EP3562726B1 - Maintenance cage and a method for the maintenance of a cable car - Google Patents
Maintenance cage and a method for the maintenance of a cable car Download PDFInfo
- Publication number
- EP3562726B1 EP3562726B1 EP17832574.2A EP17832574A EP3562726B1 EP 3562726 B1 EP3562726 B1 EP 3562726B1 EP 17832574 A EP17832574 A EP 17832574A EP 3562726 B1 EP3562726 B1 EP 3562726B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- maintenance
- cable
- axle
- suspension device
- sheave assembly
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B12/00—Component parts, details or accessories not provided for in groups B61B7/00Â -Â B61B11/00
- B61B12/02—Suspension of the load; Guiding means, e.g. wheels; Attaching traction cables
- B61B12/028—Cabin or seat suspension means
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B12/00—Component parts, details or accessories not provided for in groups B61B7/00Â -Â B61B11/00
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61B—RAILWAY SYSTEMS; EQUIPMENT THEREFOR NOT OTHERWISE PROVIDED FOR
- B61B12/00—Component parts, details or accessories not provided for in groups B61B7/00Â -Â B61B11/00
- B61B12/002—Cabins; Ski-lift seats
Definitions
- the invention relates to a maintenance cage for cable cars, a cable car and a method for maintaining a cable car.
- Cable cars transport cabins, chairs or other transport containers suspended on a rope between two locations.
- the cable is preferably circumferential.
- the cable in particular the hoisting cable, is carried on sheave assemblies supported by support structures.
- Figures 1 and 2 show an example of a section of such a ropeway with a rope 3, a support structure 1 and a sheave assembly 2.
- the support structure 1 is designed here as a support pillar with a support shaft 11 and with a cross brace 12, also known as a yoke.
- the support shaft 11 and/or the cross brace 12 can also be replaced by other support structures, such as a building or a rock.
- the cross brace 12 preferably protrudes on two sides, so that a sheave assembly 2 can be mounted on each extremity of the cross brace 12, on which the cable 3 is moved in different directions.
- Support structures 1 often also have a lifting yoke 13 to which certain parts of the cable car, e.g. the cable 3, can be attached.
- the sheave assembly 2 is an assembly that has a plurality of sheaves 21 arranged one behind the other for guiding and securing the cable 3 .
- Sheave assemblies 2 carry the weight of a rope 3 and its hangers (upholder), press down a rope 3 (downholder) or combine these functions (changing holder).
- Figures 1 and 2 show an example of a hold-up device, which is only shown in detail in 1 shown, while 2 the role batteries 2 shown only schematically as a square.
- the sheave assembly 2 generally has a battery structure and rope sheaves or sheaves 21 , the sheaves 21 being rotatably mounted in the battery structure, so that the rope 3 is guided on the sheaves 21 of the sheave assembly 2 .
- the battery structure is generally supported at one or both ends of the cross brace 12 by means of a main axis 4 rotatable about a horizontal axis which runs at right angles to the cable direction.
- the battery structure itself has a main seesaw 24 and a plurality of seesaws 25 rotatably mounted on seesaw axles 23 (preferably having the same axial direction as the main axle 4) in the main seesaw 24.
- the rockers 25 support the individual rollers 21 (or other lower rockers) on corresponding roller axles 22.
- the lowest level of the rocker preferably has two rollers 21.
- the roller battery preferably has at least four rollers 21 .
- the sheave assembly 2 typically weighs more than 500 kg, often more than 1 or 2 tons, making it impossible for one person on site to move and maintain the sheave assemblies.
- the maintenance of such a set of rollers 2 includes the removal of all pivots, their cleaning and testing, and the reinstallation of the pivots. To do this, the sheave assembly 2 must be removed from the support pillar 1 using a crane or helicopter in order to carry out this maintenance, and then reassembled on this. This also requires that the roller battery 2 is accessible from above, for which the cable 3 must be removed from the rollers 21 of the roller battery 2 and moved inwards as a rule. This requires several hours of preparation for each pillar, in addition to the high cost of transporting the sheave assembly.
- EP2301819A2 , WO2015/003196 , EP2502799 show various maintenance baskets for the maintenance of a cable car, in particular EP2301819A2 and WO2015/003196 disclose a method of maintaining a reel battery.
- EP0683079A1 and JPH02104374 show cable car vehicles for rescuing people.
- this goal is achieved with a method for maintenance and a maintenance basket according to the independent claims.
- the sheave assembly load By securing the sheave assembly load to a cable car support structure, the sheave assembly load, caused for example by its weight or by the cable car cable, can be taken off the axle so that it can be moved, cleaned and/or inspected without having to remove the roller assembly. As a result, the load on the roller assembly can be removed from the axle so that it can be cleaned and/or checked while the roller assembly 2 or the main rocker 24 remains in the secured position.
- the load is secured to a support yoke of the support structure.
- the difference in height of the cable at the two attachment points can be compensated for with the two lifting mechanisms. This allows the located on the work platform Maintenance technicians continue to adjust the height of the work platform for maintenance of the cable car so that it can reach the corresponding maintenance point.
- the load is secured to a support yoke of the support structure.
- a lifting mechanism is used to secure the load.
- the elevating mechanism is configured to raise the position of the work platform relative to the basket structure.
- the maintenance basket structure is connected between the first lifting mechanism and the second lifting mechanism only via the height-adjustable work platform.
- the first lifting mechanism includes a rope-like structure connecting the work platform to the first suspension device and a mechanism for adjusting the length of the rope-like structure in order to adjust the distance between the first suspension device and the work platform, the second lifting mechanism having a cable-like structure connecting the work platform to the second hanger, and a mechanism for adjusting the length of the cable-like structure to adjust the distance between the first hanger and the work platform.
- the cable-like structure of the first and second lifting mechanisms each has two cable-like sub-structures.
- Substructure the work platform at the four corners.
- the work platform is mounted on a lifting carriage of each lifting mechanism so that the work platform can rotate about a horizontal axis arranged perpendicular to the line connecting the first attachment point and the second attachment point.
- the first hanger and/or the second hanger enables rotation of the work platform about a vertical axis.
- the maintenance basket is designed to move the work platform horizontally and perpendicularly to the cable direction.
- the floor of the work platform is designed as a grating.
- the maintenance basket has a crane.
- the crane has a first support device, a second support device, a crossbeam between the first and second support device, and a lifting mechanism attached to the crossbeam, the crane being configured to be supported on the maintenance cage with the first support device and to be supported with the second support device on a support structure of the cable car.
- the first support device is mounted on a structure of the maintenance cage that allows displacement of the mounted first support device in the cable direction.
- the maintenance basket has a
- the maintenance basket has a small parts cleaner with a grease-dissolving cleaning fluid.
- the maintenance work comprises the steps of: rotating a main seesaw of the sheave assembly about an axis supporting the main seesaw so that the rope is lifted from sheaves mounted in a first side of the main seesaw; cleaning and/or checking and/or replacing the axles, plain bearings, rockers and/or rollers mounted in the first side of the main rocker; rotating the main seesaw of the sheave assembly about an axis supporting the main seesaw so that the cable is lifted off pulleys journaled in a second side of the main seesaw opposite the first side; and cleaning and/or checking and/or replacing the axles, slide bearings, rockers and/or rollers mounted in the second side of the main rocker.
- cleaning and/or checking and/or replacing the axles, plain bearings, rockers and/or rollers mounted in one side of the main rocker includes securing the rocker mounted on that side with a crane supported on the work platform.
- FIG. 3 shows an embodiment of such a maintenance cage 5.
- the maintenance cage 5 has a maintenance cage structure, a hanging device 6 and a work platform 8.
- the hanging device 6 is designed for hanging the maintenance cage structure on the cable 3 of the cable car.
- the hanging device 6 has a fastening mechanism 62 with which the maintenance basket 5 on one Suspension linkage 61 for vehicles (cabins, chairlift, etc.) of the cable car can be attached, the suspension linkage 61 being attached to the cable 3 .
- This attachment mechanism 62 may be, for example, a flange or an opening into which the hanger linkage can be inserted and attached, or any other attachment mechanism.
- the attachment mechanism 62 could also consist directly of a hanging linkage 61 which can be attached to the cable 3, for example with a clamp, coupling or coupling clamp.
- the hanging device 6 preferably has at least one joint 63, 64, which rotatably supports the maintenance basket structure with one, two or more degrees of freedom.
- the at least one joint 63, 64 preferably allows the maintenance basket structure or the maintenance basket 5 to be mounted so that it can rotate about a horizontal axis 63', which is aligned at right angles to the cable direction.
- the at least one joint 63, 64 preferably allows the maintenance cage 5 or the maintenance cage structure to be mounted so that it can rotate about a vertical axis 64'. This is particularly advantageous in the exemplary embodiment described below with two hanging devices 6.
- the two joints 63 and 64 are provided for the two rotations. However, it is also possible to provide only one common joint for both rotations.
- the hanging device 6 preferably has two of the hanging devices 6 described above, so that the maintenance cage 5 can be stored at two fastening points along the cable 3 . Both suspension devices 6 are preferably attached to the same cable 3 . However, it is also possible to attach or guide the two suspension devices 6 to different cables, eg a traction cable and a carrying cable.
- the two attachment points of the maintenance basket 5 along the cable 3 are preferably located at the two extremities of the maintenance basket 5. The attachment of the maintenance basket 5 at two attachment points allows a stable (non-swaying) work platform 8, which is a great help for maintenance work.
- the maintenance cage structure is attached to the hanger 6 . If the hanging device 6 is attached to the rope 3 at only one attachment point, the maintenance cage structure is preferably attached to the hanging device 6 centered over the center of gravity of the maintenance cage 5 . If the hangers 6 are attached to the cable 3 with two hangers 6 at two attachment points, the maintenance basket structure is attached to the two hangers 6 (preferably at its extremities).
- the working platform 8 is now attached to the maintenance basket structure, so that maintenance work at the maintenance point can be carried out by the maintenance technician located on the working platform 8 .
- the working platform 8 is preferably longer than 2 meters (m), preferably longer than 3 m, preferably longer than 4 m.
- the length extends in principle in the direction of the cable 3.
- the working platform 8 is preferably wider than 50 centimeters (cm) , preferably wider than 80 cm, preferably wider than 1 m/100 cm.
- the width generally extends perpendicularly to the cable 3.
- the work platform 8 is perpendicular.
- the floor of the work platform 8 preferably has a grating. The grating is preferably placed in all areas of the floor on which the maintenance technician can move.
- the grating has proven to be particularly advantageous, as it allows the maintenance technician to stand securely even in snow and contamination with slippery materials such as oil and grease.
- the working platform 8 preferably has a railing so that a maintenance technician standing on the working platform 8 can hold on and/or is protected against falling.
- the railing runs around the sides of the work platform 8 accessible to the maintenance technician.
- the work platform 8 preferably has a work table, preferably a workbench.
- the work table is preferable movably arranged on the working platform 8, for example on rollers and/or rails.
- the working platform 8 preferably has a ladder. This ladder is preferably integrated into the railing.
- the work platform 8 has a test bench for magneto-inductive material testing of parts of the cable car, in particular the sheave assembly, in particular axles, in particular the main axle 4, the rocker axles 23 and/or the roller axles 22.
- This test bench for magneto-inductive material testing is also known as the MT test bench.
- the magneto-inductive material test is preferably a magnetic powder test.
- the test bench is mobile on the work platform 8, so that the test bench can be moved to the recess 4' in the support structure 1 for material testing of the main axis 4 of the sheave assembly.
- the test bench is preferably attached to the work platform 8, preferably to the work table.
- the material test is preferably a non-destructive material test (ZfP). This is used, for example, to detect cracks in the part.
- the small parts cleaner is preferably designed to clean said parts using a cleaning fluid.
- the cleaning fluid is, for example, compressed air or a cleaning liquid.
- a grease-dissolving liquid is preferably used as the cleaning liquid in order to free the parts from contaminated oil or grease.
- the small parts cleaner has a cleaning tool that is in fluid communication with a source or reservoir for the cleaning fluid, so that said parts can be cleaned with the cleaning tool and the cleaning fluid emerging from the cleaning tool.
- the small parts cleaner preferably also has a collecting device for collecting a drain liquid. The small parts cleaner and/or the cleaning tool is so mobile that it can be guided to the recess 4′ of the main axle 4 in order to clean the main axle 4 on site.
- the working platform 8 preferably has a plurality of transport boxes.
- the transport crates can preferably be attached to different positions on the work platform 8 .
- the transport crates are preferably attached to the railing 82 of the work platform 8 .
- the transport boxes are preferably attached to the railing 82 of the working platform 8 on the outside of the working platform 8 so that the transport boxes do not restrict the working space of the working platform 8 within the railing 82 .
- the transport crates are preferably closed all around (with the possible exception of a small opening on the underside for condensation), so that the transported goods are protected against wind and weather.
- the shipping crates are preferably attached to the railing 82 on the side of the work platform 8 facing away from the supports 1 (normally to the right in the forward direction of travel).
- Spare parts such as spare rollers 21, spare seesaws 24, 25 and spare axles 4, 22 and 23 are also carried in the maintenance basket 5 to exchange these parts if the inspection reveals damage to these inspected parts.
- the working platform 8 has holders for the spare parts on the side of the working platform 8 pointing towards the supports 1, preferably on the railing 82 there. These holders are preferably designed in such a way that the spare parts are held securely even when the work platform 8 is moved. These holders are preferably arranged on the inside of the railing 82 so that the weight of the spare parts serves as a counterweight for the maintenance basket 5 .
- the working platform 8 preferably also has maintenance tools, in particular testing and/or revision tools and/or consumables such as lubricants, slide bearings, screws, nuts, etc. These can, for example, be transported in the transport boxes and/or on the work table.
- the work platform 8 also has at least one safety device 9 such as cable pulls, load slings and/or hydraulic cylinders.
