EP1533049A1 - Detonative cleaning apparatus - Google Patents
Detonative cleaning apparatus Download PDFInfo
- Publication number
- EP1533049A1 EP1533049A1 EP04257176A EP04257176A EP1533049A1 EP 1533049 A1 EP1533049 A1 EP 1533049A1 EP 04257176 A EP04257176 A EP 04257176A EP 04257176 A EP04257176 A EP 04257176A EP 1533049 A1 EP1533049 A1 EP 1533049A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- conduit
- segments
- segment
- internal cross
- combustion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G7/00—Cleaning by vibration or pressure waves
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B7/00—Cleaning by methods not provided for in a single other subclass or a single group in this subclass
- B08B7/0007—Cleaning by methods not provided for in a single other subclass or a single group in this subclass by explosions
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B08—CLEANING
- B08B—CLEANING IN GENERAL; PREVENTION OF FOULING IN GENERAL
- B08B9/00—Cleaning hollow articles by methods or apparatus specially adapted thereto
- B08B9/08—Cleaning containers, e.g. tanks
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F27—FURNACES; KILNS; OVENS; RETORTS
- F27D—DETAILS OR ACCESSORIES OF FURNACES, KILNS, OVENS OR RETORTS, IN SO FAR AS THEY ARE OF KINDS OCCURRING IN MORE THAN ONE KIND OF FURNACE
- F27D25/00—Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag
- F27D25/006—Devices or methods for removing incrustations, e.g. slag, metal deposits, dust; Devices or methods for preventing the adherence of slag using explosives
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G15/00—Details
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G15/00—Details
- F28G15/02—Supports for cleaning appliances, e.g. frames
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28G—CLEANING OF INTERNAL OR EXTERNAL SURFACES OF HEAT-EXCHANGE OR HEAT-TRANSFER CONDUITS, e.g. WATER TUBES OR BOILERS
- F28G7/00—Cleaning by vibration or pressure waves
- F28G7/005—Cleaning by vibration or pressure waves by explosions or detonations; by pressure waves generated by combustion processes
Definitions
- the invention relates to industrial equipment. More particularly, the invention relates to the detonative cleaning of industrial equipment.
- Such equipment includes furnaces (coal, oil, waste, etc.), boilers, gasifiers, reactors, heat exchangers, and the like.
- the equipment involves a vessel containing internal heat transfer surfaces that are subjected to fouling by accumulating particulate such as soot, ash, minerals and other products and byproducts of combustion, more integrated buildup such as slag and/or fouling, and the like.
- particulate build-up may progressively interfere with plant operation, reducing efficiency and throughput and potentially causing damage.
- Cleaning of the equipment is therefore highly desirable and is attended by a number of relevant considerations. Often direct access to the fouled surfaces is difficult.
- a vessel wall separates a vessel exterior from a vessel interior and has a wall aperture.
- the apparatus includes a source of fuel and oxidizer and an igniter for initiating a reaction of the fuel and oxidizer.
- An elongate conduit has first and second ends and is positioned to direct a gas flow of the reacted or reacting fuel and oxidizer through the wall aperture and discharge from the second end.
- the conduit includes a number of segments secured end-to-end.
- At least three of the conduit segments have lengths along a gas flowpath of 1-3m and characteristic internal cross-sectional areas of 0.006-0.3m 2 .
- At least three of the segments may each include a tubular body having first and second ends and first and second bolting flanges respectively proximate the first and second ends.
- a nozzle assembly may extend at least partially through the vessel wall.
- At least one of the segments may be an elbow.
- the conduit may consist essentially of three portions: an essentially straight first portion; an essentially straight second portion upstream of the first portion; and a third non-straight portion between the first and second portions.
- the second and third portions may have essentially similar internal cross-sections.
- the first portion may include downstream, upstream, and transition portions.
- the downstream portion internal cross-section may be essentially similar to that of the second and third portions.
- the upstream portion internal cross-section may be smaller than that of the downstream portion.
- the transition portion internal cross-section may transition from essentially similar to that of the upstream portion to essentially similar to that of the downstream portion.
- the first and second portions may be parallel and offset.
- the first and second portions may be oriented at a non-zero angle (e.g., 20°-160°) to each other.
- Another aspect of the invention involves a method for configuring a detonative cleaning apparatus for cleaning surfaces within a vessel.
- a suitable combustion conduit cross-sectional area is determined.
- a suitable combustion conduit length is determined.
- An appropriate path for the combustion conduit is determined in view of environmental considerations.
- An appropriate combination of conduit segments for forming the combustion conduit is determined so as to be routed along the appropriate path.
- the segments may be selected from a number of pre-established conduit segment configurations.
- the segments may include at least one straight segment and at least one curved segment. At least some of the segments may each have a tubular body with first and second ends and first and second attachment flanges proximate the first and second ends.
- An appropriate predetonator configuration may be determined. Drawings of the so-configured apparatus may be made and the so-configured apparatus may be assembled.
- FIG. 1 shows a furnace 20 having an exemplary three associated soot blowers 22.
- the furnace vessel is formed as a right parallelepiped and the soot blowers are all associated with a single common wall 24 of the vessel and are positioned at like height along the wall.
- Other configurations are possible (e.g., a single soot blower, one or more soot blowers on each of multiple levels, and the like).
- Each soot blower 22 includes an elongate combustion conduit 26 extending from an upstream distal end 28 away from the furnace wall 24 to a downstream proximal end 30 closely associated with the wall 24.
- the end 30 may be well within the furnace.
- combustion of a fuel/oxidizer mixture within the conduit 26 is initiated proximate the upstream end (e.g., within an upstreammost 10% of a conduit length) to produce a detonation wave which is expelled from the downstream end as a shock wave along with associated combustion gases for cleaning surfaces within the interior volume of the furnace.
- Each soot blower may be associated with a fuel/oxidizer source 32.
- An exemplary source includes a liquified or compressed gaseous fuel cylinder 34 and an oxygen cylinder 36 in respective containment structures 38 and 40.
- the oxidizer is a first oxidizer such as essentially pure oxygen.
- a second oxidizer may be in the form of shop air delivered from a central air source 42.
- air is stored in an air accumulator 44.
- Fuel, expanded from that in the cylinder 34 is generally stored in a fuel accumulator 46.
- Each exemplary source 32 is coupled to the associated conduit 26 by appropriate plumbing below.
- each soot blower includes a spark box 50 for initiating combustion of the fuel oxidizer mixture and which, along with the source 32, is controlled by a control and monitoring system (not shown).
- FIG. 1 further shows the wall 24 as including a number of ports for inspection and/or measurement. Exemplary ports include an optical monitoring port 54 and a temperature monitoring port 56 associated with each soot blower 22 for respectively receiving an infrared and/or visible light video camera and thermocouple probe for viewing the surfaces to be cleaned and monitoring internal temperatures. Other probes/monitoring/sampling may be utilized, including pressure monitoring, composition sampling, and the like.
- FIG. 2 shows further details of an exemplary soot blower 22.
- the exemplary detonation conduit 26 is formed with a main body portion formed by a series of doubly flanged conduit sections or segments 60 arrayed from upstream to downstream and a downstream nozzle conduit section or segment 62 having a downstream portion 64 extending through an aperture 66 in the wall and ending in the downstream end or outlet 30 exposed to the furnace interior 68.
- the term nozzle is used broadly and does not require the presence of any aerodynamic contraction, expansion, or combination thereof.
- Exemplary conduit segment material is metallic (e.g., stainless steel).
- the outlet 30 may be located further within the furnace if appropriate support and cooling are provided.
- FIG. 2 further shows furnace interior tube bundles 70, the exterior surfaces of which are subject to fouling.
- each of the conduit segments 60 is supported on an associated trolley 72, the wheels of which engage a track system 74 along the facility floor 76.
- the exemplary track system includes a pair of parallel rails engaging concave peripheral surfaces of the trolley wheels.
- the exemplary segments 60 are of similar length L, and are bolted end-to-end by associated arrays of bolts in the bolt holes of their respective flanges. Similarly, the downstream flange of the downstreammost of the segments 60 is bolted to the upstream flange of the nozzle 62.
- a reaction strap 80 (e.g., cotton or thermally/structurally robust synthetic) in series with one or more metal coil reaction springs 82 is coupled to this last mated flange pair and connects the combustion conduit to an environmental structure such as the furnace wall for resiliently absorbing reaction forces associated with discharging of the soot blower and ensuring correct placement of the combustion conduit for subsequent firings.
- additional damping (not shown) may be provided.
