EP0823172A1 - Dynamic infrastructure - Google Patents
Dynamic infrastructureInfo
- Publication number
- EP0823172A1 EP0823172A1 EP96911179A EP96911179A EP0823172A1 EP 0823172 A1 EP0823172 A1 EP 0823172A1 EP 96911179 A EP96911179 A EP 96911179A EP 96911179 A EP96911179 A EP 96911179A EP 0823172 A1 EP0823172 A1 EP 0823172A1
- Authority
- EP
- European Patent Office
- Prior art keywords
- stratum
- route
- connection
- node
- network
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04Q—SELECTING
- H04Q3/00—Selecting arrangements
- H04Q3/0016—Arrangements providing connection between exchanges
Definitions
- This invention relates to telecommunication networks, in parti ⁇ cular to allocation of resources in a stratified reference model.
- a stratified reference model is a generalization of the OSI re- ference model that enables a description of complicated network- on-network structures.
- Each network level is referred to as a stratum.
- a stratum is a logical model of a physical transmission network.
- a stratum describes nodes and routes between the nodes.
- the physical transmission network modelled by a stratum comprises nodes and links. Links are grouped into trunks which extend be ⁇ tween the nodes.
- the various stratum networks are defined by con ⁇ figuration data. The different strata together make up a stra ⁇ tified transport network.
- Each stratum is associated a respective bearer service. With bearer service is meant a service providing transport of data. Different strata have different bearer services.
- a connection is used to transfer information between two end points.
- a connection is created in various ways. For example a connection is created by cross connection, by manual switching or by switching. Cross connected connections are created in for example cross connecting devices, manually switched connections are created for example in connector matrixes by soldering and switched connections are created on demand, for example by dial- ling a directory number on a telephone.
- a channel is a means for unidirectional transmission.
- a channel is used to carry information from one point to another.
- To tran ⁇ smit information from A to B one channel is required, said one channel having a direction from A to B.
- To transmit information from B to A another channel is required, said another channel ha ⁇ ving the opposite direction of said one channel.
- a link is a physical system (that transports information). Accordingly, a link carries channel pairs. The maximum number of channel pairs a link can carry depends on the bearer service and on the proper- ties of the physical system.
- a route is a logical conception.
- a route comprises a number of channel pairs and is used to interconnect two nodes. In theory there is no maximum number of channel pairs a route can comprise.
- the conception of route is used to define the way a connection follows between nodes of a stratum. This is referred to as rou ⁇ ting and is conventional.
- An ET operates to "insert” or multiplex together a number of channel pairs on one and the same link and to "extract” or demultiplex channel pairs from said same link.
- FIG. 1 there is one route Rl extending between two nodes Nl and N2.
- route Rl carries 96 channels so distributed that there are 48 channels in each one of two opposite directions, i.e. route Rl carries 48 channel pairs.
- FIG.l is a logical description of the physical transmission system shown in FIG. 2.
- FIG. 2 there are two links LI and L2 extending between nodes Nl and N2.
- links LI and L2 At each end of links LI and L2 there is a respective exchange terminal ET.
- the bearer service is ST 64
- the link LI will carry 64 channels so distributed that there are 32 channels in each one of the two opposite directions.
- link LI carries 32 channel pairs.
- link L2 carries 32 channel pairs.
- route Rl All 32 channel pairs of link LI but only 16 channel pairs of link L2 are grouped into route Rl which accordingly will hold 48 channel pairs.
- the remaining 16 link elements of link L2 not used in route Rl may form part of another route, not shown in FIG. 1.
- nodes Nl and N2 correspond to nodes Nl and N2 in FIG.l.
- FIG. 3 three strata 1, 2, 3 are shown, each such stratum representing a logical view of a non shown physical transport network.
- Stratum 1 comprises three nodes 10-12, stratum 2 three nodes 20-22, and stratum 3 four nodes 30-33.
- Stratum 1 comprises three routes 13-15, stratum 2 three routes 23-25 and stratum 3 three routes 34-36.
- the bearer service at stratum 1 is 64 kbps STM (synchronous transmission mode) .
