FR2775998A1 - Method of construction of prefabricated building - Google Patents

Method of construction of prefabricated building Download PDF

Info

Publication number
FR2775998A1
FR2775998A1 FR9803400A FR9803400A FR2775998A1 FR 2775998 A1 FR2775998 A1 FR 2775998A1 FR 9803400 A FR9803400 A FR 9803400A FR 9803400 A FR9803400 A FR 9803400A FR 2775998 A1 FR2775998 A1 FR 2775998A1
Authority
FR
France
Prior art keywords
wall elements
foundation
metal
elements
reinforcements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
FR9803400A
Other languages
French (fr)
Other versions
FR2775998B1 (en
Inventor
Gerard Ganne
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
GERARD GANNE SARL
Original Assignee
GERARD GANNE SARL
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by GERARD GANNE SARL filed Critical GERARD GANNE SARL
Priority to FR9803400A priority Critical patent/FR2775998B1/en
Publication of FR2775998A1 publication Critical patent/FR2775998A1/en
Application granted granted Critical
Publication of FR2775998B1 publication Critical patent/FR2775998B1/en
Anticipated expiration legal-status Critical
Expired - Fee Related legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/0007Base structures; Cellars
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/02Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements
    • E04B1/04Structures consisting primarily of load-supporting, block-shaped, or slab-shaped elements the elements consisting of concrete, e.g. reinforced concrete, or other stone-like material
    • E04B1/043Connections specially adapted therefor
    • E04B1/046Connections specially adapted therefor using reinforcement loops protruding from the elements

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Foundations (AREA)

Abstract

The method involves prefabricating the walls (1) and placing them on ground frames (2) mounted in poured concrete foundation slabs (3). The slabs have rebars with locking bars (5) to interlock with the wall ground frames.

Description

Procédé de construction de bâtiments préfabriqués et ensembleMethod of constructing prefabricated buildings and assembly

d'éléments de construction pour la mise en oeuvre d'un tel procédé.  of construction elements for the implementation of such a method.

L'invention concerne le domaine technique de la construction des bâtiments et plus précisément celui de la construction de bâtiments à partir d'éléments de construction préfabriqués en béton armé. Ce type de construction est très répandu. A titre d'exemple simplement, on peut notamment citer dans ce cadre la construction des bâtiments agricoles  The invention relates to the technical field of construction of buildings and more specifically that of the construction of buildings from prefabricated reinforced concrete construction elements. This type of construction is very widespread. As an example, we can notably cite in this context the construction of agricultural buildings

(bâtiments d'élevage ou hangars de stockage).  (livestock buildings or storage sheds).

Le principe de la construction préfabriquée est de réaliser des éléments de structures (panneaux de murs, poutres, poteaux, dalles, etc...) à l'abri des intempéries, et le plus souvent en usine, puis de réaliser des bâtiments complets par simples assemblages de tels éléments préfabriqués sur le chantier. Ce type de procédé de construction permet de réaliser des bâtiments rapidement à un coût intéressant. L'un des problèmes posé par la construction des bâtiments à partir d'éléments préfabriqués est constitué par la réalisation des liaisonnements (ou clavetage) entre chacun des éléments préfabriqués d'une part (jonction entre deux panneaux de murs par exemple) ou entre un élément préfabriqué et un élément réalisé directement sur le chantier d'autre part (entre un panneau de mur et une  The principle of prefabricated construction is to produce structural elements (wall panels, beams, posts, slabs, etc.) sheltered from the weather, and most often in the factory, then to build complete buildings by simple assemblies of such prefabricated elements on site. This type of construction process makes it possible to produce buildings quickly at an attractive cost. One of the problems posed by the construction of buildings from prefabricated elements is constituted by the realization of connections (or keying) between each of the prefabricated elements on the one hand (junction between two panels of walls for example) or between a prefabricated element and an element produced directly on site on the other hand (between a wall panel and a

semelle de fondation par exemple).foundation sole for example).

Les clavetages ont pour but d'obtenir un comportement monolithique de l'ensemble des éléments préfabriqués composant le bâtiment, de manières telle que ceux-ci soient capables de transmettre l'ensemble des efforts verticaux et horizontaux qui leur sont appliqués, jusqu'au sol de fondation, et selon un schéma  The keyings are intended to obtain a monolithic behavior of all the prefabricated elements making up the building, in such a way that they are capable of transmitting all the vertical and horizontal forces applied to them, up to the ground. foundation, and according to a scheme

statique stable.static stable.

Dans le cas de bâtiments réalisés à partir de panneaux préfabriqués en béton armé, assemblés selon des plans verticaux, de manière à composer les murs de l'ouvrage, et à assurer soit la fonction de bardage, soit la fonction d'assise des poteaux de charpente, soit les deux, les clavetages doivent plus particulièrement permettre la transmission des efforts horizontaux appliqués sur la totalité de la surface des éléments préfabriqués ou appliqués par le poteau de charpente au niveau  In the case of buildings made from prefabricated reinforced concrete panels, assembled according to vertical planes, so as to compose the walls of the structure, and to ensure either the cladding function, or the seating function of the posts frame, or both, the keying must more particularly allow the transmission of horizontal forces applied to the entire surface of the prefabricated elements or applied by the frame post at the level

de son assise sur le mur jusqu'aux fondations.  from his seat on the wall to the foundations.

