EP0536962B1 - Heat exchanger with movable tube assemblies - Google Patents
Heat exchanger with movable tube assemblies Download PDFInfo
- Publication number
- EP0536962B1 EP0536962B1 EP92309038A EP92309038A EP0536962B1 EP 0536962 B1 EP0536962 B1 EP 0536962B1 EP 92309038 A EP92309038 A EP 92309038A EP 92309038 A EP92309038 A EP 92309038A EP 0536962 B1 EP0536962 B1 EP 0536962B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- duct
- hanger
- aperture
- heat exchanger
- roof
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Lifetime
Links
- 230000000712 assembly Effects 0.000 title claims description 9
- 238000000429 assembly Methods 0.000 title claims description 9
- 239000012530 fluid Substances 0.000 claims description 12
- 230000008878 coupling Effects 0.000 claims description 3
- 238000010168 coupling process Methods 0.000 claims description 3
- 238000005859 coupling reaction Methods 0.000 claims description 3
- 239000007789 gas Substances 0.000 description 17
- 238000007689 inspection Methods 0.000 description 8
- 238000012423 maintenance Methods 0.000 description 7
- 238000012546 transfer Methods 0.000 description 6
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 6
- 238000011084 recovery Methods 0.000 description 4
- 230000008439 repair process Effects 0.000 description 4
- 238000002485 combustion reaction Methods 0.000 description 3
- 239000002918 waste heat Substances 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000009471 action Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 230000008602 contraction Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- QSHDDOUJBYECFT-UHFFFAOYSA-N mercury Chemical compound [Hg] QSHDDOUJBYECFT-UHFFFAOYSA-N 0.000 description 1
- 229910052753 mercury Inorganic materials 0.000 description 1
- 238000005086 pumping Methods 0.000 description 1
- 238000005096 rolling process Methods 0.000 description 1
- 238000007789 sealing Methods 0.000 description 1
- 239000000779 smoke Substances 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Classifications
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F22—STEAM GENERATION
- F22B—METHODS OF STEAM GENERATION; STEAM BOILERS
- F22B37/00—Component parts or details of steam boilers
- F22B37/02—Component parts or details of steam boilers applicable to more than one kind or type of steam boiler
- F22B37/10—Water tubes; Accessories therefor
- F22B37/20—Supporting arrangements, e.g. for securing water-tube sets
- F22B37/202—Suspension and securing arrangements for contact heating surfaces
-
- F—MECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
- F28—HEAT EXCHANGE IN GENERAL
- F28F—DETAILS OF HEAT-EXCHANGE AND HEAT-TRANSFER APPARATUS, OF GENERAL APPLICATION
- F28F9/00—Casings; Header boxes; Auxiliary supports for elements; Auxiliary members within casings
- F28F9/007—Auxiliary supports for elements
- F28F9/013—Auxiliary supports for elements for tubes or tube-assemblies
Definitions
- the present invention relates to heat exchangers and steam generators; and specifically to heat recovery steam generators.
- Typical HRSG systems comprise a large steel duct that channels hot gas over several banks of internal tubes which contain water. As the hot gases pass over the tubes, heat is absorbed by water flowing in the tubes.
- conventional systems are designed so that the tube banks are packed very densely into the duct. The dense configuration forces the hot gas to flow directly over the tube surfaces.
- the ends of the tube banks are in close proximity to the walls of the duct to eliminate passages above, below and on either side of the banks through which the hot gases could bypass the tubes.
- Designers of conventional HRSG systems often went to great lengths to plug even the smallest openings or cracks that might allow such bypassing to occur.
- US-A-1,883,301 describes a mercury boiler having a duct through which heat can pass with a floor and a roof and a plurality of tube asemblies within the duct with each assembly including a header from which a plurality of tubes extend. Levelling movement of the headers is provided for.
- a heat exchanger comprises:
- Baffles can be provided in the duct to restrict gas flow in these spaces which otherwise would bypass the plurality of tube panels.
- the apertures in the roof are elongated to permit horizontal, as well as vertical, movement of the tube assemblies.
- a jack which rests on the structural member and connects to the hangers for raising and lowering the panels.
- the jack may have rollers or other means that enable it to be moved along the structural member to transfer the tube panel horizontally.
- a heat recovery steam generator 10 includes a duct 11 with a gas inlet 12. Exhaust gases from a combustion process flow in the direction indicated by arrow 13 from the inlet 12 through the duct.
- the inlet opens into a large section of the steam generator which for example is fifty feet high, twelve feet across (in the dimension into the paper) and 120 feet long.
- the gas continues to flow through the duct 11 to an outlet (not shown) on the remote end from the inlet 12.
- each panel consists of several tubes 16.
- the tubes 16 of each panel extend between an upper and a lower pipe header 18 and 19, respectively.
- Both headers 18 and 19 have a plurality of openings therein into which the tubes 16 are welded to provide fluid communication between the header and the tubes.
- the headers of adjacent panels are connected together by additional piping so that water can be introduced into one of the headers, flow through the tubes 16 and out the other header.
- the welds of the tube to the headers are a common point of failure during operation of the steam generator 10.
