EP1882777B1 - Method for making a balastless track for a railway - Google Patents
Method for making a balastless track for a railway Download PDFInfo
- Publication number
- EP1882777B1 EP1882777B1 EP07014775A EP07014775A EP1882777B1 EP 1882777 B1 EP1882777 B1 EP 1882777B1 EP 07014775 A EP07014775 A EP 07014775A EP 07014775 A EP07014775 A EP 07014775A EP 1882777 B1 EP1882777 B1 EP 1882777B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- track
- rail fastening
- rail
- running rails
- supporting layer
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Not-in-force
Links
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B1/00—Ballastway; Other means for supporting the sleepers or the track; Drainage of the ballastway
- E01B1/002—Ballastless track, e.g. concrete slab trackway, or with asphalt layers
- E01B1/004—Ballastless track, e.g. concrete slab trackway, or with asphalt layers with prefabricated elements embedded in fresh concrete or asphalt
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B9/00—Fastening rails on sleepers, or the like
- E01B9/38—Indirect fastening of rails by using tie-plates or chairs; Fastening of rails on the tie-plates or in the chairs
- E01B9/44—Fastening the rail on the tie-plate
- E01B9/46—Fastening the rail on the tie-plate by clamps
- E01B9/48—Fastening the rail on the tie-plate by clamps by resilient steel clips
- E01B9/486—Fastening the rail on the tie-plate by clamps by resilient steel clips the clip being a shaped plate
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B2204/00—Characteristics of the track and its foundations
- E01B2204/06—Height or lateral adjustment means or positioning means for slabs, sleepers or rails
Definitions
- the invention relates to a method for producing a fixed track for rail vehicles, wherein on a support layer prefabricated supports are laid, forming the bases for the rails, which are already passable in the rough state of the fixed carriageway and supported along rail mounting on the supports and set up according to which a track support plate made of hydraulically bound binder is installed on the support layer.
- Such a method is for example from the CH 695 568 A5 known.
- this method makes it possible to drive the track under construction, for which prefabricated track sleepers equipped with sleepers are laid at the point of installation on supports which are fixed in their adjusted position with fast-setting concrete. After introducing the filled concrete to just below the threshold underside, the fine adjustment of the track takes place, after which the entire track grid is poured. After pouring the thresholds to the curing of the binder, however, the track can not be traversed by trains, since the embedded in fresh concrete and attached to the rails sleepers must not be exposed to shocks to avoid subsidence of the thresholds and thus a qualitatively appropriate embedding the sleepers is guaranteed in the concrete.
- the rail is embedded with rail fastening stools in the ground and held in the later stages of construction or fixed on the basis of this stool in the final position, in the then again the road surface, which embeds the two rails on both sides, is produced.
- WO 2005 001 203 A1 According to another known method ( WO 2005 001 203 A1 ) are provided with mounting plates and fasteners, namely screws and dowels, rails on a previously concreted support plate, are provided in the recesses for the fastening means, and finely adjusted, after which the recesses are poured in the area around the mounting plates, whereby the dowels in the Fixing plate to be fixed.
- One Driving the rails is also not possible until the binder has hardened to ensure a good hold of the dowels.
- the invention is therefore the object of a method for producing a fixed track for rail vehicles in such a way that a possible rapid and cost-effective construction of a track with exactly adjusted in their spatial position rails is possible.
- the invention solves this problem in that the rail mounting plates supported on the supports rails are provided with dowels for rail mounting on the track plate at a distance from Schienenbefest whysplattenunterseite that in further steps on the support layer, the track plate of hydraulically bonded binder is installed at a distance from the rail mounting plate underside wherein the dowels are at least largely cast in the track plate, that then solved the connection between the rail mounting plate and the distance to the Schienenbefest onlysplattenunterseite arranged dowels for mechanical decoupling of rails and track plate until sufficient curing of the hydraulically bonded binder is and then that the rails are set after a final fine alignment with respect to their spatial position on the rail mounting plates on the track plate and underpoured with a potting compound.
- the invention has the advantage over the prior art that the rail fastening takes place via rail fastening plates which are already preassembled on the rails and which can remain on the rails after the rails have been displaced on the supports until the track has been completed.
- the rail mounting plates and possibly the supports form track units combined to form laying units, which are successively placed on the support layer in position and interconnected or welded.
- These rail mounting plates need not be dismantled until the completion of the track with the new method.
- these plates are cheaper in terms of weight and size, which allows easier handling of the track yokes or a greater range of hoists and cranes used today due to the reduced weight, as can be dispensed with these conventional sleepers or track stool.
- the rails After curing of the concrete, the rails with respect to their position, in particular their altitude, for example by means of wedges od. Like. Be corrected before the rails after final setup respect. Their spatial location on the track plate with the rail mounting plate attached to the previously embedded dowels and then be poured with a potting compound.
- Another significant advantage of the method according to the invention is that the track for concreting the track plate only needs to be directed to approximately ⁇ 10 mm in height. By concentrating on the direction, the straightening process can be carried out quickly. This is because a correction between the curing of the track slabs and the final introduction of the potting compound is still possible. If necessary, the rails can also be replaced by rails of greater length, if this is necessary, before the track is set up exactly.
- the rails should be supported at least until hardening of the potting compound including rail fastening plates by means of adjusting devices on the support layer.
- Hardwood wedges or lateral struts for the adjacent street banquet come into question as adjusting devices.
- Correspondingly secured rails can easily be used by rail vehicles at walking speed.
- a device for fastening rails to a track base plate for a fixed carriageway for rail vehicles with a fastened on the one hand to the rail and on the other hand anchored in the track plate rail fastening plate, as they can be used in particular in a method of the type described, is characterized according to the invention characterized in that the rail mounting plate on the one hand an insertable into a mounting hole of the rail mounting plate guide screw, which penetrates a arranged on the rail mounting plate bottom spacer and engages in a dowel, and on the other hand a mounting bolt belonging to the guide screw and spacer preferably via an inserted into the mounting hole eccentric sleeve engages in the dowel.
