EP2435761B1 - Heat recovery module - Google Patents
Heat recovery module Download PDFInfo
- Publication number
- EP2435761B1 EP2435761B1 EP10736772.4A EP10736772A EP2435761B1 EP 2435761 B1 EP2435761 B1 EP 2435761B1 EP 10736772 A EP10736772 A EP 10736772A EP 2435761 B1 EP2435761 B1 EP 2435761B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- flue gas
- stream
- process liquid
- heat
- primary air
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
- F22D1/00—Feed-water heaters, i.e. economisers or like preheaters
- F22D1/36—Water and air preheating systems
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22D—PREHEATING, OR ACCUMULATING PREHEATED, FEED-WATER FOR STEAM GENERATION; FEED-WATER SUPPLY FOR STEAM GENERATION; CONTROLLING WATER LEVEL FOR STEAM GENERATION; AUXILIARY DEVICES FOR PROMOTING WATER CIRCULATION WITHIN STEAM BOILERS
- F22D1/00—Feed-water heaters, i.e. economisers or like preheaters
- F22D1/02—Feed-water heaters, i.e. economisers or like preheaters with water tubes arranged in the boiler furnace, fire tubes or flue ways
Definitions
- This invention relates to a module for heat recovery from exhausted flue gas in a steam generating process involving a steam generator such as a boiler, which could form part of a power plant using steam driven turbine generators and a condensate and feed heating system able to extract steam from inner-stages of the turbine to heat the condensate and feedwater to boost cycle efficiency.
- This invention also relates to steam generation systems, and a method for same.
- steam generators In a steam generating process, there are generally one or more steam generators, one example of which is a boiler, which can be fired by various types of fuels, such as oil, gas, biomass and coal. Boilers for steam generation are well known, and can form part of a power plant using the steam to drive one or more steam turbine generators.
- Air pre-mixed with fuel before ignition is commonly termed 'primary air', and air for supporting combustion after ignition is commonly termed 'secondary air'.
- 'primary air' Air pre-mixed with fuel before ignition
- 'secondary air' air for supporting combustion after ignition
- the primary air may form a separate stream as its pressure may be much higher than that of secondary air.
- Combustion air including primary air and secondary air can be (pre-)heated by use of regenerative air heaters.
- the primary and secondary air streams are heated by heat exchange with the flue gas stream in gas-to-air heat exchangers such as a regenerative gas air heater.
- gas-to-air heat exchangers such as a regenerative gas air heater.
- the heat capacity of flue gas is much higher than the heat capacity of the air in the conventional arrangement of gas-to-air heat exchangers, making the heat exchange process inefficient.
- DE 9420492 U1 describes an arrangement for use of the flue gas of a coal-fired steam generator heat for preheating of the boiler combustion air. According to a first aspect of the present invention, there is provided a module for heat recovery from exhausted flue gas from a steam generator in a steam generating process in accordance with the claims appended hereto.
- process liquid economisers comprising at least one high pressure economiser and at least one low pressure economiser, it is possible to better match the heat capacity of the flue gas with the air flow in the first air heater and the process liquid in the process liquid economisers.
- the backend temperatures may drop significantly. This also reduces the exergy losses of the heat transfer process. The efficiency of the overall steam generating process will increase.
- the first air heater comprises one or more first air heaters being in series, parallel or both.
- the first air heater comprises at least a regenerative gas air heater able to heat at least one secondary air stream.
- the first air heater comprises at least a gas secondary air heater, preferably for a secondary air stream intended to be provided to a steam generator such as a boiler, in the steam generating process.
- a gas secondary air heater preferably for a secondary air stream intended to be provided to a steam generator such as a boiler, in the steam generating process.
- a steam generator such as a boiler
- Each of the high pressure and the low pressure process liquid economisers may comprise one or more economisers being in series, parallel or both.
- Embodiments of the present invention as described hereinafter may apply to a single process liquid economiser, each of a plurality of process liquid economisers, or be variable across a plurality of process liquid economisers.
- the heat recovery module comprises at least one high pressure economiser and at least one low pressure economiser.
- high pressure and low pressure are known to the person skilled in the art in relation to steam generating processes, especially involving a steam generator such as a boiler. Generally, they relate to the relative pressure of a stream upstream and downstream respectively from a feed pump.
- the process liquid may be provided in one or more streams.
- a plurality of process liquid streams may be provided in series, parallel or both, and optionally from a single source or a plurality of sources being the same or different.
- the properties and composition of each such stream may be same or different.
- the process stream may be provided in one or more process liquid circuits, optionally a plurality of separate circuits, being separate or connected, each circuit optionally passing also through any separate primary air heat exchanger to exchange heat between any primary air stream of the steam generating process and a process liquid stream.
- the process liquid may be any liquid or combination of liquids useable for heat exchange, including water, ammonia, alcohols, hydrocarbons and the like.
- the process liquid is wholly or substantially water, optionally including one or more additives or other minor components known in the art.
- the process liquid is feedwater for a steam generator.
- a steam generator may be a boiler, optionally comprising one or more boilers, and optionally including an integral steam generator economiser as known in the art.
- Such feedwater may be provided directly or indirectly from a feedwater stream to be processed by one or more steam generators of the steam generating process of the present invention.
- a portion of such a feedwater stream is provided as the process liquid for the present invention.
- Such a portion may be provided as the full feedwater stream, or preferably as a slip stream of such a feedwater stream, such a slip stream generally being a minor portion of the full feedwater stream.
- the feedwater is provided from the feedwater stream in the steam generating process between the steam condenser and the steam generator economiser.
- the module of the present invention may further comprise one or more first process liquid conduits defining one or more flow paths for directing process liquid from a feedwater stream to the process liquid economisers.
- the module of the present invention may also further comprise one or more second process liquid conduits defining one or more flow paths for directing process liquid from the process liquid economisers to a feedwater stream.
- the flue gas first conduit junction comprises a set of proportioning dampers to divide the flue gas in use into the first and second flue gas paths to best match the heat capacity of the second flue gas path with the heat capacity of airflow in the first air heater.
- the module of the present invention may also comprise:
- the first air heater is a secondary air heater and the invention further comprises at least one primary air heater comprising at least one process liquid heat exchanger to exchange heat between the primary air stream and the process liquid.
- primary air stream may comprise one or more primary air streams being in series, parallel or both.
- Embodiments of the present invention as described hereinafter may apply to a single primary air stream, each of a plurality of primary air streams, or be variable across a plurality of primary air streams.
- the present invention is described hereinafter in relation to a single primary air stream, the invention is not limited thereto.
- the primary air stream may comprise ambient air, recycle gas, or any combination or ratio extending from 0-100% thereof, optionally with the addition of one or more further components such as a near or pure oxygen stream.
- the requirement of the primary air stream is to at least partly assist the preparation and/or transportation of fuel into the steam generator, optionally as well as combustion support.
- each primary air stream may comprise the same or different characteristics and/or composition, including but not limited to flow rate, flow volume, temperature, pressure, oxygen content and recycle gas content.
- each primary air stream may be heated the same or differently, and by the same of different number of primary heat exchangers.
- the primary air stream comprises two or more primary air streams
- two or more of such air streams may be combined after heating according to the present invention either prior to, during or after their intended use or destination.
- the primary air streams may be passed separately and/or in any combination to the steam generator.
- each primary air stream for the preparation and/or transportation of a separate fuel stream into the steam generator, such as an equivalent plurality of fuel pulverisers, each passing a separate fuel stream into a boiler.
- the system may comprise two or more primary heat exchangers in series, parallel or both, providing heat exchange with one or more primary air streams, also being in series, parallel or both, such that they system may comprise any number of primary air streams and primary air heat exchangers in any combination thereof.
- the primary air heat exchanger(s) comprise at least one high pressure heat exchanger and at least one low pressure heat exchanger.
- high pressure and low pressure are known to the person skilled in the art in relation to steam generating processes, especially involving a steam generator such as a boiler and a feed heating/heat recovery system.
- the process liquid may be provided in one or more streams.
- a plurality of process liquid streams may be provided in series, parallel or both, and optionally from a single source or a plurality of sources.