- a first set of vertical tubes 16 extend from the upper header 18 in a common plane across the duct.
- a second coplanar set of vertical tubes also extends from the upper header 14 offset from the first set along the direction of the gas flow.
- a separate helical fin assembly, indicated by broken lines 17, is attached to the exterior of each tube to increase heat transfer.
- the tubes are closely spaced with respect to each other in both the longitudinal and transverse directions. This close spacing optimizes the heat transfer between the hot gas flowing through duct 11 and the water flowing through tubes 16.
- each hanger 30 includes a bracket 28 welded to the top surface of the upper pipe header 18.
- the bracket 28 has an aperture therethrough that receives a pin which attaches the bracket to a coupling member 31 at one end of a support rod 32.
- This assembly provides a pivotal connection of the tube panel 14 to the support rod 32.
- the support rods extend upward through elongated apertures 26 in roof 20.
- a number of I-beams 22 extend transversely across the duct 11 on the exterior of roof 20 to support the tube assemblies.
- the ends of transverse beams 22 attach to vertical structural members (not shown) on the sides of the duct.
- Two pairs of longitudinal I-beams 24 are attached to and extend between adjacent transverse beams 22. As shown in Figure 3, the longitudinal beams 24 of each pair are spaced apart and lie on either side of a elongated aperture 26 in the roof 20.
- a C-support 34 bar is placed between the upper surfaces of the pair of longitudinal beams 24 on both sides of each support rod 32.
- the support rod passes upward through an aperture in a hanger plate 36 which spans adjacent C-support bars 34.
- the upper end of the support rod 32 is threaded and receives a pair of nuts 38 which are locked in place by tightening them against one another. A short portion of the support rod extends beyond the nuts 38.
- a cover box 40 is placed over and is welded to the longitudinal beams 24 to seal the aperture 26 in the duct roof 20 as shown in Figure 1.
- the remaining figures of the drawings show the cover box 40 removed as occurs during inspection and maintenance of the steam generator. Additional means (not shown) can be used in sealing the aperture to prevent the exhaust gas flowing through the duct from travelling up into the cover, thereby bypassing the tube panels 14.
- baffle plates 41 bolted to the interior of the roof 20 before and after each group of panels 14.
- the baffle plates abut the upper pipe header 18 of the panels on each end of the group.
- baffle plates 41 close the gap between the upper pipe headers 18 and the roof 20, thereby preventing the exhaust gases from passing above the group of tube panels.
- a similar pair of baffles 42 are welded to the floor 21 of the duct to likewise block exhaust gases from flowing in the space between the lower pipe headers 19 and the duct floor.
- Each group of tube panels 14 is separated by a cavity 44.
- Access openings 46 are cut in the roof 20 and are sealed by doors 48 during generator operation. These openings allow service personnel to enter the duct for inspection and repair of the tube panels 14. Similar openings 49 are located on the sidewall of the duct 11 near the floor 21, allowing maintenance personnel access to the space below each group of panels.
- the steam generator 10 is specifically designed for ease of maintenance.
- the spaces above and below each group of panels allow a technician to enter the duct and inspect the welds where tubes 16 attach to the upper and lower headers 18 and 19.
- the suspension of the tube panels 14 permits vertical movement for inspection and servicing as shown in Figure 2.
- To gain access to a specific panel the connection of its upper and lower headers to interconnecting piping is severed. The panel then is raised or lowered by a pair of jacks 50 which are installed for that purpose.
- Each jack 50 has a base 52 formed by a horizontal plate 53 and two spaced apart vertical plates 54 extending downward from the base plate 53.
- Each of the vertical members 54 has an inverted U-shape with the cross member of the U welded to base plate 53.
- Each leg of the U-shaped vertical member 54 has an aperture therethrough containing a ball bearing.
- a pair of rollers 56 extends between the vertical members 54 and fit into the ball bearings.
- the base plate has a central opening 58 therethrough which is positioned over the end of a support rod 32.
- a pair of fluid operated cylinders 60 such as hydraulic or pneumatic cylinders, are mounted vertically on the upper surface of the base plate 53 of each jack 50.
- a jacking frame 62 extends between the upper ends of the cylinders 60. The jacking frame has a central aperture which is aligned with the end of the support rod 32 when the jack is positioned on the steam generator 10.
- a coupling 66 at one end of a rod extension 64 is threaded onto the upper end of the support rod 32.
- the other end of the extension rod 64 projects through the aperture in the jacking frame 62 and has a nut 68 threaded thereon.
- the jacks 50 are placed in their compressed state and attached to the support rods 32. Fluid is then pumped into each of the cylinders 60 thereby raising the jacking frame 62 and the panel 14 as shown in Figure 2. Maintenance personnel then can enter the duct through one of the roof access openings 46 and visually inspect the welds along the raised upper pipe header 18.
- the tube panel 14 can be lowered for inspection of the lower pipe header 19.
