Process for controlling rolling of a sheet metal strip Download PDFInfo
- Publication number
- EP2172282B1 EP2172282B1 EP20090305933 EP09305933A EP2172282B1 EP 2172282 B1 EP2172282 B1 EP 2172282B1 EP 20090305933 EP20090305933 EP 20090305933 EP 09305933 A EP09305933 A EP 09305933A EP 2172282 B1 EP2172282 B1 EP 2172282B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- cage
- strip
- thickness
- speed
- cylinders
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000005096 rolling process Methods 0.000 title claims description 35
- 238000000034 method Methods 0.000 title claims description 22
- 239000002184 metal Substances 0.000 title description 6
- 238000012937 correction Methods 0.000 claims description 39
- 238000005259 measurement Methods 0.000 claims description 24
- 238000011144 upstream manufacturing Methods 0.000 claims description 12
- 238000012546 transfer Methods 0.000 claims description 7
- 230000008094 contradictory effect Effects 0.000 description 3
- 238000009434 installation Methods 0.000 description 3
- 238000005097 cold rolling Methods 0.000 description 2
- 230000001276 controlling effect Effects 0.000 description 2
- 230000003071 parasitic effect Effects 0.000 description 2
- 238000011161 development Methods 0.000 description 1
- 238000010586 diagram Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 244000045947 parasite Species 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/16—Control of thickness, width, diameter or other transverse dimensions
- B21B37/165—Control of thickness, width, diameter or other transverse dimensions responsive mainly to the measured thickness of the product
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/24—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process
- B21B1/28—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a continuous or semi-continuous process by cold-rolling, e.g. Steckel cold mill
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B1/00—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations
- B21B1/22—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length
- B21B1/30—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process
- B21B1/32—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work
- B21B1/36—Metal-rolling methods or mills for making semi-finished products of solid or profiled cross-section; Sequence of operations in milling trains; Layout of rolling-mill plant, e.g. grouping of stands; Succession of passes or of sectional pass alternations for rolling plates, strips, bands or sheets of indefinite length in a non-continuous process in reversing single stand mills, e.g. with intermediate storage reels for accumulating work by cold-rolling
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2271/00—Mill stand parameters
- B21B2271/02—Roll gap, screw-down position, draft position
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
- B21B2275/04—Roll speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B2275/00—Mill drive parameters
- B21B2275/02—Speed
- B21B2275/06—Product speed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/46—Roll speed or drive motor control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B37/00—Control devices or methods specially adapted for metal-rolling mills or the work produced thereby
- B21B37/58—Roll-force control; Roll-gap control
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B38/00—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product
- B21B38/04—Methods or devices for measuring, detecting or monitoring specially adapted for metal-rolling mills, e.g. position detection, inspection of the product for measuring thickness, width, diameter or other transverse dimensions of the product
Definitions
- Cold rolling is an important step in the development of long products in the metallurgical industry. Its purpose is to reduce the thickness of the input product.
- the sheets produced are usually intended for the automotive and food industries.
- a method according to the preamble of claim 1 is for example known from the document JP-A 600 96 320 .
- Rolling therefore consists of reducing the thickness of a metal strip by plastic deformation.
- the strip flows continuously between two rotary cylinders, called working cylinders, with parallel axes delimiting between them a nip space commonly called air gap, and on which a force is applied.
- the thickness reduction of the band is then obtained by crushing.
- This device constitutes a cage of a rolling mill.
- the use of several successive cages in which the band passes simultaneously is a tandem mill. Alternatively a single cage can be used, the band flowing alternately in two opposite directions in said cage.
- the working rolls are rotated at a controlled speed.
- the thickness variations at the outlet of the rolling mill must be as small as possible. For this, different control loops are implemented.
- the gap is the distance separating the two working cylinders, that is to say the spacing between these two cylinders.
- One of these regulations is based on the thickness measurement of the strip made at the exit of the cage.
- the two regulations are applied distinctly from each other.
- all thickness variations are seen by the two regulators, which induces parasitic corrections and therefore disturbances on the thickness of the strip.
- the presence of a gap between the two measurements the measurement of the thickness of the strip downstream of the cage being "further” than the prediction of the thickness of the strip at the outlet of the cage, can to bring about contradictory corrections of the two regulators.
- the major disadvantage of the first regulation based on the measurement of the thickness at the exit of the cage is the delay in its reaction vis-à-vis the thickness disturbances, this is due to the fact that there is a temporary shift between what is really happening under the cage and what the measure sees. This offset is due to the transfer of the band of the cage to the point of measurement of the thickness of the strip downstream of the cage.
- the second regulation does without this problem of delay by predicting with the aid of the law of the flows the thickness directly under the cage.
- the major disadvantages of such a regulation are the corrections parasites due to calculation errors (typically an offset) based on several noisy measurements.
- One of the aims of the invention is to overcome these disadvantages by proposing a rolling control method to improve the rejection of thickness disturbances and further reduce the thickness variations of the strip at the output of the rolling mill.
- the invention relates to a rolling control method of the aforementioned type, in which the method comprises a step for correcting the spacing of the rolls or their rotational speed as a function of both the thickness measured in downstream of the cage and the estimation of the thickness of the strip according to the law of flow rates.
- the method according to the invention uses only one regulator simultaneously operating the measurement of the thickness of the strip downstream of the cage and the prediction of the thickness of the strip at the outlet of the cage by the law. flow rates. In this way spurious corrections and contradictory corrections are avoided, which makes it possible to improve the rejection of thickness disturbances by taking better account of disturbances in the cage. This improves the performance of the rolling mill more generally.
- upstream is defined relative to the running direction of the sheet metal strip in the rolling mill. This direction is represented by the arrow F of the Fig. 1 .
- FIG. 1 is schematically illustrated a cold rolling installation 1 of a strip B of metal sheet.
- this installation comprises, as known per se, a system 2 for maintaining traction at the input of the rolling mill.
