Folding device for a crane boom with nestable elements Download PDFInfo
- Publication number
- EP1072553A1 EP1072553A1 EP00420135A EP00420135A EP1072553A1 EP 1072553 A1 EP1072553 A1 EP 1072553A1 EP 00420135 A EP00420135 A EP 00420135A EP 00420135 A EP00420135 A EP 00420135A EP 1072553 A1 EP1072553 A1 EP 1072553A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- boom
- arrow
- articulated
- boom element
- elements
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
- B66C23/34—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes
- B66C23/344—Self-erecting cranes, i.e. with hoisting gear adapted for crane erection purposes adapted for transport purposes
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66C—CRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
- B66C23/00—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes
- B66C23/18—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes
- B66C23/26—Cranes comprising essentially a beam, boom, or triangular structure acting as a cantilever and mounted for translatory of swinging movements in vertical or horizontal planes or a combination of such movements, e.g. jib-cranes, derricks, tower cranes specially adapted for use in particular purposes for use on building sites; constructed, e.g. with separable parts, to facilitate rapid assembly or dismantling, for operation at successively higher levels, for transport by road or rail
Definitions
- the present invention relates to an unfolding / folding device motorized, independently controlled, of a composite crane boom elements linked together by articulation, with two arrow elements consecutive nesting one in the other in the folded position of the arrow.
- This known folding device also comprises a connecting rod connection of the upper members of the two jib elements, said connecting rod being articulated at the front end of the upper chord of the foot arrow, and sliding in lateral guides in an arc provided at the rear of the arrowhead.
- French patent application No. 2,546,496 describes another tower crane with boom composed of two elements hinged together, and nestable in the folded position.
- the two boom elements are articulated between them around a horizontal axis located halfway up the arrow, the foot arrow here having a U-shaped section, while the tip arrow has a triangular section.
- the motorization of the boom unfolding / folding is ensured by a cable associated with an arm lever in an arc, itself motorized by the articulation of the foot arrow on the top of the crane mast.
- This motorization device makes it possible to obtain a position in "Swan neck" of the boom, during the continuation of its lifting.
- it retains the same disadvantages as those of the document previous, because the kinematics of unfolding / folding the elements of arrow remains imposed by the movement of the arrow foot.
- the present invention aims to remedy these drawbacks, by providing a folding / unfolding device to avoid, in progress mounting or working of the crane, obstacles such as buildings existing, trees, power lines ..., while allowing an increase load characteristics by folding the arrowhead.
- the invention essentially relates to a device motorized unfolding / folding of a crane boom composed of elements linked together by articulation, with two consecutive arrow elements nestable one in the other in the folded position of the arrow, these two elements having respective sections allowing their nesting, and being articulated to each other around a horizontal axis located substantially halfway up the boom, the front boom element having, in its rear part, lateral guides in an arc receiving a horizontal transverse axis linked to the rear boom element, the unfolding / folding device comprising, for its motorization, on the one hand a double-acting cylinder, located in the vertical median plane of the boom and articulated by a first end, around a horizontal axis, to the element rear jib at the height of the upper member (s) of this element, and on the other hand, a connecting rod made up of a straight rod articulated on the one hand at the second end of the jack and on the other hand at the rear part of the front boom element, in the lower part of this element, and
- the straight rod and the angled rod are, one and the other, double connecting rods, allowing free passage to the jack.
- the respective ends of these connecting rods, opposite to those of the articulation of the cylinder, are preferably articulated to respective yokes, fixed one on the lower part of the front boom element, and the other on the part bottom of the rear boom element.
- an unfolding / folding device of two consecutive nestable boom elements such as a boom foot and an arrowhead in the case of an arrow in two articulated elements, which is a motorized device independently controlled by a jack specific.
- the cylinder rod output control allows unfolding boom elements to an aligned relative position, and the re-entry control of the cylinder rod allows the folding of the arrow until fully seated, all relative positions intermediates can also be obtained. So the position of the tip is no longer imposed by that of the arrow foot, and the point of boom can, at any time, be brought into a desired position to avoid an obstacle.
- the arrowhead may occasionally be folded, to allow the crane to work with a short boom and thus increasing the load characteristics of the crane.
- the linkage is designed to allow 180 ° rotation of the boom element front, relative to the rear boom element.
- the rear part of the front boom element has two vertical side plates, in each of which is provided a guide and stop light in shape of an arc of a circle, each light being crossed by one end of the transverse horizontal axis linked to the rear boom element, and each side plate being crossed by the articulation axis of the boom element front relative to the rear boom element, located substantially halfway up of the arrow.
- the axis of articulation of the boom element front relative to the rear boom element, located substantially halfway up arrow has a functional clearance, so as to release this axis of all effort, to make the connection system of the two isostatic boom elements, when it is aligned.
- the front ends of the members of the rear boom element are connected by a transverse stiffening sheath, crossed by the horizontal axis aforementioned transverse.
- the lower members of the rear boom element have, at their front end, support and guide means for the ends rear of the lower members of the front boom element; these means preferably include, at the front end of each lower frame of the rear boom element, a horizontal support, a lower guide provided by a support plate, and lateral guide provided by a support plate with ramp, such a combination allowing to take all the efforts and to align with precision the lower members of the two boom elements, so as to form a continuous raceway for the carriage movable along the arrow.
- Figures 1 to 3 show a collapsible tower crane which comprises a fixed base chassis 1 on which a chassis is mounted turning 3, orientable around a vertical axis 2.
- the crane includes a mast 4, made of two elements 5 and 6 hinged together around an axis horizontal 7.
