[go: up one dir, main page]

EA009798B1 - Method of search, exploring, estimation and forecasting of potash ore deposit development - Google Patents

Method of search, exploring, estimation and forecasting of potash ore deposit development Download PDF

Info

Publication number
EA009798B1
EA009798B1 EA200700009A EA200700009A EA009798B1 EA 009798 B1 EA009798 B1 EA 009798B1 EA 200700009 A EA200700009 A EA 200700009A EA 200700009 A EA200700009 A EA 200700009A EA 009798 B1 EA009798 B1 EA 009798B1
Authority
EA
Eurasian Patent Office
Prior art keywords
drilling
sampling
forecasting
development
search
Prior art date
Application number
EA200700009A
Other languages
Russian (ru)
Other versions
EA200700009A1 (en
Inventor
Анатолий Михайлович Гречко
Анатолий Данилович СМЫЧНИК
Сергей Федорович Шемет
Original Assignee
Открытое Акционерное Общество "Белгорхимпром"
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Открытое Акционерное Общество "Белгорхимпром" filed Critical Открытое Акционерное Общество "Белгорхимпром"
Priority to EA200700009A priority Critical patent/EA009798B1/en
Publication of EA200700009A1 publication Critical patent/EA200700009A1/en
Publication of EA009798B1 publication Critical patent/EA009798B1/en

Links

Landscapes

  • Geophysics And Detection Of Objects (AREA)

Abstract

This invention relates to mining industry and can be used in the search, exploring, research, estimation and forecasting of minerals development, particularly, of potash ore deposits development.The objective of this invention is the saving of cost and terms of search, exploring and forecasting of potash ore deposit development, increasing of effectiveness of research works on waterproof strata.The assigned task is obtained in the following way: in the method of search, exploring, research, estimation and forecasting of potash ore deposit development, that include the drilling operations, geophysical and geotechnological investigations of boreholes, in each selected point on the ground surface two drilling rigs are installed: one of them is light and designed for well-boring up to the stratification depth of waterproof strata roofing of studied deposit, the second is heavy and designed for boring on the total depth. By simultaneous boring with two drilling rigs the drilling with the light rigging is carried out permanently with the sampling for study up to the stratification depth of waterproof strata roofing, by the drilling with heavy rigging the sinking of borehole up to waterproof strata roofing is carried out with continuous face, whereupon the sinking of borehole is realized with the sampling. The sampling is carried out with special implements for core samples collection with protection against wash-out and penetration of drilling mud filtrate or stratal water in the pore space of the core.

Description

Изобретение относится к горной промышленности и может быть использовано при поиске, разведке, исследовании, оценке и прогнозировании разработки полезных ископаемых, в частности, залежей калийных руд.The invention relates to the mining industry and can be used in the search, exploration, research, evaluation and forecasting of the development of mineral resources, in particular, deposits of potash ores.

Известен способ поиска, разведки, исследования, оценки и проектирования разработки залежи и месторождений полезных ископаемых, включающий обработку и интерпретацию набора реперовразрезов, слайдов или кубов скважин-эталонов с помощью детерминистских и распознавательскостатистических зависимостей и методик, в том числе и корреляцию разрезов эталонов скважин [1].There is a method of prospecting, exploration, research, evaluation and design of development of deposits and mineral deposits, including the processing and interpretation of a set of reference sections, slides or cubes of reference wells using deterministic and statistical statistics and methods, including the correlation of sections of wells standards [1 ].

Недостатком этого способа является невысокое качество и невысокая достоверность получаемых результатов.The disadvantage of this method is the low quality and low reliability of the obtained results.

