EP2824293A1 - Power plant with integrated fuel gas preheating - Google Patents
Power plant with integrated fuel gas preheating Download PDFInfo
- Publication number
- EP2824293A1 EP2824293A1 EP13175484.8A EP13175484A EP2824293A1 EP 2824293 A1 EP2824293 A1 EP 2824293A1 EP 13175484 A EP13175484 A EP 13175484A EP 2824293 A1 EP2824293 A1 EP 2824293A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- heat exchanger
- feed water
- pressure
- water
- hrsg
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K17/00—Using steam or condensate extracted or exhausted from steam engine plant
- F01K17/02—Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic
- F01K17/025—Using steam or condensate extracted or exhausted from steam engine plant for heating purposes, e.g. industrial, domestic in combination with at least one gas turbine, e.g. a combustion gas turbine
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/02—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled
- F01K23/06—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle
- F01K23/10—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engine cycles being thermally coupled combustion heat from one cycle heating the fluid in another cycle with exhaust fluid of one cycle heating the fluid in another cycle
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K23/00—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids
- F01K23/12—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engines being mechanically coupled
- F01K23/16—Plants characterised by more than one engine delivering power external to the plant, the engines being driven by different fluids the engines being mechanically coupled all the engines being turbines
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C6/00—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use
- F02C6/18—Plural gas-turbine plants; Combinations of gas-turbine plants with other apparatus; Adaptations of gas-turbine plants for special use using the waste heat of gas-turbine plants outside the plants themselves, e.g. gas-turbine power heat plants
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C7/00—Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
- F02C7/08—Heating air supply before combustion, e.g. by exhaust gases
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F02—COMBUSTION ENGINES; HOT-GAS OR COMBUSTION-PRODUCT ENGINE PLANTS
- F02C—GAS-TURBINE PLANTS; AIR INTAKES FOR JET-PROPULSION PLANTS; CONTROLLING FUEL SUPPLY IN AIR-BREATHING JET-PROPULSION PLANTS
- F02C7/00—Features, components parts, details or accessories, not provided for in, or of interest apart form groups F02C1/00 - F02C6/00; Air intakes for jet-propulsion plants
- F02C7/22—Fuel supply systems
- F02C7/224—Heating fuel before feeding to the burner
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B1/00—Methods of steam generation characterised by form of heating method
- F22B1/02—Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers
- F22B1/18—Methods of steam generation characterised by form of heating method by exploitation of the heat content of hot heat carriers the heat carrier being a hot gas, e.g. waste gas such as exhaust gas of internal-combustion engines
-
- Y—GENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
- Y02—TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
- Y02E—REDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
- Y02E20/00—Combustion technologies with mitigation potential
- Y02E20/16—Combined cycle power plant [CCPP], or combined cycle gas turbine [CCGT]
Definitions
- the invention refers to a combined cycle power plant with integrated fuel gas preheating.
- the invention additionally refers to a method for operating a combined cycle power plant with integrated fuel gas preheating.
- a CCPP combined cycle power plant
- CCPP combined cycle power plant
- HRSG heat recovery steam generator
- the EP0931911 A2 describes the extraction of high pressure feed water upstream of a high pressure drum to preheat the fuel gas. The cold HP water is then sub-cooled and discharged to the main condenser.
- the DE 10 2007 054 467 A1 describes a stepwise preheating using different heat sources from the intermediate pressure and low pressure level of the water steam cycle. After extracting heat the water used for preheating is returned to the low pressure system of the HRSG.
- the system described in DE 10 2007 054 467 A1 can lead to improved efficiency but is complex and expensive. In addition all return streams lead to the low pressure system thereby incurring corresponding losses.
- the object of the present disclosure is to propose a CCPP (combined cycle power plant) with a fuel gas preheating which effectively uses heat from the water steam cycle to achieve high plant efficiency and a minimum power loss due to fuel gas preheating.
- CCPP combined cycle power plant
- such a CCPP comprises a gas turbine, and a water steam cycle with a steam turbine, and a HRSG (heat recovery steam generator) with at least two pressure levels. It further comprises a fuel gas preheating for preheating the fuel of the gas turbine with a first heat exchanger for preheating the fuel gas to a first elevated temperature and a second heat exchanger for further preheating the fuel gas to a second elevated temperature.
- the first heat exchanger uses heat extracted from a lower pressure level of the water steam cycle, and a second heat exchanger uses heat extracted from the highest pressure level of the water steam cycle.
- the first heat exchanger for preheating the fuel gas to the first elevated temperature is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, for feeding feed water into the first heat exchanger.
- the second heat exchanger for further preheating the fuel gas to the second elevated temperature is connected to the high pressure feed water with the highest pressure level of the HRSG for feeding high pressure feed water to the second heat exchanger.
- the proposed fuel preheating leads to noticeable advantages over the prior art.
- the size of the heat exchanger operating at the high pressure level can be reduced.
- the first heat exchanger has a lower design pressure thereby reducing the cost.
- the fuel gas can be preheated to a temperature in the range of for example 270 to 350 °C. In particular it can be preheated to a temperature in the range of for example 290 to 310 °C
- the first heat exchanger is connected to a low pressure feed water line or to a medium pressure feed water line of the HRSG for preheating the fuel gas to the first elevated temperature.
- the second heat exchanger for fuel preheating is connected to the exit of the economizer of the HRSG using high pressure feed water to preheat the fuel gas to the second elevated temperature.
- the first heat exchanger can for example be connected to the low pressure feed water line or to the medium pressure feed water line downstream of the economizer. It can also for example be connected to the feed water lines in the middle of the economizer.
- feed water line can be used for the lines for feeding water into the drums of the HRSG.
- a HRSG typically comprises a feed water supply with an economizer for preheating the feed water, a drum, an evaporator, and a superheater.
- a booster pump is connected to a water outlet of the second heat exchanger to re-pressurize the feed water leaving the second heat exchanger to the inlet pressure of the high pressure economizer.
- the water outlet of the second heat exchanger can be connected to feed water line of a lower pressure level of the HRSG or to a drum of a lower pressure level of the HRSG.
- the water outlet of the second heat exchanger can for example be connected to the medium pressure feed water line or to the low pressure feed water line.
- a booster pump is connected to the water outlet of the first heat exchanger to re-pressurize the feed water leaving the first heat exchanger to the pressure level of the feed water used for the first heat exchanger.
- the water outlet of first heat exchanger is connected to the next lower feed water line or to a drum of the next lower pressure level.
- the first heat exchanger can be connected to the medium pressure feed water line, for example downstream of the economizer.
- the outlet of the first heat exchanger can be connected to a booster pump that re-pressurize the feed water leaving the first heat exchanger to the pressure level of the medium pressure feed water for feeding the return water back into the medium pressure economizer.
- the water outlet of the first heat exchanger can also be connected to the feed water line or to a drum of the next lower pressure level, i.e. the low pressure feed water line or drum.
- the water steam cycle comprises a low pressure level, a medium pressure level and a high pressure level.
- the first heat exchanger for preheating fuel gas is connected to the exit of a low pressure economizer or the exit of a medium pressure economizer and the second heat exchanger for preheating fuel gas is connected to the exit of a high pressure economizer.
- the typical pressure range for the high pressure level is 130 to 250 bar, preferably 150 to 220 bar at base load operation.
- the typical pressure range is 30 bar to 100 bar, preferably 50 to 80 bar at base load operation.
- the first heat exchanger for preheating the fuel gas to the first elevated temperature is connected to the low pressure economizer or to the medium pressure economizer (31), and the second heat exchanger for further preheating the fuel gas to the second elevated temperature is connected to the high pressure economizer.
- the exit of the second heat exchanger can be connected to the inlet of an intermediate pressure drum or to the inlet of a low pressure drum.
