EP2949814A1 - Assembly for railway track renovation - Google Patents
Assembly for railway track renovation Download PDFInfo
- Publication number
- EP2949814A1 EP2949814A1 EP15169496.5A EP15169496A EP2949814A1 EP 2949814 A1 EP2949814 A1 EP 2949814A1 EP 15169496 A EP15169496 A EP 15169496A EP 2949814 A1 EP2949814 A1 EP 2949814A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- sleepers
- train
- gantry
- track
- trains
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000009418 renovation Methods 0.000 title claims abstract description 26
- 238000010276 construction Methods 0.000 claims abstract description 8
- 238000005096 rolling process Methods 0.000 claims description 10
- 230000000295 complement effect Effects 0.000 claims description 4
- 230000003287 optical effect Effects 0.000 claims description 3
- 238000000926 separation method Methods 0.000 claims description 2
- 238000009419 refurbishment Methods 0.000 abstract 1
- 238000000034 method Methods 0.000 description 5
- 238000009434 installation Methods 0.000 description 4
- 230000003137 locomotive effect Effects 0.000 description 4
- 238000011084 recovery Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 230000002250 progressing effect Effects 0.000 description 2
- 230000000284 resting effect Effects 0.000 description 2
- 230000032258 transport Effects 0.000 description 2
- 230000003139 buffering effect Effects 0.000 description 1
- 230000015556 catabolic process Effects 0.000 description 1
- 210000000078 claw Anatomy 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 238000005070 sampling Methods 0.000 description 1
- 238000013024 troubleshooting Methods 0.000 description 1
- 230000000007 visual effect Effects 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B29/00—Laying, rebuilding, or taking-up tracks; Tools or machines therefor
- E01B29/05—Transporting, laying, removing, or renewing both rails and sleepers
Definitions
- the present invention relates to machines and methods for the renovation of railways.
- the invention relates to a railroad renovation set intended for the replacement of both rails and sleepers of a railroad generally in operation.
- the railway is renovated in sections because this renovation is carried out for short periods of time, typically at night, during which traffic is interrupted, and the railway has to be recirculated in a restrictive manner to a precise schedule.
- Such machines have a great complexity, and the risk that a damage or failure occurs during the intervention of the machine on the track can unfortunately not be completely avoided; if such an eventuality occurs, it is very difficult that companions can intervene under the machine to ask sleepers and rails in troubleshooting solution to allow the resumption of traffic as soon as possible, preferably in time.
- the two trains can also be discarded to facilitate the journeyman's intervention in the lane area to be restored.
- the risk of non-return to the operational circulation at the end of the period of time allotted for the works is consequently reduced, compared to the case of a machine that spans the renovation zone.
- the first train includes a tool for removing the sleepers, additional wagons for storing the sleepers deposited, at least one shuttle gantry rolling on the wagons, with handling means. So that this equipment allows to continuously process the removal of old sleepers and their storage on the landing gear.
- baskets are used to contain the deposited sleepers, baskets and handling means being configured so that the sleepers are generally parallel to the transverse direction (T) to the track, without exceeding the template; whereby the used sleepers are stored securely, without risk for subsequent transport; it thus proposes a simple handling of the used sleepers, without rotation of the sleepers, and without exceeding template relative to the adjacent channel.
- Each of the baskets comprises transverse slats with at least two vertical recesses for the passage of the forks of the handling means in the axial and vertical directions; whereby the baskets form very simple structures, without moving part (s), moreover it is not necessary to strap the sleepers for the subsequent circulation.
- the support leg is a motorized track support leg; whereby each of the removal and installation trains can carry out renovation operations independently without locomotive tractor and without motorized bogie.
- the second train comprises a tool for laying sleepers, additional wagons for storing the new sleepers, at least one gantry-shuttle rolling on the wagons, with handling means. So that this equipment makes it possible to store the new sleepers in waiting on the laying train and allows to continuously process the installation of new sleepers.
- the first and second trains can operate with a distance (D1) of reduced separation, less than 2 m, so that in the construction zone (Z), the zone without crosspieces (Z1) has a length of less than 15 m and the zone without laid rails (Z2) has a length of less than 40 m; whereby the length of track deposited is small, and in case of failure of the machine, the manual installation of a portion of track to connect the old way to the new requires only a limited time.
- D1 of reduced separation less than 2 m
- An optical guiding device can be provided between the front end of the gantry of the second train and the forward end of the gantry of the first train, whereby the retrofit assembly can rest the new track exactly at the deposited track location. , even in case of curve.
- the two trains can be coupled in a standard manner, so as to be evacuated together in a convoy from the construction site area.
- the purpose of the invention is also to propose a basket for receiving used railway sleepers, specially designed with transverse slats having two vertical recesses for the passage of the forks of the handling means in the axial directions (L) and vertical.
- the figure 1 represents the renovation set according to the invention, such a railroad renovation set is intended for the replacement of both rails and sleepers of a railroad generally in operation.
- the railway in question generally extends in a longitudinal direction L , the transverse direction T being defined as the perpendicular horizontal to this longitudinal direction.
- ballast needs to be refurbished, this can be done in advance regardless of the removal and reinstallation of the track that is described here.
- the laying train 1 and the laying train 2 are separate, working close to each other, on both sides of a construction site Z zone of renovation.
- the Z worksite area in question comprises a zone without cross members Z1 and a zone without rails Z2 placed, zone longer than the previous one.
- the zone without crosspieces Z1 has a length of less than 15 m and the zone without rails Z2 has a length less than 40 m.
- Each of the first and second trains 1,2 comprises a flat car 5 with conventional bogies 50 and a telescopic gantry 3 .
- Said telescopic gantry 3 comprises a rigid mechanically welded mechanical assembly 34 , with front rolling means 35 and rear rolling means 36 provided for rolling on on-board rails 58 on the flat car.
- said telescopic gantry 3 is designed to rest on the flat car 5 and on a support leg 4 crawler, vertically movable, said support leg being part of the equipment of the telescopic gantry, at its front beam 33 .
- the track is a motorized track 40 , intended to advance the respective train during the laying and / or removal operations.
- the caterpillar could be a passive caterpillar and the train could be driven by a conventional bogie equipped with motorization, or a locomotives (the one who brought the train for example).
- a device for controlling the direction of advance (orientation) of the track relative to the telescopic gantry is preferably provided.