- a device which can remain on the rails during track mounting, since after aligning the tracks, the guide screw and the spacer fix the dowel exactly in its predetermined position until the track slab made of concrete has their corresponding to solve the lead screw green strength. Then spacers and screws are removed, after which a clean decoupling between rail mounting plate and track plate is guaranteed.
- the mounting screws are inserted into the mounting holes and screwed into the associated dowels.
- the fastening screw is inserted via an eccentric sleeve in the mounting hole. As a result, even small manufacturing tolerances can be compensated.
- the adjustment of the track in its altitude is yes by appropriate subdivision and pouring with a potting compound.
- the rail mounting plates have transversely to the rail longitudinal direction aligned guides for rail jaws and laterally of the guide at least form a tab in which the mounting holes are provided.
- This shallow, little space-requiring rail mounting plates are created, which allow as a result of the guide at later times nor a simple correction of the track with respect to its lateral position.
- the rail fastening plate according to the invention is characterized in particular by its low in track axis Width off. Furthermore, it hinders the casting of the track with potting compound and future repairs in any way.
- the rails 4 together with rail mounting plates 5 are supported on the supports 2, the rail mounting plates 5 carry dowels 6 for rail mounting on a track plate 7.
- the track plate 7 is hydraulically bonded binder, in particular concrete, installed at a distance from the rail mounting plate underside on which the track plate 7, the dowels 6 at least for the most part are cast on the support layer 3.
- the device for carrying out the method according to the invention comprises a device for rail mounting on a track plate 7 for a solid track for rail vehicles with a fastened on one hand rail 4 and on the other hand anchored to the Gleitragplatte 7 rail mounting plate 5.
- This rail mounting plate 5 takes in a mounting hole 10 alternately one Inserted into the mounting hole 10 guide screw 11, which projects through a spacer bushing 12 and engages in a dowel 6 ( Fig. 1 , right side), or a fastening screw 9, which is inserted via an eccentric sleeve 13 in the mounting hole 10 and engages in the dowel 6 ( Fig. 1 , left side).
- the rail mounting plate 5 also includes transversely to the rail longitudinal direction aligned guides 14 for rail jaws 15 which are screwed to the rail mounting plate 5.
- the side of the guide 14 each have a tab 16 is formed on the rail mounting plate 5, in which the mounting holes 10 are provided for the mounting screws 9 and guide screws 11.
- the dowels 6 are fixed by means of the guide screws 11 with the interposition of the spacers 12 to the rail mounting plates 5.
- the guide screws 11 are inserted from above into the mounting holes 10 of the rail mounting plates 5, the spacers 12 pushed from below onto the guide screws 11 and the dowel 6 with preferably a thread attached to the guide screw.
- This assembly process can be done easily and efficiently at the construction site. Due to the clamping action of dowel 6 and guide screw 11 against the rail mounting plate 5, the dowel 6 is always kept stable in its exact position. The track is then adjusted in height to ⁇ 10 mm in its longitudinal direction to about ⁇ 2 mm nominal position.
- the hydraulic binder, the concrete, the track plate 7 to about 10 mm below the top edge dowel or 10 mm below the bottom edge spacer 12 is installed ( Fig. 4 ).
- the dowels 6 are embedded in the track plate 7. Due to the free space of around 35 mm between the rail mounting plate underside and the track slab surface, it is possible to smooth out the concrete with a trowel.
- the flatness of the concrete of the track plate 7 on the surface no particularly high demands are made, as the final track in a row is still fixed against the track plate 7 on the dowels 6 and is poured with a potting compound 8. This allows very high concreting rates in the short hours available.
- the guide screws 11 are released, the dowel 6 optionally pressed a little more in the fresh concrete and the spacer 12 removed by pulling out side between track plate 7 and rail mounting plate 5 ( Fig. 5 ).
- This operation can be carried out without any change in the track position. Then there is the possibility to resume traffic, while the concrete is only 1 to 2 hours old.
- the dowels 6 can now in the next few hours and days embedded in the track plate 7 without vibrations or movements from the outside, whereby an optimal fit of the dowels 6 in the track plate 7 and a homogeneous quality of the track plate 7 is guaranteed.
- the track is decoupled from the ground, so that lateral movements or longitudinal movements of the track in the sequence of thermal stresses do not affect the quality of the hardening track plate 7.
- Eccentric sleeves 13 used which allow a lateral correction of about ⁇ 7 mm.
- This type of jaws 15 also makes it possible to install with the same system different rails, in particular with different rail foot widths in increments of 2 mm.
- a permanent formwork 18 for the potting compound 8 for example, made of concrete and the adjusted track by completely basing the rail 4 with the potting compound 8, in particular cast asphalt, in position and height finally fixed ( Fig. 6 and 8th ).
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
- Train Traffic Observation, Control, And Security (AREA)
- Automobile Manufacture Line, Endless Track Vehicle, Trailer (AREA)
- Road Paving Structures (AREA)
Abstract
Description
Die Erfindung bezieht sich auf ein Verfahren zum Herstellen einer festen Fahrbahn für Schienenfahrzeuge, wobei auf einer Tragschicht vorgefertigte Auflager verlegt werden, die Stützpunkte für die Fahrschienen bilden, welche bereits im Rohbauzustand der festen Fahrbahn befahrbar sind und samt Schienenbefestigung auf den Auflagern abgestützt und eingerichtet werden, wonach auf der Tragschicht eine Gleistragplatte aus hydraulisch gebundenem Bindemittel eingebaut wird.The invention relates to a method for producing a fixed track for rail vehicles, wherein on a support layer prefabricated supports are laid, forming the bases for the rails, which are already passable in the rough state of the fixed carriageway and supported along rail mounting on the supports and set up according to which a track support plate made of hydraulically bound binder is installed on the support layer.