- the exit of the second heat exchanger can be connected to the inlet of the high pressure economizer or to middle of the high pressure economizer.
- a booster pump can be used to re-pressurize the water leaving the second heat exchanger to feed it back into the high pressure economizer.
- a combined cycle it comprises a flash tank connected to the water outlet of the second heat exchanger.
- the pressure is lowered by flashing the inlet water into the tank and thereby releasing steam.
- the flashed steam can be used in steam turbine to produce power and the remaining water returned to a feed water system of the HRSG at a suitable pressure vessel.
- the water outlet of the flash tank can be connected to the feed water system of the water steam cycle, and the steam outlet of the flash tank can be connected to the steam turbine via a steam line.
- the use of a flash tank can be considered if the water leaving the second heat exchanger is not re-pressurized but returned to a feed water system at a lower pressure level.
- the pressure of the water leaving second heat exchanger is much higher than the pressure level of the feed water system's pressure to which it is added and its temperature still above the boiling temperature at the feed water system pressure use of flash tank can be advantageous.
- the remaining heat in the return water can be used for power production and the water is available at the required pressure.
- the flash tank can for example be connected to a medium pressure or low pressure inter-stage steam feed of the steam turbine.
- the fuel preheating can be arranged and used for preheating the fuel gas of the gas turbine of the CCPP.
- the HRSG can comprise a supplementary firing.
- An optional separate fuel gas preheating can be arranged for preheating the fuel of the supplementary firing or one fuel gas preheating can be provided which has sufficient capacity to preheat the fuel for the gas turbine and the supplementary firing.
- Fuel gas preheating for the supplementary firing can increase the net efficiency of the plant operating with supplementary firing but leads to additional cost and complexity of the plant. Its application needs to be carefully evaluated based on the expected operating time and regime with supplementary firing.
- the feed water is branched off to the fuel preheater from the HRSG feed water system after it is heated in an economizer in a line from the economizer to the drum of respective pressure level.
- the line from feed water system to heat exchanger for fuel gas preheating can be branched off in the middle of the economizer or even upstream of the economizer.
- Such a method can be used for operating a CCPP comprising a gas turbine, a steam turbine, a water steam cycle with HRSG with at least two pressure levels, and a fuel gas preheating for preheating the fuel of the gas turbine.
- the fuel is preheated to a first elevated temperature using feed water from a pressure level of the HRSG, which is below the highest HRSG pressure level, in a first heat exchanger.
- the fuel is further preheated to a second elevated temperature in a second heat exchanger using high pressure feed water with the highest pressure level of the HRSG.
- the high pressure feed water is branched off from the HRSG feed water system and fed to the second heat exchanger.
- the HRSG is operated with three pressure levels.
- Low pressure feed water or medium pressure feed water is fed to the first heat exchanger for preheating the fuel gas to the first elevated temperature, and in that high pressure feed water is heated in a high pressure economizer, and at least part of the heated high pressure feed water is fed into the second heat exchanger for preheating the fuel gas to the second elevated temperature.
- the water leaving the second heat exchanger is returned into the feed water system of a lower pressure level.
- a medium pressure feed water control valve which controls the feed water flow from the economizer to the drum in the respective pressure level of the HRSG, is closed.
- the water flowing through the economizer can be fed to the first heat exchanger.
- a second heat exchanger control valve which controls the water flow through the second heat exchanger, is used to control the water level of the drum into which the high pressure return water is returned.
- the fuel gas temperature after the second heat exchanger cannot be controlled to the design level but is a result of the available heat provided with the resulting water flow.
- the resulting temperature control is also called sliding temperature control.
- the medium pressure feed water control valve is at least partly open and used to control the water level of the drum.
- a second heat exchanger control valve can be used to control the temperature to which the fuel gas is preheated by controlling the feed water flow through the second heat exchanger.
- the water discharged from the second heat exchanger is re-pressurize by a booster pump to the inlet pressure of the high pressure economizer.
- the water discharged from the second heat exchanger is fed to a feed water line or to a drum of a lower pressure level of the HRSG.
- the method can be used for preheating the fuel of the gas turbine. In addition or combination it can be used for preheating fuel gas of a supplementary firing of the HRSG.
- two stage fuel preheating is used for fuel gas; however it can also be used for liquid fuel.
- a power plant for execution of the proposed method comprises a conventional CCPP, and a fuel preheater 2.
- the HRSG can be equipment a supplementary firing 10,
- FIG. 1 A typical arrangement with fuel gas preheating is shown in Fig. 1 .
- a gas turbine 6, which drives a first generator 25, is supplied with compressor inlet gas 3, and fuel 17.
- the compressor inlet gas 3 is compressed in the compressor 1 and the fuel 17 is heated to supply preheated fuel 18 in the fuel preheater 2.
- the compressed gas is used for combustion of preheated fuel 18 in a combustor 4, and pressurized hot gasses expand in a turbine 7.
- the gas turbine's 6 main outputs are electric power, and hot flue gasses 8.
- the gas turbine's hot flue gasses 8 pass through a HRSG 9, which generates steam for a steam turbine 13.
- a supplementary firing 10 can optionally be integrated.
- the supplementary firing 10 is supplied with fuel 11.
- preheated fuel 18 can be supplied to the supplementary firing 10.
- the steam turbine 13 is either arranged as a single shaft configuration with the gas turbine 6 and the first generator 25 (not shown), or is arranged as a multi shaft configuration to drive a second generator 26.
- the steam leaving the steam turbine 13 is condensed in the condensator 14.
- the condensate is collected in the feed water tank 15, re-pressurised by a feed water pump 12 and returned to the HRSG 9.
- Fig. 1 only one feed water pump 12, one line for feed water 16, and one steam turbine 13 are shown.
- the steam cycle is simplified and shown schematically without different steam pressure levels, feed water pumps, etc.
- the feed water is pressurized to two, three or more pressure levels. Accordingly the number of feed water pumps feed water supply lines, and steam turbine will increase to two, three or a higher number. Examples with two and three pressure levels are shown in more detail in the subsequent Figures.
- Fig. 2 shows a HRSG with three pressure levels (low, medium and high pressure) and a fuel preheater 2.
- the hot flue gases from the gas turbine 8 flow through the HRSG 9.
- the hot flue gases pass through a high pressure evaporator 22, a high pressure economizer 30, a medium pressure evaporator 23, a medium pressure economizer 31, and a low pressure evaporator 24, a low pressure economizer 32.
- a superheater is arranged upstream of each evaporator 22, 23, 24 in the hot flue gas 8 flow path. After the useful heat is extracted from the flue gas it leaves the HRGS 9 as flue gas to the stack 19.
- High pressure feed water is supplied to the high pressure economizer 30 via a high pressure feed water line 43, medium pressure feed water is supplied to the medium pressure economizer 31 via a medium pressure feed water line 44, and low pressure feed water is supplied to the low pressure economizer 32 via a low pressure feed water line 45.
- the flow of low pressure feed water to the low pressure drum 29 is controlled by a low pressure feed water control valve 35.
- the flow of medium pressure feed water to the medium pressure drum 28 is controlled by a medium pressure feed water control valve 34, and the flow of high pressure feed water to the high pressure drum 27 is controlled by a high pressure feed water control valve 33.
- Water from the low pressure drum 29 is evaporated in the low pressure evaporator 24 and returned as steam to the low pressure drum 29.
- Water from the medium pressure drum 28 is evaporated in the medium pressure evaporator 23 and returned as steam to the medium pressure drum 28, and water from the high pressure drum 27 is evaporated in the high pressure evaporator 22 and returned as steam to the high pressure drum 27.
- the steam of each respective drum 27, 28, 29 is fed to respective super heaters (not shown) and further to the steam turbine 13, respectively to corresponding low, medium and high pressure steam turbines.
