EP0052089B1 - Device for the mechanical handling of material on railway track embankments, particularly for handling ballast material - Google Patents
Device for the mechanical handling of material on railway track embankments, particularly for handling ballast material Download PDFInfo
- Publication number
- EP0052089B1 EP0052089B1 EP81850207A EP81850207A EP0052089B1 EP 0052089 B1 EP0052089 B1 EP 0052089B1 EP 81850207 A EP81850207 A EP 81850207A EP 81850207 A EP81850207 A EP 81850207A EP 0052089 B1 EP0052089 B1 EP 0052089B1
- Authority
- EP
- European Patent Office
- Prior art keywords
- brushes
- conveyor
- ballast material
- ballast
- vehicle
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000000463 material Substances 0.000 title claims abstract description 99
- 238000010408 sweeping Methods 0.000 claims description 7
- 238000006073 displacement reaction Methods 0.000 claims 2
- 230000001680 brushing effect Effects 0.000 description 8
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 7
- 238000010276 construction Methods 0.000 description 3
- 239000000428 dust Substances 0.000 description 3
- 239000004575 stone Substances 0.000 description 3
- 230000015572 biosynthetic process Effects 0.000 description 2
- 230000009194 climbing Effects 0.000 description 2
- 238000000034 method Methods 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 1
- 230000003213 activating effect Effects 0.000 description 1
- 238000004873 anchoring Methods 0.000 description 1
- 230000008878 coupling Effects 0.000 description 1
- 238000010168 coupling process Methods 0.000 description 1
- 238000005859 coupling reaction Methods 0.000 description 1
- 230000001681 protective effect Effects 0.000 description 1
- 239000010959 steel Substances 0.000 description 1
- 239000002699 waste material Substances 0.000 description 1
Images
Classifications
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/02—Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
- E01B27/023—Spreading, levelling or redistributing ballast already placed
- E01B27/026—Spreading, levelling or redistributing ballast already placed by means of driven tools, e.g. rotating brooms or digging devices
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/02—Placing the ballast; Making ballastway; Redistributing ballasting material; Machines or devices therefor; Levelling means
- E01B27/023—Spreading, levelling or redistributing ballast already placed
-
- E—FIXED CONSTRUCTIONS
- E01—CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
- E01B—PERMANENT WAY; PERMANENT-WAY TOOLS; MACHINES FOR MAKING RAILWAYS OF ALL KINDS
- E01B27/00—Placing, renewing, working, cleaning, or taking-up the ballast, with or without concurrent work on the track; Devices therefor; Packing sleepers
- E01B27/04—Removing the ballast; Machines therefor, whether or not additionally adapted for taking-up ballast
Definitions
- the present invention relates to a device for the mechanical handling of material on railway track embankments, particularly for the handling of ballast material.
- ballast material in the form of stone and gravel is laid out in strands on the previously prepared track embankment.
- the ballast material is laid out partly in the middle of the track embankment and partly outside the two lines of rails.
- the ballast then has to be distributed to form an even layer close to the railway track for securely anchoring and supporting the track by the ballast material. Excess material is then removed.
- existing track embankments must be replenished with ballast material at regular intervals, since the vibration to which the ballast is exposed due to the traffic on the track embankment leads to settling so that the ballast sinks down and therefore is no longer able to transmit loading via the sleepers in an acceptable manner.
- the ballast has to cover the lateral portions of the sleepers not only along the sleepers but also at the ends of the sleepers, which is particularly important on curve sections.
- the ballast is laid, as stated in the middle and at the sides of the track embankment.
- the ballast consisting of gravel and stone is levelled with a ballast plough.
- the ballast material which bears against the rails should be removed as completely as possible as well as the ballast material which is in contact with the rails from below, since otherwise there is a risk of leakage currents developing in damp weather which might endanger the safety of the signal system.
- the signal system is actually based on the existence of a voltage potential of about 14V between the two lines of rails.