Ein derartiges Verfahren ist beispielsweise aus der
Des weiteren ist bekannt, dass alte, zu sanierende Gleis, inklusive der zugehörigen Tragplatten während einer Wochenendsperre von Freitag Abend bis Montag Früh komplett abzutragen, den Untergrund zu verfestigen und ein provisorisches Gleis auf provisorischen Stützblöcken aufzubauen, welche sich am Untergrund auf Betonfertigteilplatten abstützen. Die weiteren Arbeiten bis zur Fertigstellung des Gleises müssen in der Regel unter Aufrechterhaltung des Straßenbahnverkehrs je in einem Zeitraum von Mitternacht bis 5 Uhr Früh durchgeführt werden. Das heißt, zur Fertigstellung des Gleises stehen stets lediglich Stundensperren von 5 bis 6 Stunden Dauer zur Verfügung.Furthermore, it is known that old, to be rehabilitated track, including the associated support plates during a weekend lock from Friday evening to Monday to remove completely early, consolidate the ground and build a makeshift track on makeshift support blocks, which are supported on precast concrete slabs on the ground. The further works until The completion of the track must normally be carried out by midnight until 5 am, while maintaining tram traffic. This means that the completion of the track is always limited to between 5 and 6 hours.
Mit den heute üblichen Umbauverfahren wird die Schiene mit Schienenbefestigungsschemeln in den Untergrund eingebettet und in den späteren Bauphasen festgehalten bzw. auf Basis dieser Schemel in der endgültigen Lage fixiert, in der anschließend wieder der Straßenbelag, der die beiden Schienen beidseitig einbettet, hergestellt wird.With today's customary conversion method, the rail is embedded with rail fastening stools in the ground and held in the later stages of construction or fixed on the basis of this stool in the final position, in the then again the road surface, which embeds the two rails on both sides, is produced.
Von Nachteil ist bei diesen heutigen Verfahren einerseits das hohe Gewicht der Schemel und anderseits die Tatsache, daß nach dem Einbetonieren der Schemel die gesamte Schienenbefestigung demontiert und anschließend das Gleis um ca. 5 cm angehoben werden muß, um den Schemel im abbindenden Beton ohne Qualitätsminderung einzubetten. Dies bedeutet, daß das Gleis üblicherweise erst fein eingerichtet und anschließend der Beton der Gleistragplatte eingebracht wird, in dem auch die Gleisschemel eingebettet sind. Nach einem ersten Abbinden des Betons werden die Schienenbefestigungsteile zwischen Schiene und Schemel komplett entfernt und anschließend das Gleis auf den zuvor beschriebenen provisorischen Stützpunkten um ca. 5 cm überhöht abgestützt. Damit ist sichergestellt, daß während des tagsüber stattfindenden Verkehrs, die im frischen Beton eingebetteten Schemel keinen Erschütterungen ausgesetzt sind und somit eine qualitativ entsprechende Einbettung in den Beton gewährleistet ist.The disadvantage of these methods today, on the one hand, the high weight of the stool and on the other hand, the fact that dismantled after Einbetonieren the stool, the entire rail fastening and then the track must be raised by about 5 cm to embed the stool in the setting concrete without quality degradation , This means that the track is usually set fine and then the concrete of the track plate is introduced, in which the track stool are embedded. After a first setting of the concrete, the rail fastening parts between rail and stool are completely removed and then the track on the previously described provisional bases supported by about 5 cm increased. This ensures that during the daytime traffic, embedded in fresh concrete stool are not exposed to vibration and thus a qualitatively appropriate embedding is guaranteed in the concrete.
Nach einem anderen bekannten Verfahren (
Schließlich ist es bekannt (
Ausgehend von einem Stand der Technik der eingangs geschilderten Art liegt der Erfindung daher die Aufgabe zugrunde, ein Verfahren zum Herstellen einer festen Fahrbahn für Schienenfahrzeuge so auszugestalten, daß ein möglichst rascher und kostengünstiger Aufbau eines Gleises mit exakt in ihrer räumlichen Lage justierten Schienen möglich wird.Based on a prior art of the type described above, the invention is therefore the object of a method for producing a fixed track for rail vehicles in such a way that a possible rapid and cost-effective construction of a track with exactly adjusted in their spatial position rails is possible.
Die Erfindung löst diese Aufgabe dadurch, daß die Schienenbefestigungsplatten der auf den Auflagern abgestützten Fahrschienen mit Dübeln für die Schienenbefestigung auf der Gleistragplatte mit Abstand zur Schienenbefestigungsplattenunterseite versehen werden, daß in weiteren Arbeitsschritten auf der Tragschicht die Gleistragplatte aus hydraulisch gebundenem Bindemittel mit Abstand zur Schienenbefestigungsplattenunterseite eingebaut wird, wobei die Dübel zumindest größtenteils in die Gleistragplatte eingegossen werden, daß dann die Verbindung zwischen der Schienenbefestigungsplatte und den Abstand zur Schienenbefestigungsplattenunterseite angeordneten Dübeln zur mechanischen Entkopplung von Fahrschienen und Gleistragplatte bis zum ausreichenden Aushärten des hydraulisch gebundenen Bindemittels gelöst wird und daß anschließend die Fahrschienen nach einem endgültigen Feinrichten bezüglich ihrer räumlichen Lage über die Schienenbefestigungsplatten an der Gleistragplatte festgelegt und mit einer Vergussmasse untergossen werden.The invention solves this problem in that the rail mounting plates supported on the supports rails are provided with dowels for rail mounting on the track plate at a distance from Schienenbefestigungsplattenunterseite that in further steps on the support layer, the track plate of hydraulically bonded binder is installed at a distance from the rail mounting plate underside wherein the dowels are at least largely cast in the track plate, that then solved the connection between the rail mounting plate and the distance to the Schienenbefestigungsplattenunterseite arranged dowels for mechanical decoupling of rails and track plate until sufficient curing of the hydraulically bonded binder is and then that the rails are set after a final fine alignment with respect to their spatial position on the rail mounting plates on the track plate and underpoured with a potting compound.
