EP2848705B1 - Structure for tuyere section in blast furnace - Google Patents
Structure for tuyere section in blast furnace Download PDFInfo
- Publication number
- EP2848705B1 EP2848705B1 EP13788617.2A EP13788617A EP2848705B1 EP 2848705 B1 EP2848705 B1 EP 2848705B1 EP 13788617 A EP13788617 A EP 13788617A EP 2848705 B1 EP2848705 B1 EP 2848705B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- tuyere
- blowpipe
- furnace
- cooler
- stave
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 239000011449 brick Substances 0.000 description 36
- 239000002184 metal Substances 0.000 description 9
- 229910052751 metal Inorganic materials 0.000 description 9
- 239000000945 filler Substances 0.000 description 7
- 239000000498 cooling water Substances 0.000 description 5
- 238000006073 displacement reaction Methods 0.000 description 5
- 239000011819 refractory material Substances 0.000 description 5
- 230000003247 decreasing effect Effects 0.000 description 3
- 238000004519 manufacturing process Methods 0.000 description 3
- 239000004570 mortar (masonry) Substances 0.000 description 3
- 238000012545 processing Methods 0.000 description 3
- 229910000805 Pig iron Inorganic materials 0.000 description 2
- 229920001971 elastomer Polymers 0.000 description 2
- 238000012423 maintenance Methods 0.000 description 2
- 239000000463 material Substances 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 230000000149 penetrating effect Effects 0.000 description 2
- 239000002893 slag Substances 0.000 description 2
- 238000007664 blowing Methods 0.000 description 1
- 239000000919 ceramic Substances 0.000 description 1
- 239000011248 coating agent Substances 0.000 description 1
- 238000000576 coating method Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 239000000806 elastomer Substances 0.000 description 1
- 238000003780 insertion Methods 0.000 description 1
- 230000037431 insertion Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000006722 reduction reaction Methods 0.000 description 1
- 230000035939 shock Effects 0.000 description 1
- 210000002268 wool Anatomy 0.000 description 1
Images
Classifications
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/16—Tuyéres
- C21B7/163—Blowpipe assembly
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21B—MANUFACTURE OF IRON OR STEEL
- C21B7/00—Blast furnaces
- C21B7/10—Cooling; Devices therefor
- C21B7/106—Cooling of the furnace bottom
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B1/00—Shaft or like vertical or substantially vertical furnaces
- F27B1/10—Details, accessories or equipment specially adapted for furnaces of these types
- F27B1/12—Shells or casings; Supports therefor
- F27B1/14—Arrangements of linings
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B1/00—Shaft or like vertical or substantially vertical furnaces
- F27B1/10—Details, accessories or equipment specially adapted for furnaces of these types
- F27B1/16—Arrangements of tuyeres
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27B—FURNACES, KILNS, OVENS OR RETORTS IN GENERAL; OPEN SINTERING OR LIKE APPARATUS
- F27B1/00—Shaft or like vertical or substantially vertical furnaces
- F27B1/10—Details, accessories or equipment specially adapted for furnaces of these types
- F27B1/24—Cooling arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/04—Casings; Linings; Walls; Roofs characterised by the form, e.g. shape of the bricks or blocks used
- F27D1/045—Bricks for lining cylindrical bodies, e.g. skids, tubes
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D1/00—Casings; Linings; Walls; Roofs
- F27D1/12—Casings; Linings; Walls; Roofs incorporating cooling arrangements
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D9/00—Cooling of furnaces or of charges therein
- F27D2009/0002—Cooling of furnaces
Definitions
- the present invention relates to a structure of a tuyere section of a blast furnace.
- the invention is usable as a tuyere section of a blast furnace including stave coolers around the tuyere section.
- a lot of tuyeres are typically provided at a predetermined height of a furnace body in a blast furnace.
- the tuyeres are respectively connected with blowpipes extending from a bustle pipe disposed around the furnace body. Hot blast is supplied from the blowpipes to the tuyeres and blown through the tuyeres into the furnace (see JP-A-2002-220609 ).
- a tuyere 8 configured to deliver high-temperature air into the furnace is held by a tuyere cooler 9.
- the tuyere cooler 9 is further held by a tuyere holder 10.
- the tuyere holder 10 is fixed to a furnace shell 11 on a periphery of the blast furnace.
- Tuyere bricks 5 are disposed surrounding the tuyere cooler 9.
- the tuyere bricks 5 are formed by combining a plurality of bricks in a manner to surround the tuyere cooler 9.
- Hearth bricks are laid on a bottom of a hearth of the blast furnace.
- a hearth wall on the upper side of the hearth is lined with hearth wall bricks 7.
- the tuyere bricks 5 are installed on the upper side of the hearth wall bricks 7.
- bosh bricks 6 are installed on the upper side of the tuyere bricks 5.
- a stave cooler 1 is disposed between the bosh bricks 6 and the furnace shell 11 and between the hearth wall bricks 7 and the furnace shell 11.
- a stave cooler 1a for the tuyere is disposed between the tuyere bricks 5 and the furnace shell 11.
- stave coolers 1 and 1a a plurality of cooling water pipes are provided. Cooling water is supplied via such cooling water pipeline 15. The stave coolers 1 and 1a are cooled by the cooling water flowing in the cooling water pipes, whereby heat from an inside of the furnace is blocked to protect the furnace shell 11.
- the tuyere 8 and the tuyere cooler 9 surrounded by the tuyere bricks 5 are fixed to the furnace shell 11 through the tuyere holder 10. Since the furnace shell 11 is kept at a low temperature by being cooled by the stave coolers, thermal expansion of the furnace shell 11 is small, so that a position of the tuyere 8 is almost constant.
- the hearth bricks and the hearth wall bricks 7 are heated to a high temperature for storing molten pig iron and slag in the furnace, resulting in thermal expansion. By this thermal expansion, the tuyere bricks 5 installed on the upper side of the hearth wall bricks 7 are pushed upward. In such a structure, the tuyere 8 and the tuyere cooler 9 receive load of upward deformation through the tuyere bricks 5.
- a compressible mortar layer 12 is provided between a lower portion of the tuyere cooler 9 and the tuyere bricks 5.
- the compressible mortar layer 12 is compressed to prevent the pushed tuyere bricks 5 from applying an excessive load onto the tuyere cooler 9.
- a blowpipe 17 is inserted from an outside of the furnace shell 11 into the tuyere holder 10, the tuyere cooler 9 and the tuyere 8.
- the blowpipe 17 is connected to the bustle pipe disposed around the furnace body via the tuyere stock 18. Hot blast is supplied from the bustle pipe through the tuyere stock 18 and the blowpipe 17 to be blown into the furnace body through the tuyere.
