EP1876254A1 - Tube en acier epais sans soudure pour tuyau de canalisation et son procede de production - Google Patents
Tube en acier epais sans soudure pour tuyau de canalisation et son procede de production Download PDFInfo
- Publication number
- EP1876254A1 EP1876254A1 EP06728830A EP06728830A EP1876254A1 EP 1876254 A1 EP1876254 A1 EP 1876254A1 EP 06728830 A EP06728830 A EP 06728830A EP 06728830 A EP06728830 A EP 06728830A EP 1876254 A1 EP1876254 A1 EP 1876254A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- pipe
- temperature
- cooling
- heating
- seamless
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 229910000831 Steel Inorganic materials 0.000 title claims abstract description 70
- 239000010959 steel Substances 0.000 title claims abstract description 70
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 41
- 238000001816 cooling Methods 0.000 claims abstract description 96
- 238000010438 heat treatment Methods 0.000 claims abstract description 76
- 239000000203 mixture Substances 0.000 claims abstract description 26
- 239000000126 substance Substances 0.000 claims abstract description 23
- 239000012535 impurity Substances 0.000 claims abstract description 14
- 229910052719 titanium Inorganic materials 0.000 claims abstract description 8
- 229910052698 phosphorus Inorganic materials 0.000 claims abstract description 7
- 229910052717 sulfur Inorganic materials 0.000 claims abstract description 7
- 229910052758 niobium Inorganic materials 0.000 claims abstract description 6
- 229910052757 nitrogen Inorganic materials 0.000 claims abstract description 6
- 229910052804 chromium Inorganic materials 0.000 claims abstract description 5
- 229910052748 manganese Inorganic materials 0.000 claims abstract description 5
- 229910052750 molybdenum Inorganic materials 0.000 claims abstract description 5
- 229910052759 nickel Inorganic materials 0.000 claims abstract description 5
- 229910052710 silicon Inorganic materials 0.000 claims abstract description 5
- 229910052796 boron Inorganic materials 0.000 claims abstract description 3
- 238000005096 rolling process Methods 0.000 claims description 23
- 238000009749 continuous casting Methods 0.000 claims description 12
- 238000005496 tempering Methods 0.000 claims description 12
- 238000005242 forging Methods 0.000 claims description 5
- ZOXJGFHDIHLPTG-UHFFFAOYSA-N Boron Chemical compound [B] ZOXJGFHDIHLPTG-UHFFFAOYSA-N 0.000 abstract description 2
- 238000000034 method Methods 0.000 description 35
- 238000001556 precipitation Methods 0.000 description 29
- 230000008569 process Effects 0.000 description 24
- 238000005266 casting Methods 0.000 description 23
- 239000000463 material Substances 0.000 description 20
- 238000007711 solidification Methods 0.000 description 20
- 230000008023 solidification Effects 0.000 description 20
- 230000000694 effects Effects 0.000 description 18
- 238000012360 testing method Methods 0.000 description 14
- 238000010791 quenching Methods 0.000 description 12
- 230000000171 quenching effect Effects 0.000 description 12
- 238000005728 strengthening Methods 0.000 description 11
- 230000006866 deterioration Effects 0.000 description 10
- 238000003303 reheating Methods 0.000 description 10
- 238000004088 simulation Methods 0.000 description 10
- 230000009466 transformation Effects 0.000 description 9
- 239000002244 precipitate Substances 0.000 description 7
- 229910001566 austenite Inorganic materials 0.000 description 6
- 238000009533 lab test Methods 0.000 description 6
- 239000012071 phase Substances 0.000 description 6
- 229910052761 rare earth metal Inorganic materials 0.000 description 5
- 230000009467 reduction Effects 0.000 description 5
- 230000002829 reductive effect Effects 0.000 description 5
- 238000007493 shaping process Methods 0.000 description 5
- 229910045601 alloy Inorganic materials 0.000 description 4
- 239000000956 alloy Substances 0.000 description 4
- 229910052799 carbon Inorganic materials 0.000 description 4
- 239000006185 dispersion Substances 0.000 description 4
- 239000003921 oil Substances 0.000 description 4
- 230000000717 retained effect Effects 0.000 description 4
- 229910001563 bainite Inorganic materials 0.000 description 3
- 230000007797 corrosion Effects 0.000 description 3
- 238000005260 corrosion Methods 0.000 description 3
- 239000007789 gas Substances 0.000 description 3
- 238000005098 hot rolling Methods 0.000 description 3
- 230000006872 improvement Effects 0.000 description 3
- 229910000734 martensite Inorganic materials 0.000 description 3
- 239000000047 product Substances 0.000 description 3
- 229920006395 saturated elastomer Polymers 0.000 description 3
- 239000006104 solid solution Substances 0.000 description 3
- 238000009864 tensile test Methods 0.000 description 3
- ATJFFYVFTNAWJD-UHFFFAOYSA-N Tin Chemical compound [Sn] ATJFFYVFTNAWJD-UHFFFAOYSA-N 0.000 description 2
- 230000007547 defect Effects 0.000 description 2
- 230000002542 deteriorative effect Effects 0.000 description 2
- 230000005484 gravity Effects 0.000 description 2
- 239000002184 metal Substances 0.000 description 2
- 229910052751 metal Inorganic materials 0.000 description 2
- 238000013508 migration Methods 0.000 description 2
- 230000005012 migration Effects 0.000 description 2
- 230000006911 nucleation Effects 0.000 description 2
- 238000010899 nucleation Methods 0.000 description 2
- 239000003208 petroleum Substances 0.000 description 2
- 238000009628 steelmaking Methods 0.000 description 2
- 229910052720 vanadium Inorganic materials 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- OKTJSMMVPCPJKN-UHFFFAOYSA-N Carbon Chemical compound [C] OKTJSMMVPCPJKN-UHFFFAOYSA-N 0.000 description 1
- UFHFLCQGNIYNRP-UHFFFAOYSA-N Hydrogen Chemical compound [H][H] UFHFLCQGNIYNRP-UHFFFAOYSA-N 0.000 description 1
- 230000002411 adverse Effects 0.000 description 1
- QVGXLLKOCUKJST-UHFFFAOYSA-N atomic oxygen Chemical compound [O] QVGXLLKOCUKJST-UHFFFAOYSA-N 0.000 description 1
- 238000013142 basic testing Methods 0.000 description 1
- 230000000052 comparative effect Effects 0.000 description 1
- 238000009833 condensation Methods 0.000 description 1
- 230000005494 condensation Effects 0.000 description 1
- 230000001276 controlling effect Effects 0.000 description 1
- 229910052802 copper Inorganic materials 0.000 description 1
- 238000005336 cracking Methods 0.000 description 1
- 239000010779 crude oil Substances 0.000 description 1
- 239000013078 crystal Substances 0.000 description 1
- 238000013461 design Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 238000009792 diffusion process Methods 0.000 description 1
- 239000012530 fluid Substances 0.000 description 1
- 239000000446 fuel Substances 0.000 description 1
- 229910052739 hydrogen Inorganic materials 0.000 description 1
- 239000001257 hydrogen Substances 0.000 description 1
- 238000009863 impact test Methods 0.000 description 1
- 230000000670 limiting effect Effects 0.000 description 1
- 238000003754 machining Methods 0.000 description 1
- 239000003129 oil well Substances 0.000 description 1
- 238000005457 optimization Methods 0.000 description 1
- 229910052760 oxygen Inorganic materials 0.000 description 1
- 239000001301 oxygen Substances 0.000 description 1
- 230000001105 regulatory effect Effects 0.000 description 1
- 230000002441 reversible effect Effects 0.000 description 1
- 229910052706 scandium Inorganic materials 0.000 description 1
- 239000013535 sea water Substances 0.000 description 1
- 239000007787 solid Substances 0.000 description 1
- 239000007790 solid phase Substances 0.000 description 1
- 229910052727 yttrium Inorganic materials 0.000 description 1
Classifications
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/001—Ferrous alloys, e.g. steel alloys containing N
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/002—Ferrous alloys, e.g. steel alloys containing In, Mg, or other elements not provided for in one single group C22C38/001 - C22C38/60
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/02—Ferrous alloys, e.g. steel alloys containing silicon
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/04—Ferrous alloys, e.g. steel alloys containing manganese
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/06—Ferrous alloys, e.g. steel alloys containing aluminium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/42—Ferrous alloys, e.g. steel alloys containing chromium with nickel with copper
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/44—Ferrous alloys, e.g. steel alloys containing chromium with nickel with molybdenum or tungsten
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/46—Ferrous alloys, e.g. steel alloys containing chromium with nickel with vanadium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/50—Ferrous alloys, e.g. steel alloys containing chromium with nickel with titanium or zirconium
-
- C—CHEMISTRY; METALLURGY
- C22—METALLURGY; FERROUS OR NON-FERROUS ALLOYS; TREATMENT OF ALLOYS OR NON-FERROUS METALS