- medium pressure feed water 38 is branched off from the medium pressure feed water line after it is heated in the medium pressure economizer 31 and feed into the first heat exchanger 20 of the fuel preheater 2 to preheat the cold fuel 17 to a first temperature level.
- the medium pressure return water 39 leaving the first heat exchanger 20 is discharged to the feed water tank 15.
- the pressure in first heat exchanger 20 can for example be maintained by an orifice or control valve at the discharge into the feed water tank 15.
- High pressure feed water 36 is branched of the high pressure feed water line after it is heated in the high pressure economizer 30.
- the branched off high pressure feed water 36 is fed into the second heat exchanger 21 of the fuel preheater 2 to further preheat the fuel to a second temperature level.
- the high pressure return water 37 leaving the second heat exchanger 21 is fed to the medium pressure drum 28 thus further utilizing its high pressure level and remaining heat in the water steam cycle.
- the heat release in the second heat exchanger 21 can be controlled by controlling the water flow through the second heat exchanger 21. In the example shown the water flow is controlled by the second heat exchanger control valve 40.
- the schematic Fig. 3 is a simplification of a HRSG 9 with fuel preheater 2 based on Fig. 2.
- the HRSG 9 has only two pressure levels. For cost reasons and simplification of the plant one pressure level is omitted.
- the low pressure level is omitted.
- the medium pressure level could also be called low pressure level; however the naming remains unchanged in this example.
- the low pressure economizer 32 with low pressure feed water line 45, low pressure feed water control valve 35 as well as low pressure drum 29 and low pressure evaporator 24 are omitted.
- the flue gas to the stack 19 is released from the HRSG 9 downstream of the medium pressure economizer 31.
- Fig. 4 schematically shows another example of a HRSG 9 with three pressure levels.
- This example is a modification based on the arrangement of Fig. 2 .
- booster pump 48 Instead of feeding the high pressure return water 37 leaving the second heat exchanger 21 to the medium pressure drum 28 it is re-pressurized in by booster pump 48 and returned to the high pressure feed water line 43 upstream of the high pressure economizer 30.
- the high pressure feed water flow coming from the high pressure feed water pump can be reduced and the high pressure level and remaining heat of the return water from the second heat exchanger 21 can be efficiently used.
- the heat release in the second heat exchanger 21 can be controlled by controlling the water flow through the second heat exchanger 21. In the example shown the water flow is controlled by controlling the booster pump 48, e.g. with a variable speed drive.
- Fig. 5 schematically shows another example with a modification based on Fig. 2 .
- the medium pressure return water 39 leaving the first heat exchanger 20 is not discharged to the feed water tank 15.
- the medium pressure return water 39 is fed to the low pressure drum 29 thus using its pressure level and remaining heat.
- the heat release in the first heat exchanger 20 can be controlled by controlling the water flow through the first heat exchanger 20. In the example shown the water flow is controlled by the first heat exchanger control valve 41.
- Fig. 6 schematically shows yet another example of a HRSG 9 with three pressure levels, and a fuel preheater 2. It shows a modification based on the example of Fig. 2 .
- a flash tank 42 instead of feeding the high pressure return water 37 leaving the second heat exchanger 21 to the medium pressure drum 28 it is discharged into a flash tank 42 to generate steam from the return water 37 of the second heat exchanger 21.
- the steam can be fed via a flash steam line 46 to the steam turbine 13.
- the remaining water can be fed back into the medium pressure feed water line 44.
- a second heat exchanger control valve 40 is arranged upstream of the flash tank 42.
- Fig. 7 schematically shows another example of a HRSG 9 with three pressure levels, and a fuel preheater 2. It shows a modification based on the example of Fig. 2 .
- the steam generator of the high pressure level does not comprise an evaporator, boiler and super heater. Instead, it comprises a once through steam generator 49 at high pressure level.
- a once through steam generator can also be used for the medium and low pressure level and in any combination of pressure levels.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- Sustainable Development (AREA)
- Sustainable Energy (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
- Air Supply (AREA)
Abstract
The invention refers to a CCPP comprising a gas turbine (6), a water steam cycle with a steam turbine (13) and a HRSG (9) with at least two pressure levels, and a fuel preheater (2) for preheating the fuel (18) of the gas turbine (6). The fuel preheater comprises a first heat exchanger (20) for preheating the fuel (17) to a first elevated temperature, which is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, and a second heat exchanger (21) for further preheating the fuel gas to a second elevated temperature, which is connected to the high pressure feed water (36) with the highest pressure level of the HRSG (9).
The disclosure further refers to a method for operating a CCPP with such a fuel preheater (2).
Description
- The invention refers to a combined cycle power plant with integrated fuel gas preheating. The invention additionally refers to a method for operating a combined cycle power plant with integrated fuel gas preheating.
- A CCPP (combined cycle power plant) is a power plant in combination of a gas turbine and a steam turbine with a high thermal efficiency so constructed as to lead high temperature exhaust gas from the gas turbine to a heat recovery steam generator (HRSG) and to generate steam by heat energy retained in the exhaust gas. This steam enables the power generation by the steam turbine, and coupled with power generated by the gas turbine, it is possible to improve thermal efficiency equivalent to thermal energy retained in exhaust gas compared with the independent power generation by a gas turbine.
- For improving thermal efficiency of a CCPP, it is most effective to increase the hot gas temperature at the inlet of gas turbine to a higher temperature. However, even with the latest material and combustion technology, the hot gas temperatures are limited due to life time and emission reasons. To further increase the efficiency of CCPPs fuel gas preheating has been proposed.
- The
EP0931911 A2 describes the extraction of high pressure feed water upstream of a high pressure drum to preheat the fuel gas. The cold HP water is then sub-cooled and discharged to the main condenser. - The use of such fuel gas preheating systems improves the overall efficiency. However, it incurs mayor exergy losses because high grade heat from a high pressure level is used.
- The
DE 10 2007 054 467 A1DE 10 2007 054 467 A1 - The object of the present disclosure is to propose a CCPP (combined cycle power plant) with a fuel gas preheating which effectively uses heat from the water steam cycle to achieve high plant efficiency and a minimum power loss due to fuel gas preheating.
- According to one embodiment such a CCPP comprises a gas turbine, and a water steam cycle with a steam turbine, and a HRSG (heat recovery steam generator) with at least two pressure levels. It further comprises a fuel gas preheating for preheating the fuel of the gas turbine with a first heat exchanger for preheating the fuel gas to a first elevated temperature and a second heat exchanger for further preheating the fuel gas to a second elevated temperature. The first heat exchanger uses heat extracted from a lower pressure level of the water steam cycle, and a second heat exchanger uses heat extracted from the highest pressure level of the water steam cycle. To this end the first heat exchanger for preheating the fuel gas to the first elevated temperature is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, for feeding feed water into the first heat exchanger. The second heat exchanger for further preheating the fuel gas to the second elevated temperature is connected to the high pressure feed water with the highest pressure level of the HRSG for feeding high pressure feed water to the second heat exchanger.
- The proposed fuel preheating leads to noticeable advantages over the prior art. First of all, the use of two heat sources with different temperatures leads to an increased efficiency. Further, the re-introduction of the return water into the feed water system reduces the total pressure losses incurred on the water side due to the fuel preheating.
- Due to the use of two stage pre-heaters the size of the heat exchanger operating at the high pressure level can be reduced. The first heat exchanger has a lower design pressure thereby reducing the cost.
- Because water leaving the fuel gas preheater is reintroduced to the feed water system the size of the feed water pump for the respective pressure level into which the water is returned can be reduced.
