EP0339010A1 - Method for creating an artificial beach or for raising an existing beach - Google Patents

Method for creating an artificial beach or for raising an existing beach Download PDF

Info

Publication number
EP0339010A1
EP0339010A1 EP89870052A EP89870052A EP0339010A1 EP 0339010 A1 EP0339010 A1 EP 0339010A1 EP 89870052 A EP89870052 A EP 89870052A EP 89870052 A EP89870052 A EP 89870052A EP 0339010 A1 EP0339010 A1 EP 0339010A1
Authority
EP
European Patent Office
Prior art keywords
beach
geotextiles
river
sand
submerged
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
EP89870052A
Other languages
German (de)
French (fr)
Other versions
EP0339010B1 (en
Inventor
Roger Paynjon
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Dredging International NV
Original Assignee
Dredging International NV
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Dredging International NV filed Critical Dredging International NV
Publication of EP0339010A1 publication Critical patent/EP0339010A1/en
Application granted granted Critical
Publication of EP0339010B1 publication Critical patent/EP0339010B1/en
Anticipated expiration legal-status Critical
Expired - Lifetime legal-status Critical Current

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/04Structures or apparatus for, or methods of, protecting banks, coasts, or harbours

Definitions

  • This invention relates to a method of making an artificial beach by backfilling with sand or raising an existing beach in a river, a mouth of a river or the sea, the original inclination of the ground is too large to hold back the backfilled sand.
  • the invention now aims to provide a method which provides a new and original solution to the problems posed and by which artificial beaches having a small inclination can be built, both at sea and along an edge. of a river.
  • a submerged dike is built on the bottom of the river or the sea, this dike submerged from materials which are proof against sliding along the inclination of the original soil of the river or the sea and, for the formation of said beach, the necessary sand is applied between this submerged dam and the earth to the desired height and until the desired inclination is reached.
  • the above-mentioned submerged dam is produced using geotextiles of which at least one layer is spread over the original background, that the part of these geotextiles arriving at the height of the dike submerged with mussels and that said geotextile is folded over this mass of mussels, in order to anchor it then in the sand to be backfilled.
  • the invention also relates to an artificial beach or a raised beach produced according to the method according to the invention.
  • the appended figure is a cross section of a patch obtained according to the invention.
  • river will always be used, although it is clear that it can also be a river mouth or a sea here.
  • the channel of the river is represented by a strongly inclined bottom 1.
  • the angle of inclination represented here is obviously completely arbitrary.
  • the background of the original range can coincide with the line AB. Most of the time, this is purely theoretical. In reality, the background of the original track may coincide or substantially coincide with the dashed line CD. In such a case, the necessary sand is first dredged until a bottom is obtained which coincides with the straight line AB. Also the representation of the curved line CD is completely arbitrary.
  • a flat bottom B-D is first created by dredging.
  • the construction of the submerged dam 2 is done using geotextiles.
  • this part of the geotextiles is highlighted which is first spread over either the original background or the newly created background.
  • the geotextiles therefore extending for the most part on this soil, extend further beyond under the submerged dike 2.
  • the submerged dike is constructed by the arrangement of molds 4, while the geotextiles 3 are folded around this first mass of molds to then again form a second layer of geotextile to a height which is actually arbitrary.
  • the submerged dam 2 can also be raised by one or more layers of molds 5, wrapped in geotextiles 6, the two bands directed towards the earth are placed above the first layer 3. Only then is the fresh sand 7 can be backfilled by dredging until the desired inclination is obtained.
  • finishing of the dike submerged by molds or other common materials for this purpose does not belong to the essence of the invention.
  • the layer of finishing materials is highlighted by reference 8.
  • the internal reinforcement of the submerged dam 2 is formed in layers by the deployment of two or more layers of geotextiles.
  • Geotextiles therefore serve as an anchor along the original bottom or the newly dredged bottom.
  • the friction between the sand and the geotextile is also an important anchoring factor.
  • the friction which is caused by the vertical load P of the freshly backfilled sand over the anchoring length of the geotextiles is therefore W.
  • the necessary anchoring length is determined as a function of the nominal tensile strength geotextiles themselves. This has the consequence that the more the inclination of the original bottom or the new bottom after dredging a quantity of sand is strong, the more important will be the anchoring length of the geotextiles under the freshly backfilled sand.
  • geotextiles used for this purpose are exclusively high-quality tensile-resistant textiles of the type which is marketed by the company UCO under the references: H5200 / 45 (44667) - UCO 20 52/60 (44615) - UCO 4.
  • the method according to the invention allows the use of dikes established for common hydraulic backfilling without having to anchor them using drilled anchors or sheet piles. This is why the process is especially, if not exclusively, indicated for the repair or rehabilitation of beaches using fresh sand to be backfilled, in all circumstances when the inclination of the original bottom is so steep that the backfilling of sand leads to great losses.

