EP0878389B1 - Semi-weathervaning anchoring system - Google Patents
Semi-weathervaning anchoring system Download PDFInfo
- Publication number
- EP0878389B1 EP0878389B1 EP19970201995 EP97201995A EP0878389B1 EP 0878389 B1 EP0878389 B1 EP 0878389B1 EP 19970201995 EP19970201995 EP 19970201995 EP 97201995 A EP97201995 A EP 97201995A EP 0878389 B1 EP0878389 B1 EP 0878389B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- vessel
- anchor
- line
- lines
- anchor line
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 238000004873 anchoring Methods 0.000 title claims description 11
- 230000001154 acute effect Effects 0.000 claims description 2
- 125000001183 hydrocarbyl group Chemical group 0.000 claims description 2
- 238000004904 shortening Methods 0.000 claims 1
- 238000005553 drilling Methods 0.000 description 5
- 238000010276 construction Methods 0.000 description 3
- 238000007599 discharging Methods 0.000 description 1
- 230000007613 environmental effect Effects 0.000 description 1
Images
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/50—Anchoring arrangements or methods for special vessels, e.g. for floating drilling platforms or dredgers
Definitions
- the invention relates to a vessel comprising at least two anchor lines connected with a first end respectively at a substantially fixed position near the bow and near the stern of the vessel, at least one anchor line comprising a first line section extending to a connection point located below keel level of the vessel and at least two branching anchor lines, each connected with one end to the anchor line in the connection point and connected with the other end to the seabed.
- a mooring system in which a vessel is moored to a drilling rig, the mooring lines being attached to mooring winches. By tightening or slackening the mooring lines, the vessel can assume a large number of different orientations with respect to the drilling rig.
- an anchor line extends to a submerged buoy to which the vessel is attached via a wire rope.
- the buoy is attached to the seabed by a branching anchor line which extends at an obtuse angle with respect to the seabed.
- the branching anchor line does not have a load bearing function for the moored vessel but maintains the submerged buoy in a fixed position.
- a weathervaning vessel which is anchored to the seabed by means of four anchor lines.
- the vessel is provided with a track which encircles the hull of the vessel.
- a plurality of movable carriages are guided along the track, one anchor line being connected to each carriage.
- the carriages can be placed at specific point along the track, each carriage being equipped with a winch for accumulating or discharging a respective anchor line.
- the known anchoring construction is relatively complex and the anchor line arrangement covers a relatively large part of the seabed, Hence the anchor lines may interfere with the operating area for the risers and leaves little room for the anchoring spread of a drilling/workover rig when such a rig is anchored next to, or in close proximity to the drilling vessel.
- the vessel according to the present invention is characterized in that at least one riser extends from the vessel to a subsea structure, the two branching anchor lines enclosing an acute angle with the seabed, all anchor lines of the vessel being attached to the seabed, for allowing weathervaning of the vessel around the stern and/or bow through relatively small angles.
- the vessel according to the present invention can be easily accessed along its sides. Thereby other vessels can easily approach and moor aside the vessel according to the present invention, and sufficient space is available for location of for instance flexible risers.
- a very stable multiple point mooring system (at least a three point system) which will leave enough play for the vessel to weathervane through angles less than 90° in both directions.
- both the bow and the stern anchor lines each comprise at least two branching anchor lines.
- the anchor lines extend substantially vertically downward. Hereby access of the vessel is further increased.
- substantially vertical shall mean a position from the first anchor line section being inclined from the vertical position by no more than 45°.
- anchor line as used herein comprises anchor cables, ropes, chains or combinations thereof.
- At least one anchor line extends through a generally vertical shaft extending through the hull of the vessel from deck level to keel lever. In this way the anchor lines are located below the vessel, and the bow and stern are easily accessible as well.
- a counterweight is connected to at least one of the anchor lines, such that the tension in the vertically extending part can be adjusted and the stiffness of the anchor line system can be varied for adjustment of the weathervaning action.
- Another embodiment of a vessel according to the present invention is characterized in that the pulling device can vary the length of the at least one anchor line such that both anchor lines are maintained in a tensioned state, and the vessel can weathervane around the bow anchor line or the stern anchor line.