Une manière traditionnelle de réaliser ces clavetages consiste à réaliser un poteau en béton armé, coulé en place sur le chantier, liaisonnant entre eux deux panneaux préfabriqués contigus et liaisonnant ceux-ci à leur semelle de fondation. Ce poteau en béton peut en outre servir d'assise au poteau de charpente, qui peut  A traditional way of making these keyways consists in making a reinforced concrete post, poured in place on the site, connecting between them two adjacent prefabricated panels and connecting them to their foundation sole. This concrete pole can also serve as a seat for the structural pole, which can

être en bois ou métallique.be made of wood or metal.

La réalisation de tels clavetages nécessite la mise en oeuvre de coffrages, d'étaiements, et le coulage sur un site d'un volume important de béton, qui  The realization of such keying requires the implementation of formwork, shoring, and the pouring on a site of a large volume of concrete, which

allongent de façon conséquente la durée de construction.  significantly extend the construction time.

L'objectif principal de la présente invention est de proposer un procédé et un matériel de liaisonnement des panneaux préfabriqués entre eux et avec leur fondation qui permettent de s'affranchir des inconvénients de la méthode de  The main objective of the present invention is to propose a method and a material for bonding the prefabricated panels together and with their foundation which make it possible to overcome the drawbacks of the method of

clavetage traditionnelle.traditional keying.

Cet objectif est atteint grâce à l'invention qui concerne un procédé de construction d'un bâtiment réalisé au moins en partie à partir d'éléments de murs préfabriqués caractérisé en ce qu'il comprend les étapes consistant à: - préfabriquer lesdits éléments de murs en prévoyant dans au moins une zone inférieure de ceux-ci au moins une armature métallique formant herse; - effectuer un terrassement en puits destiné à recevoir des massifs de fondation;  This objective is achieved thanks to the invention which relates to a method of constructing a building produced at least in part from prefabricated wall elements, characterized in that it comprises the steps consisting in: - prefabricating said wall elements by providing in at least one lower zone thereof at least one metal frame forming a harrow; - carry out earthworks in a well intended to receive foundation foundations;

- couler du béton pour former lesdits massifs de fondation en prévoyant dans ceux-  - pour concrete to form the said foundation blocks, making provision in them

ci des armatures métalliques faisant saillie au moins sur leur face supérieure; - attendre la prise desdits massifs de fondation; - poser lesdits éléments de murs sur lesdits massifs de fondation en faisant coopérer les armatures métalliques formant herse de ceux-ci avec lesdites armatures métalliques faisant saillie desdits massifs de fondation; mettre en place des barres de clavetage entre les armatures métalliques formant herse et lesdites armatures métalliques faisant saillie; - enrober lesdites armatures métalliques et lesdites barres de clavetage avec du béton;  ci metal reinforcements projecting at least on their upper face; - wait for the setting of said foundation beds; - Place said wall elements on said foundation blocks by making the metal reinforcements forming harrow thereof cooperate with said metal reinforcements projecting from said foundation blocks; placing keying bars between the metal frames forming a harrow and said projecting metal frames; - coating said metal reinforcements and said keying bars with concrete;

- attendre la prise dudit béton.- wait for the setting of said concrete.

L'invention propose ainsi de s'affranchir du coffrage et du coulage du liaisonnement vertical entre deux panneaux préfabriqués après leur pose, grâce à l'utilisation de moyens permettant de sécuriser leur maintien en position, permettant d'assurer le monolithisme de la construction et permettant d'assurer la résistance aux efforts appliqués, lesdits moyens mettant en oeuvre des herses métalliques prévues dans la partie inférieure des panneaux préfabriqués en béton armé, conçues pour coopérer avec des armatures métalliques de massifs de fondation préalablement coulés dans un terrassement, un clavetage de ces moyens de  The invention thus proposes to get rid of the formwork and the pouring of the vertical connection between two prefabricated panels after their installation, thanks to the use of means making it possible to secure their maintenance in position, making it possible to ensure the monolithism of the construction and ensuring resistance to the forces applied, said means using metal harrows provided in the lower part of the prefabricated reinforced concrete panels, designed to cooperate with metal reinforcements of foundation blocks previously poured into an earthworks, a keying of these means of

coopération et un coulage de béton sur ceux-ci.  cooperation and pouring concrete on them.

On notera que le procédé ici décrit pourra être utilisé avec tout type de murs, quels que soient leur hauteur, leur largeur, leur épaisseur, qu'ils constituent des  It will be noted that the method described here can be used with any type of wall, whatever their height, width, thickness, whether they constitute

murs de bardage, des murs d'angle, des cloisons, etc...  cladding walls, corner walls, partitions, etc.

Selon une variante préférentielle de l'invention, le procédé selon l'invention comprend de plus les étapes complémentaires suivantes consitant à: - prévoir des gorges de réservation destinées à recevoir des ferrures de jonction dans la partie supérieure desdits éléments de murs; mettre en place des ferrures de jonction après que lesdits éléments de murs ont été  According to a preferred variant of the invention, the method according to the invention further comprises the following additional steps consisting in: - providing reservation grooves intended to receive junction fittings in the upper part of said wall elements; install junction fittings after said wall elements have been

positionnés sur lesdits massifs de fondation.  positioned on said foundation blocks.

De telles ferrures de jonction permettent de compléter le monolithisme de la construction en phase finale et de limiter les moyens d'étaiement en phase de pose  Such joining fittings make it possible to complete the monolithism of construction in the final phase and to limit the shoring means in the laying phase.

des éléments.elements.

On notera qu'avantageusement, on pourra utiliser lesdites ferrures de  It will be noted that advantageously, said fittings can be used.

jonction comme éléments de fixation d'une charpente.  junction as fixing elements of a frame.