- By using a two stage fuel pre-heater the fuel can economically be preheated to higher temperatures. The fuel gas can be preheated to a temperature in the range of for example 270 to 350 °C. In particular it can be preheated to a temperature in the range of for example 290 to 310 °C
- The use of water for preheating is thermodynamically more efficient than the use of steam. Further it allows the use of smaller heat exchangers.
- In an embodiment of the CCPP the first heat exchanger is connected to a low pressure feed water line or to a medium pressure feed water line of the HRSG for preheating the fuel gas to the first elevated temperature. The second heat exchanger for fuel preheating is connected to the exit of the economizer of the HRSG using high pressure feed water to preheat the fuel gas to the second elevated temperature. The first heat exchanger can for example be connected to the low pressure feed water line or to the medium pressure feed water line downstream of the economizer. It can also for example be connected to the feed water lines in the middle of the economizer.
- In this context the expression feed water line can be used for the lines for feeding water into the drums of the HRSG. For each pressure level a HRSG typically comprises a feed water supply with an economizer for preheating the feed water, a drum, an evaporator, and a superheater.
- According to a further embodiment of the CCPP a booster pump is connected to a water outlet of the second heat exchanger to re-pressurize the feed water leaving the second heat exchanger to the inlet pressure of the high pressure economizer.
- Alternatively or in combination the water outlet of the second heat exchanger can be connected to feed water line of a lower pressure level of the HRSG or to a drum of a lower pressure level of the HRSG. For a HRSG with three pressure levels, i.e. a low, medium, and high pressure level the water outlet of the second heat exchanger can for example be connected to the medium pressure feed water line or to the low pressure feed water line.
- According to yet a further embodiment of the CCPP a booster pump is connected to the water outlet of the first heat exchanger to re-pressurize the feed water leaving the first heat exchanger to the pressure level of the feed water used for the first heat exchanger.
- Alternatively or in combination the water outlet of first heat exchanger is connected to the next lower feed water line or to a drum of the next lower pressure level.
- For a HRSG with three pressure levels the first heat exchanger can be connected to the medium pressure feed water line, for example downstream of the economizer. The outlet of the first heat exchanger can be connected to a booster pump that re-pressurize the feed water leaving the first heat exchanger to the pressure level of the medium pressure feed water for feeding the return water back into the medium pressure economizer.
- The water outlet of the first heat exchanger can also be connected to the feed water line or to a drum of the next lower pressure level, i.e. the low pressure feed water line or drum.
- According to one embodiment the water steam cycle comprises a low pressure level, a medium pressure level and a high pressure level. In this plant the first heat exchanger for preheating fuel gas is connected to the exit of a low pressure economizer or the exit of a medium pressure economizer and the second heat exchanger for preheating fuel gas is connected to the exit of a high pressure economizer.
- The typical pressure range for the high pressure level is 130 to 250 bar, preferably 150 to 220 bar at base load operation. For the medium pressure level the typical pressure range is 30 bar to 100 bar, preferably 50 to 80 bar at base load operation.
- According to a further embodiment of a CCPP with a HRSG having three pressure levels the first heat exchanger for preheating the fuel gas to the first elevated temperature is connected to the low pressure economizer or to the medium pressure economizer (31), and the second heat exchanger for further preheating the fuel gas to the second elevated temperature is connected to the high pressure economizer.
- Alternatively or in combination the exit of the second heat exchanger can be connected to the inlet of an intermediate pressure drum or to the inlet of a low pressure drum.
- According to a further embodiment of a combined cycle power with a HRSG having three pressure levels the exit of the second heat exchanger can be connected to the inlet of the high pressure economizer or to middle of the high pressure economizer. Typically a booster pump can be used to re-pressurize the water leaving the second heat exchanger to feed it back into the high pressure economizer.
- According to a further embodiment of a combined cycle it comprises a flash tank connected to the water outlet of the second heat exchanger. In the flash tank the pressure is lowered by flashing the inlet water into the tank and thereby releasing steam. The flashed steam can be used in steam turbine to produce power and the remaining water returned to a feed water system of the HRSG at a suitable pressure vessel. For this the water outlet of the flash tank can be connected to the feed water system of the water steam cycle, and the steam outlet of the flash tank can be connected to the steam turbine via a steam line. The use of a flash tank can be considered if the water leaving the second heat exchanger is not re-pressurized but returned to a feed water system at a lower pressure level. If the pressure of the water leaving second heat exchanger is much higher than the pressure level of the feed water system's pressure to which it is added and its temperature still above the boiling temperature at the feed water system pressure use of flash tank can be advantageous. The remaining heat in the return water can be used for power production and the water is available at the required pressure.
- The flash tank can for example be connected to a medium pressure or low pressure inter-stage steam feed of the steam turbine.
- The fuel preheating can be arranged and used for preheating the fuel gas of the gas turbine of the CCPP. Optionally the HRSG can comprise a supplementary firing. An optional separate fuel gas preheating can be arranged for preheating the fuel of the supplementary firing or one fuel gas preheating can be provided which has sufficient capacity to preheat the fuel for the gas turbine and the supplementary firing. Fuel gas preheating for the supplementary firing can increase the net efficiency of the plant operating with supplementary firing but leads to additional cost and complexity of the plant. Its application needs to be carefully evaluated based on the expected operating time and regime with supplementary firing.
- Typically the feed water is branched off to the fuel preheater from the HRSG feed water system after it is heated in an economizer in a line from the economizer to the drum of respective pressure level. Depending on the heat requirements and the temperature level of the feed water the line from feed water system to heat exchanger for fuel gas preheating can be branched off in the middle of the economizer or even upstream of the economizer.
- Besides the CCPP a method for operating such a CCPP is subject of the present disclosure. Such a method can be used for operating a CCPP comprising a gas turbine, a steam turbine, a water steam cycle with HRSG with at least two pressure levels, and a fuel gas preheating for preheating the fuel of the gas turbine. According to the proposed method the fuel is preheated to a first elevated temperature using feed water from a pressure level of the HRSG, which is below the highest HRSG pressure level, in a first heat exchanger. After passing through the first heat exchanger the fuel is further preheated to a second elevated temperature in a second heat exchanger using high pressure feed water with the highest pressure level of the HRSG. The high pressure feed water is branched off from the HRSG feed water system and fed to the second heat exchanger.
- According to one embodiment of the method the HRSG is operated with three pressure levels. Low pressure feed water or medium pressure feed water is fed to the first heat exchanger for preheating the fuel gas to the first elevated temperature, and in that high pressure feed water is heated in a high pressure economizer, and at least part of the heated high pressure feed water is fed into the second heat exchanger for preheating the fuel gas to the second elevated temperature.
- According to a further embodiment of the method the water leaving the second heat exchanger is returned into the feed water system of a lower pressure level. During low load operation of the gas turbine a medium pressure feed water control valve, which controls the feed water flow from the economizer to the drum in the respective pressure level of the HRSG, is closed. The water flowing through the economizer can be fed to the first heat exchanger. At the same time a second heat exchanger control valve, which controls the water flow through the second heat exchanger, is used to control the water level of the drum into which the high pressure return water is returned. In this operating mode the fuel gas temperature after the second heat exchanger cannot be controlled to the design level but is a result of the available heat provided with the resulting water flow. The resulting temperature control is also called sliding temperature control.
- At high part load operation and base load operation of the gas turbine the medium pressure feed water control valve is at least partly open and used to control the water level of the drum. A second heat exchanger control valve can be used to control the temperature to which the fuel gas is preheated by controlling the feed water flow through the second heat exchanger.
- According to another embodiment of the method the water discharged from the second heat exchanger is re-pressurize by a booster pump to the inlet pressure of the high pressure economizer. Alternatively the water discharged from the second heat exchanger is fed to a feed water line or to a drum of a lower pressure level of the HRSG.