- the bearer service at stratum 2 is 2 Mbps STM (in the U.S.A. 1.5 Mbps STM).
- the bearer service at stratum 3 is 155 Mbps STM.
- routes 13, 14, 15, 25 and 34 are shown to comprise the channel pairs of two links, while routes 23, 24, 35 and 36 are shown to comprise the channel pairs of just one link.
- a link is indicated by a solid line.
- the links of route 13 are denoted 40 and 41.
- At each stratum there are access points to the different networks. These access points are shown schematically by filled points at each stratum. Each access point has a connection to a node in a respective stratum.
- Access units are connected to access points. The access units are used for communication. As an example of access units two telephone sets A and B are shown at stratum 1. Access unit are also present at stratum 2 and are symbolically shown at C and D respectively. Examples of access units at stratum 2 are main frame computers. At stratum 3 access units are shown symbolically at E and F respectively.
- each one of the connection 16, 17, 18, 26, 27, 28,37, 38 is at its respective node side connected to its respective node by way of an exchange terminal ET.
- exchange terminals could be ordinary line interface circuits; LIC:s, in case the bearer service is STM 64 Mbps.
- An exchange terminal ET in a stratum is shown as a small unfilled rectangle in the accompanying drawings.
- the nodes 10-12 at stratum 1 generally comprise switch fabrics.
- An exchange in the physical transport network would correspond to one or more switch fabrics in different strata.
- Cross connectors in the physical transport network would correspond to the nodes 20-22 in stratum 2.
- Wire connections in the physical transport network would correspond to the nodes 30-33 in stratum 3.
- Stratum 1 forms a switched network in the sense that it is possible to route a connection from an originating access unit to a terminating access unit by dialling, at the originating access unit, the telephone number to the terminating access unit.
- Stratum 2 is generally a non-switched network.
- a connection from C to D is generally a fixed leased connection which is set up, on a long time basis, by a network operator.
- Stratum 1 is a non- switched network.
- each route 13, 14, 15 represents a number of re ⁇ sources between two nodes, said resources existing in the form of channel pairs.
- the nodes 10, 20 and 30 may or may not correspond to each other depending on the structure of the physical transport network. Generally they do not correspond to each other since their physical counterparts in the physical transport network are located at geographically different sites. The nodes 10, 20 and 30 would correspond to each other if the exchange, the cross connector and the wired connection are all located at the same geographical site. The same considerations apply for nodes 11, 21, 31 and for nodes 12, 22, 32.
- the items described above together make up a traffic system.
- the traffic at each stratum varies depending on the time of the day, the day of the week and may also depend on other criterions.
- a head office of a company that has sales offices in several cities wants the sale offices to report back to the head office all items sold during a day.
- the corresponding information should be sent to the head office nighttime.
- the time it takes to complete such a data transmission may be unacceptable long if transmission takes place using the bearer service at the stratum
- the OSS 29 con ⁇ trols and monitors the operation of the nodes and routes at stra ⁇ tum 2. There is also an OSS 39 for controlling and monitoring the corresponding items at stratum 3.
- Manual set up of connections at stratum 2 at predetermined times is a rigid method of meeting the traffic demand from users.
- the users must notify the network operator of their demands and the network operator must set up the connections manually. Should a user need to use a leased connection at other times than agreed upon the network operator must be contacted.
- the network operator then has to examine the current traffic situation in stratum 2, assign a link to the requesting user and manually set up the connection for a fixed time period.
- the time delay between custom demand and set up of a demanded connection may take days.
- U.S. Patent 5,058,105, U.S. Patent 5,182,744, U.S. Patent 5,031,211 relate to methods and devices for enhancing the reliability of a communication network so that traffic which is disrupted by, for example, a faulty link, may quickly be restored to service.
- Various methods are described for determin ⁇ ing alternate routes to which the disrupted traffic is trans ⁇ ferred.