Dans le mode réalisation préférentiel de l'invention, on utilise pour chaque massif de fondation au moins deux barres de clavetage. Le nombre de barres de clavetage utilisé pourra être fonction des hauteurs des éléments de murs et des efforts appliqués sur ces éléments de murs directement ou par les poteaux de charpente. Le nombre et la section de ces barres pourront être déterminés par  In the preferred embodiment of the invention, at least two keying bars are used for each foundation block. The number of keying bars used may be a function of the heights of the wall elements and of the forces applied to these wall elements directly or by the structural columns. The number and section of these bars may be determined by

l'homme de l'art en fonction des valeurs de ces différents paramètres.  those skilled in the art as a function of the values of these different parameters.

L'invention concerne également un ensemble d'éléments de construction  The invention also relates to a set of building elements

pour la mise en oeuvre du procédé décrit ci-dessus.  for the implementation of the method described above.

Un tel ensemble comprend: - des éléments de murs préfabriqués présentant dans au moins une zone inférieure au moins une armature métallique formant herse; - des massifs de fondation présentant des armatures métalliques faisant saillie;  Such an assembly comprises: - prefabricated wall elements having in at least one lower zone at least one metal frame forming a harrow; - foundation blocks with protruding metal reinforcements;

- des armatures de clavetage.- key fittings.

Selon une variante préférentielle de l'invention, lesdites armatures métalliques formant herse desdits éléments de murs sont réalisées dans au moins certains des coins inférieurs de ceux-ci. Dans ce cas, chaque massif de fondation  According to a preferred variant of the invention, said metal frames forming a harrow of said wall elements are produced in at least some of the lower corners thereof. In this case, each foundation block

pourra être utilisé pour relier au moins deux éléments de murs entre eux.  can be used to connect at least two wall elements together.

Avantageusement, l'ensemble de construction selon l'invention comprend de plus des ferrures de jonction d'éléments de murs et lesdits éléments de murs sont pourvus dans leur partie supérieure de gorges de réservation destinées à  Advantageously, the construction assembly according to the invention further comprises fittings for joining wall elements and said wall elements are provided in their upper part with reservation grooves intended to

accueillir lesdites ferrures de jonction.  accommodate said junction fittings.

Préférentiellement, lesdites ferrures de jonction présentent une base montrant une section transversale essentiellement trapézoïdale. Une telle forme permettra d'améliorer le centrage des éléments de murs et contribuera à une  Preferably, said junction fittings have a base showing an essentially trapezoidal cross section. Such a shape will improve the centering of the wall elements and will contribute to a

meilleure répartition des forces.better distribution of forces.

Selon une autre variante préférentielle, au moins certaines desdites armatures de clavetage son cintrées. Une telle caractérisque trouvera son intérêt  According to another preferred variant, at least some of said keying fittings are curved. Such a characteristic will find its interest

pour la jonction de deux éléments de murs prévus dans le même plan.  for the junction of two wall elements provided in the same plan.

Selon un autre aspect de l'invention, lesdites armatures desdits massifs de fondation sont constitués par au moins deux cadres métalliques essentiellement verticaux positionnés essentiellement parallèlement entre eux et reliés par des barres  According to another aspect of the invention, said reinforcements of said foundation blocks consist of at least two essentially vertical metal frames positioned essentially parallel to one another and connected by bars

essentiellement horizontales.essentially horizontal.

Avantageusement, lesdites armatures desdits massifs de fondation incluent un cadre horizontal servant de repère pour le coulage des différentes phases desdits massifs de fondation. Lors de de ce coulage, le béton utilisé sera coulé jusqu'au  Advantageously, said reinforcements of said foundation blocks include a horizontal frame serving as a benchmark for the pouring of the different phases of said foundation blocks. During this pouring, the concrete used will be poured until

niveau de ce cadre horizontal.level of this horizontal frame.

Par ailleurs, on notera également que lesdites armatures des massifs de  Furthermore, it will also be noted that said reinforcements of the massifs of

fondation incluent préférentiellement au moins un cadre de renfort.  foundation preferably include at least one reinforcement frame.

L'invention, ainsi que les différents avantages qu'elle présente seront plus  The invention, as well as the various advantages which it presents, will be more

facilement compris grâce à la description qui va suivre d'un mode non limitatif de  easily understood thanks to the description which follows in a non-limiting manner of

réalisation de celle-ci en référence aux dessins, dans lesquels: - la figure 1 représente une vue en perspective d'une partie d'un bâtiment en cours de construction selon le procédé de l'invention; - la figure 2 représente une vue de dessus d'une armature métallique d'un massif de fondation; - la figure 3 représente une vue en coupe de l'armature métallique montrée à la figure 2; - la figure 4 représente une vue en coupe d'une ferrure de jonction positionnée entre deux éléments de mur; la figure 5 représente une vue latérale de la ferrure de jonction positionnée entre deux éléments de murs; - la figure 6 représente une vue en coupe transversale de la partie inférieure d'un élément de mur au niveau d'un massif de fondation; - la figure 7 représente une vue en coupe supérieure de deux éléments de murs positionnés dans le même plan au niveau d'un massif de fondation; - la figure 8 représente une vue en coupe supérieure de trois éléments de murs au niveau d'un massif de fondation; la figure 9 représente une vue en coupe supérieure de deux éléments de  realization thereof with reference to the drawings, in which: - Figure 1 shows a perspective view of part of a building under construction according to the method of the invention; - Figure 2 shows a top view of a metal frame of a foundation block; - Figure 3 shows a sectional view of the metal frame shown in Figure 2; - Figure 4 shows a sectional view of a junction fitting positioned between two wall elements; FIG. 5 represents a side view of the junction fitting positioned between two wall elements; - Figure 6 shows a cross-sectional view of the lower part of a wall element at a foundation block; - Figure 7 shows a top sectional view of two wall elements positioned in the same plane at a foundation block; - Figure 8 shows a top sectional view of three wall elements at a foundation block; FIG. 9 represents a view in upper section of two elements of

murs perpendiculaires au niveau d'un massif de fondation.  walls perpendicular to the level of a foundation massif.

