Method of building viaducts Download PDFInfo
- Publication number
- EP1111135A2 EP1111135A2 EP00126823A EP00126823A EP1111135A2 EP 1111135 A2 EP1111135 A2 EP 1111135A2 EP 00126823 A EP00126823 A EP 00126823A EP 00126823 A EP00126823 A EP 00126823A EP 1111135 A2 EP1111135 A2 EP 1111135A2
- Authority
- EP
- European Patent Office
- Prior art keywords
- carrying
- ashlar
- horizontal
- ledger
- ashlars
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
- 238000000034 method Methods 0.000 title claims abstract description 27
- 239000003381 stabilizer Substances 0.000 claims abstract description 6
- 230000000087 stabilizing effect Effects 0.000 claims description 4
- 239000000463 material Substances 0.000 claims description 2
- 229910000746 Structural steel Inorganic materials 0.000 abstract description 2
- 230000003245 working effect Effects 0.000 description 3
- 238000009415 formwork Methods 0.000 description 2
- 230000000750 progressive effect Effects 0.000 description 1
- NWONKYPBYAMBJT-UHFFFAOYSA-L zinc sulfate Chemical compound [Zn+2].[O-]S([O-])(=O)=O NWONKYPBYAMBJT-UHFFFAOYSA-L 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01D—CONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
- E01D21/00—Methods or apparatus specially adapted for erecting or assembling bridges
- E01D21/10—Cantilevered erection
- E01D21/105—Balanced cantilevered erection
Definitions
- the invention refers to a new method to build viaducts particularly those with big span and with substantial height on the valley bottom, that is to say for all the viaducts for which for some time the classic method of lagging and work cementation has been abandoned.
- a building method has had development. Said method provides the realization of the horizontal carrying structure floor systems by assembling of prefabricated units.
- a first method refers to a working with a push launching from an end, in which the ashlars are positioned and solidarized behind of an abutment and then they are pushed so making move the units on tracks placed on the head of the piers. This method has the problem that all the piers must already be made, it has the necessity to have room behind the abutment and it does not permit the scaffolding stopage for any reasons such for example in relation to possible interferences or for the presence of obstacles.
- a second method refers to a positioning with launching truck providing a span truss equal to one or more spans and consequently much expensive.
- the bigger problem is given to the necessity to never break off the progressive advancement of the positioning and to must have big room behind the abutment to mount and to dismount the truss.
- the working times of the work are increased both in relation of the slowness of the truck translation velocity than in relation to the necessity to must mount and to must dismount the truss.
- the invented method gives a solution to said disadvantages by a new launching method more adaptable and more quick and to be actuated by different sequences following described. 1) After to have ended the piers and the same are to the plan height by formwork, it is positioned the first ashlar from which going on in the working, this positioning can be made also at the same time on the different piers.
- the invented method comprises three parts: a horizontal carrying structure, a vertical lifting ledger and a hooking beam.
- the horizontal carrying structure consists of a level structure 1 formed by two structural steel work beams with cross bracings 2 on horizontal plane. Said horizontal structure goes on rails 3 fixed on the scaffolding slab by four motorized wheels 4 with safety block device 5.
- the level structure moreover provides feet 6 acting like stabilizers to be lowered during the lifting phase of the ashlar.
- the vertical lifting beam consists of a carrying ledger 7 sliding on jaws 8 to be fixed on the level structure 1 with motorized cargo winch 9 for lifting the ropes 10 having hanging sheaves 11 with blocks 12.
- the hooking ledger consists of a carrying beam 13 equipped with hooks and with two subordinate beams which bring the ashlar with four pins realized with threaded bars 14.
- the first three ashlars15, 16 and 17 are placed by a mobile crane.
- the rails 3 are placed by fixing the same with passing means, then always with the mobile crane the horizontal carrying structure with level part 1 is placed.
- Said part 1 puts on the rails by its set of wheels 4.
- the vertical lifting beam with the carrying ledger 7 is placed equipped with cargo winches 9 and ropes 10, laying it on the jaws 8 of the level structure 1.
- the ropes 10 are lowered with hanging by the blocks 12 the carrying beam 13.
- the bars 14 the ashlar to be lifted is fixed and it is lifted acting by the motorized cargo winches 9.
- the horizontal carrying structure is moved on the rails 3 till the necessary position.
- the stabilizing feet 6 are lifted and the horizontal carrying structure is moved to the opposed halfspan so to go on with the equal simmetrical working.
