EP1476351A1 - Floating semi-submersible oil production and storage arrangement - Google Patents
Floating semi-submersible oil production and storage arrangementInfo
- Publication number
- EP1476351A1 EP1476351A1 EP03706693A EP03706693A EP1476351A1 EP 1476351 A1 EP1476351 A1 EP 1476351A1 EP 03706693 A EP03706693 A EP 03706693A EP 03706693 A EP03706693 A EP 03706693A EP 1476351 A1 EP1476351 A1 EP 1476351A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- oil
- tank
- chambers
- chamber
- plurahty
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000003860 storage Methods 0.000 title claims abstract description 42
- 238000004519 manufacturing process Methods 0.000 title claims abstract description 23
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims abstract description 63
- 238000005553 drilling Methods 0.000 claims abstract description 15
- 239000007788 liquid Substances 0.000 claims abstract description 8
- 238000012423 maintenance Methods 0.000 claims abstract description 7
- 230000005484 gravity Effects 0.000 claims abstract description 5
- 239000011150 reinforced concrete Substances 0.000 claims abstract 2
- 239000012530 fluid Substances 0.000 claims description 32
- 239000004567 concrete Substances 0.000 claims description 15
- 238000000034 method Methods 0.000 claims description 13
- 239000013535 sea water Substances 0.000 claims description 13
- 238000005086 pumping Methods 0.000 claims description 8
- 239000000203 mixture Substances 0.000 claims description 5
- 239000000463 material Substances 0.000 claims description 3
- 239000011159 matrix material Substances 0.000 claims 1
- 239000011513 prestressed concrete Substances 0.000 claims 1
- 239000003921 oil Substances 0.000 abstract description 81
- 239000010779 crude oil Substances 0.000 abstract description 5
- 238000006073 displacement reaction Methods 0.000 abstract description 3
- 230000002787 reinforcement Effects 0.000 abstract 1
- 239000007789 gas Substances 0.000 description 22
- VNWKTOKETHGBQD-UHFFFAOYSA-N methane Chemical compound C VNWKTOKETHGBQD-UHFFFAOYSA-N 0.000 description 12
- 239000003345 natural gas Substances 0.000 description 6
- 238000000926 separation method Methods 0.000 description 4
- 230000009286 beneficial effect Effects 0.000 description 3
- 229910001294 Reinforcing steel Inorganic materials 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 230000007613 environmental effect Effects 0.000 description 2
- 239000007924 injection Substances 0.000 description 2
- 238000002347 injection Methods 0.000 description 2
- 238000007689 inspection Methods 0.000 description 2
- 238000012512 characterization method Methods 0.000 description 1
- 230000006835 compression Effects 0.000 description 1
- 238000007906 compression Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000005188 flotation Methods 0.000 description 1
- 238000011065 in-situ storage Methods 0.000 description 1
- 230000000737 periodic effect Effects 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000011179 visual inspection Methods 0.000 description 1
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B35/00—Vessels or similar floating structures specially adapted for specific purposes and not otherwise provided for
- B63B35/44—Floating buildings, stores, drilling platforms, or workshops, e.g. carrying water-oil separating devices
- B63B35/4413—Floating drilling platforms, e.g. carrying water-oil separating devices
Definitions
- the oil industry frequently makes use of floating production and storage systems for developing small remote oil fields. These generally use a converted crude oil tanker moored to a purpose built mooring buoy. To minimize the wave, current and wind forces on the tanker, the mooring is designed to allow the vessel to weathervane around the buoy under the influence of the resultant environmental force. Processing equipment is mounted on the deck of the vessel.
- Oil production from the reservoir is via one or more sub sea wellheads, through a flexible flowline from each wellhead to the mooring buoy and from the buoy to the vessel.
- the system also incorporates lines to carry gas and or water from the vessel to the wellheads. Also incorporated are hydraulic and electrical lines from the vessel to allow control of the sub sea wellheads. Since the vessel must be free to rotate around the buoy, the numerous fluid flow paths through the buoy result in the need for a complicated and expensive device known as a swivel. This is a precision-engineered piece of equipment subject to high pressure, high temperature corrosive fluids from the reservoir and hence must be manufactured faultlessly if high maintenance costs are to be avoided.
- a further disadvantage of floating production systems that employ oil tankers is that they are highly susceptible to pitching, rolling and heaving. Since the separation of the oil, water and gas which comprise the flmd stream from the reservoir is effected by means of gravity separation in large pressure vessels, the sloshing of the liquids caused by the ship's motion can cause serious inefficiencies in the separation process.
- a semi-submersible vessel comprises a deck 1 supported above the water line (OWL) on a number of columns 30.
- the columns extend from the deck to (typically) two flotation pontoons 31 located some distance below the water line.
- the advantages of a semi-submersible over a ship-shaped vessel are two-fold. Firstly, the area exposed to the waves at the water line is less for a semi-submersible than for a ship-shaped vessel and hence the horizontal wave forces are reduced. Secondly, because the pontoons which provide the buoyancy are much further below the water line than the underside of a ship, the vertical forces are much less. (This is because the effects of a wave rapidly decrease as one moves deeper into the water.)
- SSFP systems Semi-submersible floating production systems
- SSFP systems have two disadvantages. Firstly, there is no significant capability for storage of the produced oil. This means that they can only be utilized where a pipeline is provided to carry the produced oil to an onshore storage/processing facility or where a dedicated moored tanker ship is provided adjacent to the SSFP vessel.
- the second disadvantage is that the amount of processing equipment which can be fitted on deck is limited because the centre of gravity of the SSFP vessel is raised as weight is added to the deck. This reduces the resistance to overturning of the vessel. This resistance to overturning is quantified in a property of the vessel known as the metacentric height (usually designated GM).
- GM metacentric height
- a number of oil fields have been developed using a SSFP vessel which have used a converted second hand semi-submersible drilling vessel. Where the produced oil is viscous and needs large pressure vessels for separation or where gas injection or water injection equipment is required, new larger semi-submersibles are required to accommodate the equipment.
- an oil storage assembly for a semi-submersible oil production vessel comprising a deck structure, at least two underwater pontoons for providing buoyancy to said deck structure, and a plurality of columns connecting said deck structure to said pontoons, characterised in that a concrete tank is attached below said pontoons, said concrete tank being subdivided into a plurality of chambers for storing fluid.
- An arrangement for the storage of oil in accordance with the invention has the advantage that it provides a system for storing large quantities of oil which is not as susceptible to extreme environmental conditions, does not decrease, and in fact may be configured to increase the resistance to overturning of a rig with which it is used, and is easily maintained in situ.