- the process stream may be provided in one or more process liquid circuits, optionally a plurality of separate circuits, being separate or connected, each circuit optionally passing through a separate primary air heat exchanger to exchange heat between the primary air stream and a process liquid stream.
- Each process liquid stream passes through a separate primary air heat exchanger.
- the system of the present invention can provide better control of the heating of the primary air stream.
- No tempering air source supply into the primary air stream may be required to achieve the correct temperature of the primary air stream prior to its use in the steam generating process.
- the primary air heat exchanger(s) comprise at least one high pressure heat exchanger and at least one low pressure heat exchanger.
- high pressure and low pressure are known as subject to the pressure downstream or upstream of the feed pump(s) respectively.
- the coal is typically pulverised in one or more mills prior to its use in the boiler.
- the primary air stream passes to one or more pulverisers after being heated by the primary air heat exchanger(s), typically to two or more pulverisers.
- each primary air stream passes to a respective pulveriser.
- each primary air stream is separately heated by separate primary air heat exchanger(s).
- the module of the present invention may be provided integrally as part of a steam generating process, or be added to an existing steam generating process by being installed, such as retrofitted, in the path of flue gas exhausted from an existing steam generator such as a boiler.
- a steam generation system comprising a steam generator such as a boiler and a flue gas heat recovery module as herein defined.
- the steam generation system preferably involves one or more steam generating processes as herein described.
- the steam generation system preferably includes one or more first flow paths for directing process liquid from a steam generator feedwater stream to the process liquid economisers, and one or more second flow paths for directing process liquid from the process liquid economisers to the steam generator feedwater stream.
- the steam generating system of the present invention may also include:
- the downstream process fluid heat exchanger could be used to directly or indirectly provide heat to one or more streams in a steam generating process, particularly one or more incoming air streams requiring a higher than ambient temperature for their proposed use.
- incoming air streams can include a primary air stream, a secondary air stream, or both, either individually or as a combined stream such as prior to their separation into primary and secondary air streams. This may provide further heat recovery from the flue gas, ensuring greater heat utilisation and greater efficiency of available energy in a steam generating process.
- a steam generation system comprising heat recovery from exhausted flue gas in a steam generator comprising a heat recovery module in accordance with the first aspect of the invention disposed to heat a downstream process fluid to heat one of: any or the primary air flow, any or the secondary air flow, or both, of the steam generation system.
- the present invention can therefore provide a steam generation system having heat recovery from exhausted flue gas from a steam generator in a steam generating process comprising:
- a heat recovery method for recovering heat from exhaust flue gases of a steam generator comprising the following steps:
- the method of heating a primary air stream according to the present invention comprises heating the primary air stream using the embodiment of the system as hereinabove described.
- the heat recovery method may further comprise the step of combining the first and second streams after the first air heater and the process liquid economisers to form a combined stream which is subsequently in direct or indirect heat exchange with one of: the primary air flow, the secondary air flow or both.
- the method for recovering heat from exhaust flue gas of a steam generator according to the present invention comprises using a steam generating system as hereindefined.
- a method of modification of a heat recovery system for a steam generator having a flue gas exhaust stream supplying one or more air heaters comprising providing at least one low pressure and at least one high pressure process liquid economiser fluidly in parallel with the air heater(s) performed as a method of modification of existing plant to retrofit a module as defined in any one of claims 1 to 5.
- An aspect of the present invention in particular comprises a method of after-market modification of existing plant.
- the present invention is particularly suited to retrofitting. Many thermal power plants suffer high backend temperatures (that is, high flue gas temperatures at the air heater outlet) particularly when the fuel moistures vary significantly. Almost all the thermal power plants operate at high backend temperatures in the summer.
- Steam or water air heaters are installed in most of the existing plants. They are the heat exchangers for pre-heating the air streams before entering gas air heaters. With the support of steam/water air heaters and relatively bigger economisers, the backend temperatures can drop further for improving the boiler thermal efficiency.
- the invention comprises a heat recovery system of a steam generator having a flue gas exhaust stream supplying one or more air heaters with such a module retrofitted.
- the present invention encompasses all combinations of various embodiments or aspects of the invention described herein. It is understood that any and all embodiments of the present invention may be taken in conjunction with any other embodiment to describe additional embodiments of the present invention. Furthermore, any elements of an embodiment may be combined with any and all other elements of any other embodiment to describe additional embodiments.
- Figure 1 shows a first scheme A for a heat recovery module for use in a steam generating process.
- the steam generating process includes a steam generator being a boiler 4.
- the boiler 4 may comprise a number of inlets and outlets for the passage of a number of streams, in particular a feedwater stream 2 thereinto, and steam therefrom. The majority of these inlets and outlets and streams are not shown in Figure 1 for clarity purposes.
- the combustion process in the boiler 4 produces exhaust flue gas, which is reduced in temperature within the boiler 4 to produce steam, before exiting the internal economiser in the boiler 4 via a flue gas outlet 13 to a flue gas outlet conduit 14.
- the flue gas outlet conduit 14 passes to a flue gas conduit first junction 16 which comprises a set of proportioning dampers to divide the flue gas in use into a first gas flue path in a first flue gas conduit 18 and a second flue gas path in a second flue gas conduit 20.
- the first flue gas conduit 18 passes its flue gas to a first air heater, being in the first scheme A of Figure 1 a regenerative gas air heater to heat one or more air streams able to pass therethrough.
- the first air heater could be a secondary air pre-heater, such as a regenerative gas secondary air heater 22.
- the heat energy of the flue gas is exchanged with a secondary air stream 24 in a manner known in the art, to provide from suitable outlets a cooler flue gas in a third flue gas conduit 26 (defining a flow path for flue gas from the secondary air heater 22 to a second junction 28), and a hotter secondary air stream 30 which can be passed, directly or indirectly, into the boiler 4 for use in the combustion of the fuel in the boiler 4 in a manner known in the art.
- the first air heater in Figure 1 could provide heat to one or more other air streams represented in Figure 1 by line 24a. This could include one or more primary air streams useable for a coal-fired boiler.
- the first air heater could therefore be a multi-sector air heater to heat both primary air and secondary air.
- the combustion air can by split into primary and secondary air streams at the outlet of airheaters.
- Hot primary air fan can be installed to boost primary air pressure.
- the flue gas in the second flue gas conduit 20 defines a second flow path for flue gas in parallel with the first flue gas conduit 18 from the first junction 16 to one or more process liquid economisers.
- a high pressure (process liquid) economiser 32 followed by an in-line low pressure (process liquid) economiser 34.
- the high pressure and low pressure economisers 32, 34 are able to exchange heat in the flue gas originating from the boiler 4 with one or more process liquids.
- the high pressure economiser 32 is provided with process liquid as a first process liquid stream 36.
- the process liquid of the first process liquid stream 36 may be any suitable liquid available in the steam generating process.
- the process liquid of the first process liquid stream 36 is a slip stream of the main feedwater stream 2 to be subsequently processed by the steam generator of the steam generating process, being the coal-fired boiler 4. This is described in more detail with reference to Figure 2 hereinafter.
- the first process liquid stream 36 is able to extract heat from the flue gas in the second flue gas conduit 20 to provide a hotter first process liquid stream 38 and a cooler flue gas stream 40, which cooler flue gas stream 40 passes via a suitable inlet into the low pressure economiser 34.
- the cooler flue gas stream 40 is able to provide heat to a second process liquid stream 42 passing via a suitable inlet into the low pressure economiser 34, to provide, via suitable outlets, a hotter second process liquid stream 44 and a further cooler flue gas stream which can pass along a fourth flue gas conduit 46 defining a flow path for the flue gas from the low pressure economiser 34 to the second junction 28.
- a feature of the present invention is the suitable control of the division of the flue gas in the flue gas outlet conduit 14 between the first flue gas conduit 18 and the second flue gas conduit 20 to best match the heat capacity of the flue gas in the first and second flue gas paths with the heat capacities of the air flow in the first air heater, being a regenerative gas secondary air heater 22 in the first scheme A of Figure 1 , and the process liquid economisers, being the high pressure and low pressure economisers 32, 34 in the first scheme A of Figure 1 .
