EP2623900A1 - Method for controlling gas pressure in cooling plant - Google Patents
Method for controlling gas pressure in cooling plant Download PDFInfo
- Publication number
- EP2623900A1 EP2623900A1 EP12000707.5A EP12000707A EP2623900A1 EP 2623900 A1 EP2623900 A1 EP 2623900A1 EP 12000707 A EP12000707 A EP 12000707A EP 2623900 A1 EP2623900 A1 EP 2623900A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- capacity
- compressors
- pressure
- heat exchanger
- cooling medium
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B49/00—Arrangement or mounting of control or safety devices
- F25B49/005—Arrangement or mounting of control or safety devices of safety devices
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2309/00—Gas cycle refrigeration machines
- F25B2309/06—Compression machines, plants or systems characterised by the refrigerant being carbon dioxide
- F25B2309/061—Compression machines, plants or systems characterised by the refrigerant being carbon dioxide with cycle highest pressure above the supercritical pressure
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2313/00—Compression machines, plants or systems with reversible cycle not otherwise provided for
- F25B2313/031—Sensor arrangements
- F25B2313/0313—Pressure sensors near the outdoor heat exchanger
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2600/00—Control issues
- F25B2600/17—Control issues by controlling the pressure of the condenser
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/19—Pressures
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F25—REFRIGERATION OR COOLING; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS; MANUFACTURE OR STORAGE OF ICE; LIQUEFACTION SOLIDIFICATION OF GASES
- F25B—REFRIGERATION MACHINES, PLANTS OR SYSTEMS; COMBINED HEATING AND REFRIGERATION SYSTEMS; HEAT PUMP SYSTEMS
- F25B2700/00—Sensing or detecting of parameters; Sensors therefor
- F25B2700/21—Temperatures
Definitions
- the invention relates to a method for controlling of gas pressure in a heat rejecting heat exchanger of a cooling plant.
- the invention also relates to a control unit operating according to the method of the invention, and to a plant with such a control unit.
- Fig. 1 is a log P-h diagram showing how a read-out of a slightly too high pressure (upper limit of ⁇ p) may result in the controller registering the pressure and/or the temperature at the outlet of the heat rejecting heat exchanger, for instance the gas cooler, to be at the optimal curve in point B in Fig. 1 , while the physical situation, or the actual condition, is shown in point A in Fig. 1 .
- cooling plant While it is believed that the cooling plant is operated at near optimal conditions, it is in fact operated in a very energy inefficient manner.
- the problem is sometimes referred to as gas loop operation and may occur, where the isothermal lines are approximately horizontal in the log P-h diagram, as illustrated in Fig. 1 .
- Gas loop operation reduces the cooling capacity to almost zero. It will result in the controller increasing the capacity of the compressor to 100%, and after a couple of minutes, the controller will increase the reference of the gas cooler.
- the present invention provides a method for monitoring gas pressure in a heat rejecting heat exchanger in a cooling circuit, said method comprising the steps of:
- the term 'cooling circuit' should be interpreted to mean a refrigerant path in which refrigerant is alternatingly compressed and expanded.
- a compressor, a heat rejecting heat exchanger, an expansion device and a heat consuming heat exchanger are arranged in the refrigerant path.
- the compressor may be in the form of a single compressor or in the form of a rack of two or more compressors.
- the heat rejecting heat exchanger may be in the form of a condenser or a gas cooler, depending on whether the cooling circuit is operated subcritically or transcritically.
- the heat consuming heat exchanger may be an evaporator.
- Refrigerant is compressed in the compressor before being supplied to the heat rejecting heat exchanger.
- heat exchange takes place with a secondary fluid flow across the heat rejecting heat exchanger, in such a manner that the temperature of the refrigerant flowing through the heat rejecting heat exchanger, via the refrigerant path, is reduced.
- the heat rejecting heat exchanger is a condenser
- gaseous refrigerant which enters the heat rejecting heat exchanger is at least partly condensed.
- the heat rejecting heat exchanger is a gas cooler, gaseous refrigerant which enters the heat rejecting heat exchanger remains gaseous, but the temperature of the refrigerant is reduced.
- the cooling circuit is capable of providing heating for a closed volume, via the heat rejecting heat exchanger.
- the refrigerant is then supplied to the expansion device, where it is expanded before being supplied to the heat consuming heat exchanger.
- heat exchange takes place with a secondary fluid flow across the heat consuming heat exchanger, in such a manner that the temperature of the refrigerant flowing through the heat consuming heat exchanger, via the refrigerant path, is increased.
