EP2139754A1 - Floating platform for operation in regions exposed to extreme weather conditions - Google Patents
Floating platform for operation in regions exposed to extreme weather conditionsInfo
- Publication number
- EP2139754A1 EP2139754A1 EP08723983A EP08723983A EP2139754A1 EP 2139754 A1 EP2139754 A1 EP 2139754A1 EP 08723983 A EP08723983 A EP 08723983A EP 08723983 A EP08723983 A EP 08723983A EP 2139754 A1 EP2139754 A1 EP 2139754A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- platform
- buoy
- anchoring
- risers
- main platform
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
- B63B21/507—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets
- B63B21/508—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers with mooring turrets connected to submerged buoy
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B22/00—Buoys
- B63B22/02—Buoys specially adapted for mooring a vessel
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
Definitions
- the invention relates to a floating platform for drilling after or production of hydrocarbons offshore, comprising a semi-submersible main platform carrying process and/or drilling equipment at its upper surface, and which is designed as a vertical, essentially flat-bottomed cylinder.
- a platform designed as stated above is known from Norwegian patent No. 319 971.
- By designing the platform with a cylindrical platform body there is obtained a substantial reduction of pitching and rolling movements.
- Such a platform has large carrying capacity with respect to production or drilling equipment, and a large storage capacity for oil, fuel and the like.
- the platform will be direction - independent with respect to environmental influence, and therefore may be anchored by means of a simple fixed anchoring system.
- risers can be connected directly to a receiving system on the platform, without any need for swivel transference or the like.
- a disconnection and a subsequent connection of anchoring lines and/or risers may involve several weeks of stoppage in the production of a production unit.
- the connection generally will require that a tender vessel is engaged for picking-up of anchoring lines and risers. The connecting operation therefore will be sensitive to the weather conditions.
- the object of the present invention is to provide a platform for use in regions exposed to extreme weather or where drifting ice and icebergs occur.
- a platform of the introductorily stated type which, according to the invention, is characterised in that the main platform is provided with a central, vertical shaft which at its lower end is adapted for reception in releasable locking of an anchoring buoy carrying fastening equipment for anchoring lines and for risers and umbilicals.
- Fig. 1 shows the main platform and the anchoring buoy connected together
- Fig. 2 shows how the anchoring buoy is raised to the main platform by chain winches
- Fig. 3 shows a first embodiment of the anchoring buoy with flexible risers connected thereto
- Fig. 4 shows a second embodiment of the anchoring buoy with steel risers connected thereto;
- Fig. 5 shows a top view of a set-up of anchoring lines connected to the anchoring buoy;
- Fig. 6 shows the anchoring buoy lowered to a free-floating position after disconnection
- Fig. 7 shows pick-up lines extending from the anchoring buoy and floating on the water surface.
- a platform structure 1 As shown in Figs. 1 and 2, the illustrated embodiment of a platform structure 1 according to the invention comprises a main platform 2 and an anchoring unit consisting of a submerged anchoring buoy 3.
- the main platform 2 is designed as a vertical, essentially flat-bottomed cylinder body, in a corresponding manner as in the introductorily mentioned patent specification.
- the platform may have a circular or a polygonal cross-section.
- the cylinder body in this case is provided with a central, vertical shaft 8 which at its lower end is adapted for reception and releasable locking of the anchoring buoy 3.
- the platform has double walls and possibly a double bottom that are used as ballast tanks 4. These are divided into a sufficient number of tanks to make sure that damage stability and the like is taken care of.
- ballast tanks 5 Inside of the ballast tanks there are arranged loading tanks 5 for storage of hydrocarbons.
- Under a living quarter 18 on the main deck 7 there will be engine rooms and different tanks, a cofferdam etc.
- Equipment for the production of oil and gas, drilling equipment and different auxiliary systems are placed as modules 6 on the main deck.
- winches 9 are arranged in the upper part of the shaft 8, for pulling-in of the anchoring buoy 3 from a submerged position and up to the connecting position in the shaft 8.
- the anchoring buoy has an at least partly conical shape, for reception in a corresponding conical portion in the lower part of the shaft. When the buoy 3 is in the correct position, it will be securely locked by a mechanical locking means (not shown).