- the invention is based on the insight that during normal operating conditions, a vessel will be subjected to wind and wave directions which are more or less constant for larger time periods. During these substantially constant conditions, the vessel only needs to weathervane through a relatively small angle such as between 0° and 90°. For these conditions, by properly tensioning and slackening at least one of the anchor lines at the bow and stern of the vessel, an efficient and controlled weathervaning action can be achieved, without the need of a complex system of displaceable winches.
- the pulling device such as for instance a winch system
- the pulling device varies the length of the anchor lines simultaneously.
- Variation of the anchor lines can take place under the control of a mean position sensor which actuates the winch system on the basis of the mean position of the vessel, the wind or wave directions, etc. The change in one of the above environmental characteristics will change the control signal and hence the stiffness of the anchor line system.
- each anchor line is connected to the pulling device via a sheave located generally at the centre line of the vessel.
- a sheave located generally at the centre line of the vessel.
- the anchor lines are connected to a single pulling device or winch.
- this single pulling device bow and stern anchor lines can be simultaneously slackened or tightened to obtain a proper weathervaning position of the vessel.
- a single anchor line passes from the bow, via the pulling device to the stern of the vessel, such that the length of the anchor line that is for instance taken in at the bow corresponds with the length of anchor line payed out at the stern.
- the vertical arm of the weathervaning system can be adjusted and thereby the stiffness of the weathervaning system can be varied.
- the vessel according to the invention is connected to a subsea hydrocarbon structure via at least one riser.
- the riser is connected to the side of the vessel near midship where dynamic movements are minimum thereby increasing the longevity of these risers.
- the riser may pass through the vessel via the moonpool. As the movements of the vessel are limited to rotations of approximately 90 degrees, the risers also do not require complicated swivels at their attachment points as the riser itself can twist this angle.
- Figure 1a shows a vessel 1 which at its bow 2 and at its stern 4 is connected to anchor lines 3 and 5.
- the anchor lines 3 and 5 comprise a generally vertically extending section and two branching sections 11,11', 12,12' attached to the vertical parts.
- submerged buoys 13,14 are attached to the stern and bow anchor lines. By positioning of the buoys 13,14, the stiffness of the anchoring system can be varied.
- the bow anchor line 3 is connected to a fixed position winch 6. Both stern and bow anchor lines are connected to counter weights 9 and 10. Each anchor line extends through a vertical shaft 19,20 extending from deck level to keel level. The vessel will weathervane around the anchor line which is stiffest. If both anchor lines have the same stiffness and the winch 6 pays out bow anchor line 3, the vessel will weathervane around the stern anchor line 5 because this anchor line is relatively stiffer than anchor line 3. In reverse, if winch 6 takes in bow anchor line 3, then the vessel will be weathervaning around anchor line 3 because this anchor line will be stiffer than the stern anchor line 5.
- the bow anchor line and stern anchor line are mutually connected by a cable 13.
- the stern counter weights 9 will be lifted or lowered and the stiffness of the system will be varied for adjustment of the weathervaning action thereof.
- FIG 4 shows a vessel 1 with at its bow 2 and its stern 4 respective winches 6,7.
- the anchor lines 3,5 may be comprised of ropes, chains or cables.
- Each anchor line 3,5 in the present embodiment is connected to a counterweight 9,10 which counterweight in turn is connected to the seabed by means of chains or cables 11,12.
- the stiffness of the weathervaning system according to the present invention may be adjusted by changing the weight of the counterweight 9 and 10 or by changing the length of the vertical arm (vertical part of the anchor line 3,5).
- the use of the counterweights 9 and 10 however is optional, and instead thereof buoys could be used as in figure 1b.
- Risers 8 are connected near midship of the vessel 1, which risers are connected to a subsea oil or gas structure which is not shown in the drawings.
- Figure 5 shows an embodiment wherein the anchor lines 3,5 are connected to a fixed position sheave 16,17 at the stern and bow of the vessel 1.
- the anchor lines are connected to a single winch 15 on the vessel 1.
- each anchor line 3,5 is passed through a vertical shaft 19,20 extending from deck level to keel level through the hull of the vessel 1. In this way, the anchor lines 3,5 stay clear from the sides of the vessel and do not interfere with other vessels which need to moor alongside the vessel 1 according to the present invention.