- the heat consuming heat exchanger is an evaporator
- liquid refrigerant entering the heat consuming heat exchanger is at least partly evaporated in the heat consuming heat exchanger.
- the evaporated refrigerant may be heated further, in which case superheated refrigerant leaves the heat consuming heat exchanger.
- the cooling circuit is capable of providing cooling for a closed volume, via the heat consuming heat exchanger. The refrigerant is then returned to the compressor, and the cycle is repeated.
- the present capacity of one or more compressors in the cooling circuit compared to a maximum capacity is established.
- the term 'capacity' should be interpreted to mean the work provided by the compressor(s).
- the capacity may be expressed in terms of the electrical energy or power consumed by the compressor(s), in terms of the amount of refrigerant being compressed and displaced by the compressor(s), in terms of the cooling load on the cooling plant, or in any other suitable manner.
- the present compressor capacity may be measured.
- information regarding the present compressor capacity may be inherently present in the compressor controller, in which case the information is simply provided by the compressor controller.
- the maximum capacity may be the rated capacity of the one or more compressors, the rated capacity being the maximum work which the compressor(s) is/are designed to deliver.
- the maximum capacity may be a capacity limit which is defined by various operating conditions of the cooling circuit, such as the outdoor temperature, the indoor temperature, the design of the cooling plant, the installation site, the desired temperature of the equipment and/or goods to be cooled, etc.
- the cooling plant may be over dimensioned in the sense that the compressor(s) is/are potentially capable of providing a significantly higher cooling capacity than will ever be necessary in order to meet the cooling load on the cooling plant.
- the maximum capacity may be a specified percentage of the rated capacity, such as 75% of the rated capacity, 80% of the rated capacity, 90% of the rated capacity, or the like.
- the maximum capacity may advantageously be a compressor capacity which is required when the cooling load on the cooling plant is at a maximum level.
- the present capacity of the one or more compressors is at least at a level corresponding to a pre-set percentage of the maximum capacity, it is investigated when this level was reached, and for how long the compressor capacity has been at or above this level. In other words, it is investigated whether the one or more compressors is/are operating at a relatively high capacity, at or close to the maximum capacity as defined above, and has/have been doing so for a while. If the compressor(s) is/are operating at a high capacity level during a continuous time period, it is an indication that the cooling plant is operating inefficiently, and that the cooling medium may be in a gas loop operational mode.
- the cooling medium is in a gas loop operational mode.
- the method according to the first aspect of the invention allows a gas loop condition to be identified in an easy manner.
- This allows the operation of the cooling plant to be adjusted in such a manner that the cooling medium is brought out of the gas loop operational mode.
- the compressor capacity has to be at a high level for at least a pre-set period of time, it is ensured that short spikes of high capacity are not reacted upon. This is an advantage, because such short spikes may be the result of fluctuations, rather than indicating a gas loop operational mode.
- the method may comprise the further step of increasing the pressure of the cooling medium inside the heat rejecting heat exchanger, if it is concluded that the cooling medium is in a gas loop operational mode.
- the pressure of the cooling medium may be increased by 5-20 bars, such as by 7-15 bars, such as by 8-10 bars, such as approximately 10 bars, or approximately 5 bars, or approximately 20 bars.
- the pressure of the cooling medium may be increased by 1 %-15%, such as by 2%-12%, such as by 5%-10%, such as by approximately 7%, or approximately 5%, or approximately 10%.
- the step of increasing the pressure may result in a pressure increase which causes the present capacity of the one or more compressors to decrease to below 95% of the maximum capacity, possibly to below 90% of the maximum capacity, even possibly to below 80% of the maximum capacity.
- the pressure increase moves the cooling medium out of the gas loop operation mode, and thereby operation of the compressor(s) is moved away from the very high capacity level.
- the method may further comprise the step of decreasing the pressure of the cooling medium inside the heat rejecting heat exchanger, if it can be concluded that the cooling medium is no longer in a gas loop operational mode.
- the increased pressure of the cooling medium inside the heat rejecting heat exchanger is only maintained as long as required in order to move the cooling medium out of the gas loop operational mode. Once this has been obtained, the pressure is once again reduced, and the cooling plant is returned to normal operation.
- the duration within which the pressure of the cooling medium is increased may differ depending on which percentage of the maximum capacity is decided as being relatively high or full capacity of the one or more compressors. For instance, if the percentage of the maximum capacity is decided as being 90%, the increase in pressure will be terminated, when the present capacity decreases to below 90% of the maximum capacity.