- the winches 9 will also be used for connection, pre- stressing and after-tensioning of the anchoring lines (anchor chains) 10 for the platform.
- On the main platform there are also installed coupling manifolds for the transfer of well stream, and for oil and gas export. Transfer hoses will be installed between the coupling manifold and riser fastenings 20 located on the anchoring buoy.
- the main platform 2 may be a passive unit which has no propulsion machinery of its own, and which has to be towed by a tender vessel to and from the position for connection, or if it has to be moved away from the current location.
- the main platform 2 may also be equipped with propellers (thrusters) 11 which will give the main platform the possibility to transfer itself without any assistance from a tender vessel. It may transfer itself to avoid bad weather or icebergs, and it may sail back for own machine and couple itself to the anchoring buoy 3.
- the anchoring buoy 3 is a large buoyancy tank. The buoyancy tank is divided into a suitable number of cells in order to ensure that a damage does not have dramatic consequences. At the outer edge of the buoy there are placed fairleads 12 for fastening of the anchor chains 10.
- the anchor chains 10 extend from the fairleads and up to chain locks 13 at the top the buoy.
- the chain locks will carry all forces from the anchor chains 10, both when the buoy floats freely and when it is connected to the main platform 2.
- Risers and umbilicals 14, 15 will be connected to the buoy. If flexible risers 14 are used at "normal" water depths, there will be arranged I- or J-tubes extending through the buoy hull from the bottom to the top. The risers 14 may then be pulled in and locked fixedly at the upper edge of the buoy. Here there will be placed safety valves and the like together with coupling flenses 20 for connection of transfer hoses etc.
- a bellmouth or a locking means for fastening of bend stiffeners At the bottom of the I- or J-tube there may be arranged either a bellmouth or a locking means for fastening of bend stiffeners.
- SCR steel catenary risers
- an opening 25 will be arranged in the center of the buoy (see Fig. 4) where there is arranged a deck for suspension of the risers. The risers then will hang in a flexible joint fastened in this deck. Safety valves, coupling flanges etc. will be placed above the deck. With this arrangement the steel risers will hang freely towards the sea bed. A similar suspension may also be used for freely hanging flexible risers 14. The flexible joint at the top then will not be required.
- the main platform 2 and the anchoring buoy 3 When installing the platform structure 1, the main platform 2 and the anchoring buoy 3 will be interconnected by a mechanical locking means. Pulling- in/adjustment of anchoring lines 10 and tensioning of lines will be as on a "conventional" unit. After pulling-in of the anchoring lines 10 they will be locked by the chain locks 13 located at the top of the anchoring buoy 3. After locking of the anchoring lines/anchor chains 10, the chain length which has been pulled on board will be placed in chain lockers 16 at the top of the anchoring buoy. At the end of some of the chains there will be mounted a pick-up line 17. The number of pick-up lines 17 depends on how the anchoring lines 10 are arranged. For the arrangement shown in Fig. 5, three pick-up lines 17 will be used, i.e.
- the pick-up lines 17 may be arranged so that they are picked up by a remotely operated vehicle (ROV) in that lines 17 with a buoyancy element are released by a hydroacoustic signal, whereafter the lines can be picked up at the water surface, or at least one line 23 may be equipped with a floating element 22 so that it lies on the surface and can be picked up. Pulling-in and connection of risers, umbilicals, etc. will also be carried out with the anchoring buoy 3 connected. After locking of risers 14, 15, connection hoses and cables between the top of risers/cables and the manifold arrangement on the main platform 2 can be mounted in place.
- ROV remotely operated vehicle
- the platform structure 1 After connection of anchoring lines 10 and risers 14, 15 the platform structure 1 is ready for operation. As mentioned above, the anchoring buoy 3 in the connected position is locked to the main platform 2 by a mechanical locking means. Before a disconnection can be carried out, all connection hoses and cables between the main platform 2 and the anchoring buoy 3 must be disconnected. When this has been carried out, the anchoring buoy can be disconnected by opening the mechanical locking means. The anchoring buoy is ballasted so that it finds a position of equilibrium at a pre-determined depth D below the water surface 24. The anchoring buoy 3 will now float in a position wherein it will only to a small extent be subjected to loads from waves. In addition, the risk for collision with vessels and possible icebergs will be reduced to a minimum.
