EP2825724B1 - Improved production valve - Google Patents
Improved production valve Download PDFInfo
- Publication number
- EP2825724B1 EP2825724B1 EP12871295.7A EP12871295A EP2825724B1 EP 2825724 B1 EP2825724 B1 EP 2825724B1 EP 12871295 A EP12871295 A EP 12871295A EP 2825724 B1 EP2825724 B1 EP 2825724B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- lid
- valve
- carrier
- spring
- shuttle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000004519 manufacturing process Methods 0.000 title claims description 30
- 229930195733 hydrocarbon Natural products 0.000 claims description 11
- 150000002430 hydrocarbons Chemical class 0.000 claims description 11
- 239000004215 Carbon black (E152) Substances 0.000 claims description 9
- 230000002441 reversible effect Effects 0.000 claims description 9
- 238000007789 sealing Methods 0.000 claims description 8
- 230000000670 limiting effect Effects 0.000 claims description 7
- 238000000034 method Methods 0.000 claims description 4
- 230000006835 compression Effects 0.000 claims 3
- 238000007906 compression Methods 0.000 claims 3
- 239000012530 fluid Substances 0.000 description 31
- 230000013011 mating Effects 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 239000004696 Poly ether ether ketone Substances 0.000 description 5
- 229920002530 polyetherether ketone Polymers 0.000 description 5
- 239000000047 product Substances 0.000 description 5
- 230000002829 reductive effect Effects 0.000 description 5
- 230000008901 benefit Effects 0.000 description 4
- 230000000903 blocking effect Effects 0.000 description 4
- 239000000463 material Substances 0.000 description 4
- 230000036961 partial effect Effects 0.000 description 4
- 230000008878 coupling Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000012423 maintenance Methods 0.000 description 3
- 239000007787 solid Substances 0.000 description 3
- XEEYBQQBJWHFJM-UHFFFAOYSA-N Iron Chemical compound [Fe] XEEYBQQBJWHFJM-UHFFFAOYSA-N 0.000 description 2
- 229930040373 Paraformaldehyde Natural products 0.000 description 2
- 230000009471 action Effects 0.000 description 2
- 239000002826 coolant Substances 0.000 description 2
- 125000004122 cyclic group Chemical group 0.000 description 2
- 238000005553 drilling Methods 0.000 description 2
- 239000013536 elastomeric material Substances 0.000 description 2
- 238000011010 flushing procedure Methods 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 150000002739 metals Chemical class 0.000 description 2
- 229920006324 polyoxymethylene Polymers 0.000 description 2
- -1 polytetrafluoroethylene Polymers 0.000 description 2
- 229920001343 polytetrafluoroethylene Polymers 0.000 description 2
- 239000004810 polytetrafluoroethylene Substances 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 239000004576 sand Substances 0.000 description 2
- 230000007704 transition Effects 0.000 description 2
- 229910001369 Brass Inorganic materials 0.000 description 1
- 229920002449 FKM Polymers 0.000 description 1
- 229910000831 Steel Inorganic materials 0.000 description 1
- 239000004809 Teflon Substances 0.000 description 1
- 229920006362 TeflonĀ® Polymers 0.000 description 1
- 230000002159 abnormal effect Effects 0.000 description 1
- 229910045601 alloy Inorganic materials 0.000 description 1
- 239000000956 alloy Substances 0.000 description 1
- 229910052782 aluminium Inorganic materials 0.000 description 1
- XAGFODPZIPBFFR-UHFFFAOYSA-N aluminium Chemical compound [Al] XAGFODPZIPBFFR-UHFFFAOYSA-N 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 239000010951 brass Substances 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 238000009434 installation Methods 0.000 description 1
- 230000002452 interceptive effect Effects 0.000 description 1
- 229910052742 iron Inorganic materials 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 239000007788 liquid Substances 0.000 description 1
- 239000000314 lubricant Substances 0.000 description 1
- 238000005461 lubrication Methods 0.000 description 1
- 229910052755 nonmetal Inorganic materials 0.000 description 1
- 150000002843 nonmetals Chemical class 0.000 description 1
- 229920000642 polymer Polymers 0.000 description 1
- 229920001296 polysiloxane Polymers 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 230000000630 rising effect Effects 0.000 description 1
- 239000002002 slurry Substances 0.000 description 1
- 239000010935 stainless steel Substances 0.000 description 1
- 229910001220 stainless steel Inorganic materials 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000013589 supplement Substances 0.000 description 1
- 229920002994 synthetic fiber Polymers 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B43/00—Methods or apparatus for obtaining oil, gas, water, soluble or meltable materials or a slurry of minerals from wells
- E21B43/12—Methods or apparatus for controlling the flow of the obtained fluid to or in wells
- E21B43/121—Lifting well fluids
- E21B43/126—Adaptations of down-hole pump systems powered by drives outside the borehole, e.g. by a rotary or oscillating drive
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B34/00—Valve arrangements for boreholes or wells
- E21B34/06—Valve arrangements for boreholes or wells in wells
- E21B34/08—Valve arrangements for boreholes or wells in wells responsive to flow or pressure of the fluid obtained
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/05—Flapper valves
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21B—EARTH OR ROCK DRILLING; OBTAINING OIL, GAS, WATER, SOLUBLE OR MELTABLE MATERIALS OR A SLURRY OF MINERALS FROM WELLS
- E21B2200/00—Special features related to earth drilling for obtaining oil, gas or water
- E21B2200/06—Sleeve valves
Definitions
- the present invention relates to fluid flow components and systems using those components.
- the present invention relates to an improved valve with shuttle for use in fluid flow systems.
- downhole production strings including pumps and valves for lifting fluids such as particulate laden liquids and slurries present a maintenance problem.
- both pumps and valves can lose capacity and in cases be rendered inoperative when conditions including fluid conditions and fluid velocities fall outside an intended operating range. Such unintended operating conditions can foul, plug, and damage equipment.
- US2002/174988 describes a tubular tool body for use with a drilling string that allows simultaneous drill string movement and fluid circulation.
- the tool has an internal check valve that opens to allow back flow of drilling fluid that may be displaced from the drill pipe as the pipe is lowered into the well and which prevents standing fluid in the top drive from spilling when the tool is withdrawn.
- Pump pressure applied through the top drive axially moves the check valve against a biasing spring to open a bypass through the wall of the tool to permit forward circulation through the drill string and casing.
- US2012/0037373 describes a system for fracturing a subterranean formation that includes a housing having one or more radially directed ports and a valve within the housing proximate the one or more ports.
- a seat member is interactive with the valve to prevent or retard fluid flow there-through.
- GB2,411,416 describes a fluid flow device having a cylindrical tube body with a through-bore formed therein. At least one bypass port is formed in the body and the device includes a moveable sleeve which moves to define either a flow path between first and second through-bore portions or flow path between the first through-bore portion and the bypass port(s).
- the present invention includes a bypass and/or protection valve with a shuttle useful in flow management and/or related production systems.
- FIG. 1 shows an embodiment of the invention 100 in the form of a schematic diagram.
- a bypass valve 108 is interconnected with a pump 104 via a pump outlet 106.
- the pump includes a pump inlet 102 and the valve includes a valve outlet 110 and a valve spill port 112.
- the inlets, outlets and ports are one or more of a fitting, flange, pipe, or similar fluid conveyance.
- Figure 2 shows a section of a typical downhole production string 200.
- the production string includes the bypass valve 108 interposed between the pump 104 and an upper tubing string 204.
- a casing 208 surrounds one or more of the tubing string, valve, and pump.
- an annulus 206 is formed between the tubing string and the casing.
- a production flow is indicated by an arrow 102 while a backflow is indicated by an arrow 202.
- the bypass valve serves to isolate backflows from one or more of the valve, portions of the valve, and the pump.
- FIG. 3A shows a first bypass valve in a lid open configuration 300A.
- a valve body 302 includes an upper body 304, a middle body 305, and a lower body 306.
- the upper body includes a first through hole 369.
- the first through hole passes through an outlet chamber 366 of an upper adapter 303 and through a lid chamber 364.
- an inner surface of the adapter 367 is threaded.
- the middle body includes a second through hole 371.
- the second through hole passes through a shuttle chamber 362 proximate the lid chamber 364.
- the lower body includes a third through hole 373.
- the third through hole passes through an inlet chamber 365 such that the shuttle chamber is located between the lid chamber and the inlet chamber.
- a spring shoulder such as an annular spring shoulder 344 for supporting a charge spring 308 projects inwardly from a first inner bore of the lower body 372.