- the reaction strap/spring combination may be formed as a single length or a loop. In the exemplary embodiment, this combined downstream section has an overall length L 2 .
- Alternative resilient recoil absorbing means may include non-metal or non-coil springs or rubber or other elastomeric elements advantageously at least partially elastically deformed in tension, compression, and/or shear, pneumatic recoil absorbers, and the like.
- the predetonator conduit segment 84 Extending downstream from the upstream end 28 is a predetonator conduit section/segment 84 which also may be doubly flanged and has a length L 3 .
- the predetonator conduit segment 84 has a characteristic internal cross-sectional area (transverse to an axis/centerline 500 of the conduit) which is smaller than a characteristic internal cross-sectional area (e.g., mean, median, mode, or the like) of the downstream portion (60, 62) of the combustion conduit.
- the predetonator cross-sectional area is a characterized by a diameter of between 8 cm and 12 cm whereas the downstream portion is characterized by a diameter of between 20 cm and 40 cm.
- exemplary cross-sectional area ratios of the downstream portion to the predetonator segment are between 1:1 and 10:1, more narrowly, 2:1 and 10:1.
- An overall length L between ends 28 and 30 may be 1-15 m, more narrowly, 5-15 m.
- a transition conduit segment 86 extends between the predetonator segment 84 and the upstreammost segment 60.
- the segment 86 has upstream and downstream flanges sized to mate with the respective flanges of the segments 84 and 60 has an interior surface which provides a smooth transition between the internal cross-sections thereof.
- the exemplary segment 86 has a length L 4 .
- An exemplary half angle of divergence of the interior surface of segment 86 is ⁇ 12°, more narrowly 5-10°.
- a fuel/oxidizer charge may be introduced to the detonation conduit interior in a variety of ways. There may be one or more distinct fuel/oxidizer mixtures. Such mixture(s) may be premixed external to the detonation conduit, or may be mixed at or subsequent to introduction to the conduit.
- FIG. 3 shows the segments 84 and 86 configured for distinct introduction of two distinct fuel/oxidizer combinations: a predetonator combination; and a main combination.
- a pair of predetonator fuel injection conduits 90 are coupled to ports 92 in the segment wall which define fuel injection ports.
- a pair of predetonator oxidizer conduits 94 are coupled to oxidizer inlet ports 96.
- these ports are in the upstream half of the length of the segment 84.
- each of the fuel injection ports 92 is paired with an associated one of the oxidizer ports 96 at even axial position and at an angle (exemplary 90° shown, although other angles including 180° are possible) to provide opposed jet mixing of fuel and oxidizer.
- a purge gas conduit 98 is similarly connected to a purge gas port 100 yet further upstream.
- An end plate 102 bolted to the upstream flange of the segment 84 seals the upstream end of the combustion conduit and passes through an igniter/initiator 106 (e.g., a spark plug) having an operative end 108 in the interior of the segment 84.
- an igniter/initiator 106 e.g., a spark plug
- main fuel and oxidizer are introduced to the segment 86.
- main fuel is carried by a number of main fuel conduits 112 and main oxidizer is carried by a number of main oxidizer conduits 110, each of which has terminal portions concentrically surrounding an associated one of the fuel conduits 112 so as to mix the main fuel and oxidizer at an associated inlet 114.
- the fuels are hydrocarbons.
- both fuels are the same, drawn from a single fuel source but mixed with distinct oxidizers: essentially pure oxygen for the predetonator mixture; and air for the main mixture.
- Exemplary fuels useful in such a situation are propane, MAPP gas, or mixtures thereof.
- ethylene and liquid fuels e.g., diesel, kerosene, and jet aviation fuels.
- the oxidizers can include mixtures such as air/oxygen mixtures of appropriate ratios to achieve desired main and/or predetonator charge chemistries.
- monopropellant fuels having molecularly combined fuel and oxidizer components may be options.
- the combustion conduit is initially empty except for the presence of air (or other purge gas).
- the predetonator fuel and oxidizer are then introduced through the associated ports filling the segment 84 and extending partially into the segment 86 (e.g., to near the midpoint) and advantageously just beyond the main fuel/oxidizer ports.
- the predetonator fuel and oxidizer flows are then shut off.
- An exemplary volume filled the predetonator fuel and oxidizer is 1-40%, more narrowly 1-20%, of the combustion conduit volume.
- the main fuel and oxidizer are then introduced, to substantially fill some fraction (e.g., 20-100%) of the remaining volume of the combustor conduit.
- the main fuel and oxidizer flows are then shut off.
- the spark box is triggered to provide a spark discharge of the initiator igniting the predetonator charge.
- the predetonator charge being selected for very fast combustion chemistry, the initial deflagration quickly transitions to a detonation within the segment 84 and producing a detonation wave. Once such a detonation wave occurs, it is effective to pass through the main charge which might, otherwise, have sufficiently slow chemistry to not detonate within the conduit of its own accord.
- the wave passes longitudinally downstream and emerges from the downstream end 30 as a shock wave within the furnace interior, impinging upon the surfaces to be cleaned and thermally and mechanically shocking to typically at least loosen the contamination.
- a purge gas e.g., air from the same source providing the main oxidizer and/or nitrogen
- a baseline flow of the purge gas may be maintained between charge/discharge cycles so as to prevent gas and particulate from the furnace interior from infiltrating upstream and to assist in cooling of the detonation conduit.
- internal surface enhancements may substantially increase internal surface area beyond that provided by the nominally cylindrical and frustoconical segment interior surfaces.
- the enhancement may be effective to assist in the deflagration-to-detonation transition or in the maintenance of the detonation wave.
- FIG. 4 shows internal surface enhancements applied to the interior of one of the main segments 60.
- the exemplary enhancement is nominally a Chin spiral, although other enhancements such as Shchelkin spirals and Smirnov cavities may be utilized.
- the spiral is formed by a helical member 120.
- the exemplary member 120 is formed as a circular-sectioned metallic element (e.g., stainless steel wire) of approximately 8-20mm in sectional diameter. Other sections may alternatively be used.
- the exemplary member 120 is held spaced-apart from the segment interior surface by a plurality of longitudinal elements 122.
- the exemplary longitudinal elements are rods of similar section and material to the member 120 and welded thereto and to the interior surface of the associated segment 60.
- Such enhancements may also be utilized to provide predetonation in lieu of or in addition to the foregoing techniques involving different charges and different combustor cross-sections.
- the apparatus may be used in a wide variety of applications.
- the apparatus may be applied to: the pendants or secondary superheaters, the convective pass (primary superheaters and the economizer bundles); air preheaters; selective catalyst removers (SCR) scrubbers; the baghouse or electrostatic precipitator; economizer hoppers; ash or other heat/accumulations whether on heat transfer surfaces or elsewhere, and the like.
- SCR selective catalyst removers
- economizer hoppers ash or other heat/accumulations whether on heat transfer surfaces or elsewhere, and the like.
- FIG. 6 shows further details of the exemplary trolley 72 and track system 74.
- the exemplary track system comprises a pair of parallel vertex-up right angle channel elements 140 (e.g., of steel) secured such as by welding to mounting plates 142.
- the mounting plates are, in turn, secured to the floor 76 such as via bolts (not shown) in bolt holes 144.
- the exemplary trolley includes a structural frame 150 having a pair of left and right longitudinal members 152 and fore and aft crossmembers 154. At the left and right sides of each crossmember, a wheel 156 is mounted on a depending bracket 158.
- the wheel periphery has a concavity (e.g., a right-angle V-groove 160) receiving the vertex of the right angle channel elements 140.
- the exemplary trolley has means for supporting the associated conduit segment and means for securing the segment in place.
- the exemplary support means include a pair of fore and aft tube/pipe clamps 170 each positioned and supported by nuts 172 on associated left and right threaded shafts 174 secured at their lower ends to the frame.
- the clamps 170 have a concave surface 176 complementary to the exterior body surface of the associated conduit segment to support the segment from below.
- the securing means comprises similar top brackets 180 also mounted to the shafts 174 and held downward in place in compressive engagement with the segment via nuts 182.
- the individual segments may be preassembled to their associated trolleys and rolled into place along the track system, whereupon the segments may be secured to each other via their end flanges. Disassembly may be by a reverse of this process.
- the trolleys may also allow the combustion conduit to be moved as a unit (e.g., if it is desired that the downstream portion of the conduit not be inserted into the furnace all the time). Additionally, as noted above, the trolleys may accommodate movement as a unit associated with longitudinal thermal expansion and/or with recoil during discharge cycles while maintaining conduit segment alignment.