- C22C—ALLOYS
- C22C38/00—Ferrous alloys, e.g. steel alloys
- C22C38/18—Ferrous alloys, e.g. steel alloys containing chromium
- C22C38/40—Ferrous alloys, e.g. steel alloys containing chromium with nickel
- C22C38/58—Ferrous alloys, e.g. steel alloys containing chromium with nickel with more than 1.5% by weight of manganese
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B19/00—Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work
- B21B19/02—Tube-rolling by rollers arranged outside the work and having their axes not perpendicular to the axis of the work the axes of the rollers being arranged essentially diagonally to the axis of the work, e.g. "cross" tube-rolling ; Diescher mills, Stiefel disc piercers or Stiefel rotary piercers
- B21B19/04—Rolling basic material of solid, i.e. non-hollow, structure; Piercing, e.g. rotary piercing mills
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B21—MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
- B21B—ROLLING OF METAL
- B21B23/00—Tube-rolling not restricted to methods provided for in only one of groups B21B17/00, B21B19/00, B21B21/00, e.g. combined processes planetary tube rolling, auxiliary arrangements, e.g. lubricating, special tube blanks, continuous casting combined with tube rolling
-
- C—CHEMISTRY; METALLURGY
- C21—METALLURGY OF IRON
- C21D—MODIFYING THE PHYSICAL STRUCTURE OF FERROUS METALS; GENERAL DEVICES FOR HEAT TREATMENT OF FERROUS OR NON-FERROUS METALS OR ALLOYS; MAKING METAL MALLEABLE, e.g. BY DECARBURISATION OR TEMPERING
- C21D8/00—Modifying the physical properties by deformation combined with, or followed by, heat treatment
- C21D8/10—Modifying the physical properties by deformation combined with, or followed by, heat treatment during manufacturing of tubular bodies
Definitions
- the present invention relates to a heavy wall seamless steel pipe for line pipe excellent in strength, toughness and weldability, and a manufacturing method thereof.
- the heavy wall seamless steel pipe means a seamless steel pipe having a wall thickness of 25 mm or more.
- the seamless steel pipe of the present invention is a high-strength, high-toughness heavy wall seamless steel pipe for line pipe having a strength of not less than X70 regulated in API (American Petroleum Institute) Standard, that is, a strength of X70 (yield strength of 482 MPa or more), X80 (yield strength of 551 MPa or more), X90 (yield strength of 620 MPa or more), X100 (yield strength of 689 MPa or more), and X120 (yield strength of 827 MPa or more), which is particularly suitably used for submarine flow lines.
- API American Petroleum Institute
- An inner part of a pipe constituting the flow line laid in the deep sea suffers a high internal fluid pressure in addition to a deep stratum pressure, and is also subjected to repeated strains by ocean waves and influenced by the sea water pressure of the deep sea at the time of shutdown. Therefore, a heavy wall steel pipe with high strength and toughness is desired as the pipe used for this purpose.
- Such a seamless steel pipe with high strength and toughness has been manufactured by piercing a billet heated to high temperature by a piercing mill, shaping into a pipe shape of product by rolling and drawing, and then performing heat treatment.
- simplification of the manufacturing process by applying an in-line heat treatment has been examined from the viewpoint of energy and process saving.
- a process for performing quenching without once cooling beforehand to room temperature has been introduced. According to this method, substantial energy saving and increased efficiency of the manufacturing process can be attained, enabling significant reduction in manufacturing cost.
- a steel pipe manufactured in the in-line heat treatment process of performing quenching directly after finish rolling has not been subjected to transformation and reverse transformation since, unlike in the past, it is not reheated after once cooling to room temperature and rolling. Therefore, the grains are apt to be coarsened, and it is not easy to ensure the toughness and corrosion resistance.
- Patent Document 1 Japanese Patent Unexamined Publication 2001-240913 discloses a technique for making fine grains by adjusting the leading time to let it into the reheating furnace after finish rolling.
- Patent Document 2 Japanese Patent Unexamined Publication 2000-104117 discloses a technique for adjusting the chemical composition, particularly, the contents of Ti and S to provide a satisfactory performance even with a relatively large grain size.
- Patent Document 1 cannot respond to manufacture of a heavy wall steel pipe with high strength for offshore oil fields in depth, which has been increasingly demanded in recent years.
- the heavy wall steel pipe requires a high finish rolling temperature, and it takes an excessive time to ensure an intended reheating furnace temperature, and seriously reduces the production efficiency.
- the method described in Patent Document 2 is also hardly applicable to heavy wall materials. Since the cooling rate in the in-line heat treatment is reduced in the case of heavy wall materials, the toughness is deteriorated even if steel of the composition disclosed in Patent Document 2 is applied.
- Precipitation strengthening deteriorates the balance between strength and toughness in the case of in-line heat treatment materials. Although it is disadvantageous for obtaining a high strength, it is desirable to utilize the transformation strengthening and the solid-solution strengthening, without utilizing the precipitation strengthening, in order to obtain a high toughness,
- the Ti carbonitride that precipitated during casting is apt to coarsen with a reduced number of precipitated grains, since the precipitation is caused at a high temperature. Therefore, the capability of pinning the grains of the parent phase is reduced.
- the Ti carbonitride is finely precipitated with an increased number of precipitated grains during the heating of the billet in the subsequent pipe making process because the precipitation is occurred at a low temperature. If the number of precipitated grains is large, the effect of pinning the crystal grains of the parent phase is increased to suppress the coarse-graining of the parent phase. Accordingly, it is extremely important to properly control the cooling rate during casting.
- the Ti carbonitride precipitates in a high temperature range during cooling. However, this precipitate in an austenite range with relatively low dislocation causes few nucleation sites, which leads to a coarsely dispersed state. Once coarsely precipitated, the Ti carbonitride cannot be finely dispersed since it is hardly dissolved in a solid phase.
- the cast ingot has no Ti carbonitride , but Ti in a dissolved state.
- the Ti carbonitride precipitates at a relatively low temperature during the subsequent heating for hot working. Since, during heating, the Ti carbonitride precipitates at a low temperature in a bainite structure with high dislocation, the Ti carbonitride precipitates as being finely dispersed with many nucleation sites. It was also found that an excessively high heating rate makes fine precipitation difficult because of the precipitation in a high temperature range.
- Ti carbonitride it is also effective for the sufficiently fine precipitation of Ti carbonitride to execute isothermal treatment in a proper temperature range during heating.
- the Ti carbonitride once finely precipitated is hardly coarsened , and even if blooming is executed, the effect of suppressing the coarse-graining can be exhibited.
- the dissolved Ti in solidification should preferably be present more than that in the case of executing without blooming.
- the C content is limited to not more than 0.08%.
- the upper limit of the Si content is set to not more than 0.25%, preferably to not more than 0.15%, and more preferably to not more than 0.10%.
- Ti content needs to be controlled in a narrow range of 0.004 to 0.010% suitable to precipitate as fine Ti carbonitride, without precipitation in the solidification, during the subsequent billet heating.
- an addition of Nb is not performed in the case of an in-line heat treatment since it causes strength dispersion in addition to deterioration of the toughness, and the upper limit as an impurity is preferably set to not more than 0.005%. Since V also deteriorates the toughness, it is not added, or should be controlled to not more than 0.08% if included.
- Mn, Cr, Ni, Mo and Cu should be selectively adjusted according to the intended strength, considering the toughness and weldability.
- A1 is added for deoxidation. It is also effective to selectively add at least one of Ca, Mg and REM to ensure the casting characteristic or improve the toughness. Further, the content of N needs to be controlled in a narrow range in order to precipitate stable Ti carbonitride.