Die Erfindung weist gegenüber dem Stand der Technik unter anderem den Vorteil auf, daß die Schienenbefestigung über bereits an den Fahrschienen vormontierte Schienenbefestigungsplatten erfolgt, die nach einem Versetzen der Schienen auf den Auflagern bis zur Fertigstellung des Gleises an den Fahrschienen verbleiben können.Among other things, the invention has the advantage over the prior art that the rail fastening takes place via rail fastening plates which are already preassembled on the rails and which can remain on the rails after the rails have been displaced on the supports until the track has been completed.
Dabei ist es insbesondere von Vorteil, wenn die Schienenbefestigungsplatten und gegebenenfalls die Auflager zu Gleisjochen zusammengefaßte Verlegeinheiten bilden, die nacheinander auf der Tragschicht in Stellung gebracht und untereinander verbunden bzw. verschweißt werden. Diese Schienenbefestigungsplatten brauchen bis zur Fertigstellung des Gleises mit dem neuen Verfahren nicht mehr demontiert werden. Außerdem sind diese Platten bzgl. Gewicht und Größe günstiger, was ein einfacheres Handling der Gleisjoche bzw. eine größere Reichweite der heute eingesetzten Hebezeuge und Kräne aufgrund des verminderten Gewichtes ermöglicht, da auf diese üblichen Schwellen bzw. Gleisschemel verzichtet werden kann.It is particularly advantageous if the rail mounting plates and possibly the supports form track units combined to form laying units, which are successively placed on the support layer in position and interconnected or welded. These rail mounting plates need not be dismantled until the completion of the track with the new method. In addition, these plates are cheaper in terms of weight and size, which allows easier handling of the track yokes or a greater range of hoists and cranes used today due to the reduced weight, as can be dispensed with these conventional sleepers or track stool.
Mit den gemäß der Erfindung vorgesehenen Schienenbefestigungsplatten, die eine sehr geringe Bauhöhe aufweisen, ergeben sich bei noch nicht montierten Dübeln auch besonders vorteilhafte Verhältnisse für die Lagerung der vormontierten Joche und deren Transport zur Baustelle und somit auch eine erhebliche Verminderung des Transportvolumens zur Baustelle. Mit der Erfindung kann das Anheben des Gleises unmittelbar nach dem Betonieren ersatzlos entfallen, da das Gleis bereits auf den Auflagern abgestützt ist und die an den Schienenbefestigungsplatten vor dem Ausgießen mit dem hydraulischen Bindemittel vormontierten Dübel nach dem Verdichten der hydraulischen gebundenen Gleistragplatte von den als Richtplatten wirkenden Schienenbefestigungsplatten gelöst werden, indem die Montageschraube und die zwischen Dübel und Schienenbefestigungsplattenunterseite vorgesehenen Abstandshalter gelöst und entfernt werden. Damit ist das Gleis von Anfang an über die Betonschicht abgehoben, so daß der frische Beton im Wesentlichen erschütterungsfrei aushärten kann, womit eine entsprechende qualitative Einbettung der Dübel in den Beton gewährleistet ist.With the rail mounting plates provided according to the invention, which have a very low overall height, particularly advantageous conditions for the storage of the preassembled yokes and their transport to the construction site, and thus also a considerable reduction of the transport volume to the construction site, result for dowels not yet assembled. With the invention, the lifting of the track immediately after concreting can be omitted without replacement, since the track is already supported on the supports and pre-mounted on the rail mounting plates before pouring with the hydraulic binder dowels after compacting the hydraulic bonded track plate of acting as a directional plates Rail mounting plates are loosened by the mounting screw and the between Dowel and rail mounting plate base provided spacers are released and removed. Thus, the track is lifted from the beginning on the concrete layer, so that the fresh concrete can harden substantially vibration-free, whereby a corresponding qualitative embedding of the dowels is ensured in the concrete.
Nach einem Aushärten des Betons können die Fahrschienen bzgl. ihrer Lage insbesondere ihrer Höhenlage beispielsweise mittels Keile od. dgl. korrigiert werden, bevor die Schienen nach dem endgültigen Einrichten bzgl. ihrer räumlichen Lage an der Gleistragplatte mit der Schienenbefestigungsplatte an den zuvor eingebetteten Dübeln befestigt und anschließend mit einer Vergußmasse untergossen werden. Ein weiterer wesentlicher Vorteil des erfindungsgemäßen Verfahrens liegt darin, daß das Gleis für das Betonieren der Gleistragplatte nur mehr auf ca. ± 10 mm genau in der Höhe gerichtet werden muß. Durch die Konzentration auf die Richtung kann der Richtprozeß rasch erfolgen. Dies deshalb, da eine Korrektur zwischen dem Aushärten der Gleistragplatten und dem endgültigen Einbringen der Vergußmasse noch möglich ist. Gegebenenfalls können die Schienen vor dem exakten Einrichten des Gleises auch noch durch Fahrschienen größerer Länge ersetzt werden, falls dies erforderlich sein sollte.After curing of the concrete, the rails with respect to their position, in particular their altitude, for example by means of wedges od. Like. Be corrected before the rails after final setup respect. Their spatial location on the track plate with the rail mounting plate attached to the previously embedded dowels and then be poured with a potting compound. Another significant advantage of the method according to the invention is that the track for concreting the track plate only needs to be directed to approximately ± 10 mm in height. By concentrating on the direction, the straightening process can be carried out quickly. This is because a correction between the curing of the track slabs and the final introduction of the potting compound is still possible. If necessary, the rails can also be replaced by rails of greater length, if this is necessary, before the track is set up exactly.
Des Weiteren sollten die Schienen wenigstens bis zum Aushärten der Vergußmasse samt Schienenbefestigungsplatten mittels Justiervorrichtungen auf der Tragschicht abgestützt werden. Als Justiervorrichtungen kommen Hartholzkeile bzw. seitliche Streben zum benachbarten Straßenbankett hin in Frage. Dementsprechend abgesicherte Schienen können problemlos von Schienenfahrzeugen in Schrittgeschwindigkeit befahren werden.Furthermore, the rails should be supported at least until hardening of the potting compound including rail fastening plates by means of adjusting devices on the support layer. Hardwood wedges or lateral struts for the adjacent street banquet come into question as adjusting devices. Correspondingly secured rails can easily be used by rail vehicles at walking speed.
