- DE877496C DE877496C DEB15379A DEB0015379A DE877496C DE 877496 C DE877496 C DE 877496C DE B15379 A DEB15379 A DE B15379A DE B0015379 A DEB0015379 A DE B0015379A DE 877496 C DE877496 C DE 877496C
- Authority
- DE
- Germany
- Prior art keywords
- falsework
- prefabricated
- lifting devices
- parts
- underframe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04B—GENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
- E04B1/00—Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
- E04B1/35—Extraordinary methods of construction, e.g. lift-slab, jack-block
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Physics & Mathematics (AREA)
- Electromagnetism (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Description
Verfahren zur Herstellung von Bauten aus Fertigteilen und Fertigbauteile zur Durchführung des Verfahrens Die Erfindung betrifft ein Verfahren und Vorrichtungen zur Herstellung und Anwendung von Fertigbauteilen zur Errichtung von Bauwerken, um zu ermöglichen, in höherem Grade als bisher Fertigbauteile bei der Errichtung von Bauwerken verwenden zu können und einen Transport solcher Fertigbauteile von weiter her zu vermeiden.Process for the production of buildings from prefabricated parts and prefabricated parts for carrying out the method The invention relates to a method and devices for the production and use of prefabricated components for the construction of structures, in order to enable, to a greater degree than before, prefabricated components during construction of buildings to be able to use and a transport of such prefabricated parts of further to avoid.
Diese Fertigbauteile, wie z. B. Außen- oder Innenwände, Decken, Dächer, Hallenträger usw., werden dicht beim zu erstellenden Bauwerk auf einem formbeständigen Lehrgerüst in waagerechter Lage erfindungsgemäß hergestellt, das geeignet ist, den Fertigbauteil zu tragen und es ermöglicht, durch eine einfache Schwenkung oder Verschiebung oder durch beide Arten von Bewegungen, also, wie hervorgehoben, ohne ein Fördern der Fertigbauteile von weiter her diese an Ort und Stelle und in die richtige Lage zu bringen.These prefabricated parts, such. B. exterior or interior walls, ceilings, roofs, Hall girders, etc., are close to the building to be created on a dimensionally stable Falsework made according to the invention in a horizontal position, which is suitable for the Carrying prefabricated component and it is made possible by a simple pivoting or shifting or by both types of movements, that is, as emphasized, without conveying of the prefabricated components from further on, these in place and in the correct position bring to.
Es ist vorteilhaft, wenn je zwei Hauptabmessungen der Fertigbauteile denen gleich sind, die beim fertigen Bauwerk z. B. in Ebenen und Kanten vorgesehen sind. Dementsprechend sind die Abmessungen der Lehrgerüste gewählt.It is advantageous if there are two main dimensions of the prefabricated components those are the same, the z. B. provided in planes and edges are. The dimensions of the falsework are selected accordingly.
Die Zeichnung veranschaulicht in schematischer, teilweise symbolischer Darstellung in zwanzig Abbildungen Vorrichtungen zur Herstellung der Fertigbauteile und ferner Vorrichtungen und deren Anwendung, um diese Fertigbauteile an ihren Platz. im fertigen Bauwerk zu schaffen, wie auch einige Beispiele von Fertigbauteilen und die Art ihrer Erstellung.The drawing illustrates in schematic, partly symbolic Representation in twenty pictures Devices for the production of the prefabricated components and also devices and their use to put these prefabricated components in place. in the to create a finished structure, as well as some examples of prefabricated components and the way they were created.
Die in den gezeigten Beispielen verwendetenLehrgerüste sind vorzugsweise zur Ausführung von Wohnbauten bestimmt. Sie bestehen aus einer Grundtafel i, deren Länge und Breite mindestens so groß sein müssen wie die Breite eines Raums oder einer ganzen Etage und deren Höhe. Diese Tafel i ruht auf einem Untergestell 2, auf welchem sie mit Hilfe einer oder mehrerer Schraubenwinden oder irgendwelcher anderer Einrichtungen geschwenkt werden kann. Diese Schraubenwinden können aus einem Gewinderohr 3 bestehen, welches auf einem am Untergestell befindlichen Drehpunktq. ruht und mit einem Handrad 5 gedreht wird. Um das Gewinderohr greift eine Mutterhülse 6, an der die Grundtafel i befestigt ist.The scaffolds used in the examples shown are preferred intended for the execution of residential buildings. They consist of a basic table i, whose The length and width must be at least as large as the width of a room or an entire floor and its height. This table i rests on a base 2, on which they use one or more screw jacks or any other facilities can be pivoted. These screw jacks can consist of a Threaded pipe 3 exist, which is located on a pivot point on the base. rests and is rotated with a handwheel 5. A nut sleeve engages around the threaded pipe 6, to which the base plate i is attached.