- the blowpipe 17 and the tuyere stock 18 are supported by a furnace tower structure (not shown) provided around the furnace body in conjunction with the bustle pipe.
- An end of the blowpipe 17 is formed in a convex spherical surface while an inner connection portion of the tuyere 8 to the blowpipe is formed in a concave spherical surface, thereby defining a spherical joint.
- Connection between the tuyere 8 and the blowpipe 17 by the spherical joint allows mutual displacement of the tuyere 8 and the blowpipe 17 while keeping airtightness therebetween.
- the tuyere 8 is held by the furnace body, namely, the furnace shell 11 through the tuyere cooler 9 and the tuyere holder 10, since it is necessary to maintain a position of the end of the tuyere 8 (i.e., blowing position of hot blast) at a predetermined position inside the furnace body for a proper operation of the blast furnace.
- blowpipe 17 and the bustle pipe are supported independently of the furnace body including the tuyere 8
- the blowpipe 17 and the tuyere 8 are connected by the spherical surface joint. This is because the furnace body is heated to a high temperature to be thermally deformed while the blowpipe 17 through the bustle pipe are supported by the furnace tower structure to be less thermally deformed, resulting in different thermal deformation behavior.
- the bricks 5, 6 and 7 for protection are piled up on an inner side of the stave coolers 1 and 1a in order to block heat shock at the initial blowing-in and prevent damage from molten pig iron and slag in the furnace. Since the tuyere section is provided penetrating a thickness of the tuyere brick 5 and the stave cooler 1a, a distance from the furnace shell 11 to the tuyere 8 is increased, and the blowpipe 17 is accordingly lengthened.
- JP-A-2002-220609 , GB1288531 and US3901539 each disclose tuyere structures for blast furnaces.
- the end of the blowpipe 17 is inserted from the outside of the furnace shell 11 into the tuyere 8, leading to the connection by the spherical surface joint.
- mutual displacement of the blowpipe 17 and the tuyere 8 is allowable while keeping airtightness.
- the spherical surface joint requires a highly accurate processing for forming a spherical surface capable of ensuring airtightness since the airtightness is kept by metal touch connection of the spherical surfaces around an air hole, resulting in an increase in production cost. Moreover, even with such metal touch connection, gas leaks when high pressure is applied.
- the blowpipe 17 is supported in a state of a cantilever. Accordingly, the position of the end of the blowpipe 17 is easily displaced, which may cause difficulty in suitably keeping airtightness of the tuyere 8 to the spherical surface joint.
- the tuyere 8 is disposed on an inner surface of the furnace while being supported by the tuyere cooler 9.
- the tuyere cooler 9 or the tuyere holder 10 is machined for adjustment so that all of the circumferentially arranged tuyeres 8 evenly face the center of the furnace.
- the tuyere 8 and the tuyere cooler 9 supporting the tuyere 8 are surrounded by the bricks 5 for protection and spaced away from the stave coolers 1 and 1a.
- This arrangement may cause thermal deformation of the tuyere cooler 9. Accordingly, the position of the tuyere 8 on the inner surface of the furnace or a posture of the tuyere 8 may be shifted by the thermal deformation.
- An object of the invention is to provide a structure of a tuyere section in a blast furnace, the tuyere section capable of preventing gas leakage and keeping a position of an end of a tuyere at a predetermined position in a furnace body while absorbing a difference in thermal deformation between the furnace body and a bustle pipe.
- a tuyere structure of a blast furnace comprising: a blowpipe comprising: a first flange formed on a periphery of the blowpipe and fixed to a furnace shell; and a second flange formed at an end of the blowpipe; a tuyere fixed to the second flange formed at the end of the blowpipe, the tuyere being inserted in a tuyere opening formed on the furnace shell, the tuyere opening being closed by the first flange; a flexible joint connecting the blowpipe to a tuyere stock; and a stave cooler provided inside the furnace shell around the tuyere and forming an inner surface of the blast furnace.
- the blowpipe is fixed to the furnace shell, the position of the tuyere fixed to the end of the blowpipe relative to the furnace shell, in other words, the position of the end of the tuyere in the furnace body can be kept at a predetermined position.
- the flexible joint since the flexible joint is interposed between the blowpipe and the tuyere stock, the flexible joint can absorb a difference in thermal deformation between the furnace body and the bustle pipe.
- the blowpipe When the distance between the tuyere and the furnace shell to which the blowpipe is fixed is large, the blowpipe may be cantilevered to displace the position of the end of the tuyere.
- the stave cooler directly serves as an inner surface of the furnace, the length of the blowpipe can minimized and displacement of the position of the tuyere can be inhibited.
- an opening for the tuyere is formed on the furnace shell around the tuyere and is connected with an entire periphery of a flange formed on a periphery of the blowpipe.
- a tuyere structure (structure of tuyere section) 20 in the exemplary embodiment includes: a blowpipe 31 fixed to a furnace shell 21; a tuyere 32 fixed to an end of the blowpipe 31; and a flexible joint 34 that connects the blowpipe 31 to a tuyere stock 33.
- a flexible joint in a form of metal bellows is used as the flexible joint 34.
- a flange to which the tuyere is attached is formed at an end of the blowpipe 31.
- the tuyere 32 is fixed to the flange by bolts and the like.
- the blowpipe 31 has a flange at an opposite end from the tuyere 32.
- the flexible joint 34 is connected to this flange.
- the flexible joint 34 has a flange at an opposite end from the blowpipe 31.
- the tuyere stock 33 is connected to this flange.
- An opposite end of the tuyere stock 33 from the flexible joint 34 is connected to a bustle pipe (not shown).
- the blowpipe 31 and the tuyere 32 are supported by the furnace shell 21.
- the tuyere stock 33 and the flexible joint 34 are supported by the bustle pipe (not shown).
- the hot blast can be delivered through the tuyere stock 33, the flexible joint 34 and the blowpipe 31 to the tuyere 32 and can be blown out through the tuyere 32.
- a direction and a position of the tuyere 32 relative to the blowpipe 31 are adjusted in advance so that the direction and the position of the tuyere 32 is set at an appropriate value when the tuyere 32 is disposed in the furnace.
- An tuyere opening 211 (an opening for the tuyere) is formed on the furnace shell 21.
- a flange 311 is formed on a periphery of the blowpipe 31.
- the end (near the tuyere 32) of the blowpipe 31 is inserted from the tuyere opening 211 to an inside of the furnace (left side in the figure), so that the flange 311 closes the tuyere opening 211.
