact with the bottom of the formwork, prevent any collapse of the box in the event of an impact or of being pressed on it. Thus, the box according to the invention can advantageously support the station of an operator, during the pouring of the concrete.

par exemple, sans que son réglage ne soit altéré.  for example, without its setting being altered.

Par ailleurs, compte tenu du fait que la boîte I se trouve entièrement noyée dans le béton 28, il est possible de procéder à une finition de la dalle au moyen  Furthermore, given the fact that the box I is completely embedded in the concrete 28, it is possible to finish the slab by means

d'une truelle mécanique sans que la boîte 1 ne fasse obstacle à son fonctionnement.  with a mechanical trowel without the box 1 obstructing its operation.

Ainsi, la mise en oeuvre de la boîte de réservation, conforme à l'invention, permet de simplifier les opérations de finition de la dalle en n'imposant pas de reprise de la zone située à proximité de la boîte, comme cela est le cas lors de l'utilisation d'un bloc de  Thus, the implementation of the reservation box, in accordance with the invention, makes it possible to simplify the operations of finishing the slab by not imposing a recovery of the zone located near the box, as is the case when using a block of

polystyrène conformément à la pratique antérieure.  polystyrene in accordance with prior practice.

7 27897117 2789711

Après séchage du béton, il suffit, pour accéder à l'extrémité du fourreau 27 disposée dans la boîte, de briser le bouchon de béton 29, présentant une faible épaisseur, situé au-dessus du couvercle 6 puis de casser ce dernier pour accéder à l'espace interne de la boîte et libérer l'extrémité libre du fourreau 27. De manière préférée mais non strictement nécessaire le couvercle 6 présente à cette fin des zones de moindre résistance pour faciliter sa rupture. Il doit être noté que, de manière avantageuse, le bris du bouchon de béton 29 n'engendre qu'un faible volume de  After drying of the concrete, it suffices, to access the end of the sheath 27 disposed in the box, to break the concrete plug 29, having a small thickness, located above the cover 6 and then to break the latter to access the internal space of the box and freeing the free end of the sheath 27. Preferably but not strictly necessary, the cover 6 has for this purpose zones of less resistance to facilitate its breaking. It should be noted that, advantageously, the breakage of the concrete plug 29 generates only a small volume of

gravats facile à évacuer ou à réutiliser.  rubble easy to evacuate or reuse.

Après extraction de l'extrémité libre du fourreau 27 hors de la boîte 1, du béton est coulé à l'intérieur de celle-ci pour la remplir complètement et atteindre le niveau supérieur de la dalle. Il pourrait, également, être envisagé de refermer la boîte par un nouveau couvercle 6 présentant des caractéristiques de résistance conformes à la destination de la dalle. Dans le même sens, il pourrait être envisagé, lors de l'ouverture de la boîte de réservation 1, après séchage de la dalle, de ne pas briser le couvercle 6 afin de pouvoir replacer ce dernier après reprise de l'extrémité libre du fourreau 27. Dans ce dernier cas, le couvercle 6 présente des moyens pour le passage  After extraction of the free end of the sheath 27 from the box 1, concrete is poured inside the latter to fill it completely and reach the upper level of the slab. It could also be envisaged to close the box with a new cover 6 having resistance characteristics in accordance with the destination of the slab. In the same direction, it could be envisaged, when opening the reservation box 1, after drying of the slab, not to break the cover 6 so as to be able to replace the latter after recovery of the free end of the sheath 27. In the latter case, the cover 6 has means for passage

d'au moins un fourreau 27 hors de la boîte 1.  at least one sleeve 27 outside the box 1.

Selon la forme préférée d'exécution du procédé conforme à l'invention, le  According to the preferred embodiment of the process according to the invention, the

réglage de la hauteur de la boîte est effectué par réglage de la hauteur des pieds.  The height of the box is adjusted by adjusting the height of the feet.

Toutefois, le réglage de la hauteur de la boîte peut, également, être effectué par  However, the height of the box can also be adjusted by

l'adjonction de rehausses au niveau de l'embouchure de la boîte.  the addition of extensions at the mouth of the box.

Selon une caractéristique préférée de la boîte 1, le volume interne ouvert du corps 2 présente une forme complémentaire de celle du volume externe englobant les pieds 4 et une partie au moins de la paroi latérale 7 pour, comme le montre plus particulièrement la fig. 3, autoriser un emboîtement l'une dans l'autre d'au moins deux  According to a preferred characteristic of the box 1, the open internal volume of the body 2 has a shape complementary to that of the external volume including the feet 4 and at least part of the side wall 7 for, as shown more particularly in FIG. 3, authorize nesting into each other of at least two

boîtes de réservation I sensiblement identiques.  reservation boxes I substantially identical.