- the present invention preferably provides a semi- submersible, floating production, storage and offloading system for the development of offshore oil and gas fields comprising a drilling vessel, an oil storage assembly according to the invention attached to the base of the drilling vessel, means for utilizing the drilling vessel's ballast pumps to add or remove water from the bottom of each chamber of the tank and means for directing produced oil into or out of the top of each chamber.
- the present invention further provides a method of storing oil in an offshore floating oil production facility comprising the steps of attaching to the bottom of a pontoon structure a concrete tank, which is subdivided into a plurality of chambers, filling said chambers with at least one fluid to adjust the buoyancy of the production facility, and displacing said fluid from said chambers by pumping produced oil thereinto in a controlled fashion such that the mass of the tank and its contents is maintained substantially constant.
- the concrete tank is divided into a number of chambers, in particularly, by a plurality of fluid tight bulk heads, at least one of which chamber is located substantially centrally of the tank and is open at the top and bottom so as to provide a through opening in the tank.
- a rig can carry out drilling or workover operations with the tank attached.
- each chamber of the tank is maintained full of at least one fluid at all times so as to control the ballast of the arrangement.
- the fluids used in this way may, for example, be sea water, oil, natural gas or a mixture of two or more of these.
- At least some of the chambers preferably include a first inlet/outlet pipe which terminated substantially at the bottom of the chamber and a second inlet/outlet pipe which terminated substantially at the top of the chamber.
- at least some of the chambers preferably include a water inlet outlet pipe and an oil inlet outlet pipe.
- Each such chamber is then at least partially filled with water prior to commencement of oil production, that water being displaced from the chamber through the water pipe as oil is added to the chamber by means of the oil pipe.
- oil may be evacuated from the tank, for example to a tank for transport to shore, by displacement using water injected through the water pipe.
- the water pipe advantageously terminates close to the bottom of the chamber, since sea water is normally denser than oil, and preferably has a diffuser pipe on the end thereof so as to minimize the mixing of oil and water as water is pumped into the chamber.
- the oil pipe then preferably terminates at the inner face of the upper surface of the chamber, which arrangement has the advantage that it avoids the possibility of a gas pocket building up in the tank.
- each of the second plurality of chambers is preferably provided with a first pipe which terminates proximate to the bottom of the chamber and a second pipe which terminates proximate to the top of the chamber, wherein as oil is produced it is pumped into the chamber through said first pipe, displacing gas already in the chamber out through the second pipe.
- said second plurality of chambers are arranged in a cascade arrangement with each second pipe extending from proximate to the top of one chamber to the bottom of the next chamber in the cascade so as to form the first pipe for said next chamber.
- This arrangement has the advantage that the chambers of the cascade are filled or emptied in sequence rather than simultaneously, i.e. once the first chamber in the cascade is filled, it then overflows into the second.
- only one of said second plurality of chamber contains a mixture of oil and gas - the rest being either filled with gas or with oil, thereby reducing the free liquid surfaces within the arrangement.
- the first plurality of chamber constitute substantially 80% of the chambers and the second plurality substantially 20% oil being fed or extracted from said first and second chambers simultaneously, preferably with substantially 80% of the flow being directed to said first plurality of chambers and substantially 20% to said second plurality.
- This has the advantage that, because the density of crude oil is substantially 80% that of sea water, a constant mass is maintained in the tank as oil is loaded or unloaded from the arrangement whilst at the same time the free surfaces of the fluids within the chambers is minimized, which is beneficial to the stability of the arrangement.
- each chamber includes, in addition to said first and second inlet/outlet pipes, a third inlet/outlet pipe which terminates part way down the chamber, at a distance from the top of the chamber of substantially 20% of the height of the chamber.
- the first pipe provides an inlet/outlet for sea water, the second an inlet outlet for gas and the third an inlet/outlet for oil, all chambers of the arrangement being equipped with an identical piping arrangement and being fed simultaneously.
- each chamber being 80% filled with water with gas thereabove when no oil is present, the volume of gas within each chamber being varied as oil is added removed therefrom so as to ensure that the volume of water displaced by the oil as it is pumped in is only 80% of the volume of oil. In this way, the overall mass of the arrangement is kept constant.
- Figure 1 shows a typical semi-submersible floating production system
- Figure 2 shows in perspective a semi-submersible drilling rig with a concrete tank attached in accordance with the present invention
- Figure 3 shows a sectional elevation of the drilling rig of Figure 2;
- Figure 4 is a schematic diagram of the layout of the connection between the chambers of the concrete tank of Figures 2 and 3;
- Figures 5 and 6 are further schematic diagrams showing how the chambers are connected
- Figure 7 shows additional detail of the drilling rig of Figures 2 and 3;
- Figure 8 shows an alternative gas/oil/water loading/offloading arrangement.
- the (hilling rig 1 has a concrete tank 2 attached below columns 30 and the pontoons 31.
- the concrete tank is segmented by fluid tight bulk heads in the form of internal concrete walls 3.
- At least one cell in the centre of the tank is constructed to be open at top and bottom to create a hole through the centre of the tank whereby the rig can carry out drilling or workover operations with the tank attached.
- FIG. 3 and 5 for one chamber are the water inlet/outlet pipe 4 and the oil inlet outlet pipe 5.
- the water pipe terminates in a diffuser pipe 6 close to the bottom of the chamber which minimizes mixing of the oil and water as water is pumped in.
- the oil pipe terminates at the inner face of the upper surface to avoid the possibility of build-up of a gas pocket. To maintain the mass of the tank and contents constant as oil is produced or offloaded only 4/5 of the chambers operate on the oil over water principle shown in Figure 3.
- Figure 5 shows a piping arrangement which ensures longitudinal stability of the tank by ensuring the centre of mass remains suitably stationary during the loading/unloading process of the oil over water chambers.
- the remaining 1/5 of the chambers utilize a gas over oil scheme employing piping as shown in Figure 6.
- Oil enters the first chamber A through oil pipe 9.
- natural gas is vented via pipe 10 to chamber B.
- chamber A is full, oil will then travel through pipe 10 to chamber B, displacing, in turn, the gas, via the link line into chamber C, and so on until all the chambers are full of oil and the gas has been vented from the final gas vent pipe 11. This process proceeds at the same time that 4/5 of the oil is being directed to the oil over water chambers.
- FIG. 4 shows an example layout for the chambers with those operating a gas over oil scheme arranged in a line along the centre of the tank and those operating a water over oil scheme being arranged symmetrically on either side so as to ensure lateral stability during the loading/unloading process.
- FIG. 8 An alternative arrangement to achieve this mass balance is shown in Figure 8.
- the loading system is identical for all chambers.
- Sea water inlet outlet pipes are provided at the bottom of the chambers, oil inlet outlet pipes are provided at 4/5 of the height of the chamber and natural gas inlet pipes are provided in the upper surface of the chambers.
- every chamber is filled 4/5 with sea water with natural gas above.
- oil is produced it enters via oil pipe 26 and sea water is displaced via water pipe 25.
- natural gas is released via the gas inlet outlet pipe 27 to ensure that the volume of water displaced by the oil is only 4/5 of the volume of oil entering.
- the invention is further characterised by the fact that the mass of tank and contents is slightly greater than the buoyancy of the tank. This means that to bring the combined semi-submersible/tank structure to the same draft that the semi-submersible normally operates uncombined, some ballast water must be removed from the semi- submersible causing a further improvement in the metacentric height of the combined vessel. This arrangement creates a tensile force between the tank and rig.
- a further characterization of the invention is that this tensile force can be changed to a compressive force which is beneficial to the fatigue life of the vessel by eliminating any gap between the underside of the semi-submersible pontoons and the upper surface of the tank.
- the centre of gravity of the tank and contents is slightly below the centre of buoyancy of the tank. This increases the metacentric height of the vessel allowing an increased payload to be added to the deck of the semi-submersible.
- each chamber may be filled at least partially with gas, for example air, so as to reduce the total mass of the tank including its contents and hence reduce its draught so as to facilitate maintenance.
- gas for example air
- each oil-over-water chamber is connected to a breaktank 12 located inside a column of the semi-submersible as shown in Figure 7.
- This breaktank is located below the elevation of the operating water level (OWL).
- OWL operating water level
- the breaktank is vented to atmosphere 13 and the water level in the breaktank is maintained by level switches 14 and 15 acting on the semi-submersible's seawater ballast pump 16 and control valve 17 to add or remove water as necessary.
- the oil inlet outlet is vented to atmosphere at a safe location 18.
- NPSH net positive suction head
- FIG. 7 Also shown in Figure 7 are an oil export meter 20, a ballast water cleanup device 21, an oil in water alarm 22 and a gas/oil/water separator 23.
- the invention is also characterised by the fact that all necessary valving, pumps and instrumentation for the seawater system can be located inside the columns of the semi-submersible where they are in a dry, benign environment and can be easily accessed for maintenance.
- the invention requires no pipes or fittings protruding from the bottom of the tank. This allows easy construction onshore, skidding of the tank into the ocean, setting the tank on a suitable seabed for fitting to the semi-submersible.
- the invention is also characterised by the ability to construct the connection between the tank and the semi-submersible rig in the dry even though this connection is underwater during normal operation. Once constructed the tank will be set on the seabed with a few metres of water above it. The semi-submersible at its minimum draft will be floated over the tank and deballasted down on to the top of the tank. The tank is then deballasted sufficient to lift the semi-submersible clear of the water allowing the permanent connection to be constructed in the dry.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Earth Drilling (AREA)
- Structures Of Non-Positive Displacement Pumps (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Abstract
An arrangement for the storage of marketable quantities of crude oil at a semi-submersible floating production vessel. The storage is achieved by hanging a segmented reinforced concrete tank (2) to the underside of the semi-submersible vessel. The semi-submersible vessel can be an existing semi-submersible drilling rig. By maintaining the mass of the tank and contents slightly greater than the displacement of the tank and by arranging the centre of gravity of the tank below its centre of buoyancy, the metacentric height of the semi-submersible vessel is approved. The storage arrangement for the oil provides the necessary maintenance of mass by either storing approximately 4/5 of the oil in oil-over-water chambers and approximately 1/5 in gas-over-oil chambers or by using a gas-over-oil-over-water arrangement in all the chambers. The piping arrangements minimize the free surface of liquids in the tank. The design ensures the internal pressure in the tank can be less than the external pressure which minimizes required reinforcement. The design provides a net positive suction head to oil export pumps located above the storage tank in a location which allows easy maintenance. The design allows all pumps, valves and instrumentation necessary for handling ballast water to be maintained within the hull of the semi-submersible where they can be easily maintained. The design allows all the valves, pumps and instrumentation necessary for handling oil to be in locations where they can be easily maintained.
Description
FLOATING SEMI-SUBMERSIBLE OIL PRODUCTION AND STORAGE ARRANGEMENT
The oil industry frequently makes use of floating production and storage systems for developing small remote oil fields. These generally use a converted crude oil tanker moored to a purpose built mooring buoy. To minimize the wave, current and wind forces on the tanker, the mooring is designed to allow the vessel to weathervane around the buoy under the influence of the resultant environmental force. Processing equipment is mounted on the deck of the vessel.
Oil production from the reservoir is via one or more sub sea wellheads, through a flexible flowline from each wellhead to the mooring buoy and from the buoy to the vessel. The system also incorporates lines to carry gas and or water from the vessel to the wellheads. Also incorporated are hydraulic and electrical lines from the vessel to allow control of the sub sea wellheads. Since the vessel must be free to rotate around the buoy, the numerous fluid flow paths through the buoy result in the need for a complicated and expensive device known as a swivel. This is a precision-engineered piece of equipment subject to high pressure, high temperature corrosive fluids from the reservoir and hence must be manufactured faultlessly if high maintenance costs are to be avoided.
A further disadvantage of floating production systems that employ oil tankers is that they are highly susceptible to pitching, rolling and heaving. Since the separation of the oil, water and gas which comprise the flmd stream from the reservoir is effected by means of gravity separation in large pressure vessels, the sloshing of the liquids caused by the ship's motion can cause serious inefficiencies in the separation process.
An alternative type of floating production system which eliminates these problems is use of a semi-submersible vessel. Semi-submersible vessels have been used in the offshore industry for a number of years as mobile drilling vessels, crane barges, pipelaying vessels and dedicated floating production vessels. As shown in Figure 1, a semi-submersible vessel comprises a deck 1 supported above the water line
(OWL) on a number of columns 30. The columns extend from the deck to (typically) two flotation pontoons 31 located some distance below the water line. The advantages of a semi-submersible over a ship-shaped vessel are two-fold. Firstly, the area exposed to the waves at the water line is less for a semi-submersible than for a ship-shaped vessel and hence the horizontal wave forces are reduced. Secondly, because the pontoons which provide the buoyancy are much further below the water line than the underside of a ship, the vertical forces are much less. (This is because the effects of a wave rapidly decrease as one moves deeper into the water.)
The results of these advantages are that semi-submersible production vessels can be moored in the ocean without the need to provide weather vaning and that the sloshing of liquids in vessels on the deck is reduced.
Semi-submersible floating production systems (SSFP systems) however have two disadvantages. Firstly, there is no significant capability for storage of the produced oil. This means that they can only be utilized where a pipeline is provided to carry the produced oil to an onshore storage/processing facility or where a dedicated moored tanker ship is provided adjacent to the SSFP vessel.
The second disadvantage is that the amount of processing equipment which can be fitted on deck is limited because the centre of gravity of the SSFP vessel is raised as weight is added to the deck. This reduces the resistance to overturning of the vessel. This resistance to overturning is quantified in a property of the vessel known as the metacentric height (usually designated GM). A high GM means a high resistance to overturning.
A number of oil fields have been developed using a SSFP vessel which have used a converted second hand semi-submersible drilling vessel. Where the produced oil is viscous and needs large pressure vessels for separation or where gas injection or water injection equipment is required, new larger semi-submersibles are required to accommodate the equipment.
A number of attempts have been made to provide oil storage in a semi- submersible (British Patent Applications GB22116849, GB2207892, GB2188291 for
example). However, these allow storage of only a relatively small quantity of oil. These systems still require a dedicated moored tanker to store a marketable quantity of oil. The storage provided in the semi-submersible vessel only provides storage of a few days production to allow the storage tanker to travel to a nearby refinery for offloading.
According to one aspect of the present invention there is provided an oil storage assembly for a semi-submersible oil production vessel comprising a deck structure, at least two underwater pontoons for providing buoyancy to said deck structure, and a plurality of columns connecting said deck structure to said pontoons, characterised in that a concrete tank is attached below said pontoons, said concrete tank being subdivided into a plurality of chambers for storing fluid.
An arrangement for the storage of oil in accordance with the invention has the advantage that it provides a system for storing large quantities of oil which is not as susceptible to extreme environmental conditions, does not decrease, and in fact may be configured to increase the resistance to overturning of a rig with which it is used, and is easily maintained in situ.
More particularly, the present invention preferably provides a semi- submersible, floating production, storage and offloading system for the development of offshore oil and gas fields comprising a drilling vessel, an oil storage assembly according to the invention attached to the base of the drilling vessel, means for utilizing the drilling vessel's ballast pumps to add or remove water from the bottom of each chamber of the tank and means for directing produced oil into or out of the top of each chamber.
The present invention further provides a method of storing oil in an offshore floating oil production facility comprising the steps of attaching to the bottom of a pontoon structure a concrete tank, which is subdivided into a plurality of chambers, filling said chambers with at least one fluid to adjust the buoyancy of the production facility, and displacing said fluid from said chambers by pumping produced oil thereinto in a controlled fashion such that the mass of the tank and its contents is
maintained substantially constant.
Preferably, the concrete tank is divided into a number of chambers, in particularly, by a plurality of fluid tight bulk heads, at least one of which chamber is located substantially centrally of the tank and is open at the top and bottom so as to provide a through opening in the tank. In this way, a rig can carry out drilling or workover operations with the tank attached.
Preferably, each chamber of the tank is maintained full of at least one fluid at all times so as to control the ballast of the arrangement. The fluids used in this way may, for example, be sea water, oil, natural gas or a mixture of two or more of these.
At least some of the chambers preferably include a first inlet/outlet pipe which terminated substantially at the bottom of the chamber and a second inlet/outlet pipe which terminated substantially at the top of the chamber. In particular, at least some of the chambers preferably include a water inlet outlet pipe and an oil inlet outlet pipe. Each such chamber is then at least partially filled with water prior to commencement of oil production, that water being displaced from the chamber through the water pipe as oil is added to the chamber by means of the oil pipe. In the same way, oil may be evacuated from the tank, for example to a tank for transport to shore, by displacement using water injected through the water pipe. The water pipe advantageously terminates close to the bottom of the chamber, since sea water is normally denser than oil, and preferably has a diffuser pipe on the end thereof so as to minimize the mixing of oil and water as water is pumped into the chamber. The oil pipe then preferably terminates at the inner face of the upper surface of the chamber, which arrangement has the advantage that it avoids the possibility of a gas pocket building up in the tank.
It has been found to be particularly advantageous for mamtaining the mass of the tank and contents substantially constant as oil is produced or offloaded if a first plurality of chambers operate this oil over water storage arrangement, and a second plurality of the chambers operate with either oil, natural gas or a mixture thereof stored therein. In particular, each of the second plurality of chambers is preferably
provided with a first pipe which terminates proximate to the bottom of the chamber and a second pipe which terminates proximate to the top of the chamber, wherein as oil is produced it is pumped into the chamber through said first pipe, displacing gas already in the chamber out through the second pipe. Preferably, then, said second plurality of chambers are arranged in a cascade arrangement with each second pipe extending from proximate to the top of one chamber to the bottom of the next chamber in the cascade so as to form the first pipe for said next chamber. This arrangement has the advantage that the chambers of the cascade are filled or emptied in sequence rather than simultaneously, i.e. once the first chamber in the cascade is filled, it then overflows into the second. As a result, at any time only one of said second plurality of chamber contains a mixture of oil and gas - the rest being either filled with gas or with oil, thereby reducing the free liquid surfaces within the arrangement.
Preferably, the first plurality of chamber constitute substantially 80% of the chambers and the second plurality substantially 20% oil being fed or extracted from said first and second chambers simultaneously, preferably with substantially 80% of the flow being directed to said first plurality of chambers and substantially 20% to said second plurality. This has the advantage that, because the density of crude oil is substantially 80% that of sea water, a constant mass is maintained in the tank as oil is loaded or unloaded from the arrangement whilst at the same time the free surfaces of the fluids within the chambers is minimized, which is beneficial to the stability of the arrangement.
In an alternative embodiment, each chamber includes, in addition to said first and second inlet/outlet pipes, a third inlet/outlet pipe which terminates part way down the chamber, at a distance from the top of the chamber of substantially 20% of the height of the chamber. In this embodiment, the first pipe provides an inlet/outlet for sea water, the second an inlet outlet for gas and the third an inlet/outlet for oil, all chambers of the arrangement being equipped with an identical piping arrangement and being fed simultaneously. A mixture of water and gas is then used to ballast each
chamber, each chamber being 80% filled with water with gas thereabove when no oil is present, the volume of gas within each chamber being varied as oil is added removed therefrom so as to ensure that the volume of water displaced by the oil as it is pumped in is only 80% of the volume of oil. In this way, the overall mass of the arrangement is kept constant.
Some embodiments of the invention will now be described by way of example with reference to the accompanying drawings in which:
Figure 1 shows a typical semi-submersible floating production system;
Figure 2 shows in perspective a semi-submersible drilling rig with a concrete tank attached in accordance with the present invention;
Figure 3 shows a sectional elevation of the drilling rig of Figure 2;
Figure 4 is a schematic diagram of the layout of the connection between the chambers of the concrete tank of Figures 2 and 3;
Figures 5 and 6 are further schematic diagrams showing how the chambers are connected;
Figure 7 shows additional detail of the drilling rig of Figures 2 and 3; and
Figure 8 shows an alternative gas/oil/water loading/offloading arrangement.
Referring first to Figure 2, the (hilling rig 1 has a concrete tank 2 attached below columns 30 and the pontoons 31.
As shown in Figure 3, the concrete tank is segmented by fluid tight bulk heads in the form of internal concrete walls 3. At least one cell in the centre of the tank is constructed to be open at top and bottom to create a hole through the centre of the tank whereby the rig can carry out drilling or workover operations with the tank attached.
Also shown in Figures 3 and 5 for one chamber are the water inlet/outlet pipe 4 and the oil inlet outlet pipe 5. The water pipe terminates in a diffuser pipe 6 close to the bottom of the chamber which minimizes mixing of the oil and water as water is pumped in. The oil pipe terminates at the inner face of the upper surface to avoid the possibility of build-up of a gas pocket. To maintain the mass of the tank and contents
constant as oil is produced or offloaded only 4/5 of the chambers operate on the oil over water principle shown in Figure 3.
Figure 5 shows a piping arrangement which ensures longitudinal stability of the tank by ensuring the centre of mass remains suitably stationary during the loading/unloading process of the oil over water chambers. The remaining 1/5 of the chambers utilize a gas over oil scheme employing piping as shown in Figure 6. Oil enters the first chamber A through oil pipe 9. As chamber A fills with oil, natural gas is vented via pipe 10 to chamber B. When chamber A is full, oil will then travel through pipe 10 to chamber B, displacing, in turn, the gas, via the link line into chamber C, and so on until all the chambers are full of oil and the gas has been vented from the final gas vent pipe 11. This process proceeds at the same time that 4/5 of the oil is being directed to the oil over water chambers. Because the density of crude oil is approximately 4/5 that of sea water this arrangement maintains a constant mass in the tank as oil is loaded or offloaded. These arrangements minimize the free surfaces of liquids inside the chambers which is beneficial to the stability of the vessel. Figure 4 shows an example layout for the chambers with those operating a gas over oil scheme arranged in a line along the centre of the tank and those operating a water over oil scheme being arranged symmetrically on either side so as to ensure lateral stability during the loading/unloading process.
An alternative arrangement to achieve this mass balance is shown in Figure 8. In this arrangement the loading system is identical for all chambers. Sea water inlet outlet pipes are provided at the bottom of the chambers, oil inlet outlet pipes are provided at 4/5 of the height of the chamber and natural gas inlet pipes are provided in the upper surface of the chambers. When no oil is on board, every chamber is filled 4/5 with sea water with natural gas above. As oil is produced it enters via oil pipe 26 and sea water is displaced via water pipe 25. At the same time, natural gas is released via the gas inlet outlet pipe 27 to ensure that the volume of water displaced by the oil is only 4/5 of the volume of oil entering.
The invention is further characterised by the fact that the mass of tank and
contents is slightly greater than the buoyancy of the tank. This means that to bring the combined semi-submersible/tank structure to the same draft that the semi-submersible normally operates uncombined, some ballast water must be removed from the semi- submersible causing a further improvement in the metacentric height of the combined vessel. This arrangement creates a tensile force between the tank and rig.
A further characterization of the invention is that this tensile force can be changed to a compressive force which is beneficial to the fatigue life of the vessel by eliminating any gap between the underside of the semi-submersible pontoons and the upper surface of the tank.
By constructing the base of the tank of a material of greater density than the roof, the centre of gravity of the tank and contents is slightly below the centre of buoyancy of the tank. This increases the metacentric height of the vessel allowing an increased payload to be added to the deck of the semi-submersible.
The volume of the tank is sufficiently large such that when the tank is empty, with the drilling rig attached above it, the upper surface of the tank is a considerable distance above the water line. Accordingly, each chamber may be filled at least partially with gas, for example air, so as to reduce the total mass of the tank including its contents and hence reduce its draught so as to facilitate maintenance. This allows access to the piping above the upper tank surface, to the manholes in the tank for internal inspections, to the tank-to-semi-submersible connections and to all external parts of the semi-submersible. This allows the inspections required by classification societies to be carried out without the vessel needing to go to dry dock. The only parts of the vessel not inspectable in the dry are the underside and lower walls of the tank. Since the tank is constructed of concrete, periodic visual inspection by divers or remote underwater vehicle is considered sufficient.
Concrete as a structural material behaves best when loaded in compression. Tensile forces must be resisted by reinforcing steel embedded in the concrete. The required quantity of reinforcing steel can be minimized by mamtaining the external pressure on the tank greater than the internal pressure. To achieve this the water
outlet line from each oil-over-water chamber is connected to a breaktank 12 located inside a column of the semi-submersible as shown in Figure 7. This breaktank is located below the elevation of the operating water level (OWL). The breaktank is vented to atmosphere 13 and the water level in the breaktank is maintained by level switches 14 and 15 acting on the semi-submersible's seawater ballast pump 16 and control valve 17 to add or remove water as necessary. To ensure that the oil system cannot overpressure the tank, the oil inlet outlet is vented to atmosphere at a safe location 18.
Large centrifugal pumps 19 are required to offload the stored oil into shuttle tankers. Such pumps require a net positive suction head (NPSH) on their suction side in order to function effectively. Normally this is achieved by locating the pumps at a lower elevation than the bottom of the storage tank. The arrangement of the present invention allows the pumps to be located above the top of the tanks in a caisson attached to one of the semi-submersible columns where they can easily be removed by one of the rig cranes for maintenance but still be provided with a net positive suction head.
Also shown in Figure 7 are an oil export meter 20, a ballast water cleanup device 21, an oil in water alarm 22 and a gas/oil/water separator 23.
The invention is also characterised by the fact that all necessary valving, pumps and instrumentation for the seawater system can be located inside the columns of the semi-submersible where they are in a dry, benign environment and can be easily accessed for maintenance.
The invention requires no pipes or fittings protruding from the bottom of the tank. This allows easy construction onshore, skidding of the tank into the ocean, setting the tank on a suitable seabed for fitting to the semi-submersible.
The invention is also characterised by the ability to construct the connection between the tank and the semi-submersible rig in the dry even though this connection is underwater during normal operation. Once constructed the tank will be set on the seabed with a few metres of water above it. The semi-submersible at its minimum
draft will be floated over the tank and deballasted down on to the top of the tank. The tank is then deballasted sufficient to lift the semi-submersible clear of the water allowing the permanent connection to be constructed in the dry.
It will, of course, be understood that the proportion of 80% used above is connected to the relative density of sea water to crude oil and is therefore only an approximate value. Furthermore, in the event that the arrangement is utilized with liquids other than oil and or water, the relative displacement quantities and/or the relative numbers of the first and second plurahties of chambers will then be in accordance with the relative densities of the actual liquids used.
Claims
1. An oil storage assembly for a semi-submersible oil production vessel comprising a deck structure, at least two underwater pontoons for providing buoyancy to said deck structure, and a plurahty of columns connecting said deck structure to said pontoons, characterised in that a concrete tank is attached below said pontoons, said concrete tank being subdivided into a plurahty of chambers for storing fluid.
2. An oil storage assembly according to claim 1, wherein the tank is subdivided into a plurahty of vertical chambers which form a matrix cross the tank, at least one of said chambers being open at the top and bottom so as to provide a through opening in the tank through which oil production operates can be carried out.
3. An oil storage assembly according to claim 2, wherein the tank is subdivided by means of a plurahty of fluid tight bulkheads.
4. An oil storage assembly according to any of claims 1 to 3, wherein at least some of the chambers of the tank include a first inlet/outlet conduit located proximate to the bottom of the chamber and a second inlet/outlet conduit located within substantially the upper 20% of the chamber.
5. An oil storage assembly according to claim 4, wherein a first plurahty of said at least some chambers are arranged in a cascade arrangement with the second inlet/outlet conduit of one of said plurahty of chambers connecting to the first inlet outlet conduit of the next chamber in the cascade.
6. An oil storage assembly according to claim 5, wherein the first inlet/outlet conduit of the first chamber in the cascade connects to an oil pipe and the second inlet/outlet conduit of the last chamber in the cascade connects to a gas pipe.
7. An oil storage assembly according to any of claims 4 to 6, wherein a second plurahty of said chambers have their first inlet outlet conduit connected to a fluid supply pipe and their second inlet outlet conduit connected to an oil pipe, fluid being stored in said second plurahty of chambers using an oil over a suitable fluid scheme.
8. An oil storage assembly according to claim 7, wherein the fraction of said at least some chambers which form said second plurahty is substantially equal to the ratio of the density of oil to the density of the fluid over which it is stored in said second plurahty of chambers, and the fraction of said at least some chambers which forms said first plurahty of chambers is substantially equal to 1 minus the proportion which form said second plurahty.
9. An oil storage assembly according to claim 7 or claim 8, wherein oil is stored over water in said second plurahty of chambers, said first plurahty of chambers constituting 20% and said second plurahty of chambers 80% of said at least some chambers.
10. An oil storage assembly according to any of claims 4 to 9, wherein said second inlet/outlet conduit is located substantially at the top of each said chamber.
11. An oil storage assembly according to claim 4, said second inlet/outlet conduit is located at a distance from the top of the chamber substantially equal to one fifth of the height of the chamber.
12. An oil storage assembly according to claim 11, wherein each of said at least some chambers includes a third inlet/outlet conduit located substantially at the top of the chamber.
13. An oil storage assembly according to claim 12, wherein said first inlet outlet conduit connects to a water pipe, said second inlet outlet conduit to an oil pipe and said third inlet outlet conduit to a gas pipe.
14. An oil storage assembly according to any of claims 4 to 13, wherein each said first inlet outlet conduit has a dif user assembly provided on its end so as to minimise the mixing of fluids within each chamber.
15. An oil storage assembly according to any of the preceding claims, wherein the tank is constructed of varying density materials such that the centre of gravity of the tank and its contents is always lower than its centre of buoyancy, thereby causing an increase in the metacentric height of the assembly.
16. An oil storage assembly according to any of the preceding claims, wherein the volume of the tank is such that when it is at least partially empty, its buoyancy is sufficient to maintain the production vessel at an elevation relative to the water at which the upper surface of the tank is above the waterline.
17. An oil storage assembly according to any of the preceding claims, further including an atmospherically vented break tank located inside the vessel at an elevation below the operating water level by means of which the internal pressure within the tank is maintained lower than the external pressure.
18. An oil storage assembly according to claim 17, wherein one break tank is located inside a column of the vessel.
19. An oil storage assembly according to claim 17 or 18, wherein the fluid level in the break tank is controllable by a level controller which activates seawater ballast pumps to remove water and activates a control valve to allow addition of sea water from the ocean.
20. An oil storage assembly according to any of the preceding claims, wherein a pump is provided to discharge oil to a tanker, said pump being located inside one of said columns above the tank elevation.
21. An oil storage assembly according to any of the preceding claims, wherein the tank is constructed of reinforced and/or prestressed concrete.
22. A semi-submersible, floating production, storage and offloading system for the development of offshore oil and gas fields comprising a drilling vessel, an oil storage assembly according to any of the preceding claims attached to the base of the drilling vessel, means for utilising the drilling vessel's ballast pumps to add or remove water from the bottom of each chamber of the tank and means for directing produced oil into or out of the top of each chamber.
23. A method of storing oil in an offshore floating oil production facility comprising the steps of attaching to the bottom of a pontoon structure a concrete tank, which is subdivided into a plurahty of chambers, filling said chambers with at least one fluid to adjust the buoyancy of the production facility, and displacing said fluid from said chambers by pumping produced oil thereinto in a controlled fashion such that the mass of the tank and its contents is maintained substantially constant.
24. A method according to claim 23, comprising the further steps of adjusting the buoyancy of the facility by filing a first plurahty of said chambers with a first fluid and a second plurahty of said chambers with a second fluid, pumping a first proportion of produced oil into said first plurality of chambers so as to displace said first fluid therefrom, and pumping a second proportion of said produced oil into said second plurahty of chambers so as to displace said second fluid therefrom, said first and second proportions being calculated based on the relative densities of the produced oil and said first and second fluids so as to maintain a substantially constant mass of fluid in said tank.
25. A method according to claim 24, comprising the further step of emptying oil from said tank by pumping said first fluid back into said first plurahty of chambers and pumping said second fluid back into said second plurahty of chambers in relative amounts such that said first proportion of oil is displaced from said first plurality of chambers and said second proportion of oil is displaced from said second plurality of chambers, wherein the mass of the tank and its contents is maintained substantially constant during off-loading of the produced oil.
26. A method according to claim 24 or claim 25, wherein said first fluid is water and said second fluid is gas, said first plurality of chambers constituting substantiaUy 80% of the volume of the tank and receiving substantiaUy 80% of the produced oU, and said second plurahty of chambers constituting substantiaUy 20% of the volume of the tank and receiving substantiaUy 20% of the produced oU.
27. A method according to any of claims 24 to 26, comprising the further steps of connecting said second plurahty of chambers in a cascade fashion such that fluid displaced from one chamber enters the next chamber in the cascade.
28. A method according to claim 23, comprising the further steps providing a water inlet/outlet conduit substantiaUy at the bottom of each chamber, providing a gas inlet outlet conduit substantiaUy at the top of each chamber, and providing an oil inlet/outlet conduit substantiaUy 1/5 of the height of the chamber from the top, filling each chamber of said tank with a mixture of water and gas in order to adjust the buoyancy of the facility, pumping produced oU into each chamber by means of said oU conduit to displace said water and gas so as to maintain each chamber full of fluid and thereby n iimise the free liquid surface therein, and controlling the relative proportions of water and gas displaced from said chamber by said oU in order to maintain the total mass of the tank and its contents substantiaUy constant.
29. A method according to claim 28, wherein oU is off-loaded from the tank by pumping water and gas back into each chamber in relative proportions such that the total mass of the tank and its contents remains substantiaUy constant.
30. A method according to claim 28 or claim 29, wherein said proportions in which said water and said gas are displaced from and/or pumped into each chamber are 80% water and 20% gas.
31. A method according to any of claims 23 to 30, comprising the further steps of at least partiaUy fiUing each chamber of said tank with gas so as to reduce the total mass of said tank including its contents and hence reducing its draught so as to facilitate maintenance.
Applications Claiming Priority (7)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
GB0203997A GB0203997D0 (en) | 2002-02-20 | 2002-02-20 | Floating semi-submersible oil production and storage arrangement |
GB0203997 | 2002-02-20 | ||
GB0210978 | 2002-05-14 | ||
GB0210978A GB0210978D0 (en) | 2002-05-14 | 2002-05-14 | Floating semi-submersible oil production and storage arrangement |
GB0214699A GB0214699D0 (en) | 2002-06-26 | 2002-06-26 | Floating semi-submersible oil production & storage arrangement |
GB0214699 | 2002-06-26 | ||
PCT/GB2003/000585 WO2003070562A1 (en) | 2002-02-20 | 2003-02-11 | Floating semi-submersible oil production and storage arrangement |
Publications (1)
Publication Number | Publication Date |
---|---|
EP1476351A1 true EP1476351A1 (en) | 2004-11-17 |
Family
ID=27256381
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP03706693A Withdrawn EP1476351A1 (en) | 2002-02-20 | 2003-02-11 | Floating semi-submersible oil production and storage arrangement |
Country Status (11)
Country | Link |
---|---|
US (1) | US20050163572A1 (en) |
EP (1) | EP1476351A1 (en) |
CN (1) | CN1646362A (en) |
AU (1) | AU2003208405A1 (en) |
BR (1) | BR0307983A (en) |
GB (1) | GB2385564B (en) |
MA (1) | MA26406A1 (en) |
NO (1) | NO20043560L (en) |
NZ (1) | NZ534878A (en) |
TN (1) | TNSN04157A1 (en) |
WO (1) | WO2003070562A1 (en) |
Families Citing this family (15)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
BRPI0601273B1 (en) * | 2006-04-17 | 2019-02-12 | Petróleo Brasileiro S.A. - Petrobras | MONO-COLUMN FPSO |
US8220406B2 (en) | 2007-09-03 | 2012-07-17 | Single Buoy Moorings Inc. | Off-shore structure, a buoyancy structure, and method for installation of an off-shore structure |
CN101980917B (en) * | 2008-03-26 | 2014-03-12 | 吴植融 | Liquid storing and offloading device and drilling and production installations on sea based thereon |
US8011312B2 (en) | 2008-08-29 | 2011-09-06 | Horton Wison Deepwater, Inc. | Floating oil storage system and method |
CN101665143A (en) * | 2008-09-05 | 2010-03-10 | 吴植融 | Multifunctional offshore bases and quality replacement method for ballast seawater and LNG or LPG and the like |
WO2010144187A1 (en) * | 2009-06-11 | 2010-12-16 | Exxonmobil Upstream Research Company | Subsea hydrocarbon recovery systems and methods |
US8491350B2 (en) | 2010-05-27 | 2013-07-23 | Helix Energy Solutions Group, Inc. | Floating production unit with disconnectable transfer system |
CN102358403B (en) * | 2011-08-18 | 2015-12-09 | 烟台中集来福士海洋工程有限公司 | For anti-system and the semi-submerged platform of toppling of semi-submerged platform |
CN102756794B (en) * | 2012-06-07 | 2015-01-07 | 中国海洋石油总公司 | Semi-submersible type production platform of reservoir oil positioned below water surface |
US9327805B2 (en) * | 2012-08-07 | 2016-05-03 | China National Offshore Oil Corporation | Vertical oil storage system and its method for deepwater drilling and production |
WO2014047926A1 (en) * | 2012-09-29 | 2014-04-03 | Wu Zhirong | Offshore liquid depot |
GB2507370B (en) * | 2013-05-15 | 2014-10-15 | Atkins Ltd | Compact floating production, storage and offloading facility |
CN103466052A (en) * | 2013-09-12 | 2013-12-25 | 中国船舶重工集团公司第七○二研究所 | Integral-floating-box-type semi-submersible platform |
KR102403659B1 (en) * | 2017-05-16 | 2022-05-27 | 탕산 리무버블 아일랜드 마린 해비 인더스트리 씨오 ., 엘티디. | Basic module of large floating structure and extra large floating structure |
CN115140256B (en) * | 2022-03-29 | 2023-10-27 | 广东海洋大学 | Semi-submersible type offshore oil production platform |
Family Cites Families (12)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
FR1225003A (en) * | 1959-02-11 | 1960-06-28 | Chantiers De Latlantique | Method and installation for handling liquid cargoes on board ships |
US3880102A (en) * | 1974-02-19 | 1975-04-29 | Offshore Technology Corp | Method and apparatus for offshore submersible oil storage and drilling |
FR2305547A1 (en) * | 1975-03-26 | 1976-10-22 | Sea Tank Co | PROCESS FOR IMMERSION OF A TWO-COMPARTMENT OFF-SHORE STRUCTURE-WEIGHT |
US4168673A (en) * | 1976-01-26 | 1979-09-25 | Preussag Aktiengessellschaft | Floating island for extracting or processing gas |
US4059065A (en) * | 1977-02-07 | 1977-11-22 | Mobil Oil Corporation | Semisubmersible loading mooring and storage facility |
NO773076L (en) * | 1977-09-06 | 1979-03-07 | Moss Rosenberg Verft As | FLOATING SYSTEMS FOR OFF-SHORE FLOATING, INTERMEDIATE STORAGE AND LOADING OF LNG |
NO165631B (en) | 1985-07-03 | 1990-12-03 | Aker Eng As | DEVICE FOR HALF SUBMITTABLE PLATFORM CONSTRUCTION. |
SE458519B (en) * | 1987-08-12 | 1989-04-10 | Goetaverken Arendal Ab | FORCE STRENGTH OF SHIPPING FOR OFF-SHORE WORK |
US4960347A (en) * | 1989-07-31 | 1990-10-02 | Strange Booth B | Ship-borne emergency oil containment system and method |
CA2089509A1 (en) * | 1993-02-15 | 1994-08-16 | William A. Scott | Ice crush resistant caisson for arctic offshore oil well drilling |
GB9401141D0 (en) * | 1994-01-21 | 1994-03-16 | Kvaerner Earl & Wright | Buoyant platform |
US5899637A (en) * | 1996-12-11 | 1999-05-04 | American Oilfield Divers, Inc. | Offshore production and storage facility and method of installing the same |
-
2003
- 2003-02-11 CN CNA038082829A patent/CN1646362A/en active Pending
- 2003-02-11 NZ NZ534878A patent/NZ534878A/en unknown
- 2003-02-11 BR BR0307983-0A patent/BR0307983A/en not_active Application Discontinuation
- 2003-02-11 EP EP03706693A patent/EP1476351A1/en not_active Withdrawn
- 2003-02-11 WO PCT/GB2003/000585 patent/WO2003070562A1/en not_active Application Discontinuation
- 2003-02-11 GB GB0303109A patent/GB2385564B/en not_active Expired - Fee Related
- 2003-02-11 AU AU2003208405A patent/AU2003208405A1/en not_active Abandoned
- 2003-02-11 US US10/505,139 patent/US20050163572A1/en not_active Abandoned
-
2004
- 2004-08-18 TN TNP2004000157A patent/TNSN04157A1/en unknown
- 2004-08-26 NO NO20043560A patent/NO20043560L/en not_active Application Discontinuation
- 2004-09-16 MA MA27862A patent/MA26406A1/en unknown
Non-Patent Citations (1)
Title |
---|
See references of WO03070562A1 * |
Also Published As
Publication number | Publication date |
---|---|
NZ534878A (en) | 2006-03-31 |
MA26406A1 (en) | 2004-12-01 |
GB0303109D0 (en) | 2003-03-19 |
WO2003070562A1 (en) | 2003-08-28 |
GB2385564A (en) | 2003-08-27 |
GB2385564B (en) | 2005-08-17 |
TNSN04157A1 (en) | 2007-03-12 |
CN1646362A (en) | 2005-07-27 |
WO2003070562A8 (en) | 2003-12-24 |
BR0307983A (en) | 2004-12-07 |
NO20043560L (en) | 2004-09-17 |
US20050163572A1 (en) | 2005-07-28 |
AU2003208405A1 (en) | 2003-09-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US7448404B2 (en) | Seabed located storage | |
US6244785B1 (en) | Precast, modular spar system | |
US6817809B2 (en) | Seabed oil storage and tanker offtake system | |
CN101980917B (en) | Liquid storing and offloading device and drilling and production installations on sea based thereon | |
EP2981485B1 (en) | Large volume subsea chemical storage and metering system | |
US4059065A (en) | Semisubmersible loading mooring and storage facility | |
US20050163572A1 (en) | Floating semi-submersible oil production and storage arrangement | |
WO1998021415A9 (en) | Precast, modular spar system | |
US20150246770A1 (en) | Large scale subsea storage tank and method for constructing and installing the same | |
CN101544272A (en) | Liquid underwater storage, loading and ex-unloading device | |
US4007700A (en) | Multiple seafloor storage and supply system | |
KR101771360B1 (en) | Floater Fixed Type Near Shore facilities For Production, Storage, and Off-loading | |
US5885028A (en) | Floating systems and method for storing produced fluids recovered from oil and gas wells | |
US3472033A (en) | Fluid storage apparatus | |
US5901656A (en) | Watercraft with stacked wing ballast tanks | |
US3408971A (en) | Submerged oil storage vessel and oil loading facility for offshore wells | |
CN1104358C (en) | Offshore production and storage facility and method of installing same | |
CN108058789A (en) | It transfers platform | |
US6899049B2 (en) | Apparatus and method of constructing offshore platforms | |
US20190106854A1 (en) | Systems, apparatuses, and methods for removing fixed offshore platforms | |
US20160347419A1 (en) | Floating production system and method | |
WO2017164919A1 (en) | Systems, apparatuses, and methods for removing fixed offshore platforms | |
KR20010033309A (en) | Offshore production and storage facility and method of installing the same | |
MXPA99005806A (en) | Method/apparatus for assembling a floating offshore structure | |
WO1999032730A1 (en) | Floating system and method for storing produced fluids recovered from oil and gas wells |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20040820 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE BG CH CY CZ DE DK EE ES FI FR GB GR HU IE IT LI LU MC NL PT SE SI SK TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION HAS BEEN WITHDRAWN |
|
18W | Application withdrawn |
Effective date: 20060209 |