- the lower mast element 5 is articulated by its base, around a horizontal axis 8, at the front of the rotating chassis 3.
- At the top of the upper mast element 6 is articulated about a horizontal axis 9, an arrow 10 along which a carriage 11 can be moved, the arrow 10 being here composed of two elements, either an arrow foot 12 and a arrowhead 13.
- the crane still includes guy wires 14 for dressing the mast 4, a retaining device 15 for the arrow 10, and a ballast 16 carried by the rear part of the rotating chassis 3.
- the boom foot 12 has a triangular section
- the arrowhead 13 has a U-shaped section.
- This tip of arrow 13 is articulated, by its rear part, to the front part of the foot of arrow 12, around a horizontal axis 17 located substantially halfway up arrow 10.
- the two mast elements 5 and 6 are arranged horizontally, one above on the other, and the two arrow elements 12 and 13 are also arranged horizontally, above the mast elements 5 and 6, these two arrow elements 12 and 13 being nested one inside the other, the section triangular of the jib foot 12 nesting in the “U” section of the arrowhead 13 returned (see also Figure 8).
- the boom foot 12 has two lower members 18, serving as raceway to the carriage 11, and an upper member 19, defining the current triangular section of the arrow base 12.
- the point boom 13 has two lower members 20, and two members upper 21. The members are interconnected, in the different faces of the two jib elements 12 and 13, by lattice structures 22, 23 and by lower crosspieces 24, 25.
- the frame upper 19 is divided into two symmetrical branches 26, the front ends are connected by a transverse stiffening sheath 49, crossed by a horizontal axis 27 which is located at the height of the upper members 21 of the arrowhead 13.
- Two plates side 28 connect the ends of the sleeve 49 to the front ends respective of the two lower members 18 of the jib foot 12.
- This axis horizontal 17 has a functional play, allowing to free it from all effort to make the bonding system isostatic when the arrow 10 is aligned.
- each side plate 29 of the arrowhead 13 is formed a hinge light in the shape of an arc of a circle 30, centered on the horizontal axis 17.
- the two lights in an arc of a circle 30 are crossed by the ends of the horizontal axis 27, located at the front of the foot arrow 12.
- This axis 27 is provided, at each end, with a lateral blocking 31 such as head or washer.
- the previously described articulation is motorized by a jack double effect 32 and linkage 33.
- the jack 32 located in the vertical median plane of the arrow 10, has a body 34 articulated by its rear end, around an axis horizontal 35, at jib foot 12 at the height of the upper chord 19, in particular at the point where this upper chord 19 is divided into two branches 26.
- the rod 36 of the jack 32 is articulated by its end front, around a horizontal axis 37, at one end of a first connecting rod 38 belonging to linkage 33.
- the connecting rod 38 is a double straight connecting rod, the end of which lower is articulated, around a horizontal axis 39, to a clevis 40 fixed on the lower rear cross member 25 of the arrowhead 13.
- the connecting rod 33 comprises another double connecting rod 41, of form bent.
- One end of the double angled connecting rod 41 is articulated around of the above-mentioned horizontal axis 37, at the front end of the rod 36 of the jack 32.
- the other end of the double angled connecting rod 41 is articulated around a horizontal axis 42, to a yoke 43 fixed on the lower front cross member 24 arrow foot 12.
- the bend 44 of the double connecting rod 41 allows passage to the axis horizontal 27, as shown in particular in FIGS. 4 and 5.
- the fully extended position of the rod 36 of the jack 32 corresponds to the aligned position of arrow 10, illustrated in FIGS. 4, 5 and 6.
- the horizontal axis 27 is in abutment at one end of the lights in an arc of a circle 30, which ensures the connection and the continuity of respective upper members 19, 26 and 21 of the jib foot 12 and of the arrowhead 13.
- the folding of arrow 10 is obtained by controlling cylinder 32 in the direction of re-entry of its rod 36.
- the jib foot 12 being maintained substantially horizontal, the arrowhead 13 pivots about the horizontal axis 17 and is then pick up along arrow 48, passing through positions intermediaries, one of which is illustrated in Figure 7.
- the reverse control of the jack 32 that is to say in the direction of the exit of its rod 36, causes the reverse unfolding movement of the arrow 10, bringing the arrowhead 13 in alignment with the foot of arrow 12.
Landscapes
- Engineering & Computer Science (AREA)
- Transportation (AREA)
- Structural Engineering (AREA)
- Mechanical Engineering (AREA)
- Jib Cranes (AREA)
Abstract
Description
La présente invention concerne un dispositif de dépliage/repliage motorisé, à commande indépendante, d'une flèche de grue composée d'éléments liés entre eux par articulation, avec deux éléments de flèche consécutifs emboítables l'un dans l'autre dans la position repliée de la flèche.The present invention relates to an unfolding / folding device motorized, independently controlled, of a composite crane boom elements linked together by articulation, with two arrow elements consecutive nesting one in the other in the folded position of the arrow.
On connaít déjà, par la demande de brevet allemand n° 3 441 573, une grue à tour dont la flèche est composée de deux éléments, désignés respectivement comme pied de flèche et pointe de flèche, qui sont articulés entre eux autour d'un axe horizontal situé sensiblement à mi-hauteur de la flèche. Le pied de flèche possède une section de forme triangulaire, et la pointe de flèche possède une section en forme de « U », de telle sorte que le repliage de la pointe de flèche sur le pied de flèche, effectué suivant l'axe horizontal précité, peut être poursuivi jusqu'à l'emboítement des deux éléments de flèche l'un dans l'autre.We already know, by the German patent application n ° 3 441 573, a tower crane whose boom is made up of two elements, designated respectively as arrowhead and point of arrow, which are hinged together around a horizontal axis located substantially halfway up the boom. The arrowhead has a triangular section, and the arrowhead has a cross section "U" shape, so that the folding of the arrowhead on the boom foot, made along the aforementioned horizontal axis, can be continued until the two arrow elements nest in one another.