- each anchor line 3,5 is connected to the seabed by means of three chains or cables 11,11',11'' and 12,12',12'' which extend from the counterweights 9,10 to the seabed.
- Figure 8 shows a situation in which the anchor line 3 at the bow is payed out and the anchor line at the stern is taken in, such that the vessel 1 will weathervane around the stern anchor line 5 in the direction of the arrow as indicated.
- this construction it is possible to use a single anchor line for the bow and stern anchor lines 3,5, such that the anchor line which is payed out at the bow corresponds to the length of anchor line which is taken in at the stern, as shown in figure 6.
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Combustion & Propulsion (AREA)
- Mechanical Engineering (AREA)
- Ocean & Marine Engineering (AREA)
- Laying Of Electric Cables Or Lines Outside (AREA)
- Filling Or Discharging Of Gas Storage Vessels (AREA)
Description
- The invention relates to a vessel comprising at least two anchor lines connected with a first end respectively at a substantially fixed position near the bow and near the stern of the vessel, at least one anchor line comprising a first line section extending to a connection point located below keel level of the vessel and at least two branching anchor lines, each connected with one end to the anchor line in the connection point and connected with the other end to the seabed.
- From GB-A-2,061,850 such a mooring system is known in which a vessel is moored to a drilling rig, the mooring lines being attached to mooring winches. By tightening or slackening the mooring lines, the vessel can assume a large number of different orientations with respect to the drilling rig. From the seabed, an anchor line extends to a submerged buoy to which the vessel is attached via a wire rope. The buoy is attached to the seabed by a branching anchor line which extends at an obtuse angle with respect to the seabed. The branching anchor line does not have a load bearing function for the moored vessel but maintains the submerged buoy in a fixed position.
- From US-A-3,583,354 a bow-stern spread catenary mooring system is known in which the vessel is maintained in a fixed position by means of four anchor lines, two of which are connected to the bow of the vessel and two at the stern. By applying the correct tension to these anchor lines it is possible in normal weather to maintain the ship in a reasonably fixed position. According to US-A-3,583,354 during storm conditions the stem anchor lines are slackened, such that the vessel can weathervane around the bow through 90°.
- From US-A-3,822,663 a weathervaning vessel is known, which is anchored to the seabed by means of four anchor lines. The vessel is provided with a track which encircles the hull of the vessel. A plurality of movable carriages are guided along the track, one anchor line being connected to each carriage. The carriages can be placed at specific point along the track, each carriage being equipped with a winch for accumulating or discharging a respective anchor line. By moving the position of the carriages along the track, and by selectively paying in or paying out the anchor lines, the vessel can weathervane about a substantially fixed position point located between the bow and the stern. The known anchoring construction, however, is relatively complex and the anchor line arrangement covers a relatively large part of the seabed, Hence the anchor lines may interfere with the operating area for the risers and leaves little room for the anchoring spread of a drilling/workover rig when such a rig is anchored next to, or in close proximity to the drilling vessel.
- It is therefore an object of the present invention to provide for a vessel which can weathervane within a predetermined area, in a controlled manner, using a relatively simple anchoring system. It is a further object of the present invention to provide a vessel comprising such a weathervaning anchoring system having a reduced anchoring layout and leaving a relatively large seabed area for the risers and for the anchoring spread of adjacent vessels such as drilling/workover rigs or shuttle tankers.
- Thereto the vessel according to the present invention is characterized in that at least one riser extends from the vessel to a subsea structure, the two branching anchor lines enclosing an acute angle with the seabed, all anchor lines of the vessel being attached to the seabed, for allowing weathervaning of the vessel around the stern and/or bow through relatively small angles. With the above anchoring arrangement the vessel according to the present invention can be easily accessed along its sides. Thereby other vessels can easily approach and moor aside the vessel according to the present invention, and sufficient space is available for location of for instance flexible risers.
- By providing at least one anchor line with two branching anchor lines, a very stable multiple point mooring system (at least a three point system) is provided which will leave enough play for the vessel to weathervane through angles less than 90° in both directions. Preferably both the bow and the stern anchor lines each comprise at least two branching anchor lines.
