EP3290290A1 - Operation management system - Google Patents
Operation management system Download PDFInfo
- Publication number
- EP3290290A1 EP3290290A1 EP16786411.5A EP16786411A EP3290290A1 EP 3290290 A1 EP3290290 A1 EP 3290290A1 EP 16786411 A EP16786411 A EP 16786411A EP 3290290 A1 EP3290290 A1 EP 3290290A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- train
- obstacle avoidance
- obstacle
- avoidance operation
- station
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000010586 diagram Methods 0.000 claims abstract description 78
- 238000012545 processing Methods 0.000 claims abstract description 38
- 238000012937 correction Methods 0.000 claims description 5
- 238000005516 engineering process Methods 0.000 abstract description 2
- 238000007726 management method Methods 0.000 description 93
- 230000008859 change Effects 0.000 description 29
- 238000000034 method Methods 0.000 description 29
- 230000008569 process Effects 0.000 description 22
- 238000011084 recovery Methods 0.000 description 11
- 230000004044 response Effects 0.000 description 10
- 238000001914 filtration Methods 0.000 description 9
- 239000000284 extract Substances 0.000 description 8
- 230000012447 hatching Effects 0.000 description 7
- 230000009471 action Effects 0.000 description 4
- 238000004364 calculation method Methods 0.000 description 4
- 230000008094 contradictory effect Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012795 verification Methods 0.000 description 2
- 230000005540 biological transmission Effects 0.000 description 1
- 230000000903 blocking effect Effects 0.000 description 1
- 238000012508 change request Methods 0.000 description 1
- 238000012790 confirmation Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000000644 propagated effect Effects 0.000 description 1
- 238000004904 shortening Methods 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61L—GUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
- B61L27/00—Central railway traffic control systems; Trackside control; Communication systems specially adapted therefor
- B61L27/10—Operations, e.g. scheduling or time tables
- B61L27/16—Trackside optimisation of vehicle or train operation
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/40—Business processes related to the transportation industry
Definitions
- the present invention relates to a traffic management system for managing a train service on a railroad.
- an initial planned timetable may be disturbed when a traffic disturbance such as a technical problem or an accident occurs on a train in service.
- a train dispatcher who manages the train service aims to recover from the traffic disturbance by replanning the timetable, manually controlling routes of trains, etc. using a traffic management system.
- PTL 1 discloses a technology for providing a replanning system which can provide plentiful information for a dispatcher to make a decision of replanning strategy and good operability.
- PTL 1 states that "A process of displaying a traffic condition, a process of predicting a traffic condition, a process of checking a prediction result, a process of displaying the result, and a process of suggesting a restoration plan are provided.
- a traffic condition is displayed, it is possible to select a display mode in which a planned timetable, an actual timetable, and a predicted timetable are overlapped and displayed or separately displayed according to a request of the dispatcher.
- the dispatcher may select a prediction strategy suitable for a situation from among a plurality of prediction strategies, a prediction check result is displayed as a hindrance mark or an automatic proposal mark, and the displayed hindrance mark or automatic proposal mark is picked using a mouse, thereby describing content of the mark or proposing a restoration plan.” (See paragraph 0005).
- Various patterns are present as a pattern of a train service operation (hereinafter referred to as an "operation pattern"). Examples thereof include an running line change, platform blockage, etc. Further, examples of the running line change include a bi-directional running in which upward and downward trains run on the same track.
- an operation pattern that avoids the occurring transport obstacle is implemented in some cases (hereinafter the operation pattern that avoids the transport obstacle will be referred to as an obstacle avoidance operation).
- the dispatcher In the obstacle avoidance operation, the dispatcher is forced to perform a troublesome operation such as changing or setting each train service which may have a complicated influence.
- PTL 1 does not describe any specific function for supporting an obstacle restoration operation by the dispatcher. For example, PTL 1 does not describe what type of information is provided to the dispatcher for the obstacle restoration operation.
- An object of the invention is to provide a technical solution that satisfactorily supports an operation of avoiding an obstacle by the dispatcher.
- a traffic management system includes: a display unit for displaying a train graph screen which represents movement of a train over time as a diagram on a plane defined by an axis in a time direction and an axis in a route direction; and a processing unit for determining restoration plan in which trains run in a designated obstacle avoidance operation pattern for an obstacle avoidance operation time slot and an obstacle avoidance operation area which are specified on a train graph screen; a processing unit for displaying a train graph which corresponds to the determined restoration plan.
- a traffic management system includes : a display unit for displaying an track diagram screen that indicates positions of trains at a current time on a track; and a processing unit for setting a subsequent station ahead of an obstacle occurrence position corresponding to a position at which an obstacle occurs and up to a station to which a train heading for the obstacle occurrence position is allowed be turned back in a reverse direction by tracing a route from the obstacle occurrence position as warning target stations when the obstacle occurs on the track, and displaying the warning target stations on the track diagram screen.
- a traffic management system includes: a storage unit for storing platform allocation management information that associates a virtual platform ID corresponding to information determining a direction and a role of each platform with a physical platform ID; and a processing unit for determining restoration plan such that the physical platform associated with the virtual platform is used in the direction and for the role of the virtual platform.
- the invention it is possible to satisfactorily support a train service operation of avoiding an obstacle by a dispatcher.
- the operation of avoiding an obstacle by the dispatcher is smoothly performed, it is possible to suppress an increase in traffic disturbance caused by an occurrence of an obstacle as much as possible, to improve punctuality of a train service, and to suppress loss such as a decrease in profit due to the traffic disturbance.
- FIG. 1 is a schematic block diagram of a traffic management system according to the present embodiment.
- a traffic management system 10 includes a human machine interface (HMI) 11, a timetable management device 14, a route control device 15, an obstacle information management device 16, a replanning device 17, and a network 18.
- the traffic management system 10 is connected to field equipment 30 through an field equipment management system 20.
- the field equipment management system 20 is a system disposed on a site side, and monitors or controls the field equipment 30 in cooperation with the traffic management system 10.
- the field equipment 30 corresponds to various facilities such as a switch, a traffic light, a track circuit, etc. used for a train service at a site.
- the HMI 11 is an interface for displaying to a dispatcher and receiving an operation of the dispatcher.
- the HMI 11 displays a traffic condition in real time, receives a change in a timetable, and transmits a received change request to a related device.
- the HMI 11 is a terminal device having two display devices as an example, and displays two screens corresponding to an track diagram screen 12 and a train graph screen on the respective display devices.
- the track diagram screen 12 displays a current train position using a track diagram.
- the train graph screen 13 displays a predicted timetable and an actual timetable in which each train service plan and actuals are displayed as a path representing movement of a train over time.
- the timetable management device 14 holds data of a timetable created in advance in an accompanying storage unit 14a.
- the timetable management device 14 receives a timetable change plan based on the request from the replanning device 17, and updates the data of the timetable held by the storage unit 14a based on received data.
- the timetable management device 14 provides data of the timetable to another device as necessary.
- the timetable management device 14 receives information about a travel record of the train from the field equipment 30 and stores the received information.
- the route control device 15 records information related to route control such as field equipment status information, train position information, etc. in an accompanying storage unit 15a.
- the route control device 15 instructs the field equipment managing system 20 to control a set or cancel the route of the train based on the timetable received from the timetable management device 14.
- the field equipment management system 20 receiving this instruction controls the field equipment 30 such as the traffic light, the switch, etc. to realize the indicated setting or canceling of the route.
- the obstacle information management device 16 records information related to management of the obstacle such as obstacle information, track linkage, etc. in an accompanying storage unit 16a.
- the obstacle information management device 16 manages obstacle information corresponding to information about an obstacle related to the train service. Examples of the obstacle information include obstacle information automatically given from the field equipment management system 20 and obstacle information given by transmission and reception of information between related devices related to management of the train service.
- the replanning device 17 stores information such as rules for timetable planning in an accompanying storage unit 17a.
- the replanning device 17 creates a modified timetable based on an operation from the HMI 11.
- the replanning device 17 transmits the modified timetable to the timetable management device 14 to update the timetable of the timetable management device 14.
- the replanning device 17 may predict a future traffic condition based on a current traffic condition.
- the replanning device 17 may transmit the modified timetable to the timetable management device 14 to display the modified timetable on the HMI 11 before updating data used for the route control, thereby urging the dispatcher to visibly check the new timetable in advance.
- the timetable management device 14, the route control device 15, the obstacle information management device 16, and the replanning device 17 are physically separately implemented.
- the invention is not limited to this example. It suffices to functionally implement the devices, and a physical configuration is not particularly limited. As another example, all the devices may be implemented on one computer or implemented by being dispersed on a plurality of computers.
- FIG. 2 is a block diagram illustrating a functional configuration of the traffic management system.
- the traffic management system 10 includes a display unit 10A, a processing unit 10B, a storage unit 10C, and an operation unit 10D.
- the display unit 10A and the operation unit 10D correspond to the HMI 11 of FIG. 1
- the processing unit 10B corresponds to the timetable management device 14, the route control device 15, the obstacle information management device 16, and the replanning device 17 of FIG. 1
- the storage unit 10C corresponds to the storage units 14a, 15a, 16a, and 17a.
- the display unit 10A displays a train graph screen that represents movement of the train over time as a diagram on a plane defined by an axis in a time direction and an axis in a route direction.
- an obstacle avoidance operation type corresponding to a type of obstacle avoidance operation for servicing a train by avoiding an obstacle
- an obstacle avoidance operation time slot corresponding to a time slot in which an obstacle avoidance operation is applied and an obstacle avoidance operation area corresponding to an area in which the obstacle avoidance operation is applied
- the processing unit 10B determines a train service plan such that the train is serviced in the obstacle avoidance operation time slot and the obstacle avoidance operation area and in a service mode of the obstacle avoidance operation type, and displays a train paths based on the timetable on the train graph screen.
- the traffic management system automatically determines a timetable in which the obstacle avoidance operation of the service mode is applied in the time slot and the area, and thus it is possible to facilitate an operation of applying a predetermined service mode, and to support the dispatcher.
- the dispatcher only needs to input a type such as a bi-directional operation, and a complicated operation such as modifying individual train services to implement the bi-directional operation is unnecessary.
- the processing unit 10B determines the timetable in the obstacle avoidance operation time slot and the obstacle avoidance operation area such that the timetable is consistent with a train service in a preceding time slot of the obstacle avoidance operation time slot, and determines a timetable in a subsequent time slot of the obstacle avoidance operation time slot such that the train service plan is consistent with the train service plan in the obstacle avoidance operation time slot.
- the dispatcher may easily modify a timetable consistent with preceding and subsequent time slots only by indicating the obstacle avoidance operation time slot, the obstacle avoidance operation area, and the obstacle avoidance operation type.
- the processing unit 10B determines a bi-directional operation area corresponding to an area in which the bi-directional operation is performed defined by a first end station and a second end station at both ends based on the obstacle avoidance operation range, and determines a timetable such that when a train (first train) enters the bi-directional operation section from the first end station, another train (second train) arriving at the second end station is kept waiting, and the second train is allowed to enter the bi-directional operation section after the first train arrives at the second end station.
- the timetable in which trains in two directions are allowed to travel on the same track may be determined by the traffic management system 10.
- the dispatcher may set a bi-directional operation by an easy way to continue a service of trains for both directions.
- the processing unit 10B corrects the obstacle avoidance operation range to an extended range in which the originally intended obstacle avoidance operation range is included and a train service of the obstacle avoidance operation type is applicable. Since the obstacle avoidance operation range and the obstacle avoidance operation type specified by the dispatcher are automatically corrected such that there is no inconsistency in a configuration of the facility, etc., the dispatcher may easily apply an appropriate obstacle avoidance operation.
- the processing unit 10B corrects the specified obstacle avoidance operation area to an extended area including the obstacle avoidance operation area and having a station, in which a crossover is present between one track and another track, at each of both ends. In this way, since the obstacle avoidance operation area specified by the dispatcher is automatically corrected to an area in which the bi-directional operation is allowed, the dispatcher may easily make appropriate setting.
- the processing unit 10B performs correction to set a time until the train arrives at an end station of the obstacle avoidance operation range to the obstacle avoidance operation time slot.
- the dispatcher may easily set the obstacle avoidance operation time slot appropriate for the bi-directional operation.
- the display unit 10A displays the track diagram screen 12 that indicates an position of the train at a current time on the track.