- FIG. 7 shows an alternate system 200 wherein the combustion conduit 202 is suspended from brackets 204 (e.g., as part of a free-standing support structure or secured to a ceiling or roof 206 of the facility).
- brackets 204 e.g., as part of a free-standing support structure or secured to a ceiling or roof 206 of the facility.
- the exemplary system 200 navigates the conduit 202 around environmental obstacles external to the furnace. Exemplary obstacles include upper and lower tube bundles 210 and 212 between which the conduit passes.
- the conduit is circuitous to permit positioning of its outlet 214 in a position on the furnace wall aligned with one of the two bundles. In such a situation, a straight conduit would be interfered with by the bundles. Accordingly, the conduit is provided with one or more curved sections 216 to accommodate the bundles.
- the exemplary support system includes an upstream and an intermediate spring hanger 220 and 222 coupled to associated conduit segments by turnbuckle systems 224 and 226.
- Exemplary spring hangers are available from LISEGA, Inc., Newport, Tennessee.
- the spring hanger 222 may have substantially higher capacity due to a higher static load at that location.
- the particular combination of hanger sizings may be influenced by the relative locations of the hangers along the conduit in view of mass parameters of the conduit (e.g., center of gravity, mass distribution, and the like), strength parameters of the conduit (e.g., various modulus), and the location of any additional support.
- the exemplary spring hangers serve as essentially constant-load hangers, with supportive tensile force essentially constant over an operating range.
- One function of the vertical compliance afforded by the hangers is to accommodate thermally-associated changes in the vertical position of the outlet 214 relative to the ceiling surface 206 or other combustion conduit support structure. For example, thermal expansion of the furnace wall may cause a change in outlet vertical position between hot and cold (e.g., running and off) furnace conditions. In the embodiment of FIG. 2, such expansion is addressed by non rigid vertical coupling of the conduit and wall with sufficient vertical play for the conduit within the oversized wall aperture.
- the hangers With rigid mounting, however, if furnace heating raises the conduit outlet height, in the absence of the constant force hangers, a greater fraction of the conduit mass would be carried by the furnace wall and a lesser fraction by the upstream supports. This would be associated with shear/bending forces/moments and associated deformations.
- the spring hangers will tend to contract, raising the segment(s) to which they are attached to so that the mass supported by the furnace wall does not substantially increase and thus to at least partially, and advantageously in major part, relieve/prevent stresses that otherwise would be associated with the outlet elevation increase. the hangers may, therefore maintain an essentially constant orientation of the conduit (e.g., maintaining its upstream major portion in an essentially horizontal orientation).
- a support structure 240 external to the combustion conduit further reinforces the associated assembled segments. Such reinforcement advantageously handles structural stresses associated with shock reflections occurring within the curved segments.
- the structure further rigidly ties downstream portions of the conduit to the furnace wall.
- the turnbuckle 226 is connected via its lower threaded rod to a fixture 242 secured to the upstream end of the support structure and having snubbers 244 to accommodate and dampen side-to-side motion of the conduit which may arise from the combustion process.
- the rigid connection of the support structure to the furnace wall absorbs the recoil forces, essentially preventing recoil.
- the support structure 240 is directly mated to several of the doubly flanged conduit segments and connects such segments to the wall 215 via a discharge valve assembly 250 and exemplary preexisting horizontal structural furnace I-beams 252 and 254 above and below the valve assembly 250.
- extension beams 256 and 258 are welded to outboard flanges of the respective beams 252 and 254.
- Exemplary beams 256 and 258 are T-beams, although I-beams may also be used.
- the combustion conduit Downstream, the combustion conduit includes a nozzle portion 268 extending through an access conduit 270 and access valve 272 of the assembly 250.
- the access conduit 270, the access valve 272, and wall mounting plate (not shown) provide an access assembly.
- the access valve 272 has a body with a downstream face mounted to an upstream flange of the conduit 270.
- the nozzle 268 is secured to and extends downstream from the body of a second valve or conduit valve 274 (FIG. 8). That body has a downstream face mounted to the upstream face of the body of the access valve 272.
- the valves 272 and 274 have respective slider or gate elements 276 and 278 which may be translated between open and closed positions.
- a downstream 45° curved elbow 280 has a downstream flange mounted to the upstream face of the body of the conduit valve 274 and an upstream flange mounted to a downstream flange of a straight conduit segment 282.
- the upstream flange of the segment 282 is mounted to the downstream flange of a second 45° elbow 284.
- the upstream flange of the elbow 284 is secured to the downstream flange of a downstreammost segment 286 of a major upstream straight portion of the combustion conduit.
- the exemplary mounting sandwiches a brace interface plate 288 between these two flanges.
- the upstream flange of the segment 286 is mounted to the downstream flange of a penultimate segment 290 of the straight portion with further segments similarly mounted in series thereahead.
- the exemplary support structure 240 includes a pair of left and right diagonally-extending downstream braces 300 having downstream ends connected by mounting brackets 302 to the upstream face of the body of the valve 274 and downstream ends connected by mounting brackets 304 to the downstream face of the plate 288. Positioned end-to-end with the braces 300 are left and right longitudinal braces 306 having downstream ends connected via brackets 308 to the upstream face of the plate 288.
- the exemplary braces are U-sectioned with inboard vertical webs and transverse flanges. Just inboard of upstream and downstream flanges of the segments 286 and 290, the braces 306 are secured to each other by split clamps 310 which compressively engage the adjacent conduit segment bodies.
- an additional structural rib 312 is welded to each brace 306 along the downstream half thereof, aligned with and extending upward from the web thereof above the upper flange thereof.
- the braces help rigidify and strengthen the assembled segments 280, 282, 284, 286, and 290. These braced segments may be vertically supported and restrained against horizontal movement.
- the hanger 222 (FIG. 7) is just upstream of the upstream end of the braces 306.
- An additional hanger is provided by a downstream turnbuckle 320 near the downstream end of the braces 300.
- the turnbuckle 320 has an upper threaded rod connected to a pivot 322 welded to the underside of the flange of the beam 252 and a lower threaded rod connected to a pivot 324 on a clamp on the body of the segment 280 near the downstream end thereof.
- first and second horizontal turnbuckles 328 and 330 essentially respectively restrain the braced segments against downstream and upstream movement.
- the first turnbuckles 328 span between a downstream end portion of the associated brace 300 and the vertical beam 260 upstream thereof and the second turnbuckles 330 span between the plate 288 and the beam 260 downstream thereof.
- the assembly 250 is rigidly positioned relative to the wall 215. In such a situation, little compliance is needed near the downstream end of the conduit and thus the exemplary turnbuckle 320 is not associated with a spring hanger. Similarly, a lack of compliance is associated with the turnbuckles 328 and 330.
- the discharge/outlet end of the conduit may not be rigidly positioned (e.g., may have a degree of float relative to an aperture in the wall). In such a situation, more compliant vertical and horizontal mounting may be provided, the latter optionally including resilient recoil absorbing means.
- the second valve is installed to the access valve.
- the downstream elbow 280 may then be secured to the upstream face of the body of the conduit valve 274.
- the turnbuckle 320 may be installed.
- the straight segment 282 may be installed to the downstream elbow 280 and the upstream elbow 284 installed to the straight segment 282.
- the interface plate 288 may be installed to the upstream flange of the elbow 284.
- the mounting brackets 302 and 304 and associated downstream braces 300 may then be installed followed by the turnbuckles 328 and 330.
- the downstreammost two segments 286 and 290 of the main straight conduit section may sequentially be assembled and the associated clamps 310 installed thereto.
- the braces 306 may be installed to the clamps and to the brackets 308, in turn, installed to the interface plate 288.
- these segments, clamps, braces and brackets may be assembled as a unit and then installed as a unit to the adapter plate 288 and elbow 284.
- the downstream hanger assembly 222 may be installed along with the fixture 242 and snubbers 244.
- the remaining upstream full diameter conduit segments may be installed along with the upstream hanger assembly 220.
- the predetonator and transition conduits may then be installed followed by gas lines, controls, instrumentation, and the like.
- FIG. 9 shows a combustion conduit 350 extending from an upstream end 351 to a downstream end/outlet 352.
- the exemplary conduit 350 is configured for use in a situation wherein proximity between an obstacle such as a building wall 354 and the furnace wall 356 at the aperture 358 is too small to permit a completely straight combustion conduit of a desired length.