- In one embodiment the anchor lines extend substantially vertically downward. Hereby access of the vessel is further increased.
- As used herein, the term "substantially vertical" shall mean a position from the first anchor line section being inclined from the vertical position by no more than 45°.
- In another embodiment a buoyancy member is connected near the branching anchor lines. In this way the stiffness of the anchor arrangement can be adjusted for varying the weathervaning action. The term "anchor line" as used herein comprises anchor cables, ropes, chains or combinations thereof.
- In one embodiment at least one anchor line extends through a generally vertical shaft extending through the hull of the vessel from deck level to keel lever. In this way the anchor lines are located below the vessel, and the bow and stern are easily accessible as well.
- Preferably a counterweight is connected to at least one of the anchor lines, such that the tension in the vertically extending part can be adjusted and the stiffness of the anchor line system can be varied for adjustment of the weathervaning action.
- Another embodiment of a vessel according to the present invention is characterized in that the pulling device can vary the length of the at least one anchor line such that both anchor lines are maintained in a tensioned state, and the vessel can weathervane around the bow anchor line or the stern anchor line.
- The invention is based on the insight that during normal operating conditions, a vessel will be subjected to wind and wave directions which are more or less constant for larger time periods. During these substantially constant conditions, the vessel only needs to weathervane through a relatively small angle such as between 0° and 90°. For these conditions, by properly tensioning and slackening at least one of the anchor lines at the bow and stern of the vessel, an efficient and controlled weathervaning action can be achieved, without the need of a complex system of displaceable winches.
- In one embodiment the pulling device, such as for instance a winch system, according to the invention varies the length of the anchor lines simultaneously. Variation of the anchor lines can take place under the control of a mean position sensor which actuates the winch system on the basis of the mean position of the vessel, the wind or wave directions, etc. The change in one of the above environmental characteristics will change the control signal and hence the stiffness of the anchor line system.
- Preferably each anchor line is connected to the pulling device via a sheave located generally at the centre line of the vessel. By the placement of the sheaves on the centre line of the vessel, a symmetric weathervaning action to both sides is achieved.
- According to an embodiment of the vessel according to the present invention the anchor lines are connected to a single pulling device or winch. By operation of this single pulling device, bow and stern anchor lines can be simultaneously slackened or tightened to obtain a proper weathervaning position of the vessel. In one embodiment, a single anchor line passes from the bow, via the pulling device to the stern of the vessel, such that the length of the anchor line that is for instance taken in at the bow corresponds with the length of anchor line payed out at the stern.
- By passing the anchor lines through a vertical shaft or hawser pipe extending from deck level to keel level, the sides of the vessel are easily accessible, and a shuttle tanker can be moored alongside the vessel according to the present invention without interference with the anchor lines. vessel according to the present invention without interference with the anchor lines.
- By connecting at least one of the anchor lines below sea level to a counterweight, which in turn is connected to the seabed, the vertical arm of the weathervaning system can be adjusted and thereby the stiffness of the weathervaning system can be varied. Preferably the vessel according to the invention is connected to a subsea hydrocarbon structure via at least one riser. The riser is connected to the side of the vessel near midship where dynamic movements are minimum thereby increasing the longevity of these risers. The riser may pass through the vessel via the moonpool. As the movements of the vessel are limited to rotations of approximately 90 degrees, the risers also do not require complicated swivels at their attachment points as the riser itself can twist this angle.
- Some embodiments of a vessel according to the present invention will be explained in detail, by way of example, with reference to the accompanying drawings. In the drawings:
- Figure 1a shows a schematic side view of a vessel according to the present invention wherein the anchor lines are connected to the bow and the stern,
- Figure 1b shows an anchoring arrangement according to figure 1 comprising buoyancy means,
- Figure 2 shows a schematic side view in which the front most anchor line is connected to a pulling device, both front and rear anchor lines extending through a vertical shaft in the vessel,
- Figure 3 shows a schematic side view of a vessel wherein the anchor lines at the bow and at the stern are mutually connected to a cable, the bow anchor line being connected to a winch,
- Figure 4 shows a schematic side view of an embodiment of a vessel according to the present invention wherein each anchor line is connected to a separate winch,
- Figure 5 shows a schematic side view of an embodiment wherein the anchor lines are connected to a single winch,
- Figure 6 shows an embodiment wherein the anchor lines are passed through vertical shafts in the vessel,
- Figures 7 and 8 show a schematic plan view of the vessel according to the present invention in different weathervaning positions, and
- Figure 9 shows a schematic perspective view of the embodiment using a single winch and a single anchor line as shown in figure 8.