- the Ti carbonitride is not precipitated immediately after solidification if the contents of C, Ti, and N are set to the above ranges. However, since a coarse-grained Ti carbonitride is precipitated if the subsequent cooling rate is low, the cooling after solidification needs to be performed at a specified rate or more.
- a continuous casting to a billet with a circular cross section (hereinafter, refers to "a round billet”) is ideal, but a process of continuously casting to a square mold or casting thereto as an ingot, and then blooming to the round billet can be adapted.
- the round billet is reheated to a hot workable temperature and piercing, drawing and shaping rolling are performed thereto. If the dissolved Ti is sufficiently present, the Ti carbonitride is precipitated during reheating. Since the precipitation temperature is relatively low, remarkably fine Ti carbonitride is precipitated, compared with the precipitation during cooling after solidification. Since the number of grains of the finely precipitated Ti carbonitride is large, grain migration during heating or holding the billet can be suppressed to prevent the coarse-graining. A quick heating causes no fine precipitation at low temperature so that the effect of preventing the coarse-graining cannot be obtained. Therefore, a gentle heating or a holding in a middle stage is required to promote a precipitation of fine-grained Ti carbonitride.
- the present invention according to the above-mentioned basic ideas involves the following seamless steel pipes for line pipe (1) and (2) and the following methods of manufacturing a seamless steel pipe for line pipe (3) to (6).
- a heavy wall seamless steel pipe for line pipe with high strength and increased toughness which has a chemical composition, by mass%, that consists of C: 0.03 to 0.08%, Si: not more than 0.25%, Mn:0.3 to 2.5%, Al: 0.001 to 0.10%, Cr: 0.02 to 1.0%, Ni: 0.02 to 1.0%, Mo: 0.02 to 1.2%, Ti:0.004 to 0.010%, N:0.002 to 0.008%, and 0.0002 to 0.005%, in total, of at least one selected from Ca, Mg and REM, and the balance Fe and impurities, optionally including V: 0 to 0.08%, Nb: 0 to 0.05% or Cu: 0 to 1.0%,and that P and S among impurities are not more than 0.05% and not more than 0.005% respectively.
- a heavy wall seamless steel pipe for line pipe with high strength and increased toughness which has 0.0003 to 0.01% of boron in addition to the chemical composition above.
- a method of manufacturing a heavy wall seamless steel pipe for line pipe with high strength and increased toughness characterized by comprising the following steps (a) to (e):
- a method of manufacturing a heavy wall seamless steel pipe for line pipe with a high strength and increased toughness characterized by comprising the following steps (a) to (f):
- a method of manufacturing a heavy wall seamless steel pipe for line pipe with a high strength and increased toughness characterized by comprising the following steps (a) to (e):
- a method of manufacturing a heavy wall seamless steel pipe for line pipe with a high strength and increased toughness characterized by comprising the following steps (a) to (f):
- C is an important element for ensuring the strength of steel.
- a content of not less than 0.03% is needed in order to improve the hardenability and strength in a heavy wall material. Since a content exceeding 0.08% causes deterioration of toughness, the C content is set to 0.03 to 0.08%.
- Si has an effect as a deoxidizer in steel production, but it is better to add as little as possible. Because it seriously deteriorates the toughness, particularly, of a heavy wall material. If the content of Si exceeds 0.25%, the toughness of the heavy wall material is remarkably deteriorated. Therefore, the content is set to 0.25% or less if it is added as the deoxidizer. A content of 0.15% or less enables further improvement in toughness. The content is most desirably controlled to less than 0.10%. Although it is difficult to extremely reduce Si as impurity from the point of the steel making process, extremely satisfactory toughness can be obtained if the content is limited to less than 0.05%.
- Mn needs to be included in a relatively large quantity since it enhances the hardenability and therefore strengthens the center even in a heavy wall material and also enhances the toughness.
- a content of less than 0.3% cannot provide these effects, and a content exceeding 2.5% causes deterioration of the HIC resisting characteristic, therefore, the Mn content is set to 0.3 to 2.5%.
- Al is added as a deoxidizer in steel making. In order to obtain this effect, it needs to be added so as to have a content of not less than 0.001%. On the other hand, if the content of Al exceeds 0.10%, the inclusions are clustered, thereby deteriorating the toughness, and surface defects are frequently generated during the bevel face working of pipe ends. Therefore, the content of Al is set to 0.001 to 0.10 %. From the point of preventing the surface defects, it is desirable to provide an upper limit, and the upper limit is preferably set to 0.03% and more preferably to 0.02%. Since a high deoxidation effect by the addition of Si cannot be expected in the steel pipe of the present invention, the lower limit of Al content is preferably set to 0.010% for sufficient deoxidation..
- Cr is an element that improves the hardenability and strength of steel in a heavy wall material. The effect becomes remarkable when 0.02% or more of Cr is included. However, since an excessive content thereof causes some deterioration of toughness, the content is limited to 1.0% or less.
- Ni is an element that improves the hardenability and strength of steel in a heavy wall material. The effect becomes remarkable when 0.02% or more of Ni is included. However, since Ni is an expensive element, and the effect is saturated if it is excessively included, the upper limit thereof is set to 1.0%.
- Mo is an element that improves the strength of steel by transformation strengthening and solid-solution strengthening. The effect becomes remarkable when 0.02% or more of Mo is included. However, since an excessive addition thereof causes deterioration of the toughness, the upper limit is set to 1.2%.
- the content of Ti needs to be controlled in a narrow range of 0.004% to 0.010% suitable to precipitate as fine Ti carbonitride, without precipitation in the solidification, during the subsequent billet heating. If the content is less than 0.004%, a sufficient number of precipitated grains of the Ti carbonitride cannot be ensured, and if it exceeds 0.010%, the Ti carbonitride is coarsely precipitated in the cooling after solidification. Therefore, a proper content of Ti is 0.004 to 0.010%.
- N needs to be included in a content of 0.002% or more to ensure finely dispersed Ti carbonitride. Since a content exceeding 0.008% results in precipitation of coarse-grained Ti carbonitride in the solidification, the content needs to be controlled in a narrow range of 0.002 to 0.008%.
- V is an element whose content is to be determined depending on the balance between strength and toughness. If sufficient strength can be ensured by other alloy elements, increased toughness can be obtained without the addition thereof.
- the content is preferably set to 0.02% or more. Since the toughness is seriously deteriorated if the content exceeds 0.08%, the upper limit of the content is set to 0.08% if added.
- Nb is remarkably effective for suppressing the coarse-graining during heating for quenching in the case of an off-line heat treatment.
- Nb is desirably included in a content of 0.005% or more.
- the upper limit is set to 0.05%.
- the allowable upper limit should be set to 0.005%.
- Cu does not need to be added. However, it can be added, if improvement in the HIC resisting characteristic (hydrogen-induced cracking resisting characteristic) is intended, since it has an effect of improving the HIC resisting characteristic.
- the minimum content that improves the HIC characteristic is 0.02%. Since the effect is saturated even with a content that exceeds 1.0%, the content may be set to 0.02 to 1.0% if added.
- Ca, Mg, and REM 00002 to 0.005%, in total of at least one selected therefrom.
- These elements are added for the purpose of improving the toughness and the corrosion resistance by shape controlling of inclusions and for the purpose of suppressing nozzle clogging in casting to improve the casting characteristic.
- a content of 0.0002% or more, in total of at least one selected therefrom is needed. If the content exceeds 0.005%, in total of at least one selected therefrom, not only the effects are saturated, but also the inclusions are easily clustered, thereby somewhat deteriorating the toughness and the HIC resisting characteristic. Therefore, when one of these elements are added, each content is set to 0.0002 to 0.005%, and when two or more selected therefrom are added, the total content is set to 0.0002 to 0.005%.
- REM means 17 elements that include lanthanoide elements, Y and Sc.
- B does not need to be added. However, since addition thereof leads to improvement in hardenability even if it is a trace, the addition is effective when further high strength is needed. In order to obtain this effect, a content of 0.0003% or more is desirable. However, since an excessive addition thereof causes deterioration of the toughness, the content of B is set to 0.01% or less if added.
- the steel pipe for line pipe of the present invention contains the above chemical composition and the balance Fe and impurities.
- the upper limits of content of P and C among the impurities should be controlled as follows.
- P is an impurity element that deteriorates the toughness, and the content is preferably as little as possible. Since a content exceeding 0.05% causes remarkable deterioration of the toughness, the allowable upper limit is set to 0.05%.