En référence à la figure 1, la construction représentée à été réalisée à partir d'éléments de murs 1 solidarisés entre eux et maintenus en position verticale grâce à  With reference to FIG. 1, the construction shown has been produced from wall elements 1 joined together and kept in a vertical position by

des massifs de fondation 3.foundation beds 3.

Lors d'une première étape, le sol sur lequel la construction en question était destinée à être construite a été terrassé pour créer des puits destinés à recevoir les massifs de fondation 3. Ensuite, les massifs de fondation ont été coulés dans ces puits. Lors de ce coulage des armatures métalliques 4 qui seront décrites plus en détails ci-après ont été insérées de façon telle que ces armatures fassent saillie des massifs de fondation 3. (On notera que, sur la figure 1, le sol n'a pas été représenté  During a first stage, the ground on which the construction in question was intended to be built was leveled to create wells intended to receive the foundations of foundation 3. Then, the foundations of foundation were poured into these wells. During this pouring of the metal reinforcements 4 which will be described in more detail below have been inserted in such a way that these reinforcements protrude from the foundation foundations 3. (It will be noted that, in FIG. 1, the ground has not been represented

pour les besoins de clarté de la description).  for clarity of description).

Les éléments de murs 1 ont quant a eux été préfabriqués en béton armé.  The wall elements 1 have been prefabricated in reinforced concrete.

Lors de cette préfabrication, leurs deux coins inférieurs ont été pourvus de retraits  During this prefabrication, their two lower corners were provided with recesses

la d'o font saillie vers le bas des armatures métalliques 2 et formant des herses.  the o protrude down from the metal frames 2 and forming harrows.

Ces éléments de murs ont par ailleurs été pourvus dans leurs coins supérieurs de gorges de réservation 7 destinées à recevoir des ferrures de jonction 6 conçues pour  These wall elements have moreover been provided in their upper corners with reservation grooves 7 intended to receive junction fittings 6 designed to

sécuriser la jonction des éléments de murs 1 contigus.  secure the junction of adjacent wall elements 1.

Après le coulage et la prise des massifs de fondation 3, les éléments de murs 1 ont été positionnés sur ceux-ci de façon à faire coopérer entre elles les armatures métalliques 2 formant herses des éléments de murs 1 avec les armatures métalliques 4 des massifs de fondation 3. Des barres de clavetage (non visibles sur la figure 1 mais qui seront décrites plus en détails ci-après) ont ensuite été positionnées entre  After the foundation blocks 3 have been poured and taken, the wall elements 1 have been positioned on them so as to make the metal frames 2 cooperate with each other forming harrows of the wall elements 1 with the metal frames 4 of the blocks of foundation 3. Locking bars (not visible in Figure 1 but which will be described in more detail below) were then positioned between

ces armatures métalliques 2,4.these metallic reinforcements 2,4.

Parallèlement ou ultérieurement, la jonction des éléments de murs 1 dans  In parallel or later, the junction of wall elements 1 in

leur partie supérieure a été assurée par la mise en place des ferrures de jonction 6.  their upper part was provided by the installation of junction fittings 6.

Ces ferrures de jonction présentent une ou plusieurs branches supérieures 6b qui pourront avantageusement être ultérieurement utilisées comme éléments de fixation  These junction fittings have one or more upper branches 6b which can advantageously be used later as fixing elements.

d'une charpente.of a frame.

La construction selon la figure 1 est représentée à ce stade du procédé selon l'invention. Dans une phase ultérieure, du béton vibré a été coulé autour des armatures  The construction according to Figure 1 is shown at this stage of the method according to the invention. In a later phase, vibrated concrete was poured around the reinforcements

métalliques 2,4.metallic 2.4.

Après séchage du béton, des essais ont montré que l'ensemble composé du massif de fondation et des panneaux de murs préfabriqués, assemblés selon le procédé exposé, était capable de résister à un effort horizontal appliqué en tête de  After the concrete has dried, tests have shown that the assembly made up of the foundation mass and prefabricated wall panels, assembled according to the process described, was capable of withstanding a horizontal force applied at the head of

mur, et selon une direction perpendiculaire au plan de mur, supérieur à 4 tonnes.  wall, and in a direction perpendicular to the wall plane, greater than 4 tonnes.