Ce dispositif de repliage connu comprend encore une bielle de liaison des membrures supérieures des deux éléments de flèche, ladite bielle étant articulée à l'extrémité avant de la membrure supérieure du pied de flèche, et étant coulissante dans des guides latéraux en arc de cercle prévus à l'arrière de la pointe de flèche.This known folding device also comprises a connecting rod connection of the upper members of the two jib elements, said connecting rod being articulated at the front end of the upper chord of the foot arrow, and sliding in lateral guides in an arc provided at the rear of the arrowhead.
Dans la demande de brevet allemand précitée n° 3 441 573, la motorisation du dépliage/repliage de la flèche est assurée par un câble mouflé, commandé par l'articulation entre le pied de flèche et le sommet du mât de la grue. Il en résulte que la cinématique de dépliage/repliage des éléments de flèche est imposée par le mouvement du pied de flèche.In the aforementioned German patent application No. 3,441,573, the boom unfolding / folding motorization is provided by a cable reeved, controlled by the articulation between the boom foot and the top of the crane mast. As a result, the kinematics of unfolding / folding of arrow elements is imposed by the movement of the arrow foot.
En conséquence, l'encombrement de la flèche en cours de montage est toujours important, et ne permet pas d'éviter un obstacle éventuel. De plus, le dépliage/repliage de la pointe de flèche est impossible, lorsque la grue est en cours de travail, pour éviter un obstacle ou pour distribuer une charge avec une configuration en flèche courte.Consequently, the size of the boom during mounting is always important, and does not avoid an obstacle possible. In addition, unfolding / folding the arrowhead is impossible, when the crane is working, to avoid an obstacle or to distribute a load with a short boom configuration.
La demande de brevet français n° 2 546 496 décrit une autre grue à tour avec flèche composée de deux éléments articulés entre eux, et emboítables en position repliée. Les deux éléments de flèche sont articulés entre eux autour d'un axe horizontal situé à mi-hauteur de la flèche, le pied de flèche possédant ici une section en forme de « U », tandis que la pointe de flèche possède une section de forme triangulaire. La motorisation du dépliage/repliage de la flèche est assurée par un câble associé à un bras de levier en arc de cercle, lui-même motorisé par l'articulation du pied de flèche sur le sommet du mât de la grue.French patent application No. 2,546,496 describes another tower crane with boom composed of two elements hinged together, and nestable in the folded position. The two boom elements are articulated between them around a horizontal axis located halfway up the arrow, the foot arrow here having a U-shaped section, while the tip arrow has a triangular section. The motorization of the boom unfolding / folding is ensured by a cable associated with an arm lever in an arc, itself motorized by the articulation of the foot arrow on the top of the crane mast.
Ce dispositif de motorisation permet d'obtenir une position en « col de cygne » de la flèche, lors de la poursuite du relevage de celle-ci. Toutefois, il conserve les mêmes inconvénients que ceux du document précédent, du fait que la cinématique de dépliage/repliage des éléments de flèche reste imposée par le mouvement du pied de flèche.This motorization device makes it possible to obtain a position in "Swan neck" of the boom, during the continuation of its lifting. However, it retains the same disadvantages as those of the document previous, because the kinematics of unfolding / folding the elements of arrow remains imposed by the movement of the arrow foot.
La présente invention vise à remédier à ces inconvénients, en fournissant un dispositif de repliage/dépliage permettant d'éviter, en cours de montage ou de travail de la grue, les obstacles tels que bâtiments existants, arbres, lignes électriques..., tout en autorisant une augmentation des caractéristiques de charge par repliage de la pointe de flèche.The present invention aims to remedy these drawbacks, by providing a folding / unfolding device to avoid, in progress mounting or working of the crane, obstacles such as buildings existing, trees, power lines ..., while allowing an increase load characteristics by folding the arrowhead.