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Revetment (AREA)

Abstract

The invention relates to a method for making an artificial beach by refilling with sand or for raising an existing beach in a river or by the sea, characterised in that there is formed on the river bottom, in this case an artificially dredged bottom, a submerged dyke (2) based on materials which are proof against slipping along the slope of the original bottom of the river or sea, and in that the sand necessary for forming said beach is introduced by refilling between this submerged dyke and the land to the desired height and at the desired slope. <IMAGE>

Description

Cette invention se rapporte à un procédé de réali­sation d'une plage artificielle par remblayage de sable ou de surélé­vation d'une plage existante dans une rivière, une embouchure d'un fleuve ou à la mer, dont l'inclinaison d'origine du sol est trop grande pour retenir le sable remblayé.This invention relates to a method of making an artificial beach by backfilling with sand or raising an existing beach in a river, a mouth of a river or the sea, the original inclination of the ground is too large to hold back the backfilled sand.

Lorsqu'une plage artificielle doit être réalisée le long d'une rivière ou d'une embouchure de fleuve, il se pose, surtout lorsque la rivière ou l'embouchure du fleuve est soumise à des marées, des problèmes qui sont directement liés à l'écoulement de l'embase de la plage nouvelle ou artificielle dans le chenal de la rivière ou dans la mer.When an artificial beach is to be built along a river or a river mouth, problems arise, especially when the river or the mouth of the river is subject to tides, which are directly related to the flow from the base of the new or artificial beach in the river channel or in the sea.

La surélévation de plages existantes a, jusqu'à présent, été réalisée pratiquement exclusivement par le remblayage de sable frais. Les résultats sont toujours décevants à relativement brève échéance du fait qu'une grande quantité de sable fraîchement remblayé disparaît à nouveau inévitablement dans la mer ou dans le chenal. Le remblayage de sable doit donc être répété plusieurs fois ce qui peut poser financièrement un problème insurmontable.Up to now, existing beaches have been raised almost exclusively by backfilling with fresh sand. The results are always disappointing in the relatively short term, since a large quantity of freshly backfilled sand inevitably disappears again in the sea or in the channel. Sand filling must therefore be repeated several times, which can pose an insurmountable problem financially.

Lorsqu'on envisage l'édification d'une plage arti­ficielle dans une rivière, le sable frais remblayé ne peut en aucun cas de nouveau s'écouler vers le chenal. Cela arrivera d'autant plus vite que l'inclinaison du fond le long du bord de la rivière forme un angle où le sable remblayé s'écoulera de cette pente.When considering the construction of an artificial beach in a river, the backfilled fresh sand cannot in any case again flow towards the channel. This will happen all the more quickly as the inclination of the bottom along the edge of the river forms an angle where the backfilled sand will flow from this slope.

L'invention a pour but à présent de fournir un procédé qui procure une solution nouvelle et originale aux problèmes posés et grâce auquel des plages artificielles ayant une faible inclinaison peuvent être édifiées, et cela aussi bien à la mer que le long d'un bord d'une rivière.The invention now aims to provide a method which provides a new and original solution to the problems posed and by which artificial beaches having a small inclination can be built, both at sea and along an edge. of a river.