Cette caractéristique préférée de la boîte I permet, de manière avantageuse, d'assurer un empilement de plusieurs boites les unes dans les autres afin d'en diminuer le volume de stockage. Bien entendu les volumes internes et externes du corps 7 sont définis de manière à laisser subsister suffisamment de jeu pour permettre un emboîtement et un désemboîtement, sans effort important, des boîtes de  This preferred feature of the box I advantageously allows stacking of several boxes one inside the other in order to reduce the storage volume. Of course, the internal and external volumes of the body 7 are defined so as to leave sufficient clearance to allow nesting and disengagement, without significant effort, of the boxes of

réservation les unes dans les autres.  booking one inside the other.

A cette fin, le corps 2 présente, de manière préférée mais non exclusive, une forme tronc pyramidale convergeant vers le fond 3, et les pieds 4 s'inscrivent dans  To this end, the body 2 has, preferably but not exclusively, a pyramidal trunk shape converging towards the bottom 3, and the feet 4 are part of

le prolongement des quatre faces 71 à 74 de la paroi latérale 7.  the extension of the four faces 71 to 74 of the side wall 7.

Selon une autre caractéristique de l'invention, il est constitué un ensemble d'au moins deux et, de préférence, trois boites sensiblement identiques qui sont reliées  According to another characteristic of the invention, there is a set of at least two and, preferably, three substantially identical boxes which are connected

deux à deux, au niveau de leur paroi latérale, par au moins un pontet sécable 30.  two by two, at their side wall, by at least one breakable bridge 30.

8 27897118 2789711

L'ensemble ainsi constitué peut alors être mis en oeuvre dans les parties d'une dalle o  The assembly thus formed can then be implemented in the parts of a slab o

doit intervenir la reprise d'un ensemble de fourreaux incorporés dans la dalle.  must intervene the recovery of a set of sheaths incorporated in the slab.

L'ensemble de plusieurs boîtes, liées par des pontets sécables, présente, de plus, I'avantage de permettre de moduler facilement le volume d'incorporation disponible, en fonction des besoins spécifiques du chantier. En effet, des boîtes assemblées peuvent être utilisées, aussi bien ensemble que séparément, après rupture  The set of several boxes, linked by breakable bridges, also has the advantage of making it possible to easily adjust the volume of incorporation available, according to the specific needs of the site. Indeed, assembled boxes can be used, both together and separately, after rupture

des pontets.bridges.

L'invention n'est pas limitée aux exemples décrits et représentés, car  The invention is not limited to the examples described and shown, because

diverses modifications peuvent y être apportées sans sortir de son cadre.  various modifications can be made without departing from its scope.

9 27897119 2789711

Claims (11)