- the flange 311 is fixed to a periphery of the tuyere opening 211 by bolts at a predetermined interval, resulting in airtight connection.
- the blowpipe 31 is fixed to the furnace shell 21.
- a hearth stave-cooler 22 Inside the furnace shell 21, a hearth stave-cooler 22, a tuyere stave-cooler 23 and a bosh stave-cooler 24 are provided.
- the tuyere stave-cooler 23 has a cutout 231 through which the tuyere is inserted.
- the blowpipe 31 and the tuyere 32 inserted inside the furnace shell 21 through the tuyere opening 211 pass through the cutout 231 to be disposed in a manner to be surrounded by the tuyere stave-cooler 23.
- hearth stave-cooler 22 Inside of the hearth stave-cooler 22 is lined with hearth wall bricks 25.
- Refractory blocks e.g., tuyere bricks 5 in Fig. 3
- Refractory blocks 232 and 242 are respectively fit into furnace-interior surfaces (inner surface of the furnace) of the tuyere stave-cooler 23 and the bosh stave-cooler 24.
- a thickness T1 from the furnace shell 21 to the furnace-interior surface is smaller than a thickness T2 (shown in a chain line in the figure) from a furnace shell 11 to the furnace-interior surface in the conventional blast furnace.
- a lever length i.e. the length for the blowpipe 31 and the tuyere 32 penetrating the thickness T1 to be supported in a cantilevered manner
- shifting of the position of the tuyere 32 on the furnace-interior surface is reducible, which is effective for a stable operation.
- the tuyere 32 can be inhibited from being pushed up due to thermal deformation of the refractory blocks.
- the surface of the tuyere stave-cooler 23 defines the furnace-interior surface that is defined in conformity with a profile suitable for the blast furnace. Accordingly, the surface of the tuyere stave-cooler 23 (i.e., the furnace-interior surface) stays at the same level as the surface of the tuyere brick 5 (see Fig. 3 ).
- the thickness of the tuyere section is reduced by positioning the furnace shell 21 close to the furnace-interior surface as compared with the conventional furnace shell 11 (i.e. by decreasing a diameter at the tuyere section of the furnace body).
- a refractory filler 29 (e.g., refractory mortar) is fed between the furnace shell 21 and the stable coolers (i.e. the hearth stave-cooler 22, the tuyere stave-cooler 23 and the bosh stave-cooler 24).
- a seal plate 291 is disposed inside the cutout 231 through which the tuyere is inserted and the tuyere opening 211.
- the seal plate 291 blocks the refractory filler 29 fed inside the furnace shell 21, so that a space defined by the cutout 231, the tuyere opening 211 and the blowpipe 31 is not filled with the filler but kept hollow.
- an elastic refractory material 292 e.g., ceramic wool is interposed between the cutout 231 and the tuyere 32.
- the assembly process of the exemplary embodiment is as follows.
- the furnace shell 21 is built to define an outline of the furnace body. Then, the hearth stave-cooler 22 and the hearth wall brick 25 are installed inside the furnace shell 21. Subsequently, the tuyere stave-cooler 23 and the bosh stave-cooler 24 are installed on the upper side of the hearth stave-cooler 22 and the hearth wall brick 25.
- the refractory material 292 is attached to the inside of the cutout 231 of the tuyere stave-cooler 23 and the seal plate 291 is provided to the inside of the cutout 231 and the tuyere opening 211.
- the tuyere stock 33, the flexible joint 34, the blowpipe 31 and the tuyere 32 are assembled outside of the furnace.
- the assembled tuyere stock 33 and the tuyere 32 are placed in front of the tuyere opening 211 and then the tuyere 32 and the blowpipe 31 are introduced into the furnace.
- the refractory material 292 is interposed between the cutout 231 and the tuyere 32.
- the tuyere 32 and the blowpipe 31 are disposed in the cutout 231, through which the tuyere is inserted, of the tuyere stave-cooler 23. At this time, the tuyere 32 projects from the tuyere stave-cooler 23 to the inside of the furnace.
- the refractory filler 29 is fed inside the furnace shell 21.
- the tuyere 32 can be easily replaced by removing the flexible joint 34 after stopping hot blast supply and subsequently pulling the blowpipe 31 and the tuyere 32 out of the furnace shell 31.
- seal plate 29 for instance, a metallic plate and an elastomer material (e.g., heat-resisting rubber) are usable.
- elastomer material e.g., heat-resisting rubber
- the flexible joint 34 is interposed between the blowpipe 31 and the tuyere stock 33, the flexible joint can absorb a difference in thermal deformation between the furnace body and the bustle pipe.
- the tuyere stave-cooler 23 is provided around the tuyere 32 inside the furnace shell 21 and defines the furnace-interior surface, conventionally required tuyere bricks can be omitted, thereby decreasing the thickness of the furnace body by the thickness of the tuyere bricks, so that a distance between the furnace shell 21 to which the blowpipe 31 is fixed and the tuyere 32 can be reduced.
- the blowpipe 31 may be cantilevered to cause a large displacement of the position of the tuyere 32.
- the conventionally required tuyere bricks see Fig. 3
- the tuyere stave cooler 23 directly serves as the furnace-interior surface
- the blowpipe 31 can be fixed to the furnace shell 21 at a predetermined posture and gas leakage from the tuyere opening 211 also can be prevented.
- the blowpipe 31 and the tuyere 32 are disposed substantially orthogonal to the furnace shell 21, the tuyere 32 is often inclined down toward the hearth in practical use. Accordingly, the tuyere 32 may be attached to the blowpipe 31 in an inclined manner, or the blowpipe 31 may be fixed to the furnace shell 21 in an inclined manner.
- the end of the blowpipe 31 is bent toward the hearth and the tuyere 32 connected to the end is inclined toward the hearth.
- the cutout 231 formed in the tuyere stave-cooler 23 is also formed in an inclined manner. Note that the other arrangements in the exemplary embodiment shown in Fig. 2 are the same as those in exemplary embodiment of Fig. 1 .
- the refractory blocks 232 and 242 are respectively provided to the tuyere stave-cooler 23 and the bosh stave-cooler 24 for protection of the surfaces thereof.
- the arrangement of the refractory blocks 232 and 242 is not limited to such an intermittent arrangement, but may be disposed continuously to each other.
- the refractory blocks 232 and 242 may be omitted when the surfaces of the stave coolers 23 and 24 can be sufficiently protected by a protection layer formed by a refractory material coating and the like over the surfaces of the stave coolers 23 and 24.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Manufacturing & Machinery (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Blast Furnaces (AREA)
- Furnace Housings, Linings, Walls, And Ceilings (AREA)
Description
- The present invention relates to a structure of a tuyere section of a blast furnace. Particularly, the invention is usable as a tuyere section of a blast furnace including stave coolers around the tuyere section.