- This security device(s) allow the Secure the work platform 8, the maintenance basket 5, the cable 3, the sheave battery 2 and/or the rocker(s) 24, 25 on the support 1, in particular on the lifting yoke 13.
- a hydraulic cylinder is particularly advantageously used as the safety device 9 .
- a hydraulic power pack is used for actuating the hydraulic cylinder.
- a hydraulic unit is advantageously used to actuate a plurality of hydraulic cylinders. The hydraulic unit is preferably driven mechanically, ie by a maintenance technician. However, an electric drive is also possible.
- the work platform 8 preferably has a hydraulic pump that pumps hydraulic fluid from a hydraulic accumulator into a hydraulic system.
- the hydraulic pump can be driven manually or by an electric motor.
- the hydraulic system has a distributor block that connects the hydraulic pump to a number of hydraulic consumers.
- the connection to the consumers can be fixed or, as is preferred, can be implemented as removable via connections.
- a consumer could be a hydraulic motor, for example, in order to actuate the lifting mechanism 7 or the further lifting mechanism.
- Other consumers could be hydraulic cylinders, which can be used as safety devices 9 as described above.
- the work platform 8 preferably has a power generator that generates the power required for the tools and/or the test bench.
- the power generator could possibly also drive the hydraulic pump directly.
- This additional lifting mechanism is, for example, a scissor lift.
- the lifting mechanism is arranged on the work platform 8 or the work table in such a way that it is below the cable 3 .
- the lifting mechanism can also be a crane.
- the crane preferably has a first support device, a second support device and a crane cross beam.
- the first support device is fastened or can be fastened on the working platform 8 .
- the second support device can be fastened or set down on the support structure 1, preferably on a flat platform (pedestal) of the support structure 1.
- the crane cross beam is arranged between the two support devices.
- the height of the first and/or the second support device can be adjusted so that the crane cross beam can be aligned horizontally.
- the first support device can be permanently mounted on the work platform 8 or on a structure of the work platform 8 that can be moved in the cable direction, so that the first support device only has to be adjusted in terms of its height and position in the cable direction and does not have to be mounted for every maintenance.
- the first supporting device or its movable structure is preferably mounted on the outside of the railing 82 of the working platform 8 or on the railing 82 . As a result, the space on the working platform 5 is not restricted by the crane. The first supporting device thus remains mounted when the maintenance cage 5 is moving.
- the first support device could also simply be supported within the railing 82 and/or on the floor of the work platform 8.
- the second support device is preferably supported on the support structure 1 .
- the first and/or second support device has two support legs, so that this support device stands more stably.
- the crossbeam and/or the second support device of the crane can be retracted or folded in or dismantled while the maintenance cage 5 is moving.
- the cross member can be shifted to the side of the maintenance cage 5 pointing away from the supports 1, so that the cross member, possibly with the second support device, does not get in the way while driving.
- a cable pull is preferably arranged on the crossbeam, with which parts can be lifted.
- the position of the cable pull on the crossbeam between the first and second support device can preferably be shifted (also under load) and fixed. This is preferably achieved by a sled or trolley that can be moved on the crane crossbeam and to which the cable pull is attached.
- the crane is preferably made of metal, preferably aluminum.
- the roller assembly 2 or parts of the roller assembly can be relieved in order to disassemble the roller assembly 2 for testing and/or maintenance.
- the further lifting mechanism can be used to support the rockers 25 and/or rollers 21 be used to remove the rocker and/or roller axles 22 and/or 23 for inspection and/or maintenance.
- the work platform 8 is movable relative to the basket structure. This allows the working platform 8 to be positioned better relative to the maintenance point (than the position of the working platform 8 specified by the maintenance cage structure).
- the work platform 8 can be attached to the support structure 1 during maintenance work. This can be achieved, for example, with load slings that can be moved in length, cable pulls and/or hydraulic cylinders.
- the maintenance cage structure has a lifting mechanism 7 which can lift the work platform 8 relative to the maintenance cage structure.
- a hydraulic mechanism is preferably used as the lifting mechanism 7 .
- mechanical lifting mechanisms are also possible.
- the lift mechanism 7 is actuated by the service technician's power.
- the lifting mechanism comprises two lifting mechanisms so that the ends of the work platform 8 can be lifted in the cable direction differently from the basket structure (and preferably independently of each other).
- a rope gradient can be compensated for when the maintenance basket structure is hung at two attachment points along the rope 3 . This is in 6 shown as an example.
- the maintenance cage structure is formed from two separate maintenance cage structures, which are each fastened to one of the two hanging devices 6.
- Each basket structure has one of the elevating mechanisms 7 .
- the two lifting mechanisms 7 each have a lifting carriage 71 which is connected to a corresponding attachment point of the working platform 8 (preferably at its extremities in the cable direction). Between one or both lifting mechanisms 7, preferably between the one or more lifting carriages 71, and the working platform 8 is preferred a joint 81 is also arranged, which allows the working platform 8 to rotate relative to the lifting carriage 71 about a horizontal axis 81'.
- Each of the two maintenance cage structures preferably forms a guide for the lifting carriage 71 .
- the two maintenance basket structures are only connected via the work platform 8. This saves a lot of weight.
- FIG 8 shows another embodiment of a maintenance basket.
- the working platform 8 has a framework.
- the framework forms a railing 82 and a floor framework.
- the framework and/or the base frame is formed from (welded) metal rods.
- the floor stand supports a floor surface on which the maintenance technician or technicians can stand and move and/or the work table.
- the floor frame preferably forms a frame linkage that surrounds/encircles the working platform 8 .
- the floor frame also has a further reinforcing or stiffening linkage between the frame linkage.
- the maintenance basket 5 in 8 has, like the last exemplary embodiment, two hanging devices 6, preferably on the two extremities (in the direction of the cable) of the maintenance basket 5. These are described in more detail here.
- the hanging device 6 has a hanging linkage 61 which can be attached to the rope 3 with a rope attachment mechanism such as a clamp, coupling or coupling clamp.
- the suspension linkage 61 has a roughly U-shape, so that the suspension linkage 61 is first led away from the rope 3 roughly horizontally (perpendicular to the rope direction), then is led roughly vertically downwards, and then roughly horizontally again (perpendicular to the rope direction ) is fed back under the rope 3 or under the rope attachment mechanism.
- the hanging device 6 further has a Cross member 65 on.
- the cross brace 65 is attached under the hanger linkage 61 .
- the crossbeam 65 is preferably designed to carry the work platform 8, preferably the lifting mechanism 7, which the work platform 8 carries in a height-adjustable manner.
- the cross member 65 is preferably slidably attached to the hanger linkage 61 .
- the direction of displacement is preferably horizontal and/or perpendicular to the cable direction. This allows the working platform 8 to be positioned optimally in relation to the support structure 1, in particular to the sheave assembly 2, in the displacement direction.
- the rope direction of the maintenance basket is defined by the rope attachment mechanism, by the direction defined by the two hangers 6 or by the attachment mechanism 62 even without being attached to a rope 3 of a cable car.
- the displacement device for displacing the working platform horizontally and/or perpendicularly to the cable direction could also be implemented differently.
- the hanger 6 described could also be used as a single hanger 6 for a maintenance basket.
- the hanging device 6 described can also be used in the embodiment of the maintenance basket 5 described above Figures 3 to 6 be used.
- the cable attachment mechanism preferably has a clamp coupling with which the hanging device 6 can be attached to the cable 3 .
- the hanging device 6 can thus be uncoupled from the cable 3 for the rotation of the maintenance cage 5 from the first direction of travel to the opposite second direction of travel, for example at the mountain station.
- the rope attachment mechanism further comprises rolling means to guide the hanger 6 in a dedicated revolving guide while the clamp clutch is disengaged during the revolving.
- the rolling means preferably have two rollers arranged one behind the other in the cable direction.
- the embodiment in 8 shows another alternative for a lifting mechanism 7.
- the lifting mechanism 7 described below is preferably arranged on both extremities in the cable direction of the working platform 8, so that the distance between the working platform 8 from the cable 3 or from the hanging device 6 on both Ends of the work platform 8 can be adjusted.
- the lifting mechanism 7 described below can also be used in the embodiment of the maintenance basket 5 described above Figures 3 to 6 be used.
- the lifting mechanism 7 has a rope-like structure 75 which connects the work platform 8 to the maintenance basket structure or to the hanging device 6 .
- the cable-like structure 75 is preferably a chain, but can also be designed as a cable, wire cable or other flexible, longitudinally load-bearing, elongate structure.
- the chain is preferably a one-dimensional movable chain, preferably a roller chain. Chains that can be moved in one dimension have the advantage that the movement of the work platform 8 is not possible, or only possible in a damped manner, except in the plane of the chain movement. This prevents the working platform 8 from swaying too much under the cable 3.
- the direction of movement of the one-dimensional chain is preferably arranged parallel to the direction of the cable.
- the rope-like structure 75 preferably has two rope-like substructures 75 which connect the work platform 8 to the suspension device 6 (in particular to the crossbeam 65) on two sides of the rope 3 or the rope attachment mechanism.
- Two corners of the working platform 8 are preferably connected to two lateral extremities of the suspension device 6 and the crossbeam 61, respectively.
- the four corners of the working platform 8 are connected to the two suspension devices 6 by means of four cable-like substructures 75.
- the two rope-like substructures 75 are formed from a common rope-like structure 75 .
- the common rope-like structure 75 extends from (a first end) of the crossbar 65 to (a corner) of the work platform 8. There the rope-like structure 75 is deflected and guided back to the (middle of) the crossbar 65 . There the rope-like structure 75 is deflected again and guided back to (another corner) of the working platform 8 . There becomes the ropey Structure 75 deflected again and guided back to cross brace 65 (the second end).
- the lifting mechanism 7 also has a mechanism that can change the length of the cable-like structure 75 between the suspension device 6 and the work platform 8 .
- the mechanism is preferably adapted to engage the cable-like structure and to displace the cable-like structure relative to the mechanism.
- This mechanism can be located either in the hanger 6 or on the work platform 8. In the embodiment in FIG 8 this mechanism is arranged in the hanging device 6, here the crossbeam 65, which shortens or lengthens the end(s) of the rope-like structure 75.
- the mechanism can be designed as a cable or chain hoist, for example.
- a disadvantage of the mechanism described is that the adjustability of the height is limited by the maximum length of the loop formed by the rope-like structure 75 . Due to the zigzag routing of the rope-like structure 75, a very long chain has to be used in order to achieve a large degree of adjustability. This leads to a great weight.
- Figures 9 to 12 show two alternative embodiments for the lifting mechanism 7.
- the two cable-like substructures 75 connect the suspension device 6 and the work platform 8 as described above.
- a first end of the cable-like substructure 75 is (fixedly) connected to one of the work platform 8 or the suspension device 6.
- the second end of the cable-like substructure 75, opposite the first end, is connected to the mechanism on the other of the work platform 8 and the hanger 6.
- the mechanism can freely adjust the stopping point along the rope-like structure 75 and/or change the distance between the hanger 6 or the working platform 8. This allows the distance between the hanger 6 and the working platform 8 to be adjusted up to the length of the rope-like substructure 75.
- the mechanism is preferably arranged on the work platform 8 . This allows the remainder of the cable-like substructure 75 to be suspended or stored beneath the mechanism or work platform.
- the second end of the cable-like substructure 75 can be transported, for example, in a box below the mechanism and/or below the work platform. Due to the open second end of the cable-like substructure 75, the two suspension devices 6 can also be attached to the cable 3 without the working platform 8 and the working platform 8 can subsequently be connected to the two mechanisms of the lifting mechanism 7 at the second ends of the four cable-like substructures 75.
- the mechanism has two support wheels 77 for each cable-like substructure 75.
- Each retaining wheel 77 engages with the rope-like substructure 75 and holds the rope-like substructure 75 in place.
- the rope-like substructure 75 runs between the two holding wheels 77 so that the rope-like substructure 75 cannot slip out of the two holding wheels 77 .
- the support wheels 77 are preferably arranged such that the gap between the two support wheels 77 through which the cable-like substructure 75 runs is located (in the vertical direction) below the attachment of the first end of the cable-like substructure 75 to the hanger 65.
- the cable-like structure 75 runs in a straight line in the vertical direction from the first end to the mechanism or the space between the two holding wheels 77 and also after the mechanism.
- the clamping means 78 or the bearing means 78 secure the axes of rotation of the two axes of rotation 76 on which the holding wheels 77 rotate in order to prevent the cable-like structure 75 from jumping out of the holding wheels 77 .
- the axes of rotation 76 are arranged parallel to one another.
- the axes of rotation 76 are arranged parallel to the narrow side of the work platform 8 and/or at right angles to the long side of the work platform 8 or to the cable direction.
- the axes of rotation 76 are rotatably mounted on the work platform 8 .
- the holding wheels 77 are preferably chain wheels, eg a toothed wheel for a roller chain or a pocket wheel for a link chain.
- clamping or friction wheels can be used as holding wheels 77, for example.
- the four support wheels 77 for the two cable-like substructures 75 run on the same two axles 76, so that the two support wheels 77 on both sides are rotated simultaneously and the distance between the hanger 6 and the work platform 8 is the same for both cable-like substructures 75.
- the mechanism further includes a rotating means 79 which causes the axle 76 or axles 76 to rotate.
- the rotating means 79 may have a transmission that reduces the effort required to rotate the axle 76 .
- the rotating means 76 is preferably hydraulic.
- the two axes 76 of the support wheels 77 are arranged at the same height.
- This allows the rope-like sub-structure 75 to be guided from the first end of the rope-like sub-structure 75 to the lower support wheel 77, around this lower support wheel 77, back to the upper support wheel 77, around the upper support wheel 77 back down.
- the deflection around each holding wheel 77 is preferably 180°.
- a safety device 90 on the side of the upper support wheel 77 facing the second end of the rope-like substructure 75 can be used to prevent the rope-like substructure 75 from jumping out of the upper support wheel 77 .
- a similar safety device 90 could be used on the other side of the upper support wheel 77 and/or on one or both sides of the lower support wheel 77.