- ballast material bears against the web of the rail or against the under-side of the rail there is a risk that this voltage potential may drop, which may result in that the remaining voltage potential only is sufficient to influence certain parts of the signal system. This may result in that a train receives a go-ahead signal because the voltage potential is sufficient to switch over to the go-ahead signal for the train while the circuit for lowering booms or for activating other warning systems is not activated.
- Ballasting machines on the market comprise a railborne, self-propelled vehicle which is provided with ballasting ploughs for the distribution and levelling of the ballast material and with powerful brushes which rotate about horizontal shafts to sweep the railway sleepers clean. It is further known to provide such devices with a conveyor adapted to convey excess material to a ballast bin on the vehicle. Such a device is known from AT-A-306 773 upon which the prior art part of claim 1 is based. The known devices suffer from certain disadvantages of which the following will be mentioned. The use of brushes which are rotatable about horizontal shafts renders it impossible or increases the difficulty to a very great extent of effective clean-sweeping close to the web of the rail and renders it practically completely impossible to remove ballast material which is bearing against the foot of the rail from below.
- Another disadvantage is that the use of brushes which rotate about horizontal shafts leads to a partly uncontrolled throwing movement, during the brushing of ballast material, which involves the risk of damage to personnel and equipment.
- Another disadvantage of the known devices is the waste of large amounts of ballast material due to the fact that excess material accumulated at both sides of the track embankment is not collected.
- the conveyors so far used for collecting and carrying away excess material have not proved well suited for this purpose.
- When using belt conveyors it has proved difficult to convey the ballast material effectively at the inclination at which it for practical reasons has been necessary to arrange the conveyor.
- gravel material could be conveyed while the stone material tends to roll back. If some kind of bucket conveyor is used, problems arise with respect to the loading of such conveyors.
- the object of the present invention is to provide a device for the mechanical handling of material on railway track embankments which rapidly and simply renders possible an effective distribution of the ballast material along the track embankment while at the same time a particularly effective clean-sweeping is obtained adjacent the foot and the web of each rail.
- Figure 1 shows diagrammatically a cross-section through a track embankment with ballast material laid out thereon
- FIG. 1 shows a cross-section through a railway track embankment 1 with sleepers 2 and rails 3 disposed thereon.
- strands of ballast material 4 are shown which have been laid out for example with a gravel waggon for ballast material or a ballast waggon specially intended for the purpose. It is important that the ballast material should cover the end portions 2a and 2b of the sleepers 2, in a satisfactory layer and in an adequate width, particularly on curve sections, since the lateral forces which have to be transmitted via the ballast are greater in curve sections than along the rectilinear extent of the track.
- Figures 2 and 3 illustrate diagrammatically and broadly how the device according to the invention is adapted to distribute, sweep clean and collect ballast material laid out on a track embankment.
- Figure 2 shows a diagrammatic view of the front portion of the device according to the invention, with front plough-like shields in position for distributing ballast material in an even layer for covering the sleepers for the track not only between the rails but also outside these.
- Figure 3 which is a diagrammatic horizontal view through the device according to the invention, illustrates the working procedure for carrying out ballasting using the device according to the invention.
- the rail-track travelling device 5 thus moves in the direction towards the left in the figure.
- the plough-like shields 9, 9A mounted at the front of the device thus cause a distribution and levelling of the ballast material as mentioned previously and as shown behind the plough-like shields 9.
- the levelled layer of ballast material is exposed to the action of rotating brushes incorporated in the brush unit 11 which is carried underneath the device.
- the brushes 13A and 13B sweep clean close to the lines of rails 3, at both sides thereof, the ballast material swept away gathering on the one hand in a strand in the middle between the railway lines 3 and on the other hand in two strands, one outside each of the lines.
- the middle strand of ballast material formed as a result of the brushing operation must necessarily be removed and this is brought about by means of a conveyor 16 which is supported by the device 5, the front end of said conveyor being situated a small distance above the level of the upper surface of the sleepers.
- the lateral strands of ballast material are collected in a similar manner by means of conveyors 23A, 23B supported by the device 5, guide shields 27 being adapted to guide the lateral strands of ballast material to the feed ends of the lateral conveyors.