Die Verlängerungen 7 für die Tafeln i und die .Verlängerungen 8 für das Untergestell 2 ermöglichen eine etwa erforderliche Angleichung der Grundtafel an die eine Hauptabmessung des Fertigbauteils. Die Grundtafel i verbreiternde Tafeln der gleichen Art wie das Untergestell 2 gleich verbreiternde zusätzliche Untergestelle ermöglichen in Verbindung mit Hebeleinrichtungen. eine Angleichung an das erforderliche Hauptmaß des Fertigbauteils.The extensions 7 for the panels i and the .Extensions 8 for the underframe 2 allow any necessary adjustment of the base table to one of the main dimensions of the prefabricated component. The basic table i widening tables the same type as the base 2 equally widening additional bases enable in connection with lever devices. an alignment with the required Main dimension of the prefabricated component.
Die verschiedenen Betätigungseinrichtungen, wie z. B. Schraubenblinde 3, sind durch eine Kupplung synchronisiert, so daß während der Bewegungen keine wesentlichen Verwindungen der Grundtafel vorkommen können. Diese Kupplung wird z. B. mit einer endlosen Kette oder einer gemeinsamen Achse hergestellt.The various actuating devices, such as B. Screw blind 3, are synchronized by a clutch, so that no significant twisting of the base table can occur. This clutch is z. B. made with an endless chain or a common axis.
Je nach der Art der Grundtafel und der Arbeit erfolgt die Schwenkung entweder um den Drehpunkt 9 oder um eine Kante .io des Untergestells 2 oder auch um beides nacheinander. An der Seitenschalung 12 befestigte Greifhaken i i, die sich der Tafel einfügen, vermindern jegliches Gleiten des vorfabrizierten Fertigbauteils während seiner Bewegung, bis er aufgestellt wird.Pivoting takes place depending on the type of base table and the type of work either around the pivot point 9 or around an edge .io of the underframe 2 or also to do both one after the other. Attached to the side form 12 gripping hooks i i, the fit into the panel, reduce any sliding of the prefabricated prefabricated component during its movement until it is erected.
Wenn der vorfabrizierte Fertigbauteil vor der Bewegung an seiner zukünftigen Standfläche entschalt werden muß, weil dies naturgemäß nach seinem Anplatzstellen unmöglich wäre, kann für seinen Halt ein darinbleibendes Profileisen benutzt werden. Dieses dient dann dazu, den vollendeten Bau zu versteifen und kann miteingerechnetwerden. Statt 'dieses Profileisens können auch mehrere in geeigneten Abständen angeordnete Kegelzapfen 13 benutzt werden, die in an der Grundtafel i des Tafellehrgerüstes befestigten Keiltaschen gehalten werden und in den betreffenden Baufertigteil hineinragen. Um diese Kegelzapfen 13 herauszutreiben, werden Lösekeile 1q. benutzt oder irgendwelche anderen geeigneten Lösevorrichtungen. Auf diese genannten Haltemittel kann unter Umständen verzichtet werden, wenn der für die Herstellung des Fertigbauteils in seinem unteren Teil verwendete Beton den während der Bewegung auftretenden Beanspruchungen genügt.If the prefabricated prefabricated part before moving to its future Stand area must be demoulded because this naturally occurs after it has been placed would be impossible, a profile iron remaining in it can be used for its hold. This then serves to stiffen the completed building and can be included in the calculation. Instead of 'this profile iron several arranged at suitable intervals Tapered pins 13 are used, which are in on the basic table i of the teaching framework fastened wedge pockets are held and protrude into the relevant prefabricated building part. In order to drive out these tapered pins 13, release wedges 1q. used or any other suitable release devices. On these mentioned holding means can under Certain circumstances are waived if the person responsible for the production of the prefabricated component in In its lower part, concrete used the stresses that occur during movement enough.