- the two axes of rotation 76 vertically one above the other, so that the cable-like substructure 75 once on a first horizontal side around the upper holding wheel 77 and once on one of the first horizontal side opposite horizontal side around the lower support wheel 77 runs.
- the rope-like substructure 75 is guided in an S-shape between the two holding wheels 77 .
- the weight of the work platform 8 causes the cable-like substructure 75 to be pressed against the support wheels 77 .
- the mechanism for adjusting the distance between the hanging device 6 and the work platform 8 on the hanging device 6 .
- the first end of the rope-like substructure 75 is then placed on the work platform 8 .
- the mechanism could consist of (only) two (instead of four) holding wheels, with a cable-like substructure 75 being deflected by 180° around each holding wheel.
- the second end of the cable-like substructure 75 can hang down freely after being deflected around the corresponding support wheel.
- the rope-like substructure 75 is guided from the working platform 8 to the corresponding holding wheel of the hanging device 6, deflected there by 180° and then guided downwards again (hanging freely).
- the two holding wheels for the two cable-like substructures 75 can be mounted on a common axle 76 .
- the common axis 76 can be mounted in the cross member 65 or at least parallel to it.
- the hanging devices 6 preferably have a joint (not shown) which allows rotation about a vertical axis.
- the joint could be located between the hanger linkage 61 and the cross member 65 or in the hanger linkage 61, for example.
- the maintenance work on cable cars can be significantly shortened and simplified if the maintenance technician is transported to the maintenance point with a maintenance basket hanging on the cable 3 of the cable car and carries out the necessary maintenance work on site.
- a maintenance basket for example the maintenance basket 5 is attached to the cable 3 of the cable car.
- the maintenance technician is then transported with the maintenance basket 5 to the maintenance location, e.g. the location of the sheave assembly 2 to be maintained (see Figure 7A ).
- the maintenance cage 5 has a movable working platform 8, the working platform 8 can still be positioned in such a way that the maintenance work on the sheave assembly 2 can be carried out easily (see 6 ).
- This is preferably realized by actuating the lifting mechanism 7 or the lifting mechanisms 7 .
- the maintenance basket 5 or the work platform 5 is preferably stabilized on the support structure 1 . This is achieved, for example, by supporting rods.
- the maintenance work is now carried out.
- the first problem is that the main axle 4, on which the entire weight of the sheave assembly 2 and the load of the cable 3 rests, has to be removed.
- the sheave assembly 2 is secured at the maintenance point on the support structure 1, preferably on the lifting yoke 13.
- a safety device 9 is used for this purpose.
- the securing of the sheave assembly 2 is preferably based on suspending the load of the sheave assembly 2 on the support structure 1 or the lifting yoke 13 (see Figure 7B ).
- the cable pull also includes cable-like structures such as belts, chains, etc.
- the cable pull preferably has a cable-like structure 91 and a hydraulic cylinder 92 .
- the hydraulic cylinder 92 is a double acting, dual hydraulic cylinder.
- the securing can also be based on the support on the support structure 1 or the lifting yoke 13, e.g. if the cable 3 pushes the sheave assembly 2 upwards and the sheave assembly 2 has to be supported by the lifting yoke 13 in such a way that the main axis 4 can be removed from the roller battery 2 from the roller battery 2.
- the main axis 4 can now be cleaned and/or checked. Further (eg rocker and roller) axles 22 and 23 are preferably removed from the roller assembly 2, cleaned and/or checked. As previously described, the further lifting mechanism of the working platform 8 can be used for this in order to support the rocker 25 or the roller 21 for the expansion of its axis 23 or 22. All removed axles 4, 22 and/or 23 are reinstalled in the sheave assembly 2 (see Figure 7D ).
- the maintenance technician can position the sheave assembly 2 relative to the support structure 1 in such a way that the main axle 4 can be reinserted into the main axle opening 4' of the sheave assembly 2 and the support structure 1. Then the sheave assembly 2 is unlocked so that the load rests on the main axle 4 again (see Fig Figure 7E ).
- the maintenance technician can be transported with the maintenance basket 5 to the next maintenance location, e.g. the next sheave assembly 2.
- one or two of the following two maintenance steps are carried out: cleaning and/or revision/inspection of the main axis 4 and cleaning and/or revision/inspection of the remaining sheave assembly 2. If both maintenance steps are carried out, their order is important not matter.
- the cable 3 is preferably secured with a securing device, preferably a hydraulic cylinder, on the support structure 1, preferably on the lifting yoke. Securing the rope 3 preferably involves lifting the rope 3 off the sheaves of the sheave assembly 2. However, this step is optional and the maintenance steps could also be performed with the rope 3 stored on the sheaves 21 of the sheave assembly 2.
- the rope is preferably secured to the support structure 1 with a safety device above the main axis 4 and/or in the middle of the main seesaw 24 .
- the cable 3 is preferably only raised to such an extent that the cable 3 remains guided on the first and second side of at least one of the rollers 21 mounted in the main seesaw 24 . This provides additional security for guiding the cable 3 and prevents the cable 3 from being threaded into the rollers 21 after the maintenance work has been carried out.
- the sheave assembly 2 is secured to the support structure 1, preferably to the lifting yoke 13, at the service point. This results in the load on the main axle 4 being reduced to such an extent that the main axle 4 can be moved or removed at the maintenance point.
- a safety device is used for this.
- the securing of the sheave assembly 2 is preferably based on hanging the load of the sheave assembly 2 on the support structure 1 or the lifting yoke 13.
- the safety device preferably has two sub-safety devices, preferably two hydraulic cylinders, which attach the two extremities in the cable direction of the main rocker 24 to the support structure 1 or secure or hang up the lifting yoke 13.
- the sheave assembly 2 or the main rocker 24 could also be secured to the support structure 1 with the securing device 9 described above.
- the main axis 4 is preferably not completely removed from the recess 4' for the inspection or cleaning.
- the main axis 4 is mounted on a first side (e.g. pointing away from the support structure 1) and a second side (e.g. pointing towards the support structure 1) of the main rocker 24 in the recess 4' of the support structure 1 (see 13A ).
- the main axis 4 is now pushed out of the first side of the recess 4' in a first direction (perpendicular to the cable direction and/or away from the support structure 1).
- the main axis 4 is pushed out (only) far enough so that the main axis 4 is still located in the recess 4 ′ of the support structure 1 and the main rocker 24 on the first side.
- an auxiliary axle 96 with the same diameter or a (slightly) larger one Diameter as the main axis 4 pushed into the recess 4 'of the support structure 1 and the main rocker 24 (see Figure 13D ).
- the auxiliary axle is pushed in far enough so that the auxiliary axle is located on the second side in the recess 4 ′ of both the support structure 1 and the main rocker 24 .
- FIGS 13B through 13D show a preferred method to partially slide the main axis 4 out of the recess 4' as described.
- the auxiliary axis 96 is arranged on the second side of the auxiliary axis 96 on the main axis 4, so that their ends lie on top of one another and their circumferences are arranged flush.
- a hydraulic cylinder 94 presses the auxiliary axle 96 against the main axle 4 so that the main axle 5 is pushed out on the first side and at the same time the auxiliary axle is pushed into the recess 4 ′ of the support structure 1 on the second side.
- the auxiliary axle 96 is pushed into the recess 4' until the auxiliary axle 4' is located both in the recess 4' of the support structure 1 and in the recess 4' of the main rocker 24 and carries the main rocker 24 on the second side (see Figure 13C ).
- the auxiliary axis preferably has a recess that runs through the axis direction.
- This recess is preferably arranged rotationally symmetrically, so that the auxiliary axis 96 is designed in the form of a hollow cylinder.
- the hydraulic cylinder 94 has a plunger 93 which can be moved by the hydraulics of the hydraulic cylinder 94 and can push the auxiliary axle 96 into the recess 4'.
- the ram 93 has an attachment 95 which widens the ram 93 to such an extent that the ram 93 cannot be inserted into the recess of the auxiliary axis 96 .
- the plunger 93 can be displaced so that it presses against the auxiliary axis 96.
- the plunger 93 can also be made so wide that it does not fit into the recess 4'.
- the stamp 93 must have an attachment for the next step, which fits into the recess 4'.
- the stamp 93 is now pushed through the continuous recess of the auxiliary axis 96 and now pushes the main axis 4 further out of the first side of the recess 4' (see Figure 13D ).
- the main axis 4 is pushed out only so far that the main axis 4 is still mounted in the recess 4 ′ of the main rocker and in the recess 4 ′ of the first side of the support structure 1 .
- the main rocker 24 remains secured on both sides by the auxiliary axle 96 and the main axle 4 partially pushed out.
- auxiliary axle 96 can be made relatively short and thus weight-saving.
- the auxiliary axle 96 can be easily inserted on both sides even if there is little space.
- the auxiliary axis 96 could also be longer, so that the punch 93 does not have to be guided through the auxiliary axis 96 .
- the main axis 4 could also be pushed out directly with the hydraulic cylinder. The part of the main axis 4 protruding from the first side can now be subjected to cleaning and/or testing. For cleaning, the small parts cleaner and/or its cleaning tool is guided to the main axis 4 protruding from the recess 4 ′ of the support structure 1 .
- the test bench is guided to the main axis 4 protruding from the recess 4′ of the support structure 1 and the crack test is carried out there.
- the slide bearing in the support structure 1 and/or in the main rocker 24 can now be removed on the second side. If the sheave assembly is secured on the second side with the auxiliary axle 96, the auxiliary axle 96 must be removed for this purpose. Since the sheave assembly is further secured by the at least one safety device on the support device 1, in particular the lifting yoke 13, and/or by the main axis 4 on the first side on the support device 1, this is possible. Since the auxiliary axle 96 has a continuous recess, it is possible to reach behind the auxiliary axle 96 through the continuous recess and pull it out.
- the hydraulic cylinder used above for pushing in can preferably be operated in two directions and can thus also be used for pulling out the auxiliary axle 96 .
- the plain bearing is usually replaced (or cleaned and/or checked) and reinserted into the recess 4' of the support structure 1 and/or the sheave assembly 2 introduced. Thereafter, the main axis 4 is pushed back completely into the recess 4 ′ of the main rocker 24 and the support structure 1 . This can be done with the help of the hydraulic cylinder 94 now located on the first side. If the sheave assembly is not perfectly centered, it will be difficult to insert the main axle 4 and this can lead to damage to the plain bearing.
- the auxiliary axle 96 is preferably pushed back into the recess 4' of the support structure 1 and the sheave assembly 2/the main rocker 24 on the second side.
- the recess 4' is centered with respect to the recess 4' of the sheave assembly 2 and the main axis 4 can now simply be pushed into the recess 4' of the sheave assembly 2 and the second side of the support structure 1.
- the auxiliary axle is pushed back out of the recess 4' on the second side.
- the diameter of the auxiliary axis 96 is preferably slightly larger than the diameter of the main axis 4, so that the auxiliary axis 96 brings about optimal centering.
- the auxiliary axis 96 can thus be used both for additional securing of the sheave assembly 2 and for better centering of the recesses 4 ′ of the sheave assembly 2 and the support structure 1 .
- the process of centering the recesses 4' and inserting the main axis 4 often took more than an hour in the prior art. This process can be significantly shortened by the method described. However, it is also possible to carry out the process without the auxiliary axis 96 .
- the same procedure is now repeated analogously in the second direction.
- the main axis 4 is now pushed out of the second side of the recess 4' in a second direction (perpendicular to the cable direction and/or away from the support structure 1).
- the main axis 4 is (only) pushed out so far that the main axis 4 is still located in the recess 4 ′ of the support structure 1 and the main rocker 24 on the second side.
- the auxiliary axle is pushed into the recess 4′ of the support structure 1 and the main rocker 24 from the first side.
- the auxiliary axle is pushed in far enough so that the auxiliary axle is located on the second side in the recess 4 ′ of both the support structure 1 and the main rocker 24 .
- the part of the main axis 4 protruding from the second side can now be subjected to cleaning and/or testing.
- the main axis 4 is completely in again the recess 4' of the main rocker 24 and the support structure 1 is pushed back (in the first direction).
- the auxiliary axle is pushed out of the recess 4' in the first side.
- the entire main axle 4 can thus be checked and/or cleaned without having to remove it completely from the recess 4′ if the examination of the main axle 4 shows that it is ok. Otherwise, this is pushed out completely and replaced by a replacement main axle 4.
- the main seesaw 24 is preferably moved on a first side/extremity in the rope direction (e.g. the mountain side) of the main seesaw 24 with the safety device to the support structure 1, preferably the lifting yoke 13 in such a way that at least one of the rollers on the first side is in the rope direction of the main seesaw 24 is pressed against the rope 3.
- the roller assembly 2 or the main rocker 24 rotates about the main axis 4 and the cable 3 releases the rollers 21 on the opposite, second side (eg the valley side).
- the at least one rocker 25 on the second side of the main rocker 24 is secured with the additional lifting mechanism, preferably the crane, so that the at least one axle 23 is load-free.
- the at least one axle 23, which supports the at least one rocker 25, can now be removed.
- the rocker 25 mounted on the removed axle 23 can be lowered onto the working platform 8, disassembled, its individual parts cleaned, checked and possibly replaced, reassembled and again with the also cleaned and checked axle 23 back in the main rocker 24 are attached.
- the main seesaw 24 on the second side of the main seesaw 24 is preferably moved to the support structure 1, preferably the lifting yoke 13, with the safety device in such a way that at least one of the rollers 21 on the second side is pressed against the rope 3 in the rope direction of the main seesaw 24.
- the roller battery 2 or the main rocker 24 rotates about the main axis 4 and the cable 3 releases the rollers 21 on the opposite first side in the direction of the cable.
- the at least one rocker 25, which is mounted on the second side in the cable direction of the main rocker 24, can now be subjected to cleaning and testing.