- A lot of tuyeres are typically provided at a predetermined height of a furnace body in a blast furnace. The tuyeres are respectively connected with blowpipes extending from a bustle pipe disposed around the furnace body. Hot blast is supplied from the blowpipes to the tuyeres and blown through the tuyeres into the furnace (see
JP-A-2002-220609 - In a typical tuyere section of a blast furnace, as shown in
Fig. 3 , atuyere 8 configured to deliver high-temperature air into the furnace is held by atuyere cooler 9. Thetuyere cooler 9 is further held by atuyere holder 10. Thetuyere holder 10 is fixed to afurnace shell 11 on a periphery of the blast furnace. -
Tuyere bricks 5 are disposed surrounding thetuyere cooler 9. Thetuyere bricks 5 are formed by combining a plurality of bricks in a manner to surround thetuyere cooler 9. Hearth bricks are laid on a bottom of a hearth of the blast furnace. A hearth wall on the upper side of the hearth is lined withhearth wall bricks 7. Thetuyere bricks 5 are installed on the upper side of thehearth wall bricks 7. Further,bosh bricks 6 are installed on the upper side of thetuyere bricks 5. - A
stave cooler 1 is disposed between thebosh bricks 6 and thefurnace shell 11 and between thehearth wall bricks 7 and thefurnace shell 11. Astave cooler 1a for the tuyere is disposed between thetuyere bricks 5 and thefurnace shell 11. - In the
stave coolers cooling water pipeline 15. Thestave coolers furnace shell 11. - The
tuyere 8 and thetuyere cooler 9 surrounded by thetuyere bricks 5 are fixed to thefurnace shell 11 through thetuyere holder 10. Since thefurnace shell 11 is kept at a low temperature by being cooled by the stave coolers, thermal expansion of thefurnace shell 11 is small, so that a position of thetuyere 8 is almost constant. On the other hand, the hearth bricks and thehearth wall bricks 7 are heated to a high temperature for storing molten pig iron and slag in the furnace, resulting in thermal expansion. By this thermal expansion, thetuyere bricks 5 installed on the upper side of thehearth wall bricks 7 are pushed upward. In such a structure, thetuyere 8 and thetuyere cooler 9 receive load of upward deformation through thetuyere bricks 5. - For this reason, a
compressible mortar layer 12 is provided between a lower portion of thetuyere cooler 9 and thetuyere bricks 5. When thetuyere bricks 5 are pushed upward by the thermal expansion of thehearth wall bricks 7, thecompressible mortar layer 12 is compressed to prevent the pushedtuyere bricks 5 from applying an excessive load onto thetuyere cooler 9. - A
blowpipe 17 is inserted from an outside of thefurnace shell 11 into thetuyere holder 10, thetuyere cooler 9 and thetuyere 8. Theblowpipe 17 is connected to the bustle pipe disposed around the furnace body via thetuyere stock 18. Hot blast is supplied from the bustle pipe through thetuyere stock 18 and theblowpipe 17 to be blown into the furnace body through the tuyere. - The
blowpipe 17 and thetuyere stock 18 are supported by a furnace tower structure (not shown) provided around the furnace body in conjunction with the bustle pipe. An end of theblowpipe 17 is formed in a convex spherical surface while an inner connection portion of thetuyere 8 to the blowpipe is formed in a concave spherical surface, thereby defining a spherical joint. Connection between thetuyere 8 and theblowpipe 17 by the spherical joint allows mutual displacement of thetuyere 8 and theblowpipe 17 while keeping airtightness therebetween. - In the above structure shown in
Fig. 3 , thetuyere 8 is held by the furnace body, namely, thefurnace shell 11 through thetuyere cooler 9 and thetuyere holder 10, since it is necessary to maintain a position of the end of the tuyere 8 (i.e., blowing position of hot blast) at a predetermined position inside the furnace body for a proper operation of the blast furnace. - While the
blowpipe 17 and the bustle pipe are supported independently of the furnace body including thetuyere 8, theblowpipe 17 and thetuyere 8 are connected by the spherical surface joint. This is because the furnace body is heated to a high temperature to be thermally deformed while theblowpipe 17 through the bustle pipe are supported by the furnace tower structure to be less thermally deformed, resulting in different thermal deformation behavior. - The
bricks stave coolers tuyere brick 5 and thestave cooler 1a, a distance from thefurnace shell 11 to thetuyere 8 is increased, and theblowpipe 17 is accordingly lengthened. -
- When the spherical surface joint is used for connection between the
blowpipe 17 and thetuyere 8 as described above, the end of theblowpipe 17 is inserted from the outside of thefurnace shell 11 into thetuyere 8, leading to the connection by the spherical surface joint. In the connected spherical surface joint, mutual displacement of theblowpipe 17 and thetuyere 8 is allowable while keeping airtightness. - However, the spherical surface joint requires a highly accurate processing for forming a spherical surface capable of ensuring airtightness since the airtightness is kept by metal touch connection of the spherical surfaces around an air hole, resulting in an increase in production cost. Moreover, even with such metal touch connection, gas leaks when high pressure is applied.
- Particularly, since the distance from the
furnace shell 11 to thetuyere 8 is long and theblowpipe 17 is formed longer by the distance, theblowpipe 17 is supported in a state of a cantilever. Accordingly, the position of the end of theblowpipe 17 is easily displaced, which may cause difficulty in suitably keeping airtightness of thetuyere 8 to the spherical surface joint. - Further, the
tuyere 8 is disposed on an inner surface of the furnace while being supported by thetuyere cooler 9. In a typical arrangement of thetuyere 8, thetuyere cooler 9 or thetuyere holder 10 is machined for adjustment so that all of the circumferentially arrangedtuyeres 8 evenly face the center of the furnace. - However, the
tuyere 8 and thetuyere cooler 9 supporting thetuyere 8 are surrounded by thebricks 5 for protection and spaced away from thestave coolers tuyere cooler 9. Accordingly, the position of thetuyere 8 on the inner surface of the furnace or a posture of thetuyere 8 may be shifted by the thermal deformation. - When the position of the
tuyere 8 on the inner surface of the furnace is shifted, uniformity in the circumferential direction of a raceway inside the furnace, which is crucial for the operation of the blast furnace, is broken, so that a stable operation (e.g., reduction reaction and stock movement) cannot be obtained. - An object of the invention is to provide a structure of a tuyere section in a blast furnace, the tuyere section capable of preventing gas leakage and keeping a position of an end of a tuyere at a predetermined position in a furnace body while absorbing a difference in thermal deformation between the furnace body and a bustle pipe.
