A method for anchoring a wall in the ground by means of pull anchors Download PDF

Info

Publication number
EP1041204A1
EP1041204A1 EP00201116A EP00201116A EP1041204A1 EP 1041204 A1 EP1041204 A1 EP 1041204A1 EP 00201116 A EP00201116 A EP 00201116A EP 00201116 A EP00201116 A EP 00201116A EP 1041204 A1 EP1041204 A1 EP 1041204A1
Authority
EP
European Patent Office
Prior art keywords
wall
anchor
hole
ground
tube section
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP00201116A
Other languages
German (de)
French (fr)
Other versions
EP1041204B1 (en
Inventor
Marinus Teunis Van Leeuwen, Sr.
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Gebr Van Leeuwen Harmelen BV
Original Assignee
Gebr Van Leeuwen Harmelen BV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Gebr Van Leeuwen Harmelen BV filed Critical Gebr Van Leeuwen Harmelen BV
Publication of EP1041204A1 publication Critical patent/EP1041204A1/en
Application granted granted Critical
Publication of EP1041204B1 publication Critical patent/EP1041204B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/74Means for anchoring structural elements or bulkheads
    • E02D5/76Anchorings for bulkheads or sections thereof in as much as specially adapted therefor

Definitions

  • the invention relates to a method as defined in the first part of claim 1.
  • one proceeds in a way that the required holes for a plurality of anchoring locations are made first before inserting the anchors therethrough and screwing the anchors to the desired depth.
  • the method of the present invention may also be advantageously applied for securing the bottom part of a construction, such as a tunnel body, that extends into the ground to a level which is (far) under ground water level.
  • 1 designates a sheet pile wall which is to be secured against the lateral ground pressure exerted by the ground body 2 from the right.
  • pull anchors 3 are used, which have to be placed from the left side of the sheet pile wall, where e.g. a construction pit has to be established.
  • whcih may be screw anchors, through holes have to be provided in the sheet pile wall 1.
  • the example shown in fig. 1 relates to a case, wherein the sites P, where the through holes must be provided, are located relatively far below the (ground) water level 4 on the right side of the sheet pile wall 1.
  • a (steel) tube section 5 is attached as by welding, whereby the end of the tube section to be attached is bevelled off and placed according to the desired direction of insertion (arrow A).
  • the length of the tube section 5 is slightly larger that the length of the screw body 3b of the anchor 3.
  • a cutting ring 6 is welded to the distal end of the screw body 3b.
  • widia scrap may be provided on the edge of the cutting ring that is facing the sheet pile wall 1.
  • the thus prepared pull anchor is placed within the tube section 5, until the bevelled pin 3c, which closes the distal end of the (hollow) anchor rod 3a, strikes the sheet pile wall.
  • the anchor rod 3a will then be projecting with its proximal end beyond the proximal end of the tube section 5.
  • the proximal end of the tube section which is expected to become under ground water level, is closed by an end plate 7 to be welded to it, said end plate having a central opening which is just large enough for passing a connecting sleeve 9 that is required for connecting an extension rod 8.