- the exemplary combustion conduit 350 has a single right angle bend formed by a doubly flanged 90° conduit elbow segment 360.
- the general configuration of the combustion conduit 350 may be similar to the foregoing combustion conduits (e.g., those of FIG. 1).
- the conduit is assembled by bolting conduit segments end-to-end.
- From upstream to downstream exemplary segments include a small diameter predetonator segment 362, a transition segment 363 having a diameter transition from the small diameter of the predetonator segment to a larger downstream diameter of remaining segments, four full diameter segments 364, the elbow 360, and the singly-flanged nozzle 366.
- FIGS. 10 and 11 show an exemplary conduit 380 which has both a change in height to accommodate an obstacle such as the tube pack of FIGS. 7 and 8 and a bend to accommodate a wall or other obstacle 382.
- the conduit 380 extends from an upstream end 383 to a downstream end/outlet 384 at the aperture in the furnace wall 386.
- the conduit includes a small diameter predetonator segment 388, a transition segment 390, a first full diameter straight segment 400, a 90° elbow 402, a second full diameter straight segment 404, a first 45° elbow 406, a third full diameter straight segment 408, a second 45° elbow 410, and a singly-flanged nozzle 412.
- the segments may be similarly formed to corresponding segments of the foregoing conduits.
- FIG. 12 shows representative conduit segments from a kit.
- the exemplary kit includes a small diameter doubly flanged predetonator segment 430.
- the upstream flange of this segment may have an end plate 432 accommodating the igniter and/or inlets for one or more of the fuel and/or oxidizer components.
- the kit may further include a doubly-flanged transition segment 434.
- the kit may further include doubly flanged full diameter conduit segments of a variety of different lengths (four different length segments 436, 438, 440, and 442 being shown). There may be multiple instances of any to all of these length segments.
- FIG. 12 further shows exemplary doubly-flanged full diameter 45° and 90° elbow segments 444 and 446. Again there may be multiple of each elbow segment.
- elbow segments may, also, be elbow segments of different angular span.
- outlet/nozzle conduits of different lengths (relatively short and long lengths 448 and 450 being shown).
- the different lengths of outlet conduit may accommodate one or both of different vessel wall thickness and general length from the penultimate segment (last doubly flanged segment) to the outlet. This latter factor may alternatively be addressed by the use of a different penultimate segment or segment combination with a single length of outlet conduit.
- conduit cross-section it may be appropriate or necessary to have additional changes in conduit cross-section.
- navigating such obstacles may be associated with a change in the cross-sectional shape with general preservation of cross-sectional area.
- a circular section could transition to an elongate rectangular section of similar area to get between relatively close obstacles.
- the transition segments could transition in cross-sectional shape.
- one or more of the segments are entirely within the vessel (including segments which may navigate internal obstacles in similar fashion to the aforementioned navigation of external obstacles).
- the exemplary kit may contain only the segments needed for a particular combustion conduit or group of combustion conduits at a facility. Such conduits may be engineered in advance and the appropriate combinations chosen to achieve desired conduit length in view of the obstacles and other constraints.
- the other constraints may include the location of entry of the conduit to the furnace, the angle of entry at that location, and the desired location of the upstream end of the conduit. For example, it may be desirable to relatively closely locate the upstream ends of several conduits for control economy. Alternatively, however, a certain amount of the engineering may be performed on-site. In such a situation, the kit could include extra components of various sizes to permit the on-site selection of configuration options and permit experimental on-site optimization.
- kits may include other aforementioned components such as bolts for securing the segments together, braces, hangers, trolleys and associated hardware, reaction straps/springs, fuel/oxidizer/purge gas equipment and plumbing, control and monitoring hardware, gaskets, and the like. Additionally, the kit might include thermal isolation flanges, air curtain flanges, and cooled nozzle components. Furthermore, the kit may include access apparatus.
Landscapes
- Engineering & Computer Science (AREA)
- Mechanical Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- General Engineering & Computer Science (AREA)
- Cleaning In General (AREA)
- Combustion Of Fluid Fuel (AREA)
Abstract
Description
- The invention relates to industrial equipment. More particularly, the invention relates to the detonative cleaning of industrial equipment.
- Surface fouling is a major problem in industrial equipment. Such equipment includes furnaces (coal, oil, waste, etc.), boilers, gasifiers, reactors, heat exchangers, and the like. Typically the equipment involves a vessel containing internal heat transfer surfaces that are subjected to fouling by accumulating particulate such as soot, ash, minerals and other products and byproducts of combustion, more integrated buildup such as slag and/or fouling, and the like. Such particulate build-up may progressively interfere with plant operation, reducing efficiency and throughput and potentially causing damage. Cleaning of the equipment is therefore highly desirable and is attended by a number of relevant considerations. Often direct access to the fouled surfaces is difficult. Additionally, to maintain revenue it is desirable to minimize industrial equipment downtime and related costs associated with cleaning. A variety of technologies have been proposed. By way of example, various technologies have been proposed in U.S. patents 5,494,004 and 6,438,191 and U.S. patent application publication 2002/0112638. Additional technology is disclosed in Huque, Z. Experimental Investigation of Slag Removal Using Pulse Detonation Wave Technique, DOE/HBCU/OMI Annual Symposium, Miami, FL., March 16-18, 1999. Particular blast wave techniques are described by Hanjali and Smajevi in their publications: Hanjali, K. and Smajevi, I., Further Experience Using Detonation Waves for Cleaning Boiler Heating Surfaces, International Journal of Energy Research Vol. 17, 583-595 (1993) and Hanjali, K. and Smajevi
- Nevertheless, there remain opportunities for further improvement in the field.
- One aspect of the invention involves an apparatus for cleaning a surface within a vessel. A vessel wall separates a vessel exterior from a vessel interior and has a wall aperture. The apparatus includes a source of fuel and oxidizer and an igniter for initiating a reaction of the fuel and oxidizer. An elongate conduit has first and second ends and is positioned to direct a gas flow of the reacted or reacting fuel and oxidizer through the wall aperture and discharge from the second end. The conduit includes a number of segments secured end-to-end.
- In various implementations, at least three of the conduit segments have lengths along a gas flowpath of 1-3m and characteristic internal cross-sectional areas of 0.006-0.3m2. At least three of the segments may each include a tubular body having first and second ends and first and second bolting flanges respectively proximate the first and second ends. A nozzle assembly may extend at least partially through the vessel wall. At least one of the segments may be an elbow. The conduit may consist essentially of three portions: an essentially straight first portion; an essentially straight second portion upstream of the first portion; and a third non-straight portion between the first and second portions. The second and third portions may have essentially similar internal cross-sections. The first portion may include downstream, upstream, and transition portions. The downstream portion internal cross-section may be essentially similar to that of the second and third portions. The upstream portion internal cross-section may be smaller than that of the downstream portion. The transition portion internal cross-section may transition from essentially similar to that of the upstream portion to essentially similar to that of the downstream portion. The first and second portions may be parallel and offset. The first and second portions may be oriented at a non-zero angle (e.g., 20°-160°) to each other.
- Another aspect of the invention involves a method for configuring a detonative cleaning apparatus for cleaning surfaces within a vessel. A suitable combustion conduit cross-sectional area is determined. A suitable combustion conduit length is determined. An appropriate path for the combustion conduit is determined in view of environmental considerations. An appropriate combination of conduit segments for forming the combustion conduit is determined so as to be routed along the appropriate path.
- In various implementations, the segments may be selected from a number of pre-established conduit segment configurations.
- The segments may include at least one straight segment and at least one curved segment. At least some of the segments may each have a tubular body with first and second ends and first and second attachment flanges proximate the first and second ends. An appropriate predetonator configuration may be determined. Drawings of the so-configured apparatus may be made and the so-configured apparatus may be assembled.
- The details of one or more embodiments of the invention are set forth in the accompanying drawings and the description below. Other features, objects, and advantages of the invention will be apparent from the description and drawings, and from the claims.
-
- FIG. 1 is a view of an industrial furnace associated with several soot blowers positioned to clean a level of the furnace.
- FIG. 2 is a side view of one of the blowers of FIG. 1.
- FIG. 3 is a partially cut-away side view of an upstream end of the blower of FIG. 2.
- FIG. 4 is a longitudinal sectional view of a main combustor segment of the soot blower of FIG. 2.
- FIG. 5 is an end view of the segment of FIG. 4.
- FIG. 6 is a view of a conduit segment support trolley of the system of FIG. 1.
- FIG. 7 is a side view of an alternate combustion conduit.