Известен также способ поиска, разведки и оценки эксплуатационных свойств залежей и месторождений полезных ископаемых, включающий использование традиционных схем геологических разведывательных работ по поиску и исследованию залежей и месторождений рудных и нерудных твердых полезных ископаемых, месторождений углеводородов, а также при поиске подземных запасов воды, преимущественно для участков с известным строением земной коры. При реализации способа проводят буровые работы, геофизические и геотехнологические исследования скважин и полевые геологогеофизические, геохимические и аэрокосмические работы, обеспечивающие формирование, по меньшей мере, каркаса из геофизических и параметрических разрезов, кубов, слайдов скважин-эталонов на основе обработки и интерпретации геофизической, геохимической, геотехнологической и буровой добычной информации о скважинах [2] - прототип.There is also known a method of prospecting, exploration and evaluation of the operational properties of deposits and mineral deposits, including the use of traditional geological exploration schemes for the search and study of deposits and deposits of ore and non-metallic solid minerals, hydrocarbon deposits, and also for searching for underground water, mainly for plots with a known structure of the earth's crust. During the implementation of the method, drilling, geophysical and geotechnological studies of wells and field geological, geochemical and aerospace works are carried out to ensure the formation of at least a framework from geophysical and parametric sections, cubes, slides of well-standards based on processing and interpretation of geophysical, geochemical, geotechnological and drilling mining well information [2] - a prototype.

Недостатком этого способа является длительность сроков и высокая себестоимость проводимых работ.The disadvantage of this method is the length of time and high cost of the work.

Задача изобретения - снижение сроков и себестоимости поиска, разведки и прогнозирования разработки залежи калийных руд, повышение эффективности исследовательских работ по изучению водозащитной толщи.The objective of the invention is to reduce the time and cost of search, exploration and forecasting of the development of deposits of potash ores, increasing the efficiency of research work on the study of water protection.

Поставленная задача достигается тем, что в способе поиска, разведки, исследования, оценки и прогнозирования разработки залежи калийных руд, включающем буровые работы, геофизические и геотехнологические исследования скважин, на каждой выбранной точке на поверхности земли размещают две буровые установки, одна - легкая, предназначенная для бурения скважин до глубины кровли водозащитной толщи изучаемой залежи, другая - тяжёлая, предназначенная для бурения на всю проектную глубину. При одновременном бурении двумя установками бурение легкой установкой осуществляют с отбором образцов для их изучения до кровли водозащитной толщи постоянно, а при бурении тяжелой установкой проходку скважины до кровли водозащитной толщи осуществляют сплошным забоем, после чего проходку скважины ведут с отбором образцов, причём отбор образцов осуществляют с помощью специальных снарядов для отбора керна с защитой от размыва и проникновения фильтрата бурового раствора или пластовых вод в поровое пространство керна.The task is achieved by the fact that in the method of prospecting, exploration, research, evaluation and forecasting of the development of a deposit of potash ores, including drilling, geophysical and geotechnological studies of wells, two drilling rigs are placed at each selected point on the surface of the earth, drilling of wells to the depth of the roof of the water-bearing stratum of the studied reservoir, the other is heavy, designed for drilling to the entire design depth. While drilling by two units at the same time, easy installation is carried out with sampling for studying them up to the roof of the water-resistant formation all the time, and when drilling with a heavy installation, the well is drilled to the roof of the water-protective thickness by continuous slaughter, after which the drilling of the well is carried out with using special projectiles for coring with protection from erosion and penetration of drilling mud filtrate or formation water into the pore space of the core.

На чертеже изображён разрез вскрытия буровыми скважинами залежи калийных руд.The drawing shows a section of the opening of the borehole deposits of potash ores.

Способ поиска, разведки, исследования, оценки и прогнозирования разработки залежи калийных руд осуществляется следующим образом.The method of prospecting, exploration, research, evaluation and forecasting of the development of deposits of potash ores as follows.