- improved cycle efficiency can be achieved by minimizing the exergy losses of the heat transfer process with the minimized LMTD (Log Mean Temperature Difference) for recovering the heat from the exhausted flue gas from the boiler 4.
- a process liquid such as water in process liquid economisers, rather than air in gas-to-air heat exchangers, in the path of at least a portion of the exhausted flue gas from the steam generator provides significant advantages. These include the transport of a process liquid, such as around a circuit, which can be carried out with minimal pressure loss over distance, even using small pipes. Another advantage is by carefully selecting and controlling the water flow, and the temperature differentials in the first air heater and process liquid economiser(s), there can be optimising of the heat exchange to the process liquid (and thus minimize the LMTD).
- the use of feedwater as the process liquid for the process liquid economisers in the first scheme A of Figure 1 improves the efficiency of the use of the heat energy of the flue gas by directly transferring heat to the feedwater and carefully selecting the flow and tap points used to provide the first and second process liquid stream 36, 42 for the slipstream(s) of feedwater used.
- the slip stream economisers can be sized to achieve the minimised backend temperatures based on the fuel sulphur contents when firing low moisture coals in the summer.
- a gas damper may be installed on the bypass gas duct. The bypass gas will be reduced when firing high moisture coals and/or in the winter so that the minimised backend temperatures can be maintained based on the fuel sulphur contents regardless of the fuel moistures and ambient temperatures.
- Low temperature turbine bleed steam or feed water is used to heat the combustion air in the water/steam air heaters.
- One or two slip stream economisers using high and low pressure boiler feed water as cooling media may be arranged.
- the flow and temperature of the cooling or heating media for the slip stream economisers and the water/steam air heaters should be carefully selected to ensure the most effective energy recovery as well as cost effectiveness.
- Boiler efficiency is very sensitive to the backend flue gas temperatures.
- the benefits of the above retrofits are very significant.
- slip stream economisers the amount of turbine bleed steam shall be reduced.
- the negative effect on the turbine heat rate caused by the slip stream economisers is partly compensated by the utilization of water/steam air heaters. In general, the total plant efficiency improvement is still very significant.
- Figure 2 shows the first scheme A of Figure 1 with further detail of a steam generation system using a coal-fired boiler, in particular further detail in the primary air stream and the feedwater stream.
- Coal for the boiler 4 in Figure 2 is supplied as a coal stream 6.
- the coal stream 6 is typically pulverised in one or more pulverisers 8, typically 4-6 pulverisers, so as to be provided to the boiler 4 as a pulverised coal stream 10.
- a primary air stream 12 is provided to the one or more pulverisers 8.
- a first low pressure heat exchanger 50 able to exchange heat between a first heating stream 52 and the primary air stream 12 to provide a hotter primary air stream 12a and a cooler first heating stream 54 via suitable outlets.
- the hotter primary air stream 12a passes into a high pressure primary air heat exchanger 55 to be further heated by a second heating stream 56.
- the high pressure primary air heat exchanger 55 provides through suitable outlets a further heated primary air stream 12b which can be passed to the one or more pulverisers 8, and a cooler second heating stream 58.
- the first and second heating streams 52, 56 could be provided from the same or separate sources, and could be provided as part of the same or separate circuits.
- the first heating stream 52 could be provided from a deaerator discharge stream
- the second heating stream could be provided from a feedwater slip stream, such as after the high pressure feedwater heaters.
- the cooler first and second heating streams 54, 58 could be directly or indirectly provided as at least part of, optionally all of, the first and second process liquid streams 36, 42.
- Figure 2 also shows a more detailed feedwater stream 2, having a first slip stream 60 at a suitable first feedwater junction 62, such as in or part of one of more of the feedwater heaters known in the art.
- the first slip stream 60 could be used to provide directly or indirectly process liquid for the second process liquid stream 42, using any suitable degree of separation, with the remaining feedwater stream 64 following the first feedwater junction 62.
- FIG. 2 shows the return of the hotter second process liquid stream 44 as a first return stream 66 passing into the remaining feedwater stream 64.
- the re-combined feedwater stream 68 may undergo one or more processes such as heating, pressurising, or both, to provide a processed feedwater stream 70, from which a second feedwater slip stream 72 could be provided via a second feedwater junction 74 in the same manner as that described hereinabove for the first feedwater junction 62.
- the second slip stream 72 could be used to provide directly or indirectly process liquid for the first process liquid stream 36, using any suitable degree of separation, with the remaining feedwater stream 76 following the second feedwater junction 74.
- Figure 2 shows the return of the hotter first process liquid stream 38 as a second return stream 78 passing into the remaining feedwater stream 76.
- the recombined feedwater stream 80 can then be passed, either directly or indirectly, into the boiler 4.
- Figure 2 shows suitable arrangements for the provision of the first and second process liquid streams 36, 42 from a feedwater stream 2, as well as a suitable arrangement for the use of first and second heating streams 56, 52 to provide heating to the primary air stream 12, optionally in conjunction with the conduits and circuits used for the process liquid economisers.
- FIG 3 shows the schemes of Figures 1 and 2 in combination with another steam generation system according to another embodiment of the present invention.
- the flue gas in the fifth flue gas conduit 48 from the second junction 28 passes through an electrostatic precipitator (ESP) 82 and an induction fan 84, followed by passage via a suitable inlet into a downstream process fluid heat exchanger 86 in the path of the fifth conduit 48.
- the downstream process fluid heat exchanger 86 is able to extract any remaining available heat energy from the flue gas with a downstream process fluid in a first process circuit 100.
- the first process circuit 100 comprises a process fluid in at least a first downstream process fluid conduit 102 passing via a suitable inlet into the downstream process fluid heat exchanger 86 to provide, via a suitable outlet, a hotter downstream process fluid stream 104 in a second fluid conduit 104.
- the hotter downstream process fluid stream 104 may be divided by a suitable controller anywhere between 0-100% between a secondary air heating stream 108 and a primary air heating stream 110.
- the secondary air heating stream 108 passes via a suitable inlet into a secondary air preheat exchanger 112 to provide heat exchange with an initial secondary air stream 90, so as to provide some pre-heating to the secondary air prior to the subsequent heating of the secondary air stream 24 by the regenerative gas secondary air heater 22.
- the primary air heating stream 110 can provide some pre-heating to an initial primary air stream 92 (after passage through a primary air fan 94) in a primary air preheat exchanger 114, to provide a primary air stream 12 to be subsequently heated by the first and second air heat exchangers 50, 55 as described above.
- the downstream process fluid of the downstream process fluid circuit 100 may be any suitable liquid, gas or combination of same, usually at low pressure and usually circulated by one or more suitable circulation pumps in the circuit 100.
- the primary and secondary air preheat exchangers 112, 114 provide cooler return streams 116, 118 respectively, which can be recombined to provide the process fluid in the first downstream process fluid conduit 102.
- the downstream process fluid heat exchanger 86 provides a cooler flue gas stream 88.
- the initial primary air stream 92 and secondary air stream 90 can be provided from a single air source stream 94, prior to being divided by a suitable controller.
- the hotter downstream process fluid stream 104 in the second fluid conduit 104 passes through a heat exchanger on the single air source stream 94 to heat the primary air and secondary air prior to their division.
- the downstream process fluid circuit 100 increases the use of the available heat energy in the flue gas to provide some pre-heating of the primary and secondary air streams so as to maximise the efficiency of the steam generation system shown in Figure 3 .
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Air Supply (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Description
- This invention relates to a module for heat recovery from exhausted flue gas in a steam generating process involving a steam generator such as a boiler, which could form part of a power plant using steam driven turbine generators and a condensate and feed heating system able to extract steam from inner-stages of the turbine to heat the condensate and feedwater to boost cycle efficiency. This invention also relates to steam generation systems, and a method for same.
- In a steam generating process, there are generally one or more steam generators, one example of which is a boiler, which can be fired by various types of fuels, such as oil, gas, biomass and coal. Boilers for steam generation are well known, and can form part of a power plant using the steam to drive one or more steam turbine generators.