- the processing unit 10B sets a station in front of an obstacle occurrence position corresponding to a position at which the obstacle occurs and stations up to a station to which a train heading for the obstacle occurrence position can be turned back in a reverse direction by tracing the route from the obstacle occurrence position to warning target stations, and displays the warning target stations on the track diagram screen.
- the dispatcher may easily perform operation arrangement such that there is no train that may not be turned back at the occurrence of an obstacle.
- this warning target station is considered as a station at which progress of a train needs to be immediately stopped.
- the dispatcher performs a train hold operation based on a display of the warning target station, it is possible to prevent situations such as a situation in which a train stops before a signal due to inappropriate hold setting, a situation in which a train stays in a section that does not allow the train to be turned back and thus even a partial service may not be resumed, etc.
- the processing unit 10B sets a station which is a adjacent station of a warning target station to an attention target station, and displays the attention target station on the track diagram screen 12.
- a route in a reverse direction of an obstacle occurrence track at which even though operation of a train service may not be immediately stopped but should be monitored carefully because a train passes right beside an obstacle occurring place can be displayed as attention target stations.
- a station at which a train may not be able to depart since a preceding train is blocking the route can also be displayed as attention target stations.
- the above-described warning target station or attention target station may be displayed not only on the track diagram screen 12 but also on the train graph screen 13.
- the storage unit 10C stores platform allocation management information that associates a virtual platform corresponding to information determining a direction and role for each platform with a physical platform.
- the processing unit 10B determines a timetable such that the physical platform associated with the virtual platform is used in the direction and for the role of the virtual platform.
- the supervisor may easily determine a timetable in which a platform is appropriately allocated by allocating a physical platform to a virtual platform for which a direction and role are determined.
- the display unit 10A displays the platform allocation management information.
- the operation unit 10D allows individual setting of the platform allocation management information for each train by operation input.
- the processing unit 10B determines the timetable by giving priority to the individually set physical platform over the virtual platform, and causes the display unit 10A to display the determined timetable.
- the dispatcher may individually set a physical platform used by each train of the timetable, and thus may easily and flexibly perform setting using collective setting by a virtual platform and individual setting by a physical platform.
- the processing unit 10B determines whether setting by a virtual platform is consistent with setting by a physical platform. In this way, even when the dispatcher inputs contradictory setting, the traffic management system 10 detects the contradictory setting, and thus it is possible to prevent a timetable including contradiction in platform setting from being generated. In this way, it is possible to construct a route in accordance with setting of the train service plan to realize a timetable.
- the processing unit 10B causes the display unit 10A to display a configuration of a route including each platform of each station as a diagram, sets a platform for each train having a specified travel pattern based on an instruction on the operation unit 10D, and causes the display unit 10A to display the platform used by the specified train.
- the dispatcher may collectively set a platform used in each station for each travel pattern of a train, and it is be expected that recovery time from a traffic disturbance can be shortened by speeding up a command task.
- a configuration of the traffic management system according to the present embodiment is the same as that illustrated in FIG. 1 and FIG. 2 .
- FIG. 3 is a table illustrating an example of a train service plan in the present embodiment.
- the train service plan of FIG. 3 corresponds to timetable information recording a time of arrival to a station, a time of departure from a station, a used platform at each station, and a traveling track (direction) for a train traveling on a certain route.
- a traveling track corresponding to a certain station indicates a track on which a train travels after departing from the station until the train arrives at a subsequent station.
- a name of a virtually determined platform is described in a column of a used platform. The virtual platform will be described below.
- a train departs from platform "Down1" of station A, departing the station at 7:15:00 to travel along a down track, passes through platform “Nonstop down” of station B at 7:26:30, passes through platform “Down1” of station C at 7:29:45, and arrives at platform “Up1” of station D at 7:34:00. Then, the train departs from station D at 7:34:45 to travel along an up track, passes through platform “Nonstop up” of station E at 7:40:00, and arrives at platform "Up2" of station F at 7:45:00.
- the train departs from station F at 7:45:00 to arrive at platform "Down1" of station G at 7:50:15, departs at 7:51:00 to travel along a down track, and arrives at platform "Down1" of station H corresponding to a terminal station at 7:58:30.
- FIG. 4 is a table illustrating an example of obstacle information in the present embodiment.
- the obstacle information management device 16 illustrated in FIG. 1 allocates an event ID to the obstacle, and records content, an occurrence place, and an occurrence time of the obstacle in the table present in the storage unit 16a.
- the obstacle information management device 16 records the event as a sub-event in the table.
- the obstacle information management device 16 allocates a sub-event ID to the occurring sub-event, and records content and an occurrence time of the event in the table.
- the technical problem occurred at a spot 4.5 km away from station B on a down line, at 7:50.
- a situation confirmation report are made at 8:00, first aid is being tried from 8:05, and recovery of the obstacle is estimated at 9:00.
- FIG. 5A is a diagram illustrating a display example of the track diagram screen at the occurrence of an obstacle.
- FIG. 5A illustrates a display example of the track diagram screen 12 when train 1A traveling between station B and station C gets technical problem.
- a circular icon having x in content is displayed at an obstacle occurrence position of a track diagram.
- the obstacle information management device 16 automatically extracts an influence of the problem of train 1A and a area thereof, and displays the influence and the area on the track diagram screen 12.
- station A, station B, and station C correspond to warning target stations, which are indicated by broken line arrows.
- a preceding station of station A corresponds to an attention target station, which is indicated by a one-dot-chain line arrow.
- station B, station C, and station D correspond to attention target stations, which are indicated by one-dot-chain line arrows.
- FIG. 5B is a diagram illustrating a display example of specific situations of the warning target station and the attention target station described above on the train graph screen.
- a circular icon having x in content is displayed at a point corresponding to a position and time at which an obstacle occurs .
- by displaying hatching of different patterns for a region 50 on the train graph screen corresponding to the area which corresponds to the broken line arrow in FIG. 5A and a region 51 on the train graph screen corresponding to the area which corresponds to the one-dot-chain line arrow in FIG. 5A these regions are visualized on the train graph screen.
- FIG. 5B is a diagram illustrating a display example of specific situations of the warning target station and the attention target station described above on the train graph screen.
- a range of a warning target and a range of an attention target are distinguished by hatching patterns.
- FIG. 5C is a flowchart illustrating a process of specifying a range in which an influence of the obstacle is received.
- the obstacle information management device 16 in response to occurrence of an obstacle, extracts a station located one station ahead of an obstacle occurrence position and a station located one station behind the obstacle occurrence position in a progress direction of a train (step S101). Subsequently, the obstacle information management device 16 adds the extracted stations as warning target stations (step S102).
- the obstacle information management device 16 performs warning target station addition loop processing of steps S103 and S104.
- the obstacle information management device 16 determines whether a last added backward station can turn back a train (step S103) . When the last added station is a station that can turn back a following train, the obstacle information management device 16 ends the process as it is. On the other hand, the last added station is a station that cannot turn back a train, the obstacle information management device 16 adds a backward station of the last added station as a warning target station (step S104), and returns to step S103. In this way, the obstacle information management device 16 extracts all the warning target station.
- FIG. 5D is a flowchart illustrating a process of specifying an attention target range. The process of specifying the attention target range is repeatedly performed for each warning target station.
- the obstacle information management device 16 selects a warning target station to be processed (step S201) . Subsequently, the obstacle information management device 16 adds a backward station of the selected warning target station in an upward direction as attention target station (step S202) . Further, the obstacle information management device 16 adds a backward station of the selected warning target station in a downward direction as an attention target station (step S203) .
- FIG. 5E is a diagram illustrating an example of the train graph screen when an obstacle occurs.
- the obstacle information management device 16 displays the obstacle information on the train graph screen 13.
- the train graph screen 13 at a time at which the obstacle occurs is illustrated in FIG. 5E .
- train 1A located between station B and station C at a current time has a technical problem.
- the obstacle information management device 16 displays specific information about the obstacle and an action to be taken on the obstacle. Examples of the predetermined operation include click, mouse-over, etc.
- display of the specific information about the obstacle and the action to be taken on the obstacle corresponds to pop-up display, etc.
- FIG. 5A an obstacle occurrence time and an obstacle occurrence position are displayed as a specific obstacle, and a call with a person concerned, editing event information, and an obstacle avoidance operation are displayed as the alternatives to be taken.
- the specific obstacle and the action to be taken on the obstacle may be similarly displayed when a predetermined operation is performed on an icon on the track diagram screen.
- FIG. 5F is a diagram illustrating an example of the train graph screen when a sub-event is added as the obstacle information.
- a straight line horizontally extending from an icon indicating an obstacle indicates an influence of occurrence of the obstacle
- a thick part in the middle indicates a time at which first aid action starts with respect to the obstacle
- a right end portion indicates an estimated time of recovery. In this way, it is possible to visualize an extent of influence due to occurrence of the obstacle.
- FIG. 5F when a predetermined operation is performed on a recovery estimation part, an obstacle occurrence time and a recovery estimated time are displayed.
- FIG. 6A is a diagram illustrating a display example of the train graph screen when the dispatcher first specifies an area and a time slot in which a bi-directional operation is needed.
- the dispatcher specifies a range in which the bi-directional operation is needed to include an icon indicating an obstacle and a line extending rightward from the icon and indicating an influence of the obstacle on the train graph screen 13.
- the rectangular region corresponds to the bi-directional operation range.
- the specified rectangular region is indicated by hatching.
- this selection operation may be performed by dragging of a mouse, etc.
- This operation is an operation of specifying an obstacle avoidance operation time slot and an obstacle avoidance operation area, and a hatching part indicates the specified range.
- the replanning device 17 corrects the obstacle avoidance operation time slot and the obstacle avoidance operation area as necessary, generates a modified timetable for applying an obstacle avoidance operation of a specified obstacle avoidance operation type to the region, and transmits the modified timetable to the timetable management device 14.
- the obstacle avoidance operation type corresponds to the bi-directional operation.
- actual functional arrangement is not limited thereto, and another device in the traffic management system 10 may perform the process.
- FIG. 6B is a diagram illustrating a state of correction of the obstacle avoidance operation time slot and the obstacle avoidance operation area. Since a crossover between upward and downward tracks is not present between station B and station C as illustrated in FIG. 5A , station B and station C may not be used as end stations of the bi-directional operation. Station A and station D have crossovers, and thus may be used as end stations of the bi-directional operation.
- the replanning device 17 automatically corrects the range in which the bi-directional operation (as a type of obstacle avoidance operation) is applied (the obstacle avoidance operation time slot and the obstacle avoidance operation area) to a range using station A and station D as end stations at both sides.
- the dispatcher may immediately start to input the bi-directional operation without considering a track configuration of each station, and may realize shortening of time required to change the timetable, that is, resumption of the train service in a short time.
- FIG. 6C is a diagram for description of an example of a method of correcting the obstacle avoidance operation time slot and the obstacle avoidance operation area.
- the replanning device 17 holds a table illustrated in FIG. 6C in advance.
- the table of FIG. 6C indicates whether each station can be used as an end station of a bi-directional operation (using either upward track or downward track).
- stations A, D, and E can be used as a starting station or a terminal station of bi-directional operation both for using upward track and downward track, since a crossover connecting the upward track and the downward track exists in each of the stations A, D, and E.
- stations B and C can be used as neither a starting station nor a terminal station of bi-directional operation, both for using the upward track and the downward track.
- the replanning device 17 specifies a range including station B and station C and having stations corresponding to end stations of the bi-directional operation at both ends with reference to the table of FIG. 6C , and corrects the obstacle avoidance operation area to the range.
- FIG. 7A is a diagram illustrating a display of a train graph screen that shows a timetable in which the bi-directional operation is performed in an obstacle avoidance operation area and an obstacle avoidance operation time slot specified by the dispatcher.
- the bi-directional operation is performed until a designated end time specified by the dispatcher, and thereafter the operation returns to a normal operation.
- Train 3B is on a different track from a track on which the train is assumed to be between station A and station D on the original plan, that is, train 3B is on the same track as that of train 4E.
- train 3B cannot pass by train 4E between station C and station D. For this reason, train 4E may not depart from station D until train 3B arrives at station D.
- the replanning device 17 When a bi-directional operation is applied to a timetable, the replanning device 17 automatically corrects an end time, and determines a timetable applicable to an actual train service. A description will be given below.
- FIG. 7B is a diagram illustrating a display of a train graph screen that shows a timetable in which an obstacle avoidance operation time slot is corrected.
- FIG. 7C is a diagram for description of a method of determining a train path when the bi-directional operation is applied.