- the powered crawler device may comprise two separate caterpillars, namely a right caterpillar and a left caterpillar.
- the steering control can result from a differential control between the left track and the right track.
- the support leg 4 is movable vertically between a working position resting on the ground and a storage position on the car 5 . In working position, the height is adjustable by means of a hydraulic cylinder 42 .
- the support leg of the landing gear comprises a harrow 41 (also known as claws) to break the coherence of the ballast.
- the telescopic gantry 3 is movable longitudinally between a working position (as illustrated in FIGS. Figures 1 to 3 ) and a storage position ( Fig 4A and 8 ), where the gantry is entirely positioned above the flat car 5.
- the two trains can be coupled in a standard way, so as to be brought together and evacuated together in a convoy from the construction zone ( Fig 8 ).
- the convoy formed by the first and second trains 1,2 is routed, through a locomotive or a locomotives (preferably one at each end), to the site area at the junction of the new and old tracks, ie where the renovation project was interrupted during the previous intervention.
- the laying train is uncoupled from the laying train, and we proceed to the operation of the site of each of the trains, starting with the landing gear.
- the telescopic gantry 3 is advanced towards the free end of the train, a distance slightly greater than the length of the tracks.
- the front wheels 35 of the telescopic gantry are then at the edge of the front end 55 of the flat car. Then we move the support leg 4 down for it to come wear on the ballast ( Fig 4B ).
- the cars 5.15 of the train are moved while the telescopic gantry remains stationary, until the rear wheels 36 of the telescopic gantry 3 are in the vicinity of the end. before 55 free of the flat wagon 5 at the head of the train ( Fig 4C ).
- the motorized track 40 is the means of movement (progression) of the train along the track from the moment it is supported on the ballast.
- the landing gear 1 When the landing gear 1 begins to operate and advances (arrow F ), it frees up space on the ballast without rail or cross, so that the landing gear 2 can be put into operation, after having advanced a few meters so as to be able to put its motorized track directly on the ballast.
- the front end 31 of the gantry 3 of the first gear 1 is separated from the front end 32 of the gantry of the second gear 2 by a distance denoted D1 ; this distance D1 can be short at the beginning of the worksite, preferably lower at 2 m, or even less than 1 m.
- this distance D1 may be greater, however it is desirable that it remains relatively small, preferably less than a few meters; this distance D1 will be reduced again as much as possible near the time limit, preferably less than 2 m, or even less than 1 m, to restore the way to traffic.
- the renovation assembly progresses along the longitudinal direction L of the track, the landing gear 1 preceding the laying train 2 , with independent control thanks to the motorized tracks.
- the landing gear 1 comprises, in addition to the telescopic gantry 3 and the flat head wagon 5 already mentioned, complementary wagons 15 for storing the deposited sleepers 7a, and a gantry-shuttle 12 rolling on the wagons with handling means.
- a tool 9 removal sleepers The tooling includes a pulling chain 91 of the sleepers, provided with teeth, a recovery conveyor 92 , and a fork manipulator 93 .
- the sampling line raises the sleepers and deposits them one by one on the recovery conveyor 92.
- the fork manipulator 93 has two forks 94 which extend in the longitudinal direction L; the fork manipulator 93 is configured to deposit the used sleepers 7a in baskets 8 which form containers for containing the used sleepers.
- the fork manipulator 93 takes a group of sleepers (7 in the illustrated example) from the recovery conveyor 92 , and transports them to deposit them in a storage basket 8 used sleepers.
- the baskets in question are specially designed with transverse side panels 81 (parallel to T) and longitudinal side panels 82 (parallel to L).
- the transverse side walls 81 comprise two vertical recesses 83 for the passage of the forks 94 in the axial directions L and vertical.
- the two transverse side panels 81 each have two vertical recesses 83 , which allows manipulator forks (or forklift) to intervene from one side or from the other side.
- Shims 85 are also provided for laying the lower level of the sleepers for the passage and withdrawal of the forks. Wooden blocks are also provided between the different layers of sleepers that are stored in the basket 8 .
- the baskets in question do not exceed the standard circulation gauge; therefore the receiving baskets of used sleepers keep a constant orientation, without rotation.
- the aforementioned shuttle gantry 12 rolling equipped with handling means evacuates the full basket to a position further away from the front end 55 of the train, and supplies another empty basket 8 for the continuation of the removal operations, and so on.
- the sleepers 7a being stored in baskets with sideboards, the convoy once reformed at the end of the intervention sequence, can travel safely without the risk of falling sleepers.
- reception baskets 8 are particularly simple, without moving parts or hood to fold, they have a relatively simple structure and are very robust and enduring.
- the laying train 2 comprises, in addition to the telescopic gantry 3 and the above-mentioned flat head wagon 5 , complementary wagons 15 for supplying new sleepers 7b , and a gantry-shuttle 12 rolling on the wagons with means of support. handling.
- the new sleepers 7b can be arranged in batches on pallets or directly on a treadmill. They are deposited on the ballast as and by measure tooling 10 , known per se, and therefore not described in detail here.
- the gantry proceeds, thanks to the guide arms (not shown, but known in itself), the laying of the new rails 6b , then to the installation of the fasteners that fix the rails relative to the sleepers .
- the bogies 50 of the laying train 2 roll on a set path and attached.
- the gantry of the laying train 2 also includes a tool for installing the fasteners or screws lag screw (not shown).
- the motorized track support leg of the landing gear comprises a shield / blade 46 for leveling the ballast, and a tamping means 47 , arranged between the motorized track and the position of the depositing tool 10 .
- the mechanical connection between the telescopic gantry 3 and the flat head wagon 5 has a degree of freedom of rotation of vertical axis A1.
- the telescopic gantry is also provided and the head flat car has a degree of freedom of rotation with a vertical axis A2 .
- the dropping train stops its operations.
- the train of pose continues to join him in order to minimize the distance D1 which separates their respective ends before 31,32 .
- the telescopic gantries 3 are retracted on either side of their respective flat cars 5 by pushing the respective locotractors located at the remote ends of the laying trains and removing them. Then we proceed to the lifting of the support leg 4 , and finally we proceed to the complete folding of each telescopic gantry 3 so that it is found entirely above the head wagon (that is to say the rear wheels 36 to near the rear end 56 ).