- the content of P is preferably 0.02% or less and, further preferably, 0.01% or less.
- S is also an impurity element that deteriorates the toughness, and the content is preferably as little as possible. Since a content exceeding 0.005% causes remarkable deterioration of the toughness, the allowable upper limit is set to 0.005%.
- the content of S is preferably 0.003% or less and, further preferably, 0.001% or less.
- a continuous casting to a round billet shape is ideal for the manufacturing process, however, a process for continuously casting to a square mold or casting thereto as an ingot and then blooming to the round billet can be performed. In this case, it is important to further strictly control the cooling rate after solidification to suppress the precipitation of a coarse-grained TiN.
- An average cooling rate in a temperature range of 1400 to 1000°C, where the Ti carbonitride is apt to be generated after solidification, is required to be not less than 6°C /min in the case of casting to the round billet and to be not less than 8°C /min in the case of executing the blooming.
- the average cooling rate is more preferably set to be not less than 8°C /min in the case of casting to the round billet and to be not less than 10°C /min in the case of executing the blooming. In each case, no upper limit is provided since the larger average cooling rate is more desirable.
- the cooling rate of the bloom varies depending on portions of the bloom.
- the cooling rate is controlled at a place distant from a center by the distance of 1/2 of the radius.
- the cooling rate is controlled at a middle position between the center of gravity and the surface on a line passing the center of gravity of the square in parallel to the long sides thereof.
- the temperature can be measured by attaching a thermocouple, or instead, by numerical simulation corrected with the temperature history of the surface.
- the round billet is reheated to a hot workable temperature, and piercing, drawing and shaping rolling are performed thereto.
- the bloom or slab cast into a square cross section is reheated and then made into a round billet by forging or/and rolling, and piercing, drawing and shaping rolling are then performed thereto.
- a reheating temperature is required to be 1150°C or higher since hot deformation resistance is increased at a lower temperature than 1150°C, which increases flaws.
- the upper limit thereof is set to 1280°C, since a temperature exceeding 1280°C leads to an excessive increase in the heating fuel raw unit, and a reduction in yield by increased scale loss, which uneconomically shortened the life of the heating furnace, and the like. Since a lower heating temperature makes finer grains and increases the toughness, a preferable heating temperature is 1200°C or lower.
- the Ti carbonitride When the dissolved Ti is sufficiently present, the Ti carbonitride is precipitated during reheating, however, the precipitation occurs at a relatively low temperature, unlike the precipitation during the cooling after solidification. Therefore, the precipitated Ti carbonitride is much more fine-grained than the one during the cooling after solidification. An increased number of fine-grained Ti carbonitride are formed, and this suppresses the grain migration during heating the billet to prevent the coarse-graining. However, since rapid heating disables minute precipitation at a low temperature, the effect of preventing coarse-graining cannot be obtained.
- the average heating rate should be 15°C /min or less at a temperature between 550 and 900°C or that the isothermal treatment should be executed for 15 minutes or more at a temperature between 550 and 1000°C.
- the piercing, drawing and shaping rolling can be executed in the manufacturing conditions for a general seamless steel pipe.
- the quenching treatment is based on the in-line heat treatment of executing quenching, without once cooling to room temperature, in succession with hot rolling. However, if the reheating and the quenching are performed after cooling, finer grains are made, improving the toughness.
- the quenching is executed in succession with isothermal treatment in an isothermal furnace after the end of hot work, a steel pipe with minimized strength dispersion can be obtained.
- the necessary average cooling rate is 8°C /sec or more at a temperature between 800 and 500°C, more preferably, 10°C /sec or more, and most preferably not less than 15°C /sec.
- the cooling end temperature is also important for ensuring excellent toughness, in addition to the cooling rate. It is important to use a steel with an adjusted chemical composition and forcedly cool it to an end temperature of not higher than 100°C.
- the forced cooling is continuously performed, preferably to 80°C or lower, more preferably to 50°C or lower, and most preferably to 30°C or lower. According to this, the generation of transformation strengthened structure in which C is partially concentrated or retained austenite can be prevented, therefore, the toughness is significantly improved.
- tempering is performed at a temperature between 500 and 700°C.
- the tempering is performed in order to adjust the strength and improving the toughness.
- the holding time at the tempering temperature may be properly determined according the wall thickness or the like of the steel pipe, and is generally set to about 10 to 120 minutes.
- a JIS (Japan Industrial Standard) No. 12 tensile test piece for tensile test was prepared from each of the resulting steel pipes to measure tensile strength (TS) and yield strength (YS).
- the tensile test was carried out according to JIS Z 2241.
- As an impact test piece a V notch test piece of 10mm ⁇ 10mm, 2mm was prepared from the longitudinal direction of the heavy wall center according to No. 4 test piece of JIS Z 2202, and subjected to the test.
- Test No. 1 of Table 2 two examples of branch numbers of 1 and 2 are described.
- Steel A the invention, is used in 1-1 and 1-2, and the manufacturing condition of 1-1 is within the range restricted by the present invention, where increased toughness is obtained.
- the manufacturing condition of 1-2 is deviated from the manufacturing process defined by the present invention with an excessively high heating rate for pipe making, where increased toughness cannot be obtained.
- Each of Test Nos. 2 to 24 also has branch numbers 1 and 2, and the same steel grade is used in the same test number.
- the manufacturing condition of each branch number 1 is within the range restricted by the present invention, where increased toughness can be obtained.
- the manufacturing condition of each branch number 2 is deviated from the manufacturing process defined by the present invention, where increased toughness cannot be obtained.
- each branch number 1 corresponds to the manufacturing process within the range restricted by the present invention, where increased toughness is obtained.
- each branch number 2 is deviated from the manufacturing process defined by the present invention, where increased toughness is not obtained.
- Test Nos. 25 to 30 are examples of comparative steels that are deviated from the alloy composition range restricted by the present invention. Each of the steels is insufficient in toughness, and has insufficient performances as a line pipe requiring increased thickness and high toughness.
- a seamless steel pipe, even a heavy wall steel pipe, for line pipe excellent in toughness while having high strength such as yield strength of X70 class (yield strength of not less than 482 MPa), X80 class (yield strength of not less than 551 MPa), X90 class (yield strength of not less than 620 MPa), X100 class (yield strength of not less than 689 MPa), and X120 class (yield strength of not less than 827 MPa) can be manufactured.