  • the end plate 7 is provided with a sealing member 10, that circumferentially engages the outwardly projecting end portion of the anchor rod and is e.g.
  • the sealing member 10 is held by means of a cover plate 11 to be fastened by screws.
  • the pull anchor 3 is then rotated by means of the usual equipment (not shown in the drawing) and pushed in the axial direction (direction A).
  • the cutting ring 6 will thereby cut a correspondingly sized piece from the sheet pile wall 1 and said piece will be pushed inwardly by the bevelled pin 3c. This creates a hole through which (ground) water may flow from the right into the tube section 5.
  • the amount of water thus leaking towards the left side of the sheet pile wall 1, however, will be limited to the space within the tube section 5.
  • the proximal portion of the (last) extension rod extending beyond the tube section 5 may be connected to the tube section in a pull proof manner.
  • the screw anchor 3 may be provided - at places between the successive screw blade convolutions of the screw blade body 3b - with injection ports.
  • a stabilizing mortar may be injected through these ports, after the anchor has been screwed to the desired depth. Up to the moment of injecting these ports will have to be closed.
  • use may be advantageously be made of an injection screw anchor of the type disclosed in published Dutch patent application 8403178, wherein injection ports are closed by means of plastic plugs. The use of such an injection anchor with the present method will prevent (ground) water that flows away towards the left side, from entering the hollow anchor rod through the injection ports.
  • the example of fig. 2 relates to a tunnel trough 20 provided in the ground 2 and comprising side walls 21 (only one of which is shown in the drawing) and a bottom 22.
  • the tunnel trough 20 is sunk deeply into the ground water (see the ground water level 4).
  • tube sections 5 of the type shown in fig. 1 may be provided at suitable locations and placed at right angles onto the bottom 22 after which one may proceed further as described hereinabove with reference to fig. 1.
  • tube sections 5 of the type shown in fig. 1 may be placed onto the bottom 22 adjavent an end of the tunnel trough and preferably adjacent one of the two tunnel trough side walls 21 and in an obliquely outwardly directed position (see arrow B), whereas adjacent the other end of the tunnel trough and preferably adjacent the other of said two tunnels trough side walls tube sections 5 are placed which are obliquely directed to the opposite side.
  • the procedure substantially corresponds with what has been described hereinabove with reference to fig. 1.
  • the tube sections 5 will have to be removed after the anchors 3 have been screwed to the desired depth.
  • one may, in the manner as described with reference to fig. 1, inject mortar through the precut through hole into the directly underlying ground body 2 via temporarily closed injection ports in the (last) extension rod 8. See the area indicated by dash lines under the bottom 22 in fig. 2.
  • each of the tube sections 5 may be removed, after which the still projecting portion of the (last) extension rod 8 may be secured - with the aid of a suitable auxiliary means, within the hole and then severed at the upper surface of the bottom 22.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)
  • Bulkheads Adapted To Foundation Construction (AREA)

