[go: up one dir, main page]

EP0417111A1 - A procedure for the forming of consolidation and foundation piles with embedded reinforcements - Google Patents

A procedure for the forming of consolidation and foundation piles with embedded reinforcements

Info

Publication number
EP0417111A1
EP0417111A1 EP19890904201 EP89904201A EP0417111A1 EP 0417111 A1 EP0417111 A1 EP 0417111A1 EP 19890904201 EP19890904201 EP 19890904201 EP 89904201 A EP89904201 A EP 89904201A EP 0417111 A1 EP0417111 A1 EP 0417111A1
Authority
EP
European Patent Office
Prior art keywords
procedure
pipe
consolidation
reinforcement
type embodiment
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
EP19890904201
Other languages
German (de)
French (fr)
Inventor
Dino Canepari
Cesare Melegari
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INIECTOJET SpA
Original Assignee
INIECTOJET SpA
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INIECTOJET SpA filed Critical INIECTOJET SpA
Publication of EP0417111A1 publication Critical patent/EP0417111A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D5/00Bulkheads, piles, or other structural elements specially adapted to foundation engineering
    • E02D5/22Piles
    • E02D5/34Concrete or concrete-like piles cast in position ; Apparatus for making same
    • E02D5/38Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds
    • E02D5/385Concrete or concrete-like piles cast in position ; Apparatus for making same making by use of mould-pipes or other moulds with removal of the outer mould-pipes

Definitions

  • the invention relates to a procedure for in-situ casting of consolidation and foundation piles with embedded reinforcements.
  • the prior art embraces methods of consolidating the soil that consist essentially in preparing a liquid mix of concrete and binders and injecting it into the ground at ultra-high pressure.
  • the mix is injected by sinking a rod into the earth to the envisaged consolidation depth.
  • a rod is provided with a special boring head, and with a injection valve carrying one or more nozzles disposed at right angles to the rod axis, substantially within the same transverse plane.
  • the rod is mounted to a device by which it is rotated and traversed along its own axis.
  • Ultra-high pressure injection of the mix occurs as the rod is withdrawn, rotating about its axis.
  • the conventional method thus outlined is beset by certain drawbacks in given applications such as those, for example, where a reinforcement has to be embedded axially in the concrete. This is achieved, conventionally, by casting the consolidation pile and then positioning tubular or other reinforcing members in a separate operation: such a procedure involves a considerable waste of time, and cannot ensure coaxial alignment between the reinforcement and the cast; the reinforcement can in fact become deflected uncontrollably during the positioning step, occasioning a subsequent loss of performance in terms of strength specifications.
  • the object of the invention is to set forth a procedure that will permit of positioning any given reinforcement of tubular or cage type embodiment in a consolidation pile cast in-situ using high pressure injection techniques, ensuring coaxial alignment between the reinforcement and the cast, and of accomplishing such operations swiftly and inexpensively.
  • figs 1...4 illustrate four steps of the casting procedure disclosed
  • figs 5 and 6 are sectional illustrations of the consolidation pile showing two different types of reinforcement
  • figs 7 and 8 are sectional illustrations of the consolidation pile showing two different types of pipe, seen during the withdrawal step.
  • the first step of the procedure is that of sinking a bore in the ground 1 down to a prescribed consolidation depth 2, using conventional mechanical equipment 3 by means of which a pipe 5 is driven straight into the soil, traversing along its own axis.
  • 6 denotes a rotatable rod inserted into the pipe 5, the end of which carries a drill head. With the spoil removed and the pipe 5 firmly in position, the rod 6 is withdrawn (fig 2) , and the pipe left
  • the side wall of the pipe 5 is perforated to enable the passage of liquid concrete from inside to ' outside, as will occur in a subsequent step of the procedure.
  • the third step of the procedure (fig 3) consists in positioning a reinforcement 7 in the bore; such a reinforcement might be tubular, as illustrated in fig 5, or composed of single bars or wires arranged to coincide with the generators of an imaginary
  • the final step of the procedure is one of pumping liquid concrete into the bore at high pressure and withdrawing the perforated pipe 5 at one and the same time, thereby consolidating the soil around a
  • Fig 7 illustrates a pipe 5a affording an annular cavity
  • the pipe 5b illustrated in fig 8 affords a set of channels arranged to coincide with
  • the reinforcement might be embodied as a cage, or tubular, or as a rod, or indeed as a simple pole, without any difficulty as regards its embedding in and alignment with the cast.
  • Casting pressure may vary between 300 and 800 bar, according to requirements, without affecting the position of the reinforcement inside the pipe 5.
  • the cavity of a pipe 5 as in fig 7 can be used to pump in back-fill material or to pump out spoil: materials pumped in could be concrete, mortar or any filling considered suitable for the purpose; in the case of materials pumped out, control will be provided over any excess pressure occasioned by the high injection pressure and disposal of the spoil.