- U.S. Patent 4,669,113 relates to a nonhierarchial switching sys- te ⁇ i employing an algorithm for developing link sizes for paths that connect switches in the switching system. This is achieved by having each switch in the switching system to send idle trunk information to a central integrated network controller on a per ⁇ iodic, for example 5-second, basis when trunk status changes occur, i.e. idle trunks are created or removed. Based on the received traffic information the integrated network controller determines the required number of trunks for each link using a process that adjusts for the traffic handling capacity between nodes based on the availability of alternate routes.
- EP-A2-464 283 relates to allocating a limited common resource, such as trunks for video conferencing, among a plurality of demands for the resource.
- An allocation methodology is shown which makes it possible to allocate the bandwidth of a communica ⁇ tion path in the network among a plurality of customer demands for that bandwidth.
- Examples of customer demands for a conference are start time, stop time, maximum bandwidth and minimum band ⁇ width.
- To each conference reservation there is associated "bin ⁇ ding" comprising a four-tuple of the form (XI, X2, X3, X4 ) where XI and X2 refer to specific positions within the bandwidth of the communication path and X3 and X4 refer to the start time and stop time respectively of the conference.
- a customer site represents one or more endpoints.
- An allocation arrangement receives demands from a customer site for allocating the network for a communica ⁇ tion among a plurality of customer sites.
- the allocation arrange- ment stratifies the received demands in response to a grouping of endpoints to be conferenced and can then allocate the network resources in response to the stratified demand. Accordingly the allocation process takes place at predetermined points of time in accordance with a customer's demands and is not driven by the current traffic load.
- An object with the present invention is to provide a method and a system for providing a connection along a route of a higher stratum using dynamic allocation of an infrastructure of a lower stratum in a stratified network structure avoiding the drawbacks with prior art technique.
- the allocation of an infrastructure of a lower stratum to a higher stratum is controlled from within the traffic system. No system external OSS is involved in the allocation process and according ⁇ ly no operator needs to be contacted when the allocation should be done. The allocation can therefore take place dynamically and on demand.
- the allocation process allows for repetitive allocations of infrastructures from a number of underlying strata to an overlaying stratum.
- the above objects are achieved by providing a route with a first reference associated with one end of said route and a second reference associated with the opposite end of said route.
- the first reference refers to a first access point resident in a lower stratum.
- the second reference refers to a second access point resident in said lower stratum. From the node at said one end of said route there is provided a wired connection to said first access point in said lower stratum. Likewise, from the node at said opposite end of said route there is provided a similar wired connection to said second access point resident in said lower stratum.
- control logic When control logic requests the set up of a connection in a first stratum said connection typically extends along a number of routes. Suppose that the traffic load along one of said routes is so heavy that all the resources of said one route are busy. Traditionally the connection request is rejected during such circumstances.
- the control logic at first examines said one route to see if it has associated therewith the above mentioned references. If it hasn't the connection request is rejected, but if it has, the control logic will take the references and send them, in a second connection request, to the stratum associated with the access points. The second connection request requests set up of a connection between the two access points with which the references are associated.
- the access points are resident in a stratum , referred to as the second stratum, next below the one in which said one busy route is resident.
- the second connection request will there ⁇ fore be transmitted to the second stratum.
- Control logic asso ⁇ ciated with the second stratum will examine the second stratum network to see if a connection between the access points can be set up.
- the control logic asso- ciated with the second stratum will now set up a connection be ⁇ tween the access points.
- This connection constitutes an infra ⁇ structure for the first stratum. In this way the infrastructure becomes available to the first stratum at said opposite end nodes.
- the resources of the infrastructure comprises a number of channel pairs as will be explained below.
- the assigned infrastructure one channel pair is seized and is used for setting up the originally requested connection, while the rest of its channel pairs are ready for use by future connec ⁇ tions.
- the allocation of an infrastructure takes place on demand when, at said higher stratum, there are no more channel pairs available for traffic along a route at said higher stratum, but there is still a demand for setting up new connections along said route.
- the infrastructure is returned to the lower stratum and can now be accessed by said lower stratum. In this way the combined structures of the two strata involved in the allocation process are used efficiently. The resources of the infrastructure will thus be used more efficiently than before.