- According to the invention there is a tuyere structure of a blast furnace, comprising: a blowpipe comprising: a first flange formed on a periphery of the blowpipe and fixed to a furnace shell; and a second flange formed at an end of the blowpipe; a tuyere fixed to the second flange formed at the end of the blowpipe, the tuyere being inserted in a tuyere opening formed on the furnace shell, the tuyere opening being closed by the first flange; a flexible joint connecting the blowpipe to a tuyere stock; and a stave cooler provided inside the furnace shell around the tuyere and forming an inner surface of the blast furnace.
- With this arrangement, since the tuyere is fixed to the end of the blowpipe, metal touch connection between the tuyere and the blowpipe can be eliminated. Accordingly, the spherical surface processing required for the metal touch connection can be eliminated to reduce the production cost. Moreover, gas leakage caused by the metal touch connection can be prevented.
- Furthermore, since the blowpipe is fixed to the furnace shell, the position of the tuyere fixed to the end of the blowpipe relative to the furnace shell, in other words, the position of the end of the tuyere in the furnace body can be kept at a predetermined position.
- In addition, since the flexible joint is interposed between the blowpipe and the tuyere stock, the flexible joint can absorb a difference in thermal deformation between the furnace body and the bustle pipe.
- With this arrangement, gas leakage can be prevented and the position of the end of the tuyere can be kept at the predetermined position in the furnace body while the difference in thermal deformation between the furnace body and the bustle pipe is absorbed.
- When the distance between the tuyere and the furnace shell to which the blowpipe is fixed is large, the blowpipe may be cantilevered to displace the position of the end of the tuyere. In contrast, in the above aspect of the invention, since conventional tuyere bricks are omitted and the stave cooler directly serves as an inner surface of the furnace, the length of the blowpipe can minimized and displacement of the position of the tuyere can be inhibited.
- In the above aspect of the invention, it is preferable that an opening for the tuyere is formed on the furnace shell around the tuyere and is connected with an entire periphery of a flange formed on a periphery of the blowpipe.
- When the flange is attached to the opening for the tuyere, it is desirable to use bolts disposed on the flange at a predetermined interval for the convenience of attachment and detachment for maintenance.
-
-
Fig. 1 is a cross-sectional view showing an exemplary embodiment of the invention. -
Fig. 2 is a cross-sectional view showing another exemplary embodiment of the invention. -
Fig. 3 is a cross-sectional view showing a conventional example. - An exemplary embodiment of the invention will be described below with reference to the drawings.
- As shown in
Fig. 1 , a tuyere structure (structure of tuyere section) 20 in the exemplary embodiment includes: ablowpipe 31 fixed to afurnace shell 21; atuyere 32 fixed to an end of theblowpipe 31; and a flexible joint 34 that connects theblowpipe 31 to atuyere stock 33. - Since high-temperature and high-pressure hot blast to be supplied into the blast furnace passes through an inside of the flexible joint 34, a flexible joint in a form of metal bellows is used as the flexible joint 34.
- A flange to which the tuyere is attached is formed at an end of the
blowpipe 31. Thetuyere 32 is fixed to the flange by bolts and the like. - The
blowpipe 31 has a flange at an opposite end from thetuyere 32. The flexible joint 34 is connected to this flange. The flexible joint 34 has a flange at an opposite end from theblowpipe 31. Thetuyere stock 33 is connected to this flange. An opposite end of thetuyere stock 33 from the flexible joint 34 is connected to a bustle pipe (not shown). - The
blowpipe 31 and thetuyere 32 are supported by thefurnace shell 21. Thetuyere stock 33 and the flexible joint 34 are supported by the bustle pipe (not shown). By supplying hot blast from the bustle pipe, the hot blast can be delivered through thetuyere stock 33, the flexible joint 34 and theblowpipe 31 to thetuyere 32 and can be blown out through thetuyere 32. - Note that a direction and a position of the
tuyere 32 relative to theblowpipe 31 are adjusted in advance so that the direction and the position of thetuyere 32 is set at an appropriate value when thetuyere 32 is disposed in the furnace. - An tuyere opening 211 (an opening for the tuyere) is formed on the
furnace shell 21. Aflange 311 is formed on a periphery of theblowpipe 31. - The end (near the tuyere 32) of the
blowpipe 31 is inserted from thetuyere opening 211 to an inside of the furnace (left side in the figure), so that theflange 311 closes thetuyere opening 211. - The
flange 311 is fixed to a periphery of thetuyere opening 211 by bolts at a predetermined interval, resulting in airtight connection. - By the connection between the
flange 311 and the periphery of thetuyere opening 211, theblowpipe 31 is fixed to thefurnace shell 21. - Inside the
furnace shell 21, a hearth stave-cooler 22, a tuyere stave-cooler 23 and a bosh stave-cooler 24 are provided. - The tuyere stave-
cooler 23 has acutout 231 through which the tuyere is inserted. Theblowpipe 31 and thetuyere 32 inserted inside thefurnace shell 21 through thetuyere opening 211 pass through thecutout 231 to be disposed in a manner to be surrounded by the tuyere stave-cooler 23. - Inside of the hearth stave-
cooler 22 is lined withhearth wall bricks 25. - Refractory blocks (e.g.,
tuyere bricks 5 inFig. 3 ) are not provided inside the tuyere stave-cooler 23 and the bosh stave-cooler 24. Instead,refractory blocks cooler 23 and the bosh stave-cooler 24. - By using the tuyere stave-
cooler 23, in the exemplary embodiment, a thickness T1 from thefurnace shell 21 to the furnace-interior surface is smaller than a thickness T2 (shown in a chain line in the figure) from afurnace shell 11 to the furnace-interior surface in the conventional blast furnace. - When the thickness T1 from the
furnace shell 21 to the furnace-interior surface is decreased, a lever length (i.e. the length for theblowpipe 31 and thetuyere 32 penetrating the thickness T1 to be supported in a cantilevered manner) can be reduced. Accordingly, shifting of the position of thetuyere 32 on the furnace-interior surface is reducible, which is effective for a stable operation. - Moreover, by replacing the refractory blocks provided inside the furnace (e.g.,
tuyere bricks 5 inFig. 3 ) with the tuyere stave-cooler 23, thetuyere 32 can be inhibited from being pushed up due to thermal deformation of the refractory blocks. - In the exemplary embodiment, the surface of the tuyere stave-
cooler 23 defines the furnace-interior surface that is defined in conformity with a profile suitable for the blast furnace. Accordingly, the surface of the tuyere stave-cooler 23 (i.e., the furnace-interior surface) stays at the same level as the surface of the tuyere brick 5 (seeFig. 3 ). In the exemplary embodiment, the thickness of the tuyere section is reduced by positioning thefurnace shell 21 close to the furnace-interior surface as compared with the conventional furnace shell 11 (i.e. by decreasing a diameter at the tuyere section of the furnace body). - A refractory filler 29 (e.g., refractory mortar) is fed between the
furnace shell 21 and the stable coolers (i.e. the hearth stave-cooler 22, the tuyere stave-cooler 23 and the bosh stave-cooler 24). - A
seal plate 291 is disposed inside thecutout 231 through which the tuyere is inserted and thetuyere opening 211. Theseal plate 291 blocks therefractory filler 29 fed inside thefurnace shell 21, so that a space defined by thecutout 231, thetuyere opening 211 and theblowpipe 31 is not filled with the filler but kept hollow. - On the other hand, an elastic refractory material 292 (e.g., ceramic wool) is interposed between the
cutout 231 and thetuyere 32. - The assembly process of the exemplary embodiment is as follows.