Eine Vorrichtung zur Schienenbefestigung an einer Gleistragplatte für eine feste Fahrbahn für Schienenfahrzeuge mit einer einerseits an der Schiene befestigbaren und anderseits in der Gleistragplatte verankerbaren Schienenbefestigungsplatte, wie sie insbesondere in einem Verfahren der eingangs geschilderten Art Verwendung finden kann, zeichnet sich gemäß der Erfindung dadurch aus, daß der Schienenbefestigungsplatte einerseits eine in eine Befestigungsbohrung der Schienenbefestigungsplatte einsetzbare Führungsschraube, die eine an der Schienenbefestigungsplattenunterseite angeordnete Distanzbuchse durchragt und in einen Dübel eingreift, und anderseits eine Befestigungsschraube zugehören, die anstelle von Führungsschraube und Distanzbuchse vorzugsweise über eine in die Befestigungsbohrung eingesetzte Exzenterhülse in den Dübel eingreift.A device for fastening rails to a track base plate for a fixed carriageway for rail vehicles with a fastened on the one hand to the rail and on the other hand anchored in the track plate rail fastening plate, as they can be used in particular in a method of the type described, is characterized according to the invention characterized in that the rail mounting plate on the one hand an insertable into a mounting hole of the rail mounting plate guide screw, which penetrates a arranged on the rail mounting plate bottom spacer and engages in a dowel, and on the other hand a mounting bolt belonging to the guide screw and spacer preferably via an inserted into the mounting hole eccentric sleeve engages in the dowel.
Damit wird eine Vorrichtung geschaffen, die während der Gleismontage an den Schienen verbleiben kann, da nach dem Ausrichten der Gleise die Führungsschraube und die Distanzbuchse den Dübel exakt in seiner vorbestimmten Lage fixieren, bis die Gleistragplatte aus Beton ihre zum Lösen der Führungsschraube entsprechende Grünstandfestigkeit aufweist. Anschließend werden Distanzbuchsen und Schrauben abgenommen, wonach eine saubere Entkopplung zwischen Schienenbefestigungsplatte und Gleistragplatte gewährleistet ist. Nach einem Aushärten der Gleistragplatte werden die Befestigungsschrauben in die Befestigungsbohrungen eingesetzt und in die zugehörigen Dübel eingeschraubt. Um dabei noch in einfacher Weise ein seitliches Justieren des Gleises zu ermöglichen ist die Befestigungsschraube über eine Exzenterhülse in die Befestigungsbohrung eingesetzt. Dadurch können noch geringe Fertigungstoleranzen ausgeglichen werden. Die Justierung des Gleises in seiner Höhenlage erfolgt ja durch entsprechendes Unterteilen und Ausgießen mit einer Vergußmasse.Thus, a device is provided, which can remain on the rails during track mounting, since after aligning the tracks, the guide screw and the spacer fix the dowel exactly in its predetermined position until the track slab made of concrete has their corresponding to solve the lead screw green strength. Then spacers and screws are removed, after which a clean decoupling between rail mounting plate and track plate is guaranteed. After curing of the track plate, the mounting screws are inserted into the mounting holes and screwed into the associated dowels. In order to still allow in a simple manner a lateral adjustment of the track, the fastening screw is inserted via an eccentric sleeve in the mounting hole. As a result, even small manufacturing tolerances can be compensated. The adjustment of the track in its altitude is yes by appropriate subdivision and pouring with a potting compound.
Besonders einfache Konstruktionsverhältnisse für die Schienenbefestigungsplatten ergeben sich, wenn die Schienenbefestigungsplatten quer zur Schienenlängsrichtung ausgerichtete Führungen für Schienenklemmbacken aufweisen und seitlich der Führung je wenigstens eine Lasche ausbilden, in welchen die Befestigungsbohrungen vorgesehen sind. Damit werden flache, wenig Bauraum benötigende Schienbefestigungsplatten geschaffen, die in Folge der Führung zu späteren Zeitpunkten noch eine einfache Korrektur des Gleises hinsichtlich seiner Seitenlage ermöglichen. Die erfindungsgemäße Schienenbefestigungsplatte zeichnet sich insbesondere durch ihre in Gleisachse geringe Breite aus. Weiters behindert sie das Untergießen des Gleises mit Vergußmasse und auch zukünftige Reparaturen in keiner Weise.Particularly simple construction conditions for the rail mounting plates arise when the rail mounting plates have transversely to the rail longitudinal direction aligned guides for rail jaws and laterally of the guide at least form a tab in which the mounting holes are provided. This shallow, little space-requiring rail mounting plates are created, which allow as a result of the guide at later times nor a simple correction of the track with respect to its lateral position. The rail fastening plate according to the invention is characterized in particular by its low in track axis Width off. Furthermore, it hinders the casting of the track with potting compound and future repairs in any way.
Wird mit beispielsweise zwei verschiedenen Klemmbacken mit zueinander in Richtung der Längsführung um einen halben Zahnabstand versetzter Rast gearbeitet, kann die Seitenlage der Schiene über die Klemmbacken in kleineren Schritten korrigiert werden. Diese Art der Klemmbacken ermöglicht es zudem, mit dem gleichen System Schienen unterschiedlicher Schienenfußbreite zu verbauen.If you work with, for example, two different jaws with each other in the direction of the longitudinal guide offset by half a tooth pitch, the lateral position of the rail over the jaws can be corrected in smaller steps. This type of jaws also makes it possible to use the same system rails of different rail foot width.