- the first reference refers to a group of first access points resident in said lower stratum and the second reference refers to a group of second access points also resident in said lower stratum.
- a respective wired connection Between the node at said one end of said route and each of the first access points there is provided a respective wired connection.
- wired connections from the node at said opposite end of said route to each one of the second access points resident in said lower stratum.
- FIG. 1 is a block diagram of a route extending between two nodes
- FIG. 2 is a detailed view of the route shown in FIG.l
- FIG. 3 is a simplified schematic view showing a stratified network structure in accordance with known technique
- FIG. 4 is a simplified schematic view of the stratified network structure in FIG. 3 modified in accordance with the invention.
- FIG. 5 is a schematic block diagram of nodes 10 and 20 in strata 1 and 2 respectively in FIG. 4,
- FIG. 6 is a list of idle resources associated with a route to which an infrastructure can be allocated
- FIG. 7 is the list of idle resources in FIG.6 to which an infrastructure has been dynamically allocated, FIG:s
- 8-10 are flow diagrams, illustrating traffic system control logic involved in the process of dynamic allocation of an infrastructure
- FIG. 11 is a routing table
- FIG. 12A and 12B are lists of idle resources similar to those shown in FIG. 6,
- FIG. 13 is a simplified stratified network showing a variant of the dynamic allocation process in accordance with the invention
- FIG. 14 is a simplified stratified network showing an example of an iterative dynamic allocation process
- FIG. 15 is a schematic diagram showing a second embodiment of the invention.
- FIG. 4 is similar to FIG. 3 with the exception that there are two physical connections 4 and 5 between stratum 1 and stratum 2.
- physical connection 4 extends from ET1 of node 10 to ET4 of node 20.
- the physical access point at ET4 of node 20 is labelled Al.
- Physical connection 5 extends in a similar fashion from ET2 of node 11 to ET3 of node 21.
- the physical access point at ET3 of node 21 is labelled A2.
- A2 A2
- a connection between Al and A2 using 2- Mbps connections of stratum 2.
- a connection can be set up between Al and A2 using route 23.
- an connection between Al and A2 can be set up using routes 25 and 24.
- a non shown control system in stratum 2 receives a request from another non shown control system in stratum 1 to set up a connection between Al and A2.
- the OSS 29 checks its traffic to find out a free route between Al and A2. Say for example that route 23 is free.
- Said non shown control system in stratum 2 seizes route 23 and connects the ET:s at each end of the seized route to the respective ET:s at which Al and A2 are.
- Such connections are schematically indicated by the broken lines Cl and C2 and are done internally in the nodes 20 and 21 of the respective connections points Al and A2.
- connection 4-A1-C1-23-C2-A2-5 which terminates at ET1 and ET2.
- ET1 and ET2 in stratum 1 will now determine the bit rate at which said connection 4-A1-C1-23-C2-A2-5 is operated. Since ET1 and ET2 multiplex at a bit rate of 64 kBit/s said connection 4- A1-C1-23-C2-A2-5 will also be driven at this speed.
- Said connection will accordingly add resources in the form of 32 channel pairs to route 13, each such channel pair being propagat ⁇ ed at a speed of 64 kB/s and being carried by the 2 MBit/s connection at stratum 2. Typically one or two of the added 32 channel pairs are used for signalling purposes.
- Fig. 4 is just a picture of logical networks. Behind the picture there is a non-shown physical transport network and it is in this physical network the wired connections are made. In particular they are made between links belonging to the physical transport network.
- the node 10 is shown in detail and comprises further to a switch 10, a processor 45 and control programs 46.
- a data base 47 comprising i.a. a network description of the resources of stratum 1.
- Such descriptions comprise i.a. conventional routing tables used for routing of a call through a network as well as link tables of the kind shown in FIG.s 6, 7 and 12B, such link tables being used to record the current state of the individual channel pairs of a particular route, i.e. whether an individual channel pair is occupied or not.
- the control program module 46 comprises several individual programs, among these a call set-up program 48 and a resource handler 49.
- node 20 of stratum 2 comprises a processor 55, a program module 56 and a data base 57.