- the purpose of the vertical shields 14 disposed close to the brush unit 11 is to prevent ballast material from being thrown out sideways during the brushing operation and to cooperate in forming said strands of excess material.
- the device illustrated diagrammatically in the figures consists of a motor-driven rail vehicle 5 with a chassis frame 6 and set of wheels 7.
- the vehicle 5 further comprises a control cabin 8 from which not only the propulsion of the vehicle but also the control and governing of the working unit of the vehicle is effected.
- the vehicle 5 is therefore provided with the necessary electrical and hydraulic power units, as well as with the necessary control and governing equipment.
- a plough device 9 is mounted on the vehicle chassis 6, said plough device being adapted for raising and lowering by means of a diagrammatically shown parallel mechanism and hydraulic means.
- the plough device 9 is shown in the lowered position for levelling and distributing ballast material on the track embankment.
- Recesses 9C for the rails 3 are provided in the lower edge of the plough blade so that the ballast material can be distributed close to the rails 3 by ploughing.
- the outer portions 9A and 9B of the plough blade are adjustable, by means of hydraulic means, into various angular positions in relation to the centre portion of the plough and can be readjusted for example into the adjustment position shown for the outer portion 9B for distribution towards the outside of the line of rails 3 of ballast material situated at the side of the track embankment.
- a distributing shield 10 Disposed at the tip of the plough device 9 is a distributing shield 10 which is pivotable sideways and which, in the normal position, is directed parallel to the rails but which can be adjusted into an angle as indicated in chain lines in Figure 5 so as to redistribute ballast material to the plough.
- the described design of the plough device 9 thus renders it possible to distribute the ballast material uniformly and evenly as shown in Figure 2, regardless of how the strands of ballast are centred on the track embankment during the laying out.
- the plough device 9 is fixed to the chassis frame 6 by means of a detachable coupling enabling, when necessary, an exchange of the plough unit for another working unit, for example a snow slinger for use during snow clearing.
- Each brush unit 11 is mounted after the plough unit 9, seen in the direction of travel, and under the chassis 6, one over each line of rails 3.
- Each brush unit 11 comprises a frame 12 which is supported by the chassis frame 6 and adjustable into different height positions by means of hydraulic power means. Seen from above, the frame 12 has a shape reminiscent of the letter H, and a rotatably driven brush 13A, 13B is supported at each of the ends of the parallel arms 12A of the H-shaped frame, one of said arms being disposed at one side and the other one at the opposite side of the line of rails 3.
- each brush unit 11 comprises two pairs of brushes 13A and 13B, one pair of brushes disposed at the outside of the ilne of rails 3 and the other pair of brushes disposed at the inside of the line of rails 3.
- the transverse arm 12B of the frame 12 of the brush unit 11 is telescopic and can be lengthened or shortened by means of power equipment not shown, enabling the pairs of brushes 13A, 13B to be adjusted into the required distance sideways in relation to the rail 3.
- the brushes 13A, 13B supported on the frame 12 of the brush unit 11 are rotatable about substantially vertical spindles and consists of strong conical steel brushes having a substantially plane brush surface.
- the brushes 13A, 13B are further adjustable into a certain inclination sideways and in the longitudinal direction of the track.
- a certain inclination is actually necessary in order for enabling the brushes to shift ballast material, since as a result of inclination of the brushes a necessary clearance angle is obtained so that ballast material which is acted upon by the brushes receives a throwing motion imparted thereto in the tangential direction of the brushes when the brushes lose contact with the layer of ballast.
- Due to the fact that the brushes 13A, 13B are conical and rotatable about substantially vertical spindles, a very good accessibility is obtained right into the foot of the rail 3, as illustrated in Figure 6.
- the inclination of the brushes and the possibility of adjusting them sideways in relation to the rail 3 makes it possible to get access even under the foot of the rail, as can be seen from Figure 6.
- the inclination of the brushes is adjusted so that ballast material swept away is thrown sideways or obliquely backwards towards the right.
- the two pairs of brushes on the left-hand side of the respective line of rails 3, seen in the direction of travel are driven in rotation counter-clockwise and adjusted at such an angle of inclination that ballast material acted upon by the brushes is thrown sideways or obliquely backwards towards the left.