- From the steam generator(s) there is an exhausted flue gas which conventionally provides heating for combustion air. Air pre-mixed with fuel before ignition is commonly termed 'primary air', and air for supporting combustion after ignition is commonly termed 'secondary air'. For coal- or biomass-fired boilers, the primary air may form a separate stream as its pressure may be much higher than that of secondary air. Combustion air including primary air and secondary air can be (pre-)heated by use of regenerative air heaters.
- Conventionally, the primary and secondary air streams are heated by heat exchange with the flue gas stream in gas-to-air heat exchangers such as a regenerative gas air heater. However, the heat capacity of flue gas is much higher than the heat capacity of the air in the conventional arrangement of gas-to-air heat exchangers, making the heat exchange process inefficient.
- Bauer et al, ERHOEHUNG DES BLOCKWIRKUNGSGRADES DURCH VERBESSERTE ABGASWAERMENUTZUNG, VGB KRAFTWERKSTECHNIK, 19970501 VGB KRAFTWERKSTECHNIK GMBH. ESSEN, DE - ISSN 0372-5715, describes a study of various methods for utilizing the extractable flue gas heat to increase power plant unit efficiency.
-
DE 9420492 U1 describes an arrangement for use of the flue gas of a coal-fired steam generator heat for preheating of the boiler combustion air. According to a first aspect of the present invention, there is provided a module for heat recovery from exhausted flue gas from a steam generator in a steam generating process in accordance with the claims appended hereto. - By using process liquid economisers comprising at least one high pressure economiser and at least one low pressure economiser, it is possible to better match the heat capacity of the flue gas with the air flow in the first air heater and the process liquid in the process liquid economisers. The backend temperatures may drop significantly. This also reduces the exergy losses of the heat transfer process. The efficiency of the overall steam generating process will increase.
- The first air heater comprises one or more first air heaters being in series, parallel or both. The first air heater comprises at least a regenerative gas air heater able to heat at least one secondary air stream.
- Regenerative air heaters are compact and effective gas-to-air heat exchangers for heat recovery from exhausted flue gas. The total weight and volume of the air heaters could be minimised by using regenerative air heaters. According to the present invention, the first air heater comprises at least a gas secondary air heater, preferably for a secondary air stream intended to be provided to a steam generator such as a boiler, in the steam generating process. Generally, it is desired to raise the temperature of secondary air to a temperature suitable for the combustion process, which can be greater than 200°C or greater than 300°C, as known in the art.
- Each of the high pressure and the low pressure process liquid economisers may comprise one or more economisers being in series, parallel or both. Embodiments of the present invention as described hereinafter may apply to a single process liquid economiser, each of a plurality of process liquid economisers, or be variable across a plurality of process liquid economisers.
- In accordance with the present invention, the heat recovery module comprises at least one high pressure economiser and at least one low pressure economiser. The terms "high pressure" and "low pressure" are known to the person skilled in the art in relation to steam generating processes, especially involving a steam generator such as a boiler. Generally, they relate to the relative pressure of a stream upstream and downstream respectively from a feed pump.
- The process liquid may be provided in one or more streams. A plurality of process liquid streams may be provided in series, parallel or both, and optionally from a single source or a plurality of sources being the same or different. The properties and composition of each such stream may be same or different.
- The process stream may be provided in one or more process liquid circuits, optionally a plurality of separate circuits, being separate or connected, each circuit optionally passing also through any separate primary air heat exchanger to exchange heat between any primary air stream of the steam generating process and a process liquid stream.
- The process liquid may be any liquid or combination of liquids useable for heat exchange, including water, ammonia, alcohols, hydrocarbons and the like. Preferably, the process liquid is wholly or substantially water, optionally including one or more additives or other minor components known in the art.
- In another embodiment of the present invention, the process liquid is feedwater for a steam generator. Such a steam generator may be a boiler, optionally comprising one or more boilers, and optionally including an integral steam generator economiser as known in the art. With the use of feedwater as the process liquid, heat can be transferred from exhausted flue gas to feedwater directly which would minimise the exergy losses of the heat transfer process.
- Such feedwater may be provided directly or indirectly from a feedwater stream to be processed by one or more steam generators of the steam generating process of the present invention. Preferably, a portion of such a feedwater stream is provided as the process liquid for the present invention. Such a portion may be provided as the full feedwater stream, or preferably as a slip stream of such a feedwater stream, such a slip stream generally being a minor portion of the full feedwater stream.
- According to another embodiment of the present invention, the feedwater is provided from the feedwater stream in the steam generating process between the steam condenser and the steam generator economiser. Thus, the module of the present invention may further comprise one or more first process liquid conduits defining one or more flow paths for directing process liquid from a feedwater stream to the process liquid economisers.
- The module of the present invention may also further comprise one or more second process liquid conduits defining one or more flow paths for directing process liquid from the process liquid economisers to a feedwater stream.
- According to another embodiment of the present invention the flue gas first conduit junction comprises a set of proportioning dampers to divide the flue gas in use into the first and second flue gas paths to best match the heat capacity of the second flue gas path with the heat capacity of airflow in the first air heater.
- The module of the present invention may also comprise:
- (d) a third flue gas conduit defining a flow path for flue gas from the secondary air heater to a second junction;
- (e) a fourth flue gas conduit defining a flow path for flue gas from the process liquid economisers to a second junction; and
- (f) a fifth flue gas conduit defining a flow path for flue gas from the second junction.
- According to the invention the first air heater is a secondary air heater and the invention further comprises at least one primary air heater comprising at least one process liquid heat exchanger to exchange heat between the primary air stream and the process liquid. By heating the primary air stream with a process liquid rather than a hot flue gas stream, the problem of primary air leakage from a regenerative gas air heater is avoided, and much greater control of the heat exchange can be achieved.
- The term "primary air stream" as used herein may comprise one or more primary air streams being in series, parallel or both. Embodiments of the present invention as described hereinafter may apply to a single primary air stream, each of a plurality of primary air streams, or be variable across a plurality of primary air streams. Thus, whilst the present invention is described hereinafter in relation to a single primary air stream, the invention is not limited thereto.
- The primary air stream may comprise ambient air, recycle gas, or any combination or ratio extending from 0-100% thereof, optionally with the addition of one or more further components such as a near or pure oxygen stream. The requirement of the primary air stream is to at least partly assist the preparation and/or transportation of fuel into the steam generator, optionally as well as combustion support.
- Where the primary air stream comprises two or more primary air streams, each primary air stream may comprise the same or different characteristics and/or composition, including but not limited to flow rate, flow volume, temperature, pressure, oxygen content and recycle gas content.
- Where the primary air stream comprises two or more primary air streams, each primary air stream may be heated the same or differently, and by the same of different number of primary heat exchangers.
- Where the primary air stream comprises two or more primary air streams, two or more of such air streams may be combined after heating according to the present invention either prior to, during or after their intended use or destination.
- Where the primary air stream comprises two or more primary air streams, the primary air streams may be passed separately and/or in any combination to the steam generator.
- In one embodiment, there are provided a plurality of primary air streams, each primary air stream for the preparation and/or transportation of a separate fuel stream into the steam generator, such as an equivalent plurality of fuel pulverisers, each passing a separate fuel stream into a boiler. In this way, there can be separate control of each primary air stream, providing greater control flexibility of the overall fuel preparation, transportation and supply into the steam generator.
- The system may comprise two or more primary heat exchangers in series, parallel or both, providing heat exchange with one or more primary air streams, also being in series, parallel or both, such that they system may comprise any number of primary air streams and primary air heat exchangers in any combination thereof.
- In one embodiment of the present invention, the primary air heat exchanger(s) comprise at least one high pressure heat exchanger and at least one low pressure heat exchanger. The terms "high pressure" and "low pressure" are known to the person skilled in the art in relation to steam generating processes, especially involving a steam generator such as a boiler and a feed heating/heat recovery system.
- The process liquid may be provided in one or more streams. A plurality of process liquid streams may be provided in series, parallel or both, and optionally from a single source or a plurality of sources. Further optionally, the process stream may be provided in one or more process liquid circuits, optionally a plurality of separate circuits, being separate or connected, each circuit optionally passing through a separate primary air heat exchanger to exchange heat between the primary air stream and a process liquid stream.