Le procédé selon l'invention permet donc de réaliser une jonction suffisamment résistante entre les éléments de murs préfabriqués d'une part et entre ceux-ci et les massifs de fondation d'autre part, pour que le mur ainsi réalisé permette l'assise d'un poteau de charpente en tête de mur, et ce sans recourir au coffrage et au coulage d'un poteau de liaisonnement, ce qui représente un avantage important par rapport aux divers procédés de construction préfabriquée de l'état de la technique. La figure 2, qui représente une vue de dessus d'un exemple de mode de réalisation d'une armature métallique 4 équipant les massifs de fondation 3 montre que celle-ci est constituée de plusieurs cadres métalliques 4a essentiellement verticaux reliés entre eux par des barres métalliques horizontales 4b. En l'occurence, l'armature représentée comprend cinq cadres métalliques. On comprendra toutefois que le nombre de ces cadres pourra varier en fonction notamment, mais non exclusivement, de la dimension des éléments de murs ou encore de la nature de ceux-ci (éléments de murs d'angle, éléments de murs de bardage, etc...) ainsi que des efforts appliqués aux murs. La dimension de ces  The method according to the invention therefore makes it possible to produce a sufficiently resistant junction between the prefabricated wall elements on the one hand and between these and the foundation blocks on the other hand, so that the wall thus produced allows the foundation d 'a structural pole at the head of the wall, without resorting to the formwork and pouring of a bonding pole, which represents an important advantage compared to the various prefabricated construction methods of the prior art. Figure 2, which shows a top view of an exemplary embodiment of a metal frame 4 equipping the foundation blocks 3 shows that it consists of several essentially vertical metal frames 4a connected together by bars horizontal metal 4b. In this case, the frame shown includes five metal frames. It will however be understood that the number of these frames may vary depending in particular, but not exclusively, on the size of the wall elements or on the nature of these (corner wall elements, cladding wall elements, etc. ...) as well as the forces applied to the walls. The size of these

cadres pourra également varier selon les modes de réalisation.  frames may also vary depending on the embodiments.

Comme on peut le voir plus précisément sur la figure 3, qui montre de côté l'armature métallique représentée à la figure 2, cette armature est avantageusement pourvue d'un cadre horizontal 4c destiné à servir de repère lors de la première phase de coulage des massifs de fondation 3 pour indiquer le niveau de béton utilisé lors  As can be seen more precisely in FIG. 3, which shows from the side the metal reinforcement shown in FIG. 2, this reinforcement is advantageously provided with a horizontal frame 4c intended to serve as a reference during the first phase of casting the foundation blocks 3 to indicate the level of concrete used during

du coulage.pouring.

Enfin, on notera également que les armatures métalliques 4 sont  Finally, it will also be noted that the metal reinforcements 4 are

préférentiellement pourvues d'un ou plusieurs cadres de renfort 4d.  preferably provided with one or more reinforcement frames 4d.

Comme décrit ci-dessus, la mise en oeuvre du procédé selon l'invention inclut une étape de positionnement de ferrures de jonctions 6 dans des gorges de réservation prévues dans les coins supérieurs desdits éléments de murs 1. En référence aux figures 4 et 5, ces ferrures sont destinées à sécuriser la jonction de deux éléments de murs 1 contigus. La fixation des ferrures 6 dans les gorges de réservation 7 conçues pour les recevoir est effectuée grâce à des boulons 8. A cet effet les gorges de réservation 7 sont pourvues d'alésages 7a permettant de recevoir  As described above, the implementation of the method according to the invention includes a step of positioning junction fittings 6 in reservation grooves provided in the upper corners of said wall elements 1. With reference to FIGS. 4 and 5, these fittings are intended to secure the junction of two adjacent wall elements 1. The fixing of the fittings 6 in the reservation grooves 7 designed to receive them is effected by bolts 8. For this purpose the reservation grooves 7 are provided with bores 7a making it possible to receive

ces boulons 8.these bolts 8.

On notera que ces ferrures de jonction 6 présentent une base 6a de section transversale essentiellement en forme de trapèze dont la petite face est la face inférieure en position. Une telle caractéristique technique permet de favoriser le centrage des éléments de murs et concourre à une meilleure répartition des forces mises en jeu. On notera par ailleurs que ces ferrures de jonction présentent une ou plusieurs branches supérieures 6b qui pourront avantageusement être ultérieurement  It will be noted that these junction fittings 6 have a base 6a of cross section essentially in the shape of a trapezium whose small face is the underside in position. Such a technical characteristic makes it possible to promote the centering of the wall elements and contributes to a better distribution of the forces involved. It will also be noted that these junction fittings have one or more upper branches 6b which can advantageously be later

utilisées comme éléments de fixation d'une charpente.  used as fasteners for a frame.

En référence à la figure 6, qui montre une coupe transversale de la construction au niveau d'un massif de fondation après enrobage des armatures métalliques 2,4 par du béton, les armatures métalliques 2 formant herses des éléments de murs 1 coopèrent avec les armatures métalliques 4 des massifs de  With reference to FIG. 6, which shows a cross section of the construction at the level of a foundation massif after coating the metal reinforcements 2,4 with concrete, the metal reinforcements 2 forming harrows of the wall elements 1 cooperate with the reinforcements metallic 4 massive

fondation 3.foundation 3.

Lors de la pose des éléments de murs 1 sur les massifs de fondation 3, les extrémités inférieures des armatures 2 viennent reposer sur la surface supérieure 3a de ceux-ci. Les barres de clavetage 5 sont ensuite glissées entre les armatures 2 et les armatures 4 de façon à sécuriser le positionnement des éléments de murs par rapport aux massifs de fondation 3. Une fois les murs positionnés, une couche 9 de béton est coulée sur les armatures 2,4 et les barres de clavetage 5 de façon à noyer  When laying the wall elements 1 on the foundation blocks 3, the lower ends of the reinforcements 2 come to rest on the upper surface 3a thereof. The keying bars 5 are then slid between the reinforcements 2 and the reinforcements 4 so as to secure the positioning of the wall elements relative to the foundation blocks 3. Once the walls have been positioned, a layer 9 of concrete is poured over the reinforcements 2,4 and 5 key bars so as to drown

complètement celles-ci.completely these.