Es gibt auch Fertigteile, welche den entstehenden Spannungen standhalten, wenn sie während der Bewegung am Seitengerüst sozusagen hängen.There are also prefabricated parts that withstand the stresses that arise, if they hang, so to speak, on the side frame while moving.
Um solche Fertigbauteile umzuwenden, d. h. um i8o° herumzudrehen, werden sie zuerst in die senkrechte Stellung gebracht und dann auf die andere Breitseite heruntergelassen. Das Seitenbgerüst 12 (s. z. B. Fig. q.) schwenkt dabei um seine Kante 15, welche auf der Kante 16 des Untergestells 2 ruht. Das Spanneisen 17 verhindert die Verformung des Rahmens bzw. des Seitengerüstes, die von dem Druck des hinunterzubringenden Hebewerks verursacht werden könnte. Für einige Werkteile kann es vorteilhafter sein, einen Sonderrahmen 2 (s-. Fig. 6) zu benutzen, der eine volle Umdrehung der Tafel um eine horizontale Zentralachse 9 ermöglicht.To turn over such prefabricated elements, i. H. to turn around i8o °, they are first brought into the vertical position and then on the other broad side lowered. The side frame 12 (see z. B. Fig. Q.) Swivels around his Edge 15, which rests on the edge 16 of the underframe 2. The clamping iron 17 prevents the deformation of the frame or the side frame caused by the pressure of the Elevator. For some parts of the work it can be more advantageous a special frame 2 (s-. Fig. 6) to use, the one full turn of the board around a horizontal central axis 9 allows.
Ein Untergestell 2 (s. Fig. 8), das die Höhenlage der Vorfabrikationsebene an die künftige Schwerpunktlage des an seinen Platz gestellten Fertigbauteils annähert, gestattet kleinere Hebevorrichtungen und vermindert die aufzuwendende Arbeit. Die Grundtafel und das Untergestell sowie die Hebevorrichtung können symmetrisch zu zwei waagerechten, aufeinander senkrecht stehenden Zentralachsen angeordnet sein. Da Fertigbauteile wie Außen- und Zwischenwände parallel und senkrecht zueinander stehen, wird diese Anordnung Versetzungen und Verrückungen der genannten Teile vermindern. Eine flache Tafel i (s. Fig. 9), auf einem geeigneten Rahmen gerichtet und auf Rollen 18 verschiebbar, kann auch in verschiedenen Fällen die Bewegungen erleichtern.An underframe 2 (see Fig. 8), the height of the prefabrication level approximates the future center of gravity of the prefabricated component placed in its place, allows smaller lifting devices and reduces the labor involved. the The base plate and the base as well as the lifting device can be symmetrical be arranged two horizontal, mutually perpendicular central axes. Because prefabricated components such as exterior and partition walls are parallel and perpendicular to each other this arrangement will reduce misalignments and displacements of the named parts. A flat table i (see Fig. 9), set up on a suitable frame and on rollers 18 slidable, can also make movements easier in different cases.
Für außergewöhnliche Werkteile, wie Hallenträger, kann die Fläche der Tafel i (s. Fig. io) diesen besonderen Formen angepaßt werden, und das Untergestell sowie auch die Hebeeinrichtungen können an die erforderlichen Bewegungen angeglichen werden.The area the table i (see Fig. io) can be adapted to these special shapes, and the underframe as well as the lifting devices can be adjusted to the required movements will.
Für leicht gekrümmte Wände, z. B. Gewölbe oder Wasserbehälterteile, kann man eine zylindrische Tafel verwenden.For slightly curved walls, e.g. B. vaults or water tank parts, you can use a cylindrical board.
Um Satteldächer vorzufabrizieren und in Stellung zu bringen, kann die Grundtafel i auch V-förmig sein.In order to prefabricate gable roofs and to position them, the base table i can also be V-shaped.