- the laying and removal trains can be evacuated separately, or they can be coupled to form a single convoy to be evacuated ( Fig 8 ).
- a proximity sensor device 61 between the front ends of the two trains to avoid buffering.
- a visual and audible warning can warn from a distance D1 too low; it is also possible to provide an intervention on the motorization means of the tracks.
- an optical guiding device 62 , 63 is provided so that the front end 32 of the The rest-train may be guided laterally so that the new track is laid exactly where the old track was, for both the straight and curved sections.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Abstract
Ensemble de rénovation de voie ferrée, comprenant un premier train (1) chargé des opérations de dépose de la voie existante, rails (6a) et traverses (7a), un deuxième train (2) chargé des opérations de pose de la voie neuve, rails (6b) et traverses (7b), les trains comprenant un wagon plat (5) et un portique télescopique (3) avec une jambe support (4) à chenille, télescopique et motorisée, les premier et deuxième trains (1,2) étant distincts, configurés pour coopérer l'un à la suite de l'autre et à proximité l'un de l'autre, de part et d'autre d'une zone de chantier (Z,Z1,Z2) de rénovation de voie.Railway refurbishment assembly, comprising a first train (1) responsible for the removal operations of the existing track, rails (6a) and crosspieces (7a), a second train (2) responsible for the laying operations of the new track, rails (6b) and sleepers (7b), the trains comprising a flat car (5) and a telescopic gantry (3) with a support leg (4) crawler, telescopic and motorized, the first and second trains (1,2) being distinct, configured to cooperate one after the other and close to each other, on both sides of a construction site zone (Z, Z1, Z2) of track renovation .
Description
La présente invention est relative aux machines et procédés pour la rénovation de voies ferrées.The present invention relates to machines and methods for the renovation of railways.
Plus particulièrement, l'invention concerne un ensemble de rénovation de voie ferrée destiné au remplacement à la fois des rails et des traverses d'une voie ferrée généralement en exploitation. Dans la pratique, la voie ferrée est rénovée par tronçons car cette rénovation est effectuée pendant de courtes périodes de temps, typiquement la nuit, pendant lesquelles la circulation est interrompue, et la voie ferrée doit être remise en circulation d'exploitation de manière contraignante à un horaire précis.More particularly, the invention relates to a railroad renovation set intended for the replacement of both rails and sleepers of a railroad generally in operation. In practice, the railway is renovated in sections because this renovation is carried out for short periods of time, typically at night, during which traffic is interrupted, and the railway has to be recirculated in a restrictive manner to a precise schedule.
On procède ainsi progressivement, tronçon par tronçon, pour rénover l'entièreté d'une voie ferrée. À l'intérieur de chaque tronçon, l'équipement de rénovation progresse de proche en proche, déposant la voie ancienne puis reposant une voie nouvelle. À l'approche de l'interruption, c'est-à-dire la fin du tronçon, on pose la voie nouvelle jusqu'à raccorder la voie ancienne intacte, ceci afin de permettre le rétablissement de la circulation d'exploitation conventionnelle.This is done progressively, section by section, to renovate the entirety of a railway. Within each section, the renovation equipment progresses step by step, laying down the old road and resting a new path. At the approach of the interruption, that is to say the end of the section, the new track is laid until the old intact track is connected, in order to allow the restoration of the conventional operating circulation.
Il est connu, par exemple du document
De telles machines présentent une complexité importante, et le risque qu'une avarie ou qu'une panne se produise pendant l'intervention de la machine sur la voie ne peut malheureusement pas être totalement évité ; si une telle éventualité se produit, il est très malaisé que des compagnons puissent intervenir sous la machine pour poser des traverses et des rails en solution de dépannage afin de pouvoir permettre la reprise de la circulation le plus tôt possible, de préférence en temps et en heure.Such machines have a great complexity, and the risk that a damage or failure occurs during the intervention of the machine on the track can unfortunately not be completely avoided; if such an eventuality occurs, it is very difficult that companions can intervene under the machine to ask sleepers and rails in troubleshooting solution to allow the resumption of traffic as soon as possible, preferably in time.
Par conséquent, il est apparu un besoin d'améliorer la situation et de proposer des solutions pour diminuer le risque de non restitution à la circulation de la voie ferrée à l'heure prescrite.As a result, there was a need to improve the situation and to propose solutions to reduce the risk of non-restitution to the circulation of the railway at the prescribed time.
A cet effet, la présente invention propose un ensemble de rénovation de voie ferrée, comprenant :
- un premier train chargé des opérations de dépose de la voie existante, à savoir rails et traverses,
- un deuxième train chargé des opérations de pose de la voie neuve, à savoir rails et traverses,
chacun des premier et deuxième trains comprenant un wagon plat et un portique télescopique pouvant s'appuyer sur le wagon et sur une jambe support à chenille, la jambe support étant déplaçable verticalement entre une position de travail et une position de rangement, le portique télescopique étant déplaçable longitudinalement entre une position de travail et une position de rangement, - les premier et deuxième trains étant distincts, configurés pour coopérer l'un à la suite de l'autre et à proximité l'un de l'autre, de part et d'autre d'une zone de chantier de rénovation de voie.
- a first train responsible for the removal operations of the existing track, namely rails and sleepers,
- a second train responsible for laying the new track, namely rails and sleepers,
each of the first and second trains comprising a flat car and a telescopic gantry which can rest on the wagon and on a caterpillar support leg, the support leg being movable vertically between a working position and a storage position, the telescopic gantry being movable longitudinally between a working position and a storage position, - the first and second trains being separate, configured to cooperate one after the other and close to each other, on either side of a lane renovation site area.
Grâce à ces dispositions, en cas de panne, on peut intervenir facilement dans l'espace entre les deux trains de sorte qu'on peut minimiser les risques de non restitution du chantier à la circulation en temps et en heure.Thanks to these provisions, in the event of a breakdown, it is easy to intervene in the space between the two trains so that the risks of non-return of the building site to the traffic in time and time can be minimized.
On peut aussi écarter les deux trains pour faciliter l'intervention des compagnons dans la zone de voie à rétablir. Les risques de non restitution à la circulation d'exploitation à l'issue de la période de temps allouée pour les travaux sont par conséquent diminués, par rapport au cas d'une machine qui enjambe la zone de rénovation.The two trains can also be discarded to facilitate the journeyman's intervention in the lane area to be restored. The risk of non-return to the operational circulation at the end of the period of time allotted for the works is consequently reduced, compared to the case of a machine that spans the renovation zone.