Landscapes

  • Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

Le domaine d'application de la présente invention est celui du coulage de piliers de consolidation et de fondation in situ, obtenus au moyen de procédés de coulage par injection de béton liquide sous ultra-haute pression. Dans le procédé décrit, on installe une armature métallique (7) avant d'effectuer le coulage.The field of application of the present invention is that of the pouring of pillars of consolidation and foundation in situ, obtained by means of casting methods by injection of liquid concrete under ultra-high pressure. In the process described, a metal reinforcement (7) is installed before casting.

Description

A procedure for the forming of consolidation and foundation piles with embedded reinforcements
The invention relates to a procedure for in-situ casting of consolidation and foundation piles with embedded reinforcements. The prior art embraces methods of consolidating the soil that consist essentially in preparing a liquid mix of concrete and binders and injecting it into the ground at ultra-high pressure.
The mix is injected by sinking a rod into the earth to the envisaged consolidation depth. Such a rod is provided with a special boring head, and with a injection valve carrying one or more nozzles disposed at right angles to the rod axis, substantially within the same transverse plane. The rod is mounted to a device by which it is rotated and traversed along its own axis.
Ultra-high pressure injection of the mix occurs as the rod is withdrawn, rotating about its axis. The conventional method thus outlined is beset by certain drawbacks in given applications such as those, for example, where a reinforcement has to be embedded axially in the concrete. This is achieved, conventionally, by casting the consolidation pile and then positioning tubular or other reinforcing members in a separate operation: such a procedure involves a considerable waste of time, and cannot ensure coaxial alignment between the reinforcement and the cast; the reinforcement can in fact become deflected uncontrollably during the positioning step, occasioning a subsequent loss of performance in terms of strength specifications. In a procedure set forth by the same applicant, use is made of a pipe, perforated with a plurality of uniformly distributed radial holes extending down to the envisaged consolidation depth. The pipe is planted in the ground, and the liquid concrete mix injected at high pressure, in such a way that the pipe remains embedded in a column of concrete and soil created by the turbulence- of the injection. The in-situ casting of consolidation piles with embedded reinforcements is simplified considerably by adoption of such a system; on the other hand, the pipe is costly, by reason of the need for a uniform perforation, and cannot be recovered. Accordingly, the object of the invention is to set forth a procedure that will permit of positioning any given reinforcement of tubular or cage type embodiment in a consolidation pile cast in-situ using high pressure injection techniques, ensuring coaxial alignment between the reinforcement and the cast, and of accomplishing such operations swiftly and inexpensively.
The stated object is achieved by adoption of a procedure as characterized in the appended claims. The invention will now be described in detail, by way of example, with the aid of the accompanying drawings, in which: figs 1...4 illustrate four steps of the casting procedure disclosed; figs 5 and 6 are sectional illustrations of the consolidation pile showing two different types of reinforcement; figs 7 and 8 are sectional illustrations of the consolidation pile showing two different types of pipe, seen during the withdrawal step. With reference to fig 1 of the drawings, the first step of the procedure is that of sinking a bore in the ground 1 down to a prescribed consolidation depth 2, using conventional mechanical equipment 3 by means of which a pipe 5 is driven straight into the soil, traversing along its own axis. 6 denotes a rotatable rod inserted into the pipe 5, the end of which carries a drill head. With the spoil removed and the pipe 5 firmly in position, the rod 6 is withdrawn (fig 2) , and the pipe left
05 in place.
The side wall of the pipe 5 is perforated to enable the passage of liquid concrete from inside to ' outside, as will occur in a subsequent step of the procedure. The third step of the procedure (fig 3) consists in positioning a reinforcement 7 in the bore; such a reinforcement might be tubular, as illustrated in fig 5, or composed of single bars or wires arranged to coincide with the generators of an imaginary
*L5 cylinder (fig 6) .
The final step of the procedure is one of pumping liquid concrete into the bore at high pressure and withdrawing the perforated pipe 5 at one and the same time, thereby consolidating the soil around a
20 pile 9 in which the reinforcement 7 remains firmly embedded.
Fig 7 illustrates a pipe 5a affording an annular cavity, whereas the pipe 5b illustrated in fig 8 affords a set of channels arranged to coincide with
25 generators of the pipe. It will be clear that the procedure as described above admits of embedding any type of reinforcement in a cast-in-situ pile, in contrast to conventional procedures, which permit of embedding bars or wires only, and to relatively shallow depths.
The reinforcement might be embodied as a cage, or tubular, or as a rod, or indeed as a simple pole, without any difficulty as regards its embedding in and alignment with the cast. Casting pressure may vary between 300 and 800 bar, according to requirements, without affecting the position of the reinforcement inside the pipe 5. The cavity of a pipe 5 as in fig 7 can be used to pump in back-fill material or to pump out spoil: materials pumped in could be concrete, mortar or any filling considered suitable for the purpose; in the case of materials pumped out, control will be provided over any excess pressure occasioned by the high injection pressure and disposal of the spoil.