Abstract

A wall (1), such as a sheet pile wall (1) is secured in the ground (2) by making a hole in the wall (1), screwingly inserting a pull anchor (3) obliquely downwardly through the hole into the ground (2) behind the wall (1) and finally securing the proximal end of the anchor (3) to the wall (1). In case the hole is to be made below ground water level (4) a tube section (5) is secured first in a corresponding oblique position to the wall (1) and the anchor (3) is provided at its distal end (3a) with cutting means (6). The anchor (3) is then placed with its distal end (3a) into the tube section (5) and rotated to first cut the hole and thereafter inserted through the hole into the ground (2). Upon making the hole ground water may flow through the hole into the tube section (5) but is prevented from flowing further through the upper end of the tube section (5).

Description

  • The invention relates to a method as defined in the first part of claim 1.
  • Such a method is commonly known for anchoring (steel) sheet pile walls.
  • In general one proceeds in a way that the required holes for a plurality of anchoring locations are made first before inserting the anchors therethrough and screwing the anchors to the desired depth.
  • Problems are encountered when the anchoring sites, i.e. the locations where the holes have to be made, are located (far) below (ground) water level. Even when one would, in such a case, postpone making of an individual sheet pile hole until the very moment at which the respective anchor would have to be placed through this hole, this would result in an unacceptable leakage of (ground) water through the sheet pile hole.
  • Now the invention aims at providing an effective solution for this problem.
  • According to the invention this aim is achieved thanks the features defined in the second part of claim 1.
  • It will be understood that with this way of proceeding, although water may flow into the tube section, such water can not escape from said tube section outwardly, because either the proximal end portion of the tube section is located above ground water level, or such escape is avoided by the annular flange, that sealingly closes the tube section.
  • The method of the present invention may also be advantageously applied for securing the bottom part of a construction, such as a tunnel body, that extends into the ground to a level which is (far) under ground water level.
  • The invention will be hereinafter further explained by two examples with reference to the accompanying drawing.
  • Fig. 1 is a diagrammatic vertical section through a sheet pile wall, which has to be secured in the ground by applying the method of the present invention and
  • fig. 2 is a diagrammatic vertical section through a portion of a tunnel body, which has to be secured by applying the method of the present invention.
  • With reference to fig. 1, 1 designates a sheet pile wall which is to be secured against the lateral ground pressure exerted by the ground body 2 from the right. For this purpose pull anchors 3 are used, which have to be placed from the left side of the sheet pile wall, where e.g. a construction pit has to be established. For inserting the pull anchors, whcih may be screw anchors, through holes have to be provided in the sheet pile wall 1. The example shown in fig. 1 relates to a case, wherein the sites P, where the through holes must be provided, are located relatively far below the (ground) water level 4 on the right side of the sheet pile wall 1. Now, in order to prevent an uncontrolled (ground) water stream from flowing from the right to the left through the created through holes, the procedure of the invention is as follows.
  • At each of the sites P a (steel) tube section 5 is attached as by welding, whereby the end of the tube section to be attached is bevelled off and placed according to the desired direction of insertion (arrow A). The length of the tube section 5 is slightly larger that the length of the screw body 3b of the anchor 3. A cutting ring 6 is welded to the distal end of the screw body 3b. E.g. widia scrap may be provided on the edge of the cutting ring that is facing the sheet pile wall 1.
  • The thus prepared pull anchor is placed within the tube section 5, until the bevelled pin 3c, which closes the distal end of the (hollow) anchor rod 3a, strikes the sheet pile wall. The anchor rod 3a will then be projecting with its proximal end beyond the proximal end of the tube section 5. The proximal end of the tube section which is expected to become under ground water level, is closed by an end plate 7 to be welded to it, said end plate having a central opening which is just large enough for passing a connecting sleeve 9 that is required for connecting an extension rod 8. The end plate 7 is provided with a sealing member 10, that circumferentially engages the outwardly projecting end portion of the anchor rod and is e.g. in the form of a rubber disc, that it placed on the plate 7 and is then pushed inwardly to enclose the outgoing end portion of the anchor rod 3a. In the example shown the sealing member 10 is held by means of a cover plate 11 to be fastened by screws. The pull anchor 3 is then rotated by means of the usual equipment (not shown in the drawing) and pushed in the axial direction (direction A). The cutting ring 6 will thereby cut a correspondingly sized piece from the sheet pile wall 1 and said piece will be pushed inwardly by the bevelled pin 3c. This creates a hole through which (ground) water may flow from the right into the tube section 5. The amount of water thus leaking towards the left side of the sheet pile wall 1, however, will be limited to the space within the tube section 5. As soon as the anchor 3 has been screwed to the desired depth the proximal portion of the (last) extension rod extending beyond the tube section 5 may be connected to the tube section in a pull proof manner.