- an area in which the bi-directional operation is applied is between station P and station Q. That is, an obstacle avoidance operation range is between station P and station Q.
- the replanning device 17 obtains a time of arrival to station P using a standard operating time t1 of this section. Subsequently, the replanning device 17 lets train 3C depart from station P after waiting for a predetermined time (intersection hindrance time) t2 from the time of arrival to station P of train 2B considering intersection of routes with train 2B at station P.
- the replanning device 17 lets train 4C depart from station Q after a time obtained by adding a traveling time t3 of train 3C between station P and station Q and an intersection hindrance time t4 of train 3C and train 4C from a time at which train 3C departs from station P.
- the replanning device 17 lets train 5E depart from station P after a total time of a traveling time t5 of train 4C between station P and station Q and an intersection hindrance time t6 of train 4C and train 5E from a time at which train 4C departs from station Q.
- FIG. 7D is a flowchart illustrating a process of determining a time at which the obstacle avoidance operation is ended.
- the replanning device 17 sets a designated end time input by the dispatcher as a scheduled end time of the obstacle avoidance operation (step S301).
- the replanning device 17 performs processing of step S302 to step S305, and repeats processes from step S302 again when the scheduled end time has been updated at the time.
- step S302 the replanning device 17 extracts all trains traveling within the obstacle avoidance operation range at the scheduled end time of the obstacle avoidance operation (in this case, the bi-directional operation).
- the replanning device 17 repeats processing of step S303 and step S304 as many times as the number of extracted trains.
- step S303 the replanning device 17 determines whether a train subjected to processing in a current loop is running on a different track from a track on which the train is assumed to travel on the original plan.
- the replanning device 17 sets a time at which the train arrives at a terminal station of a corresponding section as the scheduled end time (step S304).
- step S305 the replanning device 17 determines whether the scheduled end time is updated in a current loop of step S302 to step S305. When the scheduled end time has been updated, the replanning device 17 returns to step S302 and repeats processing. When the scheduled end time has not been updated, the replanning device 17 ends a series of processes.
- a scheduled end time of an obstacle restoration operation is corrected from an end position of hatching of FIG. 7A to an end position of hatching of FIG. 7B by the above processing.
- the dispatcher inputs restoration from the obstacle to the traffic management system 10 by editing event information.
- the obstacle information management device 16 associates the obstacle with the obstacle avoidance operation at the time of performing the obstacle avoidance operation.
- the obstacle information management device 16 determines whether the obstacle avoidance operation is associated with the obstacle to which the restoration is input.
- the obstacle information management device 16 prompts the dispatcher to verify whether to cancel the obstacle avoidance operation.
- FIG. 8A is a diagram illustrating an example of a screen display when the dispatcher inputs the restoration from the obstacle.
- the obstacle information management device 16 displays an image for prompting the dispatcher to select whether to cancel the bi-directional operation corresponding to the obstacle avoidance operation associated with the obstacle as a pop-up image as illustrated in FIG. 8B .
- FIG. 8B is a diagram illustrating a display example of a screen inquiring of the dispatcher whether to end the obstacle avoidance operation from the train graph screen 13.
- the obstacle information management device 16 instructs the HMI 11 to display the screen illustrated in FIG. 8B .
- the obstacle information management device 16 ends the event corresponding to the bi-directional operation, and instructs the replanning device 17 to modify a timetable for returning to the normal operation.
- the obstacle information management device 16 may record information about the performed event by associating the information with the obstacle information. For example, an event performed in relation to the obstacle information illustrated in FIG. 4 may be additionally described in the obstacle information. Further, for example, when an icon indicating the event of the obstacle is selected, and the end of the event is input, the obstacle information management device 16 extracts an obstacle avoidance operation associated with the obstacle with reference to a table of the obstacle information, and displays a screen prompting verification as to whether the obstacle avoidance operation can be ended.
- the obstacle avoidance operation may be automatically extended in a predetermined n-minute unit, and the inquiry may be made again after the extension period.
- the extension period may be set to a period up to a time at which the obstacle avoidance operation can be ended on the given situation.
- the obstacle avoidance operation may not be canceled in the entire obstacle avoidance region, it is possible to determine whether a new starting station or terminal station can be set based on a position at which the obstacle is left, and change the area when the station can be set.
- the estimated end time of the obstacle avoidance operation may be determined in the same manner as the above-described extension.
- a train is left on a platform of a certain station by setting a new obstacle avoidance operation range, it is possible to issue a warning thereof.
- FIG. 9A is a diagram illustrating a timetable at the time of returning from the bi-directional operation to the normal operation.
- the replanning device 17 When an end of the bi-directional operation is input, the replanning device 17 generates a timetable change plan in which whether a train traveling in a reverse direction of an original track is present at that time is verified, and a train traveling in an opposite direction to that of the train is allowed to enter a section where the bi-directional operation has been performed as illustrated in FIG. 9A in response to the train arriving at a terminal station of the bi-directional operation if the train traveling in the reverse direction is present. On the other hand, when the train traveling in the reverse direction of the original track is not present, the replanning device 17 generates a timetable change plan that lets the train traveling in the opposite direction to that of the train immediately enter the section where the bi-directional operation has been performed.
- FIG. 9B and FIG. 9C are diagrams for description of another train service plan at the time of returning from the bi-directional operation to the normal operation.
- train 4E since train 3B is traveling on a different track from a track on which train 3B is assumed to travel, train 4E may not depart from station D until train 3B arrives at station D, and a train directed from station D to station A may not travel for a long time.
- a train traveling in the opposite direction may immediately enter a section where the bi-directional operation has been performed using the other track which was unavailable during the occurrence of an obstacle.
- the replanning device 17 changes the timetable to allow train 4E to use this track, that is, to allow both train 3B and train 4E to use the track in the reverse direction of the originally used track.
- the replanning device 17 displays a menu screen that can command a change of the timetable.
- a change example of individually specifying train 4E to let only train 4E travel on a reverse line will be described.
- an area and a time slot may be specified similarly to the example of FIG. 6A .
- FIG. 9C is a diagram illustrating a timetable in a case of letting both train 3B and train 4E travel on a reverse line. Letting train 4E also travel on the reverse line accelerates recovery of all train timetables. FIG. 9C illustrates a case in which train 5C is also instructed to travel on the reverse line.
- FIG. 10A is a diagram illustrating a display example of the track diagram screen when a technical problem occurs on a certain train at a certain station.
- FIG. 10A illustrates an example in which train 3B gets technical problem on platform 1 of station Y.
- allocation of a platform may be changed by applying a predetermined operation to an icon indicating the obstacle.
- FIG. 10B is a diagram illustrating a table for managing allocation of a platform.
- a platform is managed by two types of platform information, each corresponds to a "virtual platform" and a "physical platform".
- the virtual platform indicates a role such as a platform used as the first platform of a downward train.
- the physical platform indicates a physical platform that identifies a position where a train actually arrives or passes.
- the replanning device 17 may generate a timetable change plan in which a specific physical platform is not used by changing a combination of the virtual platform and the physical platform.
- the dispatcher may change platform allocation by a simple operation. For example, it is determined in advance that physical platform 2 is used as the first platform for downward trains when physical platform 1 is unavailable, and pattern information of the change is held in advance. Then, when the platform becomes unavailable as in a case in which a train on physical platform 1 get technical problem, the dispatcher may easily change allocation by fetching and applying the held pattern information. In this way, when an obstacle corresponding to a pattern occurs, it is possible to immediately change allocation of a platform, and continue a train service.
- the replanning device 17 may hold a combination that cannot be allocated in advance.
- the replanning device 17 determines whether the input setting can be accepted with reference to the information about the combination that cannot be allocated. In this way, it is possible to prevent inappropriate platform allocation from being performed.
- FIG. 10C is a diagram illustrating an example of a timetable using a virtual platform and a physical platform.
- the timetable management device 14 basically uses a virtual platform as a platform defined in a timetable. Further, as illustrated in FIG. 10B , it is possible to collectively change platform allocation of all trains that use a corresponding station by changing a physical platform allocated to a virtual platform.
- a physical platform may be designated for an individual train in the timetable.
- the timetable management device 14 gives priority to allocation of an individual train over collective allocation in a unit of a station illustrated in FIG. 10B .
- the replanning device 17 may verify whether allocation of an individual train is consistent with collective allocation for each station, and call the attention of the dispatcher when the allocations are not consistent with each other. In this way, when allocation of an individual train is inconsistent with allocation for each station, or when there is a contradiction therebetween, it is possible to alert the dispatcher by displaying a warning icon on the train graph screen.
- FIG. 11 illustrates a station in which a running line of a downward passing train is specified by dragging a mouse on a track diagram of the track screen 12.
- the replanning device 17 determines that the bi-directional operation is applied to the part, and generates such a timetable change plan.
- an running line is specified herein with regard to a pattern of each service mode, it is possible to flexibly perform various running line changes such as a double-track co-directional operation, an upward/downward line switch operation, etc. in addition to the bi-directional operation.
- a station and a platform to which an upward train and a downward train are allocated may be specified in advance, and the replanning device 17 may hold setting information thereof in advance.
- the dispatcher selects a service mode desired to be applied, it is possible to easily perform the obstacle avoidance operation illustrated in FIG. 7A to FIG. 7D or FIG. 9A to FIG. 9C .
- a traffic disturbance corresponding to a pattern it is possible to immediately change the timetable, and to minimize a time at which an operation of a train is interrupted.
- FIG. 12 is a diagram illustrating an example in which various information exchanged on a system in relation to the occurrence of the obstacle is displayed in time series by text.
- the traffic management system 10 defines a sentence format including a variable part such as a train ID, a station name, etc. in advance, and determines information to be described in the variable part based on an operation input of the dispatcher, etc. or a result of calculation performed by the system with respect to the input.
- a description of "Dispatcher ⁇ " indicates that "input obstacle occurrence information" of 7:53 displayed in an uppermost part of FIG. 12 corresponds to information generated based on an operation performed by the dispatcher.
- the traffic management system 10 determines a train in which an obstacle occurs, a position at which the obstacle occurs, and a time at which the obstacle occurs based on the input of the dispatcher, and generates text data in the uppermost part of FIG. 12 by describing the determined train, position, and time in the variable part.
- a description of "automatic calculation by system” indicates that "specify obstacle influence range” of 7:53 displayed in a second uppermost part of FIG. 12 corresponds to information generated based on automatic calculation by the traffic management system 10.
- the traffic management system 10 describes a train restraint range (warning target station) and an attention calling range (attention target station) obtained by automatic calculation in a variable part to generate text data in the second uppermost part of FIG. 12 .
- a description of "train 1A crew” indicates that "obstacle cause identified" of 8:01 displayed in a fourth uppermost part of FIG. 12 corresponds to information which is a cause determined by a crew of train 1A and input from a terminal.
- the traffic management system 10 describes the information in a variable part to generate text data in the fourth uppermost part of FIG. 12 .
- the traffic management system 10 distributes completed text data to terminals used by other dispatchers, a station staff of each station, a crew of a related train, etc. In this way, a time-series status corresponding to a type of occurring obstacle and a type of response to the obstacle may be shared among a plurality of people concerned.
- creation and distribution of the text data are automatically performed by the traffic management system 10, and thus the dispatcher do not have to perform specific operation input for transmitting information.
- Information is automatically distributed to another person concerned only when the dispatcher performs an operation for responding to the above-described obstacle. For this reason, more information may be shared without an increase in the number of operations to be performed by the dispatcher. In this way, the dispatcher may rapidly and appropriately determine a countermeasure against an occurring event, and minimize disturbance in a train service.
- the traffic management system 10 may generate data of a chart, an image, etc., and distribute the generated data.
- the traffic management system 10 has a function of accumulating various types of information in a time series, and filtering the information according to various conditions. For example, it is possible to perform filtering to extract only information about occurrence of an obstacle, extract only information indicating delay, or extract only information related to a change of a timetable.
- the traffic management system 10 assigns tag information to each information item at the time of generating, accumulating, and distributing each information item.
- the traffic management system 10 and a terminal receiving the distributed information may extract and display only information according to a predetermined condition by filtering using the tag information.
- FIG. 13A is a diagram illustrating an example of a screen display that defines time, a sender, and classification of information as filtering conditions.
- FIG. 13B is a diagram illustrating an example of a screen display in which classification of information is allowed to be selected by a button operation in filtering.
- a condition is displayed by a character string on a button.
- the invention may not be limited thereto.
- an appropriate figure, etc. that allows a condition to be easily detected is displayed on a button, it is possible to more intuitively perform a filtering operation.