- the pre-set percentage of the maximum capacity of the one or more compressors may be at least 80% of the maximum capacity, possibly at least 90% of the maximum capacity, even possibly between 95% and 100% of the maximum capacity of the one or more compressors, even more possible 100% of the maximum capacity.
- the present capacity of the one or more compressors should be very close to the maximum capacity for a significant period of time before it can be concluded that the cooling medium is in a gas loop operational mode.
- the pre-set period of time of a certain duration may be at least one minute, preferably at least two minutes, possibly at least three minutes, even possible at least four minutes, and even more possible at least five minutes, possibly at the most 15 minutes.
- the duration within which the one or more compressors of the cooling plant operate at a capacity decided as being maximum capacity, or close to maximum capacity, may differ depending on the installation site, the outdoor and indoor temperature, the desired temperature of the equipment and/or goods to be cooled, etc. Therefore, under some conditions, a shorter period of time is enough for concluding that the cooling medium is in a gas loop operational mode, and under other conditions a longer period of time is needed for concluding that the cooling medium is in a gas loop operational mode.
- the present capacity of the one or more compressors may be established commonly for all the compressors of the cooling circuit. According to this embodiment, the combined capacity of all of the compressors is established in one go, and compared to the maximum combined capacity. Thus, the sum of capacity of the entire cooling plant is established for obtaining the capacity of all compressors, if the cooling plant comprises more than one compressor.
- the present capacity of the one or more compressors may be established individually for each compressor of the cooling circuit. According to this embodiment, the capacity of each of the compressors is established and compared to the maximum capacity for that compressor.
- the present invention provides a control unit for monitoring pressure in a heat rejecting heat exchanger of a cooling circuit comprising one or more compressors,
- control unit is adapted to establish whether or not a cooling medium of a cooling circuit is in a gas loop operational mode, by means of the method according to the first aspect of the invention. Therefore the remarks set forth above are equally applicable here.
- the present invention provides a plant with a cooling circuit comprising one or more compressors, said plant also comprising at least one heat rejecting heat exchanger and a controller for controlling pressure in the heat rejecting heat exchanger, and
- Fig. 1 is a log P-h diagram illustrating a gas loop operational mode of a cooling medium in a cooling plant.
- the cooling plant is operated transcritically, i.e. no phase transition takes place during heat exchange in the heat rejecting heat exchanger.
- Fig. 1 illustrates that when the cooling medium is operated in a region where the isothermal curve is relatively flat, small variations in pressure results in large variations in enthalpy. Therefore a measurement of the pressure of the cooling medium leaving the gas cooler may lead the controller to believe that the cooling medium is at the optimal operating point B. However, due to a small error in the measurement ( ⁇ p), the cooling medium may in fact be at the very inefficient operating point A. As a consequence, the cooling plant is not operated in an optimal manner. Since this is not registered by the controller, the operation of the cooling plant continues to be inefficient. This situation is sometimes referred to as gas loop operation.
- Fig. 2 is a log P-h diagram, similar to the diagram of Fig. 1 .
- Fig. 2 also illustrates the gas loop operational mode described above with reference to Fig. 1 .
- a small error ( ⁇ p) in the measurement of the pressure of the cooling medium leaving the gas cooler may lead the controller to believe that the cooling medium is at the optimal operating point A, while it is in fact at the very inefficient operating point B.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Mechanical Engineering (AREA)
- Thermal Sciences (AREA)
- General Engineering & Computer Science (AREA)
- Air Conditioning Control Device (AREA)
Abstract
A method for monitoring gas pressure in a heat rejecting heat exchanger in a cooling circuit is disclosed. In the heat rejecting heat exchanger, pressure is controlled by means of a control unit, said control unit controlling at least one valve. The present capacity of one or more compressors in the cooling circuit compared to a maximum capacity of the one or more compressors is established. The maximum capacity may be the rated capacity of the compressors, or it may be a maximum capacity under the given circumstances and/or the given operating conditions. If the present capacity of the one or more compressors is at least at a level corresponding to a pre-set percentage of the maximum capacity, a period of time elapsed from a point in time where the compressor capacity reached said level is established. If the established period of time has a duration which is longer than a pre-set period of time, then it is concluding that the cooling medium is in a gas loop operational mode.
Detecting a gas loop operational mode in an easy manner allows an operator or a controller to adjust operation of the cooling plant in such a manner that the cooling medium is brought out of the gas loop operational mode, thereby increasing the energy efficiency of the cooling plant.