- a pair of jacks 50 are positioned over the pair of support rods 32 for the panel and extended to substantially their full length by pumping hydraulic fluid into the cylinders 60. Nuts are tightened on the extension rods 64 which have been attached to the ends of the support rods 32. Additional fluid is pumped into the cylinder 60 to raise the panel 14 slightly. With reference to Figures 2 and 4, raising the panel 14 removes the pressure exerted by the hanger plates 38 on the C-supports 34. This permits the C-supports to be extracted between the legs of the U-shaped vertical members 54 of the jacks. The removal of the C-supports 34 allows the panel 14 to be lowered within the duct 11.
- the panel is raised so that a gap exists between the hanger plates 36 and the longitudinal beams 24 which is slightly greater than the height of the C-supports 34.
- the C-supports are inserted between the legs of the U-shaped vertical members 54 of the jack 50.
- the panel is lowered so that the hanger plates 34 drop onto the C-supports 34.
- the extension rods 64 can be removed and the jacks 50 transferred to raise or lower another panel 14 within the steam generator 10.
- each of the support rods 34 extends through an elongated aperture 26 in the roof 20. This aperture runs substantially the full distance between the transverse beams 22. Should it become necessary, access between the tube panels 14 of a group can be accomplished by moving the panels along these apertures 26. To do so, the appropriate baffles 41 and 42 are removed and the jacks 50 are attached to the outermost panel 14 of the group. That panel then is raised upward and moved longitudinally by rolling the jack 50 over the longitudinal beam 24 until the panel has been pushed away from the others. The outermost panel then can be lowered onto properly positioned C-supports 34 and the jack 50 used to similarly move other panels of the group until a space exists adjacent the panel that requires inspection or repair. The maintenance personnel enter the space created between the panels to perform the necessary work.
- the panels are moved back into their original positions and reattached to the interconnecting piping which carries water to and from the panel assembly.
- the doors over openings 46 and 49 are closed and the cover box 40 welded in place to seal the apertures 26 in roof 20.
- the structure of the present steam generator 10 provides access spaces between the groups of tube panels 14 and in the duct 11 above and below the tube panels. These spaces are blocked off by baffles to prevent the flow of exhaust gases bypassing the panel assembly during operation of the steam generator.
- the hanging support structure enables a tube panel 14 to be moved both vertically and horizontally as needed.
- the structure of the steam generator 10 provides a densely packed bundle of tubes which is desirable for efficient heat transfer while facilitating access for maintenance.
- FIGS 5 and 6 show orthogonal views of another embodiment of a jack 70 that can be used to move the tube panels 14 within the steam generator 10.
- Jack 70 is formed by a base assembly 71 and an upper jacking frame 72.
- the base assembly 71 includes a flat base plate 53 identical to the one shown in Figure 4 which bears the same reference numeral.
- Two hollow tubular members 74 and 75 are mounted on the upper surface of the base plate 53 on opposite sides of the central opening 58.
- a separate pair of side braces 76 is attached to each of the tubular members 74 and 75 to provide lateral support.
- a pair of cross bars 77 extend between the side braces 76 on opposite sides of the central opening 58.
- the side braces 76 and cross bars 77 are welded to each other, to the base plate 53 and to tubular members 74 and 75.
- Two mounting bars 78 are welded on the under side of the base plate 53 beneath the side braces 76.
- a ball bearing assembly 80 is bolted at each end of the mounting bars 78.
- Two rollers 82 extend between opposing pairs of ball bearing assemblies 80. These roller bars 82 rest on the longitudinal I-beams 24 when the jack 70 is placed on the steam generator 10.
- the length of the roller bars and the spacing between the ball bearing assemblies 80 is selected so that the jack 70 can span the upper plates of a pair of longitudinal I-beams 24 as shown in Figure 3 with respect to jack 50. In this position, the ball bearing assemblies guide the jack 70 as it rolls along the I-beams preventing the jack from riding off the beam.
- a fluid operated cylinder 84 is mounted vertically within each of the tubular members 74 and 75 of the base assembly 71.
- Each cylinder 84 has a fitting 85 through which hydraulic fluid can be pumped and withdrawn to extend and contract the cylinder.
- the jacking frame 72 has a cross plate 86 with a cylindrical member 87 mounted on its upper surface over a centrally located aperture through the cross plate.
- the rod extension 64 extends through the aperture in cross plate 86 and another aperture in cylindrical member 87 when the jack 70 is placed on the steam generator 10.
- the cylindrical member 87 is supported by two side plates 88 welded to opposite sides of the member and to the cross plate 86.
- Two cylinder tubes 89 are welded to the underside of the cross plate 86 and spaced apart to receive the upper ends of the cylinders 84.
- the jacking frame 72 When fluid is pumped to extend each of the cylinders 84, the jacking frame 72 is raised with respect to the base assembly 71. This action pulls the extension rod 64 and the support rod 32 upward with respect to the duct 11 on which the jack 70 is mounted. By pushing laterally, the jack 70 can be rolled along the longitudinal I-beams 24. The cylinders 84 collapse when the fluid is released, thereby lowering the jacking frame toward the base assembly 71. The contraction of the cylinders 84 is aided by the weight of the tube panel 14 that is exerted downward on the jacking frame 72.