- a remotely operated vehicle (ROV) picks up pick-up lines 17 which are brought up inside the shaft 8 in the main platform 2.
- the pick-up lines 17 are connected to the chain winches 9 which are used to pull up the ends of the anchor chains 10 located in the chain lockers 16 at the top of the anchoring buoy 3, and the chains are placed on the chain winches.
- the pull-in is carried out in that the chain winches 9 pull in the anchoring buoy 3 with all risers, umbilicals, cables, etc. connected to and extending down to the sea bed.
- the anchoring buoy 3 is in the correct position, it is locked by the mechanical locking means. Coupling hoses, cables, etc. from the main platform 2 is connected to the anchoring buoy 3 and the production can be restarted.
- the pick-up lines 17 will have floating buoys 21, 22 which can be released for instance by a hydroacoustic signal or which lie on the water surface and can be picked up in a conventional manner. If an arrangement with a floating pick-up line 23 is used, a line must be arranged from the shaft 8 and outwards to the side of the platform 2. The floating line 23 is then picked up from the side of the main platform 2 and is connected to said line. The buoyancy elements 21, 22 are disconnected and the interconnected lines are again dropped into the sea. The pick-up lines 17 can now be pulled up through the shaft 8 and connected to the chain winches 9. Further pulling-up and connection will be as with the use of an ROV.
- the drilling installation may be placed on a cantilever platform
- the anchoring lines may be adjusted in order to maintain a correct position of the platform when the weather load varies. If the platform is equipped with thrusters 11 these may be used in addition in order to maintain a best possible position while drilling.
- drilling risers etc. will be connected after that the anchoring buoy is in the locked position.
- drilling risers with associated valves etc. will be disconnected from the bottom and preferably raised and stored prior to disconnection.
Landscapes
- Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Earth Drilling (AREA)
- Soil Working Implements (AREA)
Abstract
Description
Claims
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
NO20071491A NO20071491L (en) | 2007-03-21 | 2007-03-21 | Detachable platform for operation in exposed areas |
PCT/NO2008/000091 WO2008115068A1 (en) | 2007-03-21 | 2008-03-12 | Floating platform for operation in regions exposed to extreme weather conditions |
Publications (2)
Publication Number | Publication Date |
---|---|
EP2139754A1 true EP2139754A1 (en) | 2010-01-06 |
EP2139754A4 EP2139754A4 (en) | 2012-12-12 |
Family
ID=39766102
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP08723983A Withdrawn EP2139754A4 (en) | 2007-03-21 | 2008-03-12 | Floating platform for operation in regions exposed to extreme weather conditions |
Country Status (8)
Country | Link |
---|---|
US (1) | US20100143045A1 (en) |
EP (1) | EP2139754A4 (en) |
KR (1) | KR101532234B1 (en) |
CN (1) | CN101674975A (en) |
CA (1) | CA2681204C (en) |
NO (1) | NO20071491L (en) |
RU (1) | RU2009138730A (en) |
WO (1) | WO2008115068A1 (en) |
Families Citing this family (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2007126477A2 (en) | 2006-03-30 | 2007-11-08 | Exxonmobil Upstream Research Company | Mobile, year-round arctic drilling system |
EP2093143B1 (en) * | 2008-02-19 | 2011-04-27 | Wärtsilä Ship Design Germany GmbH | Service vessel |
CN101612982B (en) * | 2009-08-13 | 2012-05-09 | 上海利策科技有限公司 | Circular floating ocean platform capable of releasing multi-point mooring |
SG189054A1 (en) * | 2010-10-21 | 2013-05-31 | Conocophillips Co | Ice worthy jack-up drilling unit |
KR20120045858A (en) * | 2010-11-01 | 2012-05-09 | 대우조선해양 주식회사 | Drill ship for polar region |