Claims

Claims
1) A procedure for the forming of consolidation and foundation piles with embedded reinforcements, characterized in that it comprises the steps of:
- simultaneously sinking a pilot bore in the ground to a prescribed consolidation depth by means of conventional implements, and driving an ultra-high pressure liquid concrete injection pipe (5) down the bore to the same depth;
- withdrawing the implements used to sink the bore, and leaving the pipe (5) driven into the ground;
- positioning a reinforcement (7) internally of the pipe (5) , down to a prescribed, depth;
- simultaneously injecting a liquid concrete mix through the pipe (5) into the bore at ultra-high pressure, and withdrawing the pipe from the ground.
2) A procedure as in claim 1, wherein the final step of injecting liquid concrete mix is effected at ultra-high pressure of between 200 and 800 bar. 3) A procedure as in claim 1, wherein the internally positioned reinforcement (7) is of tubular type embodiment.
4) A procedure as in claim 1, wherein the internally positioned reinforcement (7) is of sectional type embodiment.
5) A procedure as in claim 1, wherein the internally positioned reinforcement (7) is of mesh type embodiment.
6) A procedure as in claim 1, wherein the internally positioned reinforcement (7) is of lattice type embodiment.
7) A procedure as in claim 1, wherein the internally positioned reinforcement (7) is of cage type embodiment.
EP19890904201 1989-03-22 1989-03-22 A procedure for the forming of consolidation and foundation piles with embedded reinforcements Withdrawn EP0417111A1 (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
PCT/IT1989/000020 WO1990011412A1 (en) 1989-03-22 1989-03-22 A procedure for the forming of consolidation and foundation piles with embedded reinforcements

Publications (1)

Publication Number Publication Date
EP0417111A1 true EP0417111A1 (en) 1991-03-20

Family

ID=11331347

Family Applications (1)

Application Number Title Priority Date Filing Date
EP19890904201 Withdrawn EP0417111A1 (en) 1989-03-22 1989-03-22 A procedure for the forming of consolidation and foundation piles with embedded reinforcements

Country Status (2)

Country Link
EP (1) EP0417111A1 (en)
WO (1) WO1990011412A1 (en)