- Each process liquid stream passes through a separate primary air heat exchanger.
- As the flow of a process liquid can be controlled easily, the system of the present invention can provide better control of the heating of the primary air stream. No tempering air source supply into the primary air stream may be required to achieve the correct temperature of the primary air stream prior to its use in the steam generating process. Preferably, no primary air stream gas-to-air heaters are required.
- In a possible embodiment, the primary air heat exchanger(s) comprise at least one high pressure heat exchanger and at least one low pressure heat exchanger. The terms "high pressure" and "low pressure" are known as subject to the pressure downstream or upstream of the feed pump(s) respectively.
- For a coal-fired steam generator or boiler, the coal is typically pulverised in one or more mills prior to its use in the boiler.
- According to a further embodiment of the present invention, the primary air stream passes to one or more pulverisers after being heated by the primary air heat exchanger(s), typically to two or more pulverisers. Preferably, each primary air stream passes to a respective pulveriser. Preferably, each primary air stream is separately heated by separate primary air heat exchanger(s).
- The module of the present invention may be provided integrally as part of a steam generating process, or be added to an existing steam generating process by being installed, such as retrofitted, in the path of flue gas exhausted from an existing steam generator such as a boiler.
- According to the present invention, there is provided a steam generation system comprising a steam generator such as a boiler and a flue gas heat recovery module as herein defined. The steam generation system preferably involves one or more steam generating processes as herein described.
- The steam generation system preferably includes one or more first flow paths for directing process liquid from a steam generator feedwater stream to the process liquid economisers, and one or more second flow paths for directing process liquid from the process liquid economisers to the steam generator feedwater stream.
- The steam generating system of the present invention may also include:
- (d) a third flue gas conduit defining a flow path for flue gas from the secondary air heater to a second junction;
- (e) a fourth flue gas conduit defining a flow path for flue gas from the process liquid economisers to a second junction;
- (f) a fifth flue gas conduit defining a flow path for flue gas from the second junction; and
- (g) a downstream process fluid heat exchanger in the path of the fifth conduit.
- The downstream process fluid heat exchanger could be used to directly or indirectly provide heat to one or more streams in a steam generating process, particularly one or more incoming air streams requiring a higher than ambient temperature for their proposed use. Such incoming air streams can include a primary air stream, a secondary air stream, or both, either individually or as a combined stream such as prior to their separation into primary and secondary air streams. This may provide further heat recovery from the flue gas, ensuring greater heat utilisation and greater efficiency of available energy in a steam generating process.
- Thus, according to the present invention, there may be provided a steam generation system comprising heat recovery from exhausted flue gas in a steam generator comprising a heat recovery module in accordance with the first aspect of the invention disposed to heat a downstream process fluid to heat one of: any or the primary air flow, any or the secondary air flow, or both, of the steam generation system.
- The present invention can therefore provide a steam generation system having heat recovery from exhausted flue gas from a steam generator in a steam generating process comprising:
- (a) a flue gas outlet conduit defining a flow path for flue gas from a flue gas outlet of a steam generator to a flue gas conduit first junction;
- (b) a first flue gas conduit defining a first flow path for flue gas from the first junction to a secondary air heater;
- (c) a second flue gas conduit defining a second flow path for flue gas in parallel with the first flue gas conduit from the first junction to at least one low pressure and at least one high pressure process liquid economiser;
- (d) a third flue gas conduit defining a flow path for flue gas from the secondary air heater to a second junction;
- (e) a fourth flue gas conduit defining a flow path for flue gas from the process liquid economisers to a second junction;
- (f) a fifth flue gas conduit defining a flow path for flue gas from the second junction; and
- (g) a downstream process liquid heat exchanger in the path of the fifth conduit to heat a downstream process fluid to heat one of: any or the primary air flow, any or the secondary air flow, or both, of the steam generation system.
- According to the present invention, there is provided a heat recovery method for recovering heat from exhaust flue gases of a steam generator comprising the following steps:
- (i) dividing flue gas exhausted from a steam generator into two streams;
- (ii) causing a first stream to feed into a secondary air heater comprising a regenerative gas air heater;
- (iii) causing a second stream to feed into at least two process liquid economisers comprising at least one low pressure and at least one high pressure process liquid economiser, and
- (iv) passing a process liquid through one or more primary air heat exchangers to exchange heat from the process liquid to the primary air steam in the primary air heat exchanger(s).
- Preferably, the method of heating a primary air stream according to the present invention comprises heating the primary air stream using the embodiment of the system as hereinabove described.
- The heat recovery method may further comprise the step of combining the first and second streams after the first air heater and the process liquid economisers to form a combined stream which is subsequently in direct or indirect heat exchange with one of: the primary air flow, the secondary air flow or both.
- Preferably, the method for recovering heat from exhaust flue gas of a steam generator according to the present invention comprises using a steam generating system as hereindefined.
- According to the present invention, there is provided a method of modification of a heat recovery system for a steam generator having a flue gas exhaust stream supplying one or more air heaters, the method comprising providing at least one low pressure and at least one high pressure process liquid economiser fluidly in parallel with the air heater(s) performed as a method of modification of existing plant to retrofit a module as defined in any one of claims 1 to 5. An aspect of the present invention in particular comprises a method of after-market modification of existing plant. The present invention is particularly suited to retrofitting. Many thermal power plants suffer high backend temperatures (that is, high flue gas temperatures at the air heater outlet) particularly when the fuel moistures vary significantly. Almost all the thermal power plants operate at high backend temperatures in the summer. By adding slip stream economisers with reasonable sizes in parallel with the air heaters modification can be made without any changes on the costly major equipment, such as FDF, IDF, AH SAH etc. The heat capacity of the boiler exhausted flue gas will better match the heat capacity of the combustion air and the slip stream feed flow in the economisers. The backend temperatures will drop significantly and the exergy losses of the heat transfer process will be minimised. Therefore the cycle efficiency is improved. Retrofit can be carried out for the plants either with or without steam/water air heaters.
- Steam or water air heaters are installed in most of the existing plants. They are the heat exchangers for pre-heating the air streams before entering gas air heaters. With the support of steam/water air heaters and relatively bigger economisers, the backend temperatures can drop further for improving the boiler thermal efficiency.
- In a yet further aspect the invention comprises a heat recovery system of a steam generator having a flue gas exhaust stream supplying one or more air heaters with such a module retrofitted.
- The present invention encompasses all combinations of various embodiments or aspects of the invention described herein. It is understood that any and all embodiments of the present invention may be taken in conjunction with any other embodiment to describe additional embodiments of the present invention. Furthermore, any elements of an embodiment may be combined with any and all other elements of any other embodiment to describe additional embodiments.
- Embodiments of the present invention will now be described by way of example only, and with reference to the accompanying drawings in which;
-
Figure 1 comprises a first scheme for a heat recovery in a steam generating process; -
Figure 2 comprises the first scheme shown inFigure 1 in an expanded steam generating process according to one embodiment of the present invention; and -
Figure 3 comprises the heat recovery module ofFigure 1 and steam generation systems according to further embodiments of the present invention. - For the purposes of this description, a single reference number will be assigned to line as well as a stream carried in that line.