Landscapes
- Engineering & Computer Science (AREA)
- Physics & Mathematics (AREA)
- Thermal Sciences (AREA)
- Mechanical Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Heat-Exchange Devices With Radiators And Conduit Assemblies (AREA)
Description
- The present invention relates to heat exchangers and steam generators; and specifically to heat recovery steam generators.
- A considerable amount of heat energy remains in the exhaust gases from many combustion processes. Several decades ago, this "waste heat" was allowed to escape through the smoke stack. With a heightened desire to conserve energy and make combustion systems more efficient, the waste heat now is frequently passed through a heat recovery steam generator (HRSG) to transfer much of the remaining heat from the exhaust gases to water that flows through the steam generator. The resulting steam can be used to generate electricity or used in equipment converts the energy in the steam into mechanical energy.
- Typical HRSG systems comprise a large steel duct that channels hot gas over several banks of internal tubes which contain water. As the hot gases pass over the tubes, heat is absorbed by water flowing in the tubes. For maximum heat transfer, conventional systems are designed so that the tube banks are packed very densely into the duct. The dense configuration forces the hot gas to flow directly over the tube surfaces. The ends of the tube banks are in close proximity to the walls of the duct to eliminate passages above, below and on either side of the banks through which the hot gases could bypass the tubes. Designers of conventional HRSG systems often went to great lengths to plug even the smallest openings or cracks that might allow such bypassing to occur.
- Although the dense tube configuration optimized the efficiency of HRSG systems, it made the systems very difficult to maintain. If the interior tubes of a bank needed repair, large portions of the system had to be disassembled in order to gain access to those tubes. The disassembly was very difficult and extremely time consuming, necessitating a long down time for the HRSG system. Even inspection of the inner tubes was difficult due to the dense configuration.
- US-A-1,883,301 describes a mercury boiler having a duct through which heat can pass with a floor and a roof and a plurality of tube asemblies within the duct with each assembly including a header from which a plurality of tubes extend. Levelling movement of the headers is provided for.
- Therefore, it is desirable to provide a mechanism which allows relatively easy access to the tube panels within the HRSG system, while providing a very densely packed tube configuration for maximum operating efficiency.
- A heat exchanger comprises:
- a duct through which heated gas can pass and having a floor and a roof;
- a plurality of tube assemblies within the duct, each assembly including a header from which a plurality of tubes extend;
- a separate hanger including an elongated member attached to each tube assembly and the elongated member extending through an aperture in the roof of said duct, each hanger supporting the attached tube assembly within the duct in a position in which spaces exist between the assembly and the roof and between the assembly and the floor;
- means, attached to the elongated member said means being operable to lift the elongated member and hence the tube assembly vertically within said duct.
- Baffles can be provided in the duct to restrict gas flow in these spaces which otherwise would bypass the plurality of tube panels.
- In the preferred embodiment the apertures in the roof are elongated to permit horizontal, as well as vertical, movement of the tube assemblies.
- A jack is disclosed which rests on the structural member and connects to the hangers for raising and lowering the panels. The jack may have rollers or other means that enable it to be moved along the structural member to transfer the tube panel horizontally.
-
- Figure 1 is a cross sectional view through a heat exchanger according to the present invention;
- Figure 2 is an enlarged view of a portion of Figure 1 showing a tube panel in a raised state for inspection or repair;
- FIGURE 3 is a cross sectional view taken at right angles to Figure 2 across the width of the heat exchanger;
- FIGURE 4 is a view taken along line 4-4 in Figure 3; and
- FIGURES 5 and 6 illustrate two orthogonal plane views of another embodiment of a jack for moving the tube panels.
- Although the present invention is being described in the context of a heat recovery steam generator, it has equal application to other types of heat exchangers such as boilers, superheaters and economizers.