- Firstly, the
furnace shell 21 is built to define an outline of the furnace body. Then, the hearth stave-cooler 22 and thehearth wall brick 25 are installed inside thefurnace shell 21. Subsequently, the tuyere stave-cooler 23 and the bosh stave-cooler 24 are installed on the upper side of the hearth stave-cooler 22 and thehearth wall brick 25. - Herein, the
refractory material 292 is attached to the inside of thecutout 231 of the tuyere stave-cooler 23 and theseal plate 291 is provided to the inside of thecutout 231 and thetuyere opening 211. - Next, the
tuyere stock 33, the flexible joint 34, theblowpipe 31 and thetuyere 32 are assembled outside of the furnace. The assembledtuyere stock 33 and thetuyere 32 are placed in front of thetuyere opening 211 and then thetuyere 32 and theblowpipe 31 are introduced into the furnace. - Then, the
refractory material 292 is interposed between thecutout 231 and thetuyere 32. Thetuyere 32 and theblowpipe 31 are disposed in thecutout 231, through which the tuyere is inserted, of the tuyere stave-cooler 23. At this time, thetuyere 32 projects from the tuyere stave-cooler 23 to the inside of the furnace. - In this state, the
flange 311 of theblowpipe 31 is fixed to the periphery of thetuyere opening 211. - After the above process, the
refractory filler 29 is fed inside thefurnace shell 21. - The construction of the tuyere structure is thus completed.
- Since the
refractory filler 29 fed inside thefurnace shell 21 is blocked by theseal plate 291 inside thecutout 231 and thetuyere opening 211, the surroundings of theblowpipe 31 are left without being filled with therefractory filler 29. - By securing this space, when the tuyere is damaged during the operation, the
tuyere 32 can be easily replaced by removing the flexible joint 34 after stopping hot blast supply and subsequently pulling theblowpipe 31 and thetuyere 32 out of thefurnace shell 31. - As the
seal plate 291, for instance, a metallic plate and an elastomer material (e.g., heat-resisting rubber) are usable. - According the exemplary embodiment, the following advantages are obtainable.
- Since the
tuyere 32 is fixed to the end of theblowpipe 31, a conventionally employed metal touch connection between thetuyere 32 and theblowpipe 31 can be eliminated. Accordingly, the spherical surface processing required for the metal touch connection can be eliminated to decrease the production cost. Moreover, gas leakage caused by the metal touch connection can be prevented. - Moreover, since the
blowpipe 31 is fixed to thefurnace shell 21, the position of thetuyere 32 fixed to the end of theblowpipe 31 relative to thefurnace shell 21, in other words, the position of the end of thetuyere 32 in the furnace body can be kept at a predetermined position. - In addition, since the flexible joint 34 is interposed between the
blowpipe 31 and thetuyere stock 33, the flexible joint can absorb a difference in thermal deformation between the furnace body and the bustle pipe. - With this arrangement, gas leakage can be prevented and the position of the end of the
tuyere 32 can be kept at a predetermined position in the furnace body while a difference in thermal deformation between the furnace body and the bustle pipe can be absorbed. - Since the tuyere stave-
cooler 23 is provided around thetuyere 32 inside thefurnace shell 21 and defines the furnace-interior surface, conventionally required tuyere bricks can be omitted, thereby decreasing the thickness of the furnace body by the thickness of the tuyere bricks, so that a distance between thefurnace shell 21 to which theblowpipe 31 is fixed and thetuyere 32 can be reduced. - When the distance between the
tuyere 32 and thefurnace shell 21 to which theblowpipe 31 is fixed is large, theblowpipe 31 may be cantilevered to cause a large displacement of the position of thetuyere 32. In contrast, in the exemplary embodiment, since the conventionally required tuyere bricks (seeFig. 3 ) are omitted and the tuyere stave cooler 23 directly serves as the furnace-interior surface, the length of theblowpipe 31 can be minimized and displacement of the position of thetuyere 32 can be inhibited. - Since the
tuyere opening 211 is formed on thefurnace shell 21 around thetuyere 32 and the entire periphery of theflange 311 formed on the periphery of theblowpipe 31 is connected to thetuyere opening 211, theblowpipe 31 can be fixed to thefurnace shell 21 at a predetermined posture and gas leakage from thetuyere opening 211 also can be prevented. - For connection between the
flange 311 and thetuyere opening 211, since the bolts disposed on theflange 311 at a predetermined interval are used, the attachment and detachment for maintenance can easily be conducted. - The invention is not limited to the above embodiment but includes other embodiments or modifications or the like without departing from an object of the invention.
- For instance, although the
blowpipe 31 and thetuyere 32 are disposed substantially orthogonal to thefurnace shell 21, thetuyere 32 is often inclined down toward the hearth in practical use. Accordingly, thetuyere 32 may be attached to theblowpipe 31 in an inclined manner, or theblowpipe 31 may be fixed to thefurnace shell 21 in an inclined manner. - For instance, in another exemplary embodiment shown in
Fig. 2 , the end of theblowpipe 31 is bent toward the hearth and thetuyere 32 connected to the end is inclined toward the hearth. For insertion of theinclined tuyere 32, thecutout 231 formed in the tuyere stave-cooler 23 is also formed in an inclined manner. Note that the other arrangements in the exemplary embodiment shown inFig. 2 are the same as those in exemplary embodiment ofFig. 1 . - In order to use the surfaces of the tuyere stave-
cooler 23 and the bosh stave-cooler 24 as the furnace-interior surface, therefractory blocks cooler 23 and the bosh stave-cooler 24 for protection of the surfaces thereof. However, the arrangement of therefractory blocks refractory blocks coolers coolers - It should be understood that specific shape, material size and the like in the exemplary embodiment may be altered as needed in implementation of the invention.