Das Untergestell kann auf Rädern montiert werden, so daß die Einrichtungen zur Herstellung von Einfriedigungen benutzt werden können. In bezug auf den Stoff und alle Einzelheiten sind die Grundtafeln i und das Zubehör dem Bauwerk anzupassen und nach den Regeln der Maschinenbaukunde und der Festigkeitslehre auszuführen.The base can be mounted on wheels so that the facilities can be used to create fencing. In terms of the fabric and all details, the basic tables i and the accessories must be adapted to the building and to be carried out according to the rules of mechanical engineering and strength theory.
Mit Hilfe der oben beschriebenen umdrehbaren Tafellehrgerüsteinrichtungen werden die Wände eines Wahnbaues von der Höhe eines Stockwerks und von der Länge eines oder mehrerer Räume, unter Umständen auch einer ganzen Fassade vorfabriziert. Das Untergestell ruht auf dem letzten fertigen Boden derart, daß die vorfabrizierte Wand nach ihrer Aufrichtung an die richtige Stelle zu stehen kommt. Die Wand wird horizontal hergestellt, wobei die künftige Innenseite auf der Grundtafel aufliegt. Dabei haben die Seitenschalungen die Höhe der Mauerstärke. Demgemäß wird die Wand in folgender Weise hergestellt. Auf der Grundtafel w-,-rd" -n Maueröffnungen entweder mit dem gewöhnlich eingelegten Rahmen i9 oder ohne Rahmen, wie bei 2o, mit einer besonderen Verschalung hergestellt, die zuvor auf der Tafel befestigt wird. Desgleichen können keramische Verkleidungen usw. auf der Tafel befestigt werden, ferner Halbrundstäbe zur Erzielung von Nuten 21 für die Verankerung von Zwischenwänden.With the help of the reversible teaching scaffolding devices described above the walls of a delusional building are the height of a story and the length one or more rooms, possibly also a whole facade prefabricated. The underframe rests on the last finished floor so that the prefabricated Wall comes to stand in the right place after it has been erected. The wall will produced horizontally, with the future inside resting on the base board. The side formwork has the same height as the wall thickness. Accordingly, the wall becomes manufactured in the following way. On the base plate w -, - rd "-n wall openings either with the usually inserted frame i9 or without a frame, as with 2o, made with a special formwork previously attached to the panel will. Likewise, ceramic cladding etc. can be attached to the board, also semicircular rods to achieve grooves 21 for anchoring partition walls.
Nachdem die aufzubetonierendeWand die hierzu erforderliche Höhe erreicht hat, werden Rohre, wie Rauchrohre, Wasserrohre und Abfallrohre 22, Isolierblöcke 23, welche die Pfosten umgrenzen, Seitenverschalungen der Öffnungen 2.4, Läden 25, Armaturen und alle diejenigen Elemente, die in der vorfabrizierten Wand vorkommen, beim Gießvorgang, jeder Teil an seinem Platz, der Wand eingefügt.After the wall to be concreted has reached the required height pipes such as smoke pipes, water pipes and waste pipes 22 become insulating blocks 23, which delimit the posts, side cladding of the openings 2.4, shutters 25, Fittings and all those elements that occur in the prefabricated wall, during the casting process, each part is inserted into the wall in its place.
Der untere Teil der vorfabrizierten Wand, d. h. also die innere Wandseite 26 kann durch Vibration verdichtet werden, der obere, d. h. die äußere Wandseite 27 kann gewalzt oder gestampft werden. Diese äußere Seite kann mit Hilfe einer Walze einen Verputz erhalten, welche Walze mit vertieften Ziermotiven versehen sein kann. Eine Walze kann auch dazu benutzt werden, in die Wandaußenseite Verkleidungen aus gebrochenen Ziersteinen, aus keramischen oder Porzellanteilen einzuwalzen. Vorsprünge, wie Öffnungseinfassungen 28 usw., werden an der äußeren Seite der Wand eingefügt. Malerarbeiten werden auf der fertiggemachten Seite vor deren Erhärtung ausgeführt.The lower part of the prefabricated wall, i.e. H. so the inner wall side 26 can be compacted by vibration, the upper, i.e. H. the outer wall side 27 can be rolled or tamped. This outer side can be done with the help of a roller get a plaster, which roller can be provided with recessed decorative motifs. A roller can also be used to clad the outside of the wall broken decorative stones, ceramic or porcelain parts. Protrusions, such as opening bezels 28, etc., are inserted on the outer side of the wall. Painting work is carried out on the finished side before it hardens.