- With reference to Figure 1, a heat
recovery steam generator 10 includes aduct 11 with agas inlet 12. Exhaust gases from a combustion process flow in the direction indicated byarrow 13 from theinlet 12 through the duct. The inlet opens into a large section of the steam generator which for example is fifty feet high, twelve feet across (in the dimension into the paper) and 120 feet long. The gas continues to flow through theduct 11 to an outlet (not shown) on the remote end from theinlet 12. - Within
duct 11 are a plurality oftube panels 14. Each panel consists ofseveral tubes 16. Thetubes 16 of each panel extend between an upper and alower pipe header headers tubes 16 are welded to provide fluid communication between the header and the tubes. Although not shown in the drawings, the headers of adjacent panels are connected together by additional piping so that water can be introduced into one of the headers, flow through thetubes 16 and out the other header. The welds of the tube to the headers are a common point of failure during operation of thesteam generator 10. - As shown in Figures 1 through 3, a first set of
vertical tubes 16 extend from theupper header 18 in a common plane across the duct. A second coplanar set of vertical tubes also extends from theupper header 14 offset from the first set along the direction of the gas flow. A separate helical fin assembly, indicated bybroken lines 17, is attached to the exterior of each tube to increase heat transfer. As in previous steam generator designs, the tubes are closely spaced with respect to each other in both the longitudinal and transverse directions. This close spacing optimizes the heat transfer between the hot gas flowing throughduct 11 and the water flowing throughtubes 16. - Each
panel 14 of tubes is suspended from theroof 20 of theduct 11 by a pair ofhangers 30 thereby creating spaces in the duct above and below the panel. As shown in Figures 2 and 3, eachhanger 30 includes abracket 28 welded to the top surface of theupper pipe header 18. Thebracket 28 has an aperture therethrough that receives a pin which attaches the bracket to acoupling member 31 at one end of asupport rod 32. This assembly provides a pivotal connection of thetube panel 14 to thesupport rod 32. The support rods extend upward throughelongated apertures 26 inroof 20. - A number of I-
beams 22 extend transversely across theduct 11 on the exterior ofroof 20 to support the tube assemblies. The ends oftransverse beams 22 attach to vertical structural members (not shown) on the sides of the duct. Two pairs of longitudinal I-beams 24 are attached to and extend between adjacenttransverse beams 22. As shown in Figure 3, thelongitudinal beams 24 of each pair are spaced apart and lie on either side of aelongated aperture 26 in theroof 20. - With reference to Figures 2 and 4, a C-
support 34 bar is placed between the upper surfaces of the pair oflongitudinal beams 24 on both sides of eachsupport rod 32. The support rod passes upward through an aperture in ahanger plate 36 which spans adjacent C-support bars 34. The upper end of thesupport rod 32 is threaded and receives a pair ofnuts 38 which are locked in place by tightening them against one another. A short portion of the support rod extends beyond thenuts 38. - During operation of the
steam generator 10, acover box 40 is placed over and is welded to thelongitudinal beams 24 to seal theaperture 26 in theduct roof 20 as shown in Figure 1. The remaining figures of the drawings show thecover box 40 removed as occurs during inspection and maintenance of the steam generator. Additional means (not shown) can be used in sealing the aperture to prevent the exhaust gas flowing through the duct from travelling up into the cover, thereby bypassing thetube panels 14. - The
upper header pipes 18 are suspended approximately three feet below theroof 20. This space is sealed bybaffle plates 41 bolted to the interior of theroof 20 before and after each group ofpanels 14. The baffle plates abut theupper pipe header 18 of the panels on each end of the group. Thesebaffle plates 41 close the gap between theupper pipe headers 18 and theroof 20, thereby preventing the exhaust gases from passing above the group of tube panels. A similar pair ofbaffles 42 are welded to thefloor 21 of the duct to likewise block exhaust gases from flowing in the space between thelower pipe headers 19 and the duct floor. Each group oftube panels 14 is separated by acavity 44. -
Access openings 46 are cut in theroof 20 and are sealed bydoors 48 during generator operation. These openings allow service personnel to enter the duct for inspection and repair of thetube panels 14.Similar openings 49 are located on the sidewall of theduct 11 near thefloor 21, allowing maintenance personnel access to the space below each group of panels. - The
steam generator 10 is specifically designed for ease of maintenance. The spaces above and below each group of panels allow a technician to enter the duct and inspect the welds wheretubes 16 attach to the upper andlower headers tube panels 14 permits vertical movement for inspection and servicing as shown in Figure 2. To gain access to a specific panel, the connection of its upper and lower headers to interconnecting piping is severed. The panel then is raised or lowered by a pair ofjacks 50 which are installed for that purpose. - Each
jack 50 has a base 52 formed by ahorizontal plate 53 and two spaced apartvertical plates 54 extending downward from thebase plate 53. Each of thevertical members 54 has an inverted U-shape with the cross member of the U welded tobase plate 53. Each leg of the U-shapedvertical member 54 has an aperture therethrough containing a ball bearing. A pair ofrollers 56 extends between thevertical members 54 and fit into the ball bearings. When thejack 50 is placed on thesteam generator 10, the rollers rest on thelongitudinal beams 24 and permit movement of the jack along the beams. - With reference to Figure 4 as well as Figure 3, the base plate has a
central opening 58 therethrough which is positioned over the end of asupport rod 32. A pair of fluid operatedcylinders 60, such as hydraulic or pneumatic cylinders, are mounted vertically on the upper surface of thebase plate 53 of eachjack 50. A jackingframe 62 extends between the upper ends of thecylinders 60. The jacking frame has a central aperture which is aligned with the end of thesupport rod 32 when the jack is positioned on thesteam generator 10. - Prior to placing a
jack 50 over the end of asupport rod 32, acoupling 66 at one end of arod extension 64 is threaded onto the upper end of thesupport rod 32. The other end of theextension rod 64 projects through the aperture in the jackingframe 62 and has anut 68 threaded thereon. - To raise a