- the at least one rocker 25 on the first side of the main rocker 24 is secured with the additional lifting mechanism, preferably the crane, so that the at least one axle 23 is load-free.
- the same maintenance steps as on the second side are now carried out on the first side in the rope direction.
- the safety device on the second side of the main seesaw 24 is moved back again, so that the cable 3 gets back into at least one of the rollers 21 on the first side of the main seesaw 24 .
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Mechanical Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Vehicle Cleaning, Maintenance, Repair, Refitting, And Outriggers (AREA)
Description
Die Erfindung bezieht sich auf einen Wartungskorb fĂĽr Seilbahnen, eine Seilbahn und ein Verfahren zur Wartung einer Seilbahn.The invention relates to a maintenance cage for cable cars, a cable car and a method for maintaining a cable car.
Seilbahnen transportieren an einem Seil hängende Kabinen, Sessel oder andere Transportbehälter zwischen zwei Orten. Vorzugsweise ist das Seil umlaufend. Zur Stützung und/oder Führung des Seils wird das Seil, insbesondere das Förderseil, auf von Stützstrukturen getragenen Rollenbatterien getragen.Cable cars transport cabins, chairs or other transport containers suspended on a rope between two locations. The cable is preferably circumferential. To support and/or guide the cable, the cable, in particular the hoisting cable, is carried on sheave assemblies supported by support structures.
Die Stützstruktur 1 ist hier als Stützpfeiler mit einem Stützenschaft 11 und mit einer auch Joch genannten Querstrebe 12 ausgeführt. Der Stützenschaft 11 und/oder die Querstrebe 12 können aber auch durch andere Stützstrukturen ersetzt werden, wie zum Beispiel ein Gebäude oder ein Fels. Vorzugsweise ragt die Querstrebe 12 auf zwei Seiten aus, so dass an jeder Extremität der Querstrebe 12 eine Rollenbatterie 2 gelagert werden kann, auf denen das Seil 3 in unterschiedliche Richtungen bewegt wird. Allerdings ist es auch möglich, dass die Stützstruktur 1 nur eine Rollenbatterie 2 trägt. Oft weisen Stützstrukturen 1 auch ein Abhebejoch 13 auf, an dem bestimmte Teile der Seilbahn, z.B. das Seil 3, befestigt werden können.The
Die Rollenbatterie 2 ist eine Baugruppe, die eine Mehrzahl von hintereinander angeordneten Rollen 21 zur Führung und Sicherung des Seils 3 aufweist. Rollenbatterien 2 tragen das Gewicht eines Seils 3 und dessen Gehänge (Hochhalter), drücken ein Seil 3 nach unten (Niederhalter) oder Kombinieren diese Funktionen (Wechselhalter).
Die Rollenbatterie 2 wiegt in der Regel mehr als 500 kg, oft mehr als 1 oder 2 Tonnen, so dass eine Verschiebung und Wartung der Rollenbatterie durch eine Person vor Ort unmöglich werden. Die Wartung einer solchen Rollenbatterie 2 beinhaltet den Ausbau aller Drehachsen, deren Reinigung und Prüfung und den erneuten Einbau der Drehachsen. Dazu muss die Rollenbatterie 2 mit einem Kran oder Helikopter von dem Stützpfeiler 1 entfernt werden, um diese Wartung durchzuführen, und daraufhin wieder an diesem montiert werden. Dies erfordert weiterhin, dass die Rollenbatterie 2 von oben zugänglich ist, wofür in der Regel das Seil 3 von den Rollen 21 der Rollenbatterie 2 entfernt und nach innen verschoben werden muss. Dies erfordert zusätzlich zu dem hohen Aufwand des Transports der Rollenbatterie einige Stunden Vorbereitung für jeden Pfeiler. Die gegenwärtige Lösung des Stands der Technik zur Wartung der Rollenbatterien ist deshalb aufwendig und nicht zufriedenstellend. Auch aufgrund des hohen Gewichts der Rollenbatterien und der hohen darauf liegenden Last, gibt es im Stand der Technik keine Lösung, wie die Achsen der Rollenbatterie ohne Abtransport der Rollenbatterien gewartet werden können.The
Es ist ein Ziel der Erfindung, die Wartung von Seilbahnen, insbesondere von Rollenbatterien, zu verbessern.It is an aim of the invention to improve the maintenance of cableways, in particular of sheave assemblies.
Erfindungsgemäss wird dieses Ziel mit einem Verfahren zur Wartung und einem Wartungskorb nach den unabhängigen Ansprüchen erreicht.According to the invention, this goal is achieved with a method for maintenance and a maintenance basket according to the independent claims.
Durch die Verwendung eines Wartungskorbs, kann ein Wartungstechniker sich direkt an die Wartungsstelle der Seilbahn bewegen und vor Ort die notwendige Wartungsarbeit erledigen. Die aufwendige Demontage und der Abtransport von Wartungsteilen wie z.B. der Rollenbatterien entfallen somit.By using a maintenance basket, a maintenance technician can move directly to the ropeway maintenance point and perform the necessary maintenance work on site. The time-consuming dismantling and removal of maintenance parts such as the roller assemblies are therefore no longer necessary.
Durch das Sicherns der Last der Rollenbatterie an einer Stützstruktur der Seilbahn kann die Last der Rollenbatterie, die z.B. durch deren Gewicht oder durch das Seil der Seilbahn verursacht wird, von der Achse genommen werden, so dass diese bewegt, gereinigt und/oder geprüft werden kann ohne die Rollenbatterie abtransportieren zu müssen. Dadurch kann die Last der Rollenbatterie von der Achse genommen werden, so dass diese gereinigt und/oder geprüft werden kann während die Rollenbatterie 2 bzw. die Hauptwippe 24 in der gesicherten Position bleibt. Vorzugsweise wird die Last an einem Abstützjoch der Stützstruktur gesichert wird.By securing the sheave assembly load to a cable car support structure, the sheave assembly load, caused for example by its weight or by the cable car cable, can be taken off the axle so that it can be moved, cleaned and/or inspected without having to remove the roller assembly. As a result, the load on the roller assembly can be removed from the axle so that it can be cleaned and/or checked while the
Durch die zwei Hubmechanismen an den zwei Hängevorrichtungen kann der Höhenunterschied des Seils an den beiden Befestigungspunkten mit den zwei Hubmechanismen ausgeglichen werden. Dies erlaubt dem sich auf der Arbeitsplattform befindlichen Wartungstechniker weiter zur Wartung der Seilbahn die Höhe der Arbeitsplattform so einzustellen, dass er an die entsprechende Wartungsstelle gelangt.Due to the two lifting mechanisms on the two hanging devices, the difference in height of the cable at the two attachment points can be compensated for with the two lifting mechanisms. This allows the located on the work platform Maintenance technicians continue to adjust the height of the work platform for maintenance of the cable car so that it can reach the corresponding maintenance point.
Weitere vorteilhafte Ausführungsformen sind in den abhängigen Ansprüchen angegeben.Further advantageous embodiments are specified in the dependent claims.
In einem AusfĂĽhrungsbeispiel wird die Last an einem AbstĂĽtzjoch der StĂĽtzstruktur gesichert.In one embodiment, the load is secured to a support yoke of the support structure.
In einem AusfĂĽhrungsbeispiel wird zur Sicherung der Last ein Hubmechanismus verwendet.In one embodiment, a lifting mechanism is used to secure the load.
In einem AusfĂĽhrungsbeispiel ist der Hubmechanismus zum Anheben der Position der Arbeitsplattform relativ zu der Wartungskorbstruktur ausgebildet.In one embodiment, the elevating mechanism is configured to raise the position of the work platform relative to the basket structure.
In einem nicht beanspruchten Ausführungsbeispiel ist die Wartungskorbstruktur zwischen dem ersten Hubmechanismus und dem zweiten Hubmechanismus nur über die höhenverstellbare Arbeitsplattform verbunden.In an embodiment not claimed, the maintenance basket structure is connected between the first lifting mechanism and the second lifting mechanism only via the height-adjustable work platform.
In einem Ausführungsbeispiel weist der erste Hubmechanismus ein seilartiges Gebilde, das die Arbeitsplattform mit der ersten Hängevorrichtung verbindet, und einen Mechanismus zum Einstellen der Länge des seilartigen Gebildes, um den Abstand zwischen der ersten Hängevorrichtung und der Arbeitsplattform einzustellen, auf, wobei der zweite Hubmechanismus ein seilartiges Gebilde, das die Arbeitsplattform mit der zweiten Hängevorrichtung verbindet, und einen Mechanismus zum Einstellen der Länge des seilartigen Gebildes, um den Abstand zwischen der ersten Hängevorrichtung und der Arbeitsplattform einzustellen, aufweist.In one embodiment, the first lifting mechanism includes a rope-like structure connecting the work platform to the first suspension device and a mechanism for adjusting the length of the rope-like structure in order to adjust the distance between the first suspension device and the work platform, the second lifting mechanism having a cable-like structure connecting the work platform to the second hanger, and a mechanism for adjusting the length of the cable-like structure to adjust the distance between the first hanger and the work platform.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel weist das seilartige Gebilde des ersten und zweiten Hubmechanismus jeweils zwei seilartige Untergebilde auf.In a non-claimed embodiment, the cable-like structure of the first and second lifting mechanisms each has two cable-like sub-structures.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel tragen die vier seilartigenIn a non-claimed embodiment, the four carry rope-like
Untergebilde die Arbeitsplattform an den vier Ecken.Substructure the work platform at the four corners.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel ist die Arbeitsplattform auf einem Hubschlitten jedes Hubmechanismus so gelagert, dass sich die Arbeitsplattform um eine horizontale Achse drehen kann, die rechtwinkelig zu der Verbindungslinie zwischen dem ersten Befestigungspunkt und dem zweiten Befestigungspunkt angeordnet ist.In an embodiment not claimed, the work platform is mounted on a lifting carriage of each lifting mechanism so that the work platform can rotate about a horizontal axis arranged perpendicular to the line connecting the first attachment point and the second attachment point.
In einem Ausführungsbeispiel ermöglicht/ermöglichen die erste Hängevorrichtung und/oder die zweite Hängevorrichtung eine Drehung der Arbeitsplattform um eine vertikale Achse.In one embodiment, the first hanger and/or the second hanger enables rotation of the work platform about a vertical axis.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel ist der Wartungskorb ausgebildet, die Arbeitsplattform horizontal und senkrecht zu der Seilrichtung zu verschieben.In an exemplary embodiment which is not claimed, the maintenance basket is designed to move the work platform horizontally and perpendicularly to the cable direction.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel ist der Boden der Arbeitsplattform als Gitterrost ausgebildet.In an exemplary embodiment that is not claimed, the floor of the work platform is designed as a grating.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel weist der Wartungskorb einen Kran auf.In an embodiment not claimed, the maintenance basket has a crane.
In einem nicht beanspruchten Ausführungsbeispiel weist der Kran eine erste Stützvorrichtung, eine zweite Stützvorrichtung, einen Querträger zwischen der ersten und zweiten Stützvorrichtung und einen an dem Querträger befestigten Hubmechanismus auf, wobei der Kran ausgebildet ist, mit der ersten Stützvorrichtung auf dem Wartungskorb abgestützt zu werden und mit der zweiten Stützvorrichtung auf einer Stützstruktur der Seilbahn abgestützt zu werden.In a non-claimed embodiment, the crane has a first support device, a second support device, a crossbeam between the first and second support device, and a lifting mechanism attached to the crossbeam, the crane being configured to be supported on the maintenance cage with the first support device and to be supported with the second support device on a support structure of the cable car.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel ist die erste StĂĽtzvorrichtung auf einer Struktur des Wartungskorbs befestigt, die eine Verschiebung der montierten ersten StĂĽtzvorrichtung in Seilrichtung erlaubt.In a non-claimed embodiment, the first support device is mounted on a structure of the maintenance cage that allows displacement of the mounted first support device in the cable direction.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel weist der Wartungskorb eineIn a non-claimed embodiment, the maintenance basket has a
PrĂĽfvorrichtung zur magnetinduktiven MaterialprĂĽfung auf.Testing device for magneto-inductive material testing.
In einem nicht beanspruchten Ausführungsbeispiel weist der Wartungskorb einen Kleinteilereiniger mit einer fettlösenden Reinigungsflüssigkeit auf.In an exemplary embodiment that is not claimed, the maintenance basket has a small parts cleaner with a grease-dissolving cleaning fluid.
In einem nicht beanspruchten Ausführungsbeispiel weist die Wartungsarbeit die folgenden Schritte auf: Drehen einer Hauptwippe der Rollenbatterie um eine Achse, die die Hauptwippe trägt, so dass das Seil von in einer ersten Seite der Hauptwippe gelagerten Rollen abgehoben wird; Reinigen und/oder Prüfen und/oder Austauschen der in der ersten Seite der Hauptwippe gelagerten Achsen, Gleitlager, Wippen und/oder Rollen; Drehen der Hauptwippe der Rollenbatterie um eine Achse, die die Hauptwippe trägt, so dass das Seil von in einer der ersten Seite gegenüberliegenden zweiten Seite der Hauptwippe gelagerten Rollen abgehoben wird; und Reinigen und/oder Prüfen und/oder Austauschen der in der zweiten Seite der Hauptwippe gelagerten Achsen, Gleitlager, Wippen und/oder Rollen.In a non-claimed embodiment, the maintenance work comprises the steps of: rotating a main seesaw of the sheave assembly about an axis supporting the main seesaw so that the rope is lifted from sheaves mounted in a first side of the main seesaw; cleaning and/or checking and/or replacing the axles, plain bearings, rockers and/or rollers mounted in the first side of the main rocker; rotating the main seesaw of the sheave assembly about an axis supporting the main seesaw so that the cable is lifted off pulleys journaled in a second side of the main seesaw opposite the first side; and cleaning and/or checking and/or replacing the axles, slide bearings, rockers and/or rollers mounted in the second side of the main rocker.