- This system comprises a unwinder 4 in the case of a roll-to-roll mill or an S-block in the case of a continuous rolling mill, whose unwinding speed is controlled by a torque control unit 6.
- the rolling plant on which this invention can be applied comprises at least one cage 8, but may comprise two or more.
- the invention applies both to rolling mills of the "reversible" type, in which the band B circulates in the cage 8 alternately in two opposite direction of travel, than to the rolling mills in which the band B circulates in a single direction of travel. .
- the rolling mill stand 8 comprises two working rolls 10 with parallel axes between which the band B circulates. These rolls are rotated by drive motors whose speed is regulated according to a predetermined set point. u.
- the cage 8 comprises a hydraulic or electromechanical clamping device 12 making it possible to transmit to both the working rolls 10 the rolling force necessary so that they ensure the predetermined thickness reduction.
- This device 12 provides an adjustment of the gap separating the two cylinders 10, that is to say the spacing of the cylinders 10.
- the rolling force is transmitted from the device 12 to the working cylinders 10 through a stacking one or more support cylinders 14, except the duo cages, where the force is transmitted directly from the device 12 to the working cylinders 10.
- a gauge 16 of thickness J e is disposed upstream of the cage 8. This gauge 16 is able to continuously determine the thickness of the band B before entering the cage 8.
- a second gauge 18 of thickness J s is disposed downstream of the cage 8. It is capable of continuously determining the thickness of the strip B after its rolling in the cage 8.
- a speed sensor V e is disposed at the input of the cage 8. It is capable of continuously determining the instantaneous linear speed of circulation of the strip B at the input of the cage 8.
- the sensor is formed, for example, of a laser velocimeter.
- a speed sensor V S is disposed at the output of the cage 8. It is capable of continuously determining the instantaneous linear speed of circulation of the strip B at the outlet of the cage 8.
- the sensor is formed, for example, of a laser velocimeter.
- An outlet thickness regulator 24 is provided to exploit the measurements made by the thickness gauges 16 and 18 and by the speed sensors 20 and 22. This regulator 24 uses the distance between the rolls 10 to regulate this thickness. .
- the measurement of the gauge 18 of thickness J s is used in the regulation of the thickness of the strip in order to correct the spacing of the rolls 10.
- the regulator 24 receives an instruction of thickness of exit of the cage Jcs corresponding to the desired thickness at the exit of cage.
- the measured thickness J S is subtracted from this setpoint thickness J CS in order to know the difference in thickness between the measured thickness and the desired thickness, which makes it possible to calculate a correction to be made in the spacing of the rolls 10 to obtain the desired thickness at the exit of the cage 8.
- the measurement of the thickness J s downstream of the cage is combined, as shown in FIG. Fig. 2 , with the prediction of the thickness at the outlet of the cage according to the law of flow rates.
- the controller 24 receives the measurements taken by the sensor 20 of speed V e at the input of the cage 8, the gauge 16 of thickness e J input of the cage 8 and the sensor 22 of speed V s at the exit of the cage.
- the measurement of the thickness J e at the entrance of the cage 8 is supplied to the multiplier 26 via a delay line 28 in order to take account of the temporary offset corresponding to the transfer time of the band B between the measuring the thickness J e of the strip B upstream of the cage 8 and the cage 8, that is to say to take into account the distance between the place where the measurement J e is made and the cage 8 .
- the estimate of the thickness E s at the output of the cage 8 is obtained according to the law of flow rates.
- This estimate E s is compared to the thickness setpoint J CS at the exit of the cage. For this purpose, the estimate E s is subtracted from the thickness setpoint J CS to constitute a prediction of the thickness error at the exit of the cage 8.
- This prediction of the thickness errors at the exit of the cage 8 passes through a delay line 30 in order to take account of the temporary offset corresponding to the transfer time of the band B of the cage 8 to the measurement point of the thickness J s of the strip downstream of the cage 8 and a model 32 of the thickness gauge 18 output of the cage 8.
- the value obtained is subtracted from the prediction of the thickness errors at the output of the cage 8 and constitutes the thickness error at the outlet of the cage 8 to be taken into account by the regulator 24 during the transport time of the strip from the exit of the cage 8 to the output thickness gauge 18.
- the thickness errors obtained by measuring the thickness J s at the exit of cage 8 and by the estimation of the thickness according to the law of the flow rates are added, which makes it possible to calculate the correction Ce to be carried out on the spacing of the rolls 10 to obtain the desired band thickness B at the outlet of the cage 8 by means of the regulator 24.
- the correction Ce takes account of both the thickness measured downstream of the cage and the estimation of the thickness of the strip according to the law of flow rates.
- the simultaneous taking into account of these two regulations makes it possible to avoid the parasitic and contradictory corrections encountered when the two regulations are used in parallel. Thus, disturbances are reduced on the thickness of the strip B at the outlet of the cage 8 and the performance of the rolling mill is improved.
- the correction of the spacing of the rolls 10 for the band B at the moment of its passage in the cage depends only on the estimation of the thickness of this band according to the law of flow rates. And when the real value of the thickness of said strip B is known via measurement of the thickness gauge J s output downstream of the cage 8, the prediction of the thickness by the law of the flow rates is more necessary and is therefore no longer taken into account using devices 30 and 32.
- the correction It is applied to the spacing of the rolls 10 by means of the clamping device 12, as shown in FIG. Fig. 1 .
- This action modifies the thickness of the band B at the exit of cage 8.
- the correction Ce is also used by an inertial compensation unit 34, connected to the torque control unit 6.
- the filter 34 is able to determine from the correction Ce and the mechanical characteristics of the band B, the correction of torque C c which must be imposed on the system 2 for maintaining traction at the input of the rolling mill.
- the correction Ce is supplied to a filter 34 making it possible to perform the inertia compensation, as shown in FIG. Fig. 2 .
- the correction of the spacing of the rolls 10 may to be done for both directions.