Bei Gleissanierungen auf Brücken bzw. auf intakten Gleistragplatten besteht auch die Möglichkeit, die gleichen Schienenbefestigungsplatten in Verbindung mit in Bohrungen eingesetzten Dübeln zu verwenden, wobei die Schienenbefestigungsplatten in diesem Fall als Bohrlehren dienen können. Mit der Erfindung muß an der Baustelle lediglich mit Montageteilen, also Distanzbuchse und der Führungsschraube und gegebenenfalls den Dübeln manipuliert werden. Die Gefahr von Materialverlusten im Zuge des Herstellungsgleises ist im Gegensatz zu heutigen Verfahren somit wesentlich geringer.In the case of track renewal on bridges or on intact track base plates, it is also possible to use the same rail fastening plates in conjunction with dowels inserted in bores, in which case the rail fastening plates can serve as drilling jigs. With the invention must be manipulated at the site only with mounting hardware, so spacer and the lead screw and possibly the dowels. The risk of material losses in the course of the production track is thus much lower, in contrast to today's methods.
In der Zeichnung ist die Erfindung anhand eines Ausführungsbeispieles schematisch dargestellt. Es zeigen
- Fig. 1
- ein nach dem erfindungsgemäßen Verfahren hergestelltes Gleis im Querschnitt,
- Fig. 2 bis 7
- die verschiedenen Herstellungsstufen einer erfindungsgemäßen Fahrbahn und
- Fig. 8
- die erfindungsgemäße Fahrbahn in einer Zwischenbaustufe nach
Fig. 6 in Draufsicht.
- Fig. 1
- a track produced by the process according to the invention in cross-section,
- Fig. 2 to 7
- the various stages of manufacture of a roadway according to the invention and
- Fig. 8
- the roadway according to the invention in a Zwischenbaustufe after
Fig. 6 in plan view.
Es wird ein Verfahren zum Herstellen einer festen Fahrbahn 1 für Schienenfahrzeuge vorgeschlagen, wobei vorgefertigte Auflager 2 auf einer Tragschicht 3 verlegt werden. Diese Auflager 2 bilden Stützpunkte für die Fahrschienen 4, die bereits im Rohbauzustand, also bei lediglich auf die Auflager 2 aufgestützten Fahrschienen 4 mit verminderter Fahrgeschwindigkeit befahrbar sind. Gemäß der Erfindung werden die Fahrschienen 4 samt Schienenbefestigungsplatten 5 auf den Auflagern 2 abgestützt, wobei die Schienenbefestigungsplatten 5 Dübel 6 für die Schienenbefestigung an einer Gleistragplatte 7 tragen. In weiteren Arbeitsschritten wird auf der Tragschicht 3 die Gleistragplatte 7 aus hydraulisch gebundenem Bindemittel, insbesondere Beton, mit Abstand zur Schienenbefestigungsplattenunterseite eingebaut, in welche Gleistragplatte 7 die Dübel 6 zumindest größtenteils eingegossen werden. Schließlich wird die Verbindung zwischen Schienebefestigungsplatte 5 und Dübel 6 bis zum ausreichenden Aushärten des hydraulisch gebundenen Bindemittels gelöst, wonach die Fahrschienen 4 nach einem endgültigen Einrichten bzgl. ihrer räumlichen Lage, mit einer Vergußmasse 8 untergossen und über die Schienenbefestigungsplatten 5 an der Gleistragplatte 7 mittels Befestigungsschrauben 9 festgelegt werden.It is proposed a method for producing a
Die Vorrichtung zur Durchführung des erfindungsgemäßen Verfahrens umfaßt eine Vorrichtung zur Schienenbefestigung an einer Gleistragplatte 7 für eine feste Fahrbahn für Schienenfahrzeuge mit einer einerseits an einer Fahrschiene 4 befestigbaren und anderseits an der Gleitragplatte 7 verankerbaren Schienenbefestigungsplatte 5. Diese Schienenbefestigungsplatte 5 nimmt in einer Befestigungsbohrung 10 wechselweise eine in die Befestigungsbohrung 10 eingesetzte Führungsschraube 11, die eine Distanzbuchse 12 durchragt und in einen Dübel 6 eingreift (
Das der Erfindung zugrunde liegende Herstellungsverfahren erfolgt beispielsweise in folgenden Schritten:
- Die
Fahrschienen mit Spurhaltern 17 werden in der Werkstätte für das jeweilige Baulos vorbereitet, wobei üblicherweise Joche mit einer Länge von rund 18 m zum Einsatz gebracht werden. An der Baustelle werden diese vormontierten Joche auf vorbereitete Auflager 2 aufgelegt und bezüglich ihrer Höhenlage beispielsweise mit Hartholzkeilen eingerichtet (Fig. 2 ). Die seitliche Stabilisierung kann mit Streben gegen das benachbarte Straßenbankett hin erfolgen. In diesem Zwischenbauzustand ist es möglich, das Gleis mit Schienenfahrzeugen in Schrittgeschwindigkeit zu befahren. Dabei ist zu berücksichtigen, daß sich das Gleis durch dieses Befahren sowohl in der Höhe als auch seitlich durch Setzungen der Auflagerpunkte verändern kann.
- The rails with
track holders 17 are prepared in the workshop for the respective lot, usually yokes are used with a length of about 18 m for use. At the construction site, these preassembled yokes are placed onprepared supports 2 and set up with respect to their altitude, for example with hardwood wedges (Fig. 2 ). The lateral stabilization can be done with struts against the adjacent street banquet. In this intermediate state, it is possible to travel the track with rail vehicles at walking speed. It should be noted that the track can change by this driving both in height and laterally by settling of the support points.