Description
- The invention relates to a method for controlling of gas pressure in a heat rejecting heat exchanger of a cooling plant. The invention also relates to a control unit operating according to the method of the invention, and to a plant with such a control unit.
- In cooling plants comprising heat rejecting heat exchangers, such as a gas cooler, gas cooler control may not succeed, when faults in the pressure being measured and/or faults in the temperature being measured at the outlet of the gas cooler exceeds normally expected values.
Fig. 1 is a log P-h diagram showing how a read-out of a slightly too high pressure (upper limit of Δp) may result in the controller registering the pressure and/or the temperature at the outlet of the heat rejecting heat exchanger, for instance the gas cooler, to be at the optimal curve in point B inFig. 1 , while the physical situation, or the actual condition, is shown in point A inFig. 1 . Thus, while it is believed that the cooling plant is operated at near optimal conditions, it is in fact operated in a very energy inefficient manner. The problem is sometimes referred to as gas loop operation and may occur, where the isothermal lines are approximately horizontal in the log P-h diagram, as illustrated inFig. 1 . - Gas loop operation reduces the cooling capacity to almost zero. It will result in the controller increasing the capacity of the compressor to 100%, and after a couple of minutes, the controller will increase the reference of the gas cooler.
- It is an object of the present invention to provide a method for detecting and for recovering from gas loop operation. It is also an object to provide a control unit and a plant with such control unit having limited gas loop operation.
- According to a first aspect the present invention provides a method for monitoring gas pressure in a heat rejecting heat exchanger in a cooling circuit, said method comprising the steps of:
- in the heat rejecting heat exchanger, controlling pressure by means of a control unit, said control unit controlling at least one valve,
- establishing the present capacity of one or more compressors in the cooling circuit compared to a maximum capacity of the one or more compressors,
- if the present capacity of the one or more compressors is at least at a level corresponding to a pre-set percentage of the maximum capacity, establishing a period of time elapsed from a point in time where the compressor capacity reached said level,
- if the established period of time has a duration which is longer than a pre-set period of time, then concluding that the cooling medium is in a gas loop operational mode.
- In the present context the term 'cooling circuit' should be interpreted to mean a refrigerant path in which refrigerant is alternatingly compressed and expanded. To this end a compressor, a heat rejecting heat exchanger, an expansion device and a heat consuming heat exchanger are arranged in the refrigerant path. The compressor may be in the form of a single compressor or in the form of a rack of two or more compressors. The heat rejecting heat exchanger may be in the form of a condenser or a gas cooler, depending on whether the cooling circuit is operated subcritically or transcritically. The heat consuming heat exchanger may be an evaporator.
- Refrigerant is compressed in the compressor before being supplied to the heat rejecting heat exchanger. In the heat rejecting heat exchanger, heat exchange takes place with a secondary fluid flow across the heat rejecting heat exchanger, in such a manner that the temperature of the refrigerant flowing through the heat rejecting heat exchanger, via the refrigerant path, is reduced. In the case that the heat rejecting heat exchanger is a condenser, gaseous refrigerant which enters the heat rejecting heat exchanger is at least partly condensed. In the case that the heat rejecting heat exchanger is a gas cooler, gaseous refrigerant which enters the heat rejecting heat exchanger remains gaseous, but the temperature of the refrigerant is reduced. In any event, the cooling circuit is capable of providing heating for a closed volume, via the heat rejecting heat exchanger.
- The refrigerant is then supplied to the expansion device, where it is expanded before being supplied to the heat consuming heat exchanger. In the heat consuming heat exchanger, heat exchange takes place with a secondary fluid flow across the heat consuming heat exchanger, in such a manner that the temperature of the refrigerant flowing through the heat consuming heat exchanger, via the refrigerant path, is increased. In the case that the heat consuming heat exchanger is an evaporator, liquid refrigerant entering the heat consuming heat exchanger is at least partly evaporated in the heat consuming heat exchanger. Furthermore, the evaporated refrigerant may be heated further, in which case superheated refrigerant leaves the heat consuming heat exchanger. In any event, the cooling circuit is capable of providing cooling for a closed volume, via the heat consuming heat exchanger. The refrigerant is then returned to the compressor, and the cycle is repeated.