- the role of the thickness gauges 16 and 18 and the speed sensors 20 and 22 is reversed. That is to say, the thickness gauge 18 serves to measure thickness upstream of the cage, while the thickness gauge 16 serves to measure the thickness downstream, and the speed sensor 22 is used to measure the speed at the entrance of the cage while the speed sensor 20 is used to measure the output speed.
- the correction can be applied to the speed of rotation of the rolls instead of the spacing of the rolls 10 in a known manner.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Control Of Metal Rolling (AREA)
Description
La présente invention concerne un procédé de contrôle du laminage d'une bande de tôle, du type comportant le passage de la bande en continu selon au moins une direction de défilement dans au moins une cage comportant au moins deux cylindres entraînés entre lesquels la bande circule et subit un écrasement, comprenant les étapes suivantes :
- la mesure de l'épaisseur de la bande en aval de la cage par rapport à la direction de défilement,
- l'estimation de l'épaisseur de la bande en sortie de la cage selon la loi des débits.
- measuring the thickness of the strip downstream of the cage relative to the direction of travel,
- estimating the thickness of the strip at the outlet of the cage according to the law of flow rates.
Le laminage à froid est une étape importante dans l'élaboration des produits longs dans l'industrie métallurgique. Son objectif est de réduire l'épaisseur du produit d'entrée. Les tôles produites sont usuellement destinées aux industries automobiles et alimentaires. Un procédé selon le préambule de la revendication 1 est par example connu du document
Le laminage consiste donc à réduire l'épaisseur d'une bande de métal par déformation plastique. Pour cela, la bande circule en continu entre deux cylindres rotatifs, appelés cylindres de travail, à axes parallèles délimitant entre eux un espace de pincement couramment appelé entrefer, et sur lesquelles un effort est appliqué. La réduction d'épaisseur de la bande est alors obtenue par écrasement. Ce dispositif constitue une cage d'un laminoir. L'utilisation de plusieurs cages successives dans lesquelles la bande passe simultanément constitue un tandem de laminoir. En alternative une seule cage peut être utilisée, la bande circulant alternativement selon deux directions opposées dans ladite cage.Rolling therefore consists of reducing the thickness of a metal strip by plastic deformation. For this, the strip flows continuously between two rotary cylinders, called working cylinders, with parallel axes delimiting between them a nip space commonly called air gap, and on which a force is applied. The thickness reduction of the band is then obtained by crushing. This device constitutes a cage of a rolling mill. The use of several successive cages in which the band passes simultaneously is a tandem mill. Alternatively a single cage can be used, the band flowing alternately in two opposite directions in said cage.
Les cylindres de travail sont entraînés en rotation à une vitesse régulée. Pour des raisons métallurgiques, les variations d'épaisseur en sortie du laminoir doivent être les plus faibles possibles. Pour cela, différentes boucles de régulation sont mises en oeuvre.The working rolls are rotated at a controlled speed. For metallurgical reasons, the thickness variations at the outlet of the rolling mill must be as small as possible. For this, different control loops are implemented.
Ainsi, il est courant de mesurer en continu la vitesse linéaire de la bande en entrée et en sortie de la cage, et l'épaisseur de la bande en entrée et en sortie de la cage.Thus, it is common to measure continuously the linear speed of the band at the entrance and exit of the cage, and the thickness of the band at the entrance and exit of the cage.
A partir de ces mesures, il est connu d'utiliser deux régulations en parallèle qui consistent à corriger l'entrefer des cylindres de travail. L'entrefer est la distance séparant les deux cylindres de travail, c'est-à-dire l'écartement entre ces deux cylindres.From these measurements, it is known to use two parallel regulations which consist in correcting the air gap of the working rolls. The gap is the distance separating the two working cylinders, that is to say the spacing between these two cylinders.
L'une de ces régulations se base sur la mesure d'épaisseur de la bande effectuée en sortie de la cage.One of these regulations is based on the thickness measurement of the strip made at the exit of the cage.
L'autre régulation consiste en une prédiction de l'épaisseur de la bande en sortie de la cage en utilisant la loi dite des débits. En considérant que la largeur de la bande reste constante, on obtient l'épaisseur de la bande en sortie de la cage par la relation : Es = Ee.Ve/Vs où Es est l'épaisseur de la bande en sortie de la cage, Ee est l'épaisseur de la bande mesurée en entrée de la cage, Ve est la vitesse de défilement de la bande en entrée de la cage et Vs est la vitesse de défilement de la bande en sortie de la cage.The other regulation consists of a prediction of the thickness of the strip at the exit of the cage by using the so-called flow law. Considering that the width of the band remains constant, the thickness of the strip at the exit of the cage is obtained by the relation: E s = E e .V e / V s where E s is the thickness of the strip in output of the cage, E e is the thickness of the band measured at the entrance to the cage, V e is the running speed of the band at the entrance of the cage and V s is the speed of the band at the exit of the cage; the cage.
Ces régulations d'épaisseur peuvent également être appliquées sur la dernière cage d'un tandem pour modifier la vitesse de rotation des cylindres au lieu de leur écartement.These thickness regulations can also be applied to the last cage of a tandem to change the speed of rotation of the rolls instead of their spacing.
Ces procédés de correction permettent de réduire les variations d'épaisseur de la bande, mais restent insuffisants pour tenir compte des phénomènes complexes qui se produisent dans un laminoir.These correction methods make it possible to reduce the variations in thickness of the strip, but remain insufficient to take account of the complex phenomena that occur in a rolling mill.