- each brush unit 11 carries a shield 14, preferably a strong rubber shield which is supported by the frame 12 of the brush unit at a suitable distance outside the outermost pair of brushes 13A.
- the shield extends substantially vertically and is extended lengthwise over the whole range of action of the pair of brushes. Ballast material which is thrown out sideways or obliquely backwards is caught by the rubber shield and drops down onto the track embankment close to the shield so that a longitudinal strand 4 of ballast material is formed (see Figure 3).
- a third shield preferably a rubber shield, is disposed centrally between the two inner pairs of brushes 13B.
- This centre shield 15 is supported by two guide plates 17 which are connected to the lower end of a ballast conveyor 16 as shown diagrammatically in Figure 7.
- the rubber shield 15 is firmly bolted to a rod 18 which, at its inner end, is rigidly connected to the.guide plates 17 via stays 19 connecting the guide plates at the upper edges thereof.
- the guide plates 17 are constructed as sieges at the bottom and are adpated to slide against the surface of the support, for example against the upper surfaces of the sleepers 2, and may appropriately be rounded at the front edges so as to be able to climb over irregularities.
- the guide plates 17 are articulately connected to the lower end of the conveyor 16 so that a certain limited movement between them is rendered possible.
- the rubber shield 15 is likewise adapted to slide with its lower edge against the support and is rounded at the front edge like the guide plates 17.
- ballast material is thrown, under the action of the pair of brushes 13B from opposite sides towards the rubber shield 15, material being accumulated and collected close to the shield 15 in the form of a strand of ballast material situated immediately in front of the take-up region of the conveyor 16.
- water nozzles are provided on the brush units 11 and at the lower ends of the conveyors 16, 23A, 23B, said water nozzles being provided with water through pipelines not shown in the drawings, from a water tank carried by the vehicle. Water is supplied through the nozzles to the brushes 13A and 13B and to the ends of the conveyors 16, 23A, 23B. The brushes distribute the water very effectively and the sprinkling with water as described has proved to prevent troublesome dust formation very effectively.
- the ballast conveyor 16 for collecting the centre strand extends from its lower end behind the pair of brushes 13B, seen in the direction of travel, with an inclination upwards and backwards and ends with its opposite end above a ballast waggon 18 coupled to the rail vehicle.
- the conveyor 16 is supported on the rail vehicle 5 by means of a horizontal joint 19 and is pivotable about this joint, by means of power equipment not shown in the figures, to render possible swinging of the conveyor between a conveying position in which the lower end of the conveyor 16 and hence also the guide plates 17 and the shield 15 are elevated to obtain necessary clearance to the support, and a working position in close contact with the support.
- the conveyor 16 consists of two endless chains which are parallel to one another, the links of which being rigidly interconnected by means of flat rods 20 to which rubber plates projecting beyond the flat rods are secured.
- the conveyor 16 is motor-driven in such a direction that the upper part 16A of the chain moves downwards and the lower part 16B of the chain upwards.
- the lower part 16B of the chain runs in a U-shaped channel 21, the internal dimensions of which correspond, with a certain clearance, to the external dimensions of the rubber plates.
- Formed in the lower end of the channel 21 is a bent climbing plate 22, and the conveyor 16 is adjustable into a working position with the front edge of the climbing plate 22 situated a short distance, for example 10 mm, above the upper edge of the sleepers 2.
- the conveyor 16 During the movement of the vehicle 5 forwards, the conveyor 16 penetrates into the strand 4 of ballast material, thereby feeding ballast material into the conveying channel 22 where it is forcibly forwarded to the upper end of the conveyor. For this operation it is important that the conveyor 16 is driven at a speed which is adpated to the propulsion speed of the vehicle 5 so that the conveyor 16 will be able to take charge of and convey up all the ballast material in the centre strand.
- the strands of excess ballast material formed at the outsides of the rails 3 during the brushing operation are collected and forwarded in a similar manner by means of two lateral conveyors 23A and 23B of the same construction as the conveyor 16.
- the conveyors 23A and 23B are articulately carried on the vehicle 5 by means of supporting frames 24 rigidly connected to the vehicle.
- the conveyors 23A and 23B are carried in a cradle 25 which in turn is articulately suspended in said supporting frame 24 for pivoting of the conveyor about a horizontal pivot 26.
- each conveyor 23A and 23B is articulately connected to the cradle 25 to render possible swinging of the conveyors sideways in towards the vehicle 5 so as to reduce the total width of the vehicle when necessary for enabling the vehicle to pass a section of track having a limited loading-gauge, for example a tunnel.
- a transverse supporting structure 26 Disposed on a transverse supporting structure 26, situated in front of the lower ends of the conveyors 23A and 23B seen in the direction of travel are guide plates 27, 28 which are pivotable about vertical spindles and which can be readjusted, by means of power means, to guide the strands of ballast material to the lower ends of the conveyors for reliable infeed and further conveying of the ballast material to the ballast waggon.
- the supporting structure 26 can be lengthened or shortened by means of power equipment so that the desired adjustment position can be obtained.
- ballast material conveyed by the conveyors 16, 23A and 23B is emptied into a ballast bin situated below the conveyors.
- Said ballast bin may be disposed in the vehicle 5 but consists preferably of separate ballast waggons 29 and 30 coupled to the vehicle 5 and pulled by the vehicle, as shown in the figures.
- the ballast waggons used are often so long that the ballast material, instead of being emptied from the conveyors directly into the waggon, is meptied onto a belt conveyor 31 disposed above the ballast waggon and provided with a plough-like raisable stripper 32 situated substantially centrally above the waggon.
- the ballast waggons 29, 30 may appropriately be provided with discharge openings in the bottom and at the sides making possible their use also for laying out ballast material during ballasting.
- the vehicle 5 having ballast waggons coupled behind is driven along the intended section laying out strands 4 of ballast material both in the middle of the track embankment and at its sides.
- the vehicle is then reversed back to the starting position, after which the plough device 9, the brush unit 11, the conveyors 16, 23A and 23B and the shields 27 are brought into working position.
- the ballast material is levelled by means of the plough device 9, excess ballast material is swept away and then conveyed by means of the conveyors 16, 23A and 23B and emptied into the ballast waggon or waggons 29, 30 coupled behind.
- the device according to the invention thus renders possible a particularly effective handling of ballast material and the like of track embankments in connection with ballasting work thereon.
- the device according to the invention is, however, equally well suited for handling other material which is situated on or beside the track embankments, for example ploughing away, sweeping clean and handling snow in connection with snow clearing operations. There is also the possible of exchanging the plough device for a snow slinger.
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Machines For Laying And Maintaining Railways (AREA)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
AT81850207T ATE8802T1 (de) | 1980-11-06 | 1981-11-05 | Vorrichtung zur maschinellen handhabung von material auf eisenbahndaemmen, insbesondere zur handhabung von schotter. |
Applications Claiming Priority (2)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
SE8007800A SE434659B (sv) | 1980-11-06 | 1980-11-06 | Maskin for hantering av material pa jernvegsbanvallar |
SE8007800 | 1981-04-23 |
Publications (2)
Publication Number | Publication Date |
---|---|
EP0052089A1 EP0052089A1 (en) | 1982-05-19 |
EP0052089B1 true EP0052089B1 (en) | 1984-08-01 |
Family
ID=20342177
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