- the seamless steel pipe of the present invention is a steel pipe that can be laid in a severer circumstance of the deep sea, particularly, for the use of a submarine flow line. The present invention is thus greatly contributable to stable supply of energies.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Materials Engineering (AREA)
- Mechanical Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Heat Treatment Of Steel (AREA)
- Heat Treatment Of Articles (AREA)
- Metal Extraction Processes (AREA)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
JP2005095240A JP4792778B2 (ja) | 2005-03-29 | 2005-03-29 | ラインパイプ用厚肉継目無鋼管の製造方法 |
PCT/JP2006/304613 WO2006103894A1 (fr) | 2005-03-29 | 2006-03-09 | Tube en acier epais sans soudure pour tuyau de canalisation et son procede de production |
Publications (3)
Publication Number | Publication Date |
---|---|
EP1876254A1 true EP1876254A1 (fr) | 2008-01-09 |
EP1876254A4 EP1876254A4 (fr) | 2012-08-01 |
EP1876254B1 EP1876254B1 (fr) | 2014-11-12 |
Family
ID=37053160
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP06728830.8A Not-in-force EP1876254B1 (fr) | 2005-03-29 | 2006-03-09 | Tube en acier epais sans soudure pour tuyau de canalisation et son procede de production |
Country Status (10)
Country | Link |
---|---|
US (2) | US20080047635A1 (fr) |
EP (1) | EP1876254B1 (fr) |
JP (1) | JP4792778B2 (fr) |
CN (1) | CN100543167C (fr) |
AR (1) | AR052706A1 (fr) |
AU (1) | AU2006229079C1 (fr) |
BR (1) | BRPI0608953B8 (fr) |
CA (1) | CA2602526C (fr) |
NO (1) | NO340772B1 (fr) |
WO (1) | WO2006103894A1 (fr) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1918398A1 (fr) * | 2005-08-22 | 2008-05-07 | Sumitomo Metal Industries Limited | Tuyau d acier sans couture pour tuyau d oléoduc et procédé de fabrication idoine |
EP1918395A1 (fr) * | 2005-07-26 | 2008-05-07 | Sumitomo Metal Industries, Ltd. | Tuyau d acier sans couture et procédé de fabrication idoine |
EP2578713A1 (fr) * | 2010-06-02 | 2013-04-10 | Nippon Steel & Sumitomo Metal Corporation | Tube en acier sans soudure pour une canalisation et son procédé de production |
EP2644731A1 (fr) * | 2010-11-22 | 2013-10-02 | Nippon Steel & Sumitomo Metal Corporation | Joint soudé par faisceau d'électrons, matériau d'acier pour soudage par faisceau d'électrons et leur procédé de fabrication |
EP2789703A1 (fr) * | 2013-04-08 | 2014-10-15 | DALMINE S.p.A. | Tuyaux en acier sans soudure trempé et revenu à paroi moyenne haute résistance et procédé de fabrication des tuyaux d'acier |
EP2789702A1 (fr) | 2013-04-08 | 2014-10-15 | DALMINE S.p.A. | Tuyaux en acier sans soudure trempé et revenu à paroi lourde et procédé de fabrication des tuyaux d'acier |
EP2728030A4 (fr) * | 2011-06-30 | 2015-09-02 | Jfe Steel Corp | Tuyau en acier sans couture à résistance élevée et à paroi mince qui présente une excellente résistance à l'acidité pour un tuyau pour pipeline et procédé de production de ce dernier |
WO2016081578A1 (fr) * | 2014-11-18 | 2016-05-26 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Matériaux de construction pour utilisation dans le stockage en cavité saline d'hydrogène à haute pression |
EP3026139A4 (fr) * | 2013-07-26 | 2017-01-11 | Nippon Steel & Sumitomo Metal Corporation | Tube en acier faiblement allié pour puits de pétrole, et procédé de fabrication de celui-ci |
EP3031943A4 (fr) * | 2013-08-06 | 2017-01-25 | Nippon Steel & Sumitomo Metal Corporation | Tuyau d'acier sans soudure pour tuyau de canalisation, et son procédé de production |
US9803256B2 (en) | 2013-03-14 | 2017-10-31 | Tenaris Coiled Tubes, Llc | High performance material for coiled tubing applications and the method of producing the same |
EP3144407A4 (fr) * | 2014-05-16 | 2017-11-15 | Nippon Steel & Sumitomo Metal Corporation | Tuyau d'acier sans soudure pour tube de canalisation et procédé pour le produire |
EP3626841A1 (fr) * | 2018-09-20 | 2020-03-25 | Vallourec Tubes France | Tuyau sans soudure en acier micro allié haute résistance pour service sulfureux et des applications de haute ténacité |
US11105501B2 (en) | 2013-06-25 | 2021-08-31 | Tenaris Connections B.V. | High-chromium heat-resistant steel |
US11124852B2 (en) | 2016-08-12 | 2021-09-21 | Tenaris Coiled Tubes, Llc | Method and system for manufacturing coiled tubing |
US11833561B2 (en) | 2017-01-17 | 2023-12-05 | Forum Us, Inc. | Method of manufacturing a coiled tubing string |
US11952648B2 (en) | 2011-01-25 | 2024-04-09 | Tenaris Coiled Tubes, Llc | Method of forming and heat treating coiled tubing |
US12129533B2 (en) | 2015-04-14 | 2024-10-29 | Tenaris Connections B.V. | Ultra-fine grained steels having corrosion- fatigue resistance |
Families Citing this family (45)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO2004097059A1 (fr) * | 2003-04-25 | 2004-11-11 | Tubos De Acero De Mexico, S.A. | Tube en acier sans jointure susceptible d'etre utilise comme canaliseur et procede d'obtention |
MXPA05008339A (es) * | 2005-08-04 | 2007-02-05 | Tenaris Connections Ag | Acero de alta resistencia para tubos de acero soldables y sin costura. |
MX2007004600A (es) * | 2007-04-17 | 2008-12-01 | Tubos De Acero De Mexico S A | Un tubo sin costura para la aplicación como secciones verticales de work-over. |
US7862667B2 (en) * | 2007-07-06 | 2011-01-04 | Tenaris Connections Limited | Steels for sour service environments |
WO2009065432A1 (fr) * | 2007-11-19 | 2009-05-28 | Tenaris Connections Ag | Acier bainitique de haute résistance destiné à des applications octg |
JP4484123B2 (ja) * | 2008-02-08 | 2010-06-16 | 株式会社日本製鋼所 | 高強度かつ溶接熱影響部靭性に優れたクラッド鋼板用母材およびその製造方法 |
CN101565800B (zh) * | 2008-04-22 | 2011-11-23 | 宝山钢铁股份有限公司 | 强韧性、强塑性的钢板及其制造方法 |
CN101660100B (zh) * | 2008-08-27 | 2011-05-11 | 宝山钢铁股份有限公司 | 一种强韧性匹配良好的特厚调质钢板及其制造方法 |
US20100136369A1 (en) * | 2008-11-18 | 2010-06-03 | Raghavan Ayer | High strength and toughness steel structures by friction stir welding |
US8221562B2 (en) * | 2008-11-25 | 2012-07-17 | Maverick Tube, Llc | Compact strip or thin slab processing of boron/titanium steels |
JP4553073B1 (ja) * | 2009-04-01 | 2010-09-29 | 住友金属工業株式会社 | 高強度Cr−Ni合金継目無管の製造方法 |
US20100319814A1 (en) * | 2009-06-17 | 2010-12-23 | Teresa Estela Perez | Bainitic steels with boron |
CN101962741B (zh) * | 2009-07-24 | 2012-08-08 | 宝山钢铁股份有限公司 | 一种调质钢板及其制造方法 |
WO2011021396A1 (fr) * | 2009-08-21 | 2011-02-24 | 住友金属工業株式会社 | Procédé de fabrication de tuyau en acier sans soudure à paroi épaisse |
EP2325435B2 (fr) | 2009-11-24 | 2020-09-30 | Tenaris Connections B.V. | Joint fileté étanche à des pressions internes et externes [extrêmement hautes] |
CN101898295B (zh) * | 2010-08-12 | 2011-12-07 | 中国石油天然气集团公司 | 一种高强度高塑韧性连续管制造方法 |
IT1403689B1 (it) | 2011-02-07 | 2013-10-31 | Dalmine Spa | Tubi in acciaio ad alta resistenza con eccellente durezza a bassa temperatura e resistenza alla corrosione sotto tensioni da solfuri. |
IT1403688B1 (it) | 2011-02-07 | 2013-10-31 | Dalmine Spa | Tubi in acciaio con pareti spesse con eccellente durezza a bassa temperatura e resistenza alla corrosione sotto tensione da solfuri. |
US8414715B2 (en) | 2011-02-18 | 2013-04-09 | Siderca S.A.I.C. | Method of making ultra high strength steel having good toughness |