- the program module 56 comprises several control programs, i.a. a call set-up program 58, and link tables of the kind shown in FIG. 12A.
- processors 45 and 55 may physically be one and the same processor and this is also possible for the data bases 47 and 57.
- a route at stratum 1 comprises one or more links. To each route there is associated a respective route table.
- a route table 52 is shown.
- the route associated with route table 52 is route 13.
- Route 13 comprises two links link 40, 41 each of which comprises 32 channel pairs, some of which may be used for signalling purposes. The remaining 30 channel pairs are available for traffic. This gives a total of 60 channel pairs for route 13.
- the available channel pairs are numbered 1, 2... 60. Each such channel pair has a status, busy and non-busy.
- the route table 52 has two references, symbolically shown at 50 and 51. Each reference represents a relation.
- reference 50 at link table 52 indicates that the left end of route 13 is connected to access point Al in stratum 2 and the presence of reference 51 at indicates that the right end of route 13 is connected to access point A2 in stratum 2.
- the two access points Al and A2, which represent the two ends of route 13, should be connected with each other in stratum 2. As indicated above such a connection is referred to as an infrastructure.
- Allocation of an infrastructure to a higher stratum is initiated on demand when predefined conditions are fulfilled.
- the allocation of an infrastructure is initiated when all channel pairs of links 40 and 41 have been seized and the traffic continues to increase along said route 13.
- allocation of an infrastructure is initiated when there are some few, say for example 5, channels available in link table 52 and the traffic load along said route 13 is at or above a predefined level.
- Other parameters and combination of parameters may govern the point of time at which allocation of an infrastructure is initiated.
- control logic resident in stratum 1 or stratum 2 or in both strata, is the means by which the infrastructure allocation process is initiated. This embodiment was described shortly above and will be described in detail further down.
- the means by which the allocation process is initiated is a signalling procedure.
- One signalling procedure is a signalling which is associated with the access point Al and which uses an identification of access point A2 (a roaming number).
- signalling is an out of band signalling procedure.
- Another signalling procedure is to request the connection between Al and A2 by sending the request to the operation and support system OSS 29 via a non shown traffic management system TMN using the Q3 interface.
- the connection that consti ⁇ tutes an infrastructure is set up between access points Al and A2. This connection may follow either the direct way route 23 between Al and A2 or the multi way route formed by routes 25 and 24 via node 22.
- control logic resident in the resource handler 49 gives back the unoccupied link to stratum 2 and releases the connection A1-C1-ET-23-C2-A2 set up in the stratum 2.
- FIG. 8 the logic of the call set-up program 48 is shown to the left. To the right the logic of a routing analysis performed with the aid of the routing table of FIG. 11 is shown.
- a connection request, represented by box 60 is generated when user A dials the telephone number to user B.
- box 61 the destination of the call is established.
- box 61 For routing analysis in node 10 a routing table 62 of the kind shown in FIG. 11 is used.
- the destination of the call in this case the identity, represented by Nil to node 11 is given.
- the identities of the routes which are possible to use to node 11 are indicated, in this case the identity of route 13 represented as R13-ID.
- the search for the route to be used is indicated by box 63 in FIG. 8 and the process of returning the selected ROUTE-ID:s is represented by box 64.
- the call set-up program 48 receives the possible routes, box 65, and next the call set-up program orders that a resource, in the particular example which relates to a telephone call, a channel formed by a time slot that has fixed time position from frame to frame, in the first identified route should be seized, box 66. This seizure order is sent, ring 67, to the resource handler 49.
- the resource handler examines the list 52 of idle resources which corresponds to the selected resource to see if there is a resource free. The result is returned to the call set-up program as is represented by box 68. The result is either that a channel is seized or not. Which is the case is decided in selection box 69. If resources are free, alternative YES, the call set-up program 48 sets up a connection, box 70. If no resources are free, alternative NO, it is tested, decision box 71, if other routes were given in process step 64. If other routes were given, alternative YES, the next route is tried, box 70A, to see if a resource therein can be seized. This procedure is repeated until there is found a route, among said other routes, that has resources free.
