EP3147410B1 - Construction method and structure of pressure dispersing expansion head anchor rod - Google Patents
Construction method and structure of pressure dispersing expansion head anchor rod Download PDFInfo
- Publication number
- EP3147410B1 EP3147410B1 EP15795723.4A EP15795723A EP3147410B1 EP 3147410 B1 EP3147410 B1 EP 3147410B1 EP 15795723 A EP15795723 A EP 15795723A EP 3147410 B1 EP3147410 B1 EP 3147410B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- cement
- cut
- paste
- anchor
- pressure
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
- E02D5/80—Ground anchors
- E02D5/808—Ground anchors anchored by using exclusively a bonding material
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/74—Means for anchoring structural elements or bulkheads
Definitions
- the present invention relates to a construction method of a jet spouting anchor and a structure of the spouting anchor, belonging to the technical field of soil drilling of fixed buildings.
- Jet spouting anchoring is an effective soil body supporting, protecting and reinforcing technology, has been widely applied at home and abroad, and has advantages of low cost, quick effect, etc.
- a traditional jet spouting anchor is provided with a 5-10 long anchoring segment.
- the cement in the anchoring segment accounts for 12%-18%, and the strength of cement soil is relatively low in the 7-30 days. Due to the low strength, the anchor cannot be made into a pressure-type anchor, and can only be made as a tension-type anchor.
- the anti-pulling force of the anchor is provided by the lateral friction force between the anchoring segment and soil body.
- the anti-pulling force of the anchor is usually low, obviously low in the soft soil, which fails to meet the engineering requirements of the tension standard for the short maintenance period of the anchor. Meanwhile, the tension-type anchor cables cannot be recycled through dismantling the core. Therefore, the traditional jet spouting anchor cannot be recycled through dismantling the core.
- the traditional jet spouting anchor always suffers from the problems of low anti-pulling force and failure to recycling through dismantling the core, which seriously affect the application of the traditional jet spouting anchor.
- the construction method of the traditional jet spouting anchor is as follows: 1) A three-blade bit is used to perform water jet spouting, wherein the aperture is 150-200mm; the jet spouting is deep to the anchor bottom, without water pressure; 2) the drill rod and the bit exist, and a drill rod with a high-pressure nozzle is used to push the anchor body into an anchor hole; 3) after the anchor body is pushed in place, high-pressure cement paste jet spouting is carried out at a pressure of 15-25MPa; the drill rod exists along with the jet spouting; the jet spouted part is the traditional anchoring segment; the anchoring segment is 8-12m long; jet spouting is carried out one more time at a segment about 0.5-1m away from the end of the anchoring segment; the anchoring segment has a cement content of 110kg per meter; and 4) after the jet spouting of the anchoring segment ends, the drill rod exists.
- the structure of a foundation pit support formed by a traditional jet spouting anchor and concrete pile walls includes a water-pressure jet spouting cut-drilling segment 1 and a cement-paste jet spouting cut-drilling segment 2.
- the cement paste in the cement-paste jet spouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and one end of each of anchor cables 3, and the other end of each of the anchor cables 3 passes through the water-pressure jet spouting cut-drilling segment 1 and is fixed at an anchor head.
- the maintenance period of the anchor is merely about 7-21 days.
- the early strength of the anchor refers to the strength of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 in the 7-12 days.
- the drilling speed of the drill rod of the traditional jet spouting anchor in the cement paste in the cement-paste jet spouting cut-drilling segment 2 is 25-50cm/min. Due to the quick jet spouting speed of the drill rod, the maximum inner diameter of the cross section of the formed cement paste in the cement-paste jet spouting cut-drilling segment 2 is similar to the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1.
- the cement in the cement paste in the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 of the traditional jet spouting anchor accounts for 12%-18%, and the anti-pulling force of the traditional jet spouting anchor is generated by the friction force between piles and the soil body, so the traditional jet spouting anchor belongs to a tension-type anchor.
- the cement paste in the cement-paste jet spouting cut-drilling segment 2 is formed to be relatively long, thereby resulting in slow hardening of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 and low early strength of the traditional jet spouting anchor, and failing to provide sufficient anti-pulling bearing capability. Therefore, the traditional jet spouting anchor has a low anti-pulling force.
- GB 1304916A relates to a device for making holes to accommodate pile anchors or other anchoring devices, comprising a tube replaceably containing a ram tool consisting of a shaft, a cylindrical portion which is a sliding fit in the tube, and a ramming point.
- the bottom of the tube may have a cutting edge or as shown a wedge piece. Impacts are applied to a block on top of the tube and tool.
- the ram tool On reaching different strata the ram tool may be replaced by a flushing lance or a drill or auger.
- the anchoring device comprises a drill or auger inserted in the hole and surrounded by a hardening mass with optionally tube being removed.
- the first technical problem to be solved by the present invention is to, aiming at defects in the prior art, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor which has high early cement coil hardening strength and a high anti-pulling bearing capacity.
- the second technical problem to be solved by the present invention is to, on the basis of the first technical problem, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor with anchor cables which can be recycled by dismantling cores.
- the first technical solution provided by the present invention to solve the first technical problem is a construction method of a pressure-dispersion type bit expanded anchor, wherein a drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside, and the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment.
- the cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4 ⁇ 8crnlmin, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
- the amount of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%.
- the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
- the cement soil in the cement-paste jet grouting cut-drilling segment gets hardened and fixes an anchor cable carrier and anchor cables; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
- the content of the cement mixed in the cement soil in the cement-paste-pressure jet grouting cut-drilling segment is determined according to the mass percentage of the soil body in the cement-paste-pressure jet grouting cut-drilling segment as required in the design.
- the mass of the soil body per stere is generally 1,600-2,000kg.
- the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%; and when the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
- the drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn;
- the cement-paste-pressure jet grouting type cut-drilling is the one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
- the present invention provides a pressure type anchor, while the traditional jet spouting anchor is a tension type anchor, different in the stressing mechanism.
- the anti-pulling resistance of the anchor provided by the present invention depends on the lateral friction force of the hardened cement soil in the cement-paste-pressure jet spouting cut-drilling segment and the end bearing capability generated by the cross section of the hardened cement soil, greatly improving the anti-pulling capability.
- the technology can be utilized in a stable soil layer as an anchoring segment, thereby giving a full play to the end bearing capability of the pressure-type anchor and ensuing small discreteness of the anti-pulling force.
- the drilling speed of the drill rod in the present invention is controlled to be 4-8cm/min, far smaller than the jet spouting cut-drilling speed of the traditional jet spouting anchor, so the maximum inner diameter of the cross section of the cement-paste-pressure jet spouting cut-drilling segment is 600-800mm.