- the bi-directional operation is given as an example of the obstacle avoidance operation in the present embodiment and example, the invention is not limited thereto.
- the invention is not limited thereto.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Economics (AREA)
- General Health & Medical Sciences (AREA)
- Human Resources & Organizations (AREA)
- Marketing (AREA)
- Primary Health Care (AREA)
- Strategic Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- General Physics & Mathematics (AREA)
- Theoretical Computer Science (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Description
- The present invention relates to a traffic management system for managing a train service on a railroad.
- In a train service on a railroad, an initial planned timetable may be disturbed when a traffic disturbance such as a technical problem or an accident occurs on a train in service. In such a case, a train dispatcher who manages the train service aims to recover from the traffic disturbance by replanning the timetable, manually controlling routes of trains, etc. using a traffic management system.
- PTL 1 discloses a technology for providing a replanning system which can provide plentiful information for a dispatcher to make a decision of replanning strategy and good operability.
PTL 1 states that "A process of displaying a traffic condition, a process of predicting a traffic condition, a process of checking a prediction result, a process of displaying the result, and a process of suggesting a restoration plan are provided. When a traffic condition is displayed, it is possible to select a display mode in which a planned timetable, an actual timetable, and a predicted timetable are overlapped and displayed or separately displayed according to a request of the dispatcher. When a traffic condition is predicted, the dispatcher may select a prediction strategy suitable for a situation from among a plurality of prediction strategies, a prediction check result is displayed as a hindrance mark or an automatic proposal mark, and the displayed hindrance mark or automatic proposal mark is picked using a mouse, thereby describing content of the mark or proposing a restoration plan." (See paragraph 0005). - PTL 1:
JP 6-72333 A - Various patterns are present as a pattern of a train service operation (hereinafter referred to as an "operation pattern"). Examples thereof include an running line change, platform blockage, etc. Further, examples of the running line change include a bi-directional running in which upward and downward trains run on the same track.
- In an replanning operation in which a timetable is changed in response to notification of the traffic disturbance, an operation pattern that avoids the occurring transport obstacle is implemented in some cases (hereinafter the operation pattern that avoids the transport obstacle will be referred to as an obstacle avoidance operation).
- In the obstacle avoidance operation, the dispatcher is forced to perform a troublesome operation such as changing or setting each train service which may have a complicated influence.
- However,
PTL 1 does not describe any specific function for supporting an obstacle restoration operation by the dispatcher. For example,PTL 1 does not describe what type of information is provided to the dispatcher for the obstacle restoration operation. - An object of the invention is to provide a technical solution that satisfactorily supports an operation of avoiding an obstacle by the dispatcher.
- A traffic management system according to an aspect of the present invention includes: a display unit for displaying a train graph screen which represents movement of a train over time as a diagram on a plane defined by an axis in a time direction and an axis in a route direction; and a processing unit for determining restoration plan in which trains run in a designated obstacle avoidance operation pattern for an obstacle avoidance operation time slot and an obstacle avoidance operation area which are specified on a train graph screen; a processing unit for displaying a train graph which corresponds to the determined restoration plan.
- A traffic management system according to another aspect of the present invention includes : a display unit for displaying an track diagram screen that indicates positions of trains at a current time on a track; and a processing unit for setting a subsequent station ahead of an obstacle occurrence position corresponding to a position at which an obstacle occurs and up to a station to which a train heading for the obstacle occurrence position is allowed be turned back in a reverse direction by tracing a route from the obstacle occurrence position as warning target stations when the obstacle occurs on the track, and displaying the warning target stations on the track diagram screen.
- A traffic management system according to still another aspect of the present invention includes: a storage unit for storing platform allocation management information that associates a virtual platform ID corresponding to information determining a direction and a role of each platform with a physical platform ID; and a processing unit for determining restoration plan such that the physical platform associated with the virtual platform is used in the direction and for the role of the virtual platform.
- According to the invention, it is possible to satisfactorily support a train service operation of avoiding an obstacle by a dispatcher. When the operation of avoiding an obstacle by the dispatcher is smoothly performed, it is possible to suppress an increase in traffic disturbance caused by an occurrence of an obstacle as much as possible, to improve punctuality of a train service, and to suppress loss such as a decrease in profit due to the traffic disturbance.
-
- [
FIG. 1] FIG. 1 is a schematic block diagram of a traffic management system according to the present embodiment. - [
FIG. 2] FIG. 2 is a block diagram illustrating a functional configuration of the traffic management system. - [
FIG. 3] FIG. 3 is a table illustrating an example of a timetable in the present embodiment. - [
FIG. 4] FIG. 4 is a table illustrating an example of obstacle information in the present embodiment. - [
FIG. 5A] FIG. 5A is a diagram illustrating a display example of an track diagram screen at the time of occurrence of an obstacle. - [
FIG. 5B] FIG. 5B is a diagram illustrating a display example of an influence range due to the obstacle on a train graph screen. - [
FIG. 5C] FIG. 5C is a flowchart illustrating a process of specifying a range in which an influence of the obstacle is received. - [
FIG. 5D] FIG. 5D is a flowchart illustrating a process of specifying a warning range in which an influence of the obstacle may be propagated. - [
FIG. 5E] FIG. 5E is a diagram illustrating an example of the train graph screen when the obstacle occurs. - [
FIG. 5F] FIG. 5F is a diagram illustrating an example of the train graph screen when a sub-event is added as the obstacle information. - [
FIG. 6A] FIG. 6A is a diagram illustrating a display example of the train graph screen when a dispatcher specifies a area and a time slot in which a bi-directional operation is performed. - [
FIG. 6B] FIG. 6B is a diagram illustrating a state of correction of an obstacle avoidance operation time slot and an obstacle avoidance operation area. - [
FIG. 6C] FIG. 6C is a table for description of an example of a method of correcting the obstacle avoidance operation time slot and the obstacle avoidance operation area. - [
FIG. 7A] FIG. 7A is a diagram illustrating a display of a train graph screen that shows a train service plan in which the bi-directional operation is performed in an obstacle avoidance operation area and an obstacle avoidance operation time slot specified by the dispatcher. - [
FIG. 7B] FIG. 7B is a diagram illustrating a display of a train graph screen that shows a train service plan in which an obstacle avoidance operation time slot is corrected. - [
FIG. 7C] FIG. 7C is a diagram for description of a method of determining a train service plan in which the bi-directional operation is applied. - [
FIG. 7D] FIG. 7D is a flowchart illustrating a process of determining a time at which an obstacle avoidance operation is ended. - [
FIG. 8A] FIG. 8A is a diagram illustrating an example of a screen display when the dispatcher inputs an restoration from the obstacle. - [
FIG. 8B] FIG. 8B is a diagram illustrating a display example of a screen inquiring of the supervisor whether to end the obstacle avoidance operation from atrain graph screen 13. - [
FIG. 9A] FIG. 9A is a diagram illustrating a train service plan as a train graph at the time of returning from the bi-directional operation to a normal operation. - [
FIG. 9B] FIG. 9B is a diagram for description of another train service plan at the time of returning from the bi-directional operation to the normal operation. - [
FIG. 9C] FIG. 9C is a diagram for description of another train service plan at the time of returning from the bi-directional operation to the normal operation. - [
FIG. 10A] FIG. 10A is a diagram illustrating a display example of the track diagram screen when a technical problem occurred on a certain train at a certain station. - [
FIG. 10B] FIG. 10B is a diagram illustrating a table for managing allocation of a platform. - [
FIG. 10C] FIG. 10C is a diagram illustrating an example of timetable information using a virtual platform and a physical platform. - [
FIG. 11] FIG. 11 is a diagram illustrating a state in which an running line of a downward passing train is specified by dragging a mouse on atrack diagram screen 12. - [
FIG. 12] FIG. 12 is a diagram illustrating an example in which various information exchanged on a system in relation to the occurrence of the traffic disturbance is displayed in time series by text. - [
FIG. 13A] FIG. 13A is a diagram illustrating an example of a screen display that defines time, a sender, and classification of information as filtering conditions. - [
FIG. 13B] FIG. 13B is a diagram illustrating an example of a screen display in which classification of information is allowed to be selected by a button operation in filtering. - A schematic description will be given of an embodiment of a traffic management system according to the invention.
-
FIG. 1 is a schematic block diagram of a traffic management system according to the present embodiment. Atraffic management system 10 includes a human machine interface (HMI) 11, atimetable management device 14, aroute control device 15, an obstacleinformation management device 16, areplanning device 17, and anetwork 18. Thetraffic management system 10 is connected to fieldequipment 30 through an fieldequipment management system 20. The fieldequipment management system 20 is a system disposed on a site side, and monitors or controls thefield equipment 30 in cooperation with thetraffic management system 10. Thefield equipment 30 corresponds to various facilities such as a switch, a traffic light, a track circuit, etc. used for a train service at a site. - The
HMI 11 is an interface for displaying to a dispatcher and receiving an operation of the dispatcher. TheHMI 11 displays a traffic condition in real time, receives a change in a timetable, and transmits a received change request to a related device. TheHMI 11 is a terminal device having two display devices as an example, and displays two screens corresponding to antrack diagram screen 12 and a train graph screen on the respective display devices. Thetrack diagram screen 12 displays a current train position using a track diagram. Thetrain graph screen 13 displays a predicted timetable and an actual timetable in which each train service plan and actuals are displayed as a path representing movement of a train over time. - The
timetable management device 14 holds data of a timetable created in advance in an accompanyingstorage unit 14a. When a change in the timetable is requested during the operation, thetimetable management device 14 receives a timetable change plan based on the request from thereplanning device 17, and updates the data of the timetable held by thestorage unit 14a based on received data. Thetimetable management device 14 provides data of the timetable to another device as necessary. In addition, thetimetable management device 14 receives information about a travel record of the train from thefield equipment 30 and stores the received information. - The
route control device 15 records information related to route control such as field equipment status information, train position information, etc. in an accompanyingstorage unit 15a. Theroute control device 15 instructs the fieldequipment managing system 20 to control a set or cancel the route of the train based on the timetable received from thetimetable management device 14. The fieldequipment management system 20 receiving this instruction controls thefield equipment 30 such as the traffic light, the switch, etc. to realize the indicated setting or canceling of the route. - The obstacle
information management device 16 records information related to management of the obstacle such as obstacle information, track linkage, etc. in an accompanyingstorage unit 16a. The obstacleinformation management device 16 manages obstacle information corresponding to information about an obstacle related to the train service. Examples of the obstacle information include obstacle information automatically given from the fieldequipment management system 20 and obstacle information given by transmission and reception of information between related devices related to management of the train service. - The
replanning device 17 stores information such as rules for timetable planning in an accompanyingstorage unit 17a. When the change of the train service plan is necessary, thereplanning device 17 creates a modified timetable based on an operation from theHMI 11. Thereplanning device 17 transmits the modified timetable to thetimetable management device 14 to update the timetable of thetimetable management device 14. - In addition, the
replanning device 17 may predict a future traffic condition based on a current traffic condition. - In addition, the
replanning device 17 may transmit the modified timetable to thetimetable management device 14 to display the modified timetable on theHMI 11 before updating data used for the route control, thereby urging the dispatcher to visibly check the new timetable in advance. - Here, an example in which the
timetable management device 14, theroute control device 15, the obstacleinformation management device 16, and thereplanning device 17 are physically separately implemented is shown. However, the invention is not limited to this example. It suffices to functionally implement the devices, and a physical configuration is not particularly limited. As another example, all the devices may be implemented on one computer or implemented by being dispersed on a plurality of computers. -
FIG. 2 is a block diagram illustrating a functional configuration of the traffic management system. Thetraffic management system 10 includes adisplay unit 10A, aprocessing unit 10B, astorage unit 10C, and anoperation unit 10D. Thedisplay unit 10A and theoperation unit 10D correspond to theHMI 11 ofFIG. 1 , theprocessing unit 10B corresponds to thetimetable management device 14, theroute control device 15, the obstacleinformation management device 16, and thereplanning device 17 ofFIG. 1 , and thestorage unit 10C corresponds to thestorage units - The
display unit 10A displays a train graph screen that represents movement of the train over time as a diagram on a plane defined by an axis in a time direction and an axis in a route direction. When an obstacle avoidance operation type corresponding to a type of obstacle avoidance operation for servicing a train by avoiding an obstacle, an obstacle avoidance operation time slot corresponding to a time slot in which an obstacle avoidance operation is applied, and an obstacle avoidance operation area corresponding to an area in which the obstacle avoidance operation is applied are specified, theprocessing unit 10B determines a train service plan such that the train is serviced in the obstacle avoidance operation time slot and the obstacle avoidance operation area and in a service mode of the obstacle avoidance operation type, and displays a train paths based on the timetable on the train graph screen. In this way, when the dispatcher specifies the obstacle avoidance operation type, the obstacle avoidance operation time slot, and the obstacle avoidance operation area, the traffic management system automatically determines a timetable in which the obstacle avoidance operation of the service mode is applied in the time slot and the area, and thus it is possible to facilitate an operation of applying a predetermined service mode, and to support the dispatcher. For example, with regard to an obstacle avoidance operation type, the dispatcher only needs to input a type such as a bi-directional operation, and a complicated operation such as modifying individual train services to implement the bi-directional operation is unnecessary. It is possible to reduce situations in which a delay in response or an error in response occurs due to a complicated operation for recovery, and the train is stuck in a place outside a station to cause confinement in the train. In addition, since a complicated obstacle avoidance operation can be easily carried out, a possibility of continuing a train service increases even in a case in which an operation would have been interrupted in the past. A part of a timetable which predicts the future is referred to as a predicted timetable. Since a train timetable from the past to the present has a record of an actual train service, thetraffic management system 10 is able to generate a prediction timetable. - In this instance, the