- FIG. 9 the logic of the resource handler 49 is illustrated.
- the resource handler At receipt of the seizure order, ring 67, the resource handler examines the corresponding list 52 of idle resources to see if a resource is free, selection box 72. If a resource is free, alternative "YES", the resource handler 49 seizes the resource and sends the identity of the seized resource to the call set-up program 48 which will receive the resource identity at circle 68. If no resource is free, alterative "NO" at decision box 72 the resource handler checks to see if the selected resource has relation to an infrastructure, selection box 74.
- the resource handler communi ⁇ cates this to the call set-up program which receives correspond ⁇ ing message at circle 68. If there is a relation, alternative "YES”, the resource handler 49 communicates the access points of the infrastructure, box 76, to the call set-up program 58 in stratum 2, circle 77.
- the call set-up program in stratum 2 is shown in FIG. 10 and is in principle similar to that shown in FIG. 8 and will therefore not be described in detail. From the call set-up program 58 the resource handler receives a communica- tion, symbolized by circle 78, comprising information, box 79, on the result of the call set up in stratum 2.
- Either the requested connection was set up or not, alternative YES and NO respectively at decision box 80. If the connection was set up the additional resources, in form of channel pairs, is added to the list of idle resources, box 81, and a channel pair is seized, box 73, for the connection requested at the stratum 1 level. The seized channel pair is marked as "occupied for the requested connection " in the list of idle resources. A corresponding message is sent to the control logic 48, ring 68. If no connection could be set up at the stratum 2 level a corresponding message, box 82, is sent to the control logic 48 and the connection request made at the stratum 1 level is rejected.
- FIG. 10 the control program 58 in stratum 2 is shown.
- a connection request box 83
- This connection request is processed in a manner similar to a connection request at the stratum 1 level as shown in FIG.8. and will therefore not be described in detail.
- the various processes involved in setting up a connection at the stratum 2 level are shown collectively by box 84. The result is either that a connection is set up, box 85, or not, box 86. In both cases a corresponding message is sent to the link handler, ring 78.
- the number of channel pairs of a route at stratum 1 is expanded by providing said route with a relation to two access points at stratum 2, said access points establishing the two end points of a possible connection at the stratum 2 layer.
- a route, for example route 13 at stratum 1 can also be expanded by providing the route with a relation to two access points at the stratum 3 layer.
- Such relations pointing to the end points of a route at stratum 3 are shown at 87 and 88 respectively in FIG. 12A.
- first physical connec ⁇ tion similar to connection 4, between nodes 10 and 30 and a second physical connection between nodes 11 and 31.
- FIG. 13 the corresponding infrastructure at stratum 3 has been shown.
- stratum 2 is not shown in FIG.13.
- first physical connection 93 similar to connection 4, between nodes 20 and 30 and a second physical connection 94 between nodes 21 and 31.
- the number of channel pairs assigned to stratum 1 is in this case in the order of 2100 since stratum 3 provides an infrastructure carrying 155 Mbps.
- the access points pointed out by the relations 87, 88 are labelled A5 and A6 respectively.
- the number of channel pairs of a route at stratum 2 can be expanded by providing said route at stratum 2 with a relation to two access points at stratum 3.
- route 25 is provided with two such references 89, 90.
- FIG. 14 It is also possible to apply the inventive idea repetitively from stratum to stratum. This is illustrated in FIG. 14.
- Route 13 has the above relations 50 and 51 to access points Al and A2 at stratum 2.
- route 23 there are no resources available along route 23 that extends between access points Al and A2.
- route 25 is supposed to have no resources free, but route 25 has two references 89, 90, similar to those shown in FIG. 12B, that are associated with two access points A3 and A4 at stratum 3 via two physical connections 93 and 94.
- stratum 3 there are resources free and an infrastructure, represented by the intra node connections C3 and C4 in nodes 30 and 33 and route 36, is assigned to stratum 2.
- an infrastructure represented by the intra node connections C3 and C4 in nodes 30 and 33 and route 36.