- the bearing capability of a single anchor cable is enhanced, increasing safety rating and improving the initial pre-stress of the anchor at the same time. Therefore, the deformation of supporting and protecting structures can be better controlled.
- the cement-paste-pressure jet spouting cut-drilling of the present invention is one-time drilling, and the cement-paste-pressure jet spouting cut-drilling of the traditional jet spouting anchor is two-level drilling.
- the present invention reduces the drilling times.
- the present invention directly gets the point, so the cement-paste-pressure jet grouting cut-drilling segment has advantages of a small length, a large diameter and a high cement ratio, directly enhancing the cement soil strength and early strength of the anchoring segment of the anchor of the present invention.
- the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced, and the long-existing problems of low cement soil strength and low early strength of the traditional jet spouting anchor, and problem of failure to manufacture the pressure are completely solved.
- the second technical solution provided by the present invention to solve the first technical problem is a structure of a pressure-dispersion type bit expanded anchor, wherein the construction method of a pressure-dispersion type bit expanded anchor according to claim 1 is adopted to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment gets hardened and encloses an anchor cable carrier and an anchor cable; the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4
- the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%.
- the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
- the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment;
- the anchor cables are anchor cables provided with membranes;
- the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; and the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cable.
- the stress is dispersed when at least two anchor cable carrier is adopted, so the anchor belongs to a load-dispersing type anchor.
- anchor cables are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape, and after the engineering construction is ended, one end of each of the anchor cables can be released through the hinge type carrier to recover the anchor cables;
- each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable, and after the engineering construction is ended, one end of each of the anchor cables can be released through the fused anchor fixture, which means that the present invention can recover the anchor cables by dismantling the core, and the traditional jet spouting anchor cannot recover the anchor cables by dismantling the core.
- the anchor is provided with membranes, and the anchor cables are non-adhesive anchor cables, so all the front ends of all the anchor cable carriers are free ends, capable improving the requirements for the initial pre-stress on the anchor of the present invention (1.1 times the designed value, 1.0 time higher than the standard value), thereby realizing testing of every cable, reducing the pit displacement and achieving the effect safer than supports.
- the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- the second change of the first technical solution is as follows: The drill rod brings the anchor cable carrier and the anchor cable in when drilling.
- the third change of the first technical solution is as follows: After the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
- the fourth change of the first technical solution is as follows: The tensioning and locking strength of the pressure-type anchor is greater than 2Mpa.
- the fifth change of the first technical solution is as follows:
- the inner diameter of the cross section of the water-pressure jet-spouting cut-drilling segment is 150-200mm.
- the sixth change of the first technical solution is as follows:
- the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
- the seventh change of the first technical solution is as follows: When the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
- the eighth change of the first technical solution is as follows:
- the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
- the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment;
- the anchor cables are anchor cables provided with membranes;
- the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- the second change of the second technical solution is as follows:
- the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment;
- the anchor cables are anchor cables provided with membranes;
- the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- the third change of the second technical solution is as follows:
- the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
- the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.
- a construction method of a pressure-dispersion type bit expanded anchor of this embodiment adopts a drill rod to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside, the drill rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment 2.
- the cement-paste-pressure jet grouting type cut-drilling segment 2 is one-time cut-drilling segment; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4.
- the content of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 30%-40%.
- the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 reaches 15%-30%.
- the cement soil in the cement-paste jet grouting cut-drilling segment 2 gets hardened and fixes an anchor cable carrier and anchor cables 3; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
- the pressure-type anchor of the present invention refers to the pressure-type anchor defined in the Technical Specification for Ground Anchors (Cables) issued by the Standardization Institute of Chinese Construction enacted Technical specification.
- the anchor cables 3 of the present invention can be steel strands, etc.
- the anchor cables 3 are provided with membranes.
- the anchor cables 3 provided with the membranes can be steel strands sheathed with plastic.
- the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of a traditional jet spouting anchor is 20-40cm/min, and the length of the cement-paste jet grouting cut-drilling segment 2 is 8-12m; sometimes, jet spouting is executed one more time at a segment which is 0.5-1m away from the end of the cement-paste jet grouting cut-drilling segment 2; the inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 200-300mm, and the content of the cement mixed in the cement soil reserved in the cement-paste jet grouting cut-drilling segment 2 is 12%-18%.
- the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of the pressure-dispersion type bit expanded anchor is 4-8cm/min; the maximum inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 600-800mm; when the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, and the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
- the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2;
- the anchor cables 3 are anchor cables provided with membranes;
- the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
- the anchor cable carriers may be two, three or more.
- the drill rod brings the anchor cable carrier and the anchor cables 3 in when drilling.
- the tensioning and locking strength of the pressure type anchor is greater than 2Mpa.
- the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1 is 150-200mm.
- the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
- the cement-paste-pressure jet grouting cut-drilling segment 2 is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
- the length ratio of the cement-paste jet grouting cut-drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
- a structure of a pressure-dispersion type bit expanded anchor is provided in this embodiment, wherein the construction method of a pressure-dispersion type bit expanded anchor is adopted to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and an anchor cable 3; the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4.
- the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment 2 is 30%-40%.
- the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
- the anchor cable carriers in this embodiment are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
- the anchor cable carriers may be two, three or more.
- the length ratio of the cement-paste jet grouting cut-drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3.
- the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.spa or above.
- the construction method and the structure of the pressure-dispersion type bit expanded anchor rod in this embodiment are compared with those of the traditional jet spouting anchor, as shown in table 1: Table 1 Characteristics Pressure-dispersion type bit expanded anchor rod in this embodiment Traditional jet spouting anchor Steel strand Not adhesive Adhesive Stressing mechanism Pressure type Tension type Early cement strength High Low Recyclable through core dismantling Recyclable Not recyclable Length of the water-pressure jet grouting cut-drilling segment Long Short Displacement control performance High Low
- the cement-paste jet grouting cut-drilling segment 2 has a small length, a large diameter and a high cement content and is quick in cement hardening, directly improving the structure strength of the pressure-dispersion type bit expanded anchor and the early strength of the structure of the pressure-dispersion type bit expanded anchor, in particular improving the early anti-pulling capability of the cement-paste jet grouting cut-drilling segment 2.
- the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced.
- the cement soil strength age of the silty clay increases.
- the strength of the cement soil can reach design requirements after 7-15 days, equivalent to the strength of the traditional jet spouting anchor after 28-50 days.
- the strength of the cement soil of the pressure-dispersion type bit expanded anchor of the present invention is far higher than the strength of the cement soil of the traditional jet spouting anchor.