-
- 20...a tuyere structure
- 21...furnace shell
- 211...tuyere opening
- 22...hearth stave-cooler
- 23...tuyere stave-cooler
- 231...cutout
- 232...refractory block
- 24...bosh stave-cooler
- 25...hearth wall brick
- 29...refractory filler
- 291...seal plate
- 292...refractory material
- 31...blowpipe
- 311...flange
- 32...tuyere
- 33...tuyere stock
- 34...flexible joint
Claims (2)
- A tuyere structure (20) of a blast furnace, comprising:a blowpipe (31) comprising:a first flange (311) formed on a periphery of the blowpipe (31) and fixed to a furnace shell (21); anda second flange formed at an end of the blowpipe (31);a tuyere (32) fixed to the second flange formed at the end of the blowpipe (31), the tuyere (32) being inserted in a tuyere opening (211) formed on the furnace shell (21), the tuyere opening (211) being closed by the first flange (311);a flexible joint (34) connecting the blowpipe (31) to a tuyere stock (33); anda stave cooler (23) provided inside the furnace shell (21) around the tuyere (32) and forming an inner surface of the blast furnace.
- The tuyere structure (20) of the blast furnace according to claim 1, wherein the tuyere opening (211) is formed on the furnace shell (21) around the tuyere (32) and is connected with an entire periphery of the first flange (311) formed on the periphery of the blowpipe (31).
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2012110071 | 2012-05-11 | ||
PCT/JP2013/063139 WO2013168784A1 (en) | 2012-05-11 | 2013-05-10 | Structure for tuyere section in blast furnace |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2848705A1 EP2848705A1 (en) | 2015-03-18 |
EP2848705A4 EP2848705A4 (en) | 2016-01-20 |
EP2848705B1 true EP2848705B1 (en) | 2019-03-20 |
Family
ID=49550816
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13788617.2A Active EP2848705B1 (en) | 2012-05-11 | 2013-05-10 | Structure for tuyere section in blast furnace |
Country Status (7)
Country | Link |
---|---|
EP (1) | EP2848705B1 (en) |
JP (1) | JP5702889B2 (en) |
KR (1) | KR101789558B1 (en) |
CN (1) | CN104271774A (en) |
BR (1) | BR112014028084B8 (en) |
RU (1) | RU2563069C1 (en) |
WO (1) | WO2013168784A1 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP7133948B2 (en) * | 2018-03-06 | 2022-09-09 | 黒崎播磨株式会社 | Tuyere installation structure |
CN108642254B (en) * | 2018-06-30 | 2024-04-02 | 中国航空工业标准件制造有限责任公司 | Methanol cracking generating device |
FI4214337T3 (en) * | 2020-09-15 | 2024-12-13 | Arcelormittal | Device to inject a reducing gas into a shaft furnace |
EP4214339A1 (en) * | 2020-09-15 | 2023-07-26 | ArcelorMittal | Blast furnace for ironmaking production |
LU102097B1 (en) * | 2020-09-28 | 2022-03-29 | Wurth Paul Sa | Reducing gas injection System |
LU102096B1 (en) | 2020-09-28 | 2022-03-29 | Wurth Paul Sa | Exchangeable cooled nose with ceramic injector passage |
CN115404294B (en) * | 2022-08-30 | 2023-07-18 | 中国一冶集团有限公司 | Blast furnace tuyere large sleeve mounting and aligning device |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4830804Y1 (en) * | 1969-02-25 | 1973-09-20 |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU213050A1 (en) * | 1965-07-10 | 1978-02-15 | Всесоюзный научно-исследовательский и проектно-конструкторский институт металлургического машиностроения | Blast furnace tuyere device |
DE7000816U (en) * | 1970-01-13 | 1970-05-21 | Thyssen Huette Ag | MULTI-PIECE THINSTOCK |
NL169756C (en) * | 1972-09-01 | 1982-08-16 | Estel Hoogovens Bv | COMPENSATOR SECTION FOR A HOTWIND PIPE. |
JPS53137106U (en) * | 1977-04-05 | 1978-10-30 | ||
JPS6082446U (en) * | 1983-11-10 | 1985-06-07 | 川崎製鉄株式会社 | Blast furnace branch pipe |
GB8704407D0 (en) * | 1987-02-25 | 1987-04-01 | Davy Mckee Stockton | Tuyere stock |
LU87504A1 (en) * | 1989-04-21 | 1990-12-11 | Wurth Paul Sa | DEVICE FOR INJECTING PREHEATED AIR IN A TANK OVEN |
US5209657A (en) * | 1990-11-09 | 1993-05-11 | Paul Wurth S.A. | Device for injecting preheated air into a shaft furnace and process of manufacturing ball-and-socket joints |
JP2002220609A (en) | 2001-01-29 | 2002-08-09 | Nippon Steel Corp | Stave cooler and stave body on tuyere part of furnace |
CN201400691Y (en) * | 2009-05-19 | 2010-02-10 | 鞍山钢铁集团公司 | Blast furnace taphole drilling machine wind pressure transmission distributor |
IN2012DN02717A (en) * | 2009-09-29 | 2015-09-11 | Nippon Steel & Sumitomo Metal Corp | |
CN102206721B (en) * | 2011-07-08 | 2012-10-17 | 中国十九冶集团有限公司 | Blast furnace tuyere equipment installation method |
-
2013
- 2013-05-10 BR BR112014028084A patent/BR112014028084B8/en active IP Right Grant
- 2013-05-10 KR KR1020147031978A patent/KR101789558B1/en active Active
- 2013-05-10 CN CN201380024254.0A patent/CN104271774A/en active Pending
- 2013-05-10 JP JP2014514755A patent/JP5702889B2/en active Active
- 2013-05-10 RU RU2014150065/02A patent/RU2563069C1/en active
- 2013-05-10 EP EP13788617.2A patent/EP2848705B1/en active Active
- 2013-05-10 WO PCT/JP2013/063139 patent/WO2013168784A1/en active Application Filing
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS4830804Y1 (en) * | 1969-02-25 | 1973-09-20 |
Also Published As
Publication number | Publication date |
---|---|
EP2848705A1 (en) | 2015-03-18 |
EP2848705A4 (en) | 2016-01-20 |
CN104271774A (en) | 2015-01-07 |
KR101789558B1 (en) | 2017-11-20 |
BR112014028084B1 (en) | 2023-01-24 |
RU2563069C1 (en) | 2015-09-20 |
BR112014028084A2 (en) | 2017-06-27 |
JPWO2013168784A1 (en) | 2016-01-07 |
JP5702889B2 (en) | 2015-04-15 |
BR112014028084B8 (en) | 2023-04-18 |
WO2013168784A1 (en) | 2013-11-14 |
KR20150009545A (en) | 2015-01-26 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2848705B1 (en) | Structure for tuyere section in blast furnace | |
JP5194504B2 (en) | Apparatus for injecting gas reducing material into blast furnace and operating method of blast furnace using the same | |
KR101492483B1 (en) | System of leaktight connection between a tuyere and a hot blast inlet nozzle for a shaft furnace, and steel-making blast furnace comprising such a system | |
JP3023209B2 (en) | Equipment for blowing preheated air into the blast furnace | |
JP5862617B2 (en) | Blast furnace tuyere structure | |
CN213895902U (en) | Blast furnace tuyere belt structure | |
JPS62267405A (en) | Method for absorbing thermal expansion of high-temperature and high-pressure piping | |