REVENDICATIONS:CLAIMS: 1. Boîte de réservation, destinée à être placée dans le coffrage (20) d'une dalle de béton armé pour l'incorporation dans la dalle de canalisations diverses, caractérisée en ce qu'elle comporte un corps creux (2) présentant: - un fond (3) pourvu extérieurement d'au moins trois pieds d'appui (4) sur le coffrage (20), - à l'opposé du fond (3), au niveau d'une face supérieure, une ouverture (5) destinée à être obturée par un couvercle (6), - une paroi latérale (7) pourvue de moyens (8) de passage pour au moins un fourreau (27) de protection d'une canalisation, - et des moyens (10) d'accrochage de la boite sur les armatures de la dalle.  1. Reservation box, intended to be placed in the formwork (20) of a reinforced concrete slab for incorporation into the slab of various pipes, characterized in that it comprises a hollow body (2) having: - a bottom (3) provided externally with at least three support feet (4) on the formwork (20), - opposite the bottom (3), at an upper face, an opening (5) intended to be closed by a cover (6), - a side wall (7) provided with means (8) for passage for at least one sheath (27) for protecting a pipeline, - and means (10) for hanging of the box on the slab reinforcement. 2. Boite de réservation selon la revendication 1, caractérisée en ce que les moyens de passage sont définis pour chaque fourreau par une région perforable aménagée dans la paroi latérale (7) pour présenter une moindre résistance à la rupture2. Reservation box according to claim 1, characterized in that the passage means are defined for each sheath by a perforable region arranged in the side wall (7) to have less resistance to breakage que le reste de la paroi latérale.than the rest of the side wall. 3. Boîte de réservation selon l'une des revendications 1 ou 2, caractérisée  3. Reservation box according to one of claims 1 or 2, characterized en ce que chaque pied (4) présente des moyens de réglage (15, 16) de sa hauteur.  in that each leg (4) has means for adjusting (15, 16) its height. 4. Boite de réservation selon l'une des revendications I à 3, caractérisée  4. Reservation box according to one of claims I to 3, characterized en ce que le volume interne ouvert du corps (2) présente une forme complémentaire de celle du volume externe englobant les pieds (4) et une partie au moins de la paroi latérale (7) pour autoriser un emboîtement, l'une dans l'autre, d'au moins deux boîtes  in that the open internal volume of the body (2) has a shape complementary to that of the external volume including the feet (4) and at least part of the side wall (7) to allow nesting, one in the other, at least two boxes de réservation (1) sensiblement identiques.  of reservation (1) substantially identical. 5. Boîte de réservation selon l'une des revendications là 4, caractérisée en  5. Reservation box according to one of claims there 4, characterized in ce que le corps (2) présente une forme extérieure sensiblement troncpyramidale  that the body (2) has a substantially truncpyramidal outer shape convergeant vers les pieds (4) de la boite.  converging towards the feet (4) of the box. 6. Couvercle pour une boite de réservation (I) selon l'une ou l'autre des  6. Lid for a reservation box (I) according to one or other of the revendications 1 à 5.claims 1 to 5. 7. Couvercle selon la revendication 6, caractérisé en ce qu'il est destiné à  7. Lid according to claim 6, characterized in that it is intended for s'encastrer dans l'embouchure de l'ouverture du corps (2) de la boîte.  fit into the mouth of the opening of the body (2) of the box. 8. Couvercle selon la revendication 6 ou 7, caractérisé en ce qu'il présente une face supérieure cassable pour autoriser un accès aisé à l'intérieur de la boîte (1)  8. Lid according to claim 6 or 7, characterized in that it has a breakable upper face to allow easy access to the interior of the box (1) après séchage de la dalle.after the slab has dried. 9. Rallonge de pied pour une boîte (1) selon la revendication 3, caractérisée en ce qu'elle est destinée à être emboîtée dans ou sur un pied (4) de la  9. Foot extension for a box (1) according to claim 3, characterized in that it is intended to be fitted into or on a foot (4) of the boîte, pour former des moyens de réglage de la hauteur dudit pied.  box, to form means for adjusting the height of said foot. 27897112789711 10. Ensemble d'au moins deux boîtes (1) selon l'une des revendications 1 à  10. Set of at least two boxes (1) according to one of claims 1 to , caractérisé en ce qu'elles sont liées au niveau de leur paroi latérale par au moins un  , characterized in that they are linked at the level of their side wall by at least one pontet sécable (30).breakable trigger guard (30). 11. Procédé d'incorporation de canalisations diverses dans une dalle de béton armé caractérisé en ce qu'il consiste, avant le coulage du béton, à: - disposer dans le coffrage au moins une boîte d'incorporation (1)  11. Method for incorporating various pipes into a reinforced concrete slab, characterized in that it consists, before pouring the concrete, in: - placing in the formwork at least one incorporation box (1) selon l'une des revendications 1 à 5, de manière à placer les pieds de  according to one of claims 1 to 5, so as to place the feet of la botte en appui sur le fond du coffrage, - régler, le cas échéant, la hauteur de la boîte (1) pour que la face supérieure du couvercle (6) et la partie supérieure du corps (2) soient situées en dessous du niveau supérieur de coulage du béton, - accrocher la boîte aux armatures métalliques (21) de la dalle, - introduire au moins un fourreau (27) de protection d'une canalisation à l'intérieur de la boite par les moyens de passage (8) offerts par la paroi latérale (7) de la boite, - fermer la boîte (1) au moyen d'un couvercle (6) selon l'une des  the boot resting on the bottom of the formwork, - adjust, if necessary, the height of the box (1) so that the upper face of the cover (6) and the upper part of the body (2) are located below the level concrete pouring upper, - hang the box on the metal reinforcements (21) of the slab, - introduce at least one sheath (27) to protect a pipe inside the box by the passage means (8) offered by the side wall (7) of the box, - close the box (1) by means of a cover (6) according to one of revendications 6 à 8.claims 6 to 8.
FR9901957A 1999-02-12 1999-02-12 RESERVATION BOX FOR THE INCORPORATION OF PIPES IN A CONCRETE SLAB AND ITS IMPLEMENTING METHOD Expired - Lifetime FR2789711B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR9901957A FR2789711B1 (en) 1999-02-12 1999-02-12 RESERVATION BOX FOR THE INCORPORATION OF PIPES IN A CONCRETE SLAB AND ITS IMPLEMENTING METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR9901957A FR2789711B1 (en) 1999-02-12 1999-02-12 RESERVATION BOX FOR THE INCORPORATION OF PIPES IN A CONCRETE SLAB AND ITS IMPLEMENTING METHOD