Dans des modes de réalisation du procédé selon l'invention, on peut éventuellement avoir recours en outre à l'une et/ou à l'autre des dispositions suivantes.In embodiments of the method according to the invention, it may optionally be resorted further to one and / or the other of the following provisions.
Le premier train comprend un outillage de dépose des traverses, des wagons complémentaires pour stocker les traverses déposées, au moins un portique-navette roulant sur les wagons, avec des moyens de manipulation. De sorte que cet équipement permet de traiter en continu la dépose des traverses anciennes et leur stockage sur le train de dépose.The first train includes a tool for removing the sleepers, additional wagons for storing the sleepers deposited, at least one shuttle gantry rolling on the wagons, with handling means. So that this equipment allows to continuously process the removal of old sleepers and their storage on the landing gear.
Avantageusement, on utilise des paniers pour contenir les traverses déposées, les paniers et les moyens de manutention étant configurés de sorte que les traverses restent généralement parallèles à la direction transversale (T) à la voie, sans dépassement de gabarit ; moyennant quoi, les traverses usagées sont stockées de manière sécurisée, sans risque pour le transport ultérieur ; on propose ainsi une manipulation simple des traverses usagées, sans rotation des traverses, et sans dépassement de gabarit par rapport à la voie adjacente.Advantageously, baskets are used to contain the deposited sleepers, baskets and handling means being configured so that the sleepers are generally parallel to the transverse direction (T) to the track, without exceeding the template; whereby the used sleepers are stored securely, without risk for subsequent transport; it thus proposes a simple handling of the used sleepers, without rotation of the sleepers, and without exceeding template relative to the adjacent channel.
Chacun des paniers comporte des ridelles transversales avec au moins deux évidements verticaux pour le passage des fourches des moyens de manipulation dans les sens axial et vertical ; moyennant quoi, les paniers forment des structures très simples, sans partie(s) mobile(s), de plus il n'est pas nécessaire de sangler les traverses pour la circulation ultérieure.Each of the baskets comprises transverse slats with at least two vertical recesses for the passage of the forks of the handling means in the axial and vertical directions; whereby the baskets form very simple structures, without moving part (s), moreover it is not necessary to strap the sleepers for the subsequent circulation.
La jambe support est une jambe support à chenille motorisée ; moyennant quoi chacun des trains de dépose et de repose peut effectuer des opérations de rénovation de façon autonome sans loco-tracteur et sans boggie motorisé.The support leg is a motorized track support leg; whereby each of the removal and installation trains can carry out renovation operations independently without locomotive tractor and without motorized bogie.
Le deuxième train comprend un outillage de pose des traverses, des wagons complémentaires pour stocker les traverses neuves, au moins un portique-navette roulant sur les wagons, avec des moyens de manipulation. De sorte que cet équipement permet de stocker les traverses neuves en attente sur le train de pose et permet de traiter en continu la pose des traverses nouvelles.The second train comprises a tool for laying sleepers, additional wagons for storing the new sleepers, at least one gantry-shuttle rolling on the wagons, with handling means. So that this equipment makes it possible to store the new sleepers in waiting on the laying train and allows to continuously process the installation of new sleepers.
Le premier et le deuxième train peuvent opérer avec une distance (D1) de séparation réduite, inférieure à 2 m, de sorte que dans la zone de chantier (Z), la zone sans traverses (Z1) présente une longueur inférieure à 15 m et la zone sans rails posés (Z2) présente une longueur inférieure à 40 m ; moyennant quoi la longueur de voie déposée est peu étendue, et en cas de panne de la machine, la pose manuelle d'une portion de voie permettant de raccorder l'ancienne voie à la nouvelle requiert seulement un temps limité.The first and second trains can operate with a distance (D1) of reduced separation, less than 2 m, so that in the construction zone (Z), the zone without crosspieces (Z1) has a length of less than 15 m and the zone without laid rails (Z2) has a length of less than 40 m; whereby the length of track deposited is small, and in case of failure of the machine, the manual installation of a portion of track to connect the old way to the new requires only a limited time.
Il est prévu une liaison à pivot vertical entre le portique télescopique et le wagon plat ; ceci est prévu de préférence pour chacun des premier et deuxième trains ; moyennant quoi l'ensemble de rénovation peut traiter des voies en courbe.There is provided a vertical pivot connection between the telescopic gantry and the flat car; this is preferably provided for each of the first and second trains; whereby the renovation set can process curve lanes.
Il peut être prévu un dispositif de guidage optique entre l'extrémité avant du portique du deuxième train et l'extrémité avant du portique du premier train, moyennant quoi l'ensemble de rénovation peut reposer la voie neuve exactement à l'endroit de voie déposée, même en cas de courbe.An optical guiding device can be provided between the front end of the gantry of the second train and the forward end of the gantry of the first train, whereby the retrofit assembly can rest the new track exactly at the deposited track location. , even in case of curve.
Avantageusement, lorsque les jambes support et les portiques télescopiques des deux trains sont en position de rangement, les deux trains peuvent être accouplés de façon standard, de manière à être évacués ensemble en convoi depuis la zone de chantier.Advantageously, when the support legs and telescopic gantries of the two trains are in the storage position, the two trains can be coupled in a standard manner, so as to be evacuated together in a convoy from the construction site area.
Selon un autre aspect, l'invention a également pour but de proposer un panier de réception de traverses ferroviaires usagées, spécialement conçu avec des ridelles transversales présentant deux évidements verticaux pour le passage des fourches des moyens de manipulation dans les sens axial (L) et vertical.According to another aspect, the purpose of the invention is also to propose a basket for receiving used railway sleepers, specially designed with transverse slats having two vertical recesses for the passage of the forks of the handling means in the axial directions (L) and vertical.
D'autres caractéristiques et avantages de l'invention apparaîtront au cours de la description suivante d'une de ses formes de réalisation, donnée à titre d'exemple non limitatif, en regard des dessins joints.Other features and advantages of the invention will become apparent during the description following of one of its embodiments, given by way of non-limiting example, with reference to the accompanying drawings.