- the anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2;
- the anchor cables 3 are anchor cables provided with membranes;
- the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
- the anchor cable carrier and the anchor cables 3 are brought into the cement-paste jet grouting cut-drilling segment 2 in the non-jet-spouting state; a casing technology can be employed to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, or the drill rod can be used to bring the anchor cable carrier and the anchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, etc.
- the anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2; the anchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable 3.
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Piles And Underground Anchors (AREA)
Description
- The present invention relates to a construction method of a jet spouting anchor and a structure of the spouting anchor, belonging to the technical field of soil drilling of fixed buildings.
- Jet spouting anchoring is an effective soil body supporting, protecting and reinforcing technology, has been widely applied at home and abroad, and has advantages of low cost, quick effect, etc. A traditional jet spouting anchor is provided with a 5-10 long anchoring segment. The cement in the anchoring segment accounts for 12%-18%, and the strength of cement soil is relatively low in the 7-30 days. Due to the low strength, the anchor cannot be made into a pressure-type anchor, and can only be made as a tension-type anchor. The anti-pulling force of the anchor is provided by the lateral friction force between the anchoring segment and soil body. Limited by the low strength of the cement soil of the anchoring segment, the anti-pulling force of the anchor is usually low, obviously low in the soft soil, which fails to meet the engineering requirements of the tension standard for the short maintenance period of the anchor. Meanwhile, the tension-type anchor cables cannot be recycled through dismantling the core. Therefore, the traditional jet spouting anchor cannot be recycled through dismantling the core. The traditional jet spouting anchor always suffers from the problems of low anti-pulling force and failure to recycling through dismantling the core, which seriously affect the application of the traditional jet spouting anchor.
- The construction method of the traditional jet spouting anchor is as follows: 1) A three-blade bit is used to perform water jet spouting, wherein the aperture is 150-200mm; the jet spouting is deep to the anchor bottom, without water pressure; 2) the drill rod and the bit exist, and a drill rod with a high-pressure nozzle is used to push the anchor body into an anchor hole; 3) after the anchor body is pushed in place, high-pressure cement paste jet spouting is carried out at a pressure of 15-25MPa; the drill rod exists along with the jet spouting; the jet spouted part is the traditional anchoring segment; the anchoring segment is 8-12m long; jet spouting is carried out one more time at a segment about 0.5-1m away from the end of the anchoring segment; the anchoring segment has a cement content of 110kg per meter; and 4) after the jet spouting of the anchoring segment ends, the drill rod exists.
- See
FIG. 1 and FIG. 2 . The structure of a foundation pit support formed by a traditional jet spouting anchor and concrete pile walls includes a water-pressure jet spouting cut-drilling segment 1 and a cement-paste jet spouting cut-drilling segment 2. The cement paste in the cement-paste jet spouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and one end of each ofanchor cables 3, and the other end of each of theanchor cables 3 passes through the water-pressure jet spouting cut-drilling segment 1 and is fixed at an anchor head. - During construction, due to the needs of the construction period, the maintenance period of the anchor is merely about 7-21 days. In this way, the early strength of the anchor refers to the strength of the cement paste in the cement paste in the cement-paste jet spouting cut-
drilling segment 2 in the 7-12 days. After making tests repeatedly, the applicant found that the traditional jet spouting anchor has the following problems: - The drilling speed of the drill rod of the traditional jet spouting anchor in the cement paste in the cement-paste jet spouting cut-
drilling segment 2 is 25-50cm/min. Due to the quick jet spouting speed of the drill rod, the maximum inner diameter of the cross section of the formed cement paste in the cement-paste jet spouting cut-drilling segment 2 is similar to the inner diameter of the cross section of the water-pressure jet spouting cut-drilling segment 1. Besides, the cement in the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 of the traditional jet spouting anchor accounts for 12%-18%, and the anti-pulling force of the traditional jet spouting anchor is generated by the friction force between piles and the soil body, so the traditional jet spouting anchor belongs to a tension-type anchor. For this reasons, in order to provide sufficient pulling bearing capability, the cement paste in the cement-paste jet spouting cut-drilling segment 2 is formed to be relatively long, thereby resulting in slow hardening of the cement paste in the cement paste in the cement-paste jet spouting cut-drilling segment 2 and low early strength of the traditional jet spouting anchor, and failing to provide sufficient anti-pulling bearing capability. Therefore, the traditional jet spouting anchor has a low anti-pulling force. -
GB 1304916A - The first technical problem to be solved by the present invention is to, aiming at defects in the prior art, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor which has high early cement coil hardening strength and a high anti-pulling bearing capacity.
- The second technical problem to be solved by the present invention is to, on the basis of the first technical problem, provide a construction method of and a structure of a pressure-dispersion type bit expanded anchor with anchor cables which can be recycled by dismantling cores.
- The first technical solution provided by the present invention to solve the first technical problem is a construction method of a pressure-dispersion type bit expanded anchor, wherein a drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside, and the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment.
- The cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4∼8crnlmin, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
- When the soil is clay, silty clay or floury soil, the amount of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%.
- when the soil is sandy soil, the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%.
- The cement soil in the cement-paste jet grouting cut-drilling segment gets hardened and fixes an anchor cable carrier and anchor cables; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days.
- In the present invention, the content of the cement mixed in the cement soil in the cement-paste-pressure jet grouting cut-drilling segment is determined according to the mass percentage of the soil body in the cement-paste-pressure jet grouting cut-drilling segment as required in the design. The mass of the soil body per stere is generally 1,600-2,000kg. When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%; and when the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
- According to the present invention, the drill rod is employed to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn; the cement-paste-pressure jet grouting type cut-drilling is the one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4.
- 1) The present invention provides a pressure type anchor, while the traditional jet spouting anchor is a tension type anchor, different in the stressing mechanism. The anti-pulling resistance of the anchor provided by the present invention depends on the lateral friction force of the hardened cement soil in the cement-paste-pressure jet spouting cut-drilling segment and the end bearing capability generated by the cross section of the hardened cement soil, greatly improving the anti-pulling capability. The technology can be utilized in a stable soil layer as an anchoring segment, thereby giving a full play to the end bearing capability of the pressure-type anchor and ensuing small discreteness of the anti-pulling force.
- 2) The drilling speed of the drill rod in the present invention is controlled to be 4-8cm/min, far smaller than the jet spouting cut-drilling speed of the traditional jet spouting anchor, so the maximum inner diameter of the cross section of the cement-paste-pressure jet spouting cut-drilling segment is 600-800mm. In this way, the bearing capability of a single anchor cable is enhanced, increasing safety rating and improving the initial pre-stress of the anchor at the same time. Therefore, the deformation of supporting and protecting structures can be better controlled.