- FIG. 8 is a view of the combustion conduit of FIG. 7 with an upper external tube pack and various support features removed to show detail.
- FIG. 9 is a top view of an alternate combustion conduit.
- FIG. 10 is a top view of an alternate combustion conduit.
- FIG. 11 is a side view of the combustion conduit of FIG. 10.
- FIG. 12 is a view of representative sizes of conduit segments in a conduit segment kit.
-
- Like reference numbers and designations in the various drawings indicate like elements.
- FIG. 1 shows a
furnace 20 having an exemplary three associatedsoot blowers 22. In the illustrated embodiment, the furnace vessel is formed as a right parallelepiped and the soot blowers are all associated with a singlecommon wall 24 of the vessel and are positioned at like height along the wall. Other configurations are possible (e.g., a single soot blower, one or more soot blowers on each of multiple levels, and the like). - Each
soot blower 22 includes anelongate combustion conduit 26 extending from an upstreamdistal end 28 away from thefurnace wall 24 to a downstreamproximal end 30 closely associated with thewall 24. Optionally, however, theend 30 may be well within the furnace. In operation of each soot blower, combustion of a fuel/oxidizer mixture within theconduit 26 is initiated proximate the upstream end (e.g., within an upstreammost 10% of a conduit length) to produce a detonation wave which is expelled from the downstream end as a shock wave along with associated combustion gases for cleaning surfaces within the interior volume of the furnace. Each soot blower may be associated with a fuel/oxidizer source 32. Such source or one or more components thereof may be shared amongst the various soot blowers. An exemplary source includes a liquified or compressedgaseous fuel cylinder 34 and anoxygen cylinder 36 inrespective containment structures central air source 42. In the exemplary embodiment, air is stored in anair accumulator 44. Fuel, expanded from that in thecylinder 34 is generally stored in afuel accumulator 46. Eachexemplary source 32 is coupled to the associatedconduit 26 by appropriate plumbing below. Similarly, each soot blower includes aspark box 50 for initiating combustion of the fuel oxidizer mixture and which, along with thesource 32, is controlled by a control and monitoring system (not shown). FIG. 1 further shows thewall 24 as including a number of ports for inspection and/or measurement. Exemplary ports include anoptical monitoring port 54 and atemperature monitoring port 56 associated with eachsoot blower 22 for respectively receiving an infrared and/or visible light video camera and thermocouple probe for viewing the surfaces to be cleaned and monitoring internal temperatures. Other probes/monitoring/sampling may be utilized, including pressure monitoring, composition sampling, and the like. - FIG. 2 shows further details of an
exemplary soot blower 22. Theexemplary detonation conduit 26 is formed with a main body portion formed by a series of doubly flanged conduit sections orsegments 60 arrayed from upstream to downstream and a downstream nozzle conduit section orsegment 62 having adownstream portion 64 extending through anaperture 66 in the wall and ending in the downstream end oroutlet 30 exposed to thefurnace interior 68. The term nozzle is used broadly and does not require the presence of any aerodynamic contraction, expansion, or combination thereof. Exemplary conduit segment material is metallic (e.g., stainless steel). Theoutlet 30 may be located further within the furnace if appropriate support and cooling are provided. FIG. 2 further shows furnace interior tube bundles 70, the exterior surfaces of which are subject to fouling. In the exemplary embodiment, each of theconduit segments 60 is supported on an associatedtrolley 72, the wheels of which engage atrack system 74 along thefacility floor 76. The exemplary track system includes a pair of parallel rails engaging concave peripheral surfaces of the trolley wheels. Theexemplary segments 60 are of similar length L, and are bolted end-to-end by associated arrays of bolts in the bolt holes of their respective flanges. Similarly, the downstream flange of the downstreammost of thesegments 60 is bolted to the upstream flange of thenozzle 62. In the exemplary embodiment, a reaction strap 80 (e.g., cotton or thermally/structurally robust synthetic) in series with one or more metal coil reaction springs 82 is coupled to this last mated flange pair and connects the combustion conduit to an environmental structure such as the furnace wall for resiliently absorbing reaction forces associated with discharging of the soot blower and ensuring correct placement of the combustion conduit for subsequent firings. Optionally, additional damping (not shown) may be provided. The reaction strap/spring combination may be formed as a single length or a loop. In the exemplary embodiment, this combined downstream section has an overall length L2. Alternative resilient recoil absorbing means may include non-metal or non-coil springs or rubber or other elastomeric elements advantageously at least partially elastically deformed in tension, compression, and/or shear, pneumatic recoil absorbers, and the like. - Extending downstream from the
upstream end 28 is a predetonator conduit section/segment 84 which also may be doubly flanged and has a length L3. Thepredetonator conduit segment 84 has a characteristic internal cross-sectional area (transverse to an axis/centerline 500 of the conduit) which is smaller than a characteristic internal cross-sectional area (e.g., mean, median, mode, or the like) of the downstream portion (60, 62) of the combustion conduit. In an exemplary embodiment involving circular sectioned conduit segments, the predetonator cross-sectional area is a characterized by a diameter of between 8 cm and 12 cm whereas the downstream portion is characterized by a diameter of between 20 cm and 40 cm. Accordingly, exemplary cross-sectional area ratios of the downstream portion to the predetonator segment are between 1:1 and 10:1, more narrowly, 2:1 and 10:1. An overall length L between ends 28 and 30 may be 1-15 m, more narrowly, 5-15 m. In the exemplary embodiment, atransition conduit segment 86 extends between thepredetonator segment 84 and theupstreammost segment 60. Thesegment 86 has upstream and downstream flanges sized to mate with the respective flanges of thesegments exemplary segment 86 has a length L4. An exemplary half angle of divergence of the interior surface ofsegment 86 is ≤ 12°, more narrowly 5-10°. - A fuel/oxidizer charge may be introduced to the detonation conduit interior in a variety of ways. There may be one or more distinct fuel/oxidizer mixtures. Such mixture(s) may be premixed external to the detonation conduit, or may be mixed at or subsequent to introduction to the conduit. FIG. 3 shows the
segments segment 84, a pair of predetonatorfuel injection conduits 90 are coupled toports 92 in the segment wall which define fuel injection ports. Similarly, a pair ofpredetonator oxidizer conduits 94 are coupled tooxidizer inlet ports 96. In the exemplary embodiment, these ports are in the upstream half of the length of thesegment 84. In the exemplary embodiment, each of thefuel injection ports 92 is paired with an associated one of theoxidizer ports 96 at even axial position and at an angle (exemplary 90° shown, although other angles including 180° are possible) to provide opposed jet mixing of fuel and oxidizer. Discussed further below, apurge gas conduit 98 is similarly connected to apurge gas port 100 yet further upstream. Anend plate 102 bolted to the upstream flange of thesegment 84 seals the upstream end of the combustion conduit and passes through an igniter/initiator 106 (e.g., a spark plug) having anoperative end 108 in the interior of thesegment 84. - In the exemplary embodiment, the main fuel and oxidizer are introduced to the
segment 86. In the illustrated embodiment, main fuel is carried by a number ofmain fuel conduits 112 and main oxidizer is carried by a number ofmain oxidizer conduits 110, each of which has terminal portions concentrically surrounding an associated one of thefuel conduits 112 so as to mix the main fuel and oxidizer at an associatedinlet 114. In exemplary embodiments, the fuels are hydrocarbons. In particular exemplary embodiments, both fuels are the same, drawn from a single fuel source but mixed with distinct oxidizers: essentially pure oxygen for the predetonator mixture; and air for the main mixture. Exemplary fuels useful in such a situation are propane, MAPP gas, or mixtures thereof. Other fuels are possible, including ethylene and liquid fuels (e.g., diesel, kerosene, and jet aviation fuels). The oxidizers can include mixtures such as air/oxygen mixtures of appropriate ratios to achieve desired main and/or predetonator charge chemistries. Further, monopropellant fuels having molecularly combined fuel and oxidizer components may be options. - In operation, at the beginning of a use cycle, the combustion conduit is initially empty except for the presence of air (or other purge gas). The predetonator fuel and oxidizer are then introduced through the associated ports filling the
segment 84 and extending partially into the segment 86 (e.g., to near the midpoint) and advantageously just beyond the main fuel/oxidizer ports. The predetonator fuel and oxidizer flows are then shut off. An exemplary volume filled the predetonator fuel and oxidizer is 1-40%, more narrowly 1-20%, of the combustion conduit volume. The main fuel and oxidizer are then introduced, to substantially fill some fraction (e.g., 20-100%) of the remaining volume of the combustor conduit. The main fuel and oxidizer flows are then shut off. The prior introduction of predetonator fuel and oxidizer past the main fuel/oxidizer ports largely eliminates the risk of the formation of an air or other non-combustible slug between the predetonator and main charges. Such a slug could prevent migration of the combustion front between the two charges. - With the charges introduced, the spark box is triggered to provide a spark discharge of the initiator igniting the predetonator charge. The predetonator charge being selected for very fast combustion chemistry, the initial deflagration quickly transitions to a detonation within the