На каждой из точек площадки месторождения, определенной аналитическим путем, на поверхности земли 1 одновременно размещают две буровые установки, одна легкая 2, предназначенная для бурения неглубоких скважин 3 (до глубины кровли 4 водозащитной толщи 5), другая - тяжелая 6, предназначенная для бурения скважины 7 на всю проектную глубину 8. При бурении лёгкой установкой 2 отбор образцов из скважины 3 для их изучения до кровли 4 водозащитной толщи 5 осуществляется постоянно, при бурении тяжелой установкой 6 проходка скважины 7 до кровли 4 водозащитной толщи 5 ведут сплошным забоем, а только потом - с отбором образцов, причём отбор образцов осуществляют с помощью специальных снарядов для отбора керна с защитой от размыва и проникновения фильтрата бурового раствора или пластовых вод в поровое пространство керна.At each point of the field site, determined analytically, on the surface of the earth 1, two drilling rigs are simultaneously placed, one light 2, designed for drilling shallow wells 3 (up to the depth of the roof 4 of the watertight formation 5), the other is heavy 6, intended for drilling a well 7 for the entire design depth 8. When drilling with easy installation 2, sampling from well 3 to study them up to the roof 4 of the watertight formation 5 is carried out continuously, while drilling with heavy installation 6, drilling of the well 7 to the roof 4 is waterproof 5th strata are solidly slaughtered, and only then - with sampling, and sampling is carried out using special projectiles for core sampling with protection from erosion and penetration of drilling mud filtrate or formation water into the pore space of the core.

Пример осуществления способа.An example of the method.

В Котельниковском районе Волгоградской области Российской Федерации расположено месторождение калийных солей «Гремячинское». Лицензию на право пользования недрами с целью доразведки и добычи калийных солей этого месторождения выкупила одна из российских организаций. Время на проведение доразведки и начала эксплуатации месторождения строго ограничено условиями лицензии. Поэтому необходимо в кратчайшие сроки провести доразведку данного месторождения, изучить водозащитную толщу и условия залегания калийных руд с целью выбора эффективных и безопасных технологических схем их отработки, подготовить месторождение к промышленному освоению. Для этого необходимо провести целый комплекс геологоразведочных работ, включающий буровые работы, геофизические, геотехнологические и другие исследования скважин.In the Kotelnikovsky district of the Volgograd Region of the Russian Federation, the Gremyachinskoe potassium salt deposit is located. A license for the right to use subsoil for the purpose of additional exploration and extraction of potash salts of this field was bought by one of the Russian organizations. The time for additional exploration and the start of field operation is strictly limited by the terms of the license. Therefore, it is necessary in the shortest possible time to conduct additional exploration of this field, study the water barrier and the conditions of occurrence of potash ores in order to select efficient and safe technological schemes for their development, to prepare the field for industrial development. To do this, it is necessary to carry out a whole complex of exploration work, including drilling, geophysical, geotechnological and other well studies.

На каждой из точек площадки месторождения, определенной аналитическим путем, на поверхности земли одновременно размещают две буровые установки, одна легкая, типа 1БА-15В, предназначенная для бурения неглубоких скважин (до глубины кровли водозащитной толщи), другая - тяжелая, типа ЗИФ1200МР, предназначенная для бурения на всю проектную глубину. При бурении лёгкой установкой отбор образцов из скважины для их изучения через водоносные горизонты до кровли водозащитнойAt each point of the field site, determined analytically, two drilling rigs are simultaneously placed on the surface of the earth, one light, type 1BA-15B, designed for drilling shallow wells (up to the depth of the roof of the watertight sequence), the other heavy, type ZIF1200MR, intended for drilling for the entire design depth. When drilling with light installation, sampling from the well for their study through aquifers to the top of the water protection

- 1 009798 толщи осуществляют постоянно, а при бурении тяжелой установкой проходку скважины до кровли водозащитной толщи осуществляют сплошным забоем, а только потом проходку скважины ведут с отбором образцов, причём отбор образцов осуществляют с помощью специальных снарядов для отбора керна с защитой от размыва и проникновения фильтрата бурового раствора или пластовых вод в поровое пространство керна.- 1 009798 strata are carried out constantly, and when drilling with heavy installation, the well is drilled to the top of the water-proof layer by continuous slaughter, and only then the well is drilled with sampling, and the sampling is carried out using special shells for filtrate penetration drilling mud or formation water in the pore space of the core.

В результате использования предлагаемого способа повышают качество получаемых результатов физико-механических и фильтрационных свойств водозащитной толщи и калийной залежи, почти в 2 раза сокращают сроки проведения буровых работ и существенно снижают стоимость работ по доразведке месторождения.As a result of using the proposed method, the quality of the obtained results of the physicomechanical and filtration properties of the water-protective stratum and potash deposit is increased, the drilling time is reduced by 2 times and the cost of additional exploration of the field is significantly reduced.