-
- Figure 1a shows a
vessel 1 which at itsbow 2 and at itsstern 4 is connected toanchor lines anchor lines branching sections - In the embodiment of figure 1b, submerged
buoys buoys - In the embodiment shown in figure 2, the
bow anchor line 3 is connected to afixed position winch 6. Both stern and bow anchor lines are connected to counterweights vertical shaft winch 6 pays outbow anchor line 3, the vessel will weathervane around thestern anchor line 5 because this anchor line is relatively stiffer thananchor line 3. In reverse, ifwinch 6 takes inbow anchor line 3, then the vessel will be weathervaning aroundanchor line 3 because this anchor line will be stiffer than thestern anchor line 5. - In the embodiment shown in figure 3, the bow anchor line and stern anchor line are mutually connected by a
cable 13. By adjusting the length of thebow anchor line 3 by operation of thewinch 6, thestern counter weights 9 will be lifted or lowered and the stiffness of the system will be varied for adjustment of the weathervaning action thereof. - Figure 4 shows a
vessel 1 with at itsbow 2 and its stern 4respective winches winch anchor line anchor line counterweight cables counterweight anchor line 3,5). The use of thecounterweights -
Risers 8 are connected near midship of thevessel 1, which risers are connected to a subsea oil or gas structure which is not shown in the drawings. - Figure 5 shows an embodiment wherein the
anchor lines fixed position sheave vessel 1. The anchor lines are connected to asingle winch 15 on thevessel 1. - In the embodiment of figure 6, each
anchor line vertical shaft vessel 1. In this way, theanchor lines vessel 1 according to the present invention. - As can be seen in figure 7, the
sheaves winch 15 are all located on the longitudinal centre line of thevessel 1. In this way, a symmetric construction is obtained and weathervaning to both sides of the centre line of the vessel can take place around thebow anchor line 3 or thestern anchor line 5. As can be seen from figure 4, in this embodiment eachanchor line cables 11,11',11'' and 12,12',12'' which extend from thecounterweights - Figure 8 shows a situation in which the
anchor line 3 at the bow is payed out and the anchor line at the stern is taken in, such that thevessel 1 will weathervane around thestern anchor line 5 in the direction of the arrow as indicated. In this construction it is possible to use a single anchor line for the bow andstern anchor lines
Claims (20)
- Vessel comprising at least two anchor lines (3, 5) a first said line being connected with a first end at a substantially fixed position near the bow (2), and a second line being connected with a first end near the stern (4) of the vessel, at least one said anchor line comprising a first line section extending to a connection point located below keel level of the vessel and at least two branching anchor lines, each connected at one end to the anchor line in the connection point and at the other end to the seabed, characterized in that at least one riser (8) extends from the vessel to a subsea structure, the two branching anchor lines enclosing an acute angle with the seabed, all anchor lines of the vessel being attached to the seabed, for allowing weathervaning of the vessel around the stern and/or bow through relatively small angles.
- Vessel according to claim 1, characterized in that the anchor lines extend from their fixed position substantially vertically downward.
- Vessel according to claim 1, characterized in that a buoyancy means is connected to at least one anchor line at or near the connection point.
- Vessel according to claim 2, characterized in that at least one anchor line extends through a generally vertical shaft extending through the hull from deck level to keel level of the vessel.
- Vessel according to claim 1, 2 or 4, characterized in that least one anchor line is at or near the connection point connected to a ballast weight or buoyancy means.
- Vessel according to claim 1, 2, 3, 4 or 5, characterized in that both anchor lines are connected to respective branching anchor lines.