Afin de permettre cela suivant l'invention, on réalise sur le fond de la rivière ou de la mer une digue immergée, on construit cette digue immergée à partir de matériaux qui sont à l'épreuve du glissement le long de l'inclinaison du sol d'origine de la rivière ou de la mer et, pour la formation de ladite plage, on applique par remblayage le sable nécessaire entre cette digue immergée et la terre jusqu'à la hauteur souhaitée et jusqu'à ce que l'inclinaison souhai­tée soit atteinte.In order to allow this according to the invention, a submerged dike is built on the bottom of the river or the sea, this dike submerged from materials which are proof against sliding along the inclination of the original soil of the river or the sea and, for the formation of said beach, the necessary sand is applied between this submerged dam and the earth to the desired height and until the desired inclination is reached.

Toujours suivant l'invention et lorsque la rivière ou la mer est soumise à des marées on établit le sommet de ladite digue immergée pratiquement à hauteur de la marée basse moyenne.Still according to the invention and when the river or the sea is subject to tides, the top of said submerged dam is established practically at the height of the average low tide.

Le fait est remarquable pour l'invention que l'on réalise la digue immergée précitée en utilisant des géotextiles dont on étale au moins une couche sur le fond d'origine, que l'on charge la partie de ces géotextiles arrivant à hauteur de la digue immergée avec des moulons et qu'on replie ledit géotextile sur cette masse de moulons, afin d'ancrer celui-ci ensuite dans le sable à remblayer.The fact is remarkable for the invention that the above-mentioned submerged dam is produced using geotextiles of which at least one layer is spread over the original background, that the part of these geotextiles arriving at the height of the dike submerged with mussels and that said geotextile is folded over this mass of mussels, in order to anchor it then in the sand to be backfilled.

L'invention concerne également une plage artificielle ou une plage surélevée réalisée conformément au procédé suivant l'invention.The invention also relates to an artificial beach or a raised beach produced according to the method according to the invention.

D'autres détails et avantages de l'invention appa­raîtront de la description ci-après d'un procédé pour la réalisation d'une plage artificielle par remblayage de sable ou la surélévation d'une plage existante et de la plage ainsi obtenue, suivant l'invention.Other details and advantages of the invention will become apparent from the following description of a process for producing an artificial beach by backfilling with sand or raising an existing beach and the beach thus obtained, according to the invention. 'invention.

Cette description est uniquement donnée à titre d'exemple et ne limite pas l'invention. Les références se rapportent à la figure annexée.This description is given by way of example only and does not limit the invention. References refer to the appended figure.

La figure ci-annexée est une section transversale d'une plage obtenue suivant l'invention.The appended figure is a cross section of a patch obtained according to the invention.

Dans le texte ci-après, le mot rivière sera toujours utilisé, bien qu'il soit clair qu'il peut également s'agir ici d'une em­bouchure de fleuve ou d'une mer.In the text below, the word river will always be used, although it is clear that it can also be a river mouth or a sea here.

Le chenal de la rivière est représenté par un fond fortement incliné 1. L'angle d'inclinaison représenté ici est évidemment totalement arbitraire.The channel of the river is represented by a strongly inclined bottom 1. The angle of inclination represented here is obviously completely arbitrary.

Le fond de la plage d'origine peut coïncider avec la droite A-B. La plupart du temps, ceci est purement théorique. En réalité, le fond de la plage d'origine peut coïncider ou coïncider sensiblement avec le trait mixte C-D. Dans un tel cas, le sable néces­saire est d'abord dragué jusqu'à ce qu'un fond soit obtenu qui coïncide avec la droite A-B. Aussi la représentation de la ligne courbe C-D est totalement arbitraire.The background of the original range can coincide with the line AB. Most of the time, this is purely theoretical. In reality, the background of the original track may coincide or substantially coincide with the dashed line CD. In such a case, the necessary sand is first dredged until a bottom is obtained which coincides with the straight line AB. Also the representation of the curved line CD is completely arbitrary.

En tous cas, là où la digue immergée 2 doit être établie, un fond plat B-D est d'abord créé par dragage.In any case, where the submerged dam 2 must be established, a flat bottom B-D is first created by dredging.