A cet effet, l'invention a essentiellement pour objet un dispositif de dépliage/repliage motorisé d'une flèche de grue composée d'éléments liés entre eux par articulation, avec deux éléments de flèche consécutifs emboítables l'un dans l'autre dans la position repliée de la flèche, ces deux éléments possédant des sections respectives permettant leur emboítement, et étant articulés l'un à l'autre autour d'un axe horizontal situé sensiblement à mi-hauteur de la flèche, l'élément de flèche avant possédant, dans sa partie arrière, des guides latéraux en arc de cercle recevant un axe horizontal transversal lié à l'élément de flèche arrière, le dispositif de dépliage/repliage comprenant, pour sa motorisation, d'une part un vérin à double effet, situé dans le plan médian vertical de la flèche et articulé par une première extrémité, autour d'un axe horizontal, à l'élément de flèche arrière à hauteur de la ou des membrures (s) supérieure(s) de cet élément, et d'autre part, un embiellage composé d'une bielle droite articulée d'une part à la deuxième extrémité du vérin et d'autre part à la partie arrière de l'élément de flèche avant, dans la partie inférieure de cet élément, et d'une bielle coudée articulée d'une part à la deuxième extrémité du vérin et d'autre part à la partie avant de l'élément de flèche arrière, dans la partie inférieure de cet élément, la bielle coudée laissant le passage, au niveau de son coude, à l'axe horizontal reçu dans les guides latéraux en arc de cercle.To this end, the invention essentially relates to a device motorized unfolding / folding of a crane boom composed of elements linked together by articulation, with two consecutive arrow elements nestable one in the other in the folded position of the arrow, these two elements having respective sections allowing their nesting, and being articulated to each other around a horizontal axis located substantially halfway up the boom, the front boom element having, in its rear part, lateral guides in an arc receiving a horizontal transverse axis linked to the rear boom element, the unfolding / folding device comprising, for its motorization, on the one hand a double-acting cylinder, located in the vertical median plane of the boom and articulated by a first end, around a horizontal axis, to the element rear jib at the height of the upper member (s) of this element, and on the other hand, a connecting rod made up of a straight rod articulated on the one hand at the second end of the jack and on the other hand at the rear part of the front boom element, in the lower part of this element, and a bent connecting rod articulated on the one hand at the second end of the cylinder and on the other hand to the front part of the rear boom element, in the lower part of this element, the angled connecting rod allowing passage, at level of its elbow, to the horizontal axis received in the lateral arcuate guides of circle.
Avantageusement, la bielle droite et la bielle coudée sont, l'une et l'autre, des bielles doubles, laissant un libre passage au vérin. Les extrémités respectives de ces bielles, opposées à celles de l'articulation du vérin, sont de préférence articulées à des chapes respectives, fixées l'une sur la partie inférieure de l'élément de flèche avant, et l'autre sur la partie inférieure de l'élément de flèche arrière.Advantageously, the straight rod and the angled rod are, one and the other, double connecting rods, allowing free passage to the jack. The respective ends of these connecting rods, opposite to those of the articulation of the cylinder, are preferably articulated to respective yokes, fixed one on the lower part of the front boom element, and the other on the part bottom of the rear boom element.
On obtient ainsi un dispositif de dépliage/repliage de deux éléments de flèche consécutifs emboítables, tels qu'un pied de flèche et une pointe de flèche dans le cas d'une flèche en deux éléments articulés, qui est un dispositif motorisé à commande indépendante par un vérin spécifique. La commande de sortie de la tige du vérin permet le dépliage des éléments de flèche jusqu'à une position relative alignée, et la commande de rentrée de la tige du vérin permet le repliage des éléments de flèche jusqu'à leur emboítement complet, toutes positions relatives intermédiaires pouvant aussi être obtenues. Ainsi, la position de la pointe de flèche n'est plus imposée par celle du pied de flèche, et la pointe de flèche peut, à tout moment, être amenée dans une position souhaitée pour éviter un obstacle. De plus, la pointe de flèche peut être occasionnellement repliée, pour permettre le travail de la grue avec une flèche courte et augmenter ainsi les caractéristiques de charge de la grue. L'embiellage est conçu de manière à permettre une rotation sur 180° de l'élément de flèche avant, par rapport à l'élément de flèche arrière.There is thus obtained an unfolding / folding device of two consecutive nestable boom elements, such as a boom foot and an arrowhead in the case of an arrow in two articulated elements, which is a motorized device independently controlled by a jack specific. The cylinder rod output control allows unfolding boom elements to an aligned relative position, and the re-entry control of the cylinder rod allows the folding of the arrow until fully seated, all relative positions intermediates can also be obtained. So the position of the tip is no longer imposed by that of the arrow foot, and the point of boom can, at any time, be brought into a desired position to avoid an obstacle. In addition, the arrowhead may occasionally be folded, to allow the crane to work with a short boom and thus increasing the load characteristics of the crane. The linkage is designed to allow 180 ° rotation of the boom element front, relative to the rear boom element.
Selon un mode de réalisation du dispositif, la partie arrière de l'élément de flèche avant comporte deux plaques latérales verticales, dans chacune desquelles est ménagée une lumière de guidage et de butée en forme d'arc de cercle, chaque lumière étant traversée par une extrémité de l'axe horizontal transversal lié à l'élément de flèche arrière, et chaque plaque latérale étant traversée par l'axe d'articulation de l'élément de flèche avant par rapport à l'élément de flèche arrière, situé sensiblement à mi-hauteur de la flèche.According to one embodiment of the device, the rear part of the front boom element has two vertical side plates, in each of which is provided a guide and stop light in shape of an arc of a circle, each light being crossed by one end of the transverse horizontal axis linked to the rear boom element, and each side plate being crossed by the articulation axis of the boom element front relative to the rear boom element, located substantially halfway up of the arrow.
Les lumières d'articulation, ainsi prévues sur les faces latérales de l'élément de flèche avant, tel que pointe de flèche, remplissent les fonctions suivantes :
- fonction de butée supérieure réalisant, en coopération avec l'axe horizontal traversant ces lumières, une liaison entre les membrures supérieures des deux éléments de flèche, tels que le pied de flèche et la pointe de flèche, lorsque la flèche est alignée ;
- fonction de butée inférieure pour le même axe, lorsque la flèche est entièrement repliée, les deux éléments de flèche étant alors emboítés l'un dans l'autre ;
- fonction de guidage de sécurité de cet axe, au cours des opérations de dépliage et de repliage des éléments de la flèche.
- upper stop function performing, in cooperation with the horizontal axis passing through these openings, a connection between the upper members of the two boom elements, such as the boom foot and the arrowhead, when the boom is aligned;
- lower stop function for the same axis, when the boom is fully folded, the two boom elements then being fitted one into the other;
- safety guiding function of this axis, during unfolding and folding operations of the boom elements.