segment 84 and producing a detonation wave. Once such a detonation wave occurs, it is effective to pass through the main charge which might, otherwise, have sufficiently slow chemistry to not detonate within the conduit of its own accord. The wave passes longitudinally downstream and emerges from thedownstream end 30 as a shock wave within the furnace interior, impinging upon the surfaces to be cleaned and thermally and mechanically shocking to typically at least loosen the contamination. The wave will be followed by the expulsion of pressurized combustion products from the detonation conduit, the expelled products emerging as a jet from thedownstream end 30 and further completing the cleaning process (e.g., removing the loosened material). After or overlapping such venting of combustion products, a purge gas (e.g., air from the same source providing the main oxidizer and/or nitrogen) is introduced through thepurge port 100 to drive the final combustion products out and leave the detonation conduit filled with purge gas ready to repeat the cycle (either immediately or at a subsequent regular interval or at a subsequent irregular interval (which may be manually or automatically determined by the control and monitoring system)). Optionally, a baseline flow of the purge gas may be maintained between charge/discharge cycles so as to prevent gas and particulate from the furnace interior from infiltrating upstream and to assist in cooling of the detonation conduit. - In various implementations, internal surface enhancements may substantially increase internal surface area beyond that provided by the nominally cylindrical and frustoconical segment interior surfaces. The enhancement may be effective to assist in the deflagration-to-detonation transition or in the maintenance of the detonation wave. FIG. 4 shows internal surface enhancements applied to the interior of one of the
main segments 60. The exemplary enhancement is nominally a Chin spiral, although other enhancements such as Shchelkin spirals and Smirnov cavities may be utilized. The spiral is formed by ahelical member 120. Theexemplary member 120 is formed as a circular-sectioned metallic element (e.g., stainless steel wire) of approximately 8-20mm in sectional diameter. Other sections may alternatively be used. Theexemplary member 120 is held spaced-apart from the segment interior surface by a plurality oflongitudinal elements 122. The exemplary longitudinal elements are rods of similar section and material to themember 120 and welded thereto and to the interior surface of the associatedsegment 60. Such enhancements may also be utilized to provide predetonation in lieu of or in addition to the foregoing techniques involving different charges and different combustor cross-sections. - The apparatus may be used in a wide variety of applications. By way of example, just within a typical coal-fired furnace, the apparatus may be applied to: the pendants or secondary superheaters, the convective pass (primary superheaters and the economizer bundles); air preheaters; selective catalyst removers (SCR) scrubbers; the baghouse or electrostatic precipitator; economizer hoppers; ash or other heat/accumulations whether on heat transfer surfaces or elsewhere, and the like. Similar possibilities exist within other applications including oil-fired furnaces, black liquor recovery boilers, biomass boilers, waste reclamation burners (trash burners), and the like.
- FIG. 6 shows further details of the
exemplary trolley 72 andtrack system 74. The exemplary track system comprises a pair of parallel vertex-up right angle channel elements 140 (e.g., of steel) secured such as by welding to mountingplates 142. The mounting plates are, in turn, secured to thefloor 76 such as via bolts (not shown) in bolt holes 144. The exemplary trolley includes astructural frame 150 having a pair of left and rightlongitudinal members 152 and fore andaft crossmembers 154. At the left and right sides of each crossmember, awheel 156 is mounted on a dependingbracket 158. The wheel periphery has a concavity (e.g., a right-angle V-groove 160) receiving the vertex of the rightangle channel elements 140. The exemplary trolley has means for supporting the associated conduit segment and means for securing the segment in place. The exemplary support means include a pair of fore and aft tube/pipe clamps 170 each positioned and supported bynuts 172 on associated left and right threadedshafts 174 secured at their lower ends to the frame. Theclamps 170 have aconcave surface 176 complementary to the exterior body surface of the associated conduit segment to support the segment from below. The securing means comprises similartop brackets 180 also mounted to theshafts 174 and held downward in place in compressive engagement with the segment via nuts 182. - A number of options are available for using the trolleys. The individual segments may be preassembled to their associated trolleys and rolled into place along the track system, whereupon the segments may be secured to each other via their end flanges. Disassembly may be by a reverse of this process. The trolleys may also allow the combustion conduit to be moved as a unit (e.g., if it is desired that the downstream portion of the conduit not be inserted into the furnace all the time). Additionally, as noted above, the trolleys may accommodate movement as a unit associated with longitudinal thermal expansion and/or with recoil during discharge cycles while maintaining conduit segment alignment.
- FIG. 7 shows an
alternate system 200 wherein thecombustion conduit 202 is suspended from brackets 204 (e.g., as part of a free-standing support structure or secured to a ceiling orroof 206 of the facility). Such a system may be particularly useful where the conduit is positioned high above a facility floor. Theexemplary system 200 navigates theconduit 202 around environmental obstacles external to the furnace. Exemplary obstacles include upper and lower tube bundles 210 and 212 between which the conduit passes. In the exemplary embodiment, the conduit is circuitous to permit positioning of itsoutlet 214 in a position on the furnace wall aligned with one of the two bundles. In such a situation, a straight conduit would be interfered with by the bundles. Accordingly, the conduit is provided with one or morecurved sections 216 to accommodate the bundles. - From upstream to downstream, the exemplary support system includes an upstream and an
intermediate spring hanger turnbuckle systems spring hanger 222 may have substantially higher capacity due to a higher static load at that location. The particular combination of hanger sizings may be influenced by the relative locations of the hangers along the conduit in view of mass parameters of the conduit (e.g., center of gravity, mass distribution, and the like), strength parameters of the conduit (e.g., various modulus), and the location of any additional support. The exemplary spring hangers serve as essentially constant-load hangers, with supportive tensile force essentially constant over an operating range. One function of the vertical compliance afforded by the hangers is to accommodate thermally-associated changes in the vertical position of theoutlet 214 relative to theceiling surface 206 or other combustion conduit support structure. For example, thermal expansion of the furnace wall may cause a change in outlet vertical position between hot and cold (e.g., running and off) furnace conditions. In the embodiment of FIG. 2, such expansion is addressed by non rigid vertical coupling of the conduit and wall with sufficient vertical play for the conduit within the oversized wall aperture. With rigid mounting, however, if furnace heating raises the conduit outlet height, in the absence of the constant force hangers, a greater fraction of the conduit mass would be carried by the furnace wall and a lesser fraction by the upstream supports. This would be associated with shear/bending forces/moments and associated deformations. The spring hangers, however, will tend to contract, raising the segment(s) to which they are attached to so that the mass supported by the furnace wall does not substantially increase and thus to at least partially, and advantageously in major part, relieve/prevent stresses that otherwise would be associated with the outlet elevation increase. the hangers may, therefore maintain an essentially constant orientation of the conduit (e.g., maintaining its upstream major portion in an essentially horizontal orientation). - In the exemplary embodiment, a
support structure 240 external to the combustion conduit further reinforces the associated assembled segments. Such reinforcement advantageously handles structural stresses associated with shock reflections occurring within the curved segments. In the illustrated embodiment, the structure further rigidly ties downstream portions of the conduit to the furnace wall. In the exemplary embodiment, theturnbuckle 226 is connected via its lower threaded rod to afixture 242 secured to the upstream end of the support structure and havingsnubbers 244 to accommodate and dampen side-to-side motion of the conduit which may arise from the combustion process. In the exemplary embodiment, the rigid connection of the support structure to the furnace wall absorbs the recoil forces, essentially preventing recoil. To the extent that longitudinal thermal expansion of the conduit remains an issue, such expansion may be taken up by allowing the hangers to pivot (e.g., relative toconnection locations 246 to thebrackets 204 above and theconnection point 248 with the associated conduit engagement fixture below. Alternative embodiments may remove the rigid coupling of the conduit to the wall and permit a resilient or damped coupling. - The