En effet, les deux régulations sont appliquées distinctement l'une de l'autre. Ainsi, toutes les variations d'épaisseur sont vues par les deux régulateurs, ce qui induit des corrections parasites et donc des perturbations sur l'épaisseur de la bande. En outre, la présence d'un décalage entre les deux mesures, la mesure de l'épaisseur de la bande en aval de la cage étant plus « éloignée » que la prédiction de l'épaisseur de la bande en sortie de la cage, peut amener à des corrections contradictoires des deux régulateurs.Indeed, the two regulations are applied distinctly from each other. Thus, all thickness variations are seen by the two regulators, which induces parasitic corrections and therefore disturbances on the thickness of the strip. In addition, the presence of a gap between the two measurements, the measurement of the thickness of the strip downstream of the cage being "further" than the prediction of the thickness of the strip at the outlet of the cage, can to bring about contradictory corrections of the two regulators.
L'inconvénient majeur de la première régulation se basant sur la mesure de l'épaisseur en sortie de la cage est le retard dans sa réaction vis-à-vis des perturbations d'épaisseur, cela est dû au fait qu'il y a un décalage temporaire entre ce qui se passe vraiment sous la cage et ce que voit la mesure. Ce décalage est dû au transfert de la bande de la cage au point de mesure de l'épaisseur de la bande en aval de la cage. La deuxième régulation se passe de ce problème de retard en prédisant à l'aide de la loi des débits l'épaisseur directement sous la cage. Les inconvénients majeur d'une telle régulation sont les corrections parasites dues aux erreurs de calcul (typiquement un offset) se basant sur plusieurs mesures bruitées.The major disadvantage of the first regulation based on the measurement of the thickness at the exit of the cage is the delay in its reaction vis-à-vis the thickness disturbances, this is due to the fact that there is a temporary shift between what is really happening under the cage and what the measure sees. This offset is due to the transfer of the band of the cage to the point of measurement of the thickness of the strip downstream of the cage. The second regulation does without this problem of delay by predicting with the aid of the law of the flows the thickness directly under the cage. The major disadvantages of such a regulation are the corrections parasites due to calculation errors (typically an offset) based on several noisy measurements.
L'un des buts de l'invention est de pallier ces inconvénients en proposant un procédé de contrôle du laminage permettant d'améliorer le rejet des perturbations d'épaisseur et de réduire encore les variations d'épaisseur de la bande en sortie du laminoir.One of the aims of the invention is to overcome these disadvantages by proposing a rolling control method to improve the rejection of thickness disturbances and further reduce the thickness variations of the strip at the output of the rolling mill.
A cet effet, l'invention concerne un procédé de contrôle du laminage du type précité, dans lequel le procédé comprend une étape de correction de l'écartement des cylindres ou de leur vitesse de rotation en fonction à la fois de l'épaisseur mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande selon la loi des débits.For this purpose, the invention relates to a rolling control method of the aforementioned type, in which the method comprises a step for correcting the spacing of the rolls or their rotational speed as a function of both the thickness measured in downstream of the cage and the estimation of the thickness of the strip according to the law of flow rates.
Ainsi, le procédé selon l'invention n'utilise qu'un seul régulateur exploitant simultanément la mesure de l'épaisseur de la bande en aval de la cage et la prédiction de l'épaisseur de la bande en sortie de la cage par la loi des débits. On évite ainsi les corrections parasites et les corrections contradictoires, ce qui permet d'améliorer le rejet des perturbations d'épaisseur en tenant mieux compte des perturbations dans la cage. On améliore ainsi de façon plus générale les performances du laminoir.Thus, the method according to the invention uses only one regulator simultaneously operating the measurement of the thickness of the strip downstream of the cage and the prediction of the thickness of the strip at the outlet of the cage by the law. flow rates. In this way spurious corrections and contradictory corrections are avoided, which makes it possible to improve the rejection of thickness disturbances by taking better account of disturbances in the cage. This improves the performance of the rolling mill more generally.
Selon d'autres caractéristiques du procédé de contrôle du laminage selon l'invention :
- l'étape de correction de l'écartement des cylindres ou de leur vitesse de rotation en fonction à la fois de l'épaisseur mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande selon la loi des débits est réalisée au moyen d'un seul régulateur ;
- l'estimation Es de l'épaisseur de la bande en sortie de la cage selon la loi des débits comprend la mesure de l'épaisseur Je et de la vitesse de défilement Ve de la bande en amont de la cage et la mesure de la vitesse de défilement Vs de la bande en aval de la cage, l'estimation de l'épaisseur Es de la bande en sortie de la cage étant donnée par la relation Es = Je.Ve/Vs ;
- l'estimation de l'épaisseur de la bande dans la cage selon la loi des débits tient compte d'un décalage temporaire correspondant au temps de transfert de la bande entre le point de mesure de l'épaisseur de la bande en amont de la cage et la cage ;
- pour une zone donnée de la bande, la correction de l'écartement des cylindres ou de leur vitesse de rotation en fonction à la fois de l'épaisseur mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande selon la loi des débits est réalisée immédiatement lors du passage de ladite zone sous la cage ;
- l'estimation de l'épaisseur de la bande selon la loi des débits est intégrée à la correction de l'écartement des cylindres ou de leur vitesse de rotation en tenant compte d'un décalage temporaire correspondant au temps de transfert de la bande de la cage au point de mesure de l'épaisseur de la bande en aval de la cage ;
- le procédé de contrôle comporte la commande d'un dispositif de maintien de la traction situé en amont de la cage et ce que ladite commande tient compte de la correction de l'écartement des cylindres ou de leur vitesse de rotation ;
- la bande circule dans la cage alternativement selon deux directions de défilement opposées l'une par rapport à l'autre, la correction de l'écartement des cylindres ou de leur vitesse de rotation en fonction de l'épaisseur mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande selon la loi des débits étant réalisée pour chacune desdites directions ; et
- la bande circulant dans au moins deux cages successives, le procédé comprend une étape de correction de l'écartement des cylindres pour la première cage par rapport à la direction de défilement de la bande et une étape de correction de la vitesse de rotation des cylindres pour la dernière cage par rapport à la direction de défilement de la bande, lesdites étapes de correction étant réalisées en fonction à la fois de l'épaisseur mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande selon la loi des débits.