EP81850207A Expired EP0052089B1 (en) | 1980-11-06 | 1981-11-05 | Device for the mechanical handling of material on railway track embankments, particularly for handling ballast material |
Country Status (4)
Country | Link |
---|---|
EP (1) | EP0052089B1 (sv) |
AT (1) | ATE8802T1 (sv) |
DE (1) | DE3165270D1 (sv) |
SE (1) | SE434659B (sv) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220349128A1 (en) * | 2019-06-26 | 2022-11-03 | System 7 Ballast Regulator Gmbh | Track ballast levelling apparatus |
Families Citing this family (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
EP0531275B1 (de) * | 1991-09-03 | 1995-09-06 | Franz Plasser Bahnbaumaschinen-Industriegesellschaft m.b.H. | Maschinenanordnung zum Aufnehmen, Speichern und Verteilen von Schotter eines Gleises |
AT401074B (de) * | 1992-06-19 | 1996-06-25 | Plasser Bahnbaumasch Franz | Schotterpflug |
AT403706B (de) * | 1993-12-01 | 1998-05-25 | Plasser Bahnbaumasch Franz | Maschinenanlage zur behandlung der schotterbettung eines gleises |
CN104594277A (zh) * | 2014-12-26 | 2015-05-06 | 重庆智仁发电设备有限责任公司 | 铁路道砟清扫机 |
CN108774929A (zh) * | 2018-07-04 | 2018-11-09 | 蒲菊清 | 一种用于铁路道碴的整平装置 |
Family Cites Families (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE275251C (sv) * | ||||
US1397436A (en) * | 1920-10-22 | 1921-11-15 | David Stupich | Snow-gathering device |
US2416241A (en) * | 1944-09-08 | 1947-02-18 | Lloyd O Stratton | Ballast router |
US3007264A (en) * | 1958-11-03 | 1961-11-07 | George W Stanton | Railroad track ballast dressing machine |
US3468042A (en) * | 1966-12-21 | 1969-09-23 | Kalamazoo Mfg Co | Railway roadbed plow |
AT306773B (de) * | 1968-03-20 | 1973-04-25 | Plasser Bahnbaumasch Franz | Fahrbare Maschine zum kontinuierlichen Räumen, Aufnehmen und zum Verteilen des auf dem Gleis liegenden Bettungsschotters |
-
1980
- 1980-11-06 SE SE8007800A patent/SE434659B/sv unknown
-
1981
- 1981-11-05 DE DE8181850207T patent/DE3165270D1/de not_active Expired
- 1981-11-05 EP EP81850207A patent/EP0052089B1/en not_active Expired
- 1981-11-05 AT AT81850207T patent/ATE8802T1/de not_active IP Right Cessation
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
US20220349128A1 (en) * | 2019-06-26 | 2022-11-03 | System 7 Ballast Regulator Gmbh | Track ballast levelling apparatus |
Also Published As
Publication number | Publication date |
---|---|
EP0052089A1 (en) | 1982-05-19 |
SE434659B (sv) | 1984-08-06 |
DE3165270D1 (en) | 1984-09-06 |
SE8007800L (sv) | 1982-05-07 |
ATE8802T1 (de) | 1984-08-15 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US4108076A (en) | Method for removing ballast from railroad tracks | |
CA1239833A (en) | Arrangement for excavating bulk material from a track bed | |
SU1237088A3 (ru) | Машина дл непрерывной укладки сло песка между земл ным полотном и слоем щебн железнодорожного пути | |
US3872929A (en) | Method and apparatus for stablizing the sub-grade of a railroad ballast bed | |
CA1312785C (en) | Mobile machine for distributing and shaping the ballast bed of a railroad track | |
PL199479B1 (pl) | Maszyna do renowacji toru kolejowego | |
AU639636B2 (en) | A loading vehicle for receiving, moving along and discharging bulk material | |
RU2093637C1 (ru) | Уборочная машина для подметания рельсового пути | |
RU1817795C (ru) | Машина дл распределени и планировани щебеночного балластного сло железнодорожного пути | |
SK278179B6 (en) | Device for manufacture of protection layer of formation | |
JPH05202503A (ja) | 軌道敷設機械用の搬送もしくは掻出しチェーン装置 | |
EP0052089B1 (en) | Device for the mechanical handling of material on railway track embankments, particularly for handling ballast material | |
PL201969B1 (pl) | Maszyna do renowacji toru | |
US5097608A (en) | Ballast regulator | |
US5513452A (en) | Installation for the rehabilitation of a ballast bed | |
GB2074218A (en) | Track renewal machine comprising a ballast bed clearing and levelling unit | |
PL165464B1 (pl) | Maszyna poruszana po szynach do rozkladania i profilowania warstwy tluczniowej PL PL | |
US5937548A (en) | Machine for withdrawing bulk material from a track | |
PL201970B1 (pl) | Maszyna do renowacji toru | |
PL201968B1 (pl) | Maszyna do renowacji toru | |