Avantageusement, l'axe d'articulation de l'élément de flèche avant par rapport à l'élément de flèche arrière, situé sensiblement à mi-hauteur de la flèche, comporte un jeu fonctionnel, de manière à libérer cet axe de tout effort, pour rendre isostatique le système de liaison des deux éléments de flèche, lorsque celle-ci est alignée.Advantageously, the axis of articulation of the boom element front relative to the rear boom element, located substantially halfway up arrow, has a functional clearance, so as to release this axis of all effort, to make the connection system of the two isostatic boom elements, when it is aligned.
Selon un mode de réalisation du dispositif de l'invention, les extrémités avant des membrures de l'élément de flèche arrière sont reliées par un fourreau de rigidification transversal, traversé par l'axe horizontal transversal précité.According to one embodiment of the device of the invention, the front ends of the members of the rear boom element are connected by a transverse stiffening sheath, crossed by the horizontal axis aforementioned transverse.
Pour assurer la liaison au niveau des membrures inférieures des éléments de flèche, il est prévu, selon une caractéristique complémentaire, que les membrures inférieures de l'élément de flèche arrière comportent, à leur extrémité avant, des moyens d'appui et de guidage pour les extrémités arrière des membrures inférieures de l'élément de flèche avant ; ces moyens comprennent de préférence, à l'extrémité avant de chaque membrure inférieure de l'élément de flèche arrière, un appui horizontal, un guidage inférieur assuré par une plaque d'appui, et un guidage latéral assuré par une plaque d'appui avec rampe, une telle combinaison permettant de reprendre tous les efforts et d'aligner avec précision les membrures inférieures des deux éléments de flèche, de manière à former un chemin de roulement continu pour le chariot déplaçable le long de la flèche.To ensure the connection at the level of the lower members of the boom elements, it is provided, according to an additional characteristic, that the lower members of the rear boom element have, at their front end, support and guide means for the ends rear of the lower members of the front boom element; these means preferably include, at the front end of each lower frame of the rear boom element, a horizontal support, a lower guide provided by a support plate, and lateral guide provided by a support plate with ramp, such a combination allowing to take all the efforts and to align with precision the lower members of the two boom elements, so as to form a continuous raceway for the carriage movable along the arrow.
L'invention sera de toute façon mieux comprise à l'aide de la
description qui suit, en référence au dessin schématique annexé
représentant, à titre d'exemple, une forme d'exécution de ce dispositif de
repliage d'une flèche de grue à éléments emboítables :
Les figures 1 à 3 montrent une grue à tour repliable qui
comprend un châssis de base fixe 1 sur lequel est monté un châssis
tournant 3, orientable autour d'un axe vertical 2. La grue comprend un mât
4, réalisé en deux éléments 5 et 6 articulés entre eux autour d'un axe
horizontal 7. L'élément de mât inférieur 5 est articulé par sa base, autour
d'un axe horizontal 8, à l'avant du châssis tournant 3. Au sommet de
l'élément de mât supérieur 6 est articulée, autour d'un axe horizontal 9,
une flèche 10 le long de laquelle est déplaçable un chariot 11, la flèche 10
étant composée ici de deux éléments, soit un pied de flèche 12 et une
pointe de flèche 13. Comme le montre la figure 1, la grue comprend encore
des haubans 14 de dressage du mât 4, un dispositif de retenue 15 de la
flèche 10, et un lest 16 porté par la partie arrière du châssis tournant 3.Figures 1 to 3 show a collapsible tower crane which
comprises a
Le pied de flèche 12 possède une section triangulaire, et la
pointe de flèche 13 possède une section en forme de « U ». Cette pointe
de flèche 13 est articulée, par sa partie arrière, à la partie avant du pied de
flèche 12, autour d'un axe horizontal 17 situé sensiblement à mi-hauteur
de la flèche 10. Ainsi, dans la position repliée de la grue (voir figures 2 et
3), les deux éléments de mât 5 et 6 sont disposés horizontalement l'un au-dessus
de l'autre, et les deux éléments de flèche 12 et 13 sont aussi
disposés horizontalement, au-dessus des éléments de mât 5 et 6, ces deux
éléments de flèche 12 et 13 étant emboítés l'un dans l'autre, la section
triangulaire du pied de flèche 12 s'imbriquant dans la section en « U » de la
pointe de flèche 13 retournée (voir aussi figure 8). The
Dans le détail, comme le montrent les figures 4 et suivantes, le
pied de flèche 12 comporte deux membrures inférieures 18, servant de
chemin de roulement au chariot 11, et une membrure supérieure 19,
définissant la section courante triangulaire du pied de flèche 12. La pointe
de flèche 13 comporte deux membrures inférieures 20, et deux membrures
supérieures 21. Les membrures sont reliées entre elles, dans les différentes
faces des deux éléments de flèche 12 et 13, par des structures en treillis
22, 23 et par des traverses inférieures 24, 25.In detail, as shown in Figures 4 and following, the
Dans la partie avant du pied de flèche 12, la membrure
supérieure 19 se divise en deux branches symétriques 26, dont les
extrémités avant sont reliées par un fourreau de rigidification transversal
49, traversé par un axe horizontal 27 qui est situé à la hauteur des
membrures supérieures 21 de la pointe de flèche 13. Deux plaques
latérales 28 relient les extrémités du fourreau 49 aux extrémités avant
respectives des deux membrures inférieures 18 du pied de flèche 12.In the front part of the
Dans la partie arrière de la pointe de flèche 13, sont prévues
deux plaques latérales verticales 29, dont chacune relie une membrure