Sur les dessins :
- la
figure 1 est une vue générale en perspective de l'ensemble de rénovation selon l'invention, - la
figure 2 est une vue de dessus de la partie centrale de l'ensemble de rénovation de lafigure 1 , - la
figure 3 est une vue de côté de la partie centrale de l'ensemble de rénovation de lafigure 1 , - les
figures 4A 4B 4C montrent l'extrémité avant du train de dépose, - la
figure 5 est une vue en perspective montre l'extrémité avant du train de dépose, - la
figure 6 illustre un panier de réception pour les traverses usagées, - la
figure 7 montre l'extrémité avant du train de pose, - la
figure 8 illustre l'accouplement des trains de pose et dépose pour former un convoi.
- the
figure 1 is a general perspective view of the renovation assembly according to the invention, - the
figure 2 is a top view of the central part of the renovation complex of thefigure 1 , - the
figure 3 is a side view of the central part of the whole renovation of thefigure 1 , - the
Figures 4A 4B 4C show the front end of the landing gear, - the
figure 5 is a perspective view showing the front end of the landing gear, - the
figure 6 illustrates a basket of reception for the used sleepers, - the
figure 7 shows the front end of the landing gear, - the
figure 8 illustrates the coupling of the laying trains and deposits to form a convoy.
Sur les différentes figures, les mêmes références désignent des éléments identiques ou similaires.In the different figures, the same references designate identical or similar elements.
La
La voie ferrée en question s'étend généralement selon une direction longitudinale L, la direction transversale T étant définie comme la perpendiculaire horizontale à cette direction longitudinale.The railway in question generally extends in a longitudinal direction L , the transverse direction T being defined as the perpendicular horizontal to this longitudinal direction.
L'ensemble de rénovation en question comprend un premier train 1, chargé des opérations de dépose de la voie existante (on peut l'appeler « train de dépose »). Le train de dépose est configuré pour opérer les opérations suivantes en progressant (flèche F) le long de la direction longitudinale L de la voie :
- tout d'abord déposer les attaches des rails (c'est-à-dire dévisser les tirefonds ou déclipser les clips),
- ensuite écarter les rails existants 6a de leur position précédente, au moins vers l'extérieur, et un peu vers le haut, (la dépose des rails étant connue en soi, elle ne sera pas décrite en détails ici),
- déposer les traverses usagées 7a et les stocker dans des containers appelés
paniers 8 qui seront vus en détail plus loin.
- first remove the rail fasteners (ie unscrew the lag screws or unclip the clips),
- then move the existing
rails 6a away from their previous position, at least towards the outside, and a little upwards (the removal of the rails being known per se, it will not be described in detail here), - deposit the used
sleepers 7a and store them in containers calledbaskets 8 which will be seen in detail later.
L'ensemble de rénovation en question comprend un deuxième train 2 chargé des opérations de pose de la voie nouvelle (on peut l'appeler « train de pose »). Le train de pose est configuré pour opérer les opérations suivantes en progressant le long de la direction longitudinale L de la voie :
- poser des traverses neuves 7b en les acheminant depuis une réserve de traverses neuves stockées sur le deuxième train,
- mettre en place des rails neufs 6b en les déplaçant (à l'avancement) depuis une position d'attente le long de la voie vers leur position définitive sur la nouvelle voie,
- poser des attaches neuves (c'est-à-dire visser des tirefonds neufs ou clipser des clips neufs) fixant les rails neufs sur les traverses neuves.
- installing
new ties 7b by routing them from a reserve of new ties stored on the second train, - put in place
new rails 6b by moving them (in progress) from a waiting position along the track to their final position on the new track, - install new fasteners (ie screw new lag bolts or clip new clips) fixing the new rails on the new sleepers.
Il faut aussi indiquer que si le ballast doit être rénové, ceci peut être fait à l'avance indépendamment de la dépose et la repose de la voie qui est décrite ici.It should also be noted that if the ballast needs to be refurbished, this can be done in advance regardless of the removal and reinstallation of the track that is described here.
Avantageusement selon l'invention, le train de dépose 1 et le train de pose 2 sont distincts, travaillent à proximité l'un de l'autre, de part et d'autre d'une zone de chantier Z de rénovation de voie.Advantageously according to the invention, the laying
La zone de chantier Z en question comprend une zone sans traverses Z1 et une zone sans rails posés Z2, zone plus longue que la précédente. Avantageusement selon l'invention, dans la zone de chantier Z, la zone sans traverses Z1 présente une longueur inférieure à 15 m et la zone sans rails posés Z2 présente une longueur inférieure à 40 m.The Z worksite area in question comprises a zone without cross members Z1 and a zone without rails Z2 placed, zone longer than the previous one. Advantageously according to the invention, in zone Z , the zone without crosspieces Z1 has a length of less than 15 m and the zone without rails Z2 has a length less than 40 m.
Chacun des premier et second trains 1,2 comprend un wagon plat 5 avec des boggies conventionnels 50 et un portique télescopique 3. Ledit portique télescopique 3 comprend un ensemble mécanique mécano-soudé rigide 34, avec des moyens de roulement avant 35 et des moyens de roulement arrière 36 prévu pour rouler sur des rails embarqués 58 sur le wagon plat. En opérations, ledit portique télescopique 3 est prévu pour s'appuyer sur le wagon plat 5 et sur une jambe support 4 à chenille, déplaçable verticalement, ladite jambe support faisant partie de l'équipement du portique télescopique, au niveau de sa poutre avant 33.Each of the first and
Avantageusement, la chenille est une chenille motorisée 40, destinée à faire progresser le train respectif pendant les opérations de pose et/ou dépose.Advantageously, the track is a
Toutefois, de manière alternative, la chenille pourrait être une chenille passive et le train pourrait être mû par un boggie classique pourvu de motorisation, ou un locotracteur (celui qui a amené le train par exemple).However, alternatively, the caterpillar could be a passive caterpillar and the train could be driven by a conventional bogie equipped with motorization, or a locomotives (the one who brought the train for example).
Dans les deux cas, on prévoit de préférence un dispositif permettant de contrôler la direction d'avance (l'orientation) de la chenille par rapport au portique télescopique.In both cases, it is preferably provided a device for controlling the direction of advance (orientation) of the track relative to the telescopic gantry.