In einer weiteren Bauphase (
Nun wird das hydraulische Bindemittel, der Beton, der Gleistragplatte 7 bis rund 10 mm unter Oberkante Dübel bzw. 10 mm unter Unterkante Distanzbuchse 12 eingebaut (
Kurzfristig nach dem Einbau des Betons der Gleistragplatte 7, insbesondere wenn dieser eine Grünstandsfestigkeit erreicht hat, werden die Führungsschrauben 11 gelöst, der Dübel 6 gegebenenfalls noch ein wenig in den frischen Beton eingedrückt und die Distanzbuchse 12 durch seitliches Herausziehen zwischen Gleistragplatte 7 und Schienenbefestigungsplatte 5 entnommen (
In der nächsten Bauphase werden nach dem Abbinden der Gleistragplatte 7 provisorische Verkeilungen auf der neuen Gleistragplatte 7 genutzt, um das Gleis bei exakt bzw. seiner endgültigen Lage einzurichten. Anschließend wird das Gleis mit den an den Schienen vormontierten Schienenbefestigungsplatten 5 mit den in die Gleistragplatte 7 eingegossenen Dübeln 6 verschraubt und gegen die Verkeilung gepreßt. Lediglich für ein gegebenenfalls erforderliches Längsverschieben der Schienenfestigungsplatten 5 an der Schiene ist bei Bedarf ein Lösen der Klemmschrauben 20 der Schienenbefestigungsplatten 5 und gegebenenfalls eine seitliche Korrektur der Befestigungsplatten mittels der Führung 14 und dem Zahnprofil zwischen Klemmbacken 15 und Schienenbefestigungsplatte 5 möglich. Eine komplette Demontage und Neuzusammeristellung der Schienenbefestigung, wie bisher üblich, kann somit ersatzlos entfallen. Zur seitlichen Feinkorrektur werden die in die Befestigungsbohrungen 10 eingesetzten Exzenterhülsen 13 verwendet, welche eine seitliche Korrektur von rund ± 7 mm ermöglichen. Zusätzlich besteht die Möglichkeit, die Klemmbacken 15 in einer Rast um je rund 4 mm seitlich zu korrigieren bzw. für unterschiedliche Schienenfußbreiten einzusetzen. Wird mit beispielsweise zwei verschiedenen Schienenklemmbacken 15 mit zueinander in Richtung der Führung 14 um einen halben Zahnabstand versetzter Rast gearbeitet, kann die Seitenlage der Schiene über die Klemmbacken 15 in 2 mm Schritten korrigiert werden. Diese Art der Klemmbacken 15 ermöglicht es zudem, mit dem gleichen System unterschiedliche Schienen, insbesondere mit unterschiedlichen Schienenfußbreiten in Schrittweite 2 mm zu verbauen. Anschließend wird neben den Schienensträngen eine verlorene Schalung 18 für die Vergußmasse 8, beispielsweise aus Beton gefertigt und das justierte Gleis durch vollständiges Untergießen der Schiene 4 mit der Vergußmasse 8, insbesondere Gußasphalt, in Lage und Höhe endgültig fixiert (
Zur Fertigstellung wird abschließend der Straßenbelag 19 aufgebaut (
Claims (5)
- Method for producing a ballast-less track (1) for rail vehicles, wherein prefabricated bearings (2) are laid on a substructure (3) and form the support points for the running rails (4) which can already be travelled upon when the ballast-less track is in a shell construction and are supported and arranged on the bearings (2) together with the rail fastening, whereupon a track supporting layer (7) consisting of a hydraulically bonded binder is mounted on the substructure (3), wherein the rail fastening plates (5) of the running rails (4) supported on the bearings (2) are provided with anchor fittings (6) for the rail fastening to the track supporting layer (7) at a spaced disposition with respect to the lower side of the rail fastening plates, in further operating steps the track supporting layer (7) consisting of a hydraulically bonded binder is mounted on the substructure (3) at a spaced disposition with respect to the lower side of the rail fastening plates, wherein the anchor fittings (6) are at least for the most part cast into the track supporting layer (7), characterised in that the connection between the rail fastening plate (5) and the anchor fittings (6) disposed at a spaced disposition with respect to the lower side of the rail fastening plates is then released in order to mechanically decouple the running rails (4) and the track supporting layer (7) until the hydraulically bonded binder has sufficiently hardened, and in that subsequently the running rails (4) are fixed to the track supporting layer (7) after final adjustment with respect to their spatial position above the rail fastening plates (5) and a casting compound (8) is cast underneath the running rails.
- Method as claimed in Claim 1, characterised in that the running rails (4) are mounted so as to at least substantially freely oscillate between the bearings (2) from the time of release of the connection between the rail fastening plate (5) and the anchor fittings (6) until the hydraulically bonded binder has sufficiently hardened.
- Method as claimed in Claim 1 or 2, characterised in that the running rails (4), the rail fastening plates (5) and optionally the bearings (2) form laying units which are combined to form lengths of track and are moved into position one after the other on the substructure (3) and are connected or welded together.
- Method as claimed in any one of Claims 1 to 3, characterised in that, after laying a track section, the running rails (4) are corrected in terms of their position, in particular their lateral position before the track supporting layer (7) is mounted.
- Method as claimed in any one of Claims 1 to 4, characterised in that the running rails (4) are supported on the track supporting layer (7) together with the rail fastening plates (5) by means of adjusting devices at least until the casting compound (8) has hardened.