- the shoulder extends between the first inner bore of the lower body and a cylindrical spring guide 342.
- the shoulder 344 and the springe guide 342 are portions of a lower adapter 307 forming at least part of the lower body 306.
- an inside surface of the adapter is threaded 348.
- an upper end of the adapter 374 has a reduced outer diameter 376 such that the spring shoulder is formed where the diameter is reduced and the spring guide is formed along the length of the reduced diameter portion of the adapter.
- a portion of the charge spring is located in an annular pocket 363 between the first inner bore of the lower body 372 and the spring guide.
- the lower adapter and lower body are fixed together via screw threads 346.
- the port shown in the spring guide 356 provides a means for flushing the annular pocket 363 in some embodiments. As seen, the port extends between the lower chamber 365 and the annular pocket 363. Action of the spring and/or pressure differentials between the pocket and the lower chamber provide a flushing action operative to remove solids such as sand that may otherwise tend to accumulate in the annular pocket.
- a middle body bore 338 is for receiving a valve shuttle 310.
- the charge spring 308 is for urging the shuttle toward the valve outlet end 399.
- This shuttle urging may be via direct or indirect charge spring contact.
- embodiments utilize direct contact between a shuttle carrier lower end 321 and an upper end of the charge spring 378.
- Other embodiments utilize indirect contact such as via an annular transition ring 352 having an upper face 393 contacting the shuttle carrier lower end and a lower face 354 contacting a charge spring upper end (as shown).
- an inwardly projecting nose 330 includes a stationery seat 332 for engaging a closure 314 encircling a lid carrier upper end 313.
- the seat and closure are configured to meet along a line forming an angle ā ā 90 degrees with respect to a valve centerline y-y. Absent greater opposing forces, the charge spring 308 therefore moves the shuttle 310 until the shuttle closure 314 is stopped against the stationery seat 332.
- Figure 3B shows a lid open embodiment 300B of the valve shuttle of figure 3A .
- An articulated lid 312 is coupled to a lid carrier 320.
- a lid pivot 315 includes a pivot block 326 adapted to be movably coupled to a lid boss 325, for example, an engagement via a pinned connection including a hole in the pivot block 323, a hole in the lid boss 329, and a lid pin 324 for interengaging the holes.
- the lid carrier 320 has one or more distinct circumferential surfaces 309 (several shown).
- a shuttle girth boss 336 defines a circumferential boss surface 337 for aligning the shuttle carrier in the middle body bore 338.
- one or more circumferential seals provide a seal between the lid carrier and the middle body bore.
- grooves in the lid carrier circumference 339, 340 provide means for engaging seals such as groove engaging seals, O-rings and other seals including seals formed from synthetic materials such as Teflon, Viton, PEEK, silicone, and other suitable materials known to skilled artisans.
- the groves provide a means for engaging cylindrical seals such as PEEK seals with a thickness sufficient to substantially close the gap between the grooves and the middle body bore. See for example the circumferential groove engaging seal 379 of Figure 3D .
- one or more of the lid carrier girth boss and seal(s) such as seal(s) associated with the grooves provide a first lid carrier to valve body seal.
- the articulated lid 312 provides a means for blocking a lid carrier through hole 353.
- a lid carrier mouth 331 has an internal seat 317 for mating with a closure of the articulated lid 316.
- This lid closure is free to move in response to lid articulation with respect to the lid carrier, carrier translation with respect to the valve body 302, and carrier rotation with respect to the valve body.
- the lid carrier internal seat 317 is free to move in response to both translation and rotation of the lid carrier with respect to the valve body.
- various embodiments provide a lid to lid carrier seal.
- the lid carrier includes an external closure 314. This closure is near the lid carrier mouth 331 and is for mating with the stationery seat within the valve body 332. As seen here, various embodiments provide a second lid carrier to valve body seal.
- the first lid carrier to valve body seal provides a seal below the port while the second lid carrier to valve body provides a seal located above the port. Therefore, when the shuttle 310 is stopped against the inwardly projecting nose 330, these seals isolate the spill port from the inlet and outlet chambers 365, 366 such that the spill port is blocked.
- a circumferential lid carrier seal (see for example seal 379 of Figure 3D ) fitted to the upper seal engagement 339 blocks the spill port when the shuttle is stopped against the inwardly projecting nose 330.
- Figure 3C shows the first bypass valve in a spill port unblocked configuration 300C.
- the shuttle 310 is moved toward the inlet end 398 by a distance "S2," a shuttle stroke sufficient to unblock the spill port 328.
- flow entering the outlet chamber 389 can move through a spill pocket 384 with boundaries including the middle body bore 338 and the shuttle 310 before exiting the valve body 302 via one or more spill ports 328.
- the illustrated spill port is one of six spill ports arranged around a valve body periphery 386.
- Figure 3D shows an embodiment 300D of the valve shuttle of figure 3C .
- the articulated lid 312 is closed such that there is a lid to lid carrier seal formed between the lid carrier mouth internal seat 317 and the lid closure 316.
- Figures 3A and 3C therefore illustrate two operating configurations of the first bypass valve 300A, 300C.
- the valve In the lid open configuration of Figure 3A , the valve is flowing a fluid 388 under normal operating conditions. This normal flow condition, from the valve inlet end 398 to the valve outlet end 399, will be referred to as forward flow.
- forward flow lifts the articulated lid 312 such that it extends into the lid clearance chamber 364.
- forward flow fluid dynamic drag acts on the lid to overcome gravity and to lift the lid away from the lid carrier.
- forward flow fluid dynamic drag acts on the lid and overcomes one or both of gravity and a spring acting to hold the lid closed.
- Suitable spring arrangements include torsional springs, springs encircling a lid pinned connection, tension springs extending between the lid and a relative fixed point, and the like.
- the head of fluid above the lid 385 can be spilled from the valve body 302 via the spill port 328.
- This spilling occurs when the shuttle 310 compresses the charge spring 308 as shown in Figure 3C .
- spilling occurs when the second lid carrier to valve body seal is opened.
- spilling occurs when the second lid carrier to valve body seal is opened and any spill port blocking seal carried by the shuttle, such as the first lid carrier to valve body seal is moved away from the spill port.
- the spill port is fully open when the shuttle stroke dimension is "S2." In some embodiments, this shuttle stroke is limited by interference between the transition ring 352 and the spring guide upper end 380 (see S1 of figure 3A ).
- adjustments affecting forces applied to the shuttle bias shuttle position For example, when the articulated lid 312 is open, significant forces acting on the shuttle 301 are the charge spring 308 force and the substantially equal but opposite force applied by the inwardly projecting nose 330. However, when the lid is closed, the major valve shuttle forces are the charge spring force and the pump force (Pump Pressure ā AP2) balanced against the head force (Head Pressure ā AP1).
- Figures 3E - 3G show another embodiment of a valve shuttle in the form of a multipart shuttle.
- Figure 3E shows an exploded view of the multipart shuttle 300E.
- a shuttle lid carrier assembly 3014 receives an upper sealing ring or seal 3020, a cartridge or seal cartridge 3022, a lower sealing ring or seal 3030, and a lower retainer ring 3032. Sharing some similarities with the shuttle of Figure 3B , the shuttle lid carrier assembly includes a shuttle lid 3010 coupled to a shuttle body 3016 by a shuttle hinge 3012.
- a generally cylindrical outer surface of the shuttle body 3018 includes features such as threads for engaging mating parts.
- the multipart shuttle 300E provides removable upper and lower seals 3020 and 3030 carried by respective seal recesses 3025, 3027 at opposed ends of the generally cylindrical seal cartridge 3022.
- Internal threads of the seal cartridge 3023 are for engaging external threads on the body 3018 such that the upper seal can be fixed between a body rim such as an upper lip of the body 3015 and a seal cartridge rim such as a shoulder 3024 of the seal cartridge.
- the upper seal is located as the seal cartridge is advanced, as by threaded parts, onto the shuttle body.
- the lower seal 3030 is for locating between the seal cartridge 3022 and a lower retaining ring or lower retainer 3032 such that the lower seal can be fixed between a body rim such as a seal cartridge rim such as a lower shoulder 3026 of the seal cartridge and the lower retaining ring.
- a body rim such as a seal cartridge rim such as a lower shoulder 3026 of the seal cartridge and the lower retaining ring.
- an externally threaded end portion of the lid carrier body 2029 protrudes from the seal carrier 3022 after assembly of the first seal 3020.
- embodiments of this disclosure provide securely located seals during extended periods of valve operation such as years and enable replacement of seals should the shuttle be refurbished.