panel 14, thejacks 50 are placed in their compressed state and attached to thesupport rods 32. Fluid is then pumped into each of thecylinders 60 thereby raising the jackingframe 62 and thepanel 14 as shown in Figure 2. Maintenance personnel then can enter the duct through one of theroof access openings 46 and visually inspect the welds along the raisedupper pipe header 18. - In a similar manner, the
tube panel 14 can be lowered for inspection of thelower pipe header 19. To accomplish this, a pair ofjacks 50 are positioned over the pair ofsupport rods 32 for the panel and extended to substantially their full length by pumping hydraulic fluid into thecylinders 60. Nuts are tightened on theextension rods 64 which have been attached to the ends of thesupport rods 32. Additional fluid is pumped into thecylinder 60 to raise thepanel 14 slightly. With reference to Figures 2 and 4, raising thepanel 14 removes the pressure exerted by thehanger plates 38 on the C-supports 34. This permits the C-supports to be extracted between the legs of the U-shapedvertical members 54 of the jacks. The removal of the C-supports 34 allows thepanel 14 to be lowered within theduct 11. To do so, fluid is released gradually from thecylinders 60 causing them to collapse under the weight of thepanel 14 so that thelower pipe header 19 drops downward. A technician then can crawl along thefloor 21 of the duct and inspect the welds on thelower pipe header 19. If necessary for access both above and below thepanels 14, thebaffles - Following inspection, the panel is raised so that a gap exists between the
hanger plates 36 and thelongitudinal beams 24 which is slightly greater than the height of the C-supports 34. The C-supports are inserted between the legs of the U-shapedvertical members 54 of thejack 50. Next the panel is lowered so that thehanger plates 34 drop onto the C-supports 34. At this time, theextension rods 64 can be removed and thejacks 50 transferred to raise or lower anotherpanel 14 within thesteam generator 10. - As noted previously, each of the
support rods 34 extends through anelongated aperture 26 in theroof 20. This aperture runs substantially the full distance between the transverse beams 22. Should it become necessary, access between thetube panels 14 of a group can be accomplished by moving the panels along theseapertures 26. To do so, theappropriate baffles jacks 50 are attached to theoutermost panel 14 of the group. That panel then is raised upward and moved longitudinally by rolling thejack 50 over thelongitudinal beam 24 until the panel has been pushed away from the others. The outermost panel then can be lowered onto properly positioned C-supports 34 and thejack 50 used to similarly move other panels of the group until a space exists adjacent the panel that requires inspection or repair. The maintenance personnel enter the space created between the panels to perform the necessary work. - At the completion of the maintenance, the panels are moved back into their original positions and reattached to the interconnecting piping which carries water to and from the panel assembly. The doors over
openings cover box 40 welded in place to seal theapertures 26 inroof 20. - The structure of the
present steam generator 10 provides access spaces between the groups oftube panels 14 and in theduct 11 above and below the tube panels. These spaces are blocked off by baffles to prevent the flow of exhaust gases bypassing the panel assembly during operation of the steam generator. The hanging support structure enables atube panel 14 to be moved both vertically and horizontally as needed. Thus, the structure of thesteam generator 10 provides a densely packed bundle of tubes which is desirable for efficient heat transfer while facilitating access for maintenance. - Figures 5 and 6 show orthogonal views of another embodiment of a
jack 70 that can be used to move thetube panels 14 within thesteam generator 10.Jack 70 is formed by abase assembly 71 and an upper jackingframe 72. Thebase assembly 71 includes aflat base plate 53 identical to the one shown in Figure 4 which bears the same reference numeral. Two hollowtubular members base plate 53 on opposite sides of thecentral opening 58. A separate pair of side braces 76 is attached to each of thetubular members central opening 58. The side braces 76 and cross bars 77 are welded to each other, to thebase plate 53 and totubular members - Two mounting
bars 78 are welded on the under side of thebase plate 53 beneath the side braces 76. Aball bearing assembly 80 is bolted at each end of the mounting bars 78. Tworollers 82 extend between opposing pairs ofball bearing assemblies 80. These roller bars 82 rest on the longitudinal I-beams 24 when thejack 70 is placed on thesteam generator 10. The length of the roller bars and the spacing between theball bearing assemblies 80 is selected so that thejack 70 can span the upper plates of a pair of longitudinal I-beams 24 as shown in Figure 3 with respect tojack 50. In this position, the ball bearing assemblies guide thejack 70 as it rolls along the I-beams preventing the jack from riding off the beam. - A fluid operated
cylinder 84 is mounted vertically within each of thetubular members base assembly 71. Eachcylinder 84 has a fitting 85 through which hydraulic fluid can be pumped and withdrawn to extend and contract the cylinder. - The jacking
frame 72 has across plate 86 with acylindrical member 87 mounted on its upper surface over a centrally located aperture through the cross plate. Therod extension 64 extends through the aperture incross plate 86 and another aperture incylindrical member 87 when thejack 70 is placed on thesteam generator 10. Thecylindrical member 87 is supported by twoside plates 88 welded to opposite sides of the member and to thecross plate 86. Twocylinder tubes 89 are welded to the underside of thecross plate 86 and spaced apart to receive the upper ends of thecylinders 84. - When fluid is pumped to extend each of the
cylinders 84, the jackingframe 72 is raised with respect to thebase assembly 71. This action pulls theextension rod 64 and thesupport rod 32 upward with respect to theduct 11 on which thejack 70 is mounted. By pushing laterally, thejack 70 can be rolled along the longitudinal I-beams 24. Thecylinders 84 collapse when the fluid is released, thereby lowering the jacking frame toward thebase assembly 71. The contraction of thecylinders 84 is aided by the weight of thetube panel 14 that is exerted downward on the jackingframe 72.