inférieure 20 à la membrure supérieure 21 située du même côté.In the rear part of the
L'axe horizontal 17, par lequel la pointe de flèche 13 est
articulée au pied de flèche, traverse les deux plaques latérales 28 et aussi
les deux plaques latérales 29, sensiblement à mi-hauteur. Cet axe
horizontal 17 comporte un jeu fonctionnel, permettant de le libérer de tout
effort pour rendre le système de liaison isostatique lorsque la flèche 10 est
alignée.The
Dans chaque plaque latérale 29 de la pointe de flèche 13 est
ménagée une lumière d'articulation en forme d'arc de cercle 30, centrée
sur l'axe horizontal 17. Les deux lumières en arc de cercle 30 sont
traversées par les extrémités de l'axe horizontal 27, situé à l'avant du pied
de flèche 12. Cet axe 27 est muni, à chaque extrémité, d'un organe de
blocage latéral 31 tel que tête ou rondelle.In each
L'articulation précédemment décrite est motorisée par un vérin à
double effet 32 et un embiellage 33.The previously described articulation is motorized by a jack
Le vérin 32, situé dans le plan médian vertical de la flèche 10,
possède un corps 34 articulé par son extrémité arrière, autour d'un axe
horizontal 35, au pied de flèche 12 à hauteur de la membrure supérieure
19, notamment au point où cette membrure supérieure 19 se divise en
deux branches 26. La tige 36 du vérin 32 est articulée par son extrémité
avant, autour d'un axe horizontal 37, à une extrémité d'une première bielle
38 appartenant à l'embiellage 33.The
La bielle 38 est une bielle droite double, dont l'extrémité
inférieure est articulée, autour d'un axe horizontal 39, à une chape 40 fixée
sur la traverse arrière inférieure 25 de la pointe de flèche 13.The connecting
L'embiellage 33 comprend une autre bielle double 41, de forme
coudée. Une extrémité de la bielle double coudée 41 est articulée, autour
de l'axe horizontal 37 précité, à l'extrémité avant de la tige 36 du vérin 32.
L'autre extrémité de la bielle double coudée 41 est articulée, autour d'un
axe horizontal 42, à une chape 43 fixée sur la traverse avant inférieure 24
du pied de flèche 12.The connecting
Le coude 44 de la bielle double 41 laisse le passage à l'axe
horizontal 27, comme le montrent notamment les figures 4 et 5. La
configuration en bielle double de cette bielle coudée 41, ainsi que de la
première bielle 38, laisse un libre passage à la tige 36 du vérin 32.The
La position entièrement sortie de la tige 36 du vérin 32
correspond à la position alignée de la flèche 10, illustrée aux figures 4, 5 et
6. Dans cette position, l'axe horizontal 27 est en butée à une extrémité des
lumières en arc de cercle 30, ce qui assure la liaison et la continuité des
membrures supérieures respectives 19, 26 et 21 du pied de flèche 12 et de
la pointe de flèche 13.The fully extended position of the
En outre, dans cette position alignée de la flèche 10, comme le montrent plus particulièrement les figures 5 et 6, est réalisée une liaison guidée des membrures inférieures respectives 18 et 20 du pied de flèche 12 et de la pointe de flèche 13. Cette liaison guidée est réalisée par :
- un appui horizontal 45 dû à la force de gravité s'appliquant sur la pointe de flèche 13, articulée autour de l'axe horizontal 27 ;
- un guidage inférieur assuré, de chaque côté de la flèche 10,
par
une plaque d'appui 46 soudée à l'extrémité avant de la membrure inférieure 18 du pied de flèche 12, destinée à reprendre les efforts verticaux ; - un guidage latéral assuré, de chaque côté, par
une plaque d'appui 47 avec rampe, destinée à faciliter l'alignement des membrures inférieures 18et 20 et à reprendre les efforts horizontaux transversaux.
- a
horizontal support 45 due to the force of gravity applying to thearrowhead 13, articulated around thehorizontal axis 27; - a lower guide provided, on each side of the
boom 10, by asupport plate 46 welded to the front end of thelower member 18 of theboom foot 12, intended to take up the vertical forces; - lateral guidance provided, on each side, by a
support plate 47 with ramp, intended to facilitate the alignment of the 18 and 20 and to take up the transverse horizontal forces.lower members
Partant de la position alignée précédemment décrite, le repliage
de la flèche 10 est obtenu en commandant le vérin 32 dans le sens de la
rentrée de sa tige 36. Le pied de flèche 12 étant maintenu sensiblement
horizontal, la pointe de flèche 13 pivote autour de l'axe horizontal 17 et se
relève alors suivant la flèche 48, en passant par des positions
intermédiaires dont l'une est illustrée sur la figure 7.Starting from the aligned position described above, the folding
of
Le mouvement ainsi commandé par le vérin 32 se poursuivant,
la pointe de flèche 13 est rabattue sur le pied de flèche 12, jusqu'à venir,
après un pivotement de 180°, s'emboíter sur ce pied de flèche 12, la
figure 8 montrant la position entièrement repliée de la flèche 10. Dans
cette position, l'axe 27 vient en butée à l'autre extrémité des lumières en
arc de cercle 30.The movement thus controlled by the
La commande inverse du vérin 32, c'est-à-dire dans le sens de
la sortie de sa tige 36, provoque le mouvement inverse de dépliage de la
flèche 10, amenant la pointe de flèche 13 dans l'alignement du pied de
flèche 12.The reverse control of the
L'on ne s'éloignerait pas du cadre de l'invention, telle que définie dans les revendications annexées :
- en prévoyant, à l'inverse de l'exemple décrit, un pied de flèche de section en forme de « U », et une pointe de flèche de section triangulaire, ou des éléments de flèche de toutes autres formes emboítables ;
- en appliquant le même dispositif de repliage à une flèche de grue en plus de deux éléments articulés, par exemple une flèche en trois éléments, auquel cas le dispositif est monté entre un élément intermédiaire de flèche et la pointe de flèche, emboítable sur l'élément intermédiaire.