- According to the method of the first aspect of the invention the present capacity of one or more compressors in the cooling circuit compared to a maximum capacity is established. In the present context the term 'capacity' should be interpreted to mean the work provided by the compressor(s). The capacity may be expressed in terms of the electrical energy or power consumed by the compressor(s), in terms of the amount of refrigerant being compressed and displaced by the compressor(s), in terms of the cooling load on the cooling plant, or in any other suitable manner.
- The present compressor capacity may be measured. Alternatively, information regarding the present compressor capacity may be inherently present in the compressor controller, in which case the information is simply provided by the compressor controller.
- The maximum capacity may be the rated capacity of the one or more compressors, the rated capacity being the maximum work which the compressor(s) is/are designed to deliver. As an alternative, the maximum capacity may be a capacity limit which is defined by various operating conditions of the cooling circuit, such as the outdoor temperature, the indoor temperature, the design of the cooling plant, the installation site, the desired temperature of the equipment and/or goods to be cooled, etc. For instance, the cooling plant may be over dimensioned in the sense that the compressor(s) is/are potentially capable of providing a significantly higher cooling capacity than will ever be necessary in order to meet the cooling load on the cooling plant. In this case the maximum capacity may be a specified percentage of the rated capacity, such as 75% of the rated capacity, 80% of the rated capacity, 90% of the rated capacity, or the like. The maximum capacity may advantageously be a compressor capacity which is required when the cooling load on the cooling plant is at a maximum level.
- If it is established that the present capacity of the one or more compressors is at least at a level corresponding to a pre-set percentage of the maximum capacity, it is investigated when this level was reached, and for how long the compressor capacity has been at or above this level. In other words, it is investigated whether the one or more compressors is/are operating at a relatively high capacity, at or close to the maximum capacity as defined above, and has/have been doing so for a while. If the compressor(s) is/are operating at a high capacity level during a continuous time period, it is an indication that the cooling plant is operating inefficiently, and that the cooling medium may be in a gas loop operational mode.
- Accordingly, if the established period of time has a duration which is longer than a pre-set period of time, it is concluded that the cooling medium is in a gas loop operational mode.
- Thus, the method according to the first aspect of the invention allows a gas loop condition to be identified in an easy manner. This, in turn, allows the operation of the cooling plant to be adjusted in such a manner that the cooling medium is brought out of the gas loop operational mode. Furthermore, since the compressor capacity has to be at a high level for at least a pre-set period of time, it is ensured that short spikes of high capacity are not reacted upon. This is an advantage, because such short spikes may be the result of fluctuations, rather than indicating a gas loop operational mode.
- The method may comprise the further step of increasing the pressure of the cooling medium inside the heat rejecting heat exchanger, if it is concluded that the cooling medium is in a gas loop operational mode.
- As shown in
Fig. 1 , when the pressure in the heat rejecting heat exchanger (gas cooler) increases, the pressure and the enthalpy of the cooling medium are displaced into a region, where the isothermal curves have a more pronounced slope. Thereby the operation of the cooling plant is pulled away from gas loop operational mode. - The pressure of the cooling medium may be increased by 5-20 bars, such as by 7-15 bars, such as by 8-10 bars, such as approximately 10 bars, or approximately 5 bars, or approximately 20 bars.
- Alternatively, the pressure of the cooling medium may be increased by 1 %-15%, such as by 2%-12%, such as by 5%-10%, such as by approximately 7%, or approximately 5%, or approximately 10%.
- The step of increasing the pressure may result in a pressure increase which causes the present capacity of the one or more compressors to decrease to below 95% of the maximum capacity, possibly to below 90% of the maximum capacity, even possibly to below 80% of the maximum capacity. According to this embodiment, the pressure increase moves the cooling medium out of the gas loop operation mode, and thereby operation of the compressor(s) is moved away from the very high capacity level.
- The method may further comprise the step of decreasing the pressure of the cooling medium inside the heat rejecting heat exchanger, if it can be concluded that the cooling medium is no longer in a gas loop operational mode. According to this embodiment, the increased pressure of the cooling medium inside the heat rejecting heat exchanger is only maintained as long as required in order to move the cooling medium out of the gas loop operational mode. Once this has been obtained, the pressure is once again reduced, and the cooling plant is returned to normal operation.
- The duration within which the pressure of the cooling medium is increased may differ depending on which percentage of the maximum capacity is decided as being relatively high or full capacity of the one or more compressors. For instance, if the percentage of the maximum capacity is decided as being 90%, the increase in pressure will be terminated, when the present capacity decreases to below 90% of the maximum capacity.