Nachdem die vorfabrizierte Wand für die nachfolgenden Bewegungen hart genug ist, wird die nach unten kommende Seitenverschalung entfernt, die Fugen bei 29 (Fig. 3) mit Mörtel belegt und die Tafel bis in die Senkrechte bewegt. Wenn dieser Mörtel genügend erhärtet ist, wird das ganze Gerüst entfernt und eine provisorische Unterstützung gebaut, die die Wand so lange hält, bis andere Wände durch Mitverbindung diese Unterstützung entbehrlich machen.After the prefabricated wall hard for the subsequent movements is enough, the side cladding that comes down is removed, the joints at 29 (Fig. 3) covered with mortar and the board moved up to the vertical. If this If the mortar has hardened sufficiently, the entire framework is removed and a temporary one Support is built that holds the wall until other walls are joined together make this support unnecessary.
Je nach deren Bestimmung können dickere Mauern aus mehereren gleichmäßigen Wänden zusammengesetzt werden, welche nacheinander ausgeführt und so in eine Stellung gebracht werden, daß sie die gesamte Wand aus mehreren Schichten mit oder ohne gegenseitige Verklammerung bilden.Depending on their purpose, thicker walls can be made up of several even ones Walls are put together, which run one after the other and so in one position be brought to make up the entire wall of several layers with or without mutual Form bracketing.
Zwischenwände «erden wie Außenwände vorgefertigt und aufgerichtet. Eisenbetonzwischendecken werden auf einer Grundtafel vorfabriziert, deren Breite gleich ist der Spannweite der Decke, verlängert um die Breite der Deckenstützen .und anderer Vorsprünge, und deren Länge gleich ist der Länge einer oder mehrerer Räume. Der Tafelrahmen ruht so auf den unteren Mauern, daß durch die oben aufgeführten Bewegungen die Decke auf ihre Stützen gestellt wird. Diese Vorfertigung kann zweckmäßig auch auf die umgekehrte Weise geschehen, mit der Decke obenauf. Die Schicht der Dielen 31, ferner Kacheln 32, werden trocken mit ihrer Oberseite nach unten unmittelbar auf die Grundtafel i gelegt, sowie die Einrahmungen für die nötigen Fußeinschnitte 33 zum Einsetzen der Zwischenwände und die senkrecht durchgehenden Rohre 34.. Eiseneinlagen, Rippenschalblöcke und andere innere Elemente. Preßtafeln 36, Rippen 35 und Decke 33, werden gemäß dem Fortschreiten des Gießvorgangs an Ort und Stelle gelegt, wo sie im fertigen Bauwerk hingehören. Die Decke kann endlich noch in dieser Lage angestrichen werden.Partition walls «are prefabricated and erected like external walls. Reinforced concrete false ceilings are prefabricated on a base board, the width of which is the same as the span of the ceiling, extended by the width of the ceiling props .and other protrusions, and the length of which is equal to the length of one or more Spaces. The panel frame rests on the lower walls so that through those listed above Movements the ceiling is placed on its supports. This prefabrication can be useful also done the other way around, with the ceiling on top. The layer of Planks 31, also tiles 32, are dry with their top down immediately placed on the base plate i, as well as the frames for the necessary foot incisions 33 for inserting the partition walls and the vertically continuous pipes 34 .. iron inserts, Ribbed scarves and other internal elements. Press panels 36, ribs 35 and ceiling 33, are placed in the place where they belong in the finished building. The ceiling can finally be painted in this position will.
Die Dielen gewöhnlicher Stärke oder dünnere, zum Abreiben geeignet, können durch Nägel 37 befestigt werden, welche in der Preßtafel 36 mit dem Guß eingefaßt werden. Bei Anwendung schwalbenschwanzförmiger Dielenquerschnitte können Nägel vermieden werden.The boards of ordinary thickness or thinner, suitable for wiping, can be attached by nails 37, which are set in the press panel 36 with the cast will. When using dovetail-shaped board cross-sections, nails can be avoided will.