- 3) The cement-paste-pressure jet spouting cut-drilling of the present invention is one-time drilling, and the cement-paste-pressure jet spouting cut-drilling of the traditional jet spouting anchor is two-level drilling. The present invention reduces the drilling times.
- 4) When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, AND the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%, far higher than the content of the mixed cement mixed in the cement paste in the traditional jet spouting anchor structure, equivalent to that, without increase in the cement amount, the cement is completely used in a 2-4m cement-paste-pressure jet grouting cut-drilling segment to perform high-cement-ratio jet spouting replacement in the present invention. The present invention directly gets the point, so the cement-paste-pressure jet grouting cut-drilling segment has advantages of a small length, a large diameter and a high cement ratio, directly enhancing the cement soil strength and early strength of the anchoring segment of the anchor of the present invention. During actual engineering construction, the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced, and the long-existing problems of low cement soil strength and low early strength of the traditional jet spouting anchor, and problem of failure to manufacture the pressure are completely solved.
- 5) The cement paste in the cement-paste-pressure jet grouting cut-drilling segment overflows to fill in a part of the water-pressure jet spouting cut-drilling segment, and the content of the mixed cement of the part in the water-pressure jet spouting cut-drilling segment is (5%-10%), so the strength is higher than the original soil.
- The second technical solution provided by the present invention to solve the first technical problem is a structure of a pressure-dispersion type bit expanded anchor, wherein the construction method of a pressure-dispersion type bit expanded anchor according to
claim 1 is adopted to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment gets hardened and encloses an anchor cable carrier and an anchor cable; the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4: - When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%.
- When the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
- In order to solve the second technical problem, the present invention makes the following improvement on the above technical solution: the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- 1) The anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; and the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cable. Compared with the prior art where a single anchor cable carrier fixes a plurality of anchor cables, the stress is dispersed when at least two anchor cable carrier is adopted, so the anchor belongs to a load-dispersing type anchor. 2) When the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape, and after the engineering construction is ended, one end of each of the anchor cables can be released through the hinge type carrier to recover the anchor cables; when the when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable, and after the engineering construction is ended, one end of each of the anchor cables can be released through the fused anchor fixture, which means that the present invention can recover the anchor cables by dismantling the core, and the traditional jet spouting anchor cannot recover the anchor cables by dismantling the core. 3) The anchor is provided with membranes, and the anchor cables are non-adhesive anchor cables, so all the front ends of all the anchor cable carriers are free ends, capable improving the requirements for the initial pre-stress on the anchor of the present invention (1.1 times the designed value, 1.0 time higher than the standard value), thereby realizing testing of every cable, reducing the pit displacement and achieving the effect safer than supports.
- The first change of the first technical solution is as follows: The anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The second change of the first technical solution is as follows: The drill rod brings the anchor cable carrier and the anchor cable in when drilling.
- The third change of the first technical solution is as follows: After the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
- The fourth change of the first technical solution is as follows: The tensioning and locking strength of the pressure-type anchor is greater than 2Mpa.
- The fifth change of the first technical solution is as follows: The inner diameter of the cross section of the water-pressure jet-spouting cut-drilling segment is 150-200mm.
- The sixth change of the first technical solution is as follows: The water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
- The seventh change of the first technical solution is as follows: When the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
- The eighth change of the first technical solution is as follows: The length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
- The first change of the second technical solution is as follows: The anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The second change of the second technical solution is as follows: The anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The third change of the second technical solution is as follows: The length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
- As a change of the above technical solution: The cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.
- The applicant found that, compared with cements with a common strength rating, for example, the cement with a rating of P.o.42.5, the high-mark cement with a strength rating 52.5Mpa or above can obviously improve the early bearing capability of the anchor and improve the early strength of the anchor.
- The present invention is described in further detail with reference to the attached drawings.
-
FIG. 1 is a structural view of a traditional jet-spouting anchor. -
FIG. 2 is a structural view of a foundation pit support formed by the traditional jet-spouting anchor and concrete pile walls. -
FIG. 3 is structural view of a pressure-dispersion type bit expanded anchor according to an embodiment of the present invention. -
FIG. 4 is a structural view of a foundation pit support formed by the pressure-dispersion type bit expanded anchor and concrete pile walls. -
FIG. 5 is a schematic view of structures of a water-pressure jet spouting cut-drilling segment and a cement-paste-pressure jet spouting cut-drilling segment of the traditional jet spouting anchor. -
FIG. 6 is a schematic view of structures of a water-pressure jet spouting cut-drilling segment and a cement-paste-pressure jet spouting cut-drilling segment of the pressure-dispersion type bit expanded anchor of the present invention. -
FIG. 7 is a comparison diagram of the strength-age increase of the structure of the pressure-dispersion type bit expanded anchor of the present invention and the structure of the traditional jet spouting anchor. - A construction method of a pressure-dispersion type bit expanded anchor of this embodiment, as shown in
FIG. 3 and FIG. 4 , adopts a drill rod to perform cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside, the drill rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment 2. - The cement-paste-pressure jet grouting type cut-
drilling segment 2 is one-time cut-drilling segment; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4. - When the soil is clay, silty clay or floury soil, the content of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-
drilling segment 2 reaches 30%-40%. - When the soil is sandy soil, the content of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-
drilling segment 2 reaches 15%-30%. - The cement soil in the cement-paste jet grouting cut-
drilling segment 2 gets hardened and fixes an anchor cable carrier andanchor cables 3; and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days. - The pressure-type anchor of the present invention refers to the pressure-type anchor defined in the Technical Specification for Ground Anchors (Cables) issued by the Standardization Institute of Chinese Construction enacted Technical specification.
- The
anchor cables 3 of the present invention can be steel strands, etc. Theanchor cables 3 are provided with membranes. Theanchor cables 3 provided with the membranes can be steel strands sheathed with plastic. - As shown in
FIG. 5 and FIG. 6 , the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of a traditional jet spouting anchor is 20-40cm/min, and the length of the cement-paste jet grouting cut-drilling segment 2 is 8-12m; sometimes, jet spouting is executed one more time at a segment which is 0.5-1m away from the end of the cement-paste jet grouting cut-drilling segment 2; the inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 200-300mm, and the content of the cement mixed in the cement soil reserved in the cement-paste jet grouting cut-drilling segment 2 is 12%-18%. According to the present invention, the stepping speed of the drill rod of the cement-paste jet grouting cut-drilling segment 2 of the pressure-dispersion type bit expanded anchor is 4-8cm/min; the maximum inner diameter of the cross section of the cement-paste jet grouting cut-drilling segment 2 is 600-800mm; when the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%; and when the soil is sandy soil, and the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%. - According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-
drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2; theanchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers,anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of ananchor cable 3. The anchor cable carriers may be two, three or more. - According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the drill rod brings the anchor cable carrier and the
anchor cables 3 in when drilling. - According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the tensioning and locking strength of the pressure type anchor is greater than 2Mpa.