Comme on peut le voir plus précisément sur la figure 7, qui montre une vue en coupe supérieure de la construction au niveau des armatures métalliques, les barrres de clavetage 5 sont légèrement cintrées de façon à faciliter leur mise en place, les deux éléments de murs 1 étant positionnés dans le même plan. On notera toutefois qu'un tel cintrage ne sera pas nécessaire lorsque les éléments de murs joints entre eux ne seront pas prévus dans le même plan et seront par exemple perpendiculaires comme il est par exemple décrit ci-après en référence aux figures 8 et 9. Selon la figure 8, le massif de fondation 3 représenté a été conçu pour accueillir trois éléments de murs I dont un est perpendiculaire aux deux autres. A cet effet, l'armature métallique 4 de ce massif présente des cadres 4 métalliques dans deux plans verticaux perpendiculaires pour permettre une coopération avec les  As can be seen more precisely in FIG. 7, which shows a view in upper section of the construction at the level of the metal reinforcements, the keying bars 5 are slightly curved so as to facilitate their positioning, the two wall elements 1 being positioned in the same plane. However, it will be noted that such bending will not be necessary when the wall elements joined together will not be provided in the same plane and will for example be perpendicular as it is for example described below with reference to FIGS. 8 and 9. According to Figure 8, the foundation block 3 shown was designed to accommodate three wall elements I, one of which is perpendicular to the other two. To this end, the metal frame 4 of this massif has metal frames 4 in two vertical perpendicular planes to allow cooperation with the

différentes armatures métalliques formant herses 2 des trois éléments de murs 1.  different metal frames forming harrows 2 of the three wall elements 1.

Concernant ce mode de réalisation, on notera que les barres de clavetage 5 destinées à la jonction des éléments de murs disposés dans le même plan sont  Regarding this embodiment, it will be noted that the keying bars 5 intended for joining the wall elements arranged in the same plane are

cintrées tandis que les autres barres de clavetage 5 ne le sont pas.  curved while the other keying bars 5 are not.

Selon la figure 9, le massif de fondation 3 représenté a été conçu pour accueillir deux éléments de murs 1 perpendiculaires entre eux. Son armature métallique 4 présente également des cadres 4a métalliques dans deux plans verticaux perpendiculaires pour permettre une coopération avec les différentes armatures  According to Figure 9, the foundation block 3 shown has been designed to accommodate two wall elements 1 perpendicular to each other. Its metal frame 4 also has metal frames 4a in two perpendicular vertical planes to allow cooperation with the different frames

métalliques formant herses 2 de ces deux éléments de murs 1.  metal forming harrows 2 of these two wall elements 1.

L'exemple de réalisation de l'invention ici décrit n'a pas pour objectif de réduire la portée de celle-ci. Il pourra donc y être apporté de nombreuses modifications sans sortir du cadre de son cadre. En particulier, on notera que les armatures métalliques, les massifs de fondation et les éléments de murs pourront  The exemplary embodiment of the invention described here is not intended to reduce the scope thereof. Many modifications can therefore be made without departing from its framework. In particular, it should be noted that the metal reinforcements, the foundation blocks and the wall elements may

présenter des formes et des dimensions différentes de celles représentées.  have different shapes and dimensions from those shown.

Claims (11)