- The method can be used for preheating the fuel of the gas turbine. In addition or combination it can be used for preheating fuel gas of a supplementary firing of the HRSG.
- Typically two stage fuel preheating is used for fuel gas; however it can also be used for liquid fuel.
- The disclosure, its nature as well as its advantages, shall be described in more detail below with the aid of the accompanying schematic drawings. Referring to the drawings:
-
Fig. 1 schematically shows a CCPP with a gas turbine, a HRSG with supplementary firing, and fuel gas preheating. -
Fig. 2 schematically shows a HRSG with three pressure levels and fuel gas preheater. -
Fig. 3 schematically shows a HRSG with two pressure levels and fuel gas preheater. -
Fig. 4 schematically shows a HRSG with three pressure levels, fuel gas preheater and a booster pump to re-pressurize the return water from second heat exchanger of the fuel gas preheater to the high pressure feed water of the HRSG.. -
Fig. 5 schematically shows a HRSG with three pressure levels, fuel gas preheater and release of the first and second heat exchanger outlet water to the respective next lower feed water pressure level of the HRSG. -
Fig. 6 schematically shows a HRSG with three pressure levels, fuel gas preheater and a flash tank to generate steam from the return water of the second heat exchanger. -
Fig. 7 schematically shows a HRSG with three pressure levels, a once through steam generator at high pressure and fuel gas preheater. - A power plant for execution of the proposed method comprises a conventional CCPP, and a
fuel preheater 2. Optionally the HRSG can be equipment asupplementary firing 10, - A typical arrangement with fuel gas preheating is shown in
Fig. 1 . A gas turbine 6, which drives afirst generator 25, is supplied withcompressor inlet gas 3, andfuel 17. Thecompressor inlet gas 3 is compressed in thecompressor 1 and thefuel 17 is heated to supplypreheated fuel 18 in thefuel preheater 2. The compressed gas is used for combustion ofpreheated fuel 18 in acombustor 4, and pressurized hot gasses expand in aturbine 7. The gas turbine's 6 main outputs are electric power, andhot flue gasses 8. - The gas turbine's
hot flue gasses 8 pass through aHRSG 9, which generates steam for asteam turbine 13. In theHRSG 9 or the flue gas duct from the gas turbine 6 to the HRSG 9 a supplementary firing 10 can optionally be integrated. Thesupplementary firing 10 is supplied withfuel 11. Optionallypreheated fuel 18 can be supplied to thesupplementary firing 10. - The
steam turbine 13 is either arranged as a single shaft configuration with the gas turbine 6 and the first generator 25 (not shown), or is arranged as a multi shaft configuration to drive asecond generator 26. The steam leaving thesteam turbine 13 is condensed in thecondensator 14. The condensate is collected in thefeed water tank 15, re-pressurised by a feed water pump 12 and returned to theHRSG 9. InFig. 1 only one feed water pump 12, one line forfeed water 16, and onesteam turbine 13 are shown. - The steam cycle is simplified and shown schematically without different steam pressure levels, feed water pumps, etc. Depending on the
HRSG 9 design the feed water is pressurized to two, three or more pressure levels. Accordingly the number of feed water pumps feed water supply lines, and steam turbine will increase to two, three or a higher number. Examples with two and three pressure levels are shown in more detail in the subsequent Figures. - Different exemplary embodiments of the
HRSG 9 withfuel preheater 2 are shown inFigs. 2 to 6 . For simplification no subsequent firing is shown in these Figures and the steam turbines with different pressure levels and additional feed lines are omitted. - The embodiment of
Fig. 2 shows a HRSG with three pressure levels (low, medium and high pressure) and afuel preheater 2. The hot flue gases from thegas turbine 8 flow through theHRSG 9. In the schematic the hot flue gases pass through ahigh pressure evaporator 22, ahigh pressure economizer 30, amedium pressure evaporator 23, amedium pressure economizer 31, and alow pressure evaporator 24, alow pressure economizer 32. Typically a superheater is arranged upstream of each evaporator 22, 23, 24 in thehot flue gas 8 flow path. After the useful heat is extracted from the flue gas it leaves theHRGS 9 as flue gas to thestack 19. - High pressure feed water is supplied to the
high pressure economizer 30 via a high pressurefeed water line 43, medium pressure feed water is supplied to themedium pressure economizer 31 via a medium pressurefeed water line 44, and low pressure feed water is supplied to thelow pressure economizer 32 via a low pressurefeed water line 45. The flow of low pressure feed water to thelow pressure drum 29 is controlled by a low pressure feedwater control valve 35. The flow of medium pressure feed water to themedium pressure drum 28 is controlled by a medium pressure feedwater control valve 34, and the flow of high pressure feed water to thehigh pressure drum 27 is controlled by a high pressure feedwater control valve 33. - Water from the
low pressure drum 29 is evaporated in thelow pressure evaporator 24 and returned as steam to thelow pressure drum 29. Water from themedium pressure drum 28 is evaporated in themedium pressure evaporator 23 and returned as steam to themedium pressure drum 28, and water from thehigh pressure drum 27 is evaporated in thehigh pressure evaporator 22 and returned as steam to thehigh pressure drum 27. The steam of eachrespective drum steam turbine 13, respectively to corresponding low, medium and high pressure steam turbines. - For fuel preheating medium
pressure feed water 38 is branched off from the medium pressure feed water line after it is heated in themedium pressure economizer 31 and feed into thefirst heat exchanger 20 of thefuel preheater 2 to preheat thecold fuel 17 to a first temperature level. The medium pressure returnwater 39 leaving thefirst heat exchanger 20 is discharged to thefeed water tank 15. The pressure infirst heat exchanger 20 can for example be maintained by an orifice or control valve at the discharge into thefeed water tank 15. - High
pressure feed water 36 is branched of the high pressure feed water line after it is heated in thehigh pressure economizer 30. The branched off highpressure feed water 36 is fed into thesecond heat exchanger 21 of thefuel preheater 2 to further preheat the fuel to a second temperature level. The highpressure return water 37 leaving thesecond heat exchanger 21 is fed to themedium pressure drum 28 thus further utilizing its high pressure level and remaining heat in the water steam cycle. The heat release in thesecond heat exchanger 21 can be controlled by controlling the water flow through thesecond heat exchanger 21. In the example shown the water flow is controlled by the second heatexchanger control valve 40. - The schematic
Fig. 3 is a simplification of aHRSG 9 withfuel preheater 2 based onFig. 2. In this example theHRSG 9 has only two pressure levels. For cost reasons and simplification of the plant one pressure level is omitted. Based onFig. 2 the low pressure level is omitted. The medium pressure level could also be called low pressure level; however the naming remains unchanged in this example. Based onFig. 2 simply thelow pressure economizer 32 with low pressurefeed water line 45, low pressure feedwater control valve 35 as well aslow pressure drum 29 andlow pressure evaporator 24 are omitted. The flue gas to thestack 19 is released from theHRSG 9 downstream of themedium pressure economizer 31. -
Fig. 4 schematically shows another example of aHRSG 9 with three pressure levels. This example is a modification based on the arrangement ofFig. 2 . Instead of feeding the highpressure return water 37 leaving thesecond heat exchanger 21 to themedium pressure drum 28 it is re-pressurized in bybooster pump 48 and returned to the high pressurefeed water line 43 upstream of thehigh pressure economizer 30. Thereby the high pressure feed water flow coming from the high pressure feed water pump can be reduced and the high pressure level and remaining heat of the return water from thesecond heat exchanger 21 can be efficiently used. Also in this example the heat release in thesecond heat exchanger 21 can be controlled by controlling the water flow through thesecond heat exchanger 21. In the example shown the water flow is controlled by controlling thebooster pump 48, e.g. with a variable speed drive. -
Fig. 5 schematically shows another example with a modification based onFig. 2 . In this example the medium pressure returnwater 39 leaving thefirst heat exchanger 20 is not discharged to thefeed water tank 15. Here the medium pressure returnwater 39 is fed to thelow pressure drum 29 thus using its pressure level and remaining heat. The heat release in thefirst heat exchanger 20 can be controlled by controlling the water flow through thefirst heat exchanger 20. In the example shown the water flow is controlled by the first heatexchanger control valve 41. -
Fig. 6 schematically shows yet another example of aHRSG 9 with three pressure levels, and afuel preheater 2. It shows a modification based on the example ofFig. 2 . Instead of feeding the highpressure return water 37 leaving thesecond heat exchanger 21 to themedium pressure drum 28 it is discharged into aflash tank 42 to generate steam from thereturn water 37 of thesecond heat exchanger 21. The steam can be fed via aflash steam line 46 to thesteam turbine 13. The remaining water can be fed back into the medium pressurefeed water line 44. To control the second heat exchanger 21 a second heatexchanger control valve 40 is arranged upstream of theflash tank 42. -
Fig. 7 schematically shows another example of aHRSG 9 with three pressure levels, and afuel preheater 2. It shows a modification based on the example ofFig. 2 . The steam generator of the high pressure level does not comprise an evaporator, boiler and super heater. Instead, it comprises a once throughsteam generator 49 at high pressure level. - A once through steam generator can also be used for the medium and low pressure level and in any combination of pressure levels.