Publications (2)

Publication Number Publication Date
FR2789711A1 true FR2789711A1 (en) 2000-08-18
FR2789711B1 FR2789711B1 (en) 2001-05-04

Family

ID=9542165

Family Applications (1)

Application Number Title Priority Date Filing Date
FR9901957A Expired - Lifetime FR2789711B1 (en) 1999-02-12 1999-02-12 RESERVATION BOX FOR THE INCORPORATION OF PIPES IN A CONCRETE SLAB AND ITS IMPLEMENTING METHOD

Country Status (1)

Country Link
FR (1) FR2789711B1 (en)

Cited By (17)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2837514A1 (en) * 2002-03-21 2003-09-26 Philippe Gerard Blot Starter box for concrete slab comprises horizontal bottom with height adjustable feet, vertical walls one comprising cylindrical sleeve temporarily closed by opercule, and cover to form internal space
WO2003104587A1 (en) * 2002-06-11 2003-12-18 Thorsman & Co Ab Inscreed box for electrical floor installations
CN100422462C (en) * 2004-06-01 2008-10-01 邱则有 Enclosed case-like formwork
EP2009200A1 (en) * 2007-06-26 2008-12-31 Gripp Box for reserving a hollow space, in particular in a concrete slab.
FR2918090A1 (en) * 2007-06-26 2009-01-02 Gripp Soc Par Actions Simplifi Reservation box for determining hollow space in e.g. concrete slab, has lower wall presenting peripheral wall of shell extending downward beyond inclined sidewalls, and notch formed from side of lower surface of sidewalls
FR2924456A1 (en) * 2007-12-03 2009-06-05 Conception De Realisation Et D DEVICE AND METHOD FOR FORMING RESERVATION IN A CONCRETE SLAB
EP2339075A1 (en) * 2009-12-22 2011-06-29 Consolis Technology Oy Ab Method for making a floor slab element with drainage installation and the floor slab element
FR2974587A1 (en) * 2011-04-28 2012-11-02 Ain corp Method for incorporating pipes and fluid transporting boxes of e.g. gas distribution installation, in concrete slab, involves removing lids of boxes and introducing tube inside sleeve through its end, after solidification of concrete
EP2530220A1 (en) 2011-05-30 2012-12-05 Ain Corporation Removable reservation box for the installation of pipes in a concrete slab and method for implementing same
EP2843156A1 (en) 2013-08-29 2015-03-04 Mabamure Reservation box and methods for mounting such a box
FR3035902A1 (en) * 2015-05-07 2016-11-11 Philippe Blot CONNECTING BOX
DE102016109215A1 (en) * 2016-02-04 2017-08-10 Safet Hoxha Formwork protector with distributor
EP3219873A1 (en) 2016-03-18 2017-09-20 Ain Corporation Reservation box for incorporating pipelines suitable for being positioned on a frame
EP3272966A1 (en) * 2016-07-20 2018-01-24 Philippe Blot Junction box
FR3057004A1 (en) * 2016-10-05 2018-04-06 Siib SELF-LOCKING RESERVATION BOX AND METHOD OF USE
FR3118471A1 (en) 2020-12-29 2022-07-01 Ain Corporation Mounting base for a reservation box and method of manufacturing a pre-slab incorporating this base
CN115306149A (en) * 2022-08-12 2022-11-08 中交第四公路工程局有限公司 Pre-embedded casing for reserving pipeline holes in cast-in-place concrete floor