Le dispositif de chenille motorisée peut comprendre deux chenilles séparées, à savoir une chenille droite et une chenille gauche.The powered crawler device may comprise two separate caterpillars, namely a right caterpillar and a left caterpillar.
Dans le cas où la chenille est motorisée, le contrôle de direction peut résulter d'une commande différentielle entre la chenille gauche et la chenille droite.In the case where the track is motorized, the steering control can result from a differential control between the left track and the right track.
La jambe support 4 est déplaçable verticalement entre une position de travail en appui sur le sol, et une position de rangement sur le wagon 5. En position de travail, la hauteur est réglable au moyen d'un vérin hydraulique 42.The
La jambe support du train de dépose comporte une herse 41 (on dit aussi des griffes) pour briser la cohérence du ballast.The support leg of the landing gear comprises a harrow 41 (also known as claws) to break the coherence of the ballast.
Le portique télescopique 3 est déplaçable longitudinalement entre une position de travail (comme illustré aux
Lorsque les jambes support 4 et les portiques télescopiques 3 des deux trains 1,2 sont en position de rangement, les deux trains peuvent être accouplés de façon standard, de manière à être amenés ensemble et évacués ensemble en convoi depuis la zone de chantier (
Lorsque la voie ferrée devient disponible pour la reprise du chantier, le convoi formé par les premier et deuxième trains 1,2 est acheminé, grâce à une locomotive ou un locotracteur (de préférence un à chaque extrémité), jusqu'à la zone de chantier, à l'endroit de la jonction entre la voie nouvelle et la voie ancienne c'est-à-dire là où le chantier de rénovation s'était interrompu lors de l'intervention précédente.When the railway becomes available for the resumption of the yard, the convoy formed by the first and
Puis le train de pose est désaccouplé du train de dépose, et on procède à la mise en opération sur le chantier de chacun des trains, en commençant par le train de dépose.Then the laying train is uncoupled from the laying train, and we proceed to the operation of the site of each of the trains, starting with the landing gear.
Tout d'abord, on sépare la jonction qui raboutait les anciens rails et les rails neufs, et on tronçonne les anciens rails sur une distance de quelques mètres, en dépose les attaches et les rails tronçonnés. On enlève aussi manuellement les traverses sur la même distance de quelques mètres qui va permettre de poser la chenille du train de dépose directement sur le ballast.First, we separate the junction which joined the old rails and the new rails, and cut the old rails a distance of a few meters, remove the fasteners and cut-off rails. The sleepers are also manually removed from the same distance of a few meters, which will allow the crawler of the landing gear to be placed directly on the ballast.
Pour le train de dépose 1, le portique télescopique 3 est avancé en direction de l'extrémité libre du train, d'une distance légèrement supérieure à la longueur des chenilles. Les roulettes avant 35 du portique télescopique se trouvent alors en bordure de l'extrémité avant 55 du wagon plat. Puis on déplace la jambe support 4 vers le bas pour qu'elle vienne porter sur le ballast (
Grâce au locotracteur situé à l'extrémité distante du train, on déplace les wagons 5,15 du train alors que le portique télescopique reste immobile, ceci jusqu'à ce que les roulettes arrière 36 du portique télescopique 3 soient au voisinage de l'extrémité avant 55 libre du wagon plat 5 en tête de train (
À proximité de la jambe support, on prévoit une cabine opérateur dans lequel un opérateur peut agir sur les commandes de la chenille motorisée. La chenille motorisée 40 constitue le moyen de déplacement (progression) du train le long de la voie à partir du moment où il est en appui sur le ballast.Near the support leg, there is provided an operator's cabin in which an operator can act on the controls of the motorized crawler. The
Lorsque le train de dépose 1 commence à opérer et avance (flèche F), il libère de la place sur le ballast sans rail ni traverse, pour que le train de pose 2 puisse être mis en opération, après l'avoir avancé de quelques mètres de manière à pouvoir poser sa chenille motorisée directement sur le ballast.When the
Concernant le train de pose 2, pour le mettre en opération, on procède de façon similaire, on avance le portique télescopique puis on pose sur le ballast la jambe support 4 à chenille motorisée, sur le ballast ; puis on déplace les wagons 5,15 du train de pose alors que le portique télescopique reste immobile, ceci jusqu'à ce que les roulettes arrière 36 du portique télescopique 3 soient au voisinage de l'extrémité avant 55 libre du wagon plat 5 en tête de train, et que l'immobilisation relative longitudinale soit établie.Regarding the laying
Avantageusement selon la présente invention, l'extrémité avant 31 du portique 3 du premier train 1 est séparée de l'extrémité avant 32 du portique du deuxième train 2 par une distance notée D1 ; cette distance D1 peut être courte en début de chantier, de préférence inférieure à 2 m, voire même inférieur à 1 m.Advantageously according to the present invention, the
Au cours de la progression du chantier, cette distance D1 peut être plus importante, cependant il est souhaitable qu'elle reste relativement faible, préférentiellement inférieure à quelques mètres ; cette distance D1 sera à nouveau réduite le plus possible à l'approche de l'heure limite, de préférence inférieure à 2 m, voire même inférieur à 1 m, pour restituer la voie à la circulation.During the progression of the site, this distance D1 may be greater, however it is desirable that it remains relatively small, preferably less than a few meters; this distance D1 will be reduced again as much as possible near the time limit, preferably less than 2 m, or even less than 1 m, to restore the way to traffic.
En configuration opérationnelle, l'ensemble de rénovation progresse le long de la direction longitudinale L de la voie, le train de dépose 1 précédant le train de pose 2, avec pilotage indépendant grâce aux chenilles motorisées.In operational configuration, the renovation assembly progresses along the longitudinal direction L of the track, the
Le train de dépose 1 comprend, outre le portique télescopique 3 et le wagon plat 5 de tête déjà mentionné, des wagons complémentaires 15 pour stocker les traverses déposées 7a, et un portique-navette 12 roulant sur les wagons avec des moyens de manipulation.The
De plus, comme illustré à la
Le manipulateur à fourche 93 comporte deux fourches 94 qui s'étendent selon la direction longitudinale L ; le manipulateur à fourche 93 est configuré pour déposer les traverses usagées 7a dans des paniers 8 qui forment des conteneurs pour contenir les traverses usagées.The
Le manipulateur à fourche 93 prélève un groupe de traverses (7 dans l'exemple illustré) depuis le convoyeur de reprise 92, et les transporte pour les déposer dans un panier 8 d'entreposage des traverses usagées.The
Toute la manipulation des traverses décrite précédemment est effectuée en maintenant les traverses parallèlement à la direction transversale T de la voie, c'est-à-dire sans les tourner (contrairement à ce qui est pratiqué dans l'art antérieur).All the handling of the sleepers described above is carried out by maintaining the sleepers parallel to the transverse direction T of the track, that is, without turning them (contrary to what is practiced in the prior art).