Lorsque à cause des circonstances naturelles ou locales, le fond d'origine approche déjà l'horizontalité de la droite B-D, il ne faut pas nécessairement draguer.When due to natural or local circumstances, the original background is already approaching the horizontality of the straight line B-D, it is not necessary to dredge.

La construction de la digue immergée 2 se fait en utilisant des géotextiles. Par la référence 3 cette partie des géo­textiles est mise en évidence qui est étalée d'abord sur soit le fond d'origine, soit le fond nouvellement créé. Les géotextiles s'étendant donc pour la plus grande part sur ce sol, s'étendent encore au-delà sous la digue immergée 2. La digue immergée est construite par la disposition de moulons 4, tandis que les géotextiles 3 sont repliés autour de cette première masse de moulons pour former alors de nouveau une deuxième couche de géotextile jusqu'à une hauteur qui est en réalité arbitraire.The construction of the submerged dam 2 is done using geotextiles. By reference 3, this part of the geotextiles is highlighted which is first spread over either the original background or the newly created background. The geotextiles therefore extending for the most part on this soil, extend further beyond under the submerged dike 2. The submerged dike is constructed by the arrangement of molds 4, while the geotextiles 3 are folded around this first mass of molds to then again form a second layer of geotextile to a height which is actually arbitrary.

La digue immergée 2 peut encore être élevée par une ou plusieurs couches de moulons 5, enveloppés dans des géotextiles 6 dont les deux bandes dirigées vers la terre sont posées au-dessus de la première couche 3. Ce n'est qu'alors que le sable frais 7 peut être remblayé par dragage jusqu'à ce que l'inclinaison souhaitée soit obtenue.The submerged dam 2 can also be raised by one or more layers of molds 5, wrapped in geotextiles 6, the two bands directed towards the earth are placed above the first layer 3. Only then is the fresh sand 7 can be backfilled by dredging until the desired inclination is obtained.

La finition de la digue immergée par des moulons ou par d'autres matériaux courants à cette fin n'appartient pas à l'essence de l'invention. La couche de matériaux de finition est mise en évidence par la référence 8.The finishing of the dike submerged by molds or other common materials for this purpose does not belong to the essence of the invention. The layer of finishing materials is highlighted by reference 8.

On remarque sur la figure que le renforcement interne de la digue immergée 2 est formé en couches par le déploiement de deux ou plusieurs couches de géotextiles.Note in the figure that the internal reinforcement of the submerged dam 2 is formed in layers by the deployment of two or more layers of geotextiles.

La longueur d'ancrage requise de ces géotextiles est calculée en fonction de la stabilité interne necessaire de la digue immergée. Les géotextiles servent donc d'ancrage le long du fond d'origine ou du fond nouvellement dragué. La friction entre le sable et le géotextile constitue également un facteur d'ancrage important.The required anchoring length of these geotextiles is calculated according to the necessary internal stability of the dike submerged. Geotextiles therefore serve as an anchor along the original bottom or the newly dredged bottom. The friction between the sand and the geotextile is also an important anchoring factor.

Dans la structure suivant l'invention la friction qui est suscitée par la charge verticale P du sable fraîchement remblayé sur la longueur d'ancrage des géotextiles est donc W. La longueur d'ancrage nécessaire est déterminée en fonction de la résistance à la traction nominale des géotextiles eux-mêmes. Cela a pour conséquence qu'au plus l'inclinaison du fond d'origine ou du nouveau fond après dragage d'une quantité de sable est forte, au plus importante sera la longueur d'ancrage des géotextiles sous le sable fraîchement remblayé.In the structure according to the invention the friction which is caused by the vertical load P of the freshly backfilled sand over the anchoring length of the geotextiles is therefore W. The necessary anchoring length is determined as a function of the nominal tensile strength geotextiles themselves. This has the consequence that the more the inclination of the original bottom or the new bottom after dredging a quantity of sand is strong, the more important will be the anchoring length of the geotextiles under the freshly backfilled sand.

Les géotextiles utilisés à cette fin sont des textiles résistant à la traction exclusivement de haute qualité du type qui est commercialisé par la société UCO sous les références:
H5200/45 (44667) - UCO 20
52/60 (44615) - UCO 4.
The geotextiles used for this purpose are exclusively high-quality tensile-resistant textiles of the type which is marketed by the company UCO under the references:
H5200 / 45 (44667) - UCO 20
52/60 (44615) - UCO 4.