- Referring to the drawings,
Figure 1 shows a first scheme A for a heat recovery module for use in a steam generating process. For the first scheme A, the steam generating process includes a steam generator being aboiler 4. Theboiler 4 may comprise a number of inlets and outlets for the passage of a number of streams, in particular afeedwater stream 2 thereinto, and steam therefrom. The majority of these inlets and outlets and streams are not shown inFigure 1 for clarity purposes. - The combustion process in the
boiler 4 produces exhaust flue gas, which is reduced in temperature within theboiler 4 to produce steam, before exiting the internal economiser in theboiler 4 via aflue gas outlet 13 to a fluegas outlet conduit 14. The fluegas outlet conduit 14 passes to a flue gas conduitfirst junction 16 which comprises a set of proportioning dampers to divide the flue gas in use into a first gas flue path in a firstflue gas conduit 18 and a second flue gas path in a secondflue gas conduit 20. - The first
flue gas conduit 18 passes its flue gas to a first air heater, being in the first scheme A ofFigure 1 a regenerative gas air heater to heat one or more air streams able to pass therethrough. For example, the first air heater could be a secondary air pre-heater, such as a regenerative gassecondary air heater 22. In thesecondary air heater 22, the heat energy of the flue gas is exchanged with asecondary air stream 24 in a manner known in the art, to provide from suitable outlets a cooler flue gas in a third flue gas conduit 26 (defining a flow path for flue gas from thesecondary air heater 22 to a second junction 28), and a hottersecondary air stream 30 which can be passed, directly or indirectly, into theboiler 4 for use in the combustion of the fuel in theboiler 4 in a manner known in the art. - Additionally and/or alternatively, the first air heater in
Figure 1 could provide heat to one or more other air streams represented inFigure 1 byline 24a. This could include one or more primary air streams useable for a coal-fired boiler. The first air heater could therefore be a multi-sector air heater to heat both primary air and secondary air. Alternatively, the combustion air can by split into primary and secondary air streams at the outlet of airheaters. Hot primary air fan can be installed to boost primary air pressure. - The flue gas in the second
flue gas conduit 20 defines a second flow path for flue gas in parallel with the firstflue gas conduit 18 from thefirst junction 16 to one or more process liquid economisers. In the first scheme A ofFigure 1 , there is shown a high pressure (process liquid)economiser 32 followed by an in-line low pressure (process liquid)economiser 34. - The high pressure and
low pressure economisers boiler 4 with one or more process liquids. In the example of the present invention shown by the first scheme A ofFigure 1 , thehigh pressure economiser 32 is provided with process liquid as a firstprocess liquid stream 36. The process liquid of the firstprocess liquid stream 36 may be any suitable liquid available in the steam generating process. Preferably the process liquid of the firstprocess liquid stream 36 is a slip stream of themain feedwater stream 2 to be subsequently processed by the steam generator of the steam generating process, being the coal-firedboiler 4. This is described in more detail with reference toFigure 2 hereinafter. - The first
process liquid stream 36 is able to extract heat from the flue gas in the secondflue gas conduit 20 to provide a hotter firstprocess liquid stream 38 and a coolerflue gas stream 40, which coolerflue gas stream 40 passes via a suitable inlet into thelow pressure economiser 34. - In a similar manner, the cooler
flue gas stream 40 is able to provide heat to a secondprocess liquid stream 42 passing via a suitable inlet into thelow pressure economiser 34, to provide, via suitable outlets, a hotter secondprocess liquid stream 44 and a further cooler flue gas stream which can pass along a fourthflue gas conduit 46 defining a flow path for the flue gas from thelow pressure economiser 34 to thesecond junction 28. - From the
second junction 28, there is a fifthflue gas conduit 48 defining a flow path for flue gas from thesecond junction 28. - A feature of the present invention is the suitable control of the division of the flue gas in the flue
gas outlet conduit 14 between the firstflue gas conduit 18 and the secondflue gas conduit 20 to best match the heat capacity of the flue gas in the first and second flue gas paths with the heat capacities of the air flow in the first air heater, being a regenerative gassecondary air heater 22 in the first scheme A ofFigure 1 , and the process liquid economisers, being the high pressure andlow pressure economisers Figure 1 . In this way, improved cycle efficiency can be achieved by minimizing the exergy losses of the heat transfer process with the minimized LMTD (Log Mean Temperature Difference) for recovering the heat from the exhausted flue gas from theboiler 4. - The use of a process liquid such as water in process liquid economisers, rather than air in gas-to-air heat exchangers, in the path of at least a portion of the exhausted flue gas from the steam generator provides significant advantages. These include the transport of a process liquid, such as around a circuit, which can be carried out with minimal pressure loss over distance, even using small pipes. Another advantage is by carefully selecting and controlling the water flow, and the temperature differentials in the first air heater and process liquid economiser(s), there can be optimising of the heat exchange to the process liquid (and thus minimize the LMTD).
- In addition, as the specific heat capacity of liquids such as water is much higher than the specific heat capacity of gases such as air, the flow of the process liquid such as water can be significantly reduced while still providing the same heat exchange amount from the flue gas stream.
- In particular, the use of feedwater as the process liquid for the process liquid economisers in the first scheme A of
Figure 1 improves the efficiency of the use of the heat energy of the flue gas by directly transferring heat to the feedwater and carefully selecting the flow and tap points used to provide the first and secondprocess liquid stream - The schemes described above are particularly suited to retrofitting to existing plant.
- The slip stream economisers can be sized to achieve the minimised backend temperatures based on the fuel sulphur contents when firing low moisture coals in the summer. A gas damper may be installed on the bypass gas duct. The bypass gas will be reduced when firing high moisture coals and/or in the winter so that the minimised backend temperatures can be maintained based on the fuel sulphur contents regardless of the fuel moistures and ambient temperatures.
- With bigger slip stream economisers and the support of steam or water air heaters, more flue gas can be bypassed to slip stream economisers to further drop the backend temperature of gas airheater while maintaining the AH cold end metal temperatures above certain value to prevent corrosion caused by acid condensate.
- Low temperature turbine bleed steam or feed water is used to heat the combustion air in the water/steam air heaters. One or two slip stream economisers using high and low pressure boiler feed water as cooling media may be arranged. The flow and temperature of the cooling or heating media for the slip stream economisers and the water/steam air heaters should be carefully selected to ensure the most effective energy recovery as well as cost effectiveness.
- Boiler efficiency is very sensitive to the backend flue gas temperatures. The benefits of the above retrofits are very significant. However by introducing slip stream economisers, the amount of turbine bleed steam shall be reduced. With the utilization of water/steam air heaters, part of the bleed steam reduction will be trade off. The negative effect on the turbine heat rate caused by the slip stream economisers is partly compensated by the utilization of water/steam air heaters. In general, the total plant efficiency improvement is still very significant.
- No modification on the existing major equipment, such as FDF, IDF, AH etc is required. The main cost will be the additional slip stream economisers. There are flexibilities on sizing the slip stream economisers. Sizing may be optimized having regard to factors such as budget, fuel prices and the operation conditions of the plant.