- According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the inner diameter of the cross section of the water-pressure jet spouting cut-
drilling segment 1 is 150-200mm. - According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
- According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, when the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-
drilling segment 2, the cement-paste-pressure jet grouting cut-drilling segment 2 is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain. - According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, the length ratio of the cement-paste jet grouting cut-
drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3. - A structure of a pressure-dispersion type bit expanded anchor is provided in this embodiment, wherein the construction method of a pressure-dispersion type bit expanded anchor is adopted to respectively form a water-pressure jet grouting cut-
drilling segment 1 and a cement-paste-pressure jet grouting cut-drilling segment 2 which communicate with each other from the inside to the outside; the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment 2 gets hardened and encloses an anchor cable carrier and ananchor cable 3; the length of the cement-paste-pressure jet grouting cut-drilling segment 2 is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; and the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment 1 and the cement-paste-pressure jet grouting cut-drilling segment 2 is within the range of 0.2-0.4. - When the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-
drilling segment 2 is 30%-40%. - When the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%.
- The anchor cable carriers in this embodiment are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-
drilling segment 2 at an interval along the length direction of the cement-paste jet grouting cut-drilling segment 2; theanchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers,anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of ananchor cable 3. The anchor cable carriers may be two, three or more. - In this embodiment, the length ratio of the cement-paste jet grouting cut-
drilling segment 2 to the water-pressure jet grouting cut-drilling segment 1 is 0.06-0.3. - In this embodiment, the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.spa or above.
- The construction method and the structure of the pressure-dispersion type bit expanded anchor rod in this embodiment are compared with those of the traditional jet spouting anchor, as shown in table 1:
Table 1 Characteristics Pressure-dispersion type bit expanded anchor rod in this embodiment Traditional jet spouting anchor Steel strand Not adhesive Adhesive Stressing mechanism Pressure type Tension type Early cement strength High Low Recyclable through core dismantling Recyclable Not recyclable Length of the water-pressure jet grouting cut-drilling segment Long Short Displacement control performance High Low - It can be seen that, by the construction method and structure of the pressure-dispersion type bit expanded anchor in this embodiment, the cement-paste jet grouting cut-
drilling segment 2 has a small length, a large diameter and a high cement content and is quick in cement hardening, directly improving the structure strength of the pressure-dispersion type bit expanded anchor and the early strength of the structure of the pressure-dispersion type bit expanded anchor, in particular improving the early anti-pulling capability of the cement-paste jet grouting cut-drilling segment 2. During actual engineering construction, the maintenance time for the cement soil strength of the cement-paste-pressure jet grouting cut-drilling segment to increase to the designed strength is reduced. - When the construction method and structure of the pressure-dispersion type bit expanded anchor in this embodiment are applied to the silty clay soil, the cement soil strength age of the silty clay increases. As shown in
FIG. 7 , by the structure of the pressure-dispersion type bit expanded anchor of the present invention, the strength of the cement soil can reach design requirements after 7-15 days, equivalent to the strength of the traditional jet spouting anchor after 28-50 days. Moreover, in the same maintenance age, the strength of the cement soil of the pressure-dispersion type bit expanded anchor of the present invention is far higher than the strength of the cement soil of the traditional jet spouting anchor. - The present invention is not limited to the above embodiment. For example: 1) Of course, when the construction method of the pressure-dispersion type bit expanded anchor in this embodiment adopts one anchor cable carrier, the anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-
drilling segment 2; theanchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers,anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of ananchor cable 3. 2) According to the construction method of the pressure-dispersion type bit expanded anchor in this embodiment, after the drill rod ends the cut-drilling through cement paste jet spouting and exits, the anchor cable carrier and theanchor cables 3 are brought into the cement-paste jet grouting cut-drilling segment 2 in the non-jet-spouting state; a casing technology can be employed to bring the anchor cable carrier and theanchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, or the drill rod can be used to bring the anchor cable carrier and theanchor cables 3 into the cement-paste jet grouting cut-drilling segment 2, etc. 3) The anchor cable carrier is an anchor cable carrier fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment 2; theanchor cables 3 are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers,anchor cables 3 are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of ananchor cable 3.
Claims (14)
- A construction method of a pressure-dispersion type bit expanded anchor, a drill rod performing cut-drilling through water-pressure jet grouting and cut-drilling through cement-paste-pressure jet grouting in soil in turn to respectively form a water-pressure jet grouting cut-drilling segment (1) and a cement-paste-pressure jet grouting cut-drilling segment (2) which communicate with each other from the inside to the outside, the drill rod ending the cut-drilling through cement-paste-pressure jet grouting and then exiting when reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, wherein
cement soil in the cement-paste jet grouting cut-drilling segment gets hardened and fixes an anchor cable carrier and anchor cables (3); and when the hardening strength of the cement soil meets the tensioning and locking strength of a pressure type anchor, the maintenance period of the cements does not exceed 20 days;
characterized in that the cement-paste-pressure jet grouting type cut-drilling is one-time cut-drilling; when the one-time cut-drilling occurs, the drilling speed of the drill rod is controlled to be 4-8cm/min, and the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m, so that the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4;
when the soil is clay, silty clay or floury soil, the amount of the cement paste used is controlled to be 1.0-2 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 30%-40%;
when the soil is sandy soil, the amount of the cement paste used is controlled to be 1-1.5 ton such that the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment reaches 15%-30%;. - The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, wherein the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, wherein the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the drill rod brings the anchor cable carrier and the anchor cable in when drilling.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein after the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits, the anchor cable carrier and the anchor cables are brought in the cement-paste jet grouting cut-drilling segment in the non-jet-spouting state.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the water pressure of the rotary water jet spouting cut-drilling is 2-15MPa; the cement paste pressure of the rotary cement paste jet spouting cut-drilling is 15-30MPa; and the water-cement ratio of the cement paste is 1.0-1.5.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein when the drill rod ends the cut-drilling through cement-paste-pressure jet grouting and then exits after reaching the tail end of the cement-paste-pressure jet grouting cut-drilling segment, the cement-paste-pressure jet grouting cut-drilling segment is supplemented with the cement paste at a low pressure; when the anchor has a waterproof curtain, the cement paste is grouted at a pressure of 0.5-2MPa at the junction of the waterproof curtain.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
- The construction method of a pressure-dispersion type bit expanded anchor according to claim 1, 2 or 3, wherein the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 52.5Mpa or above.