- the connection requested at stratum 1 is set up using a connection set up at the stratum 3 level.
- FIG. 15 a further embodiment of the invention is shown.
- the architecture of stratum 1 is generally the same as that shown in FIG. 3. From each of the nodes 10, 11 and 12 there are, however, a number of physical connections to exchange terminals ET residing in the second stratum 2, said second stratum being symbolically indicated by the area within the closed line 22.
- Node 1 has four such physical connections which collectively are indicated by reference numeral 444, node 11 has two such physical connections labeled 555 and node 12 has four physical connections 666.
- Each physical connection extends between two exchange terminals ET:s.
- the ends of the physical connections 444, 555, 666 to stratum 2 are symbolized by filled circles and are referred to as access points.
- the access points of connections 444 are collectively marked at 93, the access points of connections 555 are marked at 94 and the connections points of connections 666 are collectively referred to as 95.
- the routes 13, 14 and 15 are present.
- Each route has a relation in the form of pointers pointing out the end points of the respective route.
- route 13 has two pointers 99, 100 of which 99 points to the group of access points 95 while 100 points to the group of access points 93.
- route 14 has two pointers 101, 102 pointing out its respective end points in stratum 2. Pointer 101 points to the group of access points 94 and pointer 102 points to the group of access points 95.
- Route 15 has two pointers 103, 104 pointing out its respec- tive end points in stratum 2.
- pointer 103 points to the group of access points 93 while pointer 104 points to the group of access points 95.
- the link handler 49 selects the group of access points 93 and the group of access points 95 since these two groups of points represent the end points of a link in the route which extends between nodes 10 and 12.
- stratum 2 a connection is set up between two selected access points in groups 93 and 95.
- the individual connection to be set up in stratum 2 may be selected using a conventional resource allocation algorithm which examines the traffic along the routes of stratum 2 and based upon this examination selects which route to follow in stratum 2.
- the telecommunication network may comprise four strata or more, or even just two strata, and the inventive method and the inventive construction would be applicable.
- a route may extend over several links, some of them being fixed and some of them being allocated dynamically as described above. The effect of this is that a route will comprise a fixed number of resources which are always present. On top of these there are a number of resources that can be dynamically allocated to the route.
- control logic for requesting a connection at stratum 1 has above been described to be resident in stratum 1 and has been described to be executed by a processor which belongs to stratum
- control logic 2 has been described to be resident in stratum 2 and has been described to be executed on a processor which belongs to stratum 2. It is, however, not necessary to split up the control logic and its execution on processors which belong to different strata. The invention is equally well achieved if one and the same processor executes the control logic of the two strata and it is of no difference if this processor belongs to one stratum or the other. The processor may even be distributed among several nodes of one and the same stratum.
- the control logic which above has been described as split up between different strata may, in accordance with the present invention, be integrated and may be executed on a single processor or on a distributed processor.
- the control logic be it structured in several strata or not, and the processor, be it a single processor or a distributed processor, on which it executes forms a control system of the telecommunica ⁇ tion network.