- the network structure 18 placed on the pier head permits the placing of the first three ashlars 15, 16 and 17 from which the whole building starts. Said first three ashlars are launched by a crane. Said network structure 18, after to have mounted the three ashlars, is dismounted from the pier head with the same crane used for placing the ashlars 15, 16 and 17.
- Said three starting ashlars form a small room on which the rails 3 bringing the whole structure are placed. Moreover it is provided, connected to the end of the horizontal carrying structure with level part 1 a metallic stull 19 with two placing stages so to control the ashlar positioning and then make its jointing. In this stull the room is suitable to house the necessary materials, the tensioning jacks and our workers. Said metallic stull 19 to be moved by a crane to be in help of the working. Said crane can be the same used for the positioning of the first three ashlars 15, 16 and 17.
- the invented method is illustrated in schematic and limitated view in the drawings of sheets 1, 2, 3, 4, 5, 6 and 7. In sheet 1 fig.
- FIG. 1 is side view of the structures 1 and 7 with the ropes 10 and without the ashlar.
- sheet 2 fig. 2 is plant view of the structures 1 and 7.
- sheet 3 fig. 3 is side view in lifting position of the ashlar.
- sheet 4 fig . 4 is transversal section view of an already jointed ashlar whereas another ashlar is in supporting phase hooked to the hooking beam 13.
- sheet 5 fig.5 is perspective view of the horizontal structure with part 1 with on an end the stull 19 and the vertical structure with ledger 7 in lifting of the ashlar.
- sheet 6 fig. 6 is perspective view of the horizontal carrying structure with part 1 and the vertical structure with ledger 7 with a hooked ashlar during the translation.
- FIG. 7 is view in detail of the network structure 18 to be put onto the pier head for the positioning of the first three ashlars from which the building is started whereas onto the behind pier is showed the horizontal structure with part 1 during the working phase with the stull 19 connected to its end.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Bridges Or Land Bridges (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
- Carriers, Traveling Bodies, And Overhead Traveling Cranes (AREA)
Abstract
Description
Claims (3)
- Method to build viaducts to be actuated by a horizontal carrying structure, a vertical lifting ledger and a hooking beam; characterized in that:the horizontal carrying structure consists of a level structure (I) formed by two structural stell work beams with cross bracings (2) on horizontal plane, said structure goes on rails (3) fixed on the scaffolding slab by four motorized wheels (4) with safety block device (5), said level structure moreover provides feet (6) acting like stabilizers to be lowered during the lifting phase of the ashlar;the vertical lifting beam consists of a carrying ledger (7) sliding on jaws (8) to be fixed on the level structure (1) with motorized cargo winch (9) for lifting the ropes (10) having hanging sheaves (11) with blocks (12);the hooking ledger consists of a carrying beam (13) equipped with hooks and with two subordinate beams which bring the ashlar with four pins realized with threaded bars (14);for the working after to have mounted the network structure at the pier head the first three ashlars (15, 16 and 17) are placed by a mobile crane, on said ashlars the rails (3) are placed by fixing the same with passing means then always with the mobile crane the horizontal carrying structure with level part (1) is placed, said part (1) puts on the rails by its set of wheels (4), then the vertical lifting beam with the carrying ledger (7) is placed equipped with cargo winches (9) and ropes (10) laying it on the jaws (8) of the level structure (1), then the ropes (10) are lowered with hanging by the blocks (12) the carrying beam (13), by the bars (14) the ashlar to be lifted is fixed and it is lifted acting by the motorized cargo winches (9), at this point the horizontal carrying structure is moved on the rails (3) till the necessary position, during this hoisting phase the stabilizers (6) of the carrying horizontal structure are lowered so stabilizing the different parts, the vertical lifting beams with ledger (7) moving itself on jaws ( ) is joltingly carried with hooked the ashlar till the position of the further lifting for the filing placing in this way the ashlar is brought to the final height to actuate the jointing by prestressing, ending the jointing the threaded bars (14) are unhooked, the carrying beam (13) is lowered on the ground in the starting position barycentric with the set of wheels (4), the stabilizing feet (6) are lifted and the horizontal carrying structure is moved to the opposed halfspan so to go on with the equal simmetrical working.
- Method to build viaducts, as per claim 1, characterized in that a network structure (18) placed on the pier head permits the placing of the first three ashlars (15, 16 and 17) from which the whole building starts, said first three ashlars are launched by a crane; said network structure (18) after to have mounted the three ashlars is dismounted from the pier head with the same crane used for placing the ashlars (15, 16 and 17), said three starting ashlars form a small room on which the rails (3) bringing the whole strcuture are placed.