- readily removable seals allows for fitting a shuttle with seals for different operating conditions such as different valves and different types of service.
- Figure 3F shows a multipart shuttle that is assembled 300F.
- a raised face of the lid carrier assembly 3031 separates the upper and lower seals 3020, 3030.
- the upper seal is bounded at the upper end by a rim of the lid carrier assembly 3016 while the lower seal is bounded at the lower end by the lower retaining ring 3032.
- Figure 3G shows a multipart shuttle partial cross-section 300G.
- the lid carrier assembly 3014 and the seal cartridge 3022 are engaged via mating threads 3040 on the inside of the seal cartridge 3023 and on an exterior of the lid carrier 3018 such that the upper seal 3020 is captured at the upper seal recess 3025.
- the retainer ring 3032 and the seal cartridge are engaged via mating threads 3042 on the inside of the retainer ring 3034 and on an exterior of the lid carrier 3018 such that the lower seal 3030 is captured at the lower seal recess 3027.
- seal 3020, 3030 dimensions are chosen to provide for a desired engagement with a mating surface and in particular for engagement with a mating sealing surface such as that of the spill port(s) 328.
- seal peripheries have respective crowns 3050, 3052 providing a seal movable with the shuttle 300F.
- FIGS 4A and 4B show side and top views of a shuttle with a multi-part lid 400A, 400B.
- a shuttle 410 includes a lid carrier 420 and first and second articulated lids 412, 492.
- the first lid 412 has a first lid boss 425 which is pivotally coupled via a first pin 424 with a first pivot block of the lid carrier 426.
- the second lid 492 has a second lid boss 495 which is pivotally coupled via a second pin 494 with a second pivot block of the lid carrier 496.
- the articulated lids 412, 492 are responsive to forward and reverse flows as described above.
- a forward flow tends to open the lids 429, 431 allowing fluid to flow through a shuttle through hole 453 while a reverse flow tends to close the lids 407, 409.
- Sealing between the front faces of the articulated lids 460, 462 may merely be a narrow gap, if any, or a seal may be employed.
- a seal is attached to one or both faces and is engaged with an opposing face when the lids are closed 407, 409.
- a feature such as a groove 419 of a front face 460 provides a coupling for a seal.
- a seal 413 is located in the groove.
- the seal is made from an elastomeric material and has a suitable cross-section such as a circular cross-section (as shown) or a rectangular cross-section.
- the pump 104 used will be a rod driven pump including a rotatable rod passing through a valve body and engaging a pump shaft for operating the pump.
- Embodiments of the present invention provide solutions for these rod driven pump applications.
- Figures 5 , 6A, and 6B below illustrate shuttles through which a pump driving rod can be passed.
- Figure 5 shows a first pump rod passing shuttle 500.
- the shuttle 510 includes an articulated lid 512 and a lid carrier 520.
- a lid boss 525 is coupled to a pivot block 526 via a pinned connection 524.
- the shuttle through hole 553 is able to pass a pump rod when the articulated lid 512 is closed because of an entryway provided in the shuttle lid.
- this entryway is a slot such as the one shown 514.
- the slot not only provides a pump rod entryway, it also enables the articulated lid to open as the slot is lifted away from the rod. Skilled artisans will appreciate the need for a slot that is wider "w" than the pump rod diameter "d5" to allow for freedom of movement. They will also recognize when the articulated lid is closed over the pump rod, a partial lid opening 532 remains.
- the partial lid opening is bounded by portions of the pump rod 530, the slot, and an adjacent portion of a lid carrier mouth 534.
- this partial lid opening is closed wholly or partially by a flexible seal allowing pump rod passage, such as a split or a lap seal fixed to the articulated lid (not shown for clarity).
- Figures 6A and 6B show side and top views of a second rod passing shuttle 600A, 600B.
- This shuttle includes a multi-part lid.
- the shuttle 610 includes a lid carrier 620 and first and second articulated lids 612, 692.
- the first lid 612 has a first lid boss 625 which is pivotally coupled via a first pin 624 with a first pivot block of the lid carrier 626.
- the second lid 692 has a second lid boss 695 which is pivotally coupled vial a second pin 694 with a second pivot block of the lid carrier 696.
- the shuttle through hole 653 is able to pass a pump rod when the articulated lids are closed 612, 692 because of an entryway provided in the shuttle lids 670, 672.
- this entryway is a somewhat semicircular hole cut from the lid's straight edge 680, 682 such that the cut outs align when the lids are closed.
- the cut outs form a somewhat circular pump rod entryway.
- These cut outs not only provide a pump rod entryway, they enable the articulated lids to open as the cut-outs are lifted away from the rod.
- a lip seal such as an elastomeric lip seal fixed to the lid parts seals between the lid and a pump rod. Skilled artisans will appreciate the need for a cut-out that forms a hole with a diameter d62 larger than the diameter of an inserted pump rod d61.
- the articulated lids 612, 692 are responsive to forward and reverse flows as described above.
- a forward flow tends to open the lids 629, 631 allowing fluid to flow through a shuttle through hole 653 while a reverse flow tends to close the lids 607, 609.
- Sealing between the front faces of the articulated lids 660, 662 may merely be a narrow gap, if any, or a seal may be employed.
- a seal is attached to one or both faces and is engaged with an opposing face when the lids are closed 607, 609.
- a feature such as a groove 619 of a front face 660 provides a coupling for a seal.
- a seal 613 is located in the groove.
- the seal is made from an elastomeric material and has a suitable cross-section such as a circular cross-section (as shown) or a rectangular cross-section.
- valve 300A, 300C is made from metals or alloys of metals including one or more of steel, iron, brass, aluminum, stainless steel, and suitable valve seat and closure materials known to persons of ordinary skill in the art.
- one or more parts of the valve are made from non-metals.
- valve seal parts such as closures and seats may be made from one or more suitable polymers such as PTFE (polytetrafluoroethylene), POM (Polyoxymethylene) and PEEK (PolyEtherEtherKetone).
- PTFE polytetrafluoroethylene
- POM Polyoxymethylene
- PEEK PolyEtherEtherKetone
- one or more shuttle seals such as the seal part marked 379 are made from materials including PEEK.
- valve embodiments react to flow conditions such as insufficient fluid flow, no fluid flow, or reverse fluid flow.
- flow conditions such as insufficient fluid flow, no fluid flow, or reverse fluid flow.
- the valve 108, 300A, 300C and pump 104 are substantially removed from the fluid circuit when the articulated lid 312 of the shuttle 310 closes and the outlet chamber 366 is isolated from the inlet chamber 365.
- a benefit of this isolation is protection of the valve and pump.
- one protection afforded is protection from solids (such as sand), normally rising with the fluid but during insufficient flow conditions moving toward the valve and pump, that might otherwise foul or block one or both of these components. Blocking the flow path through the shuttle 353 and opening the spill ports 328 removes these solids outside the tubing string 204.
- valve 300A, 300C provide valve fouling/plugging protection and pump fouling/plugging/burn-out protection. For example, below design production flow rates causing valve/pump misoperation or damage in traditional production string equipment is avoided in many cases using embodiments of the valves 300A-D of the present invention.
- embodiments of the bypass valves of Figures 3A-C and 4A-B can replace or supplement protection systems now associated with some production strings.
- One such protection system is the "pump-off controllerā ("POC") used to protect pumps from failures due to abnormal operations such as reduced flow conditions and loss of flow conditions.
- POC pump-off controller
- FIG. 7 shows an illustrative example in the form of a schematic diagram of a pump-off controller installation in a production string 700.
- a portion of the production string 712 includes a pump 702 lifting product from a reservoir 714 to a higher level such as a surface level 716.
- a pump-off controller 708 receives power from a power supply 707 and provides power to the pump 710 in accordance with a control algorithm.
- a pressure indicating device 704 monitors a pressure near a pump discharge 711 and provides a signal indicative of pressure 706 to the pump-off controller. If the pump-off controller determines the indicated pressure is below a preselected low-pressure set point, the POC stops supplying power to the pump.
- Conditions causing low pump discharge pressure include insufficient product at the pump inlet 713 (sometimes described as a "dry suction"), pump fouling, and pump damage. Attempting to run the pump under any of these conditions has the potential to damage or further damage the pump.
- FIG 8 shows a pump-off controller embodiment of the present invention 800.
- a production string 801 includes a flow management system with a pump 836 interposed between a reservoir 838 and a valve 834.
- Product the pump lifts from the reservoir 829 passes first through the pump and then through a bypass valve 834.
- the bypass valve discharges 821 into a tubing space 804 of a tubing string 802 that is surrounded by a casing 812 creating an annulus 814 between the outer casing and the inner tubing.
- Figure 9 shows a mode of bypass valve operation that substitutes for or augments a production string pump-off controller 900.
- the pressure differential P111 > P222
- the shuttle articulated lid 312 close which blocks flow through the valve along its centerline y-y.
- the shuttle moves toward the valve inlet 398 and unblocks the spill port/opens the bypass 906.
- valve bypass from the spill ports is returned to the reservoir 827 in the replenishment step 910.
- filling the reservoir with the fluid from the valve bypass serves to provide fluid to the suction of the pump 836, lift the shuttle e.g., 310, lift the shuttle articulated lid e.g., 312, and unblock flow through the valve along its centerline y-y where forward flow such as normal forward flow is re-established in step 912. Reestablishment of normal flow is followed by a return to normal operation in step 914.
- Embodiments of the bypass valves of Figures 3A-C and 4A-B also provide protection against pump backspin. It is noted that some production strings are prone to pump 836 backspin when fluid flow through the pump reverses 823. In these strings, pump backspin can be substantially reduced or eliminated when the valve operates to bypass the reverse flow rather than allowing it to backflow through the pump and return to the reservoir 838.
Landscapes
- Geology (AREA)
- Life Sciences & Earth Sciences (AREA)
- Engineering & Computer Science (AREA)
- Mining & Mineral Resources (AREA)
- Environmental & Geological Engineering (AREA)
- Fluid Mechanics (AREA)
- Physics & Mathematics (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Lift Valve (AREA)
- Check Valves (AREA)
- Multiple-Way Valves (AREA)
- Valve Housings (AREA)
- Fluid-Pressure Circuits (AREA)
Description
- The present invention relates to fluid flow components and systems using those components. In particular, the present invention relates to an improved valve with shuttle for use in fluid flow systems.
- Pumps and valves located in hard to reach places present maintenance and maintenance downtime issues. Where pumps and valves are used to produce a natural resource such as a hydrocarbon, downtime can result in lost production and increased expenses for workmen and materials.
- In particular, downhole production strings including pumps and valves for lifting fluids such as particulate laden liquids and slurries present a maintenance problem. Here, both pumps and valves can lose capacity and in cases be rendered inoperative when conditions including fluid conditions and fluid velocities fall outside an intended operating range. Such unintended operating conditions can foul, plug, and damage equipment.
- Despite the industry's resistance to change, there remains a need to improve production strings.
-
US2002/174988 describes a tubular tool body for use with a drilling string that allows simultaneous drill string movement and fluid circulation. The tool has an internal check valve that opens to allow back flow of drilling fluid that may be displaced from the drill pipe as the pipe is lowered into the well and which prevents standing fluid in the top drive from spilling when the tool is withdrawn. Pump pressure applied through the top drive axially moves the check valve against a biasing spring to open a bypass through the wall of the tool to permit forward circulation through the drill string and casing. -
US2012/0037373 describes a system for fracturing a subterranean formation that includes a housing having one or more radially directed ports and a valve within the housing proximate the one or more ports. A seat member is interactive with the valve to prevent or retard fluid flow there-through.GB2,411,416 - The present invention includes a bypass and/or protection valve with a shuttle useful in flow management and/or related production systems. In an embodiment, there is provided a valve for use in a flow management system according to
claim 1. - In an embodiment, there is provided a method of operating a downhole hydrocarbon production string according to claim 16.
- The present invention is described with reference to the accompanying figures. These figures, incorporated herein and forming part of the specification, illustrate the invention and, together with the description, further serve to explain its principles enabling a person skilled in the relevant art to make and use the invention.
-
Figure 1 is a schematic diagram of a valve in a flow management system in accordance with the present invention. -
Figure 2 is a diagram of the flow management system ofFigure 1 . -
Figure 3A is a cross-sectional view of an open valve of the flow management system ofFigure 1 . -
Figure 3B is a side view of an open shuttle of the valve of the flow management system ofFigure 1 . -
Figure 3C is a cross-sectional view of a closed valve of the flow management system ofFigure 1 . -
Figure 3D is a side view of a closed shuttle of the valve of the flow management system ofFigure 1 . -
Figures 3E-3G show views of another embodiment of the shuttle. -
Figure 4A is a side view of a second shuttle of the valve of the flow management system ofFigure 1 . -
Figure 4B is a top view of the shuttle ofFigure 4A . -
Figure 5 is a perspective view of a third shuttle of the valve of the flow management system ofFigure 1 . -
Figure 6A is a side view of a fourth shuttle of the valve of the flow management system ofFigure 1 . -
Figure 6B is a top view of the shuttle ofFigure 6A . -
Figure 7 is a schematic diagram of a pump-off controller implemented in a production string. -
Figure 8 is a schematic diagram of a valve ofFigure 1 used to implement a pump-off controller. -
Figure 9 is a flow chart showing a mode of operation of a valve ofFigure 1 . - The disclosure provided in the following pages describes examples of some embodiments of the invention. The designs, figures, and description are non-limiting examples of certain embodiments of the invention. For example, other embodiments of the disclosed device may or may not include the features described herein. Moreover, disclosed advantages and benefits may apply to only certain embodiments of the invention and should not be used to limit the disclosed invention.
- To the extent parts, components and functions of the described invention exchange fluids, the associated interconnections and couplings may be direct or indirect unless explicitly described as being limited to one or the other. Notably, indirectly connected parts, components and functions may have interposed devices and/or functions known to persons of ordinary skill in the art.
-
Figure 1 shows an embodiment of theinvention 100 in the form of a schematic diagram. Abypass valve 108 is interconnected with apump 104 via apump outlet 106. The pump includes apump inlet 102 and the valve includes avalve outlet 110 and avalve spill port 112. In various embodiments, the inlets, outlets and ports are one or more of a fitting, flange, pipe, or similar fluid conveyance. -
Figure 2 shows a section of a typicaldownhole production string 200. The production string includes thebypass valve 108 interposed between thepump 104 and anupper tubing string 204. In some embodiments, acasing 208 surrounds one or more of the tubing string, valve, and pump. Here, anannulus 206 is formed between the tubing string and the casing. A production flow is indicated by anarrow 102 while a backflow is indicated by anarrow 202. In various embodiments, the bypass valve serves to isolate backflows from one or more of the valve, portions of the valve, and the pump. -
Figure 3A shows a first bypass valve in a lidopen configuration 300A. Avalve body 302 includes anupper body 304, amiddle body 305, and alower body 306. - The upper body includes a first through
hole 369. In some embodiments, the first through hole passes through anoutlet chamber 366 of anupper adapter 303 and through alid chamber 364. In some embodiments, an inner surface of theadapter 367 is threaded. - The middle body includes a second through
hole 371. In some embodiments the second through hole passes through ashuttle chamber 362 proximate thelid chamber 364. The lower body includes a third throughhole 373. In some embodiments, the third through hole passes through aninlet chamber 365 such that the shuttle chamber is located between the lid chamber and the inlet chamber. - Within the
lower body 306, a spring shoulder such as anannular spring shoulder 344 for supporting acharge spring 308 projects inwardly from a first inner bore of thelower body 372. In some embodiments, the shoulder extends between the first inner bore of the lower body and acylindrical spring guide 342. - And, in some embodiments, the
shoulder 344 and thespringe guide 342 are portions of alower adapter 307 forming at least part of thelower body 306. In some embodiments, an inside surface of the adapter is threaded 348. Here, an upper end of theadapter 374 has a reducedouter diameter 376 such that the spring shoulder is formed where the diameter is reduced and the spring guide is formed along the length of the reduced diameter portion of the adapter. As shown, a portion of the charge spring is located in anannular pocket 363 between the first inner bore of thelower body 372 and the spring guide. In some embodiments, the lower adapter and lower body are fixed together viascrew threads 346. - The port shown in the
spring guide 356 provides a means for flushing theannular pocket 363 in some embodiments. As seen, the port extends between thelower chamber 365 and theannular pocket 363. Action of the spring and/or pressure differentials between the pocket and the lower chamber provide a flushing action operative to remove solids such as sand that may otherwise tend to accumulate in the annular pocket. - Within the middle body 305 a middle body bore 338 is for receiving a
valve shuttle 310. Thecharge spring 308 is for urging the shuttle toward thevalve outlet end 399. This shuttle urging may be via direct or indirect charge spring contact. For example, embodiments utilize direct contact between a shuttle carrierlower end 321 and an upper end of thecharge spring 378. Other embodiments utilize indirect contact such as via anannular transition ring 352 having anupper face 393 contacting the shuttle carrier lower end and alower face 354 contacting a charge spring upper end (as shown). - At a lower end of the
upper body 375, an inwardly projectingnose 330 includes astationery seat 332 for engaging aclosure 314 encircling a lid carrierupper end 313. For example, in various embodiments the seat and closure are configured to meet along a line forming an angle Īø < 90 degrees with respect to a valve centerline y-y. Absent greater opposing forces, thecharge spring 308 therefore moves theshuttle 310 until theshuttle closure 314 is stopped against thestationery seat 332. -
Figure 3B shows a lidopen embodiment 300B of the valve shuttle offigure 3A . An articulatedlid 312 is coupled to alid carrier 320. In various embodiments, alid pivot 315 includes apivot block 326 adapted to be movably coupled to alid boss 325, for example, an engagement via a pinned connection including a hole in thepivot block 323, a hole in thelid boss 329, and alid pin 324 for interengaging the holes. - In various embodiments, the
lid carrier 320 has one or more distinct circumferential surfaces 309 (several shown). In an embodiment ashuttle girth boss 336 defines acircumferential boss surface 337 for aligning the shuttle carrier in the middle body bore 338. And, in some embodiments, one or more circumferential seals provide a seal between the lid carrier and the middle body bore. For example, in some embodiments grooves in thelid carrier circumference groove engaging seal 379 ofFigure 3D . In various embodiments, one or more of the lid carrier girth boss and seal(s) such as seal(s) associated with the grooves provide a first lid carrier to valve body seal. - The articulated
lid 312 provides a means for blocking a lid carrier throughhole 353. In particular, alid carrier mouth 331 has aninternal seat 317 for mating with a closure of the articulatedlid 316. This lid closure is free to move in response to lid articulation with respect to the lid carrier, carrier translation with respect to thevalve body 302, and carrier rotation with respect to the valve body. Similarly, the lid carrierinternal seat 317 is free to move in response to both translation and rotation of the lid carrier with respect to the valve body. As seen here, various embodiments provide a lid to lid carrier seal. - Mentioned above, the lid carrier includes an
external closure 314. This closure is near thelid carrier mouth 331 and is for mating with the stationery seat within thevalve body 332. As seen here, various embodiments provide a second lid carrier to valve body seal. - Turning now to the
spill port 328 shown inFigure 3A , it can be seen that the first lid carrier to valve body seal provides a seal below the port while the second lid carrier to valve body provides a seal located above the port. Therefore, when theshuttle 310 is stopped against the inwardly projectingnose 330, these seals isolate the spill port from the inlet andoutlet chambers example seal 379 ofFigure 3D ) fitted to theupper seal engagement 339 blocks the spill port when the shuttle is stopped against the inwardly projectingnose 330. -
Figure 3C shows the first bypass valve in a spill port unblockedconfiguration 300C. Here, theshuttle 310 is moved toward theinlet end 398 by a distance "S2," a shuttle stroke sufficient to unblock thespill port 328. In this configuration, flow entering theoutlet chamber 389 can move through aspill pocket 384 with boundaries including the middle body bore 338 and theshuttle 310 before exiting thevalve body 302 via one ormore spill ports 328. In some embodiments, the illustrated spill port is one of six spill ports arranged around avalve body periphery 386. -
Figure 3D shows anembodiment 300D of the valve shuttle offigure 3C . As shown, the articulatedlid 312 is closed such that there is a lid to lid carrier seal formed between the lid carrier mouthinternal seat 317 and thelid closure 316. -
Figures 3A and3C therefore illustrate two operating configurations of thefirst bypass valve Figure 3A , the valve is flowing a fluid 388 under normal operating conditions. This normal flow condition, from thevalve inlet end 398 to thevalve outlet end 399, will be referred to as forward flow. - As shown in
Figure 3A , forward flow lifts the articulatedlid 312 such that it extends into thelid clearance chamber 364. In various embodiments, forward flow fluid dynamic drag acts on the lid to overcome gravity and to lift the lid away from the lid carrier. And, in some embodiments forward flow fluid dynamic drag acts on the lid and overcomes one or both of gravity and a spring acting to hold the lid closed. Suitable spring arrangements include torsional springs, springs encircling a lid pinned connection, tension springs extending between the lid and a relative fixed point, and the like. - Inadequate forward flow such as reverse flow causes the articulated
lid 312 to close against thelid carrier 320. When the lid is closed, forward flow is substantially limited or, but for leakage such as unintended leakage, is stopped. To the extent that the fluid head above the lid 385 (see alsoFigures 1 and 2 ) results in a fluid head force on thevalve shuttle 387 adequate to compress thecharge spring 308, theshuttle 310 moves toward the inlet end of thevalve 398. The shuttle diameter, approximated in various embodiments as the middle body borediameter 338, provides an estimate of the area acted on by the fluid head and thus the fluid head force. Skilled artisans will determine one or more valve variables including a spring constant "k" (F = kāx) of the charge spring to adapt the valve for particular applications. - The head of fluid above the
lid 385 can be spilled from thevalve body 302 via thespill port 328. This spilling occurs when theshuttle 310 compresses thecharge spring 308 as shown inFigure 3C . In various embodiments, spilling occurs when the second lid carrier to valve body seal is opened. And, in various embodiments spilling occurs when the second lid carrier to valve body seal is opened and any spill port blocking seal carried by the shuttle, such as the first lid carrier to valve body seal is moved away from the spill port. - As shown in
Figure 3C , the spill port is fully open when the shuttle stroke dimension is "S2." In some embodiments, this shuttle stroke is limited by interference between thetransition ring 352 and the spring guide upper end 380 (see S1 offigure 3A ). - Forward flow in the valve is typically be re-established through operation of the pump 104 (see
Figures 1 and 2 ). In various embodiments, sufficient pump pressure forces a) open the articulatedlid 312, b) substantially remove thehead force 387 from theshuttle 310, and c) allow thecharge spring 308 to expand and push the shuttle against the valve inwardly projectingnose 330. In various embodiments, pump pressure forces sufficient to open the lid depend substantially uponfluid head 385. - In various embodiments, adjustments affecting forces applied to the shuttle bias shuttle position. For example, when the articulated
lid 312 is open, significant forces acting on the shuttle 301 are thecharge spring 308 force and the substantially equal but opposite force applied by the inwardly projectingnose 330. However, when the lid is closed, the major valve shuttle forces are the charge spring force and the pump force (Pump Pressure ā AP2) balanced against the head force (Head Pressure ā AP1). -
Figures 3E - 3G show another embodiment of a valve shuttle in the form of a multipart shuttle. In particular,Figure 3E shows an exploded view of themultipart shuttle 300E. A shuttlelid carrier assembly 3014 receives an upper sealing ring orseal 3020, a cartridge orseal cartridge 3022, a lower sealing ring orseal 3030, and alower retainer ring 3032. Sharing some similarities with the shuttle ofFigure 3B , the shuttle lid carrier assembly includes ashuttle lid 3010 coupled to ashuttle body 3016 by ashuttle hinge 3012. A generally cylindrical outer surface of theshuttle body 3018 includes features such as threads for engaging mating parts. - Among other things, the
multipart shuttle 300E provides removable upper andlower seals respective seal recesses cylindrical seal cartridge 3022. Internal threads of theseal cartridge 3023 are for engaging external threads on thebody 3018 such that the upper seal can be fixed between a body rim such as an upper lip of thebody 3015 and a seal cartridge rim such as ashoulder 3024 of the seal cartridge. The upper seal is located as the seal cartridge is advanced, as by threaded parts, onto the shuttle body. - The
lower seal 3030 is for locating between theseal cartridge 3022 and a lower retaining ring orlower retainer 3032 such that the lower seal can be fixed between a body rim such as a seal cartridge rim such as alower shoulder 3026 of the seal cartridge and the lower retaining ring. In particular, an externally threaded end portion of thelid carrier body 2029 protrudes from theseal carrier 3022 after assembly of thefirst seal 3020. When thelower seal 3030 is in place and carried by thelower seal recess 3027 of the seal cartridge, fitting the lower retaining ring to the seal cartridge as by threads provides a means to locate the lower seal. - As skilled artisans will appreciate, embodiments of this disclosure provide securely located seals during extended periods of valve operation such as years and enable replacement of seals should the shuttle be refurbished. In addition, readily removable seals allows for fitting a shuttle with seals for different operating conditions such as different valves and different types of service.
-
Figure 3F shows a multipart shuttle that is assembled 300F. As shown, a raised face of thelid carrier assembly 3031 separates the upper andlower seals lid carrier assembly 3016 while the lower seal is bounded at the lower end by thelower retaining ring 3032. -
Figure 3G shows a multipart shuttlepartial cross-section 300G. As shown (see alsoFigures 3E-F ), thelid carrier assembly 3014 and theseal cartridge 3022 are engaged viamating threads 3040 on the inside of theseal cartridge 3023 and on an exterior of thelid carrier 3018 such that theupper seal 3020 is captured at theupper seal recess 3025. In similar fashion, theretainer ring 3032 and the seal cartridge are engaged viamating threads 3042 on the inside of theretainer ring 3034 and on an exterior of thelid carrier 3018 such that thelower seal 3030 is captured at thelower seal recess 3027. - As skilled artisans will recognize,
seal Figure 3G , seal peripheries haverespective crowns shuttle 300F. -
Figures 4A and 4B show side and top views of a shuttle with amulti-part lid shuttle 410 includes alid carrier 420 and first and second articulatedlids - Coupled at one side of the
lid carrier 450, thefirst lid 412 has afirst lid boss 425 which is pivotally coupled via afirst pin 424 with a first pivot block of thelid carrier 426. Coupled at an opposed second side of thelid carrier 452, thesecond lid 492 has asecond lid boss 495 which is pivotally coupled via asecond pin 494 with a second pivot block of thelid carrier 496. - In operation, the articulated
lids lids hole 453 while a reverse flow tends to close thelids - Sealing between the front faces of the articulated
lids groove 419 of afront face 460 provides a coupling for a seal. As shown, aseal 413 is located in the groove. In various embodiments, the seal is made from an elastomeric material and has a suitable cross-section such as a circular cross-section (as shown) or a rectangular cross-section. - In some production strings using pumps and valves, such as the production string of
Figure 2 , thepump 104 used will be a rod driven pump including a rotatable rod passing through a valve body and engaging a pump shaft for operating the pump. Embodiments of the present invention provide solutions for these rod driven pump applications. In particular,Figures 5 ,6A, and 6B below illustrate shuttles through which a pump driving rod can be passed. -
Figure 5 shows a first pumprod passing shuttle 500. Theshuttle 510 includes an articulatedlid 512 and alid carrier 520. Alid boss 525 is coupled to apivot block 526 via a pinnedconnection 524. - The shuttle through
hole 553 is able to pass a pump rod when the articulatedlid 512 is closed because of an entryway provided in the shuttle lid. In various embodiments, this entryway is a slot such as the one shown 514. The slot not only provides a pump rod entryway, it also enables the articulated lid to open as the slot is lifted away from the rod. Skilled artisans will appreciate the need for a slot that is wider "w" than the pump rod diameter "d5" to allow for freedom of movement. They will also recognize when the articulated lid is closed over the pump rod, apartial lid opening 532 remains. The partial lid opening is bounded by portions of thepump rod 530, the slot, and an adjacent portion of alid carrier mouth 534. In various embodiments, this partial lid opening is closed wholly or partially by a flexible seal allowing pump rod passage, such as a split or a lap seal fixed to the articulated lid (not shown for clarity). -
Figures 6A and 6B show side and top views of a secondrod passing shuttle shuttle 610 includes alid carrier 620 and first and second articulatedlids - Coupled at one side of the
lid carrier 650, thefirst lid 612 has afirst lid boss 625 which is pivotally coupled via afirst pin 624 with a first pivot block of thelid carrier 626. Coupled at an opposed second side of thelid carrier 652, thesecond lid 692 has asecond lid boss 695 which is pivotally coupled vial asecond pin 694 with a second pivot block of thelid carrier 696. - The shuttle through
hole 653 is able to pass a pump rod when the articulated lids are closed 612, 692 because of an entryway provided in theshuttle lids straight edge - In operation, the articulated
lids lids hole 653 while a reverse flow tends to close thelids - Sealing between the front faces of the articulated
lids groove 619 of afront face 660 provides a coupling for a seal. As shown, aseal 613 is located in the groove. In various embodiments, the seal is made from an elastomeric material and has a suitable cross-section such as a circular cross-section (as shown) or a rectangular cross-section. - In various embodiments the
valve - As will be seen from the above, various valve embodiments react to flow conditions such as insufficient fluid flow, no fluid flow, or reverse fluid flow. For example, referring to the production string of
Figure 2 andFigures 3A and 3C, thevalve lid 312 of theshuttle 310 closes and theoutlet chamber 366 is isolated from theinlet chamber 365. - A benefit of this isolation is protection of the valve and pump. For example, one protection afforded is protection from solids (such as sand), normally rising with the fluid but during insufficient flow conditions moving toward the valve and pump, that might otherwise foul or block one or both of these components. Blocking the flow path through the
shuttle 353 and opening thespill ports 328 removes these solids outside thetubing string 204. - Various embodiments and applications of the
valve valves 300A-D of the present invention. - Notably, embodiments of the bypass valves of
Figures 3A-C and4A-B can replace or supplement protection systems now associated with some production strings. One such protection system is the "pump-off controller" ("POC") used to protect pumps from failures due to abnormal operations such as reduced flow conditions and loss of flow conditions. -
Figure 7 shows an illustrative example in the form of a schematic diagram of a pump-off controller installation in aproduction string 700. A portion of theproduction string 712 includes apump 702 lifting product from areservoir 714 to a higher level such as asurface level 716. A pump-off controller 708 receives power from apower supply 707 and provides power to thepump 710 in accordance with a control algorithm. For example, apressure indicating device 704 monitors a pressure near apump discharge 711 and provides a signal indicative ofpressure 706 to the pump-off controller. If the pump-off controller determines the indicated pressure is below a preselected low-pressure set point, the POC stops supplying power to the pump. Conditions causing low pump discharge pressure include insufficient product at the pump inlet 713 (sometimes described as a "dry suction"), pump fouling, and pump damage. Attempting to run the pump under any of these conditions has the potential to damage or further damage the pump. -
Figure 8 shows a pump-off controller embodiment of thepresent invention 800. Aproduction string 801 includes a flow management system with apump 836 interposed between areservoir 838 and avalve 834. Product the pump lifts from thereservoir 829 passes first through the pump and then through abypass valve 834. The bypass valve discharges 821 into atubing space 804 of atubing string 802 that is surrounded by acasing 812 creating anannulus 814 between the outer casing and the inner tubing. -
Figure 9 shows a mode of bypass valve operation that substitutes for or augments a production string pump-off controller 900. For example, after a period ofnormal operation 902, the pressure differential (P111 > P222) driving the flow in aproduction string 821 begins to fall 904. As explained above, low flow conditions cause the shuttle articulatedlid 312 to close which blocks flow through the valve along its centerline y-y. When the forces on the shuttle including force applied by thecharge spring 308 are insufficient to maintain the shuttle in a position blocking thespill port 328, the shuttle moves toward thevalve inlet 398 and unblocks the spill port/opens thebypass 906. Duringbypass operation 908, flow through the valve along the valve centerline y-y is blocked and the spill port(s) is open, product flows from theupper tubing string 823, enters thevalve outlet chamber 366, and leaves the valve through its spill port(s) 328. The spill port empties into a space such as an annulus between the tubing and thecasing 814 and is returned 827 to thereservoir 838. Here, theshuttle 310 ofFigures 3B and3C with articulatedlid 312 are exemplary of the shuttles disclosed herein including shuttles with slotted and/or multipart lids. - Because the
annulus 814 is fluidly coupled to the reservoir 838 (e.g. as shown inFigure 8 ), valve bypass from the spill ports is returned to thereservoir 827 in thereplenishment step 910. In various embodiments, filling the reservoir with the fluid from the valve bypass serves to provide fluid to the suction of thepump 836, lift the shuttle e.g., 310, lift the shuttle articulated lid e.g., 312, and unblock flow through the valve along its centerline y-y where forward flow such as normal forward flow is re-established instep 912. Reestablishment of normal flow is followed by a return to normal operation instep 914. - The pump-off control steps of
Figure 9 result, in various embodiments, in cyclic flows through the pump. The time between these cyclic flows is shorter than would occur with a traditional valve in a traditional production string configuration because such strings are unable to bypass flow to the reservoir. - As persons of ordinary skill in the art will appreciate, many production string pumps rely on the pumped product as pump lubrication and coolant. Therefore, reducing the duration of dry pumping periods reduces pump damage due to operation with insufficient lubricant and coolant. The benefits include one or more of longer pump life, fewer outages, and higher production from tight reservoirs.
- Embodiments of the bypass valves of
Figures 3A-C and4A-B also provide protection against pump backspin. It is noted that some production strings are prone to pump 836 backspin when fluid flow through the pump reverses 823. In these strings, pump backspin can be substantially reduced or eliminated when the valve operates to bypass the reverse flow rather than allowing it to backflow through the pump and return to thereservoir 838. - The present invention has been disclosed in the form of exemplary embodiments; however, it should not be limited to these embodiments. Rather, the present invention should be limited only by the claims which follow where the terms of the claims are given the meaning a person of ordinary skill in the art would find them to have.
Claims (16)
- A valve (108) for use in a flow management system:wherein the valve is for location in a downhole hydrocarbon production string between a hydrocarbon reservoir pump (104) and production tubing (204) for surfacing produced hydrocarbons, the valve comprising:a valve body (302) with a spill port (328), the valve body having a valve body centerline (y-y) extending between opposed ends of the valve;a shuttle (310) including a lid carrier (320) and a lid (312);the lid carrier having a lid end and the lid rotatably coupled to the lid carrier near the lid end;the lid carrier located in a chamber of the valve body;the lid carrier having a through hole (353) extending between a lid carrier spring end and the lid carrier lid end;a first seat (317) located in a lid carrier mouth (331) of the lid carrier lid end;the lid (312) configured to mate with said first seat (317) to provide a first seal for limiting a through hole flow;a first closure (314) part of the lid carrier, said first closure located near the lid carrier mouth of the lid carrier lid end;a third seal (3020; 3052) for limiting a flow between the valve body and the lid carrier, the third seal including a valve body bore (338);a spring (308) located between the lid carrier spring end and a spring base (344) supported by the valve body; and,the valve operable to pass a forward flow entering the through hole at the lid carrier spring end and further operable to spill a flow when a reverse flow causes the lid to close against the lid carrier;wherein operation of the hydrocarbon reservoir pump (104) re-establishes forward flow, causes the lid to open, the shuttle to move away from the pump and the spring to expand, and the shuttle to be pushed against a valve inwardly projecting nose (330) so that said first closure (314) forms a part of a second seal for limiting a spill port flow;the first and second seals being located at the lid carrier lid end.
- The valve of claim 1 further comprising:a lid closure (316); and,the lid closure and the first seat for forming the first seal therebetween.
- The valve of claim 1 or claim 2 further comprising:a valve body seat (332); and,the valve body seat and the first closure for forming the second seal therebetween.
- The valve of any preceding claim further comprising:a lid carrier sealing surface (379); and,the lid carrier sealing surface and the valve bore for forming the third seal therebetween.
- The valve of any preceding claim further comprising:a spring compression stroke through which the shuttle can move when it is subjected to a force moving it toward the spring base;,wherein when the valve is in use, the lid closes before the spring compression stroke; anda spring expansion stroke through which the shuttle can move upon relief from a force that moved the shuttle toward the spring base;wherein when the valve is in use, the lid opens after the spring expansion stroke.
- The valve of claim 5 wherein when the valve is in use, the spill port is blocked by the second and third seals after the lid opens; and
the spill port is not blocked by the second and third seals after the lid closes. - The valve of claim 5 wherein the spill port is blocked by the second and third seals when the spring is expanded at the end of the expansion stroke, and the spill port is not blocked by the second and third seals when the spring is compressed at the end of the compression stroke.
- The valve of any preceding claim wherein a spill port centerline is about perpendicular to the valve body centerline and/or the first seat is radially oriented with respect to the valve body centerline and/or the first closure is about radially oriented with respect to the valve body centerline.
- The valve of any preceding claim wherein the first closure is not inside the lid carrier.
- The valve of any preceding claim further comprising at least one of: a second seat that is for engaging the first closure; and a second closure that is for engaging the first seat.
- The valve of any preceding claim wherein:a flow that is sufficient to move the lid away from the lid carrier tends to balance forces acting on the shuttle such that the spring has a first spring length;a flow that is not sufficient to move the lid away from the lid carrier tends to balance forces acting on the shuttle such that the spring has a second spring length less than the first spring length; and whereinsufficient flows are forward flows that pass between opposed ends of the valve body and enter the valve body at the valve end nearest the spring base.
- The valve of claim 10 wherein the second seat is located on an inwardly projecting portion of the valve body.
- The valve of any preceding claim wherein the lid is slotted for accommodating a pump drive rod.
- The valve of claim 13 further comprising a seal fixed to the lid and configured to be lifted free of the rod during valve operation, the seal for sealing at least a portion of the slot.
- The valve of any preceding claim wherein the lid includes two separately articulated portions.
- A method of operating a downhole hydrocarbon production string, the method comprising:locating a valve within the hydrocarbon production string between a hydrocarbon reservoir pump (104) and production tubing (204) for surfacing produced hydrocarbons, the valve comprising:a valve body (302) with a spill port (328);a shuttle (310) including a lid carrier (320) located within a chamber of the valve body, wherein the lid carrier is urged away from the pump by a spring located between a spring end of the lid carrier and a spring base (344) supported by the valve body;wherein the lid carrier has a through hole (353) extending through the lid carrier and a lid (312) rotatably coupled to the lid carrier near a lid end of the lid carrier, the lid being configured to engage with a first seat (317) located in a mouth (331) of the through hole to provide a first seal for limiting a through hole flow;wherein the lid carrier further comprises a first closure (314) located near the lid carrier mouth of the lid carrier lid end,the valve further comprising a third seal (379) for limiting a flow between the valve body and the lid carrier, the third seal including a valve body bore (338);wherein the valve is operable to pass a forward flow entering the through hole at the lid carrier spring end and is further operable to spill a flow when a reverse flow causes the lid to close against the lid carrier;wherein the method comprises re-establishing forward flow by operating the hydrocarbon reservoir pump (104) to cause the lid to open, the shuttle to move away from the pump and the spring to expand and the shuttle to be pushed against a valve inwardly projecting nose (330) so that said first closure (314) forms a part of a second seal for limiting a spill port flow;the first and second seals being located at the lid carrier lid end.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL12871295T PL2825724T3 (en) | 2012-03-15 | 2012-10-23 | Improved production valve |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US201261611543P | 2012-03-15 | 2012-03-15 | |
US13/446,195 US9562418B2 (en) | 2010-04-23 | 2012-04-13 | Valve with shuttle |
PCT/US2012/061492 WO2013137933A1 (en) | 2012-03-15 | 2012-10-23 | Improved production valve |
Publications (3)
Publication Number | Publication Date |
---|---|
EP2825724A1 EP2825724A1 (en) | 2015-01-21 |
EP2825724A4 EP2825724A4 (en) | 2016-06-29 |
EP2825724B1 true EP2825724B1 (en) | 2020-01-01 |
Family
ID=49161643
Family Applications (3)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12871295.7A Active EP2825724B1 (en) | 2012-03-15 | 2012-10-23 | Improved production valve |
EP20157490.2A Withdrawn EP3715581A1 (en) | 2012-03-15 | 2012-12-12 | Fluid flow manager |
EP12871543.0A Active EP2825727B1 (en) | 2012-03-15 | 2012-12-12 | Fluid flow manager |
Family Applications After (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20157490.2A Withdrawn EP3715581A1 (en) | 2012-03-15 | 2012-12-12 | Fluid flow manager |
EP12871543.0A Active EP2825727B1 (en) | 2012-03-15 | 2012-12-12 | Fluid flow manager |
Country Status (7)
Country | Link |
---|---|
EP (3) | EP2825724B1 (en) |
AU (6) | AU2012373240B2 (en) |
CA (1) | CA2780553C (en) |
ES (1) | ES2782506T3 (en) |
HU (1) | HUE049187T2 (en) |
PL (1) | PL2825724T3 (en) |
WO (2) | WO2013137933A1 (en) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU2016101791A4 (en) | 2016-07-14 | 2016-11-10 | Baker Hughes Incorporated | Diverter valve for progressing cavity pump |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2798561A (en) * | 1954-12-21 | 1957-07-09 | Exxon Research Engineering Co | Blowout preventer for wells |
US3409078A (en) * | 1966-06-29 | 1968-11-05 | Halliburton Co | Self-fill and flow control safety valve |
US4100969A (en) * | 1977-03-28 | 1978-07-18 | Schlumberger Technology Corporation | Tubing tester valve apparatus |
US4157199A (en) * | 1977-08-03 | 1979-06-05 | Wilson Industries | Apparatus for retrieving a tubular member from a well |
US4248264A (en) * | 1979-12-31 | 1981-02-03 | Hydril Company | Internal mud saver valve |
US4688593A (en) * | 1985-12-16 | 1987-08-25 | Camco, Incorporated | Well reverse flow check valve |
US5141052A (en) * | 1991-01-09 | 1992-08-25 | Bump David L | Wellhead stuffing box for polished rod and accessories for same |
AU722886B2 (en) * | 1996-04-18 | 2000-08-10 | Halliburton Energy Services, Inc. | Circulating valve responsive to fluid flow rate therethrough and associated methods of servicing a well |
RU2150575C1 (en) * | 1998-07-23 | 2000-06-10 | ŠŠµŃŃŠµŠ³Š°Š·Š¾Š“Š¾Š±ŃŠ²Š°ŃŃŠµŠµ ŃŠæŃŠ°Š²Š»ŠµŠ½ŠøŠµ "ŠŠ»ŃŠ¼ŠµŃŃŠµŠ²Š½ŠµŃŃŃ" | Well valve unit |
CA2302538C (en) * | 1999-03-24 | 2005-03-15 | Baker Hughes Incorporated | Production tubing shunt valve |
US6571876B2 (en) * | 2001-05-24 | 2003-06-03 | Halliburton Energy Services, Inc. | Fill up tool and mud saver for top drives |
RU34623U1 (en) * | 2003-04-25 | 2003-12-10 | ŠŠ°ŠŗŃŃŃŠ¾Šµ Š°ŠŗŃŠøŠ¾Š½ŠµŃŠ½Š¾Šµ Š¾Š±ŃŠµŃŃŠ²Š¾ Š·Š°Š²Š¾Š“ "ŠŠ·Š¼ŠµŃŠ¾Š½" | VALVE MULTIFUNCTIONAL |
GB2411416C (en) | 2004-02-24 | 2011-09-28 | Pump Tools Ltd | Flow diversion apparatus and method |
CA2591567A1 (en) * | 2004-04-22 | 2005-10-22 | Bj Services Company Canada | Method of fracing or stimulating a formation |
US7299880B2 (en) * | 2004-07-16 | 2007-11-27 | Weatherford/Lamb, Inc. | Surge reduction bypass valve |
US8104539B2 (en) * | 2009-10-21 | 2012-01-31 | Halliburton Energy Services Inc. | Bottom hole assembly for subterranean operations |
US8955601B2 (en) * | 2010-04-23 | 2015-02-17 | Lawrence Osborne | Flow management system and method |
US8545190B2 (en) * | 2010-04-23 | 2013-10-01 | Lawrence Osborne | Valve with shuttle for use in a flow management system |
US9562409B2 (en) | 2010-08-10 | 2017-02-07 | Baker Hughes Incorporated | Downhole fracture system and method |
-
2012
- 2012-06-21 CA CA2780553A patent/CA2780553C/en active Active
- 2012-10-23 PL PL12871295T patent/PL2825724T3/en unknown
- 2012-10-23 WO PCT/US2012/061492 patent/WO2013137933A1/en active Application Filing
- 2012-10-23 AU AU2012373240A patent/AU2012373240B2/en not_active Ceased
- 2012-10-23 EP EP12871295.7A patent/EP2825724B1/en active Active
- 2012-10-23 ES ES12871295T patent/ES2782506T3/en active Active
- 2012-10-23 HU HUE12871295A patent/HUE049187T2/en unknown
- 2012-12-12 WO PCT/US2012/069186 patent/WO2013137954A2/en active Application Filing
- 2012-12-12 AU AU2012373206A patent/AU2012373206B2/en not_active Ceased
- 2012-12-12 EP EP20157490.2A patent/EP3715581A1/en not_active Withdrawn
- 2012-12-12 EP EP12871543.0A patent/EP2825727B1/en active Active
-
2016
- 2016-01-13 AU AU2016200194A patent/AU2016200194B2/en not_active Ceased
-
2017
- 2017-09-29 AU AU2017236022A patent/AU2017236022A1/en not_active Abandoned
-
2019
- 2019-09-23 AU AU2019236589A patent/AU2019236589A1/en not_active Abandoned
-
2021
- 2021-09-30 AU AU2021240271A patent/AU2021240271A1/en not_active Abandoned
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
CA2780553A1 (en) | 2013-09-15 |
AU2017236022A1 (en) | 2017-10-26 |
AU2021240271A1 (en) | 2021-10-28 |
EP2825727B1 (en) | 2020-03-25 |
AU2016200194A1 (en) | 2016-02-04 |
AU2012373240A1 (en) | 2014-08-07 |
AU2012373206A1 (en) | 2014-08-07 |
AU2012373206B2 (en) | 2017-07-06 |
HUE049187T2 (en) | 2020-09-28 |
AU2012373240B2 (en) | 2015-10-15 |
EP2825727A2 (en) | 2015-01-21 |
AU2019236589A1 (en) | 2019-10-17 |
AU2016200194B2 (en) | 2018-05-10 |
EP2825724A4 (en) | 2016-06-29 |
WO2013137954A2 (en) | 2013-09-19 |
EP2825724A1 (en) | 2015-01-21 |
EP3715581A1 (en) | 2020-09-30 |
WO2013137954A3 (en) | 2014-09-25 |
ES2782506T3 (en) | 2020-09-15 |
WO2013137933A1 (en) | 2013-09-19 |
CA2780553C (en) | 2015-01-20 |
EP2825727A4 (en) | 2016-06-29 |
PL2825724T3 (en) | 2020-09-07 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11365604B2 (en) | Valve with shuttle | |
US8955601B2 (en) | Flow management system and method | |
CA2792805C (en) | Casing fill-up fluid management tool | |
US10030644B2 (en) | Flow router with retrievable valve assembly | |
EP2825724B1 (en) | Improved production valve | |
RU2333334C1 (en) | Relief valve of downhole motor | |
AU2017232238B2 (en) | Improved valve assembly | |
AU2015101051B4 (en) | Fluid flow manager | |
AU2015201160B2 (en) | Valve with pump rotor passage for use in downhole production strings | |
AU2015203633B2 (en) | Casing Fill-Up Fluid Management Tool |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20140912 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
DAX | Request for extension of the european patent (deleted) | ||
RA4 | Supplementary search report drawn up and despatched (corrected) |
Effective date: 20160531 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: E21B 21/10 20060101ALI20160524BHEP Ipc: E21B 34/16 20060101ALI20160524BHEP Ipc: F16K 15/03 20060101ALI20160524BHEP Ipc: E21B 34/14 20060101ALI20160524BHEP Ipc: F16K 1/00 20060101ALI20160524BHEP Ipc: E21B 34/08 20060101AFI20160524BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20180404 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20190705 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP Ref country code: AT Ref legal event code: REF Ref document number: 1219990 Country of ref document: AT Kind code of ref document: T Effective date: 20200115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602012067006 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: RO Ref legal event code: EPE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20200101 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200401 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200527 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200402 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200501 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200401 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2782506 Country of ref document: ES Kind code of ref document: T3 Effective date: 20200915 |
|
REG | Reference to a national code |
Ref country code: HU Ref legal event code: AG4A Ref document number: E049187 Country of ref document: HU |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602012067006 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 1219990 Country of ref document: AT Kind code of ref document: T Effective date: 20200101 |
|
26N | No opposition filed |
Effective date: 20201002 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602012067006 Country of ref document: DE Representative=s name: HL KEMPNER PATENTANWALT, RECHTSANWALT, SOLICIT, DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20201021 Year of fee payment: 9 Ref country code: FR Payment date: 20201009 Year of fee payment: 9 Ref country code: HU Payment date: 20201031 Year of fee payment: 9 Ref country code: DE Payment date: 20201021 Year of fee payment: 9 Ref country code: IT Payment date: 20201027 Year of fee payment: 9 Ref country code: RO Payment date: 20201015 Year of fee payment: 9 Ref country code: CZ Payment date: 20201022 Year of fee payment: 9 Ref country code: ES Payment date: 20201112 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: PL Payment date: 20201012 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AL Payment date: 20201013 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201023 |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20201031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20201023 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602012067006 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20211023 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20200101 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: RO Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211023 Ref country code: HU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211024 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211023 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20220503 Ref country code: CZ Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211023 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211023 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20230217 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211024 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211023 |