  • The screw anchor 3 may be provided - at places between the successive screw blade convolutions of the screw blade body 3b - with injection ports. A stabilizing mortar may be injected through these ports, after the anchor has been screwed to the desired depth. Up to the moment of injecting these ports will have to be closed. For this purpose use may be advantageously be made of an injection screw anchor of the type disclosed in published Dutch patent application 8403178, wherein injection ports are closed by means of plastic plugs. The use of such an injection anchor with the present method will prevent (ground) water that flows away towards the left side, from entering the hollow anchor rod through the injection ports.
  • In case the sheet pile wall in question is of a more or less permanent nature and maintenance of the tube sections 5 is undesirable because they form obstacles, it will be possible - upon the anchors having been screwed to the desired depth - to inject a stabilizing mortar through (hitherto plugged off) injection ports in the (last) extension rod into the ground immediately behind the sheet pile wall, so that the through hole made in the sheet pile wall may be at least provisionally sealed from the ground body 2. The tube sections 5 may then be removed, and the portion of the (last) extension rod which still projects beyond the sheet pile wall 1 may be secured relative to the sheet pile wall 1 and the through hole may be permanently closed by welding. In fact this has resulted in the usual situation.
  • The example of fig. 2 relates to a tunnel trough 20 provided in the ground 2 and comprising side walls 21 (only one of which is shown in the drawing) and a bottom 22. In this case the tunnel trough 20 is sunk deeply into the ground water (see the ground water level 4).
  • In the example of fig. 2 the use of the method of the invention may be advantageous when:
  • a. it has turned out that (additional) pull anchors are required to prevent the tunnel trough with (more) certainty from floating to the surface under the influence of the upward ground water pressure and/or
  • b. it has turned out that the lateral ground pressure on the opposite tunnel side walls 21 results in a moment, due to which the tunnel trough tends to turn in a horizontal plane.
  • In the first case tube sections 5 of the type shown in fig. 1 may be provided at suitable locations and placed at right angles onto the bottom 22 after which one may proceed further as described hereinabove with reference to fig. 1.
  • In the second case (b) tube sections 5 of the type shown in fig. 1 may be placed onto the bottom 22 adjavent an end of the tunnel trough and preferably adjacent one of the two tunnel trough side walls 21 and in an obliquely outwardly directed position (see arrow B), whereas adjacent the other end of the tunnel trough and preferably adjacent the other of said two tunnels trough side walls tube sections 5 are placed which are obliquely directed to the opposite side. The procedure substantially corresponds with what has been described hereinabove with reference to fig. 1.
  • To attach the tube sections 5 in the example of fig. 2 use may be made of fasteniong flanges 23, which may be received, if desired, in recesses which are precut in the upper surface of the bottom 22. Each tube section together with the flange 23 connected to it, the anchor 3 received therein and the closing end plate assembly 7, 10, 11 may be placed and attached (by screws) as a pre-assembled unit.
  • In the example of fig. 2 the tube sections 5 will have to be removed after the anchors 3 have been screwed to the desired depth. To this end one may, in the manner as described with reference to fig. 1, inject mortar through the precut through hole into the directly underlying ground body 2 via temporarily closed injection ports in the (last) extension rod 8. See the area indicated by dash lines under the bottom 22 in fig. 2.
  • Depending on the circumstances one may decide to effect injection into the ground behind the sheet pile wall or under the tunnel bottom respectively either prior to or after injecting the ground around the anchor screw body at the desired depth. For this freedom of choice one may use more or less jamming closure plugs or apply hoses for insertion into the extension rod.
  • Upon the drilled through holes being thus sealed against the leakage of ground water each of the tube sections 5 may be removed, after which the still projecting portion of the (last) extension rod 8 may be secured - with the aid of a suitable auxiliary means, within the hole and then severed at the upper surface of the bottom 22.