- the step of correcting the spacing of the rolls or their speed of rotation as a function of both the thickness measured downstream of the cage and the estimation of the thickness of the strip according to the law of flow rates is realized by means of a single regulator;
- the estimate E s of the thickness of the strip at the outlet of the cage according to the law of flow rates comprises the measurement of the thickness J e and the running speed V e of the strip upstream of the cage and the measurement the speed of travel V s of the strip downstream of the cage, the estimate of the thickness E s of the strip at the exit of the cage being given by the relation E s = J e .V e / V s ;
- the estimation of the thickness of the strip in the cage according to the law of the flows takes into account a temporary offset corresponding to the time of transfer of the strip between the point of measurement of the thickness of the strip upstream of the cage and the cage;
- for a given zone of the strip, the correction of the spacing of the rolls or their speed of rotation as a function of both the thickness measured downstream of the cage and the estimate of the thickness of the strip according to the law of the flows is carried out immediately during the passage of said zone under the cage;
- the estimation of the thickness of the strip according to the law of the flow rates is integrated in the correction of the spacing of the rolls or their speed of rotation by taking into account a temporary offset corresponding to the transfer time of the strip of the cage at the point of measurement of the thickness of the strip downstream of the cage;
- the control method comprises the control of a traction holding device located upstream of the cage and that said control takes into account the correction of the spacing of the rolls or their speed of rotation;
- the strip circulates in the cage alternately in two opposite directions of travel relative to one another, the correction of the spacing of the rolls or their speed of rotation as a function of the thickness measured downstream of the cage and the estimation of the thickness of the strip according to the law of the flow rates being carried out for each of said directions; and
- the band circulating in at least two successive cages, the method comprises a step of correction of the spacing of the rolls for the first cage with respect to the running direction of the strip and a step of correction of the speed of rotation of the rolls for the last cage relative to the running direction of the strip, said correction steps being performed as a function of both the thickness measured downstream of the cage and the estimation of the thickness of the strip according to the law flow rates.
L'invention concerne également un dispositif de contrôle du laminage d'une bande de tôle du type comprenant au moins une cage comportant au moins deux cylindres entraînés entre lesquels la bande circule et subit un écrasement, comprenant :
- des moyens de mesure de l'épaisseur de la bande en aval de la cage ;
- des moyens de mesure de l'épaisseur de la bande et de la vitesse de défilement de la bande en amont de la cage,
- des moyens de mesure de la vitesse de défilement de la bande en aval de la cage,
- des moyens de correction de l'écartement des cylindres ou de leur vitesse de rotation,
- means for measuring the thickness of the strip downstream of the cage;
- means for measuring the thickness of the strip and the speed of travel of the strip upstream of the cage,
- means for measuring the speed of travel of the strip downstream of the cage,
- means for correcting the spacing of the rolls or their speed of rotation,
D'autres aspects et avantages de l'invention apparaîtront à la lecture de la description qui suit, donnée à titre d'exemple et faite en référence aux dessins annexés, dans lesquels :
- la
Fig. 1 est une représentation schématique d'une installation de laminage selon l'invention, - la
Fig. 2 est un schéma des moyens mis en oeuvre pour effectuer la régulation de l'épaisseur de la bande en fonction de l'épaisseur de la bande mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande en sortie de la cage selon la loi des débits.
- the
Fig. 1 is a schematic representation of a rolling plant according to the invention, - the
Fig. 2 is a diagram of the means used to effect the regulation of the thickness of the strip as a function of the thickness of the strip measured downstream of the cage and the estimate of the thickness of the strip at the outlet of the strip. cage according to the law of flow.
Dans la description, les termes « amont », « aval », « entrée » et « sortie » sont définis par rapport à la direction de défilement de la bande de tôle dans le laminoir. Cette direction est représentée par la flèche F de la
Sur la
L'installation de laminage sur laquelle peut s'appliquer cette invention comporte au moins une cage 8, mais peut en comporter deux ou plus. L'invention s'applique aussi bien aux laminoirs de type « réversible », dans lesquels la bande B circule dans la cage 8 alternativement selon deux directions de défilement opposées, qu'aux laminoirs dans lesquels la bande B circule selon une direction de défilement unique.The rolling plant on which this invention can be applied comprises at least one cage 8, but may comprise two or more. The invention applies both to rolling mills of the "reversible" type, in which the band B circulates in the cage 8 alternately in two opposite direction of travel, than to the rolling mills in which the band B circulates in a single direction of travel. .
Comme connu en soi, la cage 8 du laminoir comporte deux cylindres de travail 10 à axes parallèles entre lesquels circule la bande B. Ces cylindres sont entraînés en rotation par des moteurs d'entraînement dont la vitesse est régulée en fonction d'une consigne prédéterminée u. La cage 8 comporte un dispositif de serrage hydraulique ou électromécanique 12 permettant de transmettre aux deux cylindres de travail 10 l'effort de laminage nécessaire afin que ceux-ci assurent la réduction d'épaisseur prédéterminée. Ce dispositif 12 assure un réglage de l'entrefer séparant les deux cylindres 10, c'est-à-dire l'écartement des cylindres 10. L'effort de laminage est transmis du dispositif 12 aux cylindres de travail 10 au travers d'un empilage d'un ou plusieurs cylindres d'appui 14, exception faite des cages duo, ou l'effort est transmis directement du dispositif 12 aux cylindres de travail 10.As known per se, the rolling mill stand 8 comprises two working
Une jauge 16 d'épaisseur Je est disposée en amont de la cage 8. Cette jauge 16 est propre à déterminer en continu l'épaisseur de la bande B avant son entrée dans la cage 8.A
De même, une seconde jauge 18 d'épaisseur Js est disposée en aval de la cage 8. Elle est propre à déterminer en continu l'épaisseur de la bande B après son laminage dans la cage 8.Similarly, a
Par ailleurs, un capteur 20 de vitesse Ve est disposé en entrée de la cage 8. Il est propre à déterminer en continu la vitesse linéaire instantanée de circulation de la bande B en entrée de la cage 8. Le capteur est formé par exemple d'un vélocimètre laser.Furthermore, a speed sensor V e is disposed at the input of the cage 8. It is capable of continuously determining the instantaneous linear speed of circulation of the strip B at the input of the cage 8. The sensor is formed, for example, of a laser velocimeter.