- The pre-set percentage of the maximum capacity of the one or more compressors may be at least 80% of the maximum capacity, possibly at least 90% of the maximum capacity, even possibly between 95% and 100% of the maximum capacity of the one or more compressors, even more possible 100% of the maximum capacity. In any event, the present capacity of the one or more compressors should be very close to the maximum capacity for a significant period of time before it can be concluded that the cooling medium is in a gas loop operational mode.
- The pre-set period of time of a certain duration may be at least one minute, preferably at least two minutes, possibly at least three minutes, even possible at least four minutes, and even more possible at least five minutes, possibly at the most 15 minutes.
- The duration within which the one or more compressors of the cooling plant operate at a capacity decided as being maximum capacity, or close to maximum capacity, may differ depending on the installation site, the outdoor and indoor temperature, the desired temperature of the equipment and/or goods to be cooled, etc. Therefore, under some conditions, a shorter period of time is enough for concluding that the cooling medium is in a gas loop operational mode, and under other conditions a longer period of time is needed for concluding that the cooling medium is in a gas loop operational mode.
- The present capacity of the one or more compressors may be established commonly for all the compressors of the cooling circuit. According to this embodiment, the combined capacity of all of the compressors is established in one go, and compared to the maximum combined capacity. Thus, the sum of capacity of the entire cooling plant is established for obtaining the capacity of all compressors, if the cooling plant comprises more than one compressor.
- As an alternative, the present capacity of the one or more compressors may be established individually for each compressor of the cooling circuit. According to this embodiment, the capacity of each of the compressors is established and compared to the maximum capacity for that compressor.
- According to a second aspect the present invention provides a control unit for monitoring pressure in a heat rejecting heat exchanger of a cooling circuit comprising one or more compressors,
- said control unit comprising a pressure measuring unit and a capacity establishing unit for measuring the pressure of the cooling medium inside the heat rejecting heat exchanger and for establishing the capacity of the one or more compressors, respectively, and
- said control unit also comprising a timer for measuring a period of time having elapsed from a point of time, said point of time being when the present capacity of the compressors reaches a pre-set percentage of a maximum capacity, said timer communicating with said capacity establishing unit for establishing, by means of the method according to the first aspect of the invention, whether the cooling medium is in a gas loop operational mode.
- The control unit according to the second aspect of the invention is adapted to establish whether or not a cooling medium of a cooling circuit is in a gas loop operational mode, by means of the method according to the first aspect of the invention. Therefore the remarks set forth above are equally applicable here.
- According to a third aspect the present invention provides a plant with a cooling circuit comprising one or more compressors, said plant also comprising at least one heat rejecting heat exchanger and a controller for controlling pressure in the heat rejecting heat exchanger, and
- said plant also comprising at least one valve for adjusting the pressure in the heat rejecting heat exchanger, and the plant also comprising a pressure measuring unit and a capacity establishing unit for measuring the pressure of the cooling medium inside the heat rejecting heat exchanger and establishing the capacity of one or more compressors, respectively, and
- said plant also comprising a timer for measuring a period of time having elapsed from a point of time, said point of time being when the present capacity of the compressors reaches a pre-set percentage of a maximum capacity, said timer communicating with said capacity establishing unit for establishing, by means of the method according to the first aspect of the invention, whether the cooling medium is in a gas loop operational mode.
- The invention will now be described in further detail with reference to the accompanying drawings in which
-
Fig. 1 is a log P-h diagram illustrating a gas loop operational mode of a cooling medium, and -
Fig. 2 is a log P-h diagram illustrating the effect of increasing the pressure of the cooling medium in a gas cooler. -
Fig. 1 is a log P-h diagram illustrating a gas loop operational mode of a cooling medium in a cooling plant. The cooling plant is operated transcritically, i.e. no phase transition takes place during heat exchange in the heat rejecting heat exchanger.Fig. 1 illustrates that when the cooling medium is operated in a region where the isothermal curve is relatively flat, small variations in pressure results in large variations in enthalpy. Therefore a measurement of the pressure of the cooling medium leaving the gas cooler may lead the controller to believe that the cooling medium is at the optimal operating point B. However, due to a small error in the measurement (Δp), the cooling medium may in fact be at the very inefficient operating point A. As a consequence, the cooling plant is not operated in an optimal manner. Since this is not registered by the controller, the operation of the cooling plant continues to be inefficient. This situation is sometimes referred to as gas loop operation. -
Fig. 2 is a log P-h diagram, similar to the diagram ofFig. 1 .Fig. 2 also illustrates the gas loop operational mode described above with reference toFig. 1 . InFig. 2 a small error (Δp) in the measurement of the pressure of the cooling medium leaving the gas cooler may lead the controller to believe that the cooling medium is at the optimal operating point A, while it is in fact at the very inefficient operating point B. - However, increasing the pressure level in the gas cooler by ΔP changes the situation dramatically, because the operating points are thereby moved to a region of the isothermal curve which is much steeper. Thus, it is clear from
Fig. 2 that a small error (Δp) in the measurement of the pressure of the cooling medium leaving the gas cooler leads to only a small difference in enthalpy. In other words, operating the cooling plant at operating point A' or at operating point B' has no significant impact on the efficiency of the cooling plant. Thus, it can be seen that increasing the pressure of the cooling medium in the gas cooler brings the cooling medium out of the gas loop operational mode.
Claims (12)
- A method for monitoring gas pressure in a heat rejecting heat exchanger in a cooling circuit, said method comprising the steps of:- in the heat rejecting heat exchanger, controlling pressure by means of a control unit, said control unit controlling at least one valve,- establishing the present capacity of one or more compressors in the cooling circuit compared to a maximum capacity of the one or more compressors,- if the present capacity of the one or more compressors is at least at a level corresponding to a pre-set percentage of the maximum capacity, establishing a period of time elapsed from a point in time where the compressor capacity reached said level,- if the established period of time has a duration which is longer than a pre-set period of time, then concluding that the cooling medium is in a gas loop operational mode.
- A method according to claim 1, said method comprising the further step of increasing the pressure of the cooling medium inside the heat rejecting heat exchanger, if it is concluded that the cooling medium is in a gas loop operational mode.
- A method according to claim 2, wherein the pressure of the cooling medium is increased by 5-20 bars.
- A method according to claim 2 or 3, wherein the pressure of the cooling medium is increased by 1%-15%.
- A method according to any of claims 2-4, where the step of increasing the pressure results in a pressure increase which causes the present capacity of the one or more compressors to decrease to below 95% of the maximum capacity, possibly to below 90% of the maximum capacity, even possibly to below 80% of the maximum capacity.
- A method according to any of claims 2-5, further comprising the step of decreasing the pressure of the cooling medium inside the heat rejecting heat exchanger, if it can be concluded that the cooling medium is no longer in a gas loop operational mode.
- A method according to any of the preceding claims, where the pre-set percentage of the maximum capacity of the one or more compressors is at least 80% of the maximum capacity, possibly at least 90% of the maximum capacity, even possibly between 95% and 100% of the maximum capacity of the one or more compressors, even more possible 100% of the maximum capacity.
- A method according to any of the preceding claims, where the pre-set period of time of a certain duration is at least one minute, preferably at least two minutes, possibly at least three minutes, even possible at least four minutes, and even more possible at least five minutes, possibly at the most 15 minutes.
- A method according to any of the preceding claims, where the present capacity of the one or more compressors is established commonly for all the compressors of the cooling circuit.
- A method according to any of claims 1-8, where the present capacity of the one or more compressors is established individually for each compressor of the cooling circuit.
- Control unit for monitoring pressure in a heat rejecting heat exchanger of a cooling circuit comprising one or more compressors,- said control unit comprising a pressure measuring unit and a capacity establishing unit for measuring the pressure of the cooling medium inside the heat rejecting heat exchanger and for establishing the capacity of the one or more compressors, respectively, and- said control unit also comprising a timer for measuring a period of time having elapsed from a point of time, said point of time being when the present capacity of the compressors reaches a pre-set percentage of a maximum capacity, said timer communicating with said capacity establishing unit for establishing, by means of the method according to any of claims 1-10, whether the cooling medium is in a gas loop operational mode.
- Plant with a cooling circuit comprising one or more compressors, said plant also comprising at least one heat rejecting heat exchanger and a controller for controlling pressure in the heat rejecting heat exchanger, and- said plant also comprising at least one valve for adjusting the pressure in the heat rejecting heat exchanger, and the plant also comprising a pressure measuring unit and a capacity establishing unit for measuring the pressure of the cooling medium inside the heat rejecting heat exchanger and establishing the capacity of one or more compressors, respectively, and- said plant also comprising a timer for measuring a period of time having elapsed from a point of time, said point of time being when the present capacity of the compressors reaches a pre-set percentage of a maximum capacity, said timer communicating with said capacity establishing unit for establishing, by means of the method according to any of claims 1-10, whether the cooling medium is in a gas loop operational mode.
