Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hernanz Callejon Emilio
Original Assignee
Hernanz Callejon Emilio
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hernanz Callejon EmiliofiledCriticalHernanz Callejon Emilio
Priority to ES1974201846UpriorityCriticalpatent/ES201846Y/en
Publication of ES201846UpublicationCriticalpatent/ES201846U/en
Application grantedgrantedCritical
Publication of ES201846YpublicationCriticalpatent/ES201846Y/en
Performed element partition, characterized by being formed from multiple equal elements coupled together, which are provided so that their mutual coupling provides a continuous surface and provided with holes in several directions for the insertion of structural stiffener rods of the set, maintaining the partition fixed to the floor by upper tensioners that support at various points on its upper face and on a rail placed on the roof, the tensioners being covered by upper side plates. (Machine-translation by Google Translate, not legally binding)
ES1974201846U1974-03-291974-03-29
PERFECTED PANEL BY ELEMENTS.
ExpiredES201846Y
(en)