Claims (8)

  1. A method for anchoring a wall in the ground by means of pull anchors, comprising the steps of:
    making holes in the wall;
    inserting an anchor, comprising a rod with a screw blade section at its distal end, through each hole;
    screwing the anchor into the ground behind (and under) the wall until the proximal end of the anchor rod remains extending just beyond the hole;
    connecting an extension rod to the proximal end of the anchor rod and continuing screwing to bring the anchor to the desired depth, after which
    the portion of the (last) extension rod that is kept extending beyond the hole is fixedly attached to the wall,
    characterized by the additional steps of
    attaching, at the site of each hole to be made, a tube section to the wall at an angle that corresponds with the desired angle of inclination of the anchor;
    placing the anchor with its screw blade section, which carries a cutting ring at its distal end, into the thus attached tube section, with the anchor rod projecting beyond the upper end of the tube section and
    rotating and pushing the anchor to cause the cutting ring to drill a hole in the wall and thereby allowing the anchor to pass through the wall and through the ground behind the wall, wherein
    the latter step is effected either immediately upon attachment of the tube section to the wall when the upper end of the tube section is above the ground level behind the wall or upon the upper end of the tube section being first closed by an annular flange, through which the proximal end portion of the anchor rod extends outwardly with the intermediary of a sealing member that sealingly engages the anchor rod, in case the upper end of the tube section is under ground water level.
  2. A method according to claim 1, characterized in that the wall is a sheet pile wall and that - after the anchor rod has been screwed to the desired depth - the portion of the (last) extension rod extending beyond the proximal end of the tubular section is connected to the tubular section in a pulltight manner.
  3. A method according to claim 1, characterized in that as a last extension rod use is made of an extension rod which is provided with injection ports which are temporarily closable by means of plugs, through which injection ports a stabilizing mortar is injected - while pushing the respective plugs away - into the ground just behind the sheet pile wall, in such a way, that this will seal the through hole in the wall, after which the tubular section is removed and the portion of the (last) extension rod, that still projects beyond the wall, is connected to the wall in a pulltight manner.
  4. A method according to claim 1 or 2, characterized in that it is applied for anchoring the bottom of a structure, such as a tunnel trough that is sunk deeply below ground water level into the ground, wherein the tubular section is connected to the bottom to be anchored by means of a fastening flange.
  5. A method according to claim 4, characterized in that at first a recess is provided in the upper surface of the bottom for receiving the flange.
  6. A method according to claim 5, characterized in that for a pulltight connection of the portion of the (last) extension rod use is made of an auxiliary piece, adapted to take a flush-mounted position within the through hole of the bottom.
  7. A method according to claims 4-6, characterized in that a through hole or a group of through holes is made at each of two longitudinally spaced sites, each through hole being adapted to screwingly insert a pull anchor through it, wherein the axis (axes) of one through hole or group of through holes extend(s) laterally obliquely in one direction, whereas the axis (axes) of the second through hole or group of through holes extend(s) laterally outwardly in the opposite direction.
  8. A pull anchor for use with the method according to any of the foregoing claims, comprising an anchor rod with a screw blade body at the distal end thereof, characterized in that cutting means are provided at the distal end of the screw blade body, adapted to drill a hole of a size allowing the screw blade body to pass through it.
EP20000201116 1999-03-30 2000-03-28 A method for anchoring a wall in the ground by means of pull anchors Expired - Lifetime EP1041204B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
NL1011701 1999-03-30
NL1011701A NL1011701C2 (en) 1999-03-30 1999-03-30 Method for anchoring a wall placed in the ground by means of tension-loadable screw anchors.

Publications (2)

Publication Number Publication Date
EP1041204A1 true EP1041204A1 (en) 2000-10-04
EP1041204B1 EP1041204B1 (en) 2004-06-02

Family

ID=19768941

Family Applications (1)

Application Number Title Priority Date Filing Date
EP20000201116 Expired - Lifetime EP1041204B1 (en) 1999-03-30 2000-03-28 A method for anchoring a wall in the ground by means of pull anchors

Country Status (3)

Country Link
EP (1) EP1041204B1 (en)
DE (1) DE60011173D1 (en)
NL (1) NL1011701C2 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660949A (en) * 2012-05-16 2012-09-12 上海强劲地基工程股份有限公司 Laminated hole-sealing-type hole sealing method for preventing running water and sand blast in stiffening pile construction

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3665717A (en) * 1971-01-14 1972-05-30 Soil Sampling Service Inc Method and apparatus for installing elongated rods in unstable earth formations
US4253781A (en) * 1979-03-08 1981-03-03 Philipp Holzmann Aktiengesellschaft Method and an apparatus for providing a grouted anchorage against hydrostatic pressure
EP0360221A2 (en) * 1988-09-20 1990-03-28 Tgb Technogrundbau Gmbh Method and apparatus for making a sealed anchor in a soil area bordered by an immersed wall, especially a sheet piling wall
US5575122A (en) * 1995-11-22 1996-11-19 Hubbell Incorporated Earth screw anchor assembly having enhanced penetrating capability
DE19744551C1 (en) * 1997-10-09 1998-12-10 Wilhelm Cornelius Tongued board wall