US8636856B2 (en) | 2011-02-18 | 2014-01-28 | Siderca S.A.I.C. | High strength steel having good toughness |
CN102534413B (zh) * | 2011-12-31 | 2013-09-11 | 宁波市瑞通新材料科技有限公司 | 一种高压锅炉用耐腐蚀钢管的生产方法 |
US9340847B2 (en) | 2012-04-10 | 2016-05-17 | Tenaris Connections Limited | Methods of manufacturing steel tubes for drilling rods with improved mechanical properties, and rods made by the same |
AU2013253775B2 (en) | 2012-04-27 | 2015-10-15 | Nippon Steel Corporation | Seamless steel pipe and method for producing the same |
JP5488643B2 (ja) * | 2012-05-31 | 2014-05-14 | Jfeスチール株式会社 | 油井管用高強度ステンレス鋼継目無管およびその製造方法 |
JP5682602B2 (ja) * | 2012-08-09 | 2015-03-11 | 新日鐵住金株式会社 | 内面品質に優れたNi含有高合金丸ビレットの製造方法 |
WO2014034737A1 (fr) | 2012-08-29 | 2014-03-06 | 新日鐵住金株式会社 | Tuyau d'acier sans soudure et son procédé de fabrication |
BR112015016765A2 (pt) | 2013-01-11 | 2017-07-11 | Tenaris Connections Ltd | conexão de tubos de perfuração, tubo de perfuração correspondente e método para montar tubos de perfuração |
JP5907083B2 (ja) * | 2013-01-31 | 2016-04-20 | Jfeスチール株式会社 | 靭性に優れた継目無鋼管の製造方法及び製造設備 |
US9187811B2 (en) | 2013-03-11 | 2015-11-17 | Tenaris Connections Limited | Low-carbon chromium steel having reduced vanadium and high corrosion resistance, and methods of manufacturing |
CN103521550B (zh) * | 2013-10-07 | 2016-08-31 | 宝鸡石油钢管有限责任公司 | 一种x90级管线钢大口径厚壁直缝埋弧焊管制造方法 |
CN103740900A (zh) * | 2013-11-30 | 2014-04-23 | 常熟市东鑫钢管有限公司 | 无缝钢管的热处理工艺 |
CN103695808B (zh) * | 2013-12-13 | 2016-05-25 | 莱芜钢铁集团有限公司 | X120高钢级管线钢热轧钢板及其制备方法 |
CN103757561A (zh) * | 2014-01-15 | 2014-04-30 | 扬州龙川钢管有限公司 | 一种大口径厚壁海洋用无缝钢管及其tmcp生产方法 |
MX2017007583A (es) * | 2014-12-12 | 2017-09-07 | Nippon Steel & Sumitomo Metal Corp | Acero de baja aleacion para tuberia de pozo petrolero y metodo para manufacturar tuberia de pozo petrolero de acero de baja aleacion. |
JP6229794B2 (ja) | 2015-01-15 | 2017-11-15 | Jfeスチール株式会社 | 油井用継目無ステンレス鋼管およびその製造方法 |
EP3246426B1 (fr) * | 2015-01-16 | 2020-06-24 | JFE Steel Corporation | Procédé de fabrication d'une tôle d'acier épaisse de haute ténacité et de haute résistance |
US11072835B2 (en) | 2016-07-27 | 2021-07-27 | Jfe Steel Corporation | High-strength seamless stainless steel pipe for oil country tubular goods, and method for producing the same |
CN106623432A (zh) * | 2016-12-15 | 2017-05-10 | 苏州赛斯德工程设备有限公司 | 一种耐压防蚀天然气管道及其加工工艺 |
CN112845654B (zh) * | 2019-11-12 | 2023-03-10 | 新疆大学 | 一种钛及钛合金大规格无缝管材的制备方法 |
CN114752850B (zh) * | 2021-01-12 | 2023-03-14 | 宝山钢铁股份有限公司 | 一种屈服强度785MPa级高强钢板及其制造方法 |
CN113046655B (zh) * | 2021-02-01 | 2022-06-17 | 南京钢铁股份有限公司 | 一种低温韧性优异的宽厚规格管线钢及其制造方法 |
CN113046628B (zh) * | 2021-02-01 | 2022-06-17 | 南京钢铁股份有限公司 | 一种抽水蓄能压力钢管用n800cf钢及冶炼方法 |
CN112981242B (zh) * | 2021-02-01 | 2022-06-17 | 南京钢铁股份有限公司 | 一种抽水蓄能压力钢管用n800cf钢及其制造方法 |
CN115491581B (zh) * | 2021-06-17 | 2023-07-11 | 宝山钢铁股份有限公司 | 一种x100级耐低温耐腐蚀厚壁无缝管线管及其制造方法 |
CN113737096B (zh) * | 2021-08-31 | 2022-09-09 | 东风商用车有限公司 | 一种免退火无缝钢管及其制备方法、变速箱齿轮 |
Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06172858A (ja) * | 1992-12-10 | 1994-06-21 | Nippon Steel Corp | 耐ssc性の優れた高強度高靭性シームレス鋼管の製造法 |
JPH07173536A (ja) * | 1993-12-16 | 1995-07-11 | Nippon Steel Corp | 耐サワー性の優れた高強度ラインパイプ用鋼板の製造法 |
JPH07331381A (ja) * | 1994-06-06 | 1995-12-19 | Nippon Steel Corp | 高強度高靭性継目無鋼管およびその製造法 |
JPH08104922A (ja) * | 1994-10-07 | 1996-04-23 | Nippon Steel Corp | 低温靱性の優れた高強度鋼管の製造方法 |
JPH11229079A (ja) * | 1998-02-09 | 1999-08-24 | Sumitomo Metal Ind Ltd | 超高強度ラインパイプ用鋼板およびその製造法 |
JP2000104117A (ja) * | 1998-09-30 | 2000-04-11 | Sumitomo Metal Ind Ltd | 強度の均一性と靱性に優れたラインパイプ用継目無鋼管の製造方法 |
JP2000178645A (ja) * | 1998-12-15 | 2000-06-27 | Sumitomo Metal Ind Ltd | 強度と靱性に優れた鋼材の製造方法 |
JP2001059132A (ja) * | 1999-08-19 | 2001-03-06 | Nkk Corp | 溶接性及び歪時効後の靭性に優れた60キロ級直接焼入れ焼戻し鋼 |
WO2004031420A1 (fr) * | 2002-10-01 | 2004-04-15 | Sumitomo Metal Industries, Ltd. | Tuyau en acier inoxydable a haute resistance, s'agissant notamment de resistance aux craquelures provoquees par l'hydrogene et procede de fabrication |
JP2004124158A (ja) * | 2002-10-01 | 2004-04-22 | Sumitomo Metal Ind Ltd | 継目無鋼管およびその製造方法 |
Family Cites Families (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPS5168422A (en) * | 1974-12-11 | 1976-06-14 | Nippon Steel Corp | Kyojinkono seizoho |
JPS5849628B2 (ja) * | 1979-05-28 | 1983-11-05 | 新日本製鐵株式会社 | 深絞り性のすぐれた複合組織高張力冷延鋼板の製造方法 |
JPH066741B2 (ja) * | 1985-01-26 | 1994-01-26 | 新日本製鐵株式会社 | 高靭性をもつ構造用厚鋼板の製造法 |
US5993570A (en) * | 1997-06-20 | 1999-11-30 | American Cast Iron Pipe Company | Linepipe and structural steel produced by high speed continuous casting |
JP2001158935A (ja) * | 1999-09-24 | 2001-06-12 | Sumitomo Metal Ind Ltd | ラインパイプ用鋼 |
DE29923062U1 (de) * | 1999-12-31 | 2000-02-24 | Eugster/Frismag Ag, Romanshorn | Schlauchdrahtklemmanordnung |
JP2005213534A (ja) * | 2004-01-27 | 2005-08-11 | Jfe Steel Kk | 溶接熱影響部靭性に優れた鋼材の製造方法 |
US7566416B2 (en) * | 2004-10-29 | 2009-07-28 | Sumitomo Metal Industries, Ltd. | Steel pipe for an airbag inflator and a process for its manufacture |
-
2005
- 2005-03-29 JP JP2005095240A patent/JP4792778B2/ja not_active Expired - Lifetime
-
2006
- 2006-03-09 AU AU2006229079A patent/AU2006229079C1/en not_active Ceased
- 2006-03-09 CN CNB2006800098840A patent/CN100543167C/zh not_active Expired - Fee Related
- 2006-03-09 BR BRPI0608953A patent/BRPI0608953B8/pt not_active IP Right Cessation
- 2006-03-09 WO PCT/JP2006/304613 patent/WO2006103894A1/fr active Application Filing
- 2006-03-09 EP EP06728830.8A patent/EP1876254B1/fr not_active Not-in-force
- 2006-03-09 CA CA2602526A patent/CA2602526C/fr not_active Expired - Fee Related
- 2006-03-17 AR ARP060101061A patent/AR052706A1/es active IP Right Grant
-
2007
- 2007-08-21 NO NO20074257A patent/NO340772B1/no not_active IP Right Cessation
- 2007-08-23 US US11/895,131 patent/US20080047635A1/en not_active Abandoned
-
2010
- 2010-06-01 US US12/791,486 patent/US20100236670A1/en not_active Abandoned
Patent Citations (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH06172858A (ja) * | 1992-12-10 | 1994-06-21 | Nippon Steel Corp | 耐ssc性の優れた高強度高靭性シームレス鋼管の製造法 |
JPH07173536A (ja) * | 1993-12-16 | 1995-07-11 | Nippon Steel Corp | 耐サワー性の優れた高強度ラインパイプ用鋼板の製造法 |
JPH07331381A (ja) * | 1994-06-06 | 1995-12-19 | Nippon Steel Corp | 高強度高靭性継目無鋼管およびその製造法 |
JPH08104922A (ja) * | 1994-10-07 | 1996-04-23 | Nippon Steel Corp | 低温靱性の優れた高強度鋼管の製造方法 |
JPH11229079A (ja) * | 1998-02-09 | 1999-08-24 | Sumitomo Metal Ind Ltd | 超高強度ラインパイプ用鋼板およびその製造法 |
JP2000104117A (ja) * | 1998-09-30 | 2000-04-11 | Sumitomo Metal Ind Ltd | 強度の均一性と靱性に優れたラインパイプ用継目無鋼管の製造方法 |
JP2000178645A (ja) * | 1998-12-15 | 2000-06-27 | Sumitomo Metal Ind Ltd | 強度と靱性に優れた鋼材の製造方法 |
JP2001059132A (ja) * | 1999-08-19 | 2001-03-06 | Nkk Corp | 溶接性及び歪時効後の靭性に優れた60キロ級直接焼入れ焼戻し鋼 |
WO2004031420A1 (fr) * | 2002-10-01 | 2004-04-15 | Sumitomo Metal Industries, Ltd. | Tuyau en acier inoxydable a haute resistance, s'agissant notamment de resistance aux craquelures provoquees par l'hydrogene et procede de fabrication |
JP2004124158A (ja) * | 2002-10-01 | 2004-04-22 | Sumitomo Metal Ind Ltd | 継目無鋼管およびその製造方法 |
Non-Patent Citations (1)
Title |
---|
See also references of WO2006103894A1 * |