Priority Applications (6)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP12000707.5A EP2623900A1 (en) | 2012-02-02 | 2012-02-02 | Method for controlling gas pressure in cooling plant |
US14/349,749 US9885509B2 (en) | 2011-10-07 | 2012-10-05 | Method for controlling gas pressure in cooling plant |
EP12772209.8A EP2764303B1 (en) | 2011-10-07 | 2012-10-05 | Method for controlling gas pressure in cooling plant |
PCT/DK2012/000109 WO2013050035A1 (en) | 2011-10-07 | 2012-10-05 | Method for controlling gas pressure in cooling plant |
CN201280049297.XA CN103842749B (en) | 2011-10-07 | 2012-10-05 | For the method controlling the gas pressure in cooling device |
PL12772209T PL2764303T3 (en) | 2011-10-07 | 2012-10-05 | Method for controlling gas pressure in cooling plant |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP12000707.5A EP2623900A1 (en) | 2012-02-02 | 2012-02-02 | Method for controlling gas pressure in cooling plant |
Publications (1)
Publication Number | Publication Date |
---|---|
EP2623900A1 true EP2623900A1 (en) | 2013-08-07 |
Family
ID=45654845
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP12000707.5A Withdrawn EP2623900A1 (en) | 2011-10-07 | 2012-02-02 | Method for controlling gas pressure in cooling plant |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP2623900A1 (en) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1202004A1 (en) * | 2000-10-30 | 2002-05-02 | Calsonic Kansei Corporation | Cooling cycle and control method thereof |
DE102006019082A1 (en) * | 2005-04-25 | 2006-10-26 | Denso Corp., Kariya | Cooling circuit device for a vehicle |
US20070089439A1 (en) * | 2005-10-21 | 2007-04-26 | Abtar Singh | Monitoring a condenser in a refrigeration system |
-
2012
- 2012-02-02 EP EP12000707.5A patent/EP2623900A1/en not_active Withdrawn
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1202004A1 (en) * | 2000-10-30 | 2002-05-02 | Calsonic Kansei Corporation | Cooling cycle and control method thereof |
DE102006019082A1 (en) * | 2005-04-25 | 2006-10-26 | Denso Corp., Kariya | Cooling circuit device for a vehicle |
US20070089439A1 (en) * | 2005-10-21 | 2007-04-26 | Abtar Singh | Monitoring a condenser in a refrigeration system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN105008827B (en) | Air-conditioning device | |
JP6021945B2 (en) | Refrigeration cycle apparatus and control method of refrigeration cycle apparatus | |
JP6341808B2 (en) | Refrigeration air conditioner | |
EP3205955A1 (en) | Air conditioner | |
JP4864110B2 (en) | Refrigeration air conditioner | |
CN102364258B (en) | Protection method for preventing superheat during heating of multi-connection air conditioning unit | |
AU2016202855B2 (en) | Refrigeration apparatus | |
US20090044550A1 (en) | Air conditioner | |
US20190154322A1 (en) | Refrigeration cycle apparatus | |
KR101445992B1 (en) | Device for estimating flowrate of heating medium, heat source device, and method for estimating flowrate of heating medium | |
US9157650B2 (en) | Heat source apparatus | |
EP2592367A2 (en) | Refrigeration cycle apparatus and hot water producing apparatus | |
EP3578904B1 (en) | Air conditioner | |
EP2764303B1 (en) | Method for controlling gas pressure in cooling plant | |
JP2010266190A (en) | Heat source unit | |
CN108603681A (en) | Air conditioner and air conditioner | |
KR20100079405A (en) | Air conditioner and operating method thereof | |
EP2623900A1 (en) | Method for controlling gas pressure in cooling plant | |
CN110440420A (en) | A kind of control method of the electric expansion valve of module water dispenser | |
US20220128285A1 (en) | Water regulator | |
KR100743719B1 (en) | How to prevent high pressure rise of multi air conditioner | |
JP6519098B2 (en) | Air conditioner | |
CN101644502B (en) | Refrigerating circuit and method for operating same | |
JP2011117708A (en) | Heat source system | |
KR20070031655A (en) | Pressure control method and target pressure calculation method of indoor heat exchanger of air conditioner |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO RS SE SI SK SM TR |
|
AX | Request for extension of the european patent |
Extension state: BA ME |
|
17P | Request for examination filed |
Effective date: 20140207 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20140208 |