- All the explained advantages are not limited to the specified combinations but can also be used in other combinations or alone without departing from the scope of the disclosure. Other possibilities are optionally conceivable, for example, for the return water from the first heat exchanger can also be supplied to a flash tank for producing low pressure steam for a low pressure steam turbine.
- 1
- Compressor
- 2
- Fuel preheater
- 3
- Compressor inlet gas
- 4
- Combustor
- 5
- Fuel gas for GT
- 6
- Gas turbine (GT)
- 7
- Turbine
- 8
- Hot flue gas from gas turbine
- 9
- HRSG (HRSG)
- 10
- Supplementary firing
- 11
- Fuel for supplementary firing
- 12
- Feed water pump
- 13
- Steam turbine
- 14
- Condenser
- 15
- Feed water tank
- 16
- Feed water
- 17
- Cold fuel gas
- 18
- Preheated fuel gas
- 19
- Flue gas to stack
- 20
- First heat exchanger
- 21
- Second heat exchanger
- 22
- High pressure evaporator
- 23
- Medium pressure evaporator
- 24
- Low pressure evaporator
- 25
- First generator
- 26
- Second generator
- 27
- High pressure drum
- 28
- Medium pressure drum
- 29
- Low pressure drum
- 30
- High pressure economizer
- 31
- Medium pressure economizer
- 32
- Low pressure economizer
- 33
- High pressure feed water control valve
- 34
- Medium pressure feed water control valve
- 35
- Low pressure feed water control valve
- 36
- High pressure feed water
- 37
- High pressure return water
- 38
- Medium pressure feed water
- 39
- Medium pressure return water
- 40
- Second heat exchanger control valve
- 41
- First heat exchanger control valve
- 42
- High pressure return water flash tank
- 43
- High pressure feed water line
- 44
- Medium pressure feed water line
- 45
- Low pressure feed water line
- 46
- Flash steam line
- 47
- Interstage steam feed
- 48
- Booster pump
- 49
- Once through steam generator
Claims (15)
- CCPP comprising a gas turbine (6), a water steam cycle with a steam turbine (13) and a HRSG (9) with at least two pressure levels, and a fuel preheater (2) for preheating the fuel (18) of the gas turbine (6), characterized in that the fuel preheating comprises a first heat exchanger (20) for preheating the fuel (17) to a first elevated temperature, which is connected to a feed water line from a pressure level of the HRSG, which is below the highest HRSG pressure level, for feeding feed water into the first heat exchanger (20), and a second heat exchanger (21) for further preheating the fuel gas to a second elevated temperature, which is connected to the high pressure feed water (36) with the highest pressure level of the HRSG (9) for feeding high pressure feed water to the second heat exchanger (21).
- CCPP according to claim 1,
characterized in that the first heat exchanger (20) is connected to a low pressure feed water line (45) or to a medium pressure feed water line (44) of the HRSG (9) for preheating the fuel gas (17) to the first elevated temperature, and in that the second heat exchanger (21) is connected to the exit of the economizer (30) of the HRSG (9) using high pressure feed water (36) to preheat the fuel gas to the second elevated temperature. - CCPP according to claim 1 or 2,
characterized in that a booster pump (48) is connected to a water outlet of the second heat exchanger (21) to re-pressurize the feed water (36) leaving the second heat exchanger (21) to the inlet pressure of the high pressure economizer (22) or in that the water outlet of the second heat exchanger (21) is connected to the feed water line (44, 45) of a lower pressure level of the HRSG or to a drum (28, 29) of a lower pressure level of the HRSG (9). - CCPP according to one of the claim 1 to 3,
characterized in that a booster pump is connected to the water outlet of the first heat exchanger (20) to re-pressurize the feed water leaving the first heat exchanger (20) to the pressure level of the feed water used for the first heat exchanger (21) or in that the water outlet of the first heat exchanger (20) is connected to a feed water line (45) with a lower feed water pressure or to a drum (29) with a lower feed pressure level. - CCPP according to claim 1
characterized in that the water steam cycle comprises a low pressure level, a medium pressure level and a high pressure level and in that the first heat exchanger (20) for preheating fuel gas (17) is connected to the exit of a low pressure economizer (32) or the exit of a medium pressure economizer (31) - CCPP according to claim 5
characterized in that the second heat exchanger (21) for further preheating the fuel gas to the second elevated temperature is connected to the high pressure economizer (30). - CCPP according to claim 5 or 6,
characterized in that the exit of the second heat exchanger (21) is connected to the inlet of an intermediate pressure drum (28) or to the inlet of a low pressure drum (29). - CCPP according to claim 5 or 6,
characterized in that the exit of the second heat exchanger (21) is connected to the inlet of the high pressure economizer (20) or to middle of the high pressure economizer (20). - CCPP according to one of the claims 1 to 8,
characterized in that it comprises a flash tank (42) connected to the water outlet of the second heat exchanger (21) wherein the water outlet of the flash tank (42) is connected to the feed water system of the water steam cycle, and wherein the steam outlet of the flash tank (42) is connected to the steam turbine (13) via a flash steam line (46). - CCPP according to claims 9,
characterized in that the steam outlet flash tank (42) is connected to a medium pressure inter-stage steam feed (47) or low pressure inter-stage steam feed (47) of the steam turbine (13). - Method of operating a CCPP comprising a gas turbine (6), a water steam cycle with a steam turbine (13) and a HRSG (9) with at least two pressure levels, and a fuel preheater (2) for preheating the fuel (18), characterized in that the fuel (18) for the gas turbine (6) is preheated to a first elevated temperature using feed water from a first pressure level of the HRSG (9), which is below the highest HRSG (9) pressure level in a first heat exchanger (20), and in that the fuel (18) is further preheated to a second elevated temperature in a second heat exchanger (21) using high pressure feed water (36) with the highest pressure level of the HRSG (9).