Cited By (39)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1918395A1 (fr) * | 2005-07-26 | 2008-05-07 | Sumitomo Metal Industries, Ltd. | Tuyau d acier sans couture et procédé de fabrication idoine |
EP1918395A4 (fr) * | 2005-07-26 | 2011-09-14 | Sumitomo Metal Ind | Tuyau d acier sans couture et procédé de fabrication idoine |
US7896984B2 (en) | 2005-08-22 | 2011-03-01 | Sumitomo Metal Industries, Ltd. | Method for manufacturing seamless steel pipe for line pipe |
EP1918398A4 (fr) * | 2005-08-22 | 2009-08-19 | Sumitomo Metal Ind | Tuyau d acier sans couture pour tuyau d oléoduc et procédé de fabrication idoine |
EP1918400A4 (fr) * | 2005-08-22 | 2009-08-19 | Sumitomo Metal Ind | Tuyau d acier sans couture pour tuyau d'oléoduc et procédé de fabrication idoine |
US7896985B2 (en) | 2005-08-22 | 2011-03-01 | Sumitomo Metal Industries, Ltd. | Seamless steel pipe for line pipe and a process for its manufacture |
NO341250B1 (no) * | 2005-08-22 | 2017-09-25 | Sumitomo Metal Ind | Ledningsrør av sømløse stålrør og fremgangsmåte for fremstilling derav |
EP1918400A1 (fr) * | 2005-08-22 | 2008-05-07 | Sumitomo Metal Industries, Ltd. | Tuyau d acier sans couture pour tuyau d'oléoduc et procédé de fabrication idoine |
EP1918398A1 (fr) * | 2005-08-22 | 2008-05-07 | Sumitomo Metal Industries Limited | Tuyau d acier sans couture pour tuyau d oléoduc et procédé de fabrication idoine |
EP2578713A1 (fr) * | 2010-06-02 | 2013-04-10 | Nippon Steel & Sumitomo Metal Corporation | Tube en acier sans soudure pour une canalisation et son procédé de production |
EP2578713A4 (fr) * | 2010-06-02 | 2013-12-04 | Nippon Steel & Sumitomo Metal Corp | Tube en acier sans soudure pour une canalisation et son procédé de production |
EP2644731A1 (fr) * | 2010-11-22 | 2013-10-02 | Nippon Steel & Sumitomo Metal Corporation | Joint soudé par faisceau d'électrons, matériau d'acier pour soudage par faisceau d'électrons et leur procédé de fabrication |
EP2644731A4 (fr) * | 2010-11-22 | 2014-05-07 | Nippon Steel & Sumitomo Metal Corp | Joint soudé par faisceau d'électrons, matériau d'acier pour soudage par faisceau d'électrons et leur procédé de fabrication |
US11952648B2 (en) | 2011-01-25 | 2024-04-09 | Tenaris Coiled Tubes, Llc | Method of forming and heat treating coiled tubing |
US9932651B2 (en) | 2011-06-30 | 2018-04-03 | Jfe Steel Corporation | Thick-walled high-strength seamless steel pipe with excellent sour resistance for pipe for pipeline, and process for producing same |
EP2728030A4 (fr) * | 2011-06-30 | 2015-09-02 | Jfe Steel Corp | Tuyau en acier sans couture à résistance élevée et à paroi mince qui présente une excellente résistance à l'acidité pour un tuyau pour pipeline et procédé de production de ce dernier |
US9803256B2 (en) | 2013-03-14 | 2017-10-31 | Tenaris Coiled Tubes, Llc | High performance material for coiled tubing applications and the method of producing the same |
US11377704B2 (en) | 2013-03-14 | 2022-07-05 | Tenaris Coiled Tubes, Llc | High performance material for coiled tubing applications and the method of producing the same |
US10378075B2 (en) | 2013-03-14 | 2019-08-13 | Tenaris Coiled Tubes, Llc | High performance material for coiled tubing applications and the method of producing the same |
US10378074B2 (en) | 2013-03-14 | 2019-08-13 | Tenaris Coiled Tubes, Llc | High performance material for coiled tubing applications and the method of producing the same |
EP2789702A1 (fr) | 2013-04-08 | 2014-10-15 | DALMINE S.p.A. | Tuyaux en acier sans soudure trempé et revenu à paroi lourde et procédé de fabrication des tuyaux d'acier |
EP2789701A1 (fr) * | 2013-04-08 | 2014-10-15 | DALMINE S.p.A. | Tuyaux en acier sans soudure trempé et revenu à paroi moyenne haute résistance et procédé de fabrication des tuyaux d'acier |
EP2789703A1 (fr) * | 2013-04-08 | 2014-10-15 | DALMINE S.p.A. | Tuyaux en acier sans soudure trempé et revenu à paroi moyenne haute résistance et procédé de fabrication des tuyaux d'acier |
US9657365B2 (en) | 2013-04-08 | 2017-05-23 | Dalmine S.P.A. | High strength medium wall quenched and tempered seamless steel pipes and related method for manufacturing said steel pipes |
EP2789700A1 (fr) * | 2013-04-08 | 2014-10-15 | DALMINE S.p.A. | Tuyaux en acier sans soudure trempé et revenu à paroi lourde et procédé de fabrication des tuyaux d'acier |
US9644248B2 (en) | 2013-04-08 | 2017-05-09 | Dalmine S.P.A. | Heavy wall quenched and tempered seamless steel pipes and related method for manufacturing said steel pipes |
US11105501B2 (en) | 2013-06-25 | 2021-08-31 | Tenaris Connections B.V. | High-chromium heat-resistant steel |
EP3026139A4 (fr) * | 2013-07-26 | 2017-01-11 | Nippon Steel & Sumitomo Metal Corporation | Tube en acier faiblement allié pour puits de pétrole, et procédé de fabrication de celui-ci |
US10036078B2 (en) | 2013-07-26 | 2018-07-31 | Nippon Steel & Sumitomo Metal Corporation | Low alloy oil well steel pipe and method for manufacturing same |
EP3031943A4 (fr) * | 2013-08-06 | 2017-01-25 | Nippon Steel & Sumitomo Metal Corporation | Tuyau d'acier sans soudure pour tuyau de canalisation, et son procédé de production |
US9651175B2 (en) | 2013-08-06 | 2017-05-16 | Nippon Steel & Sumitomo Metal Corporation | Seamless steel pipe for line pipe |
EP3144407A4 (fr) * | 2014-05-16 | 2017-11-15 | Nippon Steel & Sumitomo Metal Corporation | Tuyau d'acier sans soudure pour tube de canalisation et procédé pour le produire |
US10480043B2 (en) | 2014-05-16 | 2019-11-19 | Nippon Steel Corporation | Seamless steel pipe for line pipe and method for producing the same |
US9399810B2 (en) | 2014-11-18 | 2016-07-26 | Air Liquide Large Industries U.S. Lp | Materials of construction for use in high pressure hydrogen storage in a salt cavern |
WO2016081578A1 (fr) * | 2014-11-18 | 2016-05-26 | L'air Liquide, Societe Anonyme Pour L'etude Et L'exploitation Des Procedes Georges Claude | Matériaux de construction pour utilisation dans le stockage en cavité saline d'hydrogène à haute pression |
US12129533B2 (en) | 2015-04-14 | 2024-10-29 | Tenaris Connections B.V. | Ultra-fine grained steels having corrosion- fatigue resistance |
US11124852B2 (en) | 2016-08-12 | 2021-09-21 | Tenaris Coiled Tubes, Llc | Method and system for manufacturing coiled tubing |
US11833561B2 (en) | 2017-01-17 | 2023-12-05 | Forum Us, Inc. | Method of manufacturing a coiled tubing string |
EP3626841A1 (fr) * | 2018-09-20 | 2020-03-25 | Vallourec Tubes France | Tuyau sans soudure en acier micro allié haute résistance pour service sulfureux et des applications de haute ténacité |
Also Published As
Publication number | Publication date |
---|---|
EP1876254B1 (fr) | 2014-11-12 |
AU2006229079C1 (en) | 2011-03-17 |
WO2006103894A1 (fr) | 2006-10-05 |
US20080047635A1 (en) | 2008-02-28 |
BRPI0608953B1 (pt) | 2016-10-11 |
JP4792778B2 (ja) | 2011-10-12 |
CA2602526A1 (fr) | 2006-10-05 |
CN101151387A (zh) | 2008-03-26 |
US20100236670A1 (en) | 2010-09-23 |
AU2006229079A1 (en) | 2006-10-05 |
CN100543167C (zh) | 2009-09-23 |
EP1876254A4 (fr) | 2012-08-01 |
AU2006229079B2 (en) | 2009-04-09 |
NO340772B1 (no) | 2017-06-19 |
BRPI0608953B8 (pt) | 2017-03-21 |
BRPI0608953A2 (pt) | 2010-02-17 |