Источники информации.Information sources.

1. Патент Российской Федерации № 2001120889/28, МПК 7 С 01У 11/00, опубл. 2003.06.20.1. Patent of the Russian Federation No. 2001120889/28, IPC 7 S 01U 11/00, publ. 2003.06.20.

2. Патент Российской Федерации № 2001120890/28, МПК 7 С 01У 11/00, опубл. 2003.06.20 - прототип.2. Patent of the Russian Federation No. 2001120890/28, IPC 7 S 01U 11/00, publ. 2003.06.20 - a prototype.

Claims (1)

ФОРМУЛА ИЗОБРЕТЕНИЯCLAIM Способ поиска, разведки, исследования, оценки и прогнозирования разработки залежи калийных руд, включающий буровые работы, геофизические и геотехнологические исследования скважин, отличающийся тем, что на каждой из точек, определенных аналитическим путем, в районе залежи калийных руд на поверхности земли одновременно размещают две буровые установки: одна легкая, предназначенная для бурения скважин до глубины залегания кровли водозащитной толщи изучаемой залежи, другая тяжелая, предназначенная для бурения на всю проектную глубину, при этом бурение легкой установкой ведут с отбором образцов для их изучения постоянно, а при бурении тяжелой установкой проходку скважин до глубины залегания кровли водозащитной толщи осуществляют сплошным забоем, после чего проходку скважин ведут с отбором образцов, причём отбор образцов осуществляют с помощью специальных снарядов для отбора керна с защитой от размыва и проникновения фильтрата бурового раствора или пластовых вод в поровое пространство керна.The method of prospecting, exploration, research, evaluation and forecasting of the development of deposits of potash ores, including drilling, geophysical and geotechnological studies of wells, characterized in that at each of the points determined analytically in the area of deposits of potash ore on the surface of the earth simultaneously place two drilling installations: one is lightweight, intended for drilling wells to the depth of the roof of the water-proof thickness of the studied reservoir, the other is heavy, designed for drilling to the entire design depth, with In this way, easy installation is carried out with sampling for studying them constantly, and when drilling with heavy installation, wells are drilled to the depth of the roof of the water-protective layer by continuous slaughter, after which wells are drilled with sampling, and the sampling is carried out with special cores with protection against erosion and penetration of drilling mud filtrate or formation water into the pore space of the core.
EA200700009A 2006-11-10 2006-11-10 Method of search, exploring, estimation and forecasting of potash ore deposit development EA009798B1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
EA200700009A EA009798B1 (en) 2006-11-10 2006-11-10 Method of search, exploring, estimation and forecasting of potash ore deposit development

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
EA200700009A EA009798B1 (en) 2006-11-10 2006-11-10 Method of search, exploring, estimation and forecasting of potash ore deposit development

Publications (2)

Publication Number Publication Date
EA200700009A1 EA200700009A1 (en) 2008-04-28
EA009798B1 true EA009798B1 (en) 2008-04-28

Family

ID=40848861

Family Applications (1)

Application Number Title Priority Date Filing Date
EA200700009A EA009798B1 (en) 2006-11-10 2006-11-10 Method of search, exploring, estimation and forecasting of potash ore deposit development

Country Status (1)

Country Link
EA (1) EA009798B1 (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730592A (en) * 2015-01-15 2015-06-24 中国地质科学院矿产资源研究所 Method for searching deeply buried solid sylvite ore deposit

Families Citing this family (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113267376B (en) * 2021-07-01 2023-05-30 上饶师范学院 A geological testing instrument

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU989515A1 (en) * 1980-11-21 1983-01-15 Стахановский Филиал Коммунарского Горно-Металлургического Института Potassium salt locating method
SU1272297A1 (en) * 1985-06-10 1986-11-23 Научно-Исследовательский Институт Геологии Саратовского Ордена Трудового Красного Знамени Государственного Университета Им.Н.Г.Чернышевского Method of predicting potassium-magnesium bearing of halogen deposits
EP0629769A2 (en) * 1993-06-16 1994-12-21 Thyssengas Gmbh Method and apparatus for leaching out cavities in salt formations
RU5616U1 (en) * 1996-08-19 1997-12-16 Акционерное общество открытого типа "Ноябрьскнефтегаз" WELL DRILLING DEVICE