support structure 240 is directly mated to several of the doubly flanged conduit segments and connects such segments to thewall 215 via adischarge valve assembly 250 and exemplary preexisting horizontal structural furnace I-beams valve assembly 250. In the exemplary implementation, extension beams 256 and 258 are welded to outboard flanges of therespective beams Exemplary beams right beams 256 and left andright beams 258 with respective pairs spanned by left and right vertically-extending I-beams 260 each having an inboard flange secured to the head flange of the associatedbeams - Downstream, the combustion conduit includes a
nozzle portion 268 extending through anaccess conduit 270 andaccess valve 272 of theassembly 250. Theaccess conduit 270, theaccess valve 272, and wall mounting plate (not shown) provide an access assembly. Theaccess valve 272 has a body with a downstream face mounted to an upstream flange of theconduit 270. Thenozzle 268 is secured to and extends downstream from the body of a second valve or conduit valve 274 (FIG. 8). That body has a downstream face mounted to the upstream face of the body of theaccess valve 272. Thevalves gate elements curved elbow 280 has a downstream flange mounted to the upstream face of the body of theconduit valve 274 and an upstream flange mounted to a downstream flange of astraight conduit segment 282. The upstream flange of thesegment 282 is mounted to the downstream flange of a second 45°elbow 284. The upstream flange of theelbow 284 is secured to the downstream flange of adownstreammost segment 286 of a major upstream straight portion of the combustion conduit. The exemplary mounting sandwiches abrace interface plate 288 between these two flanges. The upstream flange of thesegment 286 is mounted to the downstream flange of apenultimate segment 290 of the straight portion with further segments similarly mounted in series thereahead. - The
exemplary support structure 240 includes a pair of left and right diagonally-extendingdownstream braces 300 having downstream ends connected by mountingbrackets 302 to the upstream face of the body of thevalve 274 and downstream ends connected by mountingbrackets 304 to the downstream face of theplate 288. Positioned end-to-end with thebraces 300 are left and rightlongitudinal braces 306 having downstream ends connected viabrackets 308 to the upstream face of theplate 288. The exemplary braces are U-sectioned with inboard vertical webs and transverse flanges. Just inboard of upstream and downstream flanges of thesegments braces 306 are secured to each other by split clamps 310 which compressively engage the adjacent conduit segment bodies. In the exemplary embodiment, an additionalstructural rib 312 is welded to eachbrace 306 along the downstream half thereof, aligned with and extending upward from the web thereof above the upper flange thereof. - The braces help rigidify and strengthen the assembled
segments braces 306. An additional hanger is provided by adownstream turnbuckle 320 near the downstream end of thebraces 300. In the exemplary embodiment, theturnbuckle 320 has an upper threaded rod connected to apivot 322 welded to the underside of the flange of thebeam 252 and a lower threaded rod connected to apivot 324 on a clamp on the body of thesegment 280 near the downstream end thereof. On each of the left and right sides of the conduit, first and secondhorizontal turnbuckles first turnbuckles 328 span between a downstream end portion of the associatedbrace 300 and thevertical beam 260 upstream thereof and thesecond turnbuckles 330 span between theplate 288 and thebeam 260 downstream thereof. In the exemplary embodiment, theassembly 250 is rigidly positioned relative to thewall 215. In such a situation, little compliance is needed near the downstream end of the conduit and thus theexemplary turnbuckle 320 is not associated with a spring hanger. Similarly, a lack of compliance is associated with theturnbuckles - In an exemplary installation sequence, the second valve is installed to the access valve. The
downstream elbow 280 may then be secured to the upstream face of the body of theconduit valve 274. The turnbuckle 320 may be installed. Thestraight segment 282 may be installed to thedownstream elbow 280 and theupstream elbow 284 installed to thestraight segment 282. Theinterface plate 288 may be installed to the upstream flange of theelbow 284. The mountingbrackets downstream braces 300 may then be installed followed by theturnbuckles segments braces 306 may be installed to the clamps and to thebrackets 308, in turn, installed to theinterface plate 288. Alternatively, these segments, clamps, braces and brackets may be assembled as a unit and then installed as a unit to theadapter plate 288 andelbow 284. Thedownstream hanger assembly 222 may be installed along with thefixture 242 andsnubbers 244. The remaining upstream full diameter conduit segments may be installed along with theupstream hanger assembly 220. The predetonator and transition conduits may then be installed followed by gas lines, controls, instrumentation, and the like. - FIG. 9 shows a
combustion conduit 350 extending from anupstream end 351 to a downstream end/outlet 352. Theexemplary conduit 350 is configured for use in a situation wherein proximity between an obstacle such as abuilding wall 354 and thefurnace wall 356 at theaperture 358 is too small to permit a completely straight combustion conduit of a desired length. Theexemplary combustion conduit 350 has a single right angle bend formed by a doubly flanged 90°conduit elbow segment 360. The general configuration of thecombustion conduit 350 may be similar to the foregoing combustion conduits (e.g., those of FIG. 1). The conduit is assembled by bolting conduit segments end-to-end. From upstream to downstream exemplary segments include a smalldiameter predetonator segment 362, atransition segment 363 having a diameter transition from the small diameter of the predetonator segment to a larger downstream diameter of remaining segments, fourfull diameter segments 364, theelbow 360, and the singly-flanged nozzle 366. - Yet more complex situations may be accommodated by different segment combinations. FIGS. 10 and 11 show an
exemplary conduit 380 which has both a change in height to accommodate an obstacle such as the tube pack of FIGS. 7 and 8 and a bend to accommodate a wall orother obstacle 382. Theconduit 380 extends from anupstream end 383 to a downstream end/outlet 384 at the aperture in thefurnace wall 386. From upstream to downstream, the conduit includes a smalldiameter predetonator segment 388, atransition segment 390, a first full diameterstraight segment 400, a 90°elbow 402, a second full diameterstraight segment 404, a first 45°elbow 406, a third full diameterstraight segment 408, a second 45°elbow 410, and a singly-flanged nozzle 412. The segments may be similarly formed to corresponding segments of the foregoing conduits. - FIG. 12 shows representative conduit segments from a kit. The exemplary kit includes a small diameter doubly
flanged predetonator segment 430. The upstream flange of this segment may have anend plate 432 accommodating the igniter and/or inlets for one or more of the fuel and/or oxidizer components. The kit may further include a doubly-flanged transition segment 434. The kit may further include doubly flanged full diameter conduit segments of a variety of different lengths (fourdifferent length segments elbow segments long lengths - In various implementations, it may be appropriate or necessary to have additional changes in conduit cross-section. For example, between the predetonator and the downstreammost lengths, there may be one or more segments of intermediate cross-section along with appropriate transition segments. In a particular example, there may be insufficient space to route one or more full diameter segments between obstacles at an intermediate position along the length of the conduit. Alternatively, navigating such obstacles may be associated with a change in the cross-sectional shape with general preservation of cross-sectional area. For example, a circular section could transition to an elongate rectangular section of similar area to get between relatively close obstacles. In such a situation, the transition segments could transition in cross-sectional shape. Among yet further variations are those in which one or more of the segments are entirely within the vessel (including segments which may navigate internal obstacles in similar fashion to the aforementioned navigation of external obstacles).
- The exemplary kit may contain only the segments needed for a particular combustion conduit or group of combustion conduits at a facility. Such conduits may be engineered in advance and the appropriate combinations chosen to achieve desired conduit length in view of the obstacles and other constraints. The other constraints may include the location of entry of the conduit to the furnace, the angle of entry at that location, and the desired location of the upstream end of the conduit. For example, it may be desirable to relatively closely locate the upstream ends of several conduits for control economy. Alternatively, however, a certain amount of the engineering may be performed on-site. In such a situation, the kit could include extra components of various sizes to permit the on-site selection of configuration options and permit experimental on-site optimization.
- Additionally, the kits may include other aforementioned components such as bolts for securing the segments together, braces, hangers, trolleys and associated hardware, reaction straps/springs, fuel/oxidizer/purge gas equipment and plumbing, control and monitoring hardware, gaskets, and the like. Additionally, the kit might include thermal isolation flanges, air curtain flanges, and cooled nozzle components. Furthermore, the kit may include access apparatus.
- One or more embodiments of the present invention have been described. Nevertheless, it will be understood that various modifications may be made without departing from the spirit and scope of the invention. For example, the invention may be adapted for use with a variety of industrial equipment and with variety of soot blower technologies. Aspects of the existing equipment and technologies may influence aspects of any particular implementation. Accordingly, other embodiments are within the scope of the following claims.