- Method to build viaducts, as per claim 1, characterized in that connected to the end of the horizontal carrying structure with level part (1) a metallic stull (19) with two placing stages so to control the ashlar positioning and then make its jointing, in this stull the room is suitable to house the necessary materials, the tensioning jacks and four workers; said metallic stull (19) to be moved by a crane to be in help of the working.
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
IT1999BO000704 IT1311372B1 (en) | 1999-12-23 | 1999-12-23 | SYSTEM FOR BUILDING VIADUCTS. |
ITBO990704 | 1999-12-23 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1111135A2 true EP1111135A2 (en) | 2001-06-27 |
EP1111135A3 EP1111135A3 (en) | 2003-03-19 |
Family
ID=11344433
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00126823A Withdrawn EP1111135A3 (en) | 1999-12-23 | 2000-12-07 | Method of building viaducts |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP1111135A3 (en) |
IT (1) | IT1311372B1 (en) |
Cited By (13)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2381326C1 (en) * | 2008-11-14 | 2010-02-10 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Device for lifting and erecting units of superstructure |
CN102182148A (en) * | 2011-04-02 | 2011-09-14 | 天津天佳市政公路工程有限公司 | Quick rollers for large bridge installation |
CN103628409A (en) * | 2013-11-08 | 2014-03-12 | 中天建设集团有限公司 | Construction device for anti-collision wall of viaduct |
JP2015113581A (en) * | 2013-12-09 | 2015-06-22 | 株式会社横山基礎工事 | Construction method of structure and support device |
RU2560012C1 (en) * | 2014-06-24 | 2015-08-20 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Device for lifting and installation of bridge units |
EP3018255A1 (en) * | 2014-10-27 | 2016-05-11 | Rubrica Ingenieria Y Arquitectura, S.L. | Cart for building a bridge board forward progressive |
RU177385U1 (en) * | 2017-08-03 | 2018-02-20 | Виктор Никитович Коротин | DEVICE FOR PRECISION MOUNTING SUSPENDED FOR FOUR POINTS OF STRUCTURES OF THE SPAN STRUCTURE OF THE BRIDGE |
CN108100894A (en) * | 2018-01-25 | 2018-06-01 | 中交第三航务工程局有限公司宁波分公司 | The short tower crane equipment of low speed and system |
JP2018091093A (en) * | 2016-12-06 | 2018-06-14 | 三井住友建設株式会社 | Bridge construction method |
CN110644377A (en) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | Roller type beam body pushing construction device |
CN110904841A (en) * | 2019-11-07 | 2020-03-24 | 中铁大桥局集团有限公司 | Bridge girder lifting method and system |
CN116516842A (en) * | 2023-05-19 | 2023-08-01 | 合肥工业大学 | Automatic traveling system for hanging basket truss and track movement thereof |
CN117090147A (en) * | 2023-10-19 | 2023-11-21 | 湖南省通盛工程有限公司 | Small-radius curve section cross-pier steel beam suspension splicing device and construction method |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113356078A (en) * | 2021-07-07 | 2021-09-07 | 甘肃路桥建设集团有限公司 | Bridge pier column reinforcement rack |
Family Cites Families (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1658602B1 (en) * | 1967-08-12 | 1970-11-19 | Hochtief Ag Hoch Tiefbauten | Device for assembling the prefabricated components of a prestressed concrete bridge, each comprising a complete bridge section, in cantilevered cantilevered sections |
DE2704033A1 (en) * | 1977-02-01 | 1978-08-03 | Beton & Monierbau Ag | Staged multi-span reinforced concrete bridge erection - using supports carried through roadway edge cut=outs and fixed to pier |
JP3455660B2 (en) * | 1997-09-24 | 2003-10-14 | 株式会社北川鉄工所 | Lifting device for bridge girder erection |
JPH11158817A (en) * | 1997-11-26 | 1999-06-15 | Nkk Corp | Balancing erection method for high-altitude bridges and mobile lifting equipment used in this method |
-
1999
- 1999-12-23 IT IT1999BO000704 patent/IT1311372B1/en active
-
2000
- 2000-12-07 EP EP00126823A patent/EP1111135A3/en not_active Withdrawn
Cited By (16)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
RU2381326C1 (en) * | 2008-11-14 | 2010-02-10 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Device for lifting and erecting units of superstructure |
CN102182148A (en) * | 2011-04-02 | 2011-09-14 | 天津天佳市政公路工程有限公司 | Quick rollers for large bridge installation |