In einem nicht beanspruchten AusfĂĽhrungsbeispiel weist das Reinigen und/oder PrĂĽfen und/oder Austauschen der in der einen Seite der Hauptwippe gelagerten Achsen, Gleitlager, Wippen und/oder Rollen das Sichern der auf dieser Seite gelagerten Wippe mit einem auf der Arbeitsplattform abgestĂĽtzten Kran auf.In a non-claimed embodiment, cleaning and/or checking and/or replacing the axles, plain bearings, rockers and/or rollers mounted in one side of the main rocker includes securing the rocker mounted on that side with a crane supported on the work platform.
Weitere AusfĂĽhrungsformen werden aus der Beschreibung eines exemplarischen AusfĂĽhrungsbeispiels deutlich.Further embodiments will become apparent from the description of an exemplary embodiment.
Die Erfindung wird anhand der beigefügten Figuren näher erläutert, wobei zeigen
- Fig. 1
- eine erste Ansicht eines SeilbahnstĂĽtzpfeilers aus dem Stand der Technik mit einer Rollenbatterie.
- Fig. 2
- eine zweite Ansicht des SeilbahnstĂĽtzpfeilers aus
Fig. 1 . - Fig. 3
- eine schematische Darstellung eines Ausführungsbeispiels eines erfindungsgemässen Wartungskorbs.
- Fig. 4
- ein Schnitt durch die Linie IV-IV aus
Fig. 3 . - Fig. 5
- ein Schnitt durch die Linie V-V aus
Fig. 5 . - Fig. 6
- eine schematische Darstellung des Wartungskorbs aus
Fig. 3 mit einer Seilsteigung. - Fig. 7A bis 7E
- Darstellung der Schritte eines AusfĂĽhrungsbeispiels eines Verfahrens zur Wartung einer Seilbahn.
- Fig. 8
- ein weiteres AusfĂĽhrungsbeispiel eines Wartungskorbs.
- Fig. 9
- eine Draufsicht eines Hubmechanismus eines Wartungskorbs.
- Fig. 10
- eine Seitenansicht des Hubmechanismus aus
Fig. 9 . - Fig. 11
- eine Draufsicht eines Hubmechanismus eines Wartungskorbs.
- Fig. 12
- eine Seitenansicht des Hubmechanismus aus
Fig. 11 . - Fig. 13A
- ein schematischer Schnitt der Lagerung der Rollenbatterie in der StĂĽtzstruktur mit einer Hauptachse.
- Fig. 13B
- ein erster Schritt zum teilweisen Ausbau der Hauptachse.
- Fig. 13C
- ein zweiter Schritt zum teilweisen Ausbau der Hauptachse.
- Fig. 13D
- ein dritter Schritt zum teilweisen Ausbau der Hauptachse.
- 1
- a first view of a cable car pier from the prior art with a sheave battery.
- 2
- a second view of the cable
car support pillar 1 . - 3
- a schematic representation of an embodiment of a maintenance basket according to the invention.
- 4
- a section through the line IV-
IV 3 . - figure 5
- a section through the line VV
figure 5 . - 6
- a schematic representation of the
maintenance basket 3 with a rope climb. - Figures 7A to 7E
- Representation of the steps of an exemplary embodiment of a method for maintaining a cable car.
- 8
- another embodiment of a maintenance basket.
- 9
- Fig. 12 is a plan view of a maintenance basket lifting mechanism.
- 10
- a side view of the
lifting mechanism 9 . - 11
- Fig. 12 is a plan view of a maintenance basket lifting mechanism.
- 12
- a side view of the
lifting mechanism 11 . - 13A
- a schematic section of the storage of the roller battery in the support structure with a main axis.
- Figure 13B
- a first step towards the partial expansion of the main axis.
- Figure 13C
- a second step towards partial expansion of the main axis.
- Figure 13D
- a third step to partially expand the main axis.
Die Elemente einer Seilbahn wurden bereits im Rahmen des Stands der Technik in
Zur Wartung der Seilbahn wird nun ein Wartungskorb vorgeschlagen, der einen Wartungstechniker an eine Wartungsstelle der Seilbahn transportieren kann.
Die Hängevorrichtung 6 ist ausgebildet zur hängenden Befestigung der Wartungskorbstruktur an dem Seil 3 der Seilbahn. Vorzugsweise weist die Hängevorrichtung 6 einen Befestigungsmechanismus 62 auf, mit dem der Wartungskorb 5 an einem Hängegestänge 61 für Fahrzeuge (Kabinen, Sesselbahn, etc.) der Seilbahn befestigt werden kann, wobei das Hängegestänge 61 an dem Seil 3 befestigt ist. Dies erlaubt, den Wartungskorb 5 an unterschiedlichen Hängegestängen 61 unterschiedlicher Seilbahnen zu befestigen. Dieser Befestigungsmechanismus 62 kann z.B. ein Flansch sein oder eine Öffnung, in die das Hängegestänge eingeführt und befestigt werden kann, oder jeder andere Befestigungsmechanismus sein. Alternativ könnte der Befestigungsmechanismus 62 auch direkt aus einem Hängegestänge 61 bestehen, das auf dem Seil 3, z.B. mit einer Klemme, Kupplung oder Kuppelklemme, befestigt werden kann. Vorzugsweise weist die Hängevorrichtung 6 mindestens ein Gelenk 63, 64 auf, das oder die die Wartungskorbstruktur mit einem, zwei oder mehr Freiheitsgraden drehbar lagert. Vorzugsweise erlaubt das mindestens eine Gelenk 63, 64 eine drehbare Lagerung der Wartungskorbstruktur bzw. des Wartungskorbs 5 um eine horizontale Achse 63', die rechtwinkelig zu der Seilrichtung ausgerichtet ist. Vorzugsweise erlaubt das mindestens eine Gelenk 63, 64 eine drehbare Lagerung des Wartungskorbs 5 bzw. der Wartungskorbstruktur um eine vertikale Achse 64'. Dies ist insbesondere vorteilhaft, in dem nachfolgend beschriebenen Ausführungsbeispiel mit zwei Hängevorrichtungen 6. In dem Ausführungsbeispiel sind die zwei Gelenke 63 und 64 für die zwei Drehungen vorgesehen. Es ist aber auch möglich nur ein gemeinsames Gelenk für beide Drehungen vorzusehen. Es ist ebenfalls möglich, keine drehbare Lagerung in der Hängevorrichtung 6 vorzusehen. Vorzugsweise weist die Hängevorrichtung 6 zwei der zuvor beschriebenen Hängevorrichtungen 6 auf, so dass der Wartungskorb 5 an zwei Befestigungspunkten entlang des Seils 3 gelagert werden kann. Vorzugsweise sind beide Hängevorrichtungen 6 an dem gleichen Seil 3 befestigt. Allerdings ist es auch möglich, die zwei Hängevorrichtungen 6 an unterschiedlichen Seilen, z.B. ein Zugseil und ein Tragseil zu befestigen bzw. zu führen. Die zwei Befestigungspunkte des Wartungskorbs 5 entlang des Seils 3 befinden sich vorzugsweise an den beiden Extremitäten des Wartungskorbs 5. Die Befestigung des Wartungskorbs 5 an zwei Befestigungspunkten erlaubt eine stabile (nicht schwankende) Arbeitsplattform 8, was für Wartungsarbeiten eine grosse Hilfe ist. Durch das Gelenk 64 mit der vertikalen Drehachse 64' kann ein solcher Wartungskorb 5 bzw. die Wartungskorbstruktur besser um die Umlaufpunkte an den Enden der Seilbahn oder um sonstige Kurven geführt werden. Allerdings ist es auch möglich den Wartungskorb 5 bzw. die Wartungskorbstruktur an nur einer Hängevorrichtung 6 zu befestigen.The hanging
An der Hängevorrichtung 6 ist die Wartungskorbstruktur befestigt. Falls die Hängevorrichtung 6 nur an einem Befestigungspunkt am Seil 3 befestigt ist, so ist die Wartungskorbstruktur vorzugsweise zentriert über dem Schwerpunkt des Wartungskorbs 5 an der Hängevorrichtung 6 befestigt. Fall die Hängevorrichtung 6 mit zwei Hängevorrichtungen 6 an zwei Befestigungspunkten an dem Seil 3 befestigt sind, so wird die Wartungskorbstruktur (vorzugsweise an deren Extremitäten) an den zwei Hängevorrichtungen 6 befestigt.The maintenance cage structure is attached to the
Die Arbeitsplattform 8 ist nun auf der Wartungskorbstruktur befestigt, so dass Wartungsarbeiten an der Wartungsstelle durch den auf der Arbeitsplattform 8 befindlichen Wartungstechniker durchführbar sind. Die Arbeitsplattform 8 ist dabei vorzugsweise länger als 2 Meter (m), vorzugsweise länger als 3 m, vorzugsweise länger als 4 m. Die Länge erstreckt sich grundsätzlich in Richtung des Seils 3. Die Arbeitsplattform 8 ist dabei vorzugsweise breiter als 50 Zentimeter (cm), vorzugsweise breiter als 80 cm, vorzugsweise breiter als 1 m/100 cm. Die Breite erstreckt sich grundsätzlich rechtwinkelig zu dem Seil 3. Vorzugsweise ist die Arbeitsplattform 8 rechtwinkelig. Der Boden der Arbeitsplattform 8 weist vorzugsweise einen Gitterrost auf. Der Gitterrost ist vorzugsweise in allen Bereichen des Bodens angeordnet, auf denen sich der Wartungstechniker bewegen kann. Der Gitterrost hat sich dabei als besonders vorteilhaft erwiesen, da auch bei Schnee und Verunreinigung mit rutschigen Materialien wie Öl und Fett weiterhin einen sicheren Stand für den Wartungstechniker erlaubt. Vorzugsweise weist die Arbeitsplattform 8 ein Geländer auf, so dass ein sich auf der Arbeitsplattform 8 befindlicher Wartungstechniker sich festhalten kann und/oder gegen Herunterfallen geschützt wird. Vorzugsweise läuft das Geländer um die für den Wartungstechniker zugänglichen Seiten der Arbeitsplattform 8 herum.The working
Vorzugsweise weist die Arbeitsplattform 8 einen Arbeitstisch, vorzugsweise eine Werkbank, auf. Der Arbeitstisch ist vorzugsweise beweglich auf der Arbeitsplattform 8 angeordnet, z.B. auf Rollen und/oder Schienen. Vorzugsweise weist die Arbeitsplattform 8 eine Leiter auf. Vorzugsweise ist diese Leiter in das Geländer integriert.The
Vorzugsweise weist die Arbeitsplattform 8 eine Prüfbank zur magnetinduktiven Materialprüfung von Teilen der Seilbahn, insbesondere der Rollenbatterie, insbesondere von Achsen, insbesondere der Hauptachse 4, der Wippenachsen 23 und/oder der Rollenachsen 22 auf. Diese Prüfbank zur magnetinduktiven Materialprüfung wird auch als MT Prüfbank bezeichnet. Die magnetinduktive Materialprüfung ist vorzugsweise eine Magnetpulverprüfung. Die Prüfbank ist dabei mobil auf der Arbeitsplattform 8 befestigt, so dass die Prüfbank zur Materialprüfung der Hauptachse 4 der Rollenbatterie zur Ausnehmung 4' in der Stützstruktur 1 bewegt werden kann. Für die Materialprüfung der restlichen Teile wird die Prüfbank vorzugsweise auf der Arbeitsplattform 8, vorzugsweise auf dem Arbeitstisch befestigt. Die Materialprüfung ist vorzugsweise eine zerstörungsfreie Werkstoffprüfung (ZfP). Dies dient zum Beispiel zum Aufspüren von Rissen in dem Teil.Preferably, the
Vorzugsweise weist die Arbeitsplattform 8, vorzugsweise der Arbeitstisch einen Kleinteilereiniger zur Reinigung der zu wartenden Teile der Seilbahn auf. Vorzugsweise ist der Kleinteilereiniger ausgebildet, die besagten Teile mittels eines Reinigungsfluids zu reinigen. Das Reinigungsfluid ist zum Beispiel Pressluft oder eine Reinigungsflüssigkeit. Als Reinigungsflüssigkeit wird vorzugsweise eine fettlösende Flüssigkeit verwendet, um die Teile von verschmutztem Öl oder Fett zu befreien. Vorzugsweise weist der Kleinteilereiniger ein Reinigungswerkzeug auf, das in Fluidverbindung mit einer Quelle bzw. Speicher für das Reinigungsfluid steht, so dass die besagten Teile mit dem Reinigungswerkzeug und dem aus dem Reinigungswerkzeug austretenden Reinigungsfluid gereinigt werden können. Vorzugsweise weist der Kleinteilereiniger weiterhin eine Auffangvorrichtung auf, um eine Ablussflüssigkeit aufzufangen. Der Kleinteilereiniger und/oder das Reinigungswerkzeug ist dabei so mobil, dass es zu der Ausnehmung 4' der Hauptachse 4 geführt werden kann, um die Hauptachse 4 vor Ort zu reinigen.The
Vorzugsweise weist die Arbeitsplattform 8 eine Mehrzahl an Transportkisten auf. Die Transportkisten sind vorzugsweise an unterschiedlichen Positionen auf der Arbeitsplattform 8 befestigbar. Vorzugsweise werden die Transportkisten an dem Geländer 82 der Arbeitsplattform 8 befestigt. Vorzugsweise werden die Transportkisten an der Aussenseite der Arbeitsplattform 8 an dem Geländer 82 der Arbeitsplattform 8 befestigt, so dass die Transportkisten den Arbeitsraum der Arbeitsplattform 8 innerhalb des Geländers 82 nicht einschränken. Die Transportkisten sind vorzugsweise rundum geschlossen (mit Ausnahme evtl. einer kleinen Öffnung an der unteren Seite für Kondenswasser), so dass das Transportgut gegen Wind und Wetter geschützt ist. Die Transportkisten sind vorzugsweise an der Seite der Arbeitsplattform 8 an dem Geländer 82 befestigt, die von den Stützen 1 weg zeigt (normalerweise rechts in Vorwärtsfahrtrichtung).The working