-
Figure 2 shows the first scheme A ofFigure 1 with further detail of a steam generation system using a coal-fired boiler, in particular further detail in the primary air stream and the feedwater stream. - Coal for the
boiler 4 inFigure 2 is supplied as acoal stream 6. Thecoal stream 6 is typically pulverised in one or more pulverisers 8, typically 4-6 pulverisers, so as to be provided to theboiler 4 as a pulverisedcoal stream 10. Aprimary air stream 12 is provided to the one ormore pulverisers 8. - In the path of the
primary air stream 12 shown inFigure 2 , there is shown a first lowpressure heat exchanger 50 able to exchange heat between afirst heating stream 52 and theprimary air stream 12 to provide a hotterprimary air stream 12a and a coolerfirst heating stream 54 via suitable outlets. The hotterprimary air stream 12a passes into a high pressure primaryair heat exchanger 55 to be further heated by asecond heating stream 56. The high pressure primaryair heat exchanger 55 provides through suitable outlets a further heatedprimary air stream 12b which can be passed to the one or more pulverisers 8, and a coolersecond heating stream 58. - The first and second heating streams 52, 56 could be provided from the same or separate sources, and could be provided as part of the same or separate circuits. For example, the
first heating stream 52 could be provided from a deaerator discharge stream, and the second heating stream could be provided from a feedwater slip stream, such as after the high pressure feedwater heaters. In a non-limiting example of the present invention, the cooler first and second heating streams 54, 58 could be directly or indirectly provided as at least part of, optionally all of, the first and second process liquid streams 36, 42. -
Figure 2 also shows a moredetailed feedwater stream 2, having afirst slip stream 60 at a suitablefirst feedwater junction 62, such as in or part of one of more of the feedwater heaters known in the art. Thefirst slip stream 60 could be used to provide directly or indirectly process liquid for the secondprocess liquid stream 42, using any suitable degree of separation, with the remainingfeedwater stream 64 following thefirst feedwater junction 62. -
Figure 2 shows the return of the hotter secondprocess liquid stream 44 as afirst return stream 66 passing into the remainingfeedwater stream 64. There-combined feedwater stream 68 may undergo one or more processes such as heating, pressurising, or both, to provide a processedfeedwater stream 70, from which a secondfeedwater slip stream 72 could be provided via asecond feedwater junction 74 in the same manner as that described hereinabove for thefirst feedwater junction 62. - In the same manner as described above, the
second slip stream 72 could be used to provide directly or indirectly process liquid for the firstprocess liquid stream 36, using any suitable degree of separation, with the remainingfeedwater stream 76 following thesecond feedwater junction 74.Figure 2 shows the return of the hotter firstprocess liquid stream 38 as asecond return stream 78 passing into the remainingfeedwater stream 76. The recombinedfeedwater stream 80 can then be passed, either directly or indirectly, into theboiler 4. -
Figure 2 shows suitable arrangements for the provision of the first and second process liquid streams 36, 42 from afeedwater stream 2, as well as a suitable arrangement for the use of first and second heating streams 56, 52 to provide heating to theprimary air stream 12, optionally in conjunction with the conduits and circuits used for the process liquid economisers. -
Figure 3 shows the schemes ofFigures 1 and2 in combination with another steam generation system according to another embodiment of the present invention. - In
Figure 3 , the flue gas in the fifthflue gas conduit 48 from thesecond junction 28 passes through an electrostatic precipitator (ESP) 82 and aninduction fan 84, followed by passage via a suitable inlet into a downstream processfluid heat exchanger 86 in the path of thefifth conduit 48. The downstream processfluid heat exchanger 86 is able to extract any remaining available heat energy from the flue gas with a downstream process fluid in afirst process circuit 100. - The
first process circuit 100 comprises a process fluid in at least a first downstreamprocess fluid conduit 102 passing via a suitable inlet into the downstream processfluid heat exchanger 86 to provide, via a suitable outlet, a hotter downstreamprocess fluid stream 104 in a secondfluid conduit 104. At afirst circuit junction 106, the hotter downstreamprocess fluid stream 104 may be divided by a suitable controller anywhere between 0-100% between a secondaryair heating stream 108 and a primaryair heating stream 110. - The secondary
air heating stream 108 passes via a suitable inlet into a secondaryair preheat exchanger 112 to provide heat exchange with an initialsecondary air stream 90, so as to provide some pre-heating to the secondary air prior to the subsequent heating of thesecondary air stream 24 by the regenerative gassecondary air heater 22. - Similarly, the primary
air heating stream 110 can provide some pre-heating to an initial primary air stream 92 (after passage through a primary air fan 94) in a primaryair preheat exchanger 114, to provide aprimary air stream 12 to be subsequently heated by the first and secondair heat exchangers - The downstream process fluid of the downstream
process fluid circuit 100 may be any suitable liquid, gas or combination of same, usually at low pressure and usually circulated by one or more suitable circulation pumps in thecircuit 100. - The primary and secondary
air preheat exchangers process fluid conduit 102. The downstream processfluid heat exchanger 86 provides a coolerflue gas stream 88. - The initial
primary air stream 92 andsecondary air stream 90 can be provided from a singleair source stream 94, prior to being divided by a suitable controller. - In a first alternative, the hotter downstream
process fluid stream 104 in the secondfluid conduit 104 passes through a heat exchanger on the singleair source stream 94 to heat the primary air and secondary air prior to their division. - The downstream
process fluid circuit 100 increases the use of the available heat energy in the flue gas to provide some pre-heating of the primary and secondary air streams so as to maximise the efficiency of the steam generation system shown inFigure 3 .
Claims (11)
- A module for heat recovery from exhausted flue gas from a steam generator (4) in a steam generating process comprising:(a) a flue gas outlet conduit (14) defining a flow path for flue gas from a flue gas outlet (13) of a steam generator to a flue gas conduit first junction (16);(b) a first flue gas conduit (18) defining a first flow path for flue gas from the first junction; and(c) a second flue gas conduit (20) defining a second flow path for flue gas in parallel with the first flue gas conduit from the first junction to at least two process liquid economisers (32,34) comprising at least one high pressure economiser (32) and at least one low pressure economiser (34);characterised in that the first flue gas conduit (18) defines a flow path to a secondary air heater (22) comprising a regenerative gas air heater to exchange heat between a secondary air stream and the flue gas; and in that the module comprises at least one primary air heater comprising at least one process liquid heat exchanger to exchange heat between a primary air stream and the process liquid.
- A module in accordance with claim 1 wherein the process liquid is water.
- A module in accordance with claim 2 wherein the process liquid is one or more slipstreams (36, 42) of the feedwater stream to be processed by the steam generator of the steam generating process.
- A module in accordance with any one of the preceding claims comprising one or more first process liquid conduits defining one or more flow paths for directing process liquid from a feedwater stream to the process liquid economisers (32, 34).
- A module in accordance with any one of the preceding claims comprising one or more second process liquid conduits defining one or more flow paths for directing process liquid from the process liquid economisers to a feedwater stream.
- A steam generation system comprising a steam generator (4) such as a boiler and a flue gas heat recovery module in accordance with any preceding claim.
- A steam generation system in accordance with claim 6 when additionally in accordance with claim 1 further comprising:(d) a third flue gas conduit defining a flow path for flue gas from the secondary air heater to a second junction;(e) a fourth flue gas conduit defining a flow path for flue gas from the process liquid economisers to a second junction;(f) a fifth flue gas conduit defining a flow path for flue gas from the second junction; and(g) a downstream process fluid heat exchanger in the path of the fifth conduit.
- A steam generation system in accordance with claim 7 further comprising using the downstream process fluid heat exchanger to provide heat to one of: the primary air stream, the secondary air stream, or both.
- A heat recovery method for recovering heat from exhaust flue gases of a steam generator (4) comprising the following steps:(i) dividing flue gas exhausted from a steam generator into two streams;(ii) causing a first stream to feed into a secondary air heater (22) comprising a regenerative gas air heater;(iii) causing a second stream to feed into at least two process liquid economisers (32, 34) comprising at least one high pressure economiser (32) and at least one low pressure economiser (34); and the further step of passing a process liquid through one or more primary air heat exchangers to exchange heat from the process liquid to the primary air steam in the primary air heat exchanger(s).
- A method in accordance with claim 9 further comprising the step of combining the first and second streams after the secondary air heater and the process liquid economisers to form a combined stream which is subsequently in heat exchange with the primary air stream.