- Vessel according to any if the previous claims, characterized in that the first section of at least one anchor line is connected to a pulling device for lengthening or shortening the anchor line, wherein the pulling device can vary the length of the at least one anchor line such that both anchor lines are maintained in tensioned state and the vessel can weathervane around the bow anchor line (3) or the stern anchor line (5).
- Vessel according to claim 7, characterized in that the pulling device is a winch system (6, 7, 15)/
- Vessel according to claim 7 or 8, characterized in that each anchor line is connected to a pulling device.
- Vessel (1) according to claim 7, 8 or 9, characterized in that the pulling device (6, 7, 15) varies the length of the anchor lines (3, 5) simultaneously.
- Vessel (1) according to claim 7, 8, 9 or 10, characterized in that each anchor line (3, 5) is connected to the pulling device (15) via a sheave (16, 17) located generally at the center line of the vessel (1).
- Vessel (1) according to any of claims 7 to 11, characterized in that the anchor lines (3, 5) are connected to a single pulling device (15).
- Vessel (1) according to claim 12, characterized in that an anchor line extends from the bow (2) via the pulling device (15) to the stern.
- Vessel (1) according to any of claims 7 to 13, characterized in that the anchor lines pass (3, 5) from the pulling device (15) through the hull of the vessel to a respective anchoring point.
- Vessel (1) according to claim 14, characterized in that the vessel is at least near its bow (2) or stern (4) provided with a generally vertical shaft (19, 20) extending through the hull, at least one anchor line extending through the shaft (19,20)/
- Vessel (1) according to claim 15, characterized in that the vessel comprises a shaft (19, 20) near the bow (2) and near the stern (4).
- Vessel (1) according to any of the claims 7 to 16, characterized in that at least one of the anchor lines is connected below sear level to a counter weight (9, 10) which in turn is connected to the seabed via the branching lines.
- Vessel (1) according to any of claims 7 to 16, characterized in that a buoyancy member is connected to at least one of the anchor lines.
- Vessel (1) according to any of the previous claims, characterized in that the vessel is connected to a subsea hydrocarbon structure via at least one riser (8).
- Vessel according to any of the previous claims, characterized in that the vessel does not comprise a turret structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP19970201995 EP0878389B1 (en) | 1997-05-15 | 1997-07-01 | Semi-weathervaning anchoring system |
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
EP97201461 | 1997-05-15 | ||
EP97201461A EP0878388A1 (en) | 1997-05-15 | 1997-05-15 | Semi-weathervaning anchoring system |
EP19970201995 EP0878389B1 (en) | 1997-05-15 | 1997-07-01 | Semi-weathervaning anchoring system |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0878389A1 EP0878389A1 (en) | 1998-11-18 |
EP0878389B1 true EP0878389B1 (en) | 2002-03-27 |
Family
ID=26146480
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP19970201995 Expired - Lifetime EP0878389B1 (en) | 1997-05-15 | 1997-07-01 | Semi-weathervaning anchoring system |
Country Status (1)
Country | Link |
---|---|
EP (1) | EP0878389B1 (en) |
Families Citing this family (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
AU776984B2 (en) | 1999-08-09 | 2004-09-30 | Single Buoy Moorings Inc. | Active semi-weathervaning anchoring system |
CN106290955B (en) * | 2016-10-09 | 2022-11-11 | 上海勘测设计研究院有限公司 | Wind measuring tower instrument conveying, loading and unloading device and using method |
EP3829969B1 (en) * | 2018-07-31 | 2025-02-26 | SOFEC, Inc. | Disconnectable spread mooring and riser tower system and method |
CN114162268B (en) * | 2021-12-31 | 2022-10-14 | 清华大学深圳国际研究生院 | Mooring device for floating body in shallow and medium water area and mounting method |
Family Cites Families (14)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3138135A (en) * | 1962-01-26 | 1964-06-23 | Rudolph M Langer | Mooring device |
US3583354A (en) | 1969-04-23 | 1971-06-08 | Don H Flickinger | Anchoring system for fating drilling vessel |
US3620181A (en) * | 1969-07-02 | 1971-11-16 | North American Rockwell | Permanent ship mooring system |