De même, un capteur 22 de vitesse Vs est disposé en sortie de la cage 8. Il est propre à déterminer en continu la vitesse linéaire instantanée de circulation de la bande B en sortie de la cage 8. Le capteur est formé par exemple d'un vélocimètre laser.Similarly, a speed sensor V S is disposed at the output of the cage 8. It is capable of continuously determining the instantaneous linear speed of circulation of the strip B at the outlet of the cage 8. The sensor is formed, for example, of a laser velocimeter.
Un régulateur 24 de l'épaisseur de sortie est prévu pour exploiter les mesures réalisées par les jauges d'épaisseur 16 et 18 et par les capteurs de vitesse 20 et 22. Ce régulateur 24 utilise l'écartement entre les cylindres 10 pour réguler cette épaisseur.An
En référence à la
La mesure de la jauge 18 d'épaisseur Js est utilisée dans la régulation de l'épaisseur de la bande afin de corriger l'écartement des cylindres 10. A cet effet, le régulateur 24 reçoit une consigne d'épaisseur de sortie de la cage Jcs correspondant à l'épaisseur souhaitée en sortie de cage. On soustrait l'épaisseur mesurée JS à cette épaisseur de consigne JCS afin de connaître l'écart d'épaisseur entre l'épaisseur mesurée et l'épaisseur souhaitée, ce qui permet de calculer une correction à effectuer dans l'écartement des cylindres 10 pour obtenir l'épaisseur souhaitée en sortie de cage 8.The measurement of the
La mesure de l'épaisseur Js en aval de la cage est combinée, comme représenté sur la
On notera que la mesure de l'épaisseur Je en entrée de la cage 8 est fournie au multiplicateur 26 en passant par une ligne de retard 28 afin de tenir compte du décalage temporaire correspondant au temps de transfert de la bande B entre le point de mesure de l'épaisseur Je de la bande B en amont de la cage 8 et la cage 8, c'est-à-dire pour tenir compte de la distance entre l'endroit où est effectuée la mesure Je et la cage 8.It will be noted that the measurement of the thickness J e at the entrance of the cage 8 is supplied to the
Ainsi, en sortie du multiplicateur 26, on obtient l'estimation de l'épaisseur Es en sortie de la cage 8 selon la loi des débits.Thus, at the output of the
Cette estimation Es est comparée à la consigne d'épaisseur JCS en sortie de cage. A cet effet, l'estimation Es est soustraite à la consigne d'épaisseur JCS pour constituer une prédiction de l'erreur d'épaisseur en sortie de la cage 8.This estimate E s is compared to the thickness setpoint J CS at the exit of the cage. For this purpose, the estimate E s is subtracted from the thickness setpoint J CS to constitute a prediction of the thickness error at the exit of the cage 8.
Cette prédiction des erreurs d'épaisseur en sortie de la cage 8 passe par une ligne de retard 30 afin de tenir compte du décalage temporaire correspondant au temps de transfert de la bande B de la cage 8 au point de mesure de l'épaisseur Js de la bande en aval de la cage 8 et par un modèle 32 de la jauge d'épaisseur 18 de sortie de la cage 8. La valeur obtenue est soustraite à la prédiction des erreurs d'épaisseur en sortie de la cage 8 et constitue l'erreur d'épaisseur en sortie de la cage 8 à prendre en compte par le régulateur 24 pendant le temps de transport de la bande de la sortie de la cage 8 à la jauge d'épaisseur de sortie 18.This prediction of the thickness errors at the exit of the cage 8 passes through a
Les erreurs d'épaisseur obtenues par la mesure de l'épaisseur Js en sortie de cage 8 et par l'estimation de l'épaisseur selon la loi des débits sont additionnées, ce qui permet de calculer la correction Ce à effectuer sur l'écartement des cylindres 10 pour obtenir l'épaisseur de bande B souhaitée en sortie de cage 8 à l'aide du régulateur 24. Ainsi, la correction Ce tient compte à la fois de l'épaisseur mesurée en aval de la cage et de l'estimation de l'épaisseur de la bande selon la loi des débits. La prise en compte simultanée de ces deux régulations permet d'éviter les corrections parasites et contradictoires rencontrées lorsque les deux régulations sont utilisées en parallèle. Ainsi, on réduit les perturbations sur l'épaisseur de la bande B en sortie de la cage 8 et on améliore les performances du laminoir.The thickness errors obtained by measuring the thickness J s at the exit of cage 8 and by the estimation of the thickness according to the law of the flow rates are added, which makes it possible to calculate the correction Ce to be carried out on the spacing of the
Ainsi donc, la correction de l'écartement des cylindres 10 pour la bande B au moment de son passage dans la cage n'est fonction que de l'estimation de l'épaisseur de cette bande selon la loi des débits. Et lorsque la valeur réelle de l'épaisseur de ladite bande B est connue via la mesure de la jauge de l'épaisseur Js de sortie en aval de la cage 8, la prédiction de l'épaisseur par la loi des débits n'est plus nécessaire et n'est donc plus prise en compte à l'aide des dispositifs 30 et 32.Thus, the correction of the spacing of the
La correction Ce est appliquée sur l'écartement des cylindres 10 par l'intermédiaire du dispositif de serrage 12, comme représenté sur la
La correction Ce, comme représenté sur la
Dans le cas d'un laminoir dans lequel la bande B circule alternativement selon deux directions opposées, du fait que les mêmes instruments de mesure sont disposés de part et d'autre de la cage 8, la correction de l'écartement des cylindres 10 peut se faire pour les deux directions. Pour se faire, dans la direction opposée de défilement, on inverse le rôle des jauges d'épaisseur 16 et 18 et des capteurs de vitesse 20 et 22. C'est-à-dire que la jauge d'épaisseur 18 sert à mesurer l'épaisseur en amont de la cage, tandis que la jauge d'épaisseur 16 sert à mesurer l'épaisseur en aval, et le capteur de vitesse 22 sert à mesurer la vitesse en entrée de la cage tandis que le capteur de vitesse 20 sert à mesurer la vitesse en sortie.In the case of a rolling mill in which the band B circulates alternately in two opposite directions, because the same measuring instruments are arranged on either side of the cage 8, the correction of the spacing of the
Dans le cas où plusieurs cages sont prévues, pour la dernière cage par rapport au sens de défilement de la bande B, la correction peut être appliquée sur la vitesse de rotation des cylindres au lieu de l'écartement des cylindres 10 de façon connue.In the case where several cages are provided, for the last cage with respect to the running direction of the band B, the correction can be applied to the speed of rotation of the rolls instead of the spacing of the
Claims (9)
- A method for controlling the rolling of a sheet strip (B) including the continuous passing of the strip along at least one running direction in at least one cage (8) including at least two driven cylinders (10) between which the strip (B) circulates and undergoes crushing, comprising the following steps:- measuring the thickness (Js) of the strip downstream from the cage (8) relatively to the running direction,- estimating the thickness (Es) of the strip upon exiting the cage (8) according to the flow law,- correcting (Ce) the spacing of the cylinders (10) or their speed of rotation, both according to the thickness (Js) measured downstream from the cage (8) and to the estimation of the thickness (Es) of the strip according to the flow law,characterized in that the step for correcting (Ce) the spacing of the cylinders (10) or their speed of rotation, both according to the thickness (Js) measured downstream from the cage (8) and to the estimation of the thickness (Es) of the strip according to the flow law is achieved by means of a single regulator.
- The rolling control method according to claim 1, characterized in that the estimation of the thickness (Es) of the strip upon exiting the cage according to the flow law, comprises the measurement of the thickness (Je) and of the running speed (Ve) of the strip upstream from the cage (8) and the measurement of the running speed (Vs) of the strip downstream from the cage (8), the estimation of the thickness (Es) of the strip upon exiting the cage (8) being given by the relationship Es = JeVe/Vs.
- The rolling control method according to claim 2, characterized in that the estimation of the thickness (Es) of the strip upon exiting the cage according to the flow law, takes a temporary shift into account corresponding to the transfer time of the strip (B) between the measurement point of the thickness (Je) of the strip upstream from the cage (8) and the cage (8).
- The rolling control method according to any of claims 1 to 3, characterized in that for a given area of the strip, the correction of the spacing of the cylinders (10) or their speed of rotation, both according to the thickness (Js) measured downstream from the cage (8) and of the estimation of the thickness (Es) of the strip according to the flow law is immediately achieved when said area passes under the cage (8).
- The rolling control method according to any of claims 1 to 4, characterized in that the estimation of the thickness (Es) of the strip according to the flow law is integrated to the correction of the spacing of the cylinders (10) or of their speed of rotation by taking into account a temporary shift corresponding to the transfer time of the strip (B) from the cage (8) to the measurement point of the thickness (Js) measured downstream from the cage.
- The rolling control method according to any of claims 1 to 5, characterized in that it includes the control of a device (6) for maintaining traction located upstream from the cage (8), and in that said control takes into account the correction (Ce) of the spacing of the cylinders or of their speed of rotation.
- The rolling control method according to any of claims 1 to 6, characterized in that the strip (B) circulates in the cage (8) alternately along two running directions opposite to each other, the correction (Ce) of the spacing of the cylinders or of their speed of rotation according to the measured thickness (Js) downstream from the cage (8) and to the estimation of the thickness (Es) of the strip (B) according to the flow law being achieved for each of said directions.
- The rolling control method according to any of claims 1 to 6, characterized in that the strip (B) circulates in at least two successive cages (8), the method comprising a step for correcting the spacing of the cylinders (10) for the first cage (8) relatively to the running direction of the strip and a step for correcting the speed of rotation of the cylinders for the last cage relatively to the running direction of the strip (B), said correction steps being achieved both from the measured thickness (Js) downstream from the cage and from the estimation of the thickness (Es) of the strip according to the flow law.