KR20120048097A (en) * | 2010-11-05 | 2012-05-15 | 대우조선해양 주식회사 | Drill ship for polar region |
US20130029546A1 (en) * | 2011-07-29 | 2013-01-31 | John James Murray | Mooring Disconnect Arrangement |
US20150101522A1 (en) * | 2013-10-15 | 2015-04-16 | Adel H. Younan | Arctic Rapid Disconnect and Reconnect Floating Driller |
GB2538275B (en) | 2015-05-13 | 2018-01-31 | Crondall Energy Consultants Ltd | Floating production unit and method of installing a floating production unit |
KR102495459B1 (en) * | 2015-12-31 | 2023-02-03 | 대우조선해양 주식회사 | Install structure of fluid transfer line and install method for spread mooring marine plant |
CU20190024A7 (en) * | 2016-09-26 | 2019-11-04 | Solarisfloat Lda | ROTARY FLOTATION PLATFORM |
DE102016118079B3 (en) * | 2016-09-26 | 2017-09-28 | Aerodyn Engineering Gmbh | Mooring buoy for a floating wind turbine |
CN107640296B (en) * | 2017-09-12 | 2019-11-12 | 中国海洋石油集团有限公司 | A kind of far-reaching extra large oil-gas field development drilling goods and materials storage transfer floating platform |
CN111101993A (en) * | 2018-10-29 | 2020-05-05 | 中铁第五勘察设计院集团有限公司 | Underwater tunnel ventilation shaft and system with overhauling and escaping functions |
CN111101992A (en) * | 2018-10-29 | 2020-05-05 | 中铁第五勘察设计院集团有限公司 | Underwater tunnel ventilation shafts and underwater tunnel ventilation systems |
CN109455274B (en) * | 2019-01-02 | 2024-02-27 | 上海海事大学 | Water platform stabilizing device |
JP6618063B1 (en) * | 2019-03-25 | 2019-12-11 | 華南理工大学 | On-site control equipment for treating oil-polluted water areas |
CN114030562B (en) * | 2021-11-30 | 2022-09-16 | 中国船舶科学研究中心 | Large fishery platform mooring device capable of realizing floating and submerging switching and using method thereof |
Family Cites Families (19)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2440248A (en) * | 1944-08-19 | 1948-04-27 | Bell Telephone Labor Inc | Object locating apparatus |
GB1014879A (en) * | 1964-01-09 | 1965-12-31 | Offshore Co | Improved floating structure mooring system |
US4604961A (en) * | 1984-06-11 | 1986-08-12 | Exxon Production Research Co. | Vessel mooring system |
US4735267A (en) * | 1985-03-11 | 1988-04-05 | Shell Oil Company | Flexible production riser assembly and installation method |
NO160914C (en) * | 1986-03-24 | 1989-06-14 | Svensen Niels Alf | BUILDING LOADING SYSTEM FOR OFFSHORE PETROLEUM PRODUCTION. |
US4966495A (en) * | 1988-07-19 | 1990-10-30 | Goldman Jerome L | Semisubmersible vessel with captured constant tension buoy |
US4995762A (en) * | 1988-07-19 | 1991-02-26 | Goldman Jerome L | Semisubmersible vessel with captured constant tension buoy |
US4913591A (en) * | 1988-10-17 | 1990-04-03 | Bethlehem Steel Corporation | Mobile marine platform and method of installation |
NO176131C (en) * | 1992-05-25 | 1997-07-08 | Norske Stats Oljeselskap | System for use in offshore petroleum production |
NO176130C (en) * | 1992-05-25 | 1997-07-08 | Norske Stats Oljeselskap | System for use in offshore petroleum production |
NO923281L (en) * | 1992-08-21 | 1994-02-22 | Norske Stats Oljeselskap | Closing device for an opening in the bottom of a vessel |
NO930504D0 (en) * | 1993-02-12 | 1993-02-12 | Maritime Group As | DEVICE ON TRIAL HEADS |
NO179986C (en) * | 1994-12-08 | 1997-01-22 | Norske Stats Oljeselskap | Process and system for producing liquefied natural gas at sea |
US6113314A (en) * | 1998-09-24 | 2000-09-05 | Campbell; Steven | Disconnectable tension leg platform for offshore oil production facility |
US6712560B1 (en) * | 2000-12-07 | 2004-03-30 | Fmc Technologies, Inc. | Riser support for floating offshore structure |
NO319971B1 (en) * | 2001-05-10 | 2005-10-03 | Sevan Marine As | Offshore platform for drilling for or producing hydrocarbons |