Ersatzteile wie Ersatzrollen 21, Ersatzwippen 24, 25 und Ersatzachsen 4, 22 und 23 werden ebenfalls in dem Wartungskorb 5 transportiert, um diese Teile auszutauschen, falls die Prüfung einen Schaden an diesen geprüften Teilen ergibt. Die Arbeitsplattform 8 weist an der zu den Stützen 1 hinzeigenden Seite der Arbeitsplattform 8, vorzugsweise an dem dortigen Geländer 82 Halterungen für die Ersatzteile auf. Diese Halterungen sind vorzugsweise so ausgebildet, dass die Ersatzteile sich auch bei einem Bewegen der Arbeitsplattform 8 sicher gehalten werden. Vorzugsweise sind diese Halterungen an der Innenseite des Geländers 82 angeordnet, so dass das Gewicht der Ersatzteile als Ausgleichsgewicht für den Wartungskorb 5 dient.Spare parts such as
Die Arbeitsplattform 8 weist vorzugsweise weiterhin Wartungswerkzeuge, insbesondere Prüf- und/oder Revisionswerkzeuge und/oder Verbrauchsmaterial wie Schmiermittel, Gleitlager, Schrauben, Muttern, etc. auf. Diese können zum Beispiel in den Transportkisten und/oder auf dem Arbeitstisch transportiert werden.The working
Die Arbeitsplattform 8 weist weiterhin mindestens eine Sicherungsvorrichtung, 9 wie Seilzüge, Lastschlingen und/oder Hydraulikzylinder auf. Diese Sicherungsvorrichtung(en) erlauben die Arbeitsplattform 8, den Wartungskorb 5, das Seil 3, die Rollenbatterie 2 und/oder die Wippe(n) 24, 25 an der Stütze 1, insbesondere an dem Abhebejoch 13 zu sichern. Als Sicherungsvorrichtung 9 wird besonders vorteilhaft ein Hydraulikzylinder verwendet. Ein Hydraulikaggregat wird für die Bestätigung des Hydraulikzylinders verwendet. Vorteilhafterweise wird ein Hydraulikaggregat für die Betätigung mehrerer Hydraulikzylinder verwendet. Das Hydraulikaggregat wird vorzugsweise mechanisch, d.h. durch einen Wartungstechniker, angetrieben. Allerdings ist auch ein elektrischer Antrieb möglich.The
Die Arbeitsplattform 8 weist vorzugsweise eine Hydraulikpumpe auf, die Hydraulikflüssigkeit aus einem Hydraulikspeicher in ein Hydrauliksystem pumpt. Die Hydraulikpumpe kann händisch angetrieben werden oder durch einen Elektromotor. Das Hydrauliksystem weist einen Verteilerblock auf, der die Hydraulikpumpe mit mehreren Hydraulikverbrauchern verbindet. Die Verbindung zu den Verbrauchern kann dabei fest sein oder, wie bevorzugt, entfernbar über Anschlüsse realisiert sein. Ein Verbraucher könnte zum Beispiel ein Hydraulikmotor sein, um den Hubmechanismus 7 oder den weiteren Hubmechanismus zu betätigen. Weitere Verbraucher könnten Hydraulikzylinder sein, die wie zuvor beschrieben als Sicherungsvorrichtungen 9 verwendet werden können.The
Die Arbeitsplattform 8 weist vorzugsweise einen Stromgenerator auf, der den für die Werkzeuge und/oder die Prüfbank notwendigen Strom erzeugt. Der Stromgenerator könnte evtl. auch direkt die Hydraulikpumpe antreiben.The
Vorzugsweise weist die Arbeitsplattform 8, vorzugsweise der Arbeitstisch, einen weiteren Hubmechanismus auf. Dieser weitere Hubmechanismus ist zum Beispiel ein Scherenlift. Der Hubmechanismus ist so auf der Arbeitsplattform 8 bzw. dem Arbeitstisch angeordnet, dass er sich unterhalb des Seils 3 befindet. Der Hubmechanismus kann aber auch ein Kran sein. Vorzugsweise weist der Kran eine erste Stützvorrichtung, eine zweite Stützvorrichtung und einen Kranquerträger auf. Die erste Stützvorrichtung ist auf der Arbeitsplattform 8 befestigt oder befestigbar. Die zweite Stützvorrichtung ist auf der Stützstruktur 1, vorzugsweise auf einer ebenen Plattform (Podest) der Stützstruktur 1 befestigbar oder abstellbar. Der Kranquerträger ist zwischen den beiden Stützvorrichtungen angeordnet. Die erste und/oder die zweite Stützvorrichtung ist in ihrer Höhe verstellbar, so dass der Kranquerträger horizontal ausgerichtet werden kann. Die erste Stützvorrichtung kann dabei fest auf der Arbeitsplattform 8 oder auf einer in Seilrichtung beweglichen Struktur der Arbeitsplattform 8 montiert sein, so dass die erste Stützvorrichtung nur noch in ihrer Höhe und Position in Seilrichtung eingestellt werden muss und nicht bei jeder Wartung montiert werden muss. Vorzugsweise wird die erste Stützvorrichtung bzw. dessen bewegliche Struktur an der Aussenseite des Geländers 82 der Arbeitsplattform 8 bzw. auf dem Geländer 82 montiert. Dadurch wird der Platz auf der Arbeitsplattform 5 nicht durch den Kran eingeschränkt. Die erste Stützvorrichtung bleibt somit bei der Fahrt des Wartungskorbs 5 montiert. Allerdings könnte die erste Stützvorrichtung auch einfach innerhalb des Geländers 82 und/oder auf dem Boden der Arbeitsplattform 8 abgestützt werden. Die zweite Stützvorrichtung wird vorzugsweise auf der Stützstruktur 1 abgestützt. Die erste und/oder zweite Stützvorrichtung weist zwei Stützbeine auf, so dass diese Stützvorrichtung stabiler steht. Der Querträger und/oder die zweite Stützvorrichtung des Krans können während der Fahrt des Wartungskorbs 5 eingefahren oder eingeklappt oder demontiert werden. So kann zum Beispiel der Querträger zu der von den Stützen 1 weg zeigenden Seite des Wartungskorbs 5 verschoben werden, so dass der Querträger, evtl. mit der zweiten Stützvorrichtung während der Fahrt nicht stört. Auf dem Querträger ist vorzugsweise ein Seilzug angeordnet, mit dem Teile angehoben werden können. Die Position des Seilzugs auf dem Querträger zwischen der ersten und zweiten Stützvorrichtung kann vorzugsweise (auch unter Belastung) verschoben werden und fixiert werden. Dies wird vorzugsweise durch einen auf dem Kranquerträger verschiebbaren Schlitten oder Laufkatze erreicht, an dem der Seilzug befestigt ist. Der Kran ist vorzugsweise aus Metall, vorzugsweise aus Aluminium. Mit dem weiteren Hubmechanismus kann die Rollenbatterie 2 bzw. Teile der Rollenbatterie entlastet werden, um die Rollenbatterie 2 für die Prüfung und/oder Wartung zu zerlegen. Insbesondere kann der weitere Hubmechanismus zur Stützung der Wippen 25 und/oder Rollen 21 verwendet werden, um die Wippen- und/oder Rollenachsen 22 und/der 23 für die Prüfung und/oder Wartung auszubauen.The
In einem Ausführungsbeispiel ist die Arbeitsplattform 8 gegenüber der Wartungskorbstruktur beweglich. Dies erlaubt, die Arbeitsplattform 8 gegenüber der Wartungsstelle besser (als die durch die Wartungskorbstruktur vorgegebene Position der Arbeitsplattform 8) zu positionieren. In einem einfachen Fall kann die Arbeitsplattform 8 während der Wartungsarbeiten an der Stützstruktur 1 befestigt werden. Dies kann zum Beispiel mit in deren Länge beweglichen Lastschlingen, Seilzügen und/oder Hydraulikzylindern erreicht werden. In einem bevorzugten Ausführungsbeispiel weist die Wartungskorbstruktur einen Hubmechanismus 7 auf, der die Arbeitsplattform 8 gegenüber der Wartungskorbstruktur anheben kann. Somit kann die Arbeitsplattform 8 näher an die Wartungsstelle gebracht werden. Vorzugsweise wird als Hubmechanismus 7 ein hydraulischer Mechanismus verwendet. Allerdings sind auch mechanische Hubmechanismen möglich. Vorzugsweise wird der Hubmechanismus 7 durch die Kraft des Wartungstechnikers betätigt. Allerdings ist auch eine motorische Betätigung möglich. Vorzugsweise weist der Hubmechanismus zwei Hubmechanismen auf, so dass die Enden der Arbeitsplattform 8 in Seilrichtung unterschiedlich gegenüber der Wartungskorbstruktur (und vorzugsweise unabhängig voneinander) angehoben werden können. Dadurch kann eine Seilsteigung ausgeglichen werden, wenn die Wartungskorbstruktur an zwei Befestigungspunkten entlang des Seils 3 aufgehängt wird. Dies ist in
Erfindungsgemäss wird mit zwei Hängevorrichtungen 6 und zwei Hubmechanismen 7 die Wartungskorbstruktur aus zwei getrennten Wartungskorbstrukturen gebildet, die jeweils an einer der beiden Hängevorrichtungen 6 befestigt sind. Jede Wartungskorbstruktur weist einen der Hubmechanismen 7 auf. Die beiden Hubmechanismen 7 weisen jeweils einen Hubschlitten 71 auf, der mit einem entsprechenden Befestigungspunkt der Arbeitsplattform 8 (vorzugsweise an dessen Extremitäten in Seilrichtung) verbunden ist. Zwischen einem oder beiden Hubmechanismen 7, vorzugsweise zwischen dem oder den Hubschlitten 71, und der Arbeitsplattform 8 ist vorzugsweise noch ein Gelenk 81 angeordnet, das eine Drehung der Arbeitsplattform 8 gegenüber dem Hubschlitten 71 um eine horizontale Achse 81' erlaubt. Vorzugsweise bildet jede der beiden Wartungskorbstrukturen eine Führung für den Hubschlitten 71 aus. Vorzugsweise sind die zwei Wartungskorbstrukturen nur über die Arbeitsplattform 8 verbunden. Dies spart viel Gewicht. Allerdings ist es ebenfalls möglich, eine gemeinsame / verbundene Wartungskorbstruktur zwischen beiden Hängevorrichtungen 6 vorzusehen, auf der dann die Arbeitsplattform 8 (beweglich oder nicht) gelagert ist.According to the invention, with two
Die Arbeitsplattform 8 weist ein Rahmengestell auf. Das Rahmengestell bildet ein Geländer 82 und ein Bodengestell aus. Das Rahmengestell und/oder das Bodengestell ist aus (verschweissten) Metallstangen gebildet. Das Bodengestell trägt eine Bodenfläche, auf der der oder die Wartungstechniker stehen und sich bewegen kann oder können, und/oder den Arbeitstisch. Das Bodengestell bildet vorzugsweise eine die Arbeitsplattform 8 umrandendes/umlaufendes Rahmengestänge aus. Vorzugsweise weist das Bodengestell weiterhin zwischen dem Rahmengestänge ein weiteres Verstärkungs- oder Versteifungsgestänge auf.The working
Der Wartungskorb 5 in
Das AusfĂĽhrungsbeispiel in
Der Hubmechanismus 7 weist ein seilartiges Gebilde 75 auf, das die Arbeitsplattform 8 mit der Wartungskorbstruktur bzw. mit der Hängevorrichtung 6 verbindet. Das seilartige Gebilde 75 ist vorzugsweise eine Kette, kann aber auch als Seil, Drahtseil oder anderes flexibles, in Längsrichtung tragendes, längliches Gebilde ausgebildet sein. Die Kette ist vorzugsweise eine eindimensional bewegliche Kette, vorzugsweise eine Rollenkette. Eindimensional bewegliche Ketten haben den Vorteil, dass die Bewegung der Arbeitsplattform 8 ausser in der Ebene der Kettenbewegung nicht oder nur gedämpft möglich ist. Dies verhindert ein zu grosses Schwanken der Arbeitsplattform 8 unter dem Seil 3. Vorzugsweise ist die Bewegungsrichtung der eindimensionalen Kette parallel zu der Seilrichtung angeordnet. Allerdings ist es auch möglich zweidimensional bewegliche Kette, wie zum Beispiel eine Gliederkette, oder andere eindimensional bewegliche Kettenarten zu verwenden. Ketten haben eine hohe Traglast und sind sehr stabil gegenüber Fremdeinflüssen wie Feuer und Witterung. Das seilartige Gebilde 75 weist vorzugsweise zwei seilartige Untergebilde 75 auf, die auf zwei Seiten des Seils 3 oder des Seilbefestigungsmechanismus die Arbeitsplattform 8 mit der Hängevorrichtung 6 (insbesondere mit dem Querträger 65) verbindet. Vorzugsweise sind zwei Ecken der Arbeitsplattform 8 mit zwei lateralen Extremitäten der Hängevorrichtung 6 bzw. des Querträgers 61 verbunden. Im Falle von zwei Hubvorrichtungen 7 werden somit die vier Ecken der Arbeitsplattform 8 mit vier seilartigen Untergebilden 75 mit den zwei Hängevorrichtungen 6 verbunden. In dem in
Der Hubmechanismus 7 weist weiterhin einen Mechanismus auf, der die Länge des seilartigen Gebildes 75 zwischen der Hängevorrichtung 6 und der Arbeitsplattform 8 verändern kann. Der Mechanismus ist vorzugsweise ausgebildet, in das seilartige Gebilde einzugreifen und das seilartige Gebilde relativ zu dem Mechanismus zu verschieben. Dieser Mechanismus kann entweder in der Hängevorrichtung 6 oder auf der Arbeitsplattform 8 angeordnet sein. In dem Ausführungsbeispiel in
Nachteilig an dem beschriebenen Mechanismus ist, dass die Verstellbarkeit der Höhe durch die Maximallänge der durch das seilartige Gebilde 75 gebildete Schlaufe begrenzt ist. Durch die Zickzackführung des seilartigen Gebildes 75 muss eine sehr lange Kette verwendet werden, um eine grosse Verstellbarkeit zu erreichen. Dies führt zu einem grossen Gewicht.A disadvantage of the mechanism described is that the adjustability of the height is limited by the maximum length of the loop formed by the rope-
In dem AusfĂĽhrungsbeispiel in
In dem beschriebenen Ausführungsbeispiel sind die beiden Achsen 76 der Halteräder 77 auf der gleichen Höhe angeordnet. Alternativ ist es aber auch möglich, die Drehachsen 76 der beiden Halteräder 77 vertikal (und horizontal) versetzt zueinander anzuordnen, so dass die Drehachsen 76 auf unterschiedlichen Höhen angeordnet sind. Dies ist zum Beispiel in dem Ausführungsbeispiel in den