- by providing, unlike the example described, an arrow foot of section in the shape of a "U", and an arrow tip of triangular section, or arrow elements of any other nestable shape;
- by applying the same folding device to a crane jib in addition to two articulated elements, for example a jib in three elements, in which case the device is mounted between an intermediate jib element and the jib tip, nestable on the element intermediate.
Claims (8)
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR9909688 | 1999-07-22 | ||
FR9909688A FR2796632B1 (en) | 1999-07-22 | 1999-07-22 | DEVICE FOR FOLDING A CRANE BOOM WITH NESTABLE ELEMENTS |
Publications (2)
Publication Number | Publication Date |
---|---|
EP1072553A1 true EP1072553A1 (en) | 2001-01-31 |
EP1072553B1 EP1072553B1 (en) | 2004-01-02 |
Family
ID=9548525
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP00420135A Expired - Lifetime EP1072553B1 (en) | 1999-07-22 | 2000-06-22 | Folding device for a crane boom with nestable elements |
Country Status (7)
Country | Link |
---|---|
US (1) | US6290078B1 (en) |
EP (1) | EP1072553B1 (en) |
JP (1) | JP2001063961A (en) |
DE (1) | DE60007488T2 (en) |
ES (1) | ES2211485T3 (en) |
FR (1) | FR2796632B1 (en) |
RU (1) | RU2249561C2 (en) |
Families Citing this family (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
ITMI20010116A1 (en) * | 2001-01-23 | 2002-07-23 | San Marco Internat S R L | TOWER CRANE WITH SELF-ASSEMBLING STRUCTURE WITH FOLDABLE AND REMOVABLE TOWER AND ARM WITH MULTIPLE PORTIONS |
FR2839962B1 (en) * | 2002-05-21 | 2004-10-29 | Potain Sa | TOWER CRANE WITH FOLDING COUNTER |
AT508171A1 (en) * | 2009-05-07 | 2010-11-15 | Epsilon Kran Gmbh | CRANE WITH TOTPOT TURNING |
CN104340882B (en) * | 2014-09-25 | 2016-12-07 | 中联重科股份有限公司 | Folding cantilever crane and crane |
AR098042A1 (en) * | 2014-10-16 | 2016-04-27 | Pablo Ribotta Esteban | ARTICULATED ARM HOLDER-NOZZLE FOR AGRICULTURAL SPRAYER |
FR3046149B1 (en) * | 2015-12-23 | 2017-12-29 | Manitowoc Crane Group France | AUTOMATICALLY FOLDING AND FOLDING CRANE COMPRISING A MAT AND ARROW DECALED FROM MATERIAL |
DE102016015385A1 (en) * | 2016-12-22 | 2018-06-28 | Liebherr-Werk Biberach Gmbh | Crane with folding jib |
DE102017203705A1 (en) | 2017-03-07 | 2018-09-13 | Putzmeister Engineering Gmbh | Boom arm system with space-reducing Einfaltstellung |
CN111003645B (en) * | 2019-11-26 | 2025-02-11 | 中国船舶重工集团公司第七一三研究所 | A telescopic foldable multi-section working arm |
ES2910102A1 (en) * | 2020-11-09 | 2022-05-11 | Saez Machinery S L | Automated folding and deployed tower crane (Machine-translation by Google Translate, not legally binding) |
Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3441573A1 (en) * | 1984-11-14 | 1986-05-15 | Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier | Tower crane with split jib |
FR2594427A1 (en) * | 1985-11-22 | 1987-08-21 | Ferreri Andrea | Crane arm. |
DE9316113U1 (en) * | 1993-10-21 | 1995-02-16 | Liebherr-Werk Biberach GmbH, 88400 Biberach | Tower crane |
Family Cites Families (11)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US2581087A (en) * | 1947-12-22 | 1952-01-01 | Lourie L Eakin | Hoisting apparatus |
US2689053A (en) * | 1948-10-18 | 1954-09-14 | Lourie L Eakin | Hoisting apparatus |
US2901125A (en) * | 1954-06-22 | 1959-08-25 | J H Holan Corp | Derricks |
US3032207A (en) * | 1960-02-23 | 1962-05-01 | Humboldt Company | Loading boom with adjustable extension arm |
US3426916A (en) * | 1967-06-29 | 1969-02-11 | Bucyrus Erie Co | Boom retracting machinery |
US3944081A (en) * | 1969-04-09 | 1976-03-16 | General Crane Industries Limited | Tower crane |
US3819059A (en) * | 1972-01-19 | 1974-06-25 | Mantel Brothers Proprietary Lt | Foldable cranes |
US4150754A (en) * | 1977-05-23 | 1979-04-24 | Ami Industries, Inc. | Utility crane |
NO147229C (en) * | 1981-02-11 | 1983-03-02 | Kverneland As | DEVICE FOR HANGING, SPECIAL FOR AGRICULTURAL EQUIPMENT |
IT1164241B (en) | 1983-05-25 | 1987-04-08 | Luigi Cattaneo Spa | AUTOMATIC LIFTING CRANE |
US4775287A (en) * | 1987-05-18 | 1988-10-04 | Hering Sr James R | Adjustable boom |
-
1999
- 1999-07-22 FR FR9909688A patent/FR2796632B1/en not_active Expired - Lifetime
-
2000
- 2000-06-22 DE DE60007488T patent/DE60007488T2/en not_active Expired - Lifetime
- 2000-06-22 EP EP00420135A patent/EP1072553B1/en not_active Expired - Lifetime
- 2000-06-22 ES ES00420135T patent/ES2211485T3/en not_active Expired - Lifetime
- 2000-06-23 US US09/599,960 patent/US6290078B1/en not_active Expired - Lifetime
- 2000-07-19 JP JP2000218956A patent/JP2001063961A/en active Pending