- A structure of a pressure-dispersion type bit expanded anchor according to claim 1, the construction method of a pressure-dispersion type bit expanded anchor being adopted to respectively form a water-pressure jet grouting cut-drilling segment and a cement-paste-pressure jet grouting cut-drilling segment which communicate with each other from the inside to the outside, the cement paste in the rotary cement-paste-pressure jet grouting cut-drilling segment getting hardened and enclosing an anchor cable carrier and an anchor cable, characterized in that, the length of the cement-paste-pressure jet grouting cut-drilling segment is controlled to be 2-4m; the maximum inner diameter of the cross section of the cement-paste-pressure jet grouting cut-drilling segment is 600-800mm; the ratio of the inner diameters of the water-pressure jet grouting cut-drilling segment and the cement-paste-pressure jet grouting cut-drilling segment is within the range of 0.2-0.4;
when the soil is clay, silty clay or floury soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 30%-40%;
when the soil is sandy soil, the content of the cement mixed in the cement soil reserved in the cement-paste-pressure jet grouting cut-drilling segment is 15%-30%. - The structure of a pressure-dispersion type bit expanded anchor according to claim 10, wherein the anchor cable carriers are at least two carriers which are fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment at an interval along the length direction of the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carriers are hinge type carriers or flat plate type carriers; when the anchor cable carriers are hinge type carriers, anchor cables are coiled on the hinge type carriers in U-shape; and when the anchor cable carriers are flat plate type carriers, each flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The structure a pressure-dispersion type bit expanded anchor according to claim 10, wherein the anchor cable carriers is on anchor cable carrier which is fixed in the hardened cement soil in the cement-paste jet grouting cut-drilling segment; the anchor cables are anchor cables provided with membranes; the anchor cable carrier is a hinge type carrier or flat plate type carrier; when the anchor cable carrier is a hinge type carrier, the anchor cable is coiled on the hinge type carrier in U-shape; and when the anchor cable carrier is a flat plate type carrier, the flat plate type carrier is fixed with a fused anchor fixture for holding one end of an anchor cable.
- The structure a pressure-dispersion type bit expanded anchor according to claim 10, 11 or 12, wherein the length ratio of the cement-paste jet grouting cut-drilling segment to the water-pressure jet grouting cut-drilling segment is 0.06-0.3.
- The structure a pressure-dispersion type bit expanded anchor according to claim 10, 11 or 12, wherein the cement used for making the cement paste is cement with a common strength rating or a high-mark cement with a strength rating of 525Mpa or above.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410216623.2A CN104032737B (en) | 2014-05-21 | 2014-05-21 | Construction method and the structure of pressure dispersing type enlarged footing anchor pole |
PCT/CN2015/078695 WO2015176614A1 (en) | 2014-05-21 | 2015-05-11 | Construction method and structure of pressure dispersing expansion head anchor rod |
Publications (3)
Publication Number | Publication Date |
---|---|
EP3147410A1 EP3147410A1 (en) | 2017-03-29 |
EP3147410A4 EP3147410A4 (en) | 2017-04-12 |
EP3147410B1 true EP3147410B1 (en) | 2017-12-27 |
Family
ID=51463714
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15795723.4A Not-in-force EP3147410B1 (en) | 2014-05-21 | 2015-05-11 | Construction method and structure of pressure dispersing expansion head anchor rod |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP3147410B1 (en) |
JP (1) | JP6285078B2 (en) |
CN (1) | CN104032737B (en) |
WO (1) | WO2015176614A1 (en) |
Families Citing this family (61)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US8112871B2 (en) | 2009-09-28 | 2012-02-14 | Tyco Healthcare Group Lp | Method for manufacturing electrosurgical seal plates |
US8512371B2 (en) | 2009-10-06 | 2013-08-20 | Covidien Lp | Jaw, blade and gap manufacturing for surgical instruments with small jaws |
US8597295B2 (en) | 2010-04-12 | 2013-12-03 | Covidien Lp | Surgical instrument with non-contact electrical coupling |
US8469991B2 (en) | 2010-06-02 | 2013-06-25 | Covidien Lp | Apparatus for performing an electrosurgical procedure |
US8430877B2 (en) | 2010-06-02 | 2013-04-30 | Covidien Lp | Apparatus for performing an electrosurgical procedure |
US8814864B2 (en) | 2010-08-23 | 2014-08-26 | Covidien Lp | Method of manufacturing tissue sealing electrodes |
US8685009B2 (en) | 2011-05-16 | 2014-04-01 | Covidien Lp | Thread-like knife for tissue cutting |
US8852185B2 (en) | 2011-05-19 | 2014-10-07 | Covidien Lp | Apparatus for performing an electrosurgical procedure |
US8968283B2 (en) | 2011-05-19 | 2015-03-03 | Covidien Lp | Ultrasound device for precise tissue sealing and blade-less cutting |
US9039732B2 (en) | 2011-07-11 | 2015-05-26 | Covidien Lp | Surgical forceps |
US8864795B2 (en) | 2011-10-03 | 2014-10-21 | Covidien Lp | Surgical forceps |
US9492221B2 (en) | 2011-10-20 | 2016-11-15 | Covidien Lp | Dissection scissors on surgical device |
US8968310B2 (en) | 2011-11-30 | 2015-03-03 | Covidien Lp | Electrosurgical instrument with a knife blade lockout mechanism |
US9113897B2 (en) | 2012-01-23 | 2015-08-25 | Covidien Lp | Partitioned surgical instrument |
US8968360B2 (en) | 2012-01-25 | 2015-03-03 | Covidien Lp | Surgical instrument with resilient driving member and related methods of use |
US9375282B2 (en) | 2012-03-26 | 2016-06-28 | Covidien Lp | Light energy sealing, cutting and sensing surgical device |
US9820765B2 (en) | 2012-05-01 | 2017-11-21 | Covidien Lp | Surgical instrument with stamped double-flange jaws |
US9113901B2 (en) | 2012-05-14 | 2015-08-25 | Covidien Lp | Modular surgical instrument with contained electrical or mechanical systems |
US9526564B2 (en) | 2012-10-08 | 2016-12-27 | Covidien Lp | Electric stapler device |
US9681908B2 (en) | 2012-10-08 | 2017-06-20 | Covidien Lp | Jaw assemblies for electrosurgical instruments and methods of manufacturing jaw assemblies |
US9375259B2 (en) | 2012-10-24 | 2016-06-28 | Covidien Lp | Electrosurgical instrument including an adhesive applicator assembly |