KR20230075425A (en) | Reducing gas injection system | |
KR20130002774A (en) | Apparatus for pulverized coal injection of blast furnace | |
EA044816B1 (en) | REDUCING GAS INPUT SYSTEM | |
CN111910035A (en) | Quick furnace cooling method of improved top combustion type hot blast furnace | |
CN207702995U (en) | A kind of stove water cooling ceramic welding rifle | |
CN214830447U (en) | Temporary cooling and purging device for hot blast furnace shell at hot blast outlet | |
KR101555140B1 (en) | Method and apparatus for repairing a cooling pipes in blast furnace | |
JP4238141B2 (en) | Method of inserting cooling member into blast furnace | |
CN208776760U (en) | Air supply device expansion joint and its expanded joint structure | |
JP2024160578A (en) | Blast furnace cooling structure | |
KR0149398B1 (en) | Blast connection of a furnace | |
JP2023157171A (en) | Method of constructing a hot air stove and hot air stove | |
RU2359042C1 (en) | Device for feeding of natural gas into blast furnace | |
CN201074237Y (en) | High furnace blasting branch tube low-temperature compensator | |
KR20100127632A (en) | Pulverized coal blowing device | |
JP2004027336A (en) | Rise tube structure of blast furnace body and method for absorbing expansion of blast furnace body |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20141113 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
RA4 | Supplementary search report drawn up and despatched (corrected) |
Effective date: 20151223 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: C21B 7/10 20060101ALI20151217BHEP Ipc: F27B 1/24 20060101ALI20151217BHEP Ipc: C21B 7/16 20060101AFI20151217BHEP Ipc: F27D 1/12 20060101ALI20151217BHEP Ipc: F27D 9/00 20060101ALN20151217BHEP Ipc: F27B 1/16 20060101ALI20151217BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180607 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R079 Ref document number: 602013052652 Country of ref document: DE Free format text: PREVIOUS MAIN CLASS: C21B0007160000 Ipc: F27B0001140000 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: F27D 1/04 20060101ALI20180920BHEP Ipc: F27B 1/24 20060101ALI20180920BHEP Ipc: C21B 7/16 20060101ALI20180920BHEP Ipc: F27B 1/16 20060101ALI20180920BHEP Ipc: C21B 7/10 20060101ALI20180920BHEP Ipc: F27D 9/00 20060101ALI20180920BHEP Ipc: F27D 1/12 20060101ALI20180920BHEP Ipc: F27B 1/14 20060101AFI20180920BHEP |
|
INTG | Intention to grant announced |
Effective date: 20181008 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602013052652 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 1110975 Country of ref document: AT Kind code of ref document: T Effective date: 20190415 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: FP |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190620 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190621 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190620 Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1110975 Country of ref document: AT Kind code of ref document: T Effective date: 20190320 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PK Free format text: BERICHTIGUNGEN |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190720 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
RIN2 | Information on inventor provided after grant (corrected) |
Inventor name: ISHIKAWA HIRONOBU Inventor name: KITAGAWA TOSHIYA Inventor name: FURUTACHI SHOJI |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190720 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
RAP2 | Party data changed (patent owner data changed or rights of a patent transferred) |
Owner name: NIPPON STEEL PLANT DESIGNING CORPORATION Owner name: NIPPON STEEL ENGINEERING CO., LTD. |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602013052652 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602013052652 Country of ref document: DE Owner name: NIPPON STEEL CORPORATION, JP Free format text: FORMER OWNERS: NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD., TOKYO, JP; NS PLANT DESIGNING CORP., KITAKYUSHU-SHI, FUKUOKA, JP Ref country code: DE Ref legal event code: R081 Ref document number: 602013052652 Country of ref document: DE Owner name: NIPPON STEEL ENGINEERING CO., LTD., JP Free format text: FORMER OWNERS: NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD., TOKYO, JP; NS PLANT DESIGNING CORP., KITAKYUSHU-SHI, FUKUOKA, JP Ref country code: DE Ref legal event code: R081 Ref document number: 602013052652 Country of ref document: DE Owner name: NIPPON STEEL PLANT DESIGNING CORPORATION, KITA, JP Free format text: FORMER OWNERS: NIPPON STEEL & SUMIKIN ENGINEERING CO., LTD., TOKYO, JP; NS PLANT DESIGNING CORP., KITAKYUSHU-SHI, FUKUOKA, JP |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20190531 |
|
26N | No opposition filed |
Effective date: 20200102 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: HC Owner name: NIPPON STEEL PLANT DESIGNING CORPORATION; JP Free format text: DETAILS ASSIGNMENT: CHANGE OF OWNER(S), CHANGE OF OWNER(S) NAME; FORMER OWNER NAME: NS PLANT DESIGNING CORPORATION Effective date: 20200225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190520 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R083 Ref document number: 602013052652 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20130510 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20190320 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602013052652 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R081 Ref document number: 602013052652 Country of ref document: DE Owner name: NIPPON STEEL CORPORATION, JP Free format text: FORMER OWNERS: NIPPON STEEL ENGINEERING CO., LTD., TOKYO, JP; NIPPON STEEL PLANT DESIGNING CORPORATION, KITAKYUSHU-SHI, FUKUOKA, JP |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: 732E Free format text: REGISTERED BETWEEN 20240229 AND 20240306 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: LU Payment date: 20240426 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20240415 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20240402 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240328 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 20240328 Year of fee payment: 12 |