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3665717A (en) * 1971-01-14 1972-05-30 Soil Sampling Service Inc Method and apparatus for installing elongated rods in unstable earth formations
US4253781A (en) * 1979-03-08 1981-03-03 Philipp Holzmann Aktiengesellschaft Method and an apparatus for providing a grouted anchorage against hydrostatic pressure
EP0360221A2 (en) * 1988-09-20 1990-03-28 Tgb Technogrundbau Gmbh Method and apparatus for making a sealed anchor in a soil area bordered by an immersed wall, especially a sheet piling wall
US5575122A (en) * 1995-11-22 1996-11-19 Hubbell Incorporated Earth screw anchor assembly having enhanced penetrating capability
DE19744551C1 (en) * 1997-10-09 1998-12-10 Wilhelm Cornelius Tongued board wall

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102660949A (en) * 2012-05-16 2012-09-12 上海强劲地基工程股份有限公司 Laminated hole-sealing-type hole sealing method for preventing running water and sand blast in stiffening pile construction
CN102660949B (en) * 2012-05-16 2015-06-03 上海强劲地基工程股份有限公司 Laminated hole-sealing-type hole sealing method for preventing running water and sand blast in stiffening pile construction

Also Published As

Publication number Publication date
NL1011701A1 (en) 2000-10-10
NL1011701C2 (en) 2000-12-04
EP1041204B1 (en) 2004-06-02
DE60011173D1 (en) 2004-07-08

Similar Documents

Publication Publication Date Title
US4893389A (en) Reinstatement of lateral branch connections in relined sewers or pipes
JPS6286226A (en) Method and apparatus for arranging assembling member in ground receiving water pressure through sheet pile
JPH0459514B2 (en)
EP1041204B1 (en) A method for anchoring a wall in the ground by means of pull anchors
JP4047199B2 (en) Water stop material injection method
EP0725205A1 (en) Devices and method to stop water inflow to an underground pipe laying work area
JPH06316921A (en) Construction method of injection outer pipe under pressured water
JPH09158173A (en) Anchor construction method for steel tube column retaining wall
JPH04336127A (en) Connecting method between propulsion pipe and manhole
JPH0995943A (en) Construction method of earth anchors in steel pipe column retaining wall
JPH0526375A (en) Branch pipe installing method on main pipe and coupling therefor
JP2829489B2 (en) Earth anchor method
JPH0932092A (en) Method of installing fitting pipe to existing pipe of the like
JP2645984B2 (en) Installation method of water stop device and water stop device in propulsion method
JPH0932093A (en) Method of installing fitting pipe to existing pipe or the like
KR20010026627A (en) A coupling device of drainpine
JPH039974B2 (en)
JPH08270392A (en) How to stop water at pipe propulsion wellhead
JPH074174A (en) Pit mouth sealing device
JP3434267B2 (en) Driving bolt for repair material injection of foundation structure and repair method
JPS6249408B2 (en)
JPH039972B2 (en)
JPH025878B2 (en)
JPH0730867B2 (en) Rehabilitation method and equipment for old pipes in underground pipes
JP3053221U (en) Separator device applied to the construction of a waterproof underground wall

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE DE FR GB NL

AX Request for extension of the european patent

Free format text: AL;LT;LV;MK;RO;SI

17P Request for examination filed

Effective date: 20010403

AKX Designation fees paid

Free format text: BE DE FR GB NL

17Q First examination report despatched

Effective date: 20021031

GRAP Despatch of communication of intention to grant a patent

Free format text: ORIGINAL CODE: EPIDOSNIGR1

GRAS Grant fee paid

Free format text: ORIGINAL CODE: EPIDOSNIGR3

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE DE FR GB NL

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040602

REG Reference to a national code

Ref country code: GB

Ref legal event code: FG4D

REF Corresponds to:

Ref document number: 60011173

Country of ref document: DE

Date of ref document: 20040708

Kind code of ref document: P

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: DE

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT

Effective date: 20040903

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: GB

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20050328

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

26N No opposition filed

Effective date: 20050303

EN Fr: translation not filed
GBPC Gb: european patent ceased through non-payment of renewal fee

Effective date: 20050328

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: NL

Payment date: 20140328

Year of fee payment: 15

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20140327

Year of fee payment: 15

REG Reference to a national code

Ref country code: NL

Ref legal event code: MM

Effective date: 20150401

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: NL

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES

Effective date: 20150401

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: BE

Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES