EP1204811A1 - Power station, especially an industrial power station - Google Patents
Power station, especially an industrial power stationInfo
- Publication number
- EP1204811A1 EP1204811A1 EP00960328A EP00960328A EP1204811A1 EP 1204811 A1 EP1204811 A1 EP 1204811A1 EP 00960328 A EP00960328 A EP 00960328A EP 00960328 A EP00960328 A EP 00960328A EP 1204811 A1 EP1204811 A1 EP 1204811A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- line
- power plant
- plant according
- steam
- turbine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F01—MACHINES OR ENGINES IN GENERAL; ENGINE PLANTS IN GENERAL; STEAM ENGINES
- F01K—STEAM ENGINE PLANTS; STEAM ACCUMULATORS; ENGINE PLANTS NOT OTHERWISE PROVIDED FOR; ENGINES USING SPECIAL WORKING FLUIDS OR CYCLES
- F01K13/00—General layout or general methods of operation of complete plants
Definitions
- Power plant especially industrial power plant
- the invention relates to a power plant, in particular an industrial power plant, comprising mobile modules, one of which is designed as a linking module.
- the core of the link module consists of a framework that is open on all sides, in which a continuous connection line serves as a live steam line, in addition to which a process steam line is provided.
- the live steam line is fed from a steam generator and, in addition to a turbine, supplies the process steam line via a forming station and, via at least one shut-off valve, at least one turbine for driving a feed water pump with live steam.
- the live steam line is connected to a line between the turbine and a condenser via at least one turbine bypass with a pressure reducer.
- the process steam line is supplied with steam from the forming station both with steam from an auxiliary steam generator and with steam from a turbine for driving a feed water pump.
- the forming station can be acted upon with water.
- the process steam line can also be used to supply district heating.
- connection module for condensate from turbine exhaust and one from process exhaust flow into the connection module, in which at least one suction line and one pressure line with fittings for feed water are also provided, the process steam line within the connection module having a connection which is connected to a degassing line via a valve is.
- a framework 1 made of any profile forms an outer one
- Frame for a link module has the shape of a cuboid.
- the vertical edges of this cuboid are formed by particularly strong profiles 2, for example tubes with a square cross section.
- the external dimensions of the scaffold 1 preferably correspond to those of a conventional transport container. Apart from the load-bearing profiles of the scaffold 1, its walls are essentially open.
- a live steam line 3 and a process steam line 4 are installed in the longitudinal direction next to one another in the frame 1. Both the pressure and the temperature of the steam in the live steam line 3 are usually higher than the corresponding values of the steam in the process steam line 4.
- the live steam line 3 is fed from a steam generator 5 and in turn feeds a turbine 7 via a turbine inlet control valve 6.
- the live steam line 3 is connected to the process steam line 4 via a forming station 8 and supplies at least one turbine (not shown) for driving one via a shut-off valve 9 Feed water pump.
- Tap lines possibly derived from the turbine 7 for heating condensate and / or feed water are also routed through the linking module, but are not shown in the drawing for reasons of clarity.
- the process steam line 4 also receives steam from an auxiliary steam generator 12 and, via a line with a shut-off valve 13, exhaust steam from at least one turbine which drives a feed water pump. Steam is emitted from the process steam line 4 into a line 14 of a process steam circuit leading out of the power plant and via a control valve 15 to a district heating system. To set the steam state in the process steam line 4, this can be connected to a water line via a shutoff valve, not shown.
- a condensate line from the condenser 11 opens into a condensate fitting 17 and a condensate line from the process steam circuit opens into a condensate fitting 18.
- the process steam line 4 can also be connected via a valve 19 to a line leading to a degasser, not shown.
- At least one suction line 20 and one pressure line 21 for boiler feed water are also led through the linking module and have fittings (not shown) there.
- the live steam line is provided with a control valve 22 at the outlet of the steam generator 5.
- a control valve 22 at the outlet of the steam generator 5.
- Each of the lines from and to the link module is connected to a flange or welded connection, not shown, which is preferably aligned with one of the outer sides of the link module.
- Linking modules designed according to the invention are preferably provided for the design of industrial power plants, but can also be used in any other manufacturing plant.
Landscapes
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Chemical & Material Sciences (AREA)
- Control Of Turbines (AREA)
- Engine Equipment That Uses Special Cycles (AREA)
- Emergency Protection Circuit Devices (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Breeding Of Plants And Reproduction By Means Of Culturing (AREA)
- Fertilizers (AREA)
- Compounds Of Unknown Constitution (AREA)
- Remote Monitoring And Control Of Power-Distribution Networks (AREA)
Abstract
Description
Beschreibungdescription
Kraftwerk, insbesondere IndustriekraftwerkPower plant, especially industrial power plant
Die Erfindung betrifft ein Kraftwerk, insbesondere Industriekraftwerk, aus mobilen Modulen, von denen einer als Verknüpfungsmodul ausgebildet ist.The invention relates to a power plant, in particular an industrial power plant, comprising mobile modules, one of which is designed as a linking module.
Beim Bau von Kraftwerksanlagen, beispielsweise von Industrie- kraftwerken, wird bisher üblicherweise jedes Projekt durch Spezialisten neu konzipiert. Der hierfür erforderliche Aufwand ist dadurch schon im Angebotsstadium sehr hoch. Die Entwicklung projektspezifischer Lösungen ist vor allem deswegen aufwendig, weil jede Fachabteilung für jedes Projekt eine Neuauslegung vornehmen muß und weil bei der Herstellung und dem Bau eine Vielzahl von Einzelteilen in Einzelanfertigungen hergestellt werden müssen.In the construction of power plants, for example industrial power plants, each project has so far usually been redesigned by specialists. The effort required for this is already very high in the offer stage. The development of project-specific solutions is particularly complex because each specialist department has to redesign each project and because a large number of individual parts have to be manufactured in one-off production and construction.
Bisher wurde versucht den hierdurch bedingten Aufwand dadurch zu reduzieren, daß Spezialisten aus früheren oder ähnlichen Projekten möglichst viel einschlägige Tätigkeiten und vorhandene Bauteile für jüngere Projekte zu übernehmen hatten.So far, attempts have been made to reduce the effort involved in this by having specialists from previous or similar projects take on as many relevant activities and existing components as possible for younger projects.
In der Deutschen Patentanmeldung mit dem amtlichen Aktenzei- chen 19924608.4 ist nun vorgeschlagen worden, ein Kraftwerk insgesamt aus mobilen Modulen aufzubauen. Dabei ist auch ein Modul ausschließlich zur Aufnahme von Verbindungsleitungen vorgesehen. Dieser Modul stellt sozusagen ein Verknüpfungsmodul dar. Ein derartig gestaltetes Kraftwerk ist zwar schon sehr vorteilhaft, insbesondere in der Planungs-, Bau- und Betriebsphase. Es hat sich aber ergeben, daß bei dieser Lösung die Regel-, Absperr- und Meßeinrichtungen auf die verschiedensten Moduln verteilt sind. Dadurch ist vor allem die Bedienung der Anlage erschwert. Der Erfindung liegt nun die Aufgabe zugrunde, ein Kraftwerk der eingangs genannten Art so zu gestalten, daß außer der Planung und dem Bau auch seine Bedienung vereinfacht ist.In the German patent application with the official file number 19924608.4 it has now been proposed to build a power plant from mobile modules. In this case, a module is also provided exclusively for receiving connecting lines. This module represents a link module, so to speak. A power plant designed in this way is indeed very advantageous, especially in the planning, construction and operating phase. However, it has been found that with this solution the control, shut-off and measuring devices are distributed over a wide variety of modules. This makes it particularly difficult to operate the system. The invention is based on the object of designing a power plant of the type mentioned in such a way that, in addition to planning and construction, its operation is simplified.
Diese Aufgabe ist erfindungsgemäß dadurch gelöst, daß in dem Verknüpfungsmodul neben Verbindungsleitungen ausschließlich Rohrleitungsarmaturen und Meßeinrichtungen eingebaut sind. Dabei besteht der Verknüpfungsmodul im Kern aus einem allseitig offenen Gerüst, in dem eine durchgehende Verbindungslei- tung als Frischdampfleitung dient, neben der eine Prozeßdampfleitung vorgesehen ist.This object is achieved in that, in addition to connecting lines, only pipeline fittings and measuring devices are installed in the linking module. The core of the link module consists of a framework that is open on all sides, in which a continuous connection line serves as a live steam line, in addition to which a process steam line is provided.
Die Frischdampfleitung ist aus einem Dampferzeuger gespeist und versorgt ihrerseits neben einer Turbine über eine Umform- Station die Prozeßdampfleitung und über mindestens ein Absperrventil mindestens eine Turbine zum Antrieb einer Speisewasserpumpe mit Frischdampf. Außerdem ist die Frischdampfleitung über mindestens einen Turbinenbypaß mit einem Druckminderer mit einer Leitung zwischen der Turbine und einem Kon- densator verbunden.The live steam line is fed from a steam generator and, in addition to a turbine, supplies the process steam line via a forming station and, via at least one shut-off valve, at least one turbine for driving a feed water pump with live steam. In addition, the live steam line is connected to a line between the turbine and a condenser via at least one turbine bypass with a pressure reducer.
Die Prozeßdampfleitung ist außer aus der Umformstation sowohl mit Dampf aus einem Hilfsdampferzeuger als auch mit Abdampf aus einer Turbine zum Antrieb einer Speisewasserpumpe mit Dampf versorgt. Zur Regelung des Dampfzustandes des über eine Umformstation in die Prozeßdampfleitung eingespeistem Frischdampf ist die Umformstation mit Wasser beaufschlagbar. Die Prozeßdampfleitung kann auch zur Versorgung einer Fernheizung herangezogen sein.The process steam line is supplied with steam from the forming station both with steam from an auxiliary steam generator and with steam from a turbine for driving a feed water pump. To regulate the steam state of the live steam fed into the process steam line via a forming station, the forming station can be acted upon with water. The process steam line can also be used to supply district heating.
Je eine Kondensatleitung für Kondensat aus Turbinenabdampf und aus Prozeßabdampf münden in den Verknüpfungsmodul, in dem außerdem mindestens je eine Saugleitung und eine Druckleitung mit Armaturen für Speisewasser vorgesehen sind, wobei die Prozeßdampfleitung innerhalb des Verknüpfungsmoduls einen Anschluß aufweist, der über ein Ventil mit einer Entgasungsleitung verbunden ist. Die erfindungsgemäße Ausführung eines Verknüpfungsmoduls für ein modular aufgebautes Kraftwerk ist sehr vorteilhaft, weil hierdurch neben einer einfachen, immer wieder verwendbaren Planung außerdem eine übersichtliche Anordnung der Armaturen und eine logistisch einfache Bedienung derselben gewährleistet ist.One condensate line for condensate from turbine exhaust and one from process exhaust flow into the connection module, in which at least one suction line and one pressure line with fittings for feed water are also provided, the process steam line within the connection module having a connection which is connected to a degassing line via a valve is. The implementation of a link module for a modular power plant according to the invention is very advantageous because, in addition to simple, reusable planning, this also ensures a clear arrangement of the fittings and logistically simple operation of the same.
Ein Ausführungsbeispiel der Erfindung ist anhand einer Zeichnung näher erläutert, die in schematischer Darstellung den Aufbau eines Verknüpfungsmoduls zeigt.An embodiment of the invention is explained in more detail with reference to a drawing, which shows the structure of a link module in a schematic representation.
Pfeile neben Verbindungsleitungen geben die Strömungsrichtung eines Mediums in der jeweiligen Verbindungsleitung an.Arrows next to connecting lines indicate the direction of flow of a medium in the respective connecting line.
Ein Gerüst 1 aus beliebigen Profilen bildet einen äußerenA framework 1 made of any profile forms an outer one
Rahmen für ein Verknüpfungsmodul und hat die Form eines Quaders. Die senkrechten Kanten dieses Quaders sind von besonders kräftigen Profilen 2, beispielsweise Rohren mit quadratischem Querschnitt, gebildet. Die Außenabmessungen des Ge- rüst 1 entsprechen vorzugsweise denen eines üblichen Transportcontainers. Abgesehen von den tragenden Profilen des Ge- rüsts 1 sind dessen Wände im wesentlichen offen.Frame for a link module and has the shape of a cuboid. The vertical edges of this cuboid are formed by particularly strong profiles 2, for example tubes with a square cross section. The external dimensions of the scaffold 1 preferably correspond to those of a conventional transport container. Apart from the load-bearing profiles of the scaffold 1, its walls are essentially open.
In das Gerüst 1 sind in Längsrichtung nebeneinander eine Frischdampfleitung 3 und eine Prozeßdampfleitung 4 eingebaut. Sowohl der Druck als auch die Temperatur des Dampfes in der Frischdampfleitung 3 sind üblicherweise höher, als die entsprechenden Werte des Dampfes in der Prozeßdampfleitung 4.A live steam line 3 and a process steam line 4 are installed in the longitudinal direction next to one another in the frame 1. Both the pressure and the temperature of the steam in the live steam line 3 are usually higher than the corresponding values of the steam in the process steam line 4.
Die Frischdampfleitung 3 wird gespeist aus einem Dampferzeuger 5 und speist ihrerseits über ein Turbineneinlaßstellven- til 6 eine Turbine 7. Außerdem ist die Frischdampfleitung 3 über eine Umformstation 8 mit der Prozeßdampfleitung 4 verbunden und versorgt über ein Absperrventil 9 mindestens eine nicht dargestellte Turbine zum Antrieb einer Speisewasserpumpe . Zusätzlich besteht über einen Druckminderer 10 eine Verbindung von der Frischdampfleitung 3 zu einer Abdampfleitung von der Turbine 7 zu einem Kondensator 11, der vorzugsweise als mit Luft gekühlter Kondensator ausgeführt ist. Möglicherweise von der Turbine 7 abgeleitete Anzapfleitungen zur Beheizung von Kondensat- und/oder Speisewasser sind ebenfalls durch den Verknüpfungsmodul geführt, sind aber der Übersichtlichkeit wegen in der Zeichnung nicht dargestellt.The live steam line 3 is fed from a steam generator 5 and in turn feeds a turbine 7 via a turbine inlet control valve 6. In addition, the live steam line 3 is connected to the process steam line 4 via a forming station 8 and supplies at least one turbine (not shown) for driving one via a shut-off valve 9 Feed water pump. In addition, there is a connection from the live steam line 3 to an exhaust steam line from the turbine 7 to a condenser 11, which is preferably designed as a condenser cooled with air, via a pressure reducer 10. Tap lines possibly derived from the turbine 7 for heating condensate and / or feed water are also routed through the linking module, but are not shown in the drawing for reasons of clarity.
Die Prozeßdampfleitung 4 erhält außer über die Umformstation 8 auch Dampf aus einem Hilfsdampferzeuger 12 und über eine Leitung mit einem Absperrventil 13 Abdampf aus mindestens einer Turbine, die eine Speisewasserpumpe antreibt. Aus der Prozeßdampfleitung 4 wird Dampf in eine aus dem Kraftwerk hinausführende Leitung 14 eines Prozeßdampfkreislaufs und über ein Regelventil 15 an eine Fernheizung abgegeben. Zur Einstellung des Dampfzustandes in der Prozeßdampfleitung 4 ist diese über ein nicht dargestelltes Abschlußventil an eine Wasserleitung anschließbar.In addition to the forming station 8, the process steam line 4 also receives steam from an auxiliary steam generator 12 and, via a line with a shut-off valve 13, exhaust steam from at least one turbine which drives a feed water pump. Steam is emitted from the process steam line 4 into a line 14 of a process steam circuit leading out of the power plant and via a control valve 15 to a district heating system. To set the steam state in the process steam line 4, this can be connected to a water line via a shutoff valve, not shown.
Eine Kondensatleitung vom Kondensator 11 mündet in eine Kondensatarmatur 17 und eine Kondensatleitung aus dem Prozeßdampfkreislauf mündet in eine Kondensatarmatur 18. Zur Gewährleistung eines störungsfreien Betriebes ist die Prozeß- dampfleitung 4 außerdem über ein Ventil 19 an eine zu einem nicht dargestellten Entgaser führende Leitung anschließbar.A condensate line from the condenser 11 opens into a condensate fitting 17 and a condensate line from the process steam circuit opens into a condensate fitting 18. To ensure trouble-free operation, the process steam line 4 can also be connected via a valve 19 to a line leading to a degasser, not shown.
Auch jeweils mindestens eine Saugleitung 20 und eine Druckleitung 21 für Kesselspeisewasser sind durch den Verknüp- fungsmodul geführt und weisen dort nicht dargestellte Armaturen auf.At least one suction line 20 and one pressure line 21 for boiler feed water are also led through the linking module and have fittings (not shown) there.
Außerhalb des Verknüpfungsmoduls ist die Frischdampfleitung am Ausgang des Dampferzeugers 5 mit einem Stellventil 22 ver- sehen. Jede der Leitungen von und zum Verknüpfungsmodul ist an eine nicht dargestellte Flansch- oder Schweißverbindung angeschlossen, die vorzugsweise jeweils mit einer der Außenseiten des Verknüpfungsmoduls fluchtet.Outside the link module, the live steam line is provided with a control valve 22 at the outlet of the steam generator 5. Each of the lines from and to the link module is connected to a flange or welded connection, not shown, which is preferably aligned with one of the outer sides of the link module.
Erfindungsgemäß gestaltete Verknüpfungsmoduln sind zwar vorzugweise für die Gestaltung von Industriekraftwerken vorgesehen, können aber auch bei beliebigen anderen Fertigungsanlagen eingesetzt werden. Linking modules designed according to the invention are preferably provided for the design of industrial power plants, but can also be used in any other manufacturing plant.
Claims
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DE19937789 | 1999-08-10 | ||
DE19937789 | 1999-08-10 | ||
PCT/DE2000/002506 WO2001011198A1 (en) | 1999-08-10 | 2000-07-28 | Power station, especially an industrial power station |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1204811A1 true EP1204811A1 (en) | 2002-05-15 |
EP1204811B1 EP1204811B1 (en) | 2005-03-23 |
Family
ID=7917887
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00960328A Expired - Lifetime EP1204811B1 (en) | 1999-08-10 | 2000-07-28 | Power station, especially an industrial power station |
Country Status (7)
Country | Link |
---|---|
US (1) | US6581383B2 (en) |
EP (1) | EP1204811B1 (en) |
AT (1) | ATE291678T1 (en) |
DE (1) | DE50009879D1 (en) |
DK (1) | DK1204811T3 (en) |
ES (1) | ES2239614T3 (en) |
WO (1) | WO2001011198A1 (en) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP2131013A1 (en) * | 2008-04-14 | 2009-12-09 | Siemens Aktiengesellschaft | Steam turbine system for a power plant |
ES2323355B2 (en) * | 2009-04-16 | 2011-01-04 | Universidad Politecnica De Madrid | METHOD FOR INCREASING THE NET ELECTRICAL POWER OF THERMOSOLAR POWER STATIONS. |
CN110504038B (en) * | 2018-05-16 | 2023-05-26 | 中国核工业第五建设有限公司 | Support assembly of nuclear island steam generator |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3925679A (en) * | 1973-09-21 | 1975-12-09 | Westinghouse Electric Corp | Modular operating centers and methods of building same for use in electric power generating plants and other industrial and commercial plants, processes and systems |
JPS55123593A (en) * | 1979-03-19 | 1980-09-24 | Toshiba Corp | Package type generator |
US4965880A (en) * | 1987-07-15 | 1990-10-23 | Ciba-Geigy Corporation | Productio installation for the manufacture of a product |
IT1258959B (en) * | 1992-06-09 | 1996-03-11 | MOBILE MODULES PLANT FOR THE DEVELOPMENT AND PRODUCTION OF BIOTECHNOLOGICAL PRODUCTS ON A PILOT SCALE | |
DE19749842A1 (en) * | 1997-11-11 | 1999-06-02 | Siemens Ag | Device for checking an electric drive |
EP0849435A3 (en) * | 1998-04-01 | 1998-10-21 | Christian S. Michaelsen | Power plant |
-
2000
- 2000-07-28 DE DE50009879T patent/DE50009879D1/en not_active Expired - Lifetime
- 2000-07-28 EP EP00960328A patent/EP1204811B1/en not_active Expired - Lifetime
- 2000-07-28 AT AT00960328T patent/ATE291678T1/en active
- 2000-07-28 DK DK00960328T patent/DK1204811T3/en active
- 2000-07-28 WO PCT/DE2000/002506 patent/WO2001011198A1/en active IP Right Grant
- 2000-07-28 ES ES00960328T patent/ES2239614T3/en not_active Expired - Lifetime
-
2002
- 2002-02-11 US US10/073,556 patent/US6581383B2/en not_active Expired - Fee Related
Non-Patent Citations (1)
Title |
---|
See references of WO0111198A1 * |
Also Published As
Publication number | Publication date |
---|---|
ATE291678T1 (en) | 2005-04-15 |
EP1204811B1 (en) | 2005-03-23 |
DE50009879D1 (en) | 2005-04-28 |
US6581383B2 (en) | 2003-06-24 |
DK1204811T3 (en) | 2005-07-11 |
US20020088232A1 (en) | 2002-07-11 |
WO2001011198A1 (en) | 2001-02-15 |
ES2239614T3 (en) | 2005-10-01 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE102007024934B4 (en) | Tube bundle reactors with pressure fluid cooling | |
DE102018101344A1 (en) | Cooling unit, plant and process | |
DE4223291A1 (en) | FUEL CELL POWER GENERATION SYSTEM CONSTRUCTED FROM SYSTEM UNITS | |
DE3214775C2 (en) | Device for transferring heat-carrying fluid from a supply line of a district heating power plant to a consumer | |
DE19537478C1 (en) | Multi-stage steam turbine power generation plant | |
WO2007033944A1 (en) | Construction kit for setting up an industrial plant | |
DE19957874A1 (en) | Combined power plant | |
EP1204811A1 (en) | Power station, especially an industrial power station | |
EP2517771A1 (en) | Washing tower | |
WO2008101830A2 (en) | Steam turbine system, combined gas and steam turbine power station and steam power station | |
CH656210A5 (en) | Heat pump arrangement | |
EP0245582B1 (en) | Heat exchanger for gases under elevated pressure | |
CH634127A5 (en) | Thermal power station WITH A TROCKENKUEHLEINRICHTUNG. | |
EP1336075A1 (en) | Modular system for constructing an industrial installation | |
AT14848U1 (en) | Boiler system and inventory and construction parts of such a system | |
DE1601129A1 (en) | Support structure or framework for systems in which liquid is brought into contact with gas, especially water cooling systems | |
DE818959C (en) | Tube heat exchanger | |
EP0865596B1 (en) | Recooling system | |
EP1607586A1 (en) | Arrangement of a steam power plant | |
DE2526147C3 (en) | Method for operating a nuclear power plant with a closed working gas cycle and a nuclear power plant for carrying out the method | |
EP0159976A2 (en) | Transportable unit | |
DE102010030006A1 (en) | Vacuum coating system in modular design | |
EP1174672A2 (en) | Combined- or steam-power-plant | |
EP4235074A1 (en) | Heat exchanger | |
DE102011087498B4 (en) | Wall elements for a steam-cooled channel |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 20020109 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
17Q | First examination report despatched |
Effective date: 20040617 |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IE Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050323 |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: FG4D Free format text: NOT ENGLISH |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: EP |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FG4D Free format text: GERMAN |
|
REF | Corresponds to: |
Ref document number: 50009879 Country of ref document: DE Date of ref document: 20050428 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: NV Representative=s name: SIEMENS SCHWEIZ AG |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: TRGR |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GR Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050623 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: T3 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: CY Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050728 Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050728 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: MC Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20050731 |
|
GBT | Gb: translation of ep patent filed (gb section 77(6)(a)/1977) |
Effective date: 20050711 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: PT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT Effective date: 20050907 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2239614 Country of ref document: ES Kind code of ref document: T3 |
|
REG | Reference to a national code |
Ref country code: IE Ref legal event code: FD4D |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20051227 |
|
ET | Fr: translation filed | ||
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PCAR Free format text: SIEMENS SCHWEIZ AG;INTELLECTUAL PROPERTY FREILAGERSTRASSE 40;8047 ZUERICH (CH) |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DK Payment date: 20110720 Year of fee payment: 12 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FI Payment date: 20120711 Year of fee payment: 13 Ref country code: SE Payment date: 20120710 Year of fee payment: 13 Ref country code: GB Payment date: 20120709 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20120802 Year of fee payment: 13 Ref country code: IT Payment date: 20120726 Year of fee payment: 13 Ref country code: BE Payment date: 20120810 Year of fee payment: 13 Ref country code: DE Payment date: 20120906 Year of fee payment: 13 Ref country code: ES Payment date: 20120808 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20120703 Year of fee payment: 13 Ref country code: CH Payment date: 20121011 Year of fee payment: 13 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 20120615 Year of fee payment: 13 |
|
BERE | Be: lapsed |
Owner name: *SIEMENS A.G. Effective date: 20130731 |
|
REG | Reference to a national code |
Ref country code: NL Ref legal event code: V1 Effective date: 20140201 |
|
REG | Reference to a national code |
Ref country code: DK Ref legal event code: EBP Effective date: 20130731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
REG | Reference to a national code |
Ref country code: SE Ref legal event code: EUG |
|
REG | Reference to a national code |
Ref country code: AT Ref legal event code: MM01 Ref document number: 291678 Country of ref document: AT Kind code of ref document: T Effective date: 20130728 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20130728 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20140331 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130728 Ref country code: LI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140201 Ref country code: CH Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20140201 Ref country code: FI Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130728 Ref country code: SE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130729 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 50009879 Country of ref document: DE Effective date: 20140201 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130728 Ref country code: AT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130728 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DK Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130731 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20141111 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20130729 |