processing unit 10B determines the timetable in the obstacle avoidance operation time slot and the obstacle avoidance operation area such that the timetable is consistent with a train service in a preceding time slot of the obstacle avoidance operation time slot, and determines a timetable in a subsequent time slot of the obstacle avoidance operation time slot such that the train service plan is consistent with the train service plan in the obstacle avoidance operation time slot. In this way, since the timetable is automatically determined such that the train service in the obstacle avoidance operation time slot is consistent with the preceding and subsequent time slots, the dispatcher may easily modify a timetable consistent with preceding and subsequent time slots only by indicating the obstacle avoidance operation time slot, the obstacle avoidance operation area, and the obstacle avoidance operation type. - For example, when it is presumed that the obstacle avoidance operation type corresponds to a bi-directional operation in which trains in two directions are allowed to travel on a single track by dividing a time, the
processing unit 10B determines a bi-directional operation area corresponding to an area in which the bi-directional operation is performed defined by a first end station and a second end station at both ends based on the obstacle avoidance operation range, and determines a timetable such that when a train (first train) enters the bi-directional operation section from the first end station, another train (second train) arriving at the second end station is kept waiting, and the second train is allowed to enter the bi-directional operation section after the first train arrives at the second end station. In this way, the timetable in which trains in two directions are allowed to travel on the same track may be determined by thetraffic management system 10. Thus, when an obstacle occurs, the dispatcher may set a bi-directional operation by an easy way to continue a service of trains for both directions. - In addition, when the obstacle avoidance operation time slot, the obstacle avoidance operation area, and the obstacle avoidance operation type are specified, the
processing unit 10B corrects the obstacle avoidance operation range to an extended range in which the originally intended obstacle avoidance operation range is included and a train service of the obstacle avoidance operation type is applicable. Since the obstacle avoidance operation range and the obstacle avoidance operation type specified by the dispatcher are automatically corrected such that there is no inconsistency in a configuration of the facility, etc., the dispatcher may easily apply an appropriate obstacle avoidance operation. - In addition, when the bi-directional operation is performed as an obstacle avoidance operation type, the
processing unit 10B corrects the specified obstacle avoidance operation area to an extended area including the obstacle avoidance operation area and having a station, in which a crossover is present between one track and another track, at each of both ends. In this way, since the obstacle avoidance operation area specified by the dispatcher is automatically corrected to an area in which the bi-directional operation is allowed, the dispatcher may easily make appropriate setting. - In this case, when there is a train traveling in an opposite direction to an original direction at a time when the obstacle avoidance operation time slot ends in the originally intended train service plan, the
processing unit 10B performs correction to set a time until the train arrives at an end station of the obstacle avoidance operation range to the obstacle avoidance operation time slot. In this way, since the obstacle avoidance operation time slot specified by the dispatcher is automatically corrected to be consistent with the bi-directional operation, the dispatcher may easily set the obstacle avoidance operation time slot appropriate for the bi-directional operation. - In addition, according to another viewpoint, in the
traffic management system 10 of the present embodiment, thedisplay unit 10A displays thetrack diagram screen 12 that indicates an position of the train at a current time on the track. When an obstacle occurs on the track, theprocessing unit 10B sets a station in front of an obstacle occurrence position corresponding to a position at which the obstacle occurs and stations up to a station to which a train heading for the obstacle occurrence position can be turned back in a reverse direction by tracing the route from the obstacle occurrence position to warning target stations, and displays the warning target stations on the track diagram screen. In this way, since a station in a range in which a train may not be turned back when the train enters at the occurrence of an obstacle is displayed on the track diagram screen as a warning target station, the dispatcher may easily perform operation arrangement such that there is no train that may not be turned back at the occurrence of an obstacle. Normally, this warning target station is considered as a station at which progress of a train needs to be immediately stopped. When the dispatcher performs a train hold operation based on a display of the warning target station, it is possible to prevent situations such as a situation in which a train stops before a signal due to inappropriate hold setting, a situation in which a train stays in a section that does not allow the train to be turned back and thus even a partial service may not be resumed, etc. - In addition, the
processing unit 10B sets a station which is a adjacent station of a warning target station to an attention target station, and displays the attention target station on thetrack diagram screen 12. In this way, a route in a reverse direction of an obstacle occurrence track at which even though operation of a train service may not be immediately stopped but should be monitored carefully because a train passes right beside an obstacle occurring place can be displayed as attention target stations. A station at which a train may not be able to depart since a preceding train is blocking the route can also be displayed as attention target stations. When such an attention target station is set, it is possible to prevent confusion that may occur in the future, and to shorten time required for recovery of a timetable. The above-described warning target station or attention target station may be displayed not only on thetrack diagram screen 12 but also on thetrain graph screen 13. - In addition, according to still another viewpoint, in the
traffic management system 10 of the present embodiment, thestorage unit 10C stores platform allocation management information that associates a virtual platform corresponding to information determining a direction and role for each platform with a physical platform. Theprocessing unit 10B determines a timetable such that the physical platform associated with the virtual platform is used in the direction and for the role of the virtual platform. In this way, the supervisor may easily determine a timetable in which a platform is appropriately allocated by allocating a physical platform to a virtual platform for which a direction and role are determined. In addition, it is possible to collectively set platform used for all trains included in a timetable by setting a physical platform corresponding to a virtual platform. When time required for the dispatcher to input change data to the system is shortened, and another command task subsequent to platform setting change is rapidly carried out by such collective setting, it is possible to expect that recovery time from the traffic disturbance can be shortened. - In addition, the
display unit 10A displays the platform allocation management information. Theoperation unit 10D allows individual setting of the platform allocation management information for each train by operation input. When a physical platform used by a certain train in a timetable is designated, theprocessing unit 10B determines the timetable by giving priority to the individually set physical platform over the virtual platform, and causes thedisplay unit 10A to display the determined timetable. In this way, the dispatcher may individually set a physical platform used by each train of the timetable, and thus may easily and flexibly perform setting using collective setting by a virtual platform and individual setting by a physical platform. - In addition, when a physical platform is individually set with respect to a train in the timetable by the
operation unit 10D, theprocessing unit 10B determines whether setting by a virtual platform is consistent with setting by a physical platform. In this way, even when the dispatcher inputs contradictory setting, thetraffic management system 10 detects the contradictory setting, and thus it is possible to prevent a timetable including contradiction in platform setting from being generated. In this way, it is possible to construct a route in accordance with setting of the train service plan to realize a timetable. - In addition, the
processing unit 10B causes thedisplay unit 10A to display a configuration of a route including each platform of each station as a diagram, sets a platform for each train having a specified travel pattern based on an instruction on theoperation unit 10D, and causes thedisplay unit 10A to display the platform used by the specified train. In this way, the dispatcher may collectively set a platform used in each station for each travel pattern of a train, and it is be expected that recovery time from a traffic disturbance can be shortened by speeding up a command task. - Hereinafter, a more specific embodiment will be described in detail with reference to drawings.
- A configuration of the traffic management system according to the present embodiment is the same as that illustrated in
FIG. 1 andFIG. 2 . -
FIG. 3 is a table illustrating an example of a train service plan in the present embodiment. The train service plan ofFIG. 3 corresponds to timetable information recording a time of arrival to a station, a time of departure from a station, a used platform at each station, and a traveling track (direction) for a train traveling on a certain route. A traveling track corresponding to a certain station indicates a track on which a train travels after departing from the station until the train arrives at a subsequent station. In a column of a used platform, a name of a virtually determined platform (virtual platform) is described. The virtual platform will be described below. - In the example of
FIG. 3 , a train departs from platform "Down1" of station A, departing the station at 7:15:00 to travel along a down track, passes through platform "Nonstop down" of station B at 7:26:30, passes through platform "Down1" of station C at 7:29:45, and arrives at platform "Up1" of station D at 7:34:00. Then, the train departs from station D at 7:34:45 to travel along an up track, passes through platform "Nonstop up" of station E at 7:40:00, and arrives at platform "Up2" of station F at 7:45:00. Further, the train departs from station F at 7:45:00 to arrive at platform "Down1" of station G at 7:50:15, departs at 7:51:00 to travel along a down track, and arrives at platform "Down1" of station H corresponding to a terminal station at 7:58:30. -
FIG. 4 is a table illustrating an example of obstacle information in the present embodiment. For example, when an event of a certain obstacle occurs, the obstacleinformation management device 16 illustrated inFIG. 1 allocates an event ID to the obstacle, and records content, an occurrence place, and an occurrence time of the obstacle in the table present in thestorage unit 16a. In addition, when another event occurs in response to the obstacle, the obstacleinformation management device 16 records the event as a sub-event in the table. The obstacleinformation management device 16 allocates a sub-event ID to the occurring sub-event, and records content and an occurrence time of the event in the table. -
FIG. 4 illustrates an example in which a car of atrain number 1A has technical problem, and the obstacle is described as an event of event ID = 5 in the table that records the obstacle information. The technical problem occurred at a spot 4.5 km away from station B on a down line, at 7:50. In response to the problem, a situation confirmation report are made at 8:00, first aid is being tried from 8:05, and recovery of the obstacle is estimated at 9:00. -
FIG. 5A is a diagram illustrating a display example of the track diagram screen at the occurrence of an obstacle.FIG. 5A illustrates a display example of thetrack diagram screen 12 whentrain 1A traveling between station B and station C gets technical problem. Referring toFIG. 5A , a circular icon having x in content is displayed at an obstacle occurrence position of a track diagram. When information of the obstacle corresponding to the problem ontrain 1A is input, the obstacleinformation management device 16 automatically extracts an influence of the problem oftrain 1A and a area thereof, and displays the influence and the area on thetrack diagram screen 12. - Referring to
FIG. 5A , on an upward line directed rightward in the figure, station A, station B, and station C correspond to warning target stations, which are indicated by broken line arrows. In addition, on the upward line, a preceding station of station A corresponds to an attention target station, which is indicated by a one-dot-chain line arrow. On a downward line, station B, station C, and station D correspond to attention target stations, which are indicated by one-dot-chain line arrows. - With regard to station B on the upward line, when a subsequent train of
train 1A departs from station B,train 1A becomes an obstacle, and the following train becomes stuck. For this reason, a train directed from station B to station C should not depart. In addition, here, on the assumption that there is no facility for turning back at station B, when the following train oftrain 1A departs from station A, the following train is likely to be stuck in the same manner. For this reason, a train directed from station A to station B also should not depart. In this way, when an obstacle occurrence position and information of the track diagram are combined, it is possible to specify an area at which departure of a train should be held, and to hold a train in a state in which a partial service can be rapidly resumed. A detailed process will be described usingFIG. 5C . -
FIG. 5B is a diagram illustrating a display example of specific situations of the warning target station and the attention target station described above on the train graph screen. On the train graph screen, similarly toFIG. 5A , a circular icon having x in content is displayed at a point corresponding to a position and time at which an obstacle occurs . In addition, by displaying hatching of different patterns for a region 50 on the train graph screen corresponding to the area which corresponds to the broken line arrow inFIG. 5A and a region 51 on the train graph screen corresponding to the area which corresponds to the one-dot-chain line arrow inFIG. 5A , these regions are visualized on the train graph screen. InFIG. 5B , a range of a warning target and a range of an attention target are distinguished by hatching patterns. However, in addition to the above-described distinction, it is also possible to distinguish between up and down lines corresponding to a target by further increasing a hatching pattern. -
FIG. 5C is a flowchart illustrating a process of specifying a range in which an influence of the obstacle is received. Referring toFIG. 5C , in response to occurrence of an obstacle, the obstacleinformation management device 16 extracts a station located one station ahead of an obstacle occurrence position and a station located one station behind the obstacle occurrence position in a progress direction of a train (step S101). Subsequently, the obstacleinformation management device 16 adds the extracted stations as warning target stations (step S102). - Subsequently, the obstacle
information management device 16 performs warning target station addition loop processing of steps S103 and S104. - In the warning target station addition loop processing, the obstacle
information management device 16 determines whether a last added backward station can turn back a train (step S103) . When the last added station is a station that can turn back a following train, the obstacleinformation management device 16 ends the process as it is. On the other hand, the last added station is a station that cannot turn back a train, the obstacleinformation management device 16 adds a backward station of the last added station as a warning target station (step S104), and returns to step S103. In this way, the obstacleinformation management device 16 extracts all the warning target station. - In addition, in