NO20074257L (no) | 2007-12-20 |
JP2006274350A (ja) | 2006-10-12 |
AR052706A1 (es) | 2007-03-28 |
CA2602526C (fr) | 2011-08-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP1876254B1 (fr) | Tube en acier epais sans soudure pour tuyau de canalisation et son procede de production | |
CA2752741C (fr) | Procede pour produire un tuyau en acier sans soudure | |
US7815755B2 (en) | Seamless steel pipe and manufacturing method thereof | |
US10358688B2 (en) | Steel plate and method of producing same | |
CN107208212B (zh) | 厚壁高韧性高强度钢板及其制造方法 | |
US20180073094A1 (en) | X80 pipeline steel with good strain-aging performance, pipeline tube and method for producing same | |
CN101305110A (zh) | 声各向异性小、焊接性优异的屈服应力为450MPa以上且抗拉强度为570MPa以上的高强度钢板及其制造方法 | |
CN109957710B (zh) | 一种含v大变形x80m管线钢板及其制造方法 | |
CN102162061B (zh) | 一种高强韧低碳贝氏体型厚钢板及其制造方法 | |
CN109563587B (zh) | 无缝钢管及其制造方法 | |
JP4967356B2 (ja) | 高強度継目無鋼管およびその製造方法 | |
CN114058960B (zh) | 一种25~60mm厚1000MPa级高强度高韧性易焊接纳米钢及其制备方法 | |
CN107779744B (zh) | 一种贝氏体型x100级无缝管线管及其制造方法 | |
CN112375997B (zh) | 一种低成本和超低温条件下使用的x70m管线钢板的制造方法 | |
WO2018008703A1 (fr) | Tige de fil enroulé | |
JP4793499B2 (ja) | ラインパイプ用厚肉継目無鋼管 | |
JPH0670249B2 (ja) | 靭性に優れた調質型高張力鋼板の製造方法 | |
CN117089757A (zh) | 一种700Mpa级液压活塞杆用非调质钢的生产方法 | |
CN117187684A (zh) | 一种大厚度fh690海工钢及其制备方法 | |
EA040769B1 (ru) | Заготовки с бейнитной структурой, имеющие высокую прочность, и способ изготовления |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20071026 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
DAX | Request for extension of the european patent (deleted) | ||
A4 | Supplementary search report drawn up and despatched |
Effective date: 20120704 |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: C22C 38/02 20060101ALI20120628BHEP Ipc: C22C 38/04 20060101ALI20120628BHEP Ipc: C21D 8/10 20060101ALI20120628BHEP Ipc: C22C 38/00 20060101AFI20120628BHEP Ipc: B21B 23/00 20060101ALI20120628BHEP Ipc: C22C 38/50 20060101ALI20120628BHEP Ipc: C22C 38/06 20060101ALI20120628BHEP Ipc: C21D 9/08 20060101ALI20120628BHEP Ipc: C22C 38/46 20060101ALI20120628BHEP Ipc: C22C 38/42 20060101ALI20120628BHEP Ipc: C22C 38/58 20060101ALI20120628BHEP Ipc: C22C 38/44 20060101ALI20120628BHEP |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: NIPPON STEEL & SUMITOMO METAL CORPORATION |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: C22C 38/50 20060101ALI20130627BHEP Ipc: C22C 38/04 20060101ALI20130627BHEP Ipc: B21B 23/00 20060101ALI20130627BHEP Ipc: C22C 38/42 20060101ALI20130627BHEP Ipc: C22C 38/58 20060101ALI20130627BHEP Ipc: B21B 19/04 20060101ALI20130627BHEP Ipc: C22C 38/00 20060101AFI20130627BHEP Ipc: C22C 38/06 20060101ALI20130627BHEP Ipc: C22C 38/02 20060101ALI20130627BHEP Ipc: C22C 38/46 20060101ALI20130627BHEP Ipc: C21D 9/08 20060101ALI20130627BHEP Ipc: C22C 38/44 20060101ALI20130627BHEP Ipc: C21D 8/10 20060101ALI20130627BHEP |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20130807 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAJ | Information related to disapproval of communication of intention to grant by the applicant or resumption of examination proceedings by the epo deleted |
Free format text: ORIGINAL CODE: EPIDOSDIGR1 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
INTG | Intention to grant announced |
Effective date: 20140507 |
|
INTG | Intention to grant announced |
Effective date: 20140603 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LT LU LV MC NL PL PT RO SE SI SK TR |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: REF Ref document number: 695823 Country of ref document: AT Kind code of ref document: T Effective date: 20141115 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R096 Ref document number: 602006043629 Country of ref document: DE Effective date: 20141224 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: T3 |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MK05 Ref document number: 695823 Country of ref document: AT Kind code of ref document: T Effective date: 20141112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: LT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150312 Ref country code: ES Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: IS Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150312 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: LV Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: PL Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150213 Ref country code: SE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: EE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: DK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: RO Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: SK Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: CZ Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R097 Ref document number: 602006043629 Country of ref document: DE |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20150813 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20150309 Ref country code: MC Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: MM4A |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150309 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150331 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20150331 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 11 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SI Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 12 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BG Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 Ref country code: HU Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT; INVALID AB INITIO Effective date: 20060309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: TR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20141112 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: PLFP Year of fee payment: 13 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R082 Ref document number: 602006043629 Country of ref document: DE Representative=s name: ZIMMERMANN & PARTNER PATENTANWAELTE MBB, DE Ref country code: DE Ref legal event code: R081 Ref document number: 602006043629 Country of ref document: DE Owner name: NIPPON STEEL CORPORATION, JP Free format text: FORMER OWNER: NIPPON STEEL & SUMITOMO METAL CORP., TOKYO, JP |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20200212 Year of fee payment: 15 Ref country code: DE Payment date: 20200225 Year of fee payment: 15 Ref country code: GB Payment date: 20200226 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20200214 Year of fee payment: 15 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 602006043629 Country of ref document: DE |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: MM Effective date: 20210401 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20210309 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210401 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20211001 Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210309 Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20210331 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20220210 Year of fee payment: 17 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20230309 |