US3822663A (en) | 1972-10-10 | 1974-07-09 | H Boschen | Method and apparatus for mooring floating vessels |
US3886882A (en) * | 1973-04-23 | 1975-06-03 | Global Marine Inc | Mooring apparatus for ice-breaking drill ship |
FR2385584A1 (en) * | 1977-04-01 | 1978-10-27 | Elf Aquitaine | ANCHOR LINES TENSIONING DEVICE |
JPS5853628B2 (en) * | 1979-07-20 | 1983-11-30 | 五洋建設株式会社 | Marine floating structure mooring device and mooring method |
GB2061850B (en) * | 1979-10-29 | 1984-05-23 | Ovretveit K A | Mooring systems |
JPS56135386A (en) * | 1980-03-27 | 1981-10-22 | Hitachi Zosen Corp | Mooring method for floating body |
DE3043755C2 (en) * | 1980-11-20 | 1987-04-23 | Blohm + Voss Ag, 2000 Hamburg | Permanent anchoring of floating structures |
JPS6149008A (en) * | 1984-08-17 | 1986-03-10 | Ishikawajima Harima Heavy Ind Co Ltd | How to moor a floating structure |
DE3535091A1 (en) * | 1985-10-02 | 1987-04-16 | Thyssen Nordseewerke Gmbh | ICEBREAKING SHIP |
JPH01148688A (en) * | 1987-12-04 | 1989-06-12 | Sumitomo Electric Ind Ltd | Holding method for floating plant on sea bottom |
BR9506067A (en) * | 1995-12-22 | 1997-12-23 | Petroleo Brasileira S A Petrob | Anchoring positioning system with differentiated compliance |
-
1997
- 1997-07-01 EP EP19970201995 patent/EP0878389B1/en not_active Expired - Lifetime
Also Published As
Publication number | Publication date |
---|---|
EP0878389A1 (en) | 1998-11-18 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5390618A (en) | Offshore mooring system | |
CA2246686C (en) | System for anchoring ships | |
EP1868881B1 (en) | Enhanced side-by-side mooring construction | |
US6216628B1 (en) | Semi-weathervaning anchoring system | |
US5893334A (en) | Method and apparatus for mooring floating storage vessels | |
US5678503A (en) | Method for mooring floating storage vessels | |
US6394154B1 (en) | Transfer pipe system | |
US5065687A (en) | Mooring system | |
US6467423B1 (en) | Semi-weathervaning anchoring system | |
AU2006339368B2 (en) | Lashing of a tender assist drilling unit to a floating production facility | |
US5566636A (en) | Off shore mooring system | |
US20070212170A1 (en) | Method and apparatus for reducing set-down of a tension leg platform | |
US11377174B2 (en) | Mooring system | |
EP0878389B1 (en) | Semi-weathervaning anchoring system | |
US6619223B2 (en) | Tender with hawser lines | |
US6408781B1 (en) | Mooring system and method for deep and ultra deep water | |
WO2004050470A2 (en) | Mooring windlass/winch system | |
US6575111B2 (en) | Method for tendering | |
WO1998030438A1 (en) | Arrangement of drilling and production ship | |
US4214545A (en) | Anchor stowing arrangement | |
WO2011042535A1 (en) | Calm buoy | |
AU2012209046B2 (en) | Enhanced side-by-side mooring construction | |
US11866130B2 (en) | System for restriction of hawser movement in a tandem mooring and loading | |
EP0960810A1 (en) | Transfer pipe system |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): FR GB IT NL |
|
AX | Request for extension of the european patent |
Free format text: AL;LT;LV;RO;SI |
|
17P | Request for examination filed |
Effective date: 19990518 |
|
AKX | Designation fees paid |
Free format text: AT BE CH DE LI |
|
RBV | Designated contracting states (corrected) |
Designated state(s): FR GB IT NL |
|
REG | Reference to a national code |
Ref country code: DE Ref legal event code: 8566 |
|
17Q | First examination report despatched |
Effective date: 20000927 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): FR GB IT NL |
|
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed |
Effective date: 20021230 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20050620 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 20050630 Year of fee payment: 9 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20050713 Year of fee payment: 9 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060701 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20060731 Year of fee payment: 10 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070201 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20060701 |
|
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee |
Effective date: 20070201 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20070330 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20060731 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20070701 |