FIG. 5A , the train directed from station C to station B passes right beside the obstacle occurrence position, and thus there is a possibility that some influence such as a temporary speed limit may be applied. In this way, a range that may receive a secondary influence is set to an attention target region even though the range is not a direct influence range in which departure of a train should be immediately held. -
FIG. 5D is a flowchart illustrating a process of specifying an attention target range. The process of specifying the attention target range is repeatedly performed for each warning target station. - First, the obstacle
information management device 16 selects a warning target station to be processed (step S201) . Subsequently, the obstacleinformation management device 16 adds a backward station of the selected warning target station in an upward direction as attention target station (step S202) . Further, the obstacleinformation management device 16 adds a backward station of the selected warning target station in a downward direction as an attention target station (step S203) . -
FIG. 5E is a diagram illustrating an example of the train graph screen when an obstacle occurs. - When an obstacle occurs, and information about the obstacle is input, the obstacle
information management device 16 displays the obstacle information on thetrain graph screen 13. Thetrain graph screen 13 at a time at which the obstacle occurs is illustrated inFIG. 5E . - It can be understood that
train 1A located between station B and station C at a current time has a technical problem. When a predetermined operation is performed on an icon indicating the obstacle, the obstacleinformation management device 16 displays specific information about the obstacle and an action to be taken on the obstacle. Examples of the predetermined operation include click, mouse-over, etc. For example, display of the specific information about the obstacle and the action to be taken on the obstacle corresponds to pop-up display, etc. In the example ofFIG. 5A , an obstacle occurrence time and an obstacle occurrence position are displayed as a specific obstacle, and a call with a person concerned, editing event information, and an obstacle avoidance operation are displayed as the alternatives to be taken. The specific obstacle and the action to be taken on the obstacle may be similarly displayed when a predetermined operation is performed on an icon on the track diagram screen. -
FIG. 5F is a diagram illustrating an example of the train graph screen when a sub-event is added as the obstacle information. A straight line horizontally extending from an icon indicating an obstacle indicates an influence of occurrence of the obstacle, a thick part in the middle indicates a time at which first aid action starts with respect to the obstacle, and a right end portion indicates an estimated time of recovery. In this way, it is possible to visualize an extent of influence due to occurrence of the obstacle. In the example ofFIG. 5F , when a predetermined operation is performed on a recovery estimation part, an obstacle occurrence time and a recovery estimated time are displayed. In this way, when event information or sub-event information are visualized and displayed on the train graph screen, it is possible to easily detect a relation between an occurring event and a train service, and the dispatcher may rapidly and easily determine a necessary change of the timetable. If the timetable is quickly modified, an operation interruption time at the occurrence of a traffic disturbance is shortened, and it is possible to continue a service of each train according to the modified timetable. - Next, a description will be given of a series of processes in a case in which when an obstacle occurs, the dispatcher performs a bi-directional operation, in which a single track is alternately used by trains in two directions, in an influence receiving range in a time slot in which the obstacle have an influence.
- Here, a case of performing a bi-directional operation, in which trains in two directions alternately pass on one side track not involved with trouble, between station B and station C from the state illustrated in
FIG. 5A is given as an example of replanning. -
FIG. 6A is a diagram illustrating a display example of the train graph screen when the dispatcher first specifies an area and a time slot in which a bi-directional operation is needed. - It is presumed that the dispatcher specifies a range in which the bi-directional operation is needed to include an icon indicating an obstacle and a line extending rightward from the icon and indicating an influence of the obstacle on the
train graph screen 13. For example, it is possible to specify a rectangular region on thetrain graph screen 13. In this case, the rectangular region corresponds to the bi-directional operation range. InFIG. 6A , the specified rectangular region is indicated by hatching. For example, this selection operation may be performed by dragging of a mouse, etc. - This operation is an operation of specifying an obstacle avoidance operation time slot and an obstacle avoidance operation area, and a hatching part indicates the specified range. When the obstacle avoidance operation time slot and the obstacle avoidance operation area are specified, the
replanning device 17 corrects the obstacle avoidance operation time slot and the obstacle avoidance operation area as necessary, generates a modified timetable for applying an obstacle avoidance operation of a specified obstacle avoidance operation type to the region, and transmits the modified timetable to thetimetable management device 14. Here, the obstacle avoidance operation type corresponds to the bi-directional operation. Hereinafter, a description will be given on the assumption that a process related to modification of the timetable is performed by thereplanning device 17. However, actual functional arrangement is not limited thereto, and another device in thetraffic management system 10 may perform the process. -
FIG. 6B is a diagram illustrating a state of correction of the obstacle avoidance operation time slot and the obstacle avoidance operation area. Since a crossover between upward and downward tracks is not present between station B and station C as illustrated inFIG. 5A , station B and station C may not be used as end stations of the bi-directional operation. Station A and station D have crossovers, and thus may be used as end stations of the bi-directional operation. - Therefore, as illustrated in
FIG. 6B , thereplanning device 17 automatically corrects the range in which the bi-directional operation (as a type of obstacle avoidance operation) is applied (the obstacle avoidance operation time slot and the obstacle avoidance operation area) to a range using station A and station D as end stations at both sides. When such correction is determined on the system side, the dispatcher may immediately start to input the bi-directional operation without considering a track configuration of each station, and may realize shortening of time required to change the timetable, that is, resumption of the train service in a short time. -
FIG. 6C is a diagram for description of an example of a method of correcting the obstacle avoidance operation time slot and the obstacle avoidance operation area. Thereplanning device 17 holds a table illustrated inFIG. 6C in advance. - The table of
FIG. 6C indicates whether each station can be used as an end station of a bi-directional operation (using either upward track or downward track). For example, stations A, D, and E can be used as a starting station or a terminal station of bi-directional operation both for using upward track and downward track, since a crossover connecting the upward track and the downward track exists in each of the stations A, D, and E. On the other hand, stations B and C can be used as neither a starting station nor a terminal station of bi-directional operation, both for using the upward track and the downward track. - In a case in which a train has a technical problem between station B and station C, and a bi-directional operation is performed, in response to a region having station B and station C as both end stations being specified, the
replanning device 17 specifies a range including station B and station C and having stations corresponding to end stations of the bi-directional operation at both ends with reference to the table ofFIG. 6C , and corrects the obstacle avoidance operation area to the range. - Next, a description will be given for a method of creating a new train service and a method of setting a time at which a bi-directional operation is ended. In this instance, creation of the new train service, that is, adding and changing of train paths on a train graph are automatically performed by the
replanning device 17. -
FIG. 7A is a diagram illustrating a display of a train graph screen that shows a timetable in which the bi-directional operation is performed in an obstacle avoidance operation area and an obstacle avoidance operation time slot specified by the dispatcher. In the timetable, the bi-directional operation is performed until a designated end time specified by the dispatcher, and thereafter the operation returns to a normal operation. - However, this modification to the timetable is incomplete.
Train 3B is on a different track from a track on which the train is assumed to be between station A and station D on the original plan, that is,train 3B is on the same track as that oftrain 4E. Thus, in practice,train 3B cannot pass bytrain 4E between station C and station D. For this reason, train 4E may not depart from station D untiltrain 3B arrives at station D. - When a bi-directional operation is applied to a timetable, the
replanning device 17 automatically corrects an end time, and determines a timetable applicable to an actual train service. A description will be given below. -
FIG. 7B is a diagram illustrating a display of a train graph screen that shows a timetable in which an obstacle avoidance operation time slot is corrected. -
FIG. 7C is a diagram for description of a method of determining a train path when the bi-directional operation is applied. - Here, an area in which the bi-directional operation is applied is between station P and station Q. That is, an obstacle avoidance operation range is between station P and station Q.
- With regard to train 2B initially entering between station P and station Q corresponding to the area in which the bi-directional operation is applied, the
replanning device 17 obtains a time of arrival to station P using a standard operating time t1 of this section. Subsequently, thereplanning device 17 lets train 3C depart from station P after waiting for a predetermined time (intersection hindrance time) t2 from the time of arrival to station P oftrain 2B considering intersection of routes withtrain 2B at station P. Thereafter, similarly, thereplanning device 17 lets train 4C depart from station Q after a time obtained by adding a traveling time t3 oftrain 3C between station P and station Q and an intersection hindrance time t4 oftrain 3C and train 4C from a time at which train 3C departs from station P. In addition, thereplanning device 17 lets train 5E depart from station P after a total time of a traveling time t5 oftrain 4C between station P and station Q and an intersection hindrance time t6 oftrain 4C and train 5E from a time at which train 4C departs from station Q. When such a process is performed, it is possible to create a timetable having consistency in a specific operation pattern corresponding to the bi-directional operation. Therefore, the route control device can issue a control command to the field equipment management system as the same manner as usual, even when the complicated bi-directional operation is performed. - Next, a description will be given for a process of determining a time at which the obstacle avoidance operation is ended.
-
FIG. 7D is a flowchart illustrating a process of determining a time at which the obstacle avoidance operation is ended. First, thereplanning device 17 sets a designated end time input by the dispatcher as a scheduled end time of the obstacle avoidance operation (step S301). - Subsequently, the
replanning device 17 performs processing of step S302 to step S305, and repeats processes from step S302 again when the scheduled end time has been updated at the time. - In step S302, the
replanning device 17 extracts all trains traveling within the obstacle avoidance operation range at the scheduled end time of the obstacle avoidance operation (in this case, the bi-directional operation). - Further, the
replanning device 17 repeats processing of step S303 and step S304 as many times as the number of extracted trains. In step S303, thereplanning device 17 determines whether a train subjected to processing in a current loop is running on a different track from a track on which the train is assumed to travel on the original plan. When the train is running on the different track, thereplanning device 17 sets a time at which the train arrives at a terminal station of a corresponding section as the scheduled end time (step S304). - In step S305, the
replanning device 17 determines whether the scheduled end time is updated in a current loop of step S302 to step S305. When the scheduled end time has been updated, thereplanning device 17 returns to step S302 and repeats processing. When the scheduled end time has not been updated, thereplanning device 17 ends a series of processes. - In the above-described example, a scheduled end time of an obstacle restoration operation is corrected from an end position of hatching of
FIG. 7A to an end position of hatching ofFIG. 7B by the above processing. - Next, a description will be given for an operation of the dispatcher and an operation of the
traffic management system 10 at the time of recovering from an obstacle with reference toFIGS. 8A and8B . - For example, in response to restoration from an obstacle occurring from a technical problem of a train, the dispatcher inputs restoration from the obstacle to the
traffic management system 10 by editing event information. When the obstacle avoidance operation is applied for the obstacle, the obstacleinformation management device 16 associates the obstacle with the obstacle avoidance operation at the time of performing the obstacle avoidance operation. The obstacleinformation management device 16 determines whether the obstacle avoidance operation is associated with the obstacle to which the restoration is input. When the obstacle is associated with the obstacle avoidance operation, the obstacleinformation management device 16 prompts the dispatcher to verify whether to cancel the obstacle avoidance operation. -
FIG. 8A is a diagram illustrating an example of a screen display when the dispatcher inputs the restoration from the obstacle. When the dispatcher inputs the restoration from the obstacle by applying a predetermined operation on an icon indicating obstacle information displayed on thetrain graph screen 13, the obstacleinformation management device 16 displays an image for prompting the dispatcher to select whether to cancel the bi-directional operation corresponding to the obstacle avoidance operation associated with the obstacle as a pop-up image as illustrated inFIG. 8B . -
FIG. 8B is a diagram illustrating a display example of a screen inquiring of the dispatcher whether to end the obstacle avoidance operation from thetrain graph screen 13. - Here, it is presumed that the bi-directional operation is associated to the obstacle information. To prompt verification as to whether to end the bi-directional operation associated with the obstacle information on which a predetermined operation of inputting the restoration is performed, the obstacle
information management device 16 instructs theHMI 11 to display the screen illustrated inFIG. 8B . When the dispatcher selects YES with respect to the display ofFIG. 8B , the obstacleinformation management device 16 ends the event corresponding to the bi-directional operation, and instructs thereplanning device 17 to modify a timetable for returning to the normal operation. - When a certain event is performed in relation to the obstacle as described above, the obstacle
information management device 16 may record information about the performed event by associating the information with the obstacle information. For example, an event performed in relation to the obstacle information illustrated inFIG. 4 may be additionally described in the obstacle information. Further, for example, when an icon indicating the event of the obstacle is selected, and the end of the event is input, the obstacleinformation management device 16 extracts an obstacle avoidance operation associated with the obstacle with reference to a table of the obstacle information, and displays a screen prompting verification as to whether the obstacle avoidance operation can be ended. - Here, an example of inquiring about canceling the obstacle avoidance operation when recovery from the obstacle is input is described. However, it is possible to inquire about canceling the obstacle avoidance operation at another time.
- For example, it is possible to inquire about canceling the obstacle avoidance operation when an estimated end time of the obstacle avoidance operation is reached, and the obstacle has already been removed at that time. Alternatively, it is possible to inquire about canceling the obstacle avoidance operation when the obstacle has been removed before the estimated end time of the obstacle avoidance operation. In addition, it is possible to inquire about extending the obstacle avoidance operation when the obstacle remains at a point in time approaching the estimated end time of the obstacle avoidance operation. When the dispatcher does not respond to the inquiry and leaves the inquiry unsolved, the obstacle avoidance operation may be automatically extended in a predetermined n-minute unit, and the inquiry may be made again after the extension period. In addition, the extension period may be set to a period up to a time at which the obstacle avoidance operation can be ended on the given situation. In addition, when the obstacle avoidance operation may not be canceled in the entire obstacle avoidance region, it is possible to determine whether a new starting station or terminal station can be set based on a position at which the obstacle is left, and change the area when the station can be set. In this case, the estimated end time of the obstacle avoidance operation may be determined in the same manner as the above-described extension. In addition, in this case, when a train is left on a platform of a certain station by setting a new obstacle avoidance operation range, it is possible to issue a warning thereof. In addition, for example, when a train is on a physical platform that is no longer allocated to a virtual platform, a warning is issued. In this way, when event information and an obstacle avoidance operation with respect to the event information are combined and managed, for example, it is possible to prevent a problem that an operation of appropriately returning a pattern of a train operation is not performed after an event ends, and a train service is impeded.
- Next, a description will be given of a process of ending the bi-directional operation and returning to the normal operation with reference to
FIG. 9A to FIG. 9C . -
FIG. 9A is a diagram illustrating a timetable at the time of returning from the bi-directional operation to the normal operation. - When an end of the bi-directional operation is input, the
replanning device 17 generates a timetable change plan in which whether a train traveling in a reverse direction of an original track is present at that time is verified, and a train traveling in an opposite direction to that of the train is allowed to enter a section where the bi-directional operation has been performed as illustrated inFIG. 9A in response to the train arriving at a terminal station of the bi-directional operation if the train traveling in the reverse direction is present. On the other hand, when the train traveling in the reverse direction of the original track is not present, thereplanning device 17 generates a timetable change plan that lets the train traveling in the opposite direction to that of the train immediately enter the section where the bi-directional operation has been performed. -
FIG. 9B andFIG. 9C are diagrams for description of another train service plan at the time of returning from the bi-directional operation to the normal operation. In an example ofFIG. 9A , sincetrain 3B is traveling on a different track from a track on whichtrain 3B is assumed to travel, train 4E may not depart from station D untiltrain 3B arrives at station D, and a train directed from station D to station A may not travel for a long time. - Meanwhile, in another example, in this instance, a train traveling in the opposite direction may immediately enter a section where the bi-directional operation has been performed using the other track which was unavailable during the occurrence of an obstacle.
- Recovery from the obstacle allows the other unavailable track to be used. Therefore, in the other example, the
replanning device 17 changes the timetable to allowtrain 4E to use this track, that is, to allow bothtrain 3B and train 4E to use the track in the reverse direction of the originally used track. - As illustrated in
FIG. 9B , thereplanning device 17 displays a menu screen that can command a change of the timetable. Here, a change example of individually specifyingtrain 4E to let only train 4E travel on a reverse line will be described. In practice, as still another example, it is possible to change the train service plan to let all trains directed from station D to station A reverse-line travel. In this case, an area and a time slot may be specified similarly to the example ofFIG. 6A . -
FIG. 9C is a diagram illustrating a timetable in a case of letting bothtrain 3B and train 4E travel on a reverse line. Lettingtrain 4E also travel on the reverse line accelerates recovery of all train timetables.FIG. 9C illustrates a case in which train 5C is also instructed to travel on the reverse line. - Next, a description will be given of an example of bypassing a place where an obstacle occurs by changing allocation of a platform with reference to
FIGS. 10A to 10C . -
FIG. 10A is a diagram illustrating a display example of the track diagram screen when a technical problem occurs on a certain train at a certain station.FIG. 10A illustrates an example in which train 3B gets technical problem onplatform 1 of station Y. Here, allocation of a platform may be changed by applying a predetermined operation to an icon indicating the obstacle. -
FIG. 10B is a diagram illustrating a table for managing allocation of a platform. A platform is managed by two types of platform information, each corresponds to a "virtual platform" and a "physical platform". The virtual platform indicates a role such as a platform used as the first platform of a downward train. The physical platform indicates a physical platform that identifies a position where a train actually arrives or passes. As illustrated inFIG. 10B , thereplanning device 17 may generate a timetable change plan in which a specific physical platform is not used by changing a combination of the virtual platform and the physical platform. - Further, in particular, when the
replanning device 17 patterns a typical allocation change in advance and holds pattern information in advance, the dispatcher may change platform allocation by a simple operation. For example, it is determined in advance thatphysical platform 2 is used as the first platform for downward trains whenphysical platform 1 is unavailable, and pattern information of the change is held in advance. Then, when the platform becomes unavailable as in a case in which a train onphysical platform 1 get technical problem, the dispatcher may easily change allocation by fetching and applying the held pattern information. In this way, when an obstacle corresponding to a pattern occurs, it is possible to immediately change allocation of a platform, and continue a train service. - In addition, the
replanning device 17 may hold a combination that cannot be allocated in advance. When the dispatcher tries to allocate a platform, thereplanning device 17 determines whether the input setting can be accepted with reference to the information about the combination that cannot be allocated. In this way, it is possible to prevent inappropriate platform allocation from being performed. -
FIG. 10C is a diagram illustrating an example of a timetable using a virtual platform and a physical platform. Thetimetable management device 14 basically uses a virtual platform as a platform defined in a timetable. Further, as illustrated inFIG. 10B , it is possible to collectively change platform allocation of all trains that use a corresponding station by changing a physical platform allocated to a virtual platform. - Further, as indicated in No. 8 and No. 9 of
FIG. 10C , a physical platform may be designated for an individual train in the timetable. When a physical platform is set in the timetable, thetimetable management device 14 gives priority to allocation of an individual train over collective allocation in a unit of a station illustrated inFIG. 10B . In this way, it is possible to change platform allocation of an individual train. In this case, thereplanning device 17 may verify whether allocation of an individual train is consistent with collective allocation for each station, and call the attention of the dispatcher when the allocations are not consistent with each other. In this way, when allocation of an individual train is inconsistent with allocation for each station, or when there is a contradiction therebetween, it is possible to alert the dispatcher by displaying a warning icon on the train graph screen. For example, when setting of a physical platform is inconsistent with setting of a virtual platform, or when setting for a station is inconsistent with setting for a train, it is possible to consider displaying a warning icon that calls the attention of the dispatcher. In this way, it is possible to prevent the timetable from being modified inappropriately, in which a route cannot be set and a train service is disturbed. - Next, a description will be given for inputting a change of a running line of a train. The above-described bi-directional operation may be regarded as an example of this running line change.
FIG. 11 illustrates a station in which a running line of a downward passing train is specified by dragging a mouse on a track diagram of thetrack screen 12. - For example, when an upward train and a downward train are set on the same track, the
replanning device 17 determines that the bi-directional operation is applied to the part, and generates such a timetable change plan. When an running line is specified herein with regard to a pattern of each service mode, it is possible to flexibly perform various running line changes such as a double-track co-directional operation, an upward/downward line switch operation, etc. in addition to the bi-directional operation. - In addition, on the contrary, with regard to a pattern of a typical service mode such as the bi-directional operation or the upward/downward line switch operation, a station and a platform to which an upward train and a downward train are allocated may be specified in advance, and the
replanning device 17 may hold setting information thereof in advance. In this way, when the dispatcher selects a service mode desired to be applied, it is possible to easily perform the obstacle avoidance operation illustrated inFIG. 7A to FIG. 7D orFIG. 9A to FIG. 9C . In this way, when a traffic disturbance corresponding to a pattern occurs, it is possible to immediately change the timetable, and to minimize a time at which an operation of a train is interrupted. -
FIG. 12 is a diagram illustrating an example in which various information exchanged on a system in relation to the occurrence of the obstacle is displayed in time series by text. - The
traffic management system 10 defines a sentence format including a variable part such as a train ID, a station name, etc. in advance, and determines information to be described in the variable part based on an operation input of the dispatcher, etc. or a result of calculation performed by the system with respect to the input. - A description of "Dispatcher ○○" indicates that "input obstacle occurrence information" of 7:53 displayed in an uppermost part of
FIG. 12 corresponds to information generated based on an operation performed by the dispatcher. Thetraffic management system 10 determines a train in which an obstacle occurs, a position at which the obstacle occurs, and a time at which the obstacle occurs based on the input of the dispatcher, and generates text data in the uppermost part ofFIG. 12 by describing the determined train, position, and time in the variable part. - In addition, a description of "automatic calculation by system" indicates that "specify obstacle influence range" of 7:53 displayed in a second uppermost part of
FIG. 12 corresponds to information generated based on automatic calculation by thetraffic management system 10. Thetraffic management system 10 describes a train restraint range (warning target station) and an attention calling range (attention target station) obtained by automatic calculation in a variable part to generate text data in the second uppermost part ofFIG. 12 . - In addition, a description of "
train 1A crew" indicates that "obstacle cause identified" of 8:01 displayed in a fourth uppermost part ofFIG. 12 corresponds to information which is a cause determined by a crew oftrain 1A and input from a terminal. When the crew inputs information such as the cause of the obstacle, information as to whether the train having the obstacle can move, etc. from the terminal, thetraffic management system 10 describes the information in a variable part to generate text data in the fourth uppermost part ofFIG. 12 . - The
traffic management system 10 distributes completed text data to terminals used by other dispatchers, a station staff of each station, a crew of a related train, etc. In this way, a time-series status corresponding to a type of occurring obstacle and a type of response to the obstacle may be shared among a plurality of people concerned. - In this instance, creation and distribution of the text data are automatically performed by the
traffic management system 10, and thus the dispatcher do not have to perform specific operation input for transmitting information. Information is automatically distributed to another person concerned only when the dispatcher performs an operation for responding to the above-described obstacle. For this reason, more information may be shared without an increase in the number of operations to be performed by the dispatcher. In this way, the dispatcher may rapidly and appropriately determine a countermeasure against an occurring event, and minimize disturbance in a train service. - Here, an example of distributing data in a text format is described. However, the invention may not be limited thereto. As another example, the
traffic management system 10 may generate data of a chart, an image, etc., and distribute the generated data. - Next, a description will be given of a function of filtering information accumulated in a time series. The
traffic management system 10 has a function of accumulating various types of information in a time series, and filtering the information according to various conditions. For example, it is possible to perform filtering to extract only information about occurrence of an obstacle, extract only information indicating delay, or extract only information related to a change of a timetable. - The
traffic management system 10 assigns tag information to each information item at the time of generating, accumulating, and distributing each information item. At the time of browsing the information, thetraffic management system 10 and a terminal receiving the distributed information may extract and display only information according to a predetermined condition by filtering using the tag information. -
FIG. 13A is a diagram illustrating an example of a screen display that defines time, a sender, and classification of information as filtering conditions.FIG. 13B is a diagram illustrating an example of a screen display in which classification of information is allowed to be selected by a button operation in filtering. By allowing a condition to be input by a simple input method, for example, a station staff may promptly browse necessary information at the time of extracting and browsing only information according to a predetermined condition using a small portable terminal. InFIG. 13B , a condition is displayed by a character string on a button. However, the invention may not be limited thereto. As another example, when an appropriate figure, etc. that allows a condition to be easily detected is displayed on a button, it is possible to more intuitively perform a filtering operation. - The above-described embodiment and examples are examples for description of the invention, and are not intended to limit the scope of the invention to only the embodiment and examples. Those skilled in the art may implement the invention in various other modes without departing from the subject matter of the invention.
- For example, even though the bi-directional operation is given as an example of the obstacle avoidance operation in the present embodiment and example, the invention is not limited thereto. As another example, it is possible to adopt an upward/downward line reversal operation in which an upward train is allowed to travel on a downward track and a downward train is allowed to travel on an upward track, the double-track co-directional operation in which trains in the same direction, for example, upward trains are distributed and allowed to travel on a plurality of tracks, etc.
- In addition, even though a technical problem of a train traveling between stations is given as an example of an obstacle in the present embodiment and example, the invention is not limited thereto. As another example, it is possible to consider a state in which a specific platform becomes unavailable due to a technical problems on a switch, on a stopped train, on a station facility such as an elevator of the platform, etc. Information about such obstacle may be displayed on the
track diagram screen 12 and thetrain graph screen 13. -
- 10
- traffic management system
- 10A
- display unit
- 10B
- processing unit
- 10C
- storage unit
- 10D
- operation unit
- 12
- track diagram screen
- 13
- train graph screen
- 14
- timetable management device
- 14a
- storage unit
- 15
- route control device
- 15a
- storage unit
- 16
- obstacle information management device
- 16a
- storage unit
- 17
- replanning device
- 17a
- storage unit
- 18
- network
- 20
- field equipment management system
- 30
- field equipment
Claims (11)
- A traffic management system, comprising:a display unit for displaying a train graph screen that represents movement of a train over time as a diagram on a plane defined by an axis in a time direction and an axis in a route direction; anda processing unit for determining a timetable to service a train in a service mode of an obstacle avoidance operation type in an obstacle avoidance operation time slot and an obstacle avoidance operation area when the obstacle avoidance operation type, the obstacle avoidance operation time slot, and the obstacle avoidance operation area are specified, and displaying a train graph based on the timetable on the train graph screen, the obstacle avoidance operation type corresponding to a type of obstacle avoidance operation for servicing the train by avoiding an obstacle, the obstacle avoidance operation time slot corresponding to a time slot in which the obstacle avoidance operation is applied on the train graph screen, the obstacle avoidance operation area corresponding to an area in which the obstacle avoidance operation is applied.
- The traffic management system according to claim 1,
wherein the obstacle avoidance operation type corresponds to a bi-directional operation in which trains in two directions are allowed to travel on a single track at a different time, and
the processing unit
determines a bi-directional operation section corresponding to a section in which bi-directional operation is performed defined by a first end station and a second end station at both ends based on the obstacle avoidance operation range, and
determines the timetable such that when a first train enters the bi-directional operation section from the first end station, a second train arriving at the second end station is kept waiting, and the second train is allowed to enter the bi-directional operation section after the first train arrives at the second end station. - The traffic management system according to claim 1, wherein when the obstacle avoidance operation time slot, the obstacle avoidance operation area, and the obstacle avoidance operation type are specified, the processing unit corrects the obstacle avoidance operation range to a range in which the obstacle avoidance operation range is included and a train service of the obstacle avoidance operation type is applicable.
- The traffic management system according to claim 3,
wherein the obstacle avoidance operation type corresponds to a bi-directional operation in which trains in two directions are allowed to travel on a single track at a different time, and
the processing unit corrects the specified obstacle avoidance operation range to a range including the obstacle avoidance operation range and having a station, in which a crossover is present between the track and another track, at both ends. - The traffic management system according to claim 4, wherein when there is a train traveling in an opposite direction to an original direction at a time when the obstacle avoidance operation time slot ends in the designated timetable, the processing unit performs correction to set a time until the train arrives at an end station of the obstacle avoidance operation range to the obstacle avoidance operation time slot.
- A traffic management system, comprising:a display unit for displaying an track diagram screen that indicates an position of a train at a current time on a track; anda processing unit for setting a subsequent station ahead of an obstacle occurrence position corresponding to a position at which an obstacle occurs and up to a station to which a train heading for the obstacle occurrence position is allowed be turned back in a reverse direction by tracing a route from the obstacle occurrence position as warning target stations when the obstacle occurs on the track, and displaying the warning target stations on the track diagram screen.
- The traffic management system according to claim 6, wherein the processing unit sets a station which is a rear station of one of the warning target stations as an attention target station, and displays the attention target station on the track diagram screen.
- A traffic management system, comprising:a storage unit for storing platform allocation management information that associates a virtual platform corresponding to information determining a direction and role for each platform with a physical platform physically indicating each platform; anda processing unit for determining a timetable such that the physical platform associated with the virtual platform is used in the direction and for the role of the virtual platform.
- The traffic management system according to claim 8, further comprising:a display unit for displaying the platform allocation management information; andan operation unit for allowing setting of the platform allocation management information by operation input,wherein when a physical platform used by a train set in the timetable is individually set, the processing unit determines the timetable by giving priority to the individually set physical platform over the virtual platform, and causes the display unit to display the determined timetable.
- The traffic management system according to claim 9,
wherein when a physical platform is individually set with respect to a train set in the timetable by the operation unit,
the processing unit determines whether the setting by a virtual platform is consistent with the setting by a physical platform. - The traffic management system according to claim 10,
wherein the processing unit causes the display unit to display a configuration of a running line including each platform of each station as a diagram,
sets a platform passed by a specified train based on an operation on the operation unit, and
causes the display unit to display the platform of the line passed by the specified train.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2015091680 | 2015-04-28 | ||
PCT/JP2016/062694 WO2016175134A1 (en) | 2015-04-28 | 2016-04-22 | Operation management system |
Publications (2)
Publication Number | Publication Date |
---|---|
EP3290290A1 true EP3290290A1 (en) | 2018-03-07 |
EP3290290A4 EP3290290A4 (en) | 2019-05-01 |
Family
ID=57198323
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP16786411.5A Withdrawn EP3290290A4 (en) | 2015-04-28 | 2016-04-22 | OPERATING MANAGEMENT SYSTEM |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP3290290A4 (en) |
JP (1) | JP6472512B2 (en) |
WO (1) | WO2016175134A1 (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3851358A1 (en) * | 2020-01-17 | 2021-07-21 | Kabushiki Kaisha Toshiba | Information processing apparatus, information processing method, computer program, and method |
CN114194258A (en) * | 2021-11-08 | 2022-03-18 | 东风悦享科技有限公司 | Avoidance scheduling method, system and device for railway vehicle |
CN114706324A (en) * | 2022-04-14 | 2022-07-05 | 南京航空航天大学 | Distributed controller rapid prototyping and simulation verification method based on time triggering |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3312795A4 (en) * | 2015-06-22 | 2018-12-05 | Hitachi, Ltd. | Train traffic control system and method for manually controlling railway facilities |
JP7059085B2 (en) * | 2018-04-12 | 2022-04-25 | 株式会社東芝 | Wire usage plan creation device and track usage plan creation method |
JP7074708B2 (en) * | 2019-03-26 | 2022-05-24 | 日鉄ソリューションズ株式会社 | Information processing equipment, information processing methods, programs and storage media |
CN111003031B (en) * | 2019-12-30 | 2021-11-30 | 中国铁道科学研究院集团有限公司通信信号研究所 | Method for checking connectivity between access delivery port and station track in stage plan |
CN111688761B (en) * | 2020-06-02 | 2023-05-12 | 通号城市轨道交通技术有限公司 | Train operation control method, device and storage medium |
JP7512102B2 (en) * | 2020-07-10 | 2024-07-08 | 株式会社日立製作所 | Train control system and train control device |
JP7591978B2 (en) | 2021-06-01 | 2024-11-29 | 株式会社日立製作所 | Train control device and train control method |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2689027B2 (en) * | 1991-03-04 | 1997-12-10 | 三菱電機株式会社 | Train schedule making device |
JP2000095111A (en) * | 1998-09-25 | 2000-04-04 | Hitachi Ltd | Train schedule creation device by thinning and train automatic course control device |
JP5959419B2 (en) * | 2012-11-26 | 2016-08-02 | 株式会社日立製作所 | Train operation management system and control method of train operation management system |
JP6038693B2 (en) * | 2013-03-11 | 2016-12-07 | 株式会社日立製作所 | Course control device, course control method, and course control program |
-
2016
- 2016-04-22 JP JP2017515525A patent/JP6472512B2/en active Active
- 2016-04-22 EP EP16786411.5A patent/EP3290290A4/en not_active Withdrawn
- 2016-04-22 WO PCT/JP2016/062694 patent/WO2016175134A1/en active Application Filing
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP3851358A1 (en) * | 2020-01-17 | 2021-07-21 | Kabushiki Kaisha Toshiba | Information processing apparatus, information processing method, computer program, and method |
CN114194258A (en) * | 2021-11-08 | 2022-03-18 | 东风悦享科技有限公司 | Avoidance scheduling method, system and device for railway vehicle |
CN114194258B (en) * | 2021-11-08 | 2023-09-19 | 东风悦享科技有限公司 | Avoidance scheduling method, system and device for railway vehicle |
CN114706324A (en) * | 2022-04-14 | 2022-07-05 | 南京航空航天大学 | Distributed controller rapid prototyping and simulation verification method based on time triggering |
CN114706324B (en) * | 2022-04-14 | 2023-11-28 | 南京航空航天大学 | A time-triggered distributed controller rapid prototyping and simulation verification method |
Also Published As
Publication number | Publication date |
---|---|
EP3290290A4 (en) | 2019-05-01 |
JPWO2016175134A1 (en) | 2018-01-11 |
JP6472512B2 (en) | 2019-02-20 |
WO2016175134A1 (en) | 2016-11-03 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3290290A1 (en) | Operation management system | |
JP7136750B2 (en) | Unmanned driving vehicle dispatch method, device, equipment and storage medium | |
USRE47835E1 (en) | Tools for railway traffic control | |
JP6180773B2 (en) | Bus operation management system, apparatus, and method | |
JP6068634B2 (en) | Route operation result prediction time generation system, route operation result prediction time generation method, and route operation result prediction time generation program | |
CA2658139A1 (en) | Air traffic control apparatus and air traffic control information processing method | |
US8965605B2 (en) | System and method for vehicle movement modeling in a railway network | |
JP5268808B2 (en) | Operation management system | |
EP2345944A1 (en) | Vehicle system | |
JP6038693B2 (en) | Course control device, course control method, and course control program | |
JP5219222B2 (en) | Train operation information notification device | |
JP6295211B2 (en) | Diamond prediction apparatus and method | |
JP2014019182A (en) | Train operation command device | |
JP5628707B2 (en) | Program and operation scheduling diagram creation device | |
JP5731912B2 (en) | Driving arrangement support system | |
JP2011173530A (en) | Operation arrangement support system and method thereof | |
JP4573661B2 (en) | Distributed train operation management system and control method thereof | |
JP5498142B2 (en) | Operation control device | |
JP2017013578A (en) | Train operation management system and train operation management method | |
JP6298515B2 (en) | Course control device and course control method | |
JP2006137361A (en) | Train operation management system | |
JP4420316B2 (en) | Train operation information notification device | |
JP2006151137A (en) | Train operation management system | |
JP7074708B2 (en) | Information processing equipment, information processing methods, programs and storage media | |
JP6887281B2 (en) | Passenger guidance system and passenger guidance method |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: REQUEST FOR EXAMINATION WAS MADE |
|
17P | Request for examination filed |
Effective date: 20171016 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20190402 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: G06Q 50/30 20120101ALI20190327BHEP Ipc: B61L 27/00 20060101AFI20190327BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
18W | Application withdrawn |
Effective date: 20210219 |