CN103628409A (en) * | 2013-11-08 | 2014-03-12 | 中天建设集团有限公司 | Construction device for anti-collision wall of viaduct |
JP2015113581A (en) * | 2013-12-09 | 2015-06-22 | 株式会社横山基礎工事 | Construction method of structure and support device |
RU2560012C1 (en) * | 2014-06-24 | 2015-08-20 | Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" | Device for lifting and installation of bridge units |
EP3018255A1 (en) * | 2014-10-27 | 2016-05-11 | Rubrica Ingenieria Y Arquitectura, S.L. | Cart for building a bridge board forward progressive |
JP2018091093A (en) * | 2016-12-06 | 2018-06-14 | 三井住友建設株式会社 | Bridge construction method |
RU177385U1 (en) * | 2017-08-03 | 2018-02-20 | Виктор Никитович Коротин | DEVICE FOR PRECISION MOUNTING SUSPENDED FOR FOUR POINTS OF STRUCTURES OF THE SPAN STRUCTURE OF THE BRIDGE |
CN108100894A (en) * | 2018-01-25 | 2018-06-01 | 中交第三航务工程局有限公司宁波分公司 | The short tower crane equipment of low speed and system |
CN110644377A (en) * | 2019-09-30 | 2020-01-03 | 中铁二院工程集团有限责任公司 | Roller type beam body pushing construction device |
CN110644377B (en) * | 2019-09-30 | 2021-01-12 | 中铁二院工程集团有限责任公司 | Roller type beam body pushing construction device |
CN110904841A (en) * | 2019-11-07 | 2020-03-24 | 中铁大桥局集团有限公司 | Bridge girder lifting method and system |
CN110904841B (en) * | 2019-11-07 | 2021-08-10 | 中铁大桥局集团有限公司 | Bridge girder lifting method and system |
CN116516842A (en) * | 2023-05-19 | 2023-08-01 | 合肥工业大学 | Automatic traveling system for hanging basket truss and track movement thereof |
CN117090147A (en) * | 2023-10-19 | 2023-11-21 | 湖南省通盛工程有限公司 | Small-radius curve section cross-pier steel beam suspension splicing device and construction method |
CN117090147B (en) * | 2023-10-19 | 2023-12-26 | 湖南省通盛工程有限公司 | Small-radius curve section cross-pier steel beam suspension splicing device and construction method |
Also Published As
Publication number | Publication date |
---|---|
EP1111135A3 (en) | 2003-03-19 |
ITBO990704A1 (en) | 2001-06-23 |
IT1311372B1 (en) | 2002-03-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP3885584B2 (en) | Construction method of composite truss bridge | |
US3550723A (en) | Bridge scaffold | |
EP1111135A2 (en) | Method of building viaducts | |
KR20140084107A (en) | Self-Launching Movable Scaffolding System | |
US4768938A (en) | Apparatus for pouring concrete slabs | |
US4492358A (en) | Truss shoring system and apparatus therefor | |
JP3804883B2 (en) | Concrete high structure construction apparatus and concrete oblique column construction method | |
JP4361775B2 (en) | Bridge erection method and bridge erection device | |
JP3110985B2 (en) | Construction method of column capital of overhang girder bridge | |
JP2539150B2 (en) | Bridge erection equipment | |
US4921649A (en) | Method for pouring concrete slabs | |
JPH11222819A (en) | Construction method of elevated structure using building girder | |
JP3197234B2 (en) | Moving scaffold for floor slab assembly | |
JP2000087314A (en) | Method and device for construction of floor slab | |
JP2552997B2 (en) | Bridge girder construction method and its equipment | |
JP3032477B2 (en) | Moving scaffold for floor slab assembly | |
JPH1088521A (en) | Overhang work equipment | |
JP3026544B2 (en) | Method and apparatus for moving overhanging work vehicle | |
JPH11158817A (en) | Balancing erection method for high-altitude bridges and mobile lifting equipment used in this method | |
JPH0336362B2 (en) | ||
JP7112146B1 (en) | Mobile connection suspension scaffold and its usage | |
JPH07102524A (en) | Construction method for concrete cable-stayed bridge and formwork support cart used for it | |
JPS649403B2 (en) | ||
RU2247805C2 (en) | Method for assembling over-pier part of bridge span structure | |
JPS5847803A (en) | Bridge crane |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A2 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
PUAL | Search report despatched |
Free format text: ORIGINAL CODE: 0009013 |
|
AK | Designated contracting states |
Kind code of ref document: A3 Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
AX | Request for extension of the european patent |
Extension state: AL LT LV MK RO SI |
|
AKX | Designation fees paid |
Designated state(s): AT BE CH CY DE DK ES FI FR GB GR IE IT LI LU MC NL PT SE TR |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20030920 |