CA2030500C (en) | Mobile ballast regulating machine | |
CN1055026A (zh) | 分配与整平道碴用的机械 | |
US4316416A (en) | Mobile apparatus for replacing old track ties by new track ties | |
US4119154A (en) | Method and apparatus for treating ballast | |
RU2093632C1 (ru) | Машина для обработки балластного слоя или земляного полотна железнодорожного пути |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PUAI | Public reference made under article 153(3) epc to a published international application that has entered the european phase |
Free format text: ORIGINAL CODE: 0009012 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LU NL SE |
|
RAP1 | Party data changed (applicant data changed or rights of an application transferred) |
Owner name: VINGAKER PRESSAR AB |
|
17P | Request for examination filed |
Effective date: 19821115 |
|
GRAA | (expected) grant |
Free format text: ORIGINAL CODE: 0009210 |
|
AK | Designated contracting states |
Designated state(s): AT BE CH DE FR GB IT LI LU NL SE |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: IT Free format text: LAPSE BECAUSE OF FAILURE TO SUBMIT A TRANSLATION OF THE DESCRIPTION OR TO PAY THE FEE WITHIN THE PRESCRIBED TIME-LIMIT;WARNING: LAPSES OF ITALIAN PATENTS WITH EFFECTIVE DATE BEFORE 2007 MAY HAVE OCCURRED AT ANY TIME BEFORE 2007. THE CORRECT EFFECTIVE DATE MAY BE DIFFERENT FROM THE ONE RECORDED. Effective date: 19840801 |
|
REF | Corresponds to: |
Ref document number: 8802 Country of ref document: AT Date of ref document: 19840815 Kind code of ref document: T |
|
REF | Corresponds to: |
Ref document number: 3165270 Country of ref document: DE Date of ref document: 19840906 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: FR Payment date: 19841031 Year of fee payment: 4 |
|
ET | Fr: translation filed | ||
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: AT Payment date: 19841109 Year of fee payment: 4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: NL Payment date: 19841120 Year of fee payment: 4 Ref country code: DE Payment date: 19841120 Year of fee payment: 4 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LU Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19841130 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: CH Payment date: 19841224 Year of fee payment: 4 |
|
PGFP | Annual fee paid to national office [announced via postgrant information from national office to epo] |
Ref country code: SE Payment date: 19841231 Year of fee payment: 4 Ref country code: BE Payment date: 19841231 Year of fee payment: 4 |
|
PLBE | No opposition filed within time limit |
Free format text: ORIGINAL CODE: 0009261 |
|
STAA | Information on the status of an ep patent application or granted ep patent |
Free format text: STATUS: NO OPPOSITION FILED WITHIN TIME LIMIT |
|
26N | No opposition filed | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: AT Effective date: 19851105 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: SE Effective date: 19851106 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: LI Effective date: 19851130 Ref country code: CH Effective date: 19851130 Ref country code: BE Effective date: 19851130 |
|
BERE | Be: lapsed |
Owner name: VINGAKER PRESSAR A.B. Effective date: 19851130 |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: NL Effective date: 19860601 |
|
GBPC | Gb: european patent ceased through non-payment of renewal fee | ||
NLV4 | Nl: lapsed or anulled due to non-payment of the annual fee | ||
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: FR Free format text: LAPSE BECAUSE OF NON-PAYMENT OF DUE FEES Effective date: 19860731 |
|
REG | Reference to a national code |
Ref country code: CH Ref legal event code: PL |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: DE Effective date: 19860801 |
|
REG | Reference to a national code |
Ref country code: FR Ref legal event code: ST |
|
PG25 | Lapsed in a contracting state [announced via postgrant information from national office to epo] |
Ref country code: GB Effective date: 19881118 |
|
EUG | Se: european patent has lapsed |
Ref document number: 81850207.2 Effective date: 19860811 |