Families Citing this family (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
AU641174B2 (en) * 1989-07-06 1993-09-16 Alexei Leonidovich Egorov Method and tool for producing a pile
IT1254303B (en) * 1992-02-07 1995-09-14 PROCEDURE FOR THE REALIZATION OF A MICRO-POLE FOR FOUNDATIONS OF BUILDINGS SUITABLE FOR LANDS WITH POOR MECHANICAL CHARACTERISTICS.
FR2708947B1 (en) * 1993-08-09 1995-11-03 Intrafor Device for prestressing a micropile intended to support a foundation and micropile thus prestressed.
IT1286418B1 (en) 1996-12-02 1998-07-08 Uretek Srl PROCEDURE TO INCREASE THE WEIGHT OF FOUNDATION LANDS FOR BUILDING CONSTRUCTIONS
DE19721361C2 (en) * 1997-05-22 2001-01-04 Zueblin Ag Method of making piles and piles made in this way
DE19744322C1 (en) * 1997-10-08 1999-01-28 Juergen Kretschmar Method of placing anchor piles in friable soils
SG93217A1 (en) * 1999-10-15 2002-12-17 Abv Engineering Pte Ltd Bored piles
DE10338171B4 (en) * 2003-08-20 2007-10-25 Keller Grundbau Gmbh Method for introducing a slender base pile and ground pile produced by this method

Family Cites Families (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CH466997A (en) * 1964-05-13 1968-12-31 Failla Ignazio Process for the creation of building structures in the ground
DE2120691A1 (en) * 1971-04-27 1972-11-09 Jebens, Claus, Dipl.-Ing., 2000 Hamburg Method of manufacturing a composite pile
EP0151389B1 (en) * 1984-01-11 1990-07-25 Stump Bohr GmbH Method and apparatus for constructing building elements in the soil like piles, injection anchorages, cut-off walls or similar
GB2154630B (en) * 1984-02-24 1986-09-17 Matsuzawa Kiko Kabushiki Kaish Construction method for foundation piling

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
See references of WO9011412A1 *

Also Published As

Publication number Publication date
WO1990011412A1 (en) 1990-10-04

Similar Documents

Publication Publication Date Title
EP0417111A1 (en) A procedure for the forming of consolidation and foundation piles with embedded reinforcements
JP2002155530A (en) Embedding method and tip metal fitting of existing pile
JP5799474B2 (en) Retaining method for retaining wall
EP0556642B1 (en) Reinforcing block for excavation work and method of construction thereof
JP2008031772A (en) Construction method of precast pile, and cover for use in the construction method
JP2848212B2 (en) Cast-in-place concrete pile method
JP4074198B2 (en) How to remove existing piles
JPH09317373A (en) Method of shaft construction
CN112832776B (en) Pre-grouting solidification treatment method for shield interval to penetrate through prestressed anchor cable area
KR20190143205A (en) Construction method of composite pile with extensioned tip
JP3000497B2 (en) Construction method for high strength cast-in-place concrete piles
JP2002097639A (en) Pile burying method and jig
JP2884273B2 (en) Construction method for high strength cast-in-place concrete piles
JP2881501B2 (en) Construction method for high strength cast-in-place concrete piles
JPH08209687A (en) Partial casing pile method
JP2018109308A (en) Foundation structure, method for constructing foundation structure, and consolidation support member
JPH0333398A (en) Lining work for tunnel
JPH05321511A (en) Construction method for underground vessel in weak ground
JPH10220165A (en) Reinforcing method of unsolidified natural ground and reinforcing member formation device
JPH0759873B2 (en) Pile hole excavation method and device
JPH10298981A (en) Construction method for cast-in-place pile in confined ground water zone
JP2022129955A (en) How to remove existing concrete piles
JP2512157B2 (en) Reinforcement method for soft ground
GB2363152A (en) Method and apparatus for forming enlarged pile heads
JPH07119145A (en) Cast-in-place concrete pile method

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

17P Request for examination filed

Effective date: 19901206

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): AT BE DE FR GB NL SE

17Q First examination report despatched

Effective date: 19920219

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: THE APPLICATION IS DEEMED TO BE WITHDRAWN

18D Application deemed to be withdrawn

Effective date: 19921104