Le procédé suivant l'invention permet l'utilisation de digues établies en vue du remblayage hydraulique courantes sans devoir ancrer celles-ci à l'aide de tirants d'ancrage forés ou de pal­planches. C'est pourquoi le procédé est surtout, sinon exclusivement, indiqué pour la réfection ou la réhabilitation de plages à l'aide de sable frais à remblayer, en toutes circonstances lorsque l'inclinaison du fond d'origine est si raide que le remblayage de sable conduit à de grandes pertes.The method according to the invention allows the use of dikes established for common hydraulic backfilling without having to anchor them using drilled anchors or sheet piles. This is why the process is especially, if not exclusively, indicated for the repair or rehabilitation of beaches using fresh sand to be backfilled, in all circumstances when the inclination of the original bottom is so steep that the backfilling of sand leads to great losses.

Il va de soi que l'invention n'est pas limitée à la forme de réalisation décrite ci-dessus et de nombreuses modifications pourraient y être apportées sans sortir du cadre de la demande de brevet.It goes without saying that the invention is not limited to the embodiment described above and numerous modifications could be made to it without departing from the scope of the patent application.

Claims (6)

1. Procédé de réalisation d'une plage artificielle par remblayage de sable ou de surélévation d'une plage existante dans une rivière, une embouchure d'un fleuve ou à la mer, dont l'incli­naison d'origine du sol est trop grande pour retenir le sable remblayé, caractérisé en ce qu'on réalise une digue immergée (2) sur le fond de la rivière, le cas échéant sur un fond dragué artificiellement, en ce qu'on édifie cette digue immergée à base de matériaux qui sont à l'épreuve du glissement le long de l'inclinaison du fond d'origine de la rivière ou de la mer et en ce qu'on amène par remblayage le sable nécessaire, pour la formation de ladite plage, entre cette digue immergée et la terre jusqu'à la hauteur souhaitée et l'inclinaison souhaitée.1. Method of making an artificial beach by backfilling with sand or raising an existing beach in a river, a mouth of a river or the sea, the original slope of the soil is too large for retain the backfilled sand, characterized in that a submerged dike (2) is made on the bottom of the river, if necessary on an artificially dredged bottom, in that this submerged dike is constructed from materials which are the sliding test along the inclination of the original bottom of the river or the sea and in that we bring by backfilling the sand necessary, for the formation of said beach, between this submerged dike and the earth up to the desired height and the desired inclination. 2. Procédé suivant la revendication 1, caractérisé en ce qu'on établit le sommet de la digue immergée précitée (2) sensiblement à hauteur de la marée basse moyenne, lorsque la rivière ou la mer est soumise à des marées.2. Method according to claim 1, characterized in that the top of the above-mentioned submerged dam (2) is established substantially at the level of the average low tide, when the river or the sea is subject to tides. 3. Procédé suivant l'une des revendications 1, 2, caractérisé en ce qu'on établit la digue immergée précitée (2) à une distance de la terre permettant la réalisation d'une pente douce de la plage.3. Method according to one of claims 1, 2, characterized in that the above-mentioned submerged dam (2) is established at a distance from the ground allowing the realization of a gentle slope of the beach. 4. Procédé suivant l'une des revendications 1 à 3, caractérisé en ce que l'on réalise la digue immergée précitée (2) en utilisant des géotextiles (3, 6) dont on étale au moins une couche sur le fond d'origine, le cas échéant sur un fond dragué à cette fin, en ce qu'on charge la partie de ces géotextiles arrivant à hauteur de la digue immergée avec des moulons et en ce qu'on replie lesdits géotextiles sur la masse de moulons, ces géotextiles étant alors ancrés dans le sable à remblayer.4. Method according to one of claims 1 to 3, characterized in that the above-mentioned submerged dam (2) is produced using geotextiles (3, 6) of which at least one layer is spread over the original bottom , if necessary on a dredged bottom for this purpose, in that the part of these geotextiles arriving at the level of the submerged dike is loaded with mussels and in that the said geotextiles are folded over the mass of mussels, these geotextiles then being anchored in the sand to be backfilled. 5. Procédé suivant la revendication 4, caractérisé en ce que l'ancrage des géotextiles précités a lieu en étalant ces géotextiles (3, 6) sur une longueur suffisante sur le fond d'origine, le cas échéant le fond dragué à cette fin.5. Method according to claim 4, characterized in that the anchoring of the aforementioned geotextiles takes place by spreading these geotextiles (3, 6) over a sufficient length over the original background, if necessary the bottom dredged for this purpose. 6. Plage artificielle ou surélevée réalisée en appli­quant l'une des revendications 1 à 4, caractérisée en ce qu'elle est constituée, suivant une section transversale, d'une digue immergée (2) qui est parallèle ou sensiblement parallèle à la terre et en ce qu'elle est principalement constituée de moulons (4, 5) ou d'un matériau techniquement équivalent, enveloppées dans des géotextiles (3, 6) servant, sur une longueur sous le sable fraîchement remblayé (7), à la formation ou à l'élévation de la plage.6. Artificial or raised beach produced by applying one of claims 1 to 4, characterized in that it is consisting, in a cross section, of a submerged dike (2) which is parallel or substantially parallel to the ground and in that it consists mainly of molds (4, 5) or a technically equivalent material, wrapped in geotextiles (3, 6) used, over a length under the freshly backfilled sand (7), to form or elevate the beach.
EP89870052A 1988-04-19 1989-04-14 Method for creating an artificial beach or for raising an existing beach Expired - Lifetime EP0339010B1 (en)