Comme illustré à la
Les paniers en question ne dépassent pas du gabarit de circulation standard ; par conséquent les paniers de réception des traverses usagées conservent une orientation constante, sans rotation.The baskets in question do not exceed the standard circulation gauge; therefore the receiving baskets of used sleepers keep a constant orientation, without rotation.
Dès lors qu'un panier 8 de réception des traverses est complet, c'est-à-dire avec plusieurs couches de traverses séparées par exemple par des lambourdes en bois, le portique-navette 12 roulant susmentionné équipé de moyens de manipulation (connus en soi) évacue le panier plein vers une position plus éloignée de l'extrémité avant 55 du train, et approvisionne un autre panier vide 8 pour la poursuite des opérations de dépose, et ainsi de suite.As soon as a
Les traverses 7a étant stockées dans des paniers avec ridelles, le convoi une fois reformé en fin de séquence d'intervention, peut circuler en toute sécurité sans risque de chute de traverses.The
On remarque que les paniers de réception 8 sont particulièrement simples, sans pièce mobile ou capot à rabattre, ils présentent une structure relativement simple et sont très robustes et endurants.Note that the
Le train de pose 2 comprend, outre le portique télescopique 3 et le wagon plat 5 de tête déjà mentionné, des wagons complémentaires 15 pour assurer l'approvisionnement en traverses neuves 7b, et un portique-navette 12 roulant sur les wagons avec des moyens de manipulation.The laying
Les traverses neuves 7b peuvent être disposées par lots sur des palettes ou directement sur un tapis roulant. Elles sont déposées sur le ballast au fur et à mesure par un outillage de dépose 10, connu en soi, et donc non décrit en détail ici.The
Après la pose des traverses neuves 7b, le portique procède, grâce à des bras de guidage (non représentés, mais connu en soi), à la pose des nouveaux rails 6b, puis à la pose des attaches qui fixent les rails par rapport aux traverses. Ainsi les boggies 50 du train de pose 2 roulent sur une voie réglée et attachée. Le portique du train de pose 2 comprend aussi un outillage de pose des attaches ou de vissage de tirefonds (non représentés).After the laying of the
La jambe support à chenille motorisée du train de pose comprend un bouclier/lame 46 de mise à niveau du ballast, et un moyen de tassement 47, agencé entre la chenille motorisée et la position de l'outillage de dépose 10.The motorized track support leg of the landing gear comprises a shield /
Avantageusement, sur le train de dépose 1, la liaison mécanique entre le portique télescopique 3 et le wagon plat 5 de tête possède un degré de liberté de rotation d'axe vertical A1. Advantageously, on the
De façon analogue, sur le train de pose 2, on prévoit également entre le portique télescopique et le wagon plat de tête possède un degré de liberté de rotation d'axe vertical A2.Similarly, on the
On autorise ainsi un désalignement possible, ce qui est utile pour le traitement des voies en courbe.This allows a possible misalignment, which is useful for the treatment of curved tracks.
Lorsque l'heure limite pour terminer le chantier approche, alors le train de dépose stoppe ses opérations. Le train de pose continue pour le rejoindre afin de minimiser la distance D1 qui sépare leurs extrémités respectives avant 31,32.When the time limit for completing the project approaches, then the dropping train stops its operations. The train of pose continues to join him in order to minimize the distance D1 which separates their respective ends before 31,32 .
En vue de permettre l'évacuation de l'ensemble de rénovation, on procède aux opérations inverses de celles du démarrage du chantier.In order to allow the evacuation of the whole of renovation, one carries out the operations opposite of those of the starting of the building site.
Plus précisément, on procède à la rétractation des portiques télescopiques 3 de part et d'autre sur leur wagon plat 5 respectif par poussée des locotracteurs respectifs situés aux extrémités distantes des trains de pose et dépose. Puis on procède au relevage de la jambe support 4, et enfin on procède au repliement complet de chaque portique télescopique 3 pour qu'il se retrouve entièrement au-dessus du wagon de tête (c'est-à-dire les roulettes arrière 36 au voisinage de l'extrémité arrière 56).More precisely, the
On commence par replier le portique télescopique 3 du train de dépose 1 ; de manière à ce que la chenille du train de pose 2 puisse avancer jusqu'à la limite de l'ancien rail qu'on a tronçonné à cet endroit ; on minimise ainsi le reste à faire en manuel. À ce moment, on procède au repliement du train de pose 2 à l'inverse du dépliement.We start by folding the
Ensuite, il reste une zone de longueur limitée où les traverses manquantes sont rajoutées par des compagnons, les rails neufs sont tronçonnés pour autoriser le raboutage de ces rails aux anciens rails coupés sur la voie, afin de permettre la remise en circulation.Then, there is a limited length area where the missing ties are added by companions, the new rails are cut to allow the splicing of these rails to the old rails cut on the track, to allow the recirculation.
À ce moment, les trains de pose et de dépose peuvent être évacués séparément, ou bien ils peuvent être accouplés pour former un convoi unique à évacuer (
Avantageusement, on prévoit un dispositif de capteur de proximité 61 entre les extrémités avant des deux trains pour éviter un tamponnage. Une alerte visuelle et sonore peut prévenir d'une distance D1 trop faible ; on peut aussi prévoir une intervention sur les moyens de motorisation des chenilles.Advantageously, there is provided a
De plus, avantageusement on prévoit un dispositif de guidage optique, 62,63 de sorte que l'extrémité avant 32 du train de repose puisse être guidée latéralement de manière à ce que la voie nouvelle soit posée à l'endroit exact où était la voie ancienne, tant pour les tronçons en ligne droite que pour les tronçons en courbe.In addition, advantageously an
Il faut noter que sur les figures ne sont pas représentés les outillages de dépose des attaches (agencés sur le portique du train de dépose 1), les outillages de pose des attaches (agencés sur le portique du train de pose 2), et les bras de guidage des rails anciens et des rails neufs.It should be noted that in the figures are not shown the tools for removing the fasteners (arranged on the gantry of the landing gear 1 ), the tools for laying the fasteners (arranged on the gantry of the landing gear 2 ), and the arms guiding old rails and new rails.