Claims (11)
- A heat exchanger (10) having a duct (11) through which heated gas can pass with a floor (21) and a roof (20), and having a plurality of tube assemblies (14) within the duct with each assembly including a header (18) from which a plurality of tubes (16) extend;a separate hanger (30) including an elongated member 32 attached to each tube assembly (14) and the elongated member 32 extending through an aperture (26) in the roof (20) of said duct (11), each hanger supporting the attached tube assembly within the duct in a position in which spaces exist between the assembly and the roof and between the assembly and the floor;means (22,24,34,38), attached to the elongated member (32) said means being operable to lift the elongated member and hence the tube assembly (14) vertically within said duct for access by a human to connections between the header (18) and the tubes (16).
- The heat exchanger (10) as recited in Claim 1 further comprising a baffle (41 or 42) within the duct (11) to prevent gas from flowing through the spaces and bypassing a flow path among the tube assemblies (14).
- The heat exchanger (10) as recited in Claim 2 wherein said baffle (41 or 42) is removably attached to said duct.
- The heat exchanger (10) as recited in any one of Claims 1 to 3 wherein each hanger (30) further comprises:a bracket (28) attached to the header (18); anda coupling member (31) pivotally connecting said bracket (28) to said elongated member (32).
- The heat exchanger as recited in any one of the preceding Claims wherein said means for supporting the hanger comprises:a pair of structural members (22) extending across the exterior of the roof with the aperture (26) in the roof located between said structural members; anda support (24) extending between said structural members (22) and to which the hanger (30) is releasably attached.
- The heat exchanger as recited in Claim 1 wherein:each hanger (30) comprises a bracket (28) attached to the header (18), and a rod (32) coupled to said bracket and extending through an aperture (26) in the roof (20) of said duct (11); andsaid means for supporting the hanger includes a pair of structural members (22) extending substantially parallel to each other across the exterior of the roof and spaced apart with the aperture (26) in the roof (20) located therebetween, a support (24) extending between said structural members (22) and having an aperture (58) through which the rod (32) extends, and a fastener (38) removably attached to the rod (32) for restricting movement of the rod through the aperture in the support.
- The heat exchanger as recited in any one of the preceding Claims wherein the aperture in the roof of said duct is elongated to permit horizontal as well as vertical movement of a tube assembly within said duct.
- The heat exchanger as recited in any one of the preceding Claims further comprising a jack (50) which engages a hanger (30) for raising and lowering a tube assembly (14) within said duct (11).
- The heat exchanger as recited in Claim 8 wherein said jack (50) has rollers (82) for moving the tube assembly (14) horizontally within said duct (11).
- The heat exchanger as recited in any one of Claims 1 to 7 further comprising a jack (50) for raising and lowering a tube assembly (14), said jack (50) comprising:a base (71);a pair of rollers (82) rotatably attached to an underside of said base (71) to allow the jack (50) to ride on either the duct (11) or the means (22,24,34,38) for supporting the hanger;a pair of fluid operated cylinders (84) coupled at one end portion to said base (71) and projecting upward from said base on opposite sides of the aperture (26);a jacking frame (72) attached to another end portion of both fluid operated cylinders (84); anda means (64,66,68) for attaching said jacking frame (72) to said hanger (30) of the tube assembly (14).
- The heat exchanger as recited in Claim 10 comprising the jack (50) wherein said means for attaching said jacking frame (72) to the hanger (30) comprises an extension (64) which can be attached to a section of the hanger that extends through the aperture (26) in the roof (20) of said duct (11), and which extends through an aperture (58) in said jacking frame (72), said extension (64) having an adjustable means (68) which limits downward movement of the extension through the aperture in said jacking frame.