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
BE8800445 1988-04-19
BE8800445A BE1001602A6 (en) 1988-04-19 1988-04-19 Method for applying an art beach or to raise an existing beach, and thus obtained beach.

Publications (2)

Publication Number Publication Date
EP0339010A1 true EP0339010A1 (en) 1989-10-25
EP0339010B1 EP0339010B1 (en) 1993-03-24

Family

ID=3883367

Family Applications (1)

Application Number Title Priority Date Filing Date
EP89870052A Expired - Lifetime EP0339010B1 (en) 1988-04-19 1989-04-14 Method for creating an artificial beach or for raising an existing beach

Country Status (2)

Country Link
EP (1) EP0339010B1 (en)
BE (1) BE1001602A6 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820675A (en) * 2019-11-29 2020-02-21 中交烟台环保疏浚有限公司 Construction method for forming artificial sand beach

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
BE1014863A5 (en) 2002-06-03 2004-05-04 Dredging Int Artificial dyke, has one slanting wall formed by stacked dyke bodies anchored by textile or film in sand forming central part of dyke and other slanting wall

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1019527A (en) * 1950-06-06 1953-01-22 Underwater dam changing a large and medium pebble beach into a beach of very small pebbles or sand and widening any beach by moving its shore
WO1987001148A1 (en) * 1985-08-23 1987-02-26 Huesker Synthetic Gmbh & Co. Process for constructing a sloping wall or embankment in particular a sound-proofing embankment
WO1987002082A1 (en) * 1985-09-26 1987-04-09 John Temple Method of raising and extending an ocean beach

Family Cites Families (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4729691A (en) * 1986-11-04 1988-03-08 Sample Jay W Backshore sill beach and dune erosion control system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
FR1019527A (en) * 1950-06-06 1953-01-22 Underwater dam changing a large and medium pebble beach into a beach of very small pebbles or sand and widening any beach by moving its shore
WO1987001148A1 (en) * 1985-08-23 1987-02-26 Huesker Synthetic Gmbh & Co. Process for constructing a sloping wall or embankment in particular a sound-proofing embankment
WO1987002082A1 (en) * 1985-09-26 1987-04-09 John Temple Method of raising and extending an ocean beach

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
PATENT ABSTRACTS OF JAPAN, vol. 8, no. 152 (M-309)[1589], 14 juillet 1984; & JP-A-59 48 525 (MITSUI SEKIYU KAGAKU KOGYO K.K.) 19-03-1984 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110820675A (en) * 2019-11-29 2020-02-21 中交烟台环保疏浚有限公司 Construction method for forming artificial sand beach