US9572529B2 (en) | 2012-10-31 | 2017-02-21 | Covidien Lp | Surgical devices and methods utilizing optical coherence tomography (OCT) to monitor and control tissue sealing |
US9375205B2 (en) | 2012-11-15 | 2016-06-28 | Covidien Lp | Deployment mechanisms for surgical instruments |
US9498281B2 (en) | 2012-11-27 | 2016-11-22 | Covidien Lp | Surgical apparatus |
US9713491B2 (en) | 2013-02-19 | 2017-07-25 | Covidien Lp | Method for manufacturing an electrode assembly configured for use with an electrosurigcal instrument |
US10070916B2 (en) | 2013-03-11 | 2018-09-11 | Covidien Lp | Surgical instrument with system and method for springing open jaw members |
US9456863B2 (en) | 2013-03-11 | 2016-10-04 | Covidien Lp | Surgical instrument with switch activation control |
US9655673B2 (en) | 2013-03-11 | 2017-05-23 | Covidien Lp | Surgical instrument |
US9649151B2 (en) | 2013-05-31 | 2017-05-16 | Covidien Lp | End effector assemblies and methods of manufacturing end effector assemblies for treating and/or cutting tissue |
US9962221B2 (en) | 2013-08-07 | 2018-05-08 | Covidien Lp | Bipolar surgical instrument |
US9445865B2 (en) | 2013-09-16 | 2016-09-20 | Covidien Lp | Electrosurgical instrument with end-effector assembly including electrically-conductive, tissue-engaging surfaces and switchable bipolar electrodes |
US9943357B2 (en) | 2013-09-16 | 2018-04-17 | Covidien Lp | Split electrode for use in a bipolar electrosurgical instrument |
US9687295B2 (en) | 2014-04-17 | 2017-06-27 | Covidien Lp | Methods of manufacturing a pair of jaw members of an end-effector assembly for a surgical instrument |
CN104032737B (en) * | 2014-05-21 | 2016-05-04 | 苏州市能工基础工程有限责任公司 | Construction method and the structure of pressure dispersing type enlarged footing anchor pole |
US10080606B2 (en) | 2014-09-17 | 2018-09-25 | Covidien Lp | Method of forming a member of an end effector |
CN106498943B (en) * | 2015-09-08 | 2019-03-05 | 宏润建设集团股份有限公司 | Disposable high-pressure rotary-spray type enlarged footing Prestressed Soil anchor pole construction method |
US10631887B2 (en) | 2016-08-15 | 2020-04-28 | Covidien Lp | Electrosurgical forceps for video assisted thoracoscopic surgery and other surgical procedures |
US11172980B2 (en) | 2017-05-12 | 2021-11-16 | Covidien Lp | Electrosurgical forceps for grasping, treating, and/or dividing tissue |
US10973567B2 (en) | 2017-05-12 | 2021-04-13 | Covidien Lp | Electrosurgical forceps for grasping, treating, and/or dividing tissue |
CN107143358B (en) * | 2017-06-28 | 2024-04-09 | 山东省地质矿产勘查开发局八0一水文地质工程地质大队(山东省地矿工程勘察院) | Opposite-pulling anchor cable structure for controlling tunnel bias deformation and construction method thereof |
CN107513996A (en) * | 2017-10-20 | 2017-12-26 | 上海智平基础工程有限公司 | A kind of anchorage and its construction method of recoverable prestressed anchor cable |
US11109930B2 (en) | 2018-06-08 | 2021-09-07 | Covidien Lp | Enhanced haptic feedback system |
US11471211B2 (en) | 2018-10-12 | 2022-10-18 | Covidien Lp | Electrosurgical forceps |
CN109322623A (en) * | 2018-10-19 | 2019-02-12 | 广州市第二建筑工程有限公司 | Pile driver equipment and construction method for large-diameter rotary jetting piles |
US11147613B2 (en) | 2019-03-15 | 2021-10-19 | Covidien Lp | Surgical instrument with increased lever stroke |
US11576696B2 (en) | 2019-03-29 | 2023-02-14 | Covidien Lp | Engagement features and methods for attaching a drive rod to a knife blade in an articulating surgical instrument |
CN110055974A (en) * | 2019-04-24 | 2019-07-26 | 兰州理工大学 | A kind of recyclable miniature steel pipe pile soil nailing combined support structure and its recovery method |
CN110792088B (en) * | 2019-12-12 | 2024-12-13 | 中国电建集团昆明勘测设计研究院有限公司 | A deformation adjustable anchor pile anti-slip structure and anti-slip method thereof |
CN110965551B (en) * | 2019-12-26 | 2024-12-10 | 姚炳祥 | A recyclable central anchor cable and its use method |
CN111021368A (en) * | 2019-12-31 | 2020-04-17 | 陕西建工集团股份有限公司 | Larsen steel plate and prestressed steel beam composite pile structure and construction method thereof |
CN111560952A (en) * | 2019-12-31 | 2020-08-21 | 刘晓理 | Fusion structure of umbrella-shaped expansion device and free-cutting bolt or retrievable bolt cable |
US11617612B2 (en) | 2020-03-16 | 2023-04-04 | Covidien Lp | Forceps with linear trigger mechanism |
CN111535314B (en) * | 2020-06-03 | 2024-12-13 | 江苏东合南岩土科技股份有限公司 | A recyclable anchor rod and construction method thereof |
CN111852527B (en) * | 2020-06-30 | 2025-02-21 | 焦作市倍特矿业设备有限公司 | A high-strength anchor cable positioning bearing tray and use method |
CN113323031A (en) * | 2021-05-17 | 2021-08-31 | 宇旺建工集团有限公司 | Construction method of high-pressure rotary spraying and cloth bag expanding anti-floating anchor rod |
CN113529709A (en) * | 2021-08-13 | 2021-10-22 | 深圳百勤建设工程有限公司 | Pressure type anchor rod construction method and pressure type anchor rod |
CN113585289A (en) * | 2021-09-18 | 2021-11-02 | 中冶建工集团有限公司 | Support method for collapse soil deep foundation pit |
CN113931179A (en) * | 2021-10-27 | 2022-01-14 | 贵州建工集团第一建筑工程有限责任公司 | Anchor cable pore-forming and grouting construction method |
CN113914313A (en) * | 2021-10-27 | 2022-01-11 | 贵州建工集团第一建筑工程有限责任公司 | Finite depth anchor cable construction method under complex geological condition |
CN114435538B (en) * | 2022-01-26 | 2023-05-05 | 南京林业大学 | Device and method for reversely pulling shelling growth type fish mine anchors |
CN114547806B (en) * | 2022-03-03 | 2024-05-03 | 中国地质科学院探矿工艺研究所 | Self-bearing anchor cable design method considering anchor-rock interaction |
Family Cites Families (17)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2403643A (en) * | 1944-02-25 | 1946-07-09 | George L Dresser | Method of and apparatus for introducing grout into subsoil |
DE1922744A1 (en) * | 1969-05-03 | 1970-11-05 | Mueller Ludwig | Device for creating a cavity in a building site with very different soil layers for pile foundation or anchoring purposes |
DE3824955A1 (en) * | 1988-07-22 | 1990-01-25 | Gkn Keller Gmbh | Method of producing ground anchors |
US5203127A (en) * | 1991-06-28 | 1993-04-20 | Olthoff John R | Earth anchor |
CA2088287C (en) * | 1992-02-07 | 2003-05-20 | Masaru Tateyama | Reinforcing block for excavation work and method of construction thereof |
JP2804236B2 (en) * | 1994-12-14 | 1998-09-24 | 東興建設株式会社 | Anchor construction method and device |
JP3103038B2 (en) * | 1996-11-29 | 2000-10-23 | 構造工事株式会社 | Expanded bottom anchor method |
JP2000345560A (en) * | 1999-06-07 | 2000-12-12 | Hiromitsu Utsunomiya | Building structure of ground anchor its building method |