NO20024303D0 (en) * | 2002-09-09 | 2002-09-09 | Maritime Tentech As | Buoy |
ES2303716T3 (en) * | 2006-01-03 | 2008-08-16 | Bluewater Energy Services B.V. | DISCONNECTING MOUNTING SYSTEM FOR A BOAT. |
US7958835B2 (en) * | 2007-01-01 | 2011-06-14 | Nagan Srinivasan | Offshore floating production, storage, and off-loading vessel for use in ice-covered and clear water applications |
-
2007
- 2007-03-21 NO NO20071491A patent/NO20071491L/en not_active Application Discontinuation
-
2008
- 2008-03-12 US US12/531,785 patent/US20100143045A1/en not_active Abandoned
- 2008-03-12 WO PCT/NO2008/000091 patent/WO2008115068A1/en active Application Filing
- 2008-03-12 KR KR1020097021880A patent/KR101532234B1/en active Active
- 2008-03-12 EP EP08723983A patent/EP2139754A4/en not_active Withdrawn
- 2008-03-12 CA CA2681204A patent/CA2681204C/en active Active
- 2008-03-12 RU RU2009138730/11A patent/RU2009138730A/en not_active Application Discontinuation
- 2008-03-12 CN CN200880014490A patent/CN101674975A/en active Pending
Also Published As
Publication number | Publication date |
---|---|
WO2008115068A1 (en) | 2008-09-25 |
KR101532234B1 (en) | 2015-06-29 |
CA2681204C (en) | 2014-08-05 |
EP2139754A4 (en) | 2012-12-12 |
NO20071491L (en) | 2008-09-22 |
US20100143045A1 (en) | 2010-06-10 |
CN101674975A (en) | 2010-03-17 |
CA2681204A1 (en) | 2008-09-25 |
KR20090121403A (en) | 2009-11-25 |
RU2009138730A (en) | 2011-04-27 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CA2681204C (en) | Floating platform for operation in regions exposed to extreme weather conditions | |
US5941746A (en) | Vessel with a disconnectable riser supporting buoy | |
EP0877702B1 (en) | System for anchoring ships | |
US7690434B2 (en) | Offshore vessel mooring and riser inboarding system | |
US5044297A (en) | Disconnectable mooring system for deep water | |
US7669660B1 (en) | Riser disconnect and support mechanism | |
CA2637832C (en) | Submerged loading system | |
EP0677008B1 (en) | Vessel mooring system | |
KR20230031217A (en) | Detachable mooring system | |
WO2016057455A1 (en) | Taut inverted catenary mooring system | |
EP2576334B1 (en) | Floating production unit with disconnectable transfer system | |
Rutkowski | A comparison between conventional buoy mooring CBM, single point mooring SPM and single anchor loading sal systems considering the hydro-meteorological condition limits for safe ship’s operation offshore | |
US8544400B2 (en) | Mooring arrangement | |
US20150307161A1 (en) | Device and method for interconnecting a tanker and a floating terminal | |
WO2000027692A1 (en) | Device for positioning of vessels | |
NO336533B1 (en) | System for mooring a large vessel | |
US9409631B2 (en) | Loading hose | |
US6685519B1 (en) | System for transferring fluids and methods for installing, modifying and operating system | |
WO2018007370A1 (en) | Disconnectable bow turret | |
WO2000078603A1 (en) | Equipment for storage of a loading hose in a body of water, and method of transferring the hose from the storage position to a position of use | |
WO2000044615A1 (en) | Equipment for storage of a loading hose in a body of water, and method of transferring the hose from a storage position to a position of use |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20091021 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HR HU IE IS IT LI LT LU LV MC MT NL NO PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20121109 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: B63B 35/44 20060101ALI20121105BHEP Ipc: B63B 22/02 20060101ALI20121105BHEP Ipc: B63B 21/50 20060101AFI20121105BHEP |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: EXAMINATION IS IN PROGRESS |
|
17Q | First examination report despatched |
Effective date: 20170103 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20170516 |