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT0128406A AT503599B1 (en) | 2006-07-28 | 2006-07-28 | Method for manufacturing firm track for rail vehicles involves providing rail fastening plates on supports for supporting rails with anchor fittings for fixing rail at track support plate at distance |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1882777A1 EP1882777A1 (en) | 2008-01-30 |
EP1882777B1 true EP1882777B1 (en) | 2010-11-24 |
Family
ID=38610592
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP07014775A Not-in-force EP1882777B1 (en) | 2006-07-28 | 2007-07-27 | Method for making a balastless track for a railway |
Country Status (3)
Country | Link |
---|---|
EP (1) | EP1882777B1 (en) |
AT (2) | AT503599B1 (en) |
DE (1) | DE502007005731D1 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160061549A (en) * | 2014-11-21 | 2016-06-01 | 빌트원 주식회사 | A track panel for assembly of base plate |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE102010020801B4 (en) | 2010-05-18 | 2013-03-14 | Wirthwein Ag | rail fastening |
DE102011108093B4 (en) * | 2011-07-19 | 2020-03-05 | Siemag Tecberg Gmbh | Precast lane for inclined conveyor system for mining trucks |
CN109879166A (en) * | 2019-03-09 | 2019-06-14 | 中国水利水电第五工程局有限公司 | A fast track changing device for cross-shaped cross track of large gantry crane |
CN112048947A (en) * | 2019-06-06 | 2020-12-08 | 河南森源重工有限公司 | Guide rail precision adjusting device and guide rail system |
AT525562B1 (en) * | 2022-02-04 | 2023-05-15 | Porr Bau Gmbh | Track layout and track layout system |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1577384A (en) * | 1924-10-23 | 1926-03-16 | Stoye Lothar | Railway tie and rail-securing means |
DE10000227A1 (en) | 1999-03-19 | 2000-10-19 | Gsg Knape Gleissanierung Gmbh | Permanent way production method comprises producing running section consisting of rails and sleepers, inserting rods into concrete bearing layer, adjusting running section, fixing it to rods, pouring upper bearing layer and adding revetment |
AT500982B8 (en) * | 2003-04-23 | 2007-02-15 | Rte Technologie Gmbh | METHOD FOR LAYING A TRACK OF A FIXED RAILWAY |
DE10328895A1 (en) * | 2003-06-26 | 2005-01-20 | Rte Technologie Gmbh | Method for producing a rail track for rail vehicles |
DK1528151T3 (en) * | 2003-10-31 | 2008-01-21 | Stadt Zuerich Verkehrsbetr E Z | Rails fastener |
AT7942U3 (en) * | 2005-06-02 | 2006-07-15 | Vae Gmbh | DEVICE FOR DETERMINING VARIABLE RAIL FASTENINGS |
-
2006
- 2006-07-28 AT AT0128406A patent/AT503599B1/en not_active IP Right Cessation
-
2007
- 2007-07-27 AT AT07014775T patent/ATE489503T1/en active
- 2007-07-27 EP EP07014775A patent/EP1882777B1/en not_active Not-in-force
- 2007-07-27 DE DE502007005731T patent/DE502007005731D1/en active Active
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
KR20160061549A (en) * | 2014-11-21 | 2016-06-01 | 빌트원 주식회사 | A track panel for assembly of base plate |
Also Published As
Publication number | Publication date |
---|---|
DE502007005731D1 (en) | 2011-01-05 |
EP1882777A1 (en) | 2008-01-30 |
AT503599B1 (en) | 2007-11-15 |
ATE489503T1 (en) | 2010-12-15 |
AT503599A4 (en) | 2007-11-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1417379B1 (en) | Method for the continuous laying of a rail on a rigid track, in addition to an alignment device and a rigid track | |
EP0735189B1 (en) | Method for producing a ballastless track superstrucure for at least one railway track | |
EP1888843A1 (en) | Ballastless track for rail vehicles | |
EP1882777B1 (en) | Method for making a balastless track for a railway | |
EP0663470B1 (en) | Process for obtaining a superstructure for railway tracks | |
EP1026320B1 (en) | Method for building a ballastless track | |
DE10004194C2 (en) | Process for the production of a fixed railroad track on a bridge | |
AT520614B1 (en) | Process for the production of a carriageway slab with precast slabs underneath | |
WO2003104562A1 (en) | Precast concrete part and method | |
EP2166149B1 (en) | Unit of railway structure part | |
EP0905319A2 (en) | Railway track and its construction method | |
EP1216326B1 (en) | Method for producing a soundproofed track | |
DE19952803C2 (en) | Superstructure for rail-bound public transport vehicles and method and device for its manufacture | |
AT500876B1 (en) | METHOD FOR MANUFACTURING A FIXED RAILWAY RAILWAY | |
DE102004019083A1 (en) | Method for laying rail track on uneven ground especially in tunnels using integral alignment means which are removed after the sleepers are secured with poured concrete | |
EP2010713B1 (en) | Track and method for production of prefabricated concrete panels | |
EP1636424B1 (en) | Method for producing a rail track for rail vehicles | |
DE10216573B4 (en) | Method for storing a concrete component and slab track | |
WO2018121902A1 (en) | Trough-shaped superstructure for a bridge, bridge, finished part for a trough wall of a bridge, and method for producing a bridge | |
DE10221626A1 (en) | Permanent way track for a magnetically levitating train has steel carrier units for the stator assembly, at the support structure, with exact positioning of the stator sections | |
DE4428163C1 (en) | Method for construction of permanent way in points area | |
DE19753747A1 (en) | Method for producing solid rail bed | |
CH703860A2 (en) | Road with a pavement slab. | |
DE19963664A1 (en) | Twin block concrete sleeper has reinforcements which protrude partially from it, additional concrete blocks being cast around protruding sections before sleeper is anchored in place by embedding in concrete | |
DE102004037941A1 (en) | Road bridge of prefabricated components, which can be dismantled, has sleeves and pins to fasten and/or position the concrete slabs at the substructure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL BA HR MK YU |
|
17P | Request for examination filed |
Effective date: 20080123 |
|
17Q | First examination report despatched |
Effective date: 20080313 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: VERKEHRSBETRIEBE ZUERICH |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC MT NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REF | Corresponds to: |
Ref document number: 502007005731 Country of ref document: DE Date of ref document: 20110105 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: E. BLUM & CO. AG PATENT- UND MARKENANWAELTE VSP |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: VDEP Effective date: 20101124 |
|
LTIE | Lt: invalidation of european patent or patent extension |
Effective date: 20101124 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110324 Ref country code: NL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110224 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110324 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110225 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20110307 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20110825 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 502007005731 Country of ref document: DE Effective date: 20110825 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 |
|
BERE | Be: lapsed |
Owner name: VERKEHRSBETRIEBE ZURICH Effective date: 20110731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110731 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20110727 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20120330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120201 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110731 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110801 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 502007005731 Country of ref document: DE Effective date: 20120201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110727 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20110727 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 489503 Country of ref document: AT Kind code of ref document: T Effective date: 20120731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20101124 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20120731 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 20140605 Year of fee payment: 8 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150731 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150731 |