- Method of operating a CCPP according to claim 11,
characterized in that the HRSG (9) is operated with three pressure levels, and low pressure feed water (45) or medium pressure feed water (38, 44) is fed to the first heat exchanger (20) for preheating the fuel gas (17) to the first elevated temperature, and in that high pressure feed water is heated in a high pressure economizer (30), and at least part of the heated high pressure feed water 36 is fed into the second heat exchanger (21) for preheating the fuel gas (18) to the second elevated temperature. - Method of operating a CCPP according to claim 11 or 12,
characterized the water leaving the second heat exchanger (21) is returned into the feed water system of a lower pressure level and in that at low load operation of the gas turbine (6) a medium pressure feed water control valve (34) is closed, and a second heat exchanger control valve (40), which controls the water flow through the second heat exchanger (21), is used to control the water level of the drum (28, 29) into which the high pressure return water (37) is returned. - Method of operating a CCPP according to one of the claims 11 to 13,
characterized in that at high part load operation and base load operation of the gas turbine (6) medium pressure feed water control valve (34) is used to control the water level of the drum (28, 29) and a second heat exchanger control valve (40) is used to control the temperature to which the fuel gas (18) is preheated by controlling the feed water flow through the second heat exchanger (21). - Method of operating a CCPP according to claim 11 or 12,
characterized in that water discharged from the second heat exchanger (21) is re-pressurize by a booster pump (48) to the inlet pressure of the high pressure economizer (22) or in that the water discharged from the second heat exchanger (21) is fed to a feed water line (44, 45) or to a drum (28, 29) of a lower pressure level of the HRSG (9).
Priority Applications (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13175484.8A EP2824293A1 (en) | 2013-07-08 | 2013-07-08 | Power plant with integrated fuel gas preheating |
EP14173590.2A EP2824294A1 (en) | 2013-07-08 | 2014-06-24 | Power plant with integrated fuel gas preheating |
US14/317,723 US10006313B2 (en) | 2013-07-08 | 2014-06-27 | Power plant with integrated fuel gas preheating |
IN1798DE2014 IN2014DE01798A (en) | 2013-07-08 | 2014-07-03 | |
KR1020140084380A KR101594323B1 (en) | 2013-07-08 | 2014-07-07 | Power plant with integrated fuel gas preheating |
RU2014127721/02A RU2595192C2 (en) | 2013-07-08 | 2014-07-07 | Power plant with built-in pre-heating of fuel gas |
CN201410322059.2A CN104279058B (en) | 2013-07-08 | 2014-07-08 | Combined cycle power plant and method of operating a combined cycle power plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP13175484.8A EP2824293A1 (en) | 2013-07-08 | 2013-07-08 | Power plant with integrated fuel gas preheating |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2824293A1 true EP2824293A1 (en) | 2015-01-14 |
Family
ID=48746360
Family Applications (2)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP13175484.8A Withdrawn EP2824293A1 (en) | 2013-07-08 | 2013-07-08 | Power plant with integrated fuel gas preheating |
EP14173590.2A Withdrawn EP2824294A1 (en) | 2013-07-08 | 2014-06-24 | Power plant with integrated fuel gas preheating |
Family Applications After (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP14173590.2A Withdrawn EP2824294A1 (en) | 2013-07-08 | 2014-06-24 | Power plant with integrated fuel gas preheating |
Country Status (6)
Country | Link |
---|---|
US (1) | US10006313B2 (en) |
EP (2) | EP2824293A1 (en) |
KR (1) | KR101594323B1 (en) |
CN (1) | CN104279058B (en) |
IN (1) | IN2014DE01798A (en) |
RU (1) | RU2595192C2 (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160230606A1 (en) * | 2013-09-19 | 2016-08-11 | Siemens Aktiengesellschaft | Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step |
CN115183222A (en) * | 2022-06-16 | 2022-10-14 | 西安热工研究院有限公司 | Coupling system for waste heat utilization of tail flue gas of waste heat boiler and natural gas heating |
Families Citing this family (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2787868C (en) * | 2011-09-07 | 2016-07-12 | Alstom Technology Ltd | Method for operating a power plant |
EP2824293A1 (en) * | 2013-07-08 | 2015-01-14 | Alstom Technology Ltd | Power plant with integrated fuel gas preheating |
JP6415219B2 (en) * | 2014-09-26 | 2018-10-31 | 三菱日立パワーシステムズ株式会社 | Boiler, combined cycle plant and boiler operation method |
US10221726B2 (en) * | 2015-12-21 | 2019-03-05 | Cockerill Maintenance & Ingenierie S.A. | Condensing heat recovery steam generator |
US9828884B2 (en) * | 2016-02-25 | 2017-11-28 | General Electric Technology Gmbh | System and method for preheating a heat recovery steam generator |
US10900418B2 (en) * | 2017-09-28 | 2021-01-26 | General Electric Company | Fuel preheating system for a combustion turbine engine |
CN107989677B (en) * | 2017-11-29 | 2019-11-01 | 哈尔滨工程大学 | The residual heat combined recovery system of marine diesel EGR gas and control strategy |
US11199113B2 (en) * | 2018-12-21 | 2021-12-14 | General Electric Company | Combined cycle power plant and method for operating the combined cycle power plant |
US11719156B2 (en) * | 2021-03-30 | 2023-08-08 | Doosan Enerbility Co., Ltd. | Combined power generation system with feedwater fuel preheating arrangement |
EP4071338B1 (en) | 2021-04-08 | 2024-01-31 | General Electric Technology GmbH | Gas turbine system having serial heat exchangers |
CN114165826B (en) * | 2022-02-11 | 2022-05-10 | 中国能源建设集团山西省电力勘测设计院有限公司 | Steam extraction and heat supply operation method of cogeneration unit under low heat load |
US12031457B2 (en) | 2022-10-25 | 2024-07-09 | Ge Infrastructure Technology Llc | Combined cycle power plant having reduced parasitic pumping losses |
US12173650B2 (en) | 2022-10-25 | 2024-12-24 | Ge Infrastructure Technology Llc | Combined cycle power plant having reduced parasitic pumping losses |
KR20240093200A (en) * | 2022-12-15 | 2024-06-24 | 두산에너빌리티 주식회사 | Vertical type heat recovery steam generator and combined cycle system comprising it |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0931911A2 (en) | 1998-01-19 | 1999-07-28 | Kabushiki Kaisha Toshiba | Combined cycle power plant |
US6269626B1 (en) * | 2000-03-31 | 2001-08-07 | Duk M. Kim | Regenerative fuel heating system |
EP1199445A1 (en) * | 2000-10-17 | 2002-04-24 | Siemens Aktiengesellschaft | Apparatus and method of fuel preheating in combined gas and steam turbine plants |
DE102007054467A1 (en) | 2007-11-13 | 2009-05-20 | Triesch, Frank, Dr. Ing. | Method for preheating fuel in gas and steam power plant, involves guiding steam or condenser water of condenser as heat transfer medium by heat exchanger |
Family Cites Families (29)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU601441A1 (en) | 1976-06-07 | 1978-04-05 | Ленинградский Ордена Ленина Политехнический Институт Имени М.И.Калинина | Steam-gas unit |
US4354347A (en) | 1980-06-02 | 1982-10-19 | General Electric Company | Combined cycle system for optimizing cycle efficiency having varying sulfur content fuels |
JPH0718525B2 (en) | 1987-05-06 | 1995-03-06 | 株式会社日立製作所 | Exhaust gas boiler |
DE19512466C1 (en) | 1995-04-03 | 1996-08-22 | Siemens Ag | Steam generator operating method for gas and steam turbine plant |