JP3904779B2 (en) * | 1999-11-15 | 2007-04-11 | 鉱研工業株式会社 | Ground improvement type anchor method and ground improvement combined drilling machine |
NL1015346C2 (en) * | 2000-05-31 | 2001-12-03 | Visser & Smit Bouw Bv | Removal method for free anchor length of grouted anchor sunk into the ground, involves heating free anchor length to form point of weakness |
JP4591878B2 (en) * | 2004-02-10 | 2010-12-01 | 株式会社複合技術研究所 | Reinforcement structure of existing retaining wall and reinforcement method for existing retaining wall |
CN100371533C (en) * | 2005-07-19 | 2008-02-27 | 曾庆义 | Construction method of high pressure jet expansion head anchor rod and its device |
CN101575854B (en) * | 2009-06-10 | 2010-10-20 | 陕西中机岩土工程有限责任公司 | High-pressure jet grouting enlarged footing anchor rod and construction method thereof |
CN203530988U (en) * | 2013-08-12 | 2014-04-09 | 中国建筑第四工程局有限公司 | One-time forming major-diameter anchor rod foundation pit supporting structure |
CN103526754A (en) * | 2013-09-30 | 2014-01-22 | 中国建筑第八工程局有限公司 | Method for constructing head-expanded anchoring rod in sand-rich decomposed rock |
CN104032737B (en) * | 2014-05-21 | 2016-05-04 | 苏州市能工基础工程有限责任公司 | Construction method and the structure of pressure dispersing type enlarged footing anchor pole |
CN203866824U (en) * | 2014-05-21 | 2014-10-08 | 苏州市能工基础工程有限责任公司 | Pressure-dispersing type expansion anchor rod structure |
-
2014
- 2014-05-21 CN CN201410216623.2A patent/CN104032737B/en active Active
-
2015
- 2015-05-11 JP JP2017513296A patent/JP6285078B2/en not_active Expired - Fee Related
- 2015-05-11 EP EP15795723.4A patent/EP3147410B1/en not_active Not-in-force
- 2015-05-11 WO PCT/CN2015/078695 patent/WO2015176614A1/en active Application Filing
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
CN104032737A (en) | 2014-09-10 |
WO2015176614A1 (en) | 2015-11-26 |
JP2017516936A (en) | 2017-06-22 |
EP3147410A4 (en) | 2017-04-12 |
CN104032737B (en) | 2016-05-04 |
JP6285078B2 (en) | 2018-02-28 |
EP3147410A1 (en) | 2017-03-29 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP3147410B1 (en) | Construction method and structure of pressure dispersing expansion head anchor rod | |
CN103088819B (en) | Construction prestressed cable method | |
CN201704689U (en) | Four-corner-reinforced pre-stressed anchor rope head for reinforcing rock slope | |
CN103147440B (en) | Construction prestressed cable method | |
CN104775428A (en) | Compound-type prestressed anchor cable structure and construction method thereof | |
CN104895072B (en) | A kind of prestress anchorage cable and prestress anchorage cable one-pass molding construction method | |
CN104790394A (en) | Pressure anchor cable structure with prefabricated anchor head and construction method of pressure anchor cable structure | |
CN105201514A (en) | Water-bearing rock stratum borehole wall structure and construction method | |
CN102080377B (en) | Composite anchor rod and guide construction method thereof | |
CN104533486A (en) | Bolting-grouting reinforcement method for remained roadway along goaf by use of self-drilling hollow grouting anchor cable | |
RU83517U1 (en) | SOIL ANCHOR | |
CN104727317B (en) | A kind of combinative structure reducing prestressd anchor cable loss | |
CN202108052U (en) | Imbedding recoverable soil nail | |
EP2893139B1 (en) | Arrangement for the high-strength anchorage of a tendon having a tie rod in a structural element and method for producing an anchorage of this type | |
CN111379581B (en) | Deep roadway prestress full-anchor support construction equipment and construction method thereof | |
CN205529907U (en) | P -type anchorage device at fixed end | |
CN204327134U (en) | A kind of prestressing force balance anchor cable | |
CN218813685U (en) | Self-advancing anchor rod prestress applying device | |
CN217053959U (en) | Telescopic superimposed sheet bottom plate of reinforcing bar retractable is established to board end | |
EP3336258B1 (en) | End anchorage for a soil and/or rock anchor | |
KR101853185B1 (en) | Pile grouting device for enhanced friction of skin | |
CN203866824U (en) | Pressure-dispersing type expansion anchor rod structure | |
CN205062813U (en) | But ground tackle of recovery type anchor rope | |
CN102493441A (en) | Stress-dispersed type sand-adding anti-floating pile with high pull-out resistance and construction method thereof | |
CN209227902U (en) | Steel pipe sleeve joints of prefabricated concrete structural columns |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20161221 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
A4 | Supplementary search report drawn up and despatched |
Effective date: 20170310 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E02D 5/74 20060101AFI20170306BHEP Ipc: E02D 5/80 20060101ALI20170306BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
DAV | Request for validation of the european patent (deleted) | ||
DAX | Request for extension of the european patent (deleted) | ||
INTG | Intention to grant announced |
Effective date: 20170804 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 958412 Country of ref document: AT Kind code of ref document: T Effective date: 20180115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602015007055 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180327 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20171227 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 958412 Country of ref document: AT Kind code of ref document: T Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180327 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180328 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20180427 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602015007055 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
26N | No opposition filed |
Effective date: 20180928 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20171227 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20150511 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171227 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180511 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20211124 Year of fee payment: 7 Ref country code: DE Payment date: 20211124 Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20211126 Year of fee payment: 7 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602015007055 Country of ref document: DE |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20220511 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220511 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20221201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220511 |