Landscapes
- Engineering & Computer Science (AREA)
- Computer Networks & Wireless Communication (AREA)
- Data Exchanges In Wide-Area Networks (AREA)
- Telephonic Communication Services (AREA)
Abstract
Description
Claims
Applications Claiming Priority (3)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE9501543 | 1995-04-26 | ||
SE9501543A SE504347C2 (en) | 1995-04-26 | 1995-04-26 | Procedure and system for dynamic resource allocation in a telecommunications network |
PCT/SE1996/000544 WO1996034482A1 (en) | 1995-04-26 | 1996-04-24 | Dynamic infrastructure |
Publications (1)
Publication Number | Publication Date |
---|---|
EP0823172A1 true EP0823172A1 (en) | 1998-02-11 |
Family
ID=20398096
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP96911179A Withdrawn EP0823172A1 (en) | 1995-04-26 | 1996-04-24 | Dynamic infrastructure |
Country Status (6)
Country | Link |
---|---|
EP (1) | EP0823172A1 (en) |
JP (1) | JPH11504186A (en) |
AU (1) | AU5413996A (en) |
CA (1) | CA2219168A1 (en) |
SE (1) | SE504347C2 (en) |
WO (1) | WO1996034482A1 (en) |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2749098B2 (en) * | 1989-02-03 | 1998-05-13 | 株式会社日立製作所 | Communication line switching / combination method |
US5136581A (en) * | 1990-07-02 | 1992-08-04 | At&T Bell Laboratories | Arrangement for reserving and allocating a plurality of competing demands for an ordered bus communication network |
US5359596A (en) * | 1992-10-01 | 1994-10-25 | Alcatel Network Systems, Inc. | Apparatus and method for finding bandwidth and making circuits in a telecommunications transport network |
-
1995
- 1995-04-26 SE SE9501543A patent/SE504347C2/en not_active IP Right Cessation
-
1996
- 1996-04-24 WO PCT/SE1996/000544 patent/WO1996034482A1/en not_active Application Discontinuation
- 1996-04-24 CA CA 2219168 patent/CA2219168A1/en not_active Abandoned
- 1996-04-24 JP JP8532439A patent/JPH11504186A/en active Pending
- 1996-04-24 AU AU54139/96A patent/AU5413996A/en not_active Abandoned
- 1996-04-24 EP EP96911179A patent/EP0823172A1/en not_active Withdrawn
Non-Patent Citations (1)
Title |
---|
See references of WO9634482A1 * |
Also Published As
Publication number | Publication date |
---|---|
CA2219168A1 (en) | 1996-10-31 |
SE504347C2 (en) | 1997-01-20 |
SE9501543D0 (en) | 1995-04-26 |
SE9501543L (en) | 1996-10-27 |
AU5413996A (en) | 1996-11-18 |
WO1996034482A1 (en) | 1996-10-31 |
JPH11504186A (en) | 1999-04-06 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
JP2648579B2 (en) | Method and network node for determining optimal route | |
JP2685069B2 (en) | Network access node of communication network and method for selecting connection route in the network | |
JP3103091B2 (en) | Completely shared communication network and completely shared method of communication network | |
CA2220790C (en) | Automatic learning of network routing using random routes | |
US5440563A (en) | Service circuit allocation in large networks | |
CA2226447C (en) | Distributed network control and fabric application interface | |
MX2011006536A (en) | NETWORK NODE AND METHOD TO CONTROL RESOURCES IN A COMMUNICATIONS NETWORK. | |
US6608831B1 (en) | Breakout/break-in hybrid network system | |
JPH10505722A (en) | Resource segregation in separate call and connection networks | |
JP3826181B2 (en) | Telecommunications system | |
EP0888020B1 (en) | Method and apparatus for achieving fabric independent routing technique | |
US5936951A (en) | Dynamic infrastructure | |
JP3083540B2 (en) | Switching control method using multiprocessor | |
US7706802B2 (en) | Media gateway interconnect routing in a softswitch environment | |
US8547849B2 (en) | ATM telecommunications systems and method for routing narrow band traffic | |
JP4090738B2 (en) | Switching method and network element | |
WO1996034482A1 (en) | Dynamic infrastructure | |
KR100538876B1 (en) | Method of Managing Link Channels between a SGSN and a GGSN | |
Reed et al. | Packet routing algorithms for integrated switching networks | |
JP3255238B2 (en) | Communication control processor | |
JPH0426254A (en) | Information processor | |
MXPA00012001A (en) | Method of and system for providing services in a communications network | |
MXPA98004084A (en) | Method and apparatus for carrying out the independent route design of the estruct technique |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
17P | Request for examination filed |
Effective date: 19970920 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): DE FI FR GB |
|
RIC1 | Information provided on ipc code assigned before grant |
Ipc: 7H 04L 12/24 B Ipc: 7H 04Q 3/00 B Ipc: 7H 04L 29/08 A |
|
17Q | First examination report despatched |
Effective date: 20031030 |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: TELEFONAKTIEBOLAGET LM ERICSSON (PUBL) |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN |
|
18D | Application deemed to be withdrawn |
Effective date: 20040310 |