DE19736889C1 (en) | 1997-08-25 | 1999-02-11 | Siemens Ag | Operating method for combined gas-and-steam turbine plant |
EP1065347B1 (en) | 1999-07-01 | 2007-03-07 | General Electric Company | Method for fuel gas moisturization and heating |
KR100424910B1 (en) * | 2001-04-27 | 2004-03-27 | 홍국선 | Coating process of bioactive ceramics |
US20070017207A1 (en) | 2005-07-25 | 2007-01-25 | General Electric Company | Combined Cycle Power Plant |
KR100774546B1 (en) | 2006-11-13 | 2007-11-08 | 두산중공업 주식회사 | Seawater desalination system using discharged water from steam recovery steam generator |
EP1956294A1 (en) | 2007-02-06 | 2008-08-13 | Siemens Aktiengesellschaft | Combustion plant and method for operating a combustion plant |
UA27473U (en) | 2007-09-20 | 2007-10-25 | Yevhenii Oleksandrovy Cherniak | Closing device |
US20100031933A1 (en) * | 2008-08-05 | 2010-02-11 | Prakash Narayan | System and assemblies for hot water extraction to pre-heat fuel in a combined cycle power plant |
US8205451B2 (en) * | 2008-08-05 | 2012-06-26 | General Electric Company | System and assemblies for pre-heating fuel in a combined cycle power plant |
US9109513B2 (en) * | 2008-10-01 | 2015-08-18 | Mitsubishi Hitachi Power Systems, Ltd. | Combined cycle electric power generation plant and heat exchanger |
US7793501B2 (en) * | 2008-10-03 | 2010-09-14 | General Electric Company | Apparatus for steam attemperation using fuel gas heater water discharge to reduce feedwater pump size |
DE202009007156U1 (en) | 2009-05-18 | 2009-08-20 | Sondermann, Thomas | Profile rail system for covering at least one covering edge |
US8528335B2 (en) * | 2010-02-02 | 2013-09-10 | General Electric Company | Fuel heater system including hot and warm water sources |
US8141367B2 (en) * | 2010-05-19 | 2012-03-27 | General Electric Company | System and methods for pre-heating fuel in a power plant |
JP5665621B2 (en) * | 2011-03-25 | 2015-02-04 | 株式会社東芝 | Waste heat recovery boiler and power plant |
US8505309B2 (en) * | 2011-06-14 | 2013-08-13 | General Electric Company | Systems and methods for improving the efficiency of a combined cycle power plant |
US8813471B2 (en) | 2011-06-29 | 2014-08-26 | General Electric Company | System for fuel gas moisturization and heating |
US20130074508A1 (en) * | 2011-09-23 | 2013-03-28 | John Edward Sholes | Fuel Heating in Combined Cycle Turbomachinery |
US20140069078A1 (en) * | 2012-09-10 | 2014-03-13 | General Electric Company | Combined Cycle System with a Water Turbine |
US9470145B2 (en) * | 2012-10-15 | 2016-10-18 | General Electric Company | System and method for heating fuel in a combined cycle gas turbine |
JP6604937B2 (en) * | 2013-03-15 | 2019-11-13 | エクソンモービル リサーチ アンド エンジニアリング カンパニー | Integrated power generation and carbon capture using fuel cells |
EP2824293A1 (en) * | 2013-07-08 | 2015-01-14 | Alstom Technology Ltd | Power plant with integrated fuel gas preheating |
EP2937528B1 (en) * | 2013-10-31 | 2021-08-11 | General Electric Technology GmbH | Combined cycle power plant with improved efficiency |
US10577982B2 (en) * | 2015-12-15 | 2020-03-03 | General Electric Company | Power plant with steam generation via turbine extraction and including a gas distribution manifold |
US10415432B2 (en) * | 2015-12-15 | 2019-09-17 | General Electric Company | Power plant with steam generation and fuel heating capabilities |
-
2013
- 2013-07-08 EP EP13175484.8A patent/EP2824293A1/en not_active Withdrawn
-
2014
- 2014-06-24 EP EP14173590.2A patent/EP2824294A1/en not_active Withdrawn
- 2014-06-27 US US14/317,723 patent/US10006313B2/en active Active
- 2014-07-03 IN IN1798DE2014 patent/IN2014DE01798A/en unknown
- 2014-07-07 RU RU2014127721/02A patent/RU2595192C2/en not_active IP Right Cessation
- 2014-07-07 KR KR1020140084380A patent/KR101594323B1/en active Active
- 2014-07-08 CN CN201410322059.2A patent/CN104279058B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0931911A2 (en) | 1998-01-19 | 1999-07-28 | Kabushiki Kaisha Toshiba | Combined cycle power plant |
US6269626B1 (en) * | 2000-03-31 | 2001-08-07 | Duk M. Kim | Regenerative fuel heating system |
EP1199445A1 (en) * | 2000-10-17 | 2002-04-24 | Siemens Aktiengesellschaft | Apparatus and method of fuel preheating in combined gas and steam turbine plants |
DE102007054467A1 (en) | 2007-11-13 | 2009-05-20 | Triesch, Frank, Dr. Ing. | Method for preheating fuel in gas and steam power plant, involves guiding steam or condenser water of condenser as heat transfer medium by heat exchanger |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20160230606A1 (en) * | 2013-09-19 | 2016-08-11 | Siemens Aktiengesellschaft | Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step |
US10100680B2 (en) * | 2013-09-19 | 2018-10-16 | Siemens Aktiengesellschaft | Combined cycle gas turbine plant comprising a waste heat steam generator and fuel preheating step |
CN115183222A (en) * | 2022-06-16 | 2022-10-14 | 西安热工研究院有限公司 | Coupling system for waste heat utilization of tail flue gas of waste heat boiler and natural gas heating |
WO2023241001A1 (en) * | 2022-06-16 | 2023-12-21 | 西安热工研究院有限公司 | Coupling system for utilizing waste heat of flue gas at tail of waste heat boiler and heating natural gas |
Also Published As
Publication number | Publication date |
---|---|
RU2595192C2 (en) | 2016-08-20 |
IN2014DE01798A (en) | 2015-06-19 |
KR20150006370A (en) | 2015-01-16 |
US10006313B2 (en) | 2018-06-26 |
CN104279058A (en) | 2015-01-14 |
US20150007575A1 (en) | 2015-01-08 |
RU2014127721A (en) | 2016-02-10 |
EP2824294A1 (en) | 2015-01-14 |
CN104279058B (en) | 2017-07-25 |
KR101594323B1 (en) | 2016-02-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US10006313B2 (en) | Power plant with integrated fuel gas preheating | |
EP2482958B1 (en) | Power plant for co2 capture | |
KR101695121B1 (en) | Preheating device for gas-turbine fuel, gas-turbine plant provided therewith, and preheating method for gas-turbine fuel | |
KR102719198B1 (en) | Fuel preheating system for a combustion turbine engine | |
US20110247335A1 (en) | Waste heat steam generator and method for improved operation of a waste heat steam generator | |
CN106089341B (en) | Method for enhancing cold steam turbine startup in a multi-gas turbine combined cycle plant | |
CN102828830A (en) | Systems and method for improving the efficiency of a combined cycle power plant | |
CN109312635B (en) | Condensate recirculation | |
EP3047210B1 (en) | Flue gas heat recovery integration | |
JP2019044678A (en) | Steam turbine system and combined cycle plant | |
US20150052906A1 (en) | Duct Fired Combined Cycle System | |
US20160273406A1 (en) | Combined cycle system | |
KR102106676B1 (en) | Steam turbine plant, combined cycle plant equipped with same, and method of operating steam turbine plant | |
US9404395B2 (en) | Selective pressure kettle boiler for rotor air cooling applications | |
US10208630B2 (en) | Method for operating a steam power plant and steam power plant for conducting said method | |
JP2013117209A (en) | Gas turbine and gas turbine plant | |
EP3219940B1 (en) | Combined cycle power plant and method for operating such a combined cycle power plant | |
US20140069078A1 (en) | Combined Cycle System with a Water Turbine | |
EP3318733B1 (en) | Feedwater bypass system for a desuperheater | |
JP2002206702A (en) | Water supply system and exhaust heat recovery boiler for combined cycle plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
17P | Request for examination filed |
Effective date: 20130708 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20150715 |