- 2000-07-21 RU RU2000119628/11A patent/RU2249561C2/en not_active IP Right Cessation
Patent Citations (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE3441573A1 (en) * | 1984-11-14 | 1986-05-15 | Peiner Hebe- Und Transportsysteme Gmbh, 5500 Trier | Tower crane with split jib |
FR2594427A1 (en) * | 1985-11-22 | 1987-08-21 | Ferreri Andrea | Crane arm. |
DE9316113U1 (en) * | 1993-10-21 | 1995-02-16 | Liebherr-Werk Biberach GmbH, 88400 Biberach | Tower crane |
Also Published As
Publication number | Publication date |
---|---|
US6290078B1 (en) | 2001-09-18 |
DE60007488D1 (en) | 2004-02-05 |
FR2796632A1 (en) | 2001-01-26 |
ES2211485T3 (en) | 2004-07-16 |
RU2249561C2 (en) | 2005-04-10 |
DE60007488T2 (en) | 2004-11-25 |
EP1072553B1 (en) | 2004-01-02 |
JP2001063961A (en) | 2001-03-13 |
FR2796632B1 (en) | 2001-08-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
EP0733584B1 (en) | Automatic erection for a crane with a foldable boom | |
EP1533470B1 (en) | Drilling and bolting head for a bolting machine | |
EP0536060B1 (en) | Crane jib which folds automatically | |
EP0345187B1 (en) | Unitary set of individually movable carrier plates for automobile carrying vehicles | |
EP1184328B1 (en) | Cable arrangement for tower crane | |
EP1072553A1 (en) | Folding device for a crane boom with nestable elements | |
EP1364906B1 (en) | Tower crane with foldable counter-jib | |
EP1301431B1 (en) | Articulated jib crane | |
EP1048605A1 (en) | Multiple function crane with telescope jib | |
FR2756551A1 (en) | METHOD AND DEVICE FOR MOUNTING THE TIE RODS OF TOWER CRANE BOOMS | |
EP0888997A1 (en) | Mast foldable in three elements with folding/unfolding device for tower crane | |
EP0536061B1 (en) | Automatically foldable tower crane | |
EP2107033B1 (en) | Boom of a tower crane with folding-unfolding mechanism | |
FR2643625A2 (en) | FOLDING CRANE WITH THREE ARTICULATED ELEMENTS ONE TO THE OTHER | |
EP0873964B1 (en) | Device for erecting the tower for a telescopic crane | |
EP1352870B1 (en) | Device for erecting and unfolding the mast and for erecting the jib of a crane | |
EP0733583B1 (en) | Self-erecting crane with laterally foldable jib | |
FR2761971A1 (en) | AUTOMATED CRANE WITH FOLDABLE BOOM, WITH LATERAL FOLDING FOR TRANSPORT | |
EP0473518B1 (en) | Self-erecting crane with laterally foldable jib | |
FR2670840A1 (en) | ARTICULATING ACTUATOR FOR THE IMPLEMENTATION OF ALL STRAIGHT OR ROTARY MOVEMENTS. | |
EP1057776B1 (en) | Articulated jib crane | |
FR2597703A1 (en) | Improvements to fertiliser barrels and the like | |
EP4356705A1 (en) | Folding agricultural machine with kinematically-interconnected components | |
EP0185826A1 (en) | Elevator device for agricultural tractor loaders | |
FR2636616A1 (en) | Folding crane with a gib having two or three mutually articulated elements. |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE ES IT |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;MK;RO;SI |
|
17P | Request for examination filed |
Effective date: 20010305 |
|
AKX | Designation fees paid |
Free format text: BE DE ES IT |
|
GRAP | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOSNIGR1 |
|
GRAS | Grant fee paid |
Free format text: ORIGINAL CODE: EPIDOSNIGR3 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE ES |
|
REF | Corresponds to: |
Ref document number: 60007488 Country of ref document: DE Date of ref document: 20040205 Kind code of ref document: P |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FG2A Ref document number: 2211485 Country of ref document: ES Kind code of ref document: T3 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20041005 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20050629 Year of fee payment: 6 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060630 |
|
BERE | Be: lapsed |
Owner name: *POTAIN Effective date: 20060630 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: ES Payment date: 20170724 Year of fee payment: 18 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20180625 Year of fee payment: 19 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20180627 Year of fee payment: 19 |
|
REG | Reference to a national code |
Ref country code: ES Ref legal event code: FD2A Effective date: 20190916 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: ES Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20180623 |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: R119 Ref document number: 60007488 Country of ref document: DE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20200101 Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20190622 |