REVENDICATIONS 1. Procédé de construction d'un bâtiment réalisé au moins en partie à partir d'éléments de murs (1) préfabriqués caractérisé en ce qu'il comprend les étapes consistant à: - préfabriquer lesdits éléments de murs (1) en prévoyant dans au moins une zone inférieure de ceux-ci au moins une armature métallique formant herse (2); - effectuer un terrassement en puits destiné à recevoir des massifs de fondation (3); - couler du béton pour former lesdits massifs de fondation (3) en prévoyant dans ceux-ci des armatures métalliques faisant saillie (4) au moins sur leur face supérieure; - attendre la prise desdits massifs de fondation (3); - poser lesdits éléments de murs (1) sur lesdits massifs de fondation (3) en faisant coopérer les armatures métalliques formant herse (2) de ceux-ci avec lesdites armatures métalliques faisant saillie (4) desdits massifs de fondation (3); - mettre en place des barres de clavetage (5) entre les armatures métalliques formant herse (2) et lesdites armatures métalliques (4) faisant saillie; - enrober lesdites armatures métalliques (2,4) et lesdites barres de clavetage (5) avec du béton;  1. A method of constructing a building produced at least in part from prefabricated wall elements (1) characterized in that it comprises the steps consisting in: - prefabricating said wall elements (1) by providing in at at least one lower region thereof at least one metal frame forming a harrow (2); - carry out earthworks in a well intended to receive foundation foundations (3); - pouring concrete to form said foundation blocks (3) by providing in them metal reinforcements projecting (4) at least on their upper face; - wait for the setting of said foundation blocks (3); - Place said wall elements (1) on said foundation blocks (3) by making the metal frames forming harrow (2) cooperate with said projecting metal frames (4) of said foundation blocks (3); - Fit keying bars (5) between the metal frames forming a harrow (2) and said metal frames (4) projecting; - coating said metal reinforcements (2,4) and said keying bars (5) with concrete; - attendre la prise dudit béton.- wait for the setting of said concrete. 2. Procédé selon la revendication 1 caractérisé en ce qu'il comprend les étapes complémentaires suivantes consitant à: - prévoir des gorges de réservation (7) destinées à recevoir des ferrures de jonction (6) dans la partie supérieure desdits éléments de murs (1); - mettre en place des ferrures de jonction (6) après que lesdits éléments de murs (1)  2. Method according to claim 1 characterized in that it comprises the following additional steps consisting in: - providing reservation grooves (7) intended to receive junction fittings (6) in the upper part of said wall elements (1 ); - set up junction fittings (6) after said wall elements (1) ont été positionnés sur lesdits massifs de fondation (3).  have been positioned on said foundation blocks (3). 3. Procédé selon la revendication 2 caractérisé en ce qu'il consiste à utiliser  3. Method according to claim 2 characterized in that it consists in using lesdites ferrures de jonction (6) comme éléments de fixation d'une charpente.  said junction fittings (6) as fixing elements for a frame. 4. Procédé selon l'une des revendications 1 à 3 caractérisé en ce que pour  4. Method according to one of claims 1 to 3 characterized in that for chaque massif de fondation (3) on utilise au moins deux barres de clavetage (5).  each foundation block (3) at least two locking bars (5) are used. 5. Ensemble d'éléments de construction pour la mise en oeuvre du procédé 1l  5. Set of construction elements for implementing the 1l process selon l'une des revendications 1 à 4 caractérisé en ce qu'il comprend:  according to one of claims 1 to 4 characterized in that it comprises: - des éléments de murs préfabriqués (1) présentant dans au moins une zone inférieure au moins une armature métallique formant herse (2); - des massifs de fondation (3) présentant des armatures métalliques (4) faisant saillie;  - prefabricated wall elements (1) having in at least one lower zone at least one metal frame forming a harrow (2); - foundation blocks (3) having metal reinforcements (4) projecting; - des armatures de clavetage (5).- key plates (5). 6. Ensemble d'éléments de construction selon la revendication 5 caractérisé en ce que lesdites armatures métalliques formant herse (2) desdits éléments de murs (1)  6. Set of building elements according to claim 5 characterized in that said metal frames forming harrow (2) of said wall elements (1) sont réalisées dans au moins certains des coins inférieurs de ceux-ci.  are made in at least some of the lower corners thereof. 7. Ensemble d'éléments de construction selon l'une quelconque des  7. Set of building elements according to any one of revendications 5 ou 6 caractérisé en ce qu'il comprend de plus des ferrures de  Claims 5 or 6 characterized in that it further comprises fittings of jonction (6) d'éléments de murs (1) et en ce que lesdits éléments de murs (1) sont pourvus dans leur partie supérieure de gorges de réservation (7) destinées à  junction (6) of wall elements (1) and in that said wall elements (1) are provided in their upper part with reservation grooves (7) intended to accueillir lesdites ferrures de jonction (6).  receiving said junction fittings (6). 8. Ensemble d'éléments de construction selon la revendication 7 caractérisé en ce que lesdites ferrures de jonction (6) présentent une base (6a) montrant une  8. A set of construction elements according to claim 7 characterized in that said junction fittings (6) have a base (6a) showing a section transversale essentiellement trapézoidale.  essentially trapezoidal cross section. 9. Ensemble d'éléments de construction selon l'une quelconque des  9. Set of building elements according to any one of revendications 5 à 8 caractérisé en ce qu'au moins certaines desdites armatures de  claims 5 to 8 characterized in that at least some of said reinforcements clavetage (5) son cintrées.keying (5) its arched. 10. Ensemble d'éléments de constructions selon l'une quelconque des  10. Set of construction elements according to any one of revendications 5 à 9 caractérisé en ce que lesdites armatures (4) desdits massifs de  claims 5 to 9 characterized in that said reinforcements (4) of said massifs fondation (3) sont constitués par au moins deux cadres métalliques(4a) essentiellement verticaux positionnés essentiellement parallèlement entre eux et  foundation (3) consist of at least two essentially vertical metal frames (4a) positioned essentially parallel to each other and reliés par des barres essentiellement horizontales (4b).  connected by essentially horizontal bars (4b). 1 1. Ensemble d'éléments de construction selon la revendication 10 caractérisé en ce que lesdites armatures (4) desdits massifs de fondation (3) incluent un cadre  1 1. Set of building elements according to claim 10 characterized in that said frames (4) of said foundation blocks (3) include a frame horizontal (4c) servant de repère pour le coulage desdits massifs de fondation (3).  horizontal (4c) serving as a benchmark for the pouring of said foundation blocks (3). 12. Ensemble d'éléments de construction selon la revendication 10 ou 11 caractérisé en ce que lesdites armatures (4) des massifs de fondation (3) incluent au  12. Set of building elements according to claim 10 or 11 characterized in that said frames (4) of the foundation blocks (3) include at moins un cadre de renfort (4d).minus a reinforcement frame (4d).
FR9803400A 1998-03-16 1998-03-16 METHOD FOR CONSTRUCTING PREFABRICATED BUILDINGS AND SET OF CONSTRUCTION ELEMENTS FOR IMPLEMENTING SUCH A METHOD Expired - Fee Related FR2775998B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
FR9803400A FR2775998B1 (en) 1998-03-16 1998-03-16 METHOD FOR CONSTRUCTING PREFABRICATED BUILDINGS AND SET OF CONSTRUCTION ELEMENTS FOR IMPLEMENTING SUCH A METHOD