Claims (15)
- An apparatus (22) for cleaning a surface within a vessel (20) having a vessel wall (24) separating a vessel exterior from a vessel interior and having a wall aperture (66), the apparatus comprising:a source (32) of fuel and oxidizer;an igniter (106) for initiating a reaction of the fuel and oxidizer; andan elongate conduit (26; 202; 350; 380) having a first end (28) and a second end (30) and positioned to direct a gas flow of the reacted or reacting fuel and oxidizer through the wall aperture and discharge from the second end and comprising a plurality of segments (60) secured end-to-end.
- The apparatus of claim 1 wherein:at least three of the conduit segments (60) have lengths along a gas flowpath 1-3m and characteristic internal cross-sectional areas of 0.006-0.3m2.
- The apparatus of claim 1 or 2 wherein:at least three of the segments (60) each comprise:a tubular body having first and second ends; andfirst and second attachment flanges proximate the first and second ends,
- The apparatus of any preceding claim wherein:a nozzle assembly extends at least partially through the vessel wall (24).
- The apparatus of any preceding claim wherein:at least one of the segments is an elbow (360; 402).
- The apparatus of any preceding claim wherein the conduit consists essentially of three portions:an essentially straight first portion;an essentially straight second portion upstream of the first portion; anda third non-straight portion between the first and second portions.
- The apparatus of claim 6 wherein:the second and third portions have essentially similar internal cross-sections; andthe first portion includes:a downstream portion having an internal cross-section essentially similar to the internal cross-sections of the second and third portions;an upstream portion having an internal cross-section smaller than the internal cross-section of the downstream portion; anda transition portion having an internal cross-section that transitions from essentially similar to the internal cross-section of the upstream portion to essentially similar to the internal cross-section of the downstream portion.
- The apparatus of claim 6 or 7 wherein the first and second portions are parallel and offset.
- The apparatus of claim 6 or 7 wherein the first and second portions are oriented at an angle of 20°-160° to each other.
- A method for configuring a detonative cleaning apparatus for cleaning surfaces within a vessel (20), the vessel having a wall (24), the method comprising:determining a suitable cross-sectional area for a combustion conduit (26) of the apparatus;determining a suitable length for the combustion conduit (26);determining an appropriate path for the combustion conduit in view of environmental considerations; anddetermining an appropriate combination of combustion conduit segments for (60) forming the combustion conduit so as to be routed along the appropriate path.
- The method of claim 10 wherein:the combustion conduit segments (60) are selected from a plurality of pre-established conduit segment configurations.
- The method of claim 10 or 11 wherein:the combustion conduit segments (60) include at least one straight segment and at least one curved segment (360; 402).
- The method of claim 10, 11 or 12 wherein:at least some of the combustion conduit segments each comprise:a tubular body having first and second ends; andfirst and second attachment flanges proximate the first and second ends,
- The method of any of claims 10 to 13 further comprising:determining an appropriate predetonator configuration.
- The method of any of claims 10 to 14 in combination with:generating drawings of the so-configured detonative cleaning apparatus; andassembling the so-configured detonative cleaning apparatus.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US10/718,730 US7011047B2 (en) | 2003-11-20 | 2003-11-20 | Detonative cleaning apparatus |
US718730 | 2003-11-20 | ||
US10/733,889 US20050125933A1 (en) | 2003-12-11 | 2003-12-11 | Detonative cleaning apparatus |
US733889 | 2003-12-11 |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1533049A1 true EP1533049A1 (en) | 2005-05-25 |
Family
ID=34437430
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP04257176A Withdrawn EP1533049A1 (en) | 2003-11-20 | 2004-11-19 | Detonative cleaning apparatus |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP1533049A1 (en) |
JP (1) | JP2005152894A (en) |
CN (1) | CN1626287A (en) |
AU (1) | AU2004229046B2 (en) |
NZ (1) | NZ536698A (en) |
RU (1) | RU2004133924A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1962046A1 (en) | 2007-02-22 | 2008-08-27 | General Electric Company | Pulse detonation combustor cleaning device and method of operation |
US8651066B2 (en) | 2010-09-28 | 2014-02-18 | Bha Altair, Llc | Pulse detonation cleaning system |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112974444B (en) * | 2018-07-26 | 2022-09-23 | 德州鲁斯泰铝业有限公司 | Use method of air explosion cleaning equipment for columnar garbage can |
WO2023033110A1 (en) * | 2021-09-02 | 2023-03-09 | 株式会社レゾナック | Method for operating fullerene manufacturing device, fullerene manufacturing device, and method for manufacturing fullerene |
CN114570708B (en) * | 2022-04-02 | 2022-09-02 | 广东雷诺精密科技有限公司 | Watch cleaning machine and watch cleaning method |
Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US5494004A (en) * | 1994-09-23 | 1996-02-27 | Lockheed Corporation | On line pulsed detonation/deflagration soot blower |
WO1996036417A1 (en) * | 1994-05-27 | 1996-11-21 | Seditec Ltd. | Shock wave generator |
Family Cites Families (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2003320331A (en) * | 2002-04-26 | 2003-11-11 | Jfe Engineering Kk | Dust removing method and dust extractor |
-
2004
- 2004-11-12 AU AU2004229046A patent/AU2004229046B2/en not_active Ceased
- 2004-11-17 JP JP2004332553A patent/JP2005152894A/en active Pending
- 2004-11-19 NZ NZ53669804A patent/NZ536698A/en unknown
- 2004-11-19 EP EP04257176A patent/EP1533049A1/en not_active Withdrawn
- 2004-11-22 CN CN 200410095203 patent/CN1626287A/en active Pending
- 2004-11-22 RU RU2004133924/12A patent/RU2004133924A/en not_active Application Discontinuation
Patent Citations (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
WO1996036417A1 (en) * | 1994-05-27 | 1996-11-21 | Seditec Ltd. | Shock wave generator |
US5494004A (en) * | 1994-09-23 | 1996-02-27 | Lockheed Corporation | On line pulsed detonation/deflagration soot blower |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP1962046A1 (en) | 2007-02-22 | 2008-08-27 | General Electric Company | Pulse detonation combustor cleaning device and method of operation |
US8651066B2 (en) | 2010-09-28 | 2014-02-18 | Bha Altair, Llc | Pulse detonation cleaning system |
Also Published As
Publication number | Publication date |
---|---|
AU2004229046B2 (en) | 2006-06-22 |
JP2005152894A (en) | 2005-06-16 |
CN1626287A (en) | 2005-06-15 |
NZ536698A (en) | 2006-09-29 |
RU2004133924A (en) | 2007-04-27 |
AU2004229046A1 (en) | 2005-06-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7011047B2 (en) | Detonative cleaning apparatus | |
US20090229068A1 (en) | Detonative cleaning apparatus mounting system | |
US7104223B2 (en) | Detonative cleaning apparatus | |
US20050125933A1 (en) | Detonative cleaning apparatus | |
US20050199743A1 (en) | Control of detonative cleaning apparatus | |
US7442034B2 (en) | Detonative cleaning apparatus | |
US20050130084A1 (en) | Detonative cleaning apparatus | |
US20050126597A1 (en) | Inspection camera | |
AU2004229046B2 (en) | Detonative cleaning apparatus | |
US20080092828A1 (en) | Detonative cleaning apparatus | |
US20050125930A1 (en) | Detonative cleaning apparatus | |
US7047908B2 (en) | Cooling flange | |
EP1533048A1 (en) | Control of detonative cleaning apparatus | |
US20050126594A1 (en) | Soot blower access apparatus | |
GB2408556A (en) | Moveable support for combustion conduit of detonative cleaning apparatus | |
JP3974611B2 (en) | Container inner surface cleaning apparatus and inner surface cleaning method | |
GB2408555A (en) | Detonative cleaning device with cooling | |
JP2005172418A (en) | Internal face cleaning apparatus for vessel | |
EP1533050A1 (en) | Detonative cleaning apparatus | |
US20050125932A1 (en) | Detonative cleaning apparatus nozzle | |
GB2408784A (en) | Detonative cleaning with monitoring camera | |
US20050126512A1 (en) | Pressure probe | |
GB2408557A (en) | Detonative cleaning apparatus with pressure probe | |
NZ536701A (en) | Detonative cleaning apparatus |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL HR LT LV MK YU |
|
17P | Request for examination filed |
Effective date: 20050816 |
|
AKX | Designation fees paid |
Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IS IT LI LU MC NL PL PT RO SE SI SK TR |
|
17Q | First examination report despatched |
Effective date: 20060302 |
|
RTI1 | Title (correction) |
Free format text: DENOTATIVE CLEANING APPARATUS AND METHOD |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20100429 |