Applications Claiming Priority (4)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
US07/774,007 US5131459A (en) | 1991-10-08 | 1991-10-08 | Heat exchanger with movable tube assemblies |
US07/774,009 US5219150A (en) | 1991-10-08 | 1991-10-08 | Fluid jack for a heat exchanger |
US774007 | 1991-10-08 | ||
US774009 | 1991-10-08 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0536962A1 EP0536962A1 (en) | 1993-04-14 |
EP0536962B1 true EP0536962B1 (en) | 1997-06-18 |
Family
ID=27118828
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP92309038A Expired - Lifetime EP0536962B1 (en) | 1991-10-08 | 1992-10-02 | Heat exchanger with movable tube assemblies |
Country Status (2)
Country | Link |
---|---|
EP (1) | EP0536962B1 (en) |
DE (1) | DE69220445T2 (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT202100021287A1 (en) * | 2021-08-05 | 2023-02-05 | Ruths S P A | THERMAL EXCHANGE BENCH FOR WASTE INCINERATION PLANTS |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE19909267B4 (en) * | 1999-03-03 | 2015-07-09 | Alstom Technology Ltd. | boiler suspension |
CN105928375A (en) * | 2016-05-06 | 2016-09-07 | 北京立化科技有限公司 | Built-in type header system |
CN111520921B (en) * | 2020-04-14 | 2021-10-01 | 哈尔滨锅炉厂有限责任公司 | Thin-wall fused salt heat absorber tube panel |
Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1883301A (en) * | 1929-04-23 | 1932-10-18 | Babcock & Wilcox Co | Mercury boiler having horizontal headers |
Family Cites Families (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US3751783A (en) * | 1971-06-22 | 1973-08-14 | Combustion Eng | Method of erection of horizontal surfaced heat transfer modules for steam generating units |
DE3441972C2 (en) * | 1984-11-16 | 1987-03-26 | Belgorodskij zavod energetičeskogo mašinostroenija imeni 60-letija Sojuza SSR, Belgorod | boiler |
US4685426A (en) * | 1986-05-05 | 1987-08-11 | The Babcock & Wilcox Company | Modular exhaust gas steam generator with common boiler casing |
-
1992
- 1992-10-02 EP EP92309038A patent/EP0536962B1/en not_active Expired - Lifetime
- 1992-10-02 DE DE1992620445 patent/DE69220445T2/en not_active Expired - Fee Related
Patent Citations (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US1883301A (en) * | 1929-04-23 | 1932-10-18 | Babcock & Wilcox Co | Mercury boiler having horizontal headers |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
IT202100021287A1 (en) * | 2021-08-05 | 2023-02-05 | Ruths S P A | THERMAL EXCHANGE BENCH FOR WASTE INCINERATION PLANTS |
EP4130572A1 (en) * | 2021-08-05 | 2023-02-08 | Ruths S.p.A. | Heat exchange bank |
Also Published As
Publication number | Publication date |
---|---|
DE69220445T2 (en) | 1998-02-12 |
EP0536962A1 (en) | 1993-04-14 |
DE69220445D1 (en) | 1997-07-24 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US5131459A (en) | Heat exchanger with movable tube assemblies | |
JP2517272B2 (en) | Modular exhaust gas steam generator with common boiler casing | |
US10995999B2 (en) | Cooling unit, installation and process | |
CN101627258B (en) | Method of and apparatus for supporting walls of a power boiler | |
AU2003252325B2 (en) | Heat exchanger tube panel module, and method of constructing exhaust heat recovery boiler using the module | |
US20200318909A1 (en) | Air-cooled condenser system | |
CN86102704A (en) | Modular tubular heat exchanger | |
US5722354A (en) | Heat recovery steam generating apparatus | |
US3447598A (en) | Air cooled heat exchanger | |
EP0536962B1 (en) | Heat exchanger with movable tube assemblies | |
US5219150A (en) | Fluid jack for a heat exchanger | |
CN104534451B (en) | Boiler controller system denitrating system economizer | |
US9457826B2 (en) | Catalyst loading and unloading device and methods therefor | |
US6092591A (en) | Top mounting arrangement for a heat exchange module | |
KR20220001492U (en) | Trolley hanger for a heat exchanger | |
JP2002213707A (en) | Separate type boiler plant and its building method | |
WO2020257598A1 (en) | Air-cooled condenser system | |
CN112325307B (en) | Rapid cooler of sintering flue gas incinerator | |
JP3801267B2 (en) | Installation method and structure of horizontal heat transfer tube group | |
JPH08159402A (en) | Boiler apparatus and method of repairing heat transfer device | |
CN222670411U (en) | A water cooling device | |
CN112984492A (en) | Conveniently-overhauled small-sized tube panel device at tail part of waste heat boiler and installation method | |
CN221780708U (en) | A boiler support structure | |
JPH0253682B2 (en) | ||
CN217764515U (en) | Direct air cooling system of double-small 'A' type air cooling condenser |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Kind code of ref document: A1 Designated state(s): BE DE FR GB IT |
|
17P | Request for examination filed |
Effective date: 19930929 |
|
17Q | First examination report despatched |
Effective date: 19950119 |
|
GRAG | Despatch of communication of intention to grant |
Free format text: ORIGINAL CODE: EPIDOS AGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAH | Despatch of communication of intention to grant a patent |
Free format text: ORIGINAL CODE: EPIDOS IGRA |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Kind code of ref document: B1 Designated state(s): BE DE FR GB IT |
|
REF | Corresponds to: |
Ref document number: 69220445 Country of ref document: DE Date of ref document: 19970724 |
|
ITF | It: translation for a ep patent filed | ||
ET | Fr: translation filed | ||
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
REG | Reference to a national code |
Ref country code: GB Ref legal event code: IF02 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: GB Payment date: 20061025 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: IT Payment date: 20061031 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: BE Payment date: 20061124 Year of fee payment: 15 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: DE Payment date: 20061130 Year of fee payment: 15 |
|
BERE | Be: lapsed |
Owner name: DELTAK CORP. Effective date: 20071031 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee |
Effective date: 20071002 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20080501 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: BE Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071031 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST Effective date: 20080630 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 20061017 Year of fee payment: 15 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071002 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071031 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 20071002 |