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR9803400A FR2775998B1 (en) 1998-03-16 1998-03-16 METHOD FOR CONSTRUCTING PREFABRICATED BUILDINGS AND SET OF CONSTRUCTION ELEMENTS FOR IMPLEMENTING SUCH A METHOD

Publications (2)

Publication Number Publication Date
FR2775998A1 true FR2775998A1 (en) 1999-09-17
FR2775998B1 FR2775998B1 (en) 2000-05-05

Family

ID=9524250

Family Applications (1)

Application Number Title Priority Date Filing Date
FR9803400A Expired - Fee Related FR2775998B1 (en) 1998-03-16 1998-03-16 METHOD FOR CONSTRUCTING PREFABRICATED BUILDINGS AND SET OF CONSTRUCTION ELEMENTS FOR IMPLEMENTING SUCH A METHOD

Country Status (1)

Country Link
FR (1) FR2775998B1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2326111A1 (en) * 2009-03-10 2009-09-30 Adhorna Prefabricacion, S.A. Manufacturing procedure for containment walls (Machine-translation by Google Translate, not legally binding)
CN114232808A (en) * 2021-12-30 2022-03-25 洛阳北玻硅巢新材料有限公司 Manufacturing and mounting method of combined wall for prefabricated building

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1009676A (en) * 1948-06-16 1952-06-03 Construction process
BE660732A (en) * 1964-03-12 1965-09-06
BE692165A (en) * 1967-01-04 1967-06-16
FR2185117A5 (en) * 1972-05-17 1973-12-28 Balzer Edmond
US4030262A (en) * 1973-07-09 1977-06-21 Dean Almeta C Building panel connector assembly and the like
GB2058873A (en) * 1979-08-06 1981-04-15 Pilar Dev Corp System for constructing a building
AU600916B2 (en) * 1985-11-05 1990-08-30 Michael Oreskovic Building construction

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1009676A (en) * 1948-06-16 1952-06-03 Construction process
BE660732A (en) * 1964-03-12 1965-09-06
BE692165A (en) * 1967-01-04 1967-06-16
FR2185117A5 (en) * 1972-05-17 1973-12-28 Balzer Edmond
US4030262A (en) * 1973-07-09 1977-06-21 Dean Almeta C Building panel connector assembly and the like
GB2058873A (en) * 1979-08-06 1981-04-15 Pilar Dev Corp System for constructing a building
AU600916B2 (en) * 1985-11-05 1990-08-30 Michael Oreskovic Building construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
ES2326111A1 (en) * 2009-03-10 2009-09-30 Adhorna Prefabricacion, S.A. Manufacturing procedure for containment walls (Machine-translation by Google Translate, not legally binding)
CN114232808A (en) * 2021-12-30 2022-03-25 洛阳北玻硅巢新材料有限公司 Manufacturing and mounting method of combined wall for prefabricated building

Also Published As

Publication number Publication date
FR2775998B1 (en) 2000-05-05

Similar Documents

Publication Publication Date Title
EP3310973B1 (en) Construction of the prefabricated column and beam type
EP0285465B1 (en) Structural element, especially a facing element with integrated insulation
WO1986002967A1 (en) System of modular construction for a covered structure
EP0174347A1 (en) Structural elements and method for making the same
FR2488930A1 (en) Building construction using reinforced ring beams - has self wedging prefabricated elements forming lost shutters for floor and walls on each level
EP0369914B1 (en) Method for joining a matrix material to a functional support, and devices manufactured according to this method
WO1998054418A1 (en) Building framework
FR2584461A1 (en) Dismantleable three-dimensional modular assembly method intended for any type of construction
FR2775998A1 (en) Method of construction of prefabricated building
EP0080398B1 (en) Industrial building supporting structure constituted of prefabricated reinforced concrete elements
EP3293318B1 (en) Composite wood-concrete structures
FR2939817A1 (en) Prefabricated elementary block for constructing e.g. outer insulating wall of building, has connection elements connecting reinforcement structures to fix inner bearing wall and outer protective shell to maintain constant transversal gap
EP2489809B1 (en) Method for manufacturing a structural element and elements thus manufactured
EP0004998A2 (en) Construction frame
FR2925083A1 (en) Building constructing system, has co-operating male/female preassembling units to maintain beams on posts before definitive fixation of sealing material i.e. anti shrinkage wedging mortar, by casting
FR2558868A1 (en) Method for constructing walls of buildings or of other structures, and shuttering unit for its implementation
FR3036419A1 (en) REINFORCING BEAM FOR WALL FORMWORK OF SWIMMING WALL
FR2938858A1 (en) Concrete floor framework for e.g. buried parking area, in building site, has posts surmounted by capital presenting variable inertia section maximal at right of posts, and beams whose ends are set with respect to each other in posts axis
BE1031238B1 (en) PREFABRICATED REINFORCED CONCRETE SHEET INTENDED FOR USE IN FORMWORK TO CONSTRUCT A CONCRETE WALL
FR2610339A1 (en) Method for constructing building substructures and means for implementing the said method
FR2495207A1 (en) Multi-storey prefabricated building - comprises columns of modular elements which are interconnected by prefabricated horizontal panels
FR2567560A1 (en) Method and prefabricated formwork blocks for the construction of concrete walls, particularly for swimming pools
FR2547612A1 (en) Method for modular construction of buildings
EP0229041A1 (en) Panels for constructions by assembling on the spot, and method for manufacturing said panels
WO2022034271A1 (en) Building with wooden framework and concrete floor

Legal Events

Date Code Title Description
ST Notification of lapse

Effective date: 20101130