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3346230A (en) * 1964-07-15 1967-10-10 Accessories Mfg Corp Const Pipe sleeve
FR2269407A1 (en) * 1974-05-03 1975-11-28 Bassani Spa
FR2481728A1 (en) * 1980-05-05 1981-11-06 Cotard Didier Prefabricated concrete fencing post - includes fitting comprising rod extending across embedded casing with clips to reinforcing frame
FR2584440A1 (en) * 1985-07-05 1987-01-09 Moreau Pierre Socket for positioning a pipe during the pouring of reinforced concrete
CH660618A5 (en) * 1984-10-16 1987-05-15 Roland Favre Device for guiding tubes and/or pipes coming out of concrete slabs and its use
US4742585A (en) * 1987-05-01 1988-05-10 Logsdon Duane D Tub box
US5072911A (en) * 1990-07-03 1991-12-17 The Logsdon Foundation Barrier mold for forming openings in concrete structures

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3346230A (en) * 1964-07-15 1967-10-10 Accessories Mfg Corp Const Pipe sleeve
FR2269407A1 (en) * 1974-05-03 1975-11-28 Bassani Spa
FR2481728A1 (en) * 1980-05-05 1981-11-06 Cotard Didier Prefabricated concrete fencing post - includes fitting comprising rod extending across embedded casing with clips to reinforcing frame
CH660618A5 (en) * 1984-10-16 1987-05-15 Roland Favre Device for guiding tubes and/or pipes coming out of concrete slabs and its use
FR2584440A1 (en) * 1985-07-05 1987-01-09 Moreau Pierre Socket for positioning a pipe during the pouring of reinforced concrete
US4742585A (en) * 1987-05-01 1988-05-10 Logsdon Duane D Tub box
US5072911A (en) * 1990-07-03 1991-12-17 The Logsdon Foundation Barrier mold for forming openings in concrete structures

Cited By (24)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR2837514A1 (en) * 2002-03-21 2003-09-26 Philippe Gerard Blot Starter box for concrete slab comprises horizontal bottom with height adjustable feet, vertical walls one comprising cylindrical sleeve temporarily closed by opercule, and cover to form internal space
WO2003080960A1 (en) * 2002-03-21 2003-10-02 Blot Philippe Gerard Connector box for a concrete slab
WO2003104587A1 (en) * 2002-06-11 2003-12-18 Thorsman & Co Ab Inscreed box for electrical floor installations
CN100422462C (en) * 2004-06-01 2008-10-01 邱则有 Enclosed case-like formwork
EP2009200A1 (en) * 2007-06-26 2008-12-31 Gripp Box for reserving a hollow space, in particular in a concrete slab.
FR2918090A1 (en) * 2007-06-26 2009-01-02 Gripp Soc Par Actions Simplifi Reservation box for determining hollow space in e.g. concrete slab, has lower wall presenting peripheral wall of shell extending downward beyond inclined sidewalls, and notch formed from side of lower surface of sidewalls
FR2918091A1 (en) * 2007-06-26 2009-01-02 Gripp Soc Par Actions Simplifi BOX FOR RESERVATION OF A HOLLOW SPACE, IN PARTICULAR IN A CONCRETE SLAB
FR2924456A1 (en) * 2007-12-03 2009-06-05 Conception De Realisation Et D DEVICE AND METHOD FOR FORMING RESERVATION IN A CONCRETE SLAB
EP2067910A1 (en) 2007-12-03 2009-06-10 SCOREV-Société de Conception de Réalisation et de Vente Device and method for forming a recess in a concrete slab
EP2339075A1 (en) * 2009-12-22 2011-06-29 Consolis Technology Oy Ab Method for making a floor slab element with drainage installation and the floor slab element
FR2974587A1 (en) * 2011-04-28 2012-11-02 Ain corp Method for incorporating pipes and fluid transporting boxes of e.g. gas distribution installation, in concrete slab, involves removing lids of boxes and introducing tube inside sleeve through its end, after solidification of concrete
FR2976009A1 (en) * 2011-05-30 2012-12-07 Ain corp EXTRACTIBLE BOX FOR THE INCORPORATION OF PIPES IN A CONCRETE SLAB AND METHOD OF IMPLEMENTING THE SAME
EP2530220A1 (en) 2011-05-30 2012-12-05 Ain Corporation Removable reservation box for the installation of pipes in a concrete slab and method for implementing same
EP2843156A1 (en) 2013-08-29 2015-03-04 Mabamure Reservation box and methods for mounting such a box
FR3010109A1 (en) * 2013-08-29 2015-03-06 Mabamure BOX FOR RESERVATION AND METHODS OF ASSEMBLING SUCH A BOX
FR3035902A1 (en) * 2015-05-07 2016-11-11 Philippe Blot CONNECTING BOX
DE102016109215A1 (en) * 2016-02-04 2017-08-10 Safet Hoxha Formwork protector with distributor
DE102016109215B4 (en) * 2016-02-04 2020-03-19 Safet Hoxha Formwork cover with distributor
EP3219873A1 (en) 2016-03-18 2017-09-20 Ain Corporation Reservation box for incorporating pipelines suitable for being positioned on a frame
EP3272966A1 (en) * 2016-07-20 2018-01-24 Philippe Blot Junction box
FR3057004A1 (en) * 2016-10-05 2018-04-06 Siib SELF-LOCKING RESERVATION BOX AND METHOD OF USE
EP3306012A1 (en) * 2016-10-05 2018-04-11 SIIB France Self-locking reservation box and method for using same
FR3118471A1 (en) 2020-12-29 2022-07-01 Ain Corporation Mounting base for a reservation box and method of manufacturing a pre-slab incorporating this base
CN115306149A (en) * 2022-08-12 2022-11-08 中交第四公路工程局有限公司 Pre-embedded casing for reserving pipeline holes in cast-in-place concrete floor