Also Published As

Publication number Publication date
BE1001602A6 (en) 1989-12-12
EP0339010B1 (en) 1993-03-24

Similar Documents

Publication Publication Date Title
Bird Physical setting and geomorphology of coastal lagoons
EP0557401B1 (en) Erosion control device
US3373568A (en) System for reclamation of land
CA2032275C (en) Spillway weir for dams and like structures
EP2076425B1 (en) Network of floaters, especially for anchoring wind turbines and/or underwater generators on deep marine sites
EP0046418A1 (en) Anchoring method and foundation device for a platform, especially a mobile one
EP0028558B1 (en) Method of improving the sliding resistance of a civil engineering construction and its foundation
EP0339010A1 (en) Method for creating an artificial beach or for raising an existing beach
EP0125939A1 (en) Construction method of impervious walls
ITMI992383A1 (en) BREAK BARRIERS FOR THE DEFENSE OF THE COAST
Van Loon et al. Holocene lagoonal silts (formerly called “sloef”) from the Zuiderzee
FR2792661A1 (en) Barrage assembly for controlling the flow of water through a channel, into and out of a main body of water and other such applications, utilizes piles driven through the bed and lower substrata supporting rotating vanes
EP0185041B1 (en) Retainer works with structure of thin, double curvature elements
FR2807079A1 (en) Fresh water retaining procedure for bed of river with variable flow consists of creating storage zone and reservoir in bed upstream of it
EP0273077B1 (en) Retaining structure and method for realizing this retaining structure
EP1208034A1 (en) Mobile barge with tensioned struts for nautical works at medium depths
EP0022399B1 (en) Vertical barrier for instantaneous placement in the water and immediately unfoldable, permitting the screening-off or enclosing of a layer of oil or hydrocarbon spread on the surface of the water
WO1999040261A1 (en) Structure and method for crossing a head drop, and navigation canal
OA21135A (en) Natural tidal sand dredging system for coastal protection and its variants.
FR2532684A1 (en) Method for producing an underground construction.
FR2545121A1 (en) Method for a foundation on undulating underwater ground
FR2752432A1 (en) Structure and process for overcoming change of level in waterways and navigation canal
Marsh et al. The hydrology of lakes in the Western Canadian Arctic–implications to proposed natural gas development
Holmberg Alternative to traditional ways of treating shoreline erosion
BE771063A (en) PROCESS FOR THE CONSTRUCTION OF MARITIME DYES, THROWS, BREAKWAVES, AND EQUIVALENT WORKS

Legal Events

Date Code Title Description
PUAI Public reference made under article 153(3) epc to a published international application that has entered the european phase

Free format text: ORIGINAL CODE: 0009012

AK Designated contracting states

Kind code of ref document: A1

Designated state(s): BE ES FR IT

17P Request for examination filed

Effective date: 19891117

17Q First examination report despatched

Effective date: 19910726

GRAA (expected) grant

Free format text: ORIGINAL CODE: 0009210

AK Designated contracting states

Kind code of ref document: B1

Designated state(s): BE ES FR IT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: IT

Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRE;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED.SCRIBED TIME-LIMIT

Effective date: 19930324

Ref country code: ES

Free format text: THE PATENT HAS BEEN ANNULLED BY A DECISION OF A NATIONAL AUTHORITY

Effective date: 19930324

PLBE No opposition filed within time limit

Free format text: ORIGINAL CODE: 0009261

STAA Information on the status of an ep patent application or granted ep patent

Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19940228

26N No opposition filed
REG Reference to a national code

Ref country code: FR

Ref legal event code: ST

PG25 Lapsed in a contracting state [announced via postgrant information from national office to epo]

Ref country code: FR

Effective date: 19930430

PGFP Annual fee paid to national office [announced via postgrant information from national office to epo]

Ref country code: BE

Payment date: 20080513

Year of fee payment: 20

BE20 Be: patent expired

Owner name: *DREDGING INTERNATIONAL

Effective date: 20090414