- A device for controlling the rolling of a sheet strip comprising at least one cage (8) including at least two driven cylinders (10) between which the strip circulates and undergoes crushing, comprising:- means for measuring the thickness (18) of the strip downstream from the cage (8),- means for measuring the thickness (16) of the strip and the running speed (20) of the strip upstream from the cage,- means for measuring the running speed (22) of the strip downstream from the cage (8),- means for correcting the spacing of the cylinders or their speed of rotation,characterized in that it comprises means for applying a method according to any of claims 1 to 8.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR0856633A FR2936436B1 (en) | 2008-10-01 | 2008-10-01 | METHOD FOR CONTROLLING THE ROLLING OF A TAPE |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2172282A1 EP2172282A1 (en) | 2010-04-07 |
EP2172282B1 true EP2172282B1 (en) | 2012-11-21 |
Family
ID=40090181
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP20090305933 Active EP2172282B1 (en) | 2008-10-01 | 2009-10-01 | Process for controlling rolling of a sheet metal strip |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP2172282B1 (en) |
ES (1) | ES2399955T3 (en) |
FR (1) | FR2936436B1 (en) |
Families Citing this family (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2823901A1 (en) * | 2013-07-11 | 2015-01-14 | Siemens Aktiengesellschaft | Reversing rolling mill with earliest possible activation of a thickness regulation |
CN108080413A (en) * | 2017-12-15 | 2018-05-29 | 唐山全丰薄板有限公司 | Technique under a kind of roughing chain-drive section weight |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS6096320A (en) * | 1983-10-28 | 1985-05-29 | Nippon Steel Corp | Automatic plate thickness control method for cold rolling mill |
JPS6186019A (en) * | 1984-10-03 | 1986-05-01 | Nippon Steel Corp | Plate thickness control method in steel plate rolling |
JPS63171214A (en) * | 1987-01-09 | 1988-07-15 | Hitachi Ltd | Automatic plate thickness control device |
JP3041135B2 (en) * | 1992-06-19 | 2000-05-15 | 株式会社東芝 | Control device for continuous hot rolling mill |
-
2008
- 2008-10-01 FR FR0856633A patent/FR2936436B1/en active Active
-
2009
- 2009-10-01 ES ES09305933T patent/ES2399955T3/en active Active
- 2009-10-01 EP EP20090305933 patent/EP2172282B1/en active Active
Also Published As
Publication number | Publication date |
---|---|
FR2936436A1 (en) | 2010-04-02 |
EP2172282A1 (en) | 2010-04-07 |
FR2936436B1 (en) | 2011-04-22 |
ES2399955T3 (en) | 2013-04-04 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2690096C (en) | Method for rolling a metal strip with adjustment of the side position of the strip and adapted rolling mill | |
EP3086889B1 (en) | Hot rolling method, hot rolling mill and computer programm for carrying out such method | |
EP1466675B1 (en) | Method and device for controlling the thickness of a rolled product | |
CN101959623B (en) | Operating method for a multi-stand rolling mill train with strip thickness determination on the basis of the continuity equation | |
EP1996347B1 (en) | Method for rolling a sheet metal strip | |
FR2877862A1 (en) | METHOD FOR DETECTING VIBRATIONS OF A ROLLER CAGE | |
CN101443136B (en) | Method for suppressing the influence of roll eccentricities | |
EP2172282B1 (en) | Process for controlling rolling of a sheet metal strip | |
EP3374735B1 (en) | Method and device for measuring the planarity of a metal product | |
US9242283B2 (en) | Control apparatus of rolling mill | |
EP0988903B1 (en) | Method of rolling a metal product | |
EP1020240B1 (en) | Method of tension/compression control in a multistand hot rolling mill and corresponding control system | |
CN104066523A (en) | Method for processing rolled stock in a hot rolling shop | |
EP2464470B1 (en) | Method and device for automatically adjusting the position of working rolls in rolling equipment | |
KR101008443B1 (en) | Method of measuring friction coefficient of work roll | |
FR2771809A1 (en) | APPARATUS FOR MEASURING THE PLANEITY OF A RUNNING WEB | |
FR2887606A1 (en) | METHOD FOR CONTROLLING A COUPLING DEVICE BETWEEN AN INLET SHAFT AND AN OUTPUT SHAFT | |
EP2938476B1 (en) | Method and device for regulating an extrusion device | |
EP0000454B1 (en) | Process for controlling the interstand tension during the hot-rolling of thick products. | |
JP2002172406A (en) | Method for correcting plate thickness by rolling mill | |
WO2010043775A1 (en) | Device and method for setting up an installation for the conversion of steel strip as a function of an arbitrary thickness of the said steel strip | |
JP2020032439A (en) | Tension control method in metal strip processing line | |
CA3106835A1 (en) | Method and device for ascertaining the lateral strip contour or the position of the strip edges of a running metal strip | |
FR2688428A1 (en) | DEVICE FOR CONTROLLING A TOOL FOR LIGHT-SCRAPING SCRAPING OF A SHEET. | |
FR2528333A1 (en) | METHOD OF CALIBRATING AND CONTROLLING THE PROFILE OF A BAR-SHAPED WORKPIECE OR THE LIKE |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
17P | Request for examination filed |
Effective date: 20100913 |
|
17Q | First examination report despatched |
Effective date: 20101005 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B21B 37/16 20060101AFI20120411BHEP |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MK MT NL NO PL PT RO SE SI SK SM TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 584770 Country of ref document: AT Kind code of ref document: T Effective date: 20121215 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: LANGUAGE OF EP DOCUMENT: FRENCH |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602009011339 Country of ref document: DE Effective date: 20130117 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2399955 Country of ref document: ES Kind code of ref document: T3 Effective date: 20130404 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20121121 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 584770 Country of ref document: AT Kind code of ref document: T Effective date: 20121121 |
|
REG | Reference to a national code |
Ref country code: LT Ref legal event code: MG4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: NO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130221 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130321 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130222 Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130221 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20130822 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602009011339 Country of ref document: DE Representative=s name: RUEGER | ABEL PATENT- UND RECHTSANWAELTE, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602009011339 Country of ref document: DE Representative=s name: RUEGER, BARTHELT & ABEL PATENTANWAELTE, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602009011339 Country of ref document: DE Representative=s name: RUEGER ABEL PATENT- UND RECHTSANWAELTE, DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602009011339 Country of ref document: DE Representative=s name: RUEGER | ABEL PATENT- UND RECHTSANWAELTE, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602009011339 Country of ref document: DE Representative=s name: RUEGER, BARTHELT & ABEL PATENTANWAELTE, DE Ref country code: DE Ref legal event code: R082 Ref document number: 602009011339 Country of ref document: DE Representative=s name: RUEGER ABEL PATENT- UND RECHTSANWAELTE, DE |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602009011339 Country of ref document: DE Effective date: 20130822 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20130731 |
|
BERE | Be: lapsed |
Owner name: CONVERTEAM TECHNOLOGY LTD Effective date: 20131031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20131001 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131031 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131001 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131001 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SM Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20091001 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20131001 Ref country code: MK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 7 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20151026 Year of fee payment: 7 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20121121 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20161002 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 10 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20181120 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20240919 Year of fee payment: 16 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20240919 Year of fee payment: 16 |