In einem nicht gezeigten Ausführungsbeispiel wäre es auch möglich, die beiden Drehachsen 76 vertikal übereinander anzuordnen, so dass das seilartige Untergebilde 75 einmal auf einer ersten horizontalen Seite um das obere Halterad 77 und einmal auf einer der ersten horizontalen Seite gegenüberliegenden horizontalen Seite um das untere Halterad 77 läuft. Somit wird das seilartige Untergebilde 75 S-förmig zwischen den beiden Halterädern 77 geführt. Das Gewicht der Arbeitsplattform 8 führt dazu, dass das seilartige Untergebilde 75 gegen die Halteräder 77 gedrückt werden.In an embodiment that is not shown, it would also be possible to arrange the two axes of
In einem nicht gezeigten Ausführungsbeispiel wäre es auch möglich, den Mechanismus zur Einstellung des Abstands zwischen der Hängevorrichtung 6 und der Arbeitsplattform 8 an der Hängevorrichtung 6 anzuordnen. Das erste Ende der seilartigen Untergebilde 75 wird dann auf der Arbeitsplattform 8 angeordnet. Der Mechanismus könnte so aus (nur) zwei (anstatt vier) Halterädern bestehen, wobei um jedes Halterad jeweils ein seilartiges Untergebilde 75 um 180° umgelenkt wird. Das zweite Ende des seilartigen Untergebildes 75 kann nach der Umlenkung um das entsprechende Halterad frei herunterhängen. Das seilartige Untergebildet 75 wird von der Arbeitsplattform 8 zu dem entsprechenden Halterad der Hängevorrichtung 6 geführt, dort um 180° umgelenkt und dann wieder nach unten geführt (frei hängend). Die beiden Halteräder für die beiden seilartigen Untergebilde 75 können auf einer gemeinsamen Achse 76 gelagert sein. Die gemeinsame Achse 76 kann in dem Querträger 65 oder zumindest parallel zu diesem gelagert sein.In an exemplary embodiment that is not shown, it would also be possible to arrange the mechanism for adjusting the distance between the hanging
Vorzugsweise weisen die Hängevorrichtungen 6 ein nicht gezeigtes Gelenk auf, das eine Drehung um eine vertikale Achse erlaubt. Das Gelenk könnte zum Beispiel zwischen dem Hängegestänge 61 und dem Querträger 65 oder in dem Hängegestänge 61 angeordnet sein.The hanging
Erfindungsgemäss kann die Wartungsarbeit an Seilbahnen signifikant verkürzt und vereinfacht werden, wenn der Wartungstechniker mit einem an dem Seil 3 der Seilbahn hängenden Wartungskorb an die Wartungsstelle befördert wird und vor Ort die notwendigen Wartungsarbeiten ausführt.According to the invention, the maintenance work on cable cars can be significantly shortened and simplified if the maintenance technician is transported to the maintenance point with a maintenance basket hanging on the
In
In einem ersten Schritt wird ein Wartungskorb, z.B. der Wartungskorb 5, an dem Seil 3 der Seilbahn befestigt. Dann wird der Wartungstechniker mit dem Wartungskorb 5 an die Wartungsstelle, z.B. den Ort der zu wartenden Rollenbatterie 2, befördert (siehe
In einem zweiten Schritt wird nun die Wartungsarbeit durchgeführt. Im Falle der Rollenbatterie 2 ist das erste Problem, dass die Hauptachse 4, auf der das gesamte Gewicht der Rollenbatterie 2 und die Last des Seils 3 aufliegt, ausgebaut werden muss. Dazu wird in einem bevorzugten Ausführungsbeispiel die Rollenbatterie 2 an der Wartungsstelle an der Stützstruktur 1, vorzugsweise an dem Abhebejoch 13, gesichert. Dies führt dazu, dass die Last auf der Hauptachse 4 soweit reduziert wird, dass die Hauptachse 4 an der Wartungsstelle ausgebaut werden kann. Dazu wird eine Sicherungsvorrichtung 9 verwendet. Vorzugsweise basiert die Sicherung der Rollenbatterie 2 auf einem Aufhängen der Last der Rollenbatterie 2 auf der Stützstruktur 1 bzw. dem Abhebejoch 13 (siehe
In einem dritten Schritt kann der Wartungstechniker mit dem Wartungskorb 5 zu einer nächsten Wartungsstelle, z.B. der nächsten Rollenbatterie 2 befördert werden.In a third step, the maintenance technician can be transported with the maintenance basket 5 to the next maintenance location, e.g. the
In einem alternativen zweiten Schritt wird einer oder zwei der folgenden zwei Wartungsschritte durchgefĂĽhrt: eine Reinigung und/oder Revision/PrĂĽfung der Hauptachse 4 und eine Reinigung und/oder Revision/PrĂĽfung der restlichen Rollenbatterie 2. Wenn beide Wartungsschritte ausgefĂĽhrt werden, so spielt deren Reihenfolge keine Rolle.In an alternative second step, one or two of the following two maintenance steps are carried out: cleaning and/or revision/inspection of the main axis 4 and cleaning and/or revision/inspection of the remaining
Vor dem Durchführen einer oder beider der Wartungsschritte wird vorzugsweise das Seil 3 mit einer Sicherungsvorrichtung, vorzugsweise einem Hydraulikzylinder an der Stützstruktur 1, vorzugsweise an dem Abhebejoch gesichert. Das Sichern des Seils 3 beinhaltet vorzugsweise ein Abheben des Seils 3 von den Rollen der Rollenbatterie 2. Allerdings ist dieser Schritt optional und die Wartungsschritte könnten auch mit auf den Rollen 21 der Rollenbatterie 2 gelagerten Seil 3 vollzogen werden. Vorzugsweise wird das Seil mit einer Sicherungsvorrichtung über der Hauptachse 4 und/oder in der Mitte der Hauptwippe 24 an der Stützstruktur 1 gesichert. Vorzugsweise wird das Seil 3 nur soweit angehoben, dass das Seil 3 auf der ersten und zweiten Seite zumindest einer der in der Hauptwippe 24 gelagerten Rollen 21 geführt bleibt. Dies gibt eine zusätzliche Sicherheit für die Führung des Seils 3 und verhindert ein umständliches Einfädeln des Seils 3 in die Rollen 21 nach den durchgeführten Wartungsarbeiten.Before carrying out one or both of the maintenance steps, the
Im Folgenden wird die Reinigung und/oder Prüfung der Hauptachse 4 beschrieben. Wie zuvor beschrieben wird in einem bevorzugten Ausführungsbeispiel die Rollenbatterie 2 an der Wartungsstelle an der Stützstruktur 1, vorzugsweise an dem Abhebejoch 13, gesichert. Dies führt dazu, dass die Last auf der Hauptachse 4 soweit reduziert wird, dass die Hauptachse 4 an der Wartungsstelle bewegt bzw. ausgebaut werden kann. Dazu wird eine Sicherungsvorrichtung verwendet. Vorzugsweise basiert die Sicherung der Rollenbatterie 2 auf einem Aufhängen der Last der Rollenbatterie 2 auf der Stützstruktur 1 bzw. dem Abhebejoch 13. Vorzugsweise weist die Sicherheitsvorrichtung zwei Untersicherheitsvorrichtungen, vorzugsweise zwei Hydraulikzylinder auf, die die beiden Extremitäten in Seilrichtung der Hauptwippe 24 an der Stützstruktur 1 bzw. dem Abhebejoch 13 sichern bzw. aufhängen. Allerdings könnte die Rollenbatterie 2 bzw. die Hauptwippe 24 auch mit der oben beschriebenen Sicherungsvorrichtung 9 an der Stützstruktur 1 gesichert werden. Vorzugsweise wird die Hauptachse 4 für die Prüfung bzw. Reinigung nicht komplett aus der Ausnehmung 4' genommen. Die Hauptachse 4, ist auf einer (z.B. von der Stützstruktur 1 wegzeigenden) ersten Seite und einer (z.B. zu der Stützstruktur 1 hinzeigenden) zweiten Seite der Hauptwippe 24 in der Ausnehmung 4' der Stützstruktur 1 gelagert (siehe
Das Reinigen und/oder Prüfen der restlichen Rollenbatterie 2 wird im Folgenden beschrieben. Vorzugsweise wird hierfür die Hauptwippe 24 auf einer ersten Seite/Extremität in Seilrichtung (zum Beispiel der Bergseite) der Hauptwippe 24 mit der Sicherungsvorrichtung so zu der Stützstruktur 1, vorzugsweise dem Abhebejoch 13 bewegt, dass zumindest eine der Rollen der ersten Seite in Seilrichtung der Hauptwippe 24 gegen das Seil 3 gedrückt wird. Dadurch dreht sich die Rollenbatterie 2 bzw. die Hauptwippe 24 um die Hauptachse 4 und das Seil 3 gibt die Rollen 21 der gegenüberliegenden zweiten Seite (z.B. die Talseite) frei. Dies hat den Vorteil, dass das Seil während der Reinigung bzw. der Revision immer in zumindest einer der Rollen 21 der Rollenbatterie 2 geführt bleibt. Die zumindest eine Wippe 25, Achse 22, 23, Gleitlager und/oder Rolle 21, die auf der zweiten Seite der Hauptwippe 24 (relativ zu der Hauptachse 4) gelagert sind/ist, kann/können nun der Reinigung und/oder der Prüfung und/oder dem Austausch unterzogen werden. Dazu wird die zumindest eine Wippe 25 der zweiten Seite der Hauptwippe 24 mit dem weiteren Hubmechanismus, vorzugsweise dem Kran gesichert, so dass die mindestens eine Achse 23 lastfrei ist. Die mindestens eine Achse 23, die die mindestens eine Wippe 25 lagert, kann nun ausgebaut werden. Dadurch kann die an der ausgebauten Achse 23 gelagerte Wippe 25 auf die Arbeitsplattform 8 herabgelassen werden, auseinander genommen werden, dessen Einzelteile gereinigt, geprüft und evtl. ersetzt werden, wieder zusammengebaut werden und erneut mit der ebenfalls gereinigten und geprüften Achse 23 wieder in der Hauptwippe 24 befestigt werden. Sollte die zweite Seite in Seilrichtung der Hauptwippe 24 mehr als eine Wippe 25 aufweisen, so wird dies für jede der Wippe 25 durchgeführt. Die Sicherungsvorrichtung auf der ersten Seite der Hauptwippe 24 wird wieder zurückbewegt, so dass das Seil 3 wieder zurück in zumindest eine der Rollen 21 der zweiten Seite der Hauptwippe 24 gelangt. Das gleiche wird nun auf der anderen Seite durchgeführt. Vorzugsweise wird hierfür die Hauptwippe 24 auf der zweiten Seite der Hauptwippe 24 mit der Sicherungsvorrichtung so zu der Stützstruktur 1, vorzugsweise dem Abhebejoch 13 bewegt, dass zumindest eine der Rollen 21 der zweiten Seite in Seilrichtung der Hauptwippe 24 gegen das Seil 3 gedrückt werden. Dadurch dreht sich die Rollenbatterie 2 bzw. die Hauptwippe 24 um die Hauptachse 4 und das Seil 3 gibt die Rollen 21 der gegenüberliegenden ersten Seite in Seilrichtung frei. Die zumindest eine Wippe 25, die auf der zweiten Seite in Seilrichtung der Hauptwippe 24 gelagert ist, kann nun der Reinigung und der Prüfung unterzogen werden. Dazu wird die zumindest eine Wippe 25 der ersten Seite der Hauptwippe 24 mit dem weiteren Hubmechanismus, vorzugsweise dem Kran gesichert, so dass die mindestens eine Achse 23 lastfrei ist. Die gleichen Wartungsschritte wie auf der zweiten Seite werden nun auf der ersten Seite in Seilrichtung durchgeführt. Die Sicherungsvorrichtung auf der zweiten Seite der Hauptwippe 24 wird wieder zurückbewegt, so dass das Seil 3 wieder zurück in zumindest eine der Rollen 21 der ersten Seite der Hauptwippe 24 gelangt.The cleaning and/or checking of the remaining
Claims (15)
- Maintenance cage for the maintenance of a cable car, having:a maintenance cage structure;a suspension device (6) for fastening the maintenance cage structure so as to be suspended from a cable (3) of the cable car, wherein the suspension device (6) has a first suspension device and a second suspension device, wherein the first suspension device is configured for fastening the maintenance cage structure so as to be suspended from a first fastening point on the cable (3) of the cable car, and the second suspension device is configured for fastening the maintenance cage structure so as to be suspended from a second fastening point on the cable (3) of the cable car; anda working platform (8) configured for transporting a maintenance technician to a maintenance location of the cable car and for carrying out the maintenance work at the maintenance location by the maintenance technician,characterized in thatthe maintenance cage structure has a lifting mechanism having a first lifting mechanism and a second lifting mechanism, wherein the working platform (8) is mounted between the first and the second lifting mechanism;wherein the first lifting mechanism is disposed in the maintenance cage structure at the side of the first suspension device, and the second lifting mechanism is disposed in the maintenance cage structure at the side of the second suspension device, such that the spacing of the working platform (8) from the cable (3) at the first fastening point can be adjusted by the first lifting mechanism and the spacing of the working platform (8) from the cable (3) at the second fastening point can be adjusted by the second lifting mechanism in a mutually different manner.