Claims (11)
chacun des premier et deuxième trains comprenant un wagon plat (5) et un portique télescopique (3) pouvant s'appuyer sur le wagon et sur une jambe support (4) à chenille, la jambe support étant déplaçable verticalement entre une position de travail et une position de rangement, le portique télescopique étant déplaçable longitudinalement entre une position de travail et une position de rangement,
each of the first and second trains comprising a flat car (5) and a telescopic gantry (3) being able to rest on the wagon and on a caterpillar support leg (4), the support leg being movable vertically between a working position and a storage position, the telescopic gantry being movable longitudinally between a working position and a storage position,
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR1454758A FR3021674A1 (en) | 2014-05-27 | 2014-05-27 | RAILWAY RENOVATION KIT |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2949814A1 true EP2949814A1 (en) | 2015-12-02 |
Family
ID=51483612
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP15169496.5A Withdrawn EP2949814A1 (en) | 2014-05-27 | 2015-05-27 | Assembly for railway track renovation |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP2949814A1 (en) |
FR (1) | FR3021674A1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3150531A1 (en) * | 2023-06-27 | 2025-01-03 | Tth | Work train. |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3604358A (en) * | 1968-09-05 | 1971-09-14 | Plasser Bahnbaumasch Franz | Maintenance apparatus |
US3633513A (en) * | 1967-06-29 | 1972-01-11 | Plasser Bahnbaumasch Franz | Method for replacing an old track by a new track |
US3752332A (en) * | 1970-12-17 | 1973-08-14 | Plasser Bahnbaumasch Franz | Pallet for transporting track ties |
US4236452A (en) | 1978-06-28 | 1980-12-02 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Mobile apparatus for continuously renewing track |
DE3200741A1 (en) * | 1981-01-19 | 1982-08-05 | Schweizerische Aluminium AG, 3965 Chippis | Dual-walled loading pallet |
EP0355240A1 (en) * | 1988-08-18 | 1990-02-28 | Scheuchzer S.A. | Train for renewing a railway track |
-
2014
- 2014-05-27 FR FR1454758A patent/FR3021674A1/en not_active Withdrawn
-
2015
- 2015-05-27 EP EP15169496.5A patent/EP2949814A1/en not_active Withdrawn
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3633513A (en) * | 1967-06-29 | 1972-01-11 | Plasser Bahnbaumasch Franz | Method for replacing an old track by a new track |
US3604358A (en) * | 1968-09-05 | 1971-09-14 | Plasser Bahnbaumasch Franz | Maintenance apparatus |
US3752332A (en) * | 1970-12-17 | 1973-08-14 | Plasser Bahnbaumasch Franz | Pallet for transporting track ties |
US4236452A (en) | 1978-06-28 | 1980-12-02 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft M.B.H. | Mobile apparatus for continuously renewing track |
DE3200741A1 (en) * | 1981-01-19 | 1982-08-05 | Schweizerische Aluminium AG, 3965 Chippis | Dual-walled loading pallet |
EP0355240A1 (en) * | 1988-08-18 | 1990-02-28 | Scheuchzer S.A. | Train for renewing a railway track |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR3150531A1 (en) * | 2023-06-27 | 2025-01-03 | Tth | Work train. |
Also Published As
Publication number | Publication date |
---|---|
FR3021674A1 (en) | 2015-12-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0431092B1 (en) | Process for continuous welding of track sections, and set of wagons especially equipped for its implementation | |
FR2618466A1 (en) | EXCHANGE MACHINE OF TRAVERSES | |
WO2012072921A1 (en) | Method for constructing a railway track | |
EP0245155B1 (en) | Process for carrying out works under railway tracks in operation | |
EP0971071B1 (en) | Method and device for laying railway track elements using a tracked vehicle | |
WO2014080118A1 (en) | Railway rail renewal train and method | |
FR2683235A1 (en) | RAILWAY RENEWAL TRAIN. | |
EP2949814A1 (en) | Assembly for railway track renovation | |
FR2975682A1 (en) | Trolley train for shifting alignment of traffic lane splitter blocks on road in e.g. motorway works, has head and tail trolleys comprising rolling plane formed of bearings on which splitter blocks and guiding units of blocks are rolled | |
CH680865A5 (en) | ||
CH653072A5 (en) | RAILWAY MACHINE FOR LAYING AND DEPOSITING SECTIONS OR ASSEMBLED TRACKS. | |
EP3875342A1 (en) | Method for installing or removing equipment for operating a railway track | |
FR2666599A1 (en) | Method and device for continuous laying and/or replacing of railway tracks | |
WO2015025092A1 (en) | Method for replacing rails and associated railway vehicles | |
CH653071A5 (en) | RAILWAY MACHINE FOR LAYING AND DEPOSITING SECTIONS OR ASSEMBLED TRACKS. | |
EP0467001A1 (en) | Train for laying new tracks and method for their laying using such a train | |
EP4179147B1 (en) | Initial and final methods for laying long rails | |
BE536101A (en) | ||
EP4179148B1 (en) | Method for renewing rails of a railway track with new long rails, and associated work train | |
FR2845701A1 (en) | Railway track laying procedure consists of making up track sections with temporary rails and permanent sleepers and replacing rails after laying | |
WO2024246326A1 (en) | Work train for renewing the ballast and sleepers of a track portion | |
EP0385828A1 (en) | Arrangement for maintaining a track for rail laying portal cranes, and method for laying a track by means of said arrangement | |
FR3017397A1 (en) | METHOD OF RENEWING RAILWAYS IN DENSE ZONE AND REDUCED TEMPLATE | |
FR2564117A1 (en) | METHOD AND APPARATUS FOR RENEWING RAILWAY APPARATUS | |
EP3892775A1 (en) | Carriage for transferring sleepers and associated railway vehicle |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20160527 |
|
RBV | Designated contracting states (corrected) |
Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20170602 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20171013 |