- A method of modification of a heat recovery system for a steam generator having a primary flue gas exhaust stream supplying one or more air heaters, the method comprising providing at least one high pressure and at least one low pressure process liquid economiser fluidly in parallel with the air heater(s) performed as a method of modification of existing plant to retrofit a module as defined in any one of claims 1 to 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
PL10736772T PL2435761T3 (en) | 2009-05-27 | 2010-05-26 | Heat recovery module |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GBGB0909060.6A GB0909060D0 (en) | 2009-05-27 | 2009-05-27 | Heat recovery module |
PCT/GB2010/050863 WO2010136795A2 (en) | 2009-05-27 | 2010-05-26 | Heat recovery module |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2435761A2 EP2435761A2 (en) | 2012-04-04 |
EP2435761B1 true EP2435761B1 (en) | 2017-07-05 |
Family
ID=40863006
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP10736772.4A Not-in-force EP2435761B1 (en) | 2009-05-27 | 2010-05-26 | Heat recovery module |
Country Status (7)
Country | Link |
---|---|
US (1) | US20120167838A1 (en) |
EP (1) | EP2435761B1 (en) |
KR (1) | KR101659527B1 (en) |
CN (1) | CN102460012B (en) |
GB (1) | GB0909060D0 (en) |
PL (1) | PL2435761T3 (en) |
WO (1) | WO2010136795A2 (en) |
Families Citing this family (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CA2811446A1 (en) * | 2010-09-29 | 2012-04-05 | Babcock-Hitachi Kabushiki Kaisha | Oxygen combustion system and method for operating same |
WO2013178446A1 (en) * | 2012-05-31 | 2013-12-05 | Robert Bosch Gmbh | Method for preheating air on steam boilers, and device for carrying out the method |
EP2851616A1 (en) * | 2013-09-19 | 2015-03-25 | Alstom Technology Ltd | Flue gas heat recovery integration |
EP3184757A1 (en) | 2015-12-21 | 2017-06-28 | Cockerill Maintenance & Ingenierie S.A. | Condensing heat recovery steam generator |
CN106895383B (en) | 2015-12-21 | 2019-11-12 | 考克利尔维修工程有限责任公司 | Waste heat of condensation recovered steam generator |
US10221726B2 (en) | 2015-12-21 | 2019-03-05 | Cockerill Maintenance & Ingenierie S.A. | Condensing heat recovery steam generator |
CN109631074A (en) * | 2018-12-03 | 2019-04-16 | 河南华润电力首阳山有限公司 | A kind of hot steam extraction utilization system and method again |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
GB841040A (en) * | 1957-08-06 | 1960-07-13 | Babcock & Wilcox Ltd | Improvements in or relating to steam generators provided with air heater means |
FR1526049A (en) * | 1967-03-17 | 1968-05-24 | Stein & Roubaix | Advanced gas turbine-steam turbine combined cycle installation |
DE4212336C1 (en) * | 1992-03-06 | 1993-09-02 | Gea Luftkuehler Gmbh, 4630 Bochum, De | |
US5247907A (en) * | 1992-05-05 | 1993-09-28 | The M. W. Kellogg Company | Process furnace with a split flue convection section |
DE4222811C2 (en) * | 1992-07-14 | 2001-05-10 | Balcke Duerr Energietech Gmbh | Arrangement for using the heat contained in the exhaust gas of a coal-fired boiler |
DE4441324C1 (en) * | 1994-11-22 | 1996-01-04 | Steinmueller Gmbh L & C | Heat utilisation system in coal=fired steam generator flue |
US5915340A (en) * | 1996-10-02 | 1999-06-29 | Abb Air Preheater Inc. | Variable sector plate quad sector air preheater |
US6405791B1 (en) * | 1999-07-22 | 2002-06-18 | Paul James Lieb | Air heater gas inlet plenum |
JP2003074310A (en) * | 2001-09-04 | 2003-03-12 | Babcock Hitachi Kk | Exhaust recombustion type combined cycle plant |
US7021248B2 (en) * | 2002-09-06 | 2006-04-04 | The Babcock & Wilcox Company | Passive system for optimal NOx reduction via selective catalytic reduction with variable boiler load |
US7193123B2 (en) * | 2004-05-21 | 2007-03-20 | Exxonmobil Chemical Patents Inc. | Process and apparatus for cracking hydrocarbon feedstock containing resid to improve vapor yield from vapor/liquid separation |
-
2009
- 2009-05-27 GB GBGB0909060.6A patent/GB0909060D0/en not_active Ceased
-
2010
- 2010-05-26 PL PL10736772T patent/PL2435761T3/en unknown
- 2010-05-26 WO PCT/GB2010/050863 patent/WO2010136795A2/en active Application Filing
- 2010-05-26 EP EP10736772.4A patent/EP2435761B1/en not_active Not-in-force
- 2010-05-26 KR KR1020117030241A patent/KR101659527B1/en not_active Expired - Fee Related
- 2010-05-26 CN CN201080033355.0A patent/CN102460012B/en not_active Expired - Fee Related
- 2010-05-26 US US13/322,400 patent/US20120167838A1/en not_active Abandoned
Non-Patent Citations (1)
Title |
---|
None * |
Also Published As
Publication number | Publication date |
---|---|
KR101659527B1 (en) | 2016-09-30 |
WO2010136795A3 (en) | 2011-10-06 |
US20120167838A1 (en) | 2012-07-05 |
EP2435761A2 (en) | 2012-04-04 |
PL2435761T3 (en) | 2017-12-29 |
GB0909060D0 (en) | 2009-07-01 |
KR20120030427A (en) | 2012-03-28 |
CN102460012A (en) | 2012-05-16 |
WO2010136795A2 (en) | 2010-12-02 |
CN102460012B (en) | 2015-11-25 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP2435761B1 (en) | Heat recovery module | |
EP2433050B1 (en) | Heat recovery system and method | |
CN1132540A (en) | Equipment for cooling gas turbine coolant for gas and steam turbine installations | |
US20080034757A1 (en) | Method and system integrating solar heat into a regenerative rankine cycle | |
CN103244944A (en) | Air preheating system and method performing steam extraction by utilizing steam turbine | |
TWI645104B (en) | Fossil fuel power plant | |
CN113803706B (en) | Power generation system based on hot air recycling and utilizing waste heat of tail flue gas of boiler | |
US8205451B2 (en) | System and assemblies for pre-heating fuel in a combined cycle power plant | |
CN109780566A (en) | Steam power plant | |
CN103574587A (en) | Waste heat utilizing system of thermal power plant and thermal power unit | |
KR101584418B1 (en) | Boiler plant | |
AU2011206688B2 (en) | System for combined flue gas heat recovery and dust precipitation improvement as retrofit solution for existing coal-fired power stations | |
CN102839999B (en) | Small steam turbine exhaust steam cold source loss recovery system and method | |
US20040025510A1 (en) | Method for operating a gas and steam turbine installation and corresponding installation | |
CN103573311A (en) | Steam exhaust energy utilizing system of driving steam turbine of thermal power plant and thermal power unit | |
CN103485892B (en) | Power plant with solar system | |
CN107388229A (en) | A kind of adjustable joint backheating system | |
US20120160188A1 (en) | System for Heating a Primary Air Stream | |
TW201529961A (en) | Heat exchanging system and method for a heat recovery steam generator | |
CN110578931B (en) | System and method for adjusting secondary air temperature by utilizing condensation water to improve heater | |
CN116642170A (en) | Coal-fired thermal power heat storage system for realizing cascade storage and utilization of steam energy | |
CN205897104U (en) | Efficiency of generating set is improved heater system | |
SU1224417A1 (en) | Power unit of steam power plant | |
RU1824510C (en) | Power unit of thermoelectric plant |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20111208 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
TPAC | Observations filed by third parties |
Free format text: ORIGINAL CODE: EPIDOSNTIPA |
|
DAX | Request for extension of the european patent (deleted) | ||
17Q | First examination report despatched |
Effective date: 20130325 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: CHEN, CHAO HUI Inventor name: NAYAR, RAMESH CHANDER Inventor name: LI, MENG Inventor name: SMITH, MICHAEL |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: NAYAR, RAMESH CHANDER Inventor name: CHEN, CHAO HUI Inventor name: LI, MENG Inventor name: SMITH, MICHAEL |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DOOSAN POWER SYSTEMS (UK) LIMITED |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: DOOSAN BABCOCK LIMITED |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTG | Intention to grant announced |
Effective date: 20170109 |
|
RIN1 | Information on inventor provided before grant (corrected) |
Inventor name: SMITH, MICHAEL Inventor name: NAYAR, RAMESH CHANDER Inventor name: CHEN, CHAO HUI Inventor name: LI, MENG |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAL | Information related to payment of fee for publishing/printing deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR3 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
GRAR | Information related to intention to grant a patent recorded |
Free format text: ORIGINAL CODE: EPIDOSNIGR71 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: GRANT OF PATENT IS INTENDED |
|
INTC | Intention to grant announced (deleted) | ||
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE PATENT HAS BEEN GRANTED |
|
INTG | Intention to grant announced |
Effective date: 20170502 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AL AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 906854 Country of ref document: AT Kind code of ref document: T Effective date: 20170715 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602010043428 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MP Effective date: 20170705 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 906854 Country of ref document: AT Kind code of ref document: T Effective date: 20170705 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171005 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171005 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171006 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20171105 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602010043428 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
26N | No opposition filed |
Effective date: 20180406 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20180524 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: TR Payment date: 20180512 Year of fee payment: 9 Ref country code: FR Payment date: 20180528 Year of fee payment: 9 Ref country code: PL Payment date: 20180427 Year of fee payment: 9 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: BE Ref legal event code: MM Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180526 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180526 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180531 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602010043428 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180526 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20191203 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20100526 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20170705 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190531 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20170705 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190526 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190526 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20230530 Year of fee payment: 14 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20240526 |