- Maintenance cage according to Claim 1, wherein the first lifting mechanism has a cable-type structure (75) which connects the working platform (8) to the first suspension device (6), and a mechanism for adjusting the length of the cable-type structure (75) so as to adjust the spacing between the suspension device (6) and the working platform (8); wherein the second lifting mechanism (7) has a cable-type structure (75) which connects the working platform (8) to the second suspension device (6), and a mechanism for adjusting the length of the cable-type structure (75) so as to adjust the spacing between the first suspension device (6) and the working platform (8).
- Maintenance cage according to Claim 1 or 2, wherein the first suspension device (6) and/or the second suspension device (6) enable/enables a rotation of the working platform (8) about a vertical axis.
- Maintenance cage according to Claim 1, wherein the first and the second suspension device (6) each have a suspension linkage (61) and a fastening mechanism (62), wherein the suspension linkage (61) is able to be fastened to the cable (3), wherein the maintenance cage (5) by way of the fastening mechanism (62) is able to be fastened to the suspension linkage (61) such that the maintenance cage (5) is able to be fastened to different suspension linkages (61) of different cable cars.
- Cable car having a maintenance cage according to one of Claims 1 to 4.
- Method for the maintenance of a cable car, said method comprising the following steps:- conveying a maintenance technician by a maintenance cage according to one of Claims 1 to 4 to a maintenance location, said maintenance cage being fastened so as to be suspended from a cable (3) of the cable car; and- carrying out the maintenance work at the maintenance location by the maintenance technician located on the working platform (8).
- Method according to Claim 6, wherein the cable car at the maintenance location has a sheave assembly (2) and the maintenance work comprises the following steps:- securing the load of the sheave assembly (2) or of part of the sheave assembly on a support structure (1) of the sheave assembly (2) such that an axle (4) on which the sheave assembly (2) or part of the sheave assembly (2) is mounted is substantially free of any load and can be removed by the maintenance technician;- cleaning and/or checking the axle (4), wherein the sheave assembly (2) or a primary compensator (24) of the sheave assembly (2) is not transported away or remains in the secured position during cleaning and/or checking of the axle (4);- unlocking the load of the sheave assembly (2).
- Method according to Claim 7, wherein- the axle (4) on a first side is partially extracted from a clearance (4') for the axle (4);- the part of the axle (4) partially extracted from the first side is cleaned and/or checked;- the axle (4) on a second side is partially extracted from the clearance (4'); and- the part of the axle (4) partially extracted from the second side is cleaned and/or checked.
- Method according to Claim 8, wherein the axle (4) is extracted so far that the primary axle (4) on the extracted side is still situated in the clearance (4') of the support structure (1) and the clearance (4') of the primary compensator (24) and/or that the primary axle (4) on the side opposite the extracted side is extracted from the clearance (4') of the support structure (1).
- Method according to Claim 8 or 9, wherein, while the axle (4) on the extracted side is being partially extracted from the clearance (4'), an auxiliary axle (96) on the side opposite the extracted side is inserted into the clearance (4') of the support structure (1) and of the primary compensator (24) until said auxiliary axle (96) on the side opposite the extracted side is situated in the clearance (4') of the support structure (1) and the clearance (4') of the primary compensator (24).
- Method according to Claim 9 or 10, wherein, while the axle (4) on the extracted side is being partially extracted from the clearance (4'), a friction bearing on the side opposite the extracted side is removed from the clearance (4') and the friction bearing or a replacement friction bearing is re-inserted.
- Method according to one of Claims 7 to 11, wherein the maintenance work comprises the following steps:- removing the axle (4) prior to cleaning and/or checking the axle (4); and- re-introducing the primary axle (4) after cleaning and/or checking the axle (4).
- Method according to one of Claims 7 to 12, wherein the load is secured on a raising yoke (13) of the support structure (1).
- Method according to one of Claims 7 to 13, wherein the load of the sheave assembly (2) by way of a lifting mechanism (9) is suspended from the support structure (1).
- Method according to one of Claims 7 to 14, wherein the maintenance work comprises the step of at least partially raising the cable (3) from the sheave assembly (2).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP22152686.6A EP4005899B8 (en) | 2016-12-29 | 2017-12-29 | Method for maintaining a cableway |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CH01755/16A CH713297A2 (en) | 2016-12-29 | 2016-12-29 | Method and maintenance basket for maintenance of a cable car. |
PCT/IB2017/058511 WO2018122790A1 (en) | 2016-12-29 | 2017-12-29 | Maintenance cage and a method for the maintenance of a cable car |
Related Child Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP22152686.6A Division EP4005899B8 (en) | 2016-12-29 | 2017-12-29 | Method for maintaining a cableway |
EP22152686.6A Division-Into EP4005899B8 (en) | 2016-12-29 | 2017-12-29 | Method for maintaining a cableway |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3562726A1 EP3562726A1 (en) | 2019-11-06 |
EP3562726B1 true EP3562726B1 (en) | 2022-03-30 |
EP3562726B2 EP3562726B2 (en) | 2024-03-27 |
Family
ID=61007730
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP22152686.6A Active EP4005899B8 (en) | 2016-12-29 | 2017-12-29 | Method for maintaining a cableway |
EP17832574.2A Active EP3562726B2 (en) | 2016-12-29 | 2017-12-29 | Maintenance cage and a method for the maintenance of a cable car |
Family Applications Before (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP22152686.6A Active EP4005899B8 (en) | 2016-12-29 | 2017-12-29 | Method for maintaining a cableway |
Country Status (3)
Country | Link |
---|---|
EP (2) | EP4005899B8 (en) |
CH (1) | CH713297A2 (en) |
WO (1) | WO2018122790A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AT527220B1 (en) * | 2023-11-15 | 2024-12-15 | Innova Patent Gmbh | Device for storing a roller battery on a holding device |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB917597A (en) | 1960-07-20 | 1963-02-06 | Bagshawe & Company Ltd | Improvements in and relating to conveyor systems |
DE7304936U (en) | 1974-03-28 | Morsbach P | Railway system with a closed rail system in the manner of a roller coaster | |
EP0516969A1 (en) | 1991-06-03 | 1992-12-09 | RSL LOGISTIK GMBH & CO | Conveyor means |
EP2301819A2 (en) | 2009-09-24 | 2011-03-30 | Innova Patent GmbH | Method and device for replacing roller groups of a ropeway system |
EP2502799B1 (en) | 2011-03-23 | 2013-11-20 | Pomagalski | Aerial cable transport installation provided with a maintenance vehicle |
WO2015003196A1 (en) | 2013-07-11 | 2015-01-15 | Innova Patent Gmbh | Device for replacing roller sets |
DE102014011971B3 (en) | 2014-08-15 | 2015-09-17 | Eisenmann Ag | Transport device with several cars and transport system |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH02104374A (en) * | 1988-10-14 | 1990-04-17 | Mitsubishi Heavy Ind Ltd | Life saving device for gondola lift |
US4995319A (en) | 1989-06-09 | 1991-02-26 | Poma Of America, Inc. | Sheave train assembly for cable transportation systems |
EP0683079A1 (en) | 1994-05-18 | 1995-11-22 | Garaventa Holding Ag | Recovery vehicle for an aerial ropeway |
FR2920123B1 (en) | 2007-08-20 | 2009-10-09 | Pomagalski Sa | INTERVENTION VEHICLE ALONG AN AIR CABLE OF A MECHANICAL REASSEMBLY SYSTEM |
EP3206930B1 (en) | 2014-10-14 | 2019-12-18 | Wopfner, Kurt | Cable roller, in particular for a roller battery of a cableway installation |
AT517045B1 (en) | 2015-04-14 | 2018-06-15 | Kurt Wopfner | Bearing for storing a roller battery |
-
2016
- 2016-12-29 CH CH01755/16A patent/CH713297A2/en not_active Application Discontinuation
-
2017
- 2017-12-29 EP EP22152686.6A patent/EP4005899B8/en active Active
- 2017-12-29 WO PCT/IB2017/058511 patent/WO2018122790A1/en unknown
- 2017-12-29 EP EP17832574.2A patent/EP3562726B2/en active Active
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE7304936U (en) | 1974-03-28 | Morsbach P | Railway system with a closed rail system in the manner of a roller coaster | |
GB917597A (en) | 1960-07-20 | 1963-02-06 | Bagshawe & Company Ltd | Improvements in and relating to conveyor systems |
EP0516969A1 (en) | 1991-06-03 | 1992-12-09 | RSL LOGISTIK GMBH & CO | Conveyor means |
EP2301819A2 (en) | 2009-09-24 | 2011-03-30 | Innova Patent GmbH | Method and device for replacing roller groups of a ropeway system |
EP2502799B1 (en) | 2011-03-23 | 2013-11-20 | Pomagalski | Aerial cable transport installation provided with a maintenance vehicle |
WO2015003196A1 (en) | 2013-07-11 | 2015-01-15 | Innova Patent Gmbh | Device for replacing roller sets |
DE102014011971B3 (en) | 2014-08-15 | 2015-09-17 | Eisenmann Ag | Transport device with several cars and transport system |
Also Published As
Publication number | Publication date |
---|---|
EP4005899B1 (en) | 2024-04-24 |
WO2018122790A1 (en) | 2018-07-05 |
EP4005899B8 (en) | 2024-05-29 |
EP3562726B2 (en) | 2024-03-27 |
EP3562726A1 (en) | 2019-11-06 |
EP4005899A1 (en) | 2022-06-01 |
CH713297A2 (en) | 2018-06-29 |
EP4005899C0 (en) | 2024-04-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE202010008730U1 (en) | Transport device for printing plates | |
DE102017102930B4 (en) | Lifting device and system for transporting general cargo | |
EP4172096A1 (en) | Method for building a lift system, and lift system suitable for carrying out the method | |
DE102007003000B4 (en) | Device for driving on a wind energy plant | |
DE10140238A1 (en) | Lifting platform, in particular mobile lifting platform | |
EP3562726B1 (en) | Maintenance cage and a method for the maintenance of a cable car | |
EP4090620B1 (en) | Mobile transport device and method for inserting a mounting frame into a shaft | |
DE3911868C2 (en) | ||
DE102006062245A1 (en) | Maintenance track system | |
EP1717186B1 (en) | Method and apparatus for installing guide rails in an elevator hoistway | |
DE202009016924U1 (en) | Collapsible small crane | |
DE202005019439U1 (en) | Lifting platform for maintenance of rotor blades of windmills with basic frame as support and rope hoist with bracing cables for movement of platform along blade length | |
DE3608096C2 (en) | ||
AT396585B (en) | Equipment for operating storage racks | |
DE2029681B2 (en) | Universal crane suspension attachment - has various guides to influence crane drive and hoist movement | |
DE202011101434U1 (en) | Compact gripper trolley | |
DE2629253C3 (en) | Device for conveying building material through an opening in a wall into a building | |
EP0683079A1 (en) | Recovery vehicle for an aerial ropeway | |
DE102009030741B4 (en) | Device and method for mounting and / or dismantling a crane jib and crane with such a device | |
DE1508161C (en) | Blowing lance device for metallurgical vessels | |
DE2711115C2 (en) | Lifting device for conveyor baskets, containers and counterweights | |
DE102021006101A1 (en) | Working platforms for bridges | |
EP4108786A1 (en) | Transport device, brickwork machine, system and method for operating such a system | |
DE8717752U1 (en) | Equipment for transporting rolling stands or groups of rolling stands | |
AT118332B (en) | Work table for sorting, counting, packing, etc. Like. Of stacks of goods. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: UNKNOWN |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE INTERNATIONAL PUBLICATION HAS BEEN MADE |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20190726 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: SWISSREVIGONDOLA AG |
|
INTG | Intention to grant announced |
Effective date: 20210512 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
INTC | Intention to grant announced (deleted) | ||
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20211013 |
|
INTG | Intention to grant announced |
Effective date: 20211027 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1478933 Country of ref document: AT Kind code of ref document: T Effective date: 20220415 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 502017012877 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: GERMAN |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG9D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220630 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220630 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220701 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220801 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220730 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R026 Ref document number: 502017012877 Country of ref document: DE |
|
PLBI | Opposition filed |
Free format text: ORIGINAL CODE: 0009260 |
|
PLAX | Notice of opposition and request to file observation + time limit sent |
Free format text: ORIGINAL CODE: EPIDOSNOBS2 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
26 | Opposition filed |
Opponent name: DOPPELMAYR SEILBAHNEN GMBH Effective date: 20221228 |
|
PLBB | Reply of patent proprietor to notice(s) of opposition received |
Free format text: ORIGINAL CODE: EPIDOSNOBS3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20221229 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20221231 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221229 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221231 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20231227 Year of fee payment: 7 |
|
PUAH | Patent maintained in amended form |
Free format text: ORIGINAL CODE: 0009272 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: PATENT MAINTAINED AS AMENDED |
|
27A | Patent maintained in amended form |
Effective date: 20240327 |
|
AK | Designated contracting states |
Kind code of ref document: B2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R102 Ref document number: 502017012877 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20171229 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20231222 Year of fee payment: 7 Ref country code: CH Payment date: 20240101 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 502017012877 Country of ref document: DE Owner name: COLOMBO REVIGONDOLA AG, CH Free format text: FORMER OWNER: SWISSREVIGONDOLA AG, MOEREL, CH |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20220330 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: HC Ref document number: 1478933 Country of ref document: AT Kind code of ref document: T Owner name: COLOMBO REVIGONDOLA AG, CH Effective date: 20241128 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20241230 Year of fee payment: 8 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20241223 Year of fee payment: 8 |