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU989515A1 (en) * 1980-11-21 1983-01-15 Стахановский Филиал Коммунарского Горно-Металлургического Института Potassium salt locating method
SU1272297A1 (en) * 1985-06-10 1986-11-23 Научно-Исследовательский Институт Геологии Саратовского Ордена Трудового Красного Знамени Государственного Университета Им.Н.Г.Чернышевского Method of predicting potassium-magnesium bearing of halogen deposits
EP0629769A2 (en) * 1993-06-16 1994-12-21 Thyssengas Gmbh Method and apparatus for leaching out cavities in salt formations
RU5616U1 (en) * 1996-08-19 1997-12-16 Акционерное общество открытого типа "Ноябрьскнефтегаз" WELL DRILLING DEVICE

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104730592A (en) * 2015-01-15 2015-06-24 中国地质科学院矿产资源研究所 Method for searching deeply buried solid sylvite ore deposit

Also Published As

Publication number Publication date
EA200700009A1 (en) 2008-04-28

Similar Documents

Publication Publication Date Title
Younger et al. Chloride waters of Great Britain revisited: from subsea formation waters to onshore geothermal fluids
EA009798B1 (en) Method of search, exploring, estimation and forecasting of potash ore deposit development
RU2602427C2 (en) Method of exploration of potassium-magnesium salts deposits at large depths
RU2273734C1 (en) Method for potassium mine protection against flooding
RU2390043C2 (en) Method for reproduction of ore deposits contour
RU2013117603A (en) METHOD FOR OPENING A NEW INDUSTRIAL ORE DEPOSIT ON THE OUTSIDE OF GRANITOID ARRAY
RU2005119046A (en) METHOD FOR COMBINED DEVELOPMENT OF GENDER PLASTS OF COAL DEPOSITS
Martinelli Groundwater exploration by geoelectrical methods in Southern Africa
RU2418166C1 (en) Compound development method of series of gently sloping beds of mine fields
Pfaffhuber et al. Extraction of depth of bedrock from airborn electromagnetic data using artificial neural networks
Daly et al. Fault control of groundwater flow and hydrochemistry in the aquifer system of the Castlecomer Plateau, Ireland
Singh et al. Exploration of subsurface strata conditions for a limestone mining area in India with ground-penetrating radar
Levashov et al. Innovative geoelectric methods: multi-year experience of application for the practical problems of near-surface geophysics operative solution
RU2116445C1 (en) Method for developing deposits of potassium-magnesium and rock salts
RU2825810C1 (en) Method for determining height of zone of technogenic cracks above mining site
RU2418168C1 (en) Compound development method of series of gently sloping beds of mine fields
Kenetayeva et al. Sudden emissions of coal and gas in the Karaganda coal basin
RU2139557C1 (en) Method of search for metal deposits on examples of noble metals
RU2230191C2 (en) Method for extracting potassium deposit in zone of local shift influence
RU2127361C1 (en) Method for extracting liquid minerals from salt mines
RU2265124C2 (en) Method for salt deposit development along with platinum obtaining from stratum above salt layer
RU2230190C2 (en) Method for extraction of potassium deposit in areas of replacement of silv enate by rock salt
Schofield et al. The hydrogeology of the Ballimore region, central New South Wales, Australia: an integrated study
Demjanski et al. The stability of the working and finishing slopes in the coal mine" Brod-Gneotino" at the municipality of Novaci
Legault et al. Risk assessment from historical coal undermining using helicopter TDEM and ground geophysics: The Ermelo Ring Road Study, South Africa

Legal Events

Date Code Title Description
MM4A Lapse of a eurasian patent due to non-payment of renewal fees within the time limit in the following designated state(s)

Designated state(s): BY KZ KG TJ TM RU