Also Published As

Publication number Publication date
FR2789711B1 (en) 2001-05-04

Similar Documents

Publication Publication Date Title
FR2789711A1 (en) Allocation case, and method, for inserting pipeline in slab of reinforced concrete has hollow body with top face sealed with cover, lateral side with aperture for protective barrel, and feet under box
FR2546215A1 (en) TRAVERSEE FOR THE PASSAGE OF CONDUITS SUCH AS CABLES, PIPES, ETC. BY AN OPENING IN THE WALL AND DEVICE FOR MAKING AN INTERNAL SURFACE FOR SUCH A CROSS IN A CONCRETE WALL
EP2530220B1 (en) Removable reservation box for the installation of pipes in a concrete slab and method for implementing same
EP3029218B1 (en) Underground box for telecom cables
FR3033514A1 (en) PROCESS FOR MOLDING TUBULAR ELEMENTS IN MATERIAL COMPRISING CEMENT AND PIEU THUS OBTAINED
FR2949491A1 (en) Sheath passage reserving device for forming concrete wall of building during pouring of concrete in casing, has cup whose diameter is greater than diameter of tubular element, so as to form peripheral extension at level of cups
WO2003080960A1 (en) Connector box for a concrete slab
EP2563975B1 (en) Molded wall having prefabricated cladding
FR2926576A1 (en) Guiderail stud step device, has ballast housed in central cylindrical barrel whose weight is related to buoyancy of device in liquid concrete bath, where barrel is limited at one end by closed base and at another rend by opening
FR2530693A3 (en) Drainage gutter element intended for burying in the ground over its entire height.
FR2722818A1 (en) Temporary construction site storage bin for cable, pipe, etc.
FR2797288A1 (en) DEVICE FOUNDATION ANCHORED IN THE GROUND BY DAMAGE
EP2067910A1 (en) Device and method for forming a recess in a concrete slab
FR2524030A1 (en) Anchor head for progressively contracted composite tie rod - has truncated anchoring pin wedged into anchoring ring orifice
FR2732714A1 (en) Reinforced concrete panel for making tank and esp. slurry pit
FR3115308A1 (en) Method and device for fixing a metal corbel retaining a wall
EP1899555B1 (en) Means for access to a pool filled with water such as a swimming pool
EP1466673B1 (en) Method for decontaminating and demolishing cowpers
EP4063590A1 (en) Device for securing a construction accessory to tie bars, associated attachment method and construction element
FR2886710A1 (en) Molded hollow concrete unit e.g. septic tank, has lateral walls with one wall comprising opening that is sealed by removable rigid gate which maintains shape and position of joint and protects lip of joint
FR3148611A1 (en) Top and bottom hat leaf look
FR2623536A1 (en) Process for manufacture of a composite casting peephole and casting peephole
FR2771157A1 (en) Underground gas tank
FR3127774A1 (en) Reservation box for the incorporation of ducts with a central support leg
FR2471451A1 (en) Driving and casting procedure for bulbous foot piles - uses concrete rammer inside pile tube with projection above tube being equal to volume of concrete cast

Legal Events

Date Code Title Description
CL Concession to grant licences
TP Transmission of property

Owner name: AIN-CORPORATION, FR

Effective date: 20120607

PLFP Fee payment

Year of fee payment: 18

PLFP Fee payment

Year of fee payment: 19

PLFP Fee payment

Year of fee payment: 20