Nachdem die Decke so weit erhärtet ist, daß sie sich selbst trägt, wird sie über die Verwendungsstelle gekippt, auf Schraubenwinden gestützt, vom Lehrgerüst freigemacht und auf eine Mörtelschicht in ihre gewünschte Lage heruntergelegt.After the blanket has hardened enough to support itself, it is tipped over the point of use, supported on screw jacks, from the falsework cleared and laid down on a layer of mortar in their desired position.
Wenn eine Zwischendecke so vorhergestellt wird, daß die Deckenseite und der gegossene Fußboden oben liegt, wird die Zwischendecke samt Seitenverschalung durch Schraubenwinden gehoben und von der Grundtafel i getrennt. Die Tafel i und deren Stützrahmen können entfernt und andere Schraubenwinden benutzt werden, um die Zwischendecke zu stützen und dann herunterzulassen, so daß die Seitenverschalung auch vorher fortgenommen werden kann. Die Decke kann auf der ganzen Breite der Stützwände ruhen, Altanverlängerungen aufweisen und Baurahmen sowie die Bögen oder Stürze über Öffnungen enthalten.If a false ceiling is placed in advance so that the ceiling side and the poured floor is on top, the false ceiling and the side cladding are used lifted by screw jacks and separated from the base plate i. Table i and their support frames can be removed and other screw jacks used to to support the false ceiling and then lower it so that the side cladding can also be removed beforehand. The ceiling can cover the entire width of the retaining walls rest, have arbor extensions and building frames as well as the arches or lintels Openings included.
Die Deckenschicht für Balkendecken kann auf der Grundtafel i vorbereitet sein und muß mit Seilen 39 versehen sein, die am Gerippe der Decke angebunden werden. Nach genügender Erhärtung wird die Decke an Ort und Stelle gebracht, indem die Grundtafel in Richtung eines schwenkbaren, mit Walzen versehenen. Gestells 40 geschwenkt wird. Die Deckenschicht wird provisorisch festgesetzt, bis die Balken gelegt werden, an denen die Seile zu befestigen sind. Es kommen auch schwachgeneigte Dächer in Betracht, denn die Regenseite :4i kann auf der Tafel durch Vibration verdichtet werden. Zierverkleidungen, Schornsteinsockel 4.2 usw. werden auf die Tafel gelegt oder gesetzt. Die Dachplatten mit geraden oder schrägen . Rippen .1 .3 und die Decke 30 werden in gleicher Weise wie Zwischendecken weiter erstellt.The ceiling layer for beam ceilings can be prepared on the basic panel i and must be provided with ropes 39, which are tied to the framework of the ceiling. After sufficient hardening, the ceiling is put in place by the base board in the direction of a pivotable, roller-mounted. Frame 40 is pivoted. The ceiling layer is temporarily set until the joists are put on where the ropes are to be attached. Slightly sloping roofs are also possible, because the rainy side: 4i can be compacted on the board by vibration. Decorative panels, Chimney plinths 4.2 etc. are placed or set on the board. The roof panels with straight or inclined. Ribs .1 .3 and the ceiling 30 are made in the same way how false ceilings are further created.
Das Dach kann auch aus dünnen Platten verschiedener Breiten bestehen, deren Länge der Spannweite einer oder beider Dachseiten entspricht, j e nachdem ob die benutzte Grundtafel flach ist oder V-förmig zueinander geneigte Flächen aufweist. Diese Platten besitzen eine einzige Rippe (s. Fig. i6), welche die Binderippe 4.5 der nächsten Platte aufnimmt. Endlich können auch terrassenförmige Dächer vorgefertigt werden.The roof can also be made of thin panels of various widths, whose length corresponds to the span of one or both sides of the roof, depending on whether the base table used is flat or has surfaces that are inclined in a V-shape to one another. These plates have a single rib (see Fig. I6), which the binding rib 4.5 the next record. Finally, terraced roofs can also be prefabricated will.
Die Verbindung der vorgefertigten und an ihren Platz gebrachten Teile untereinander wird wie üblich ausgeführt. Die Verbindung der Außenmauern wird mit Hilfe von äußeren Verschalungen .I6 und inneren Verschalungen .47 ausgeführt, die durch Zangen .48 gehalten werden (Fig. i8). Die Seiten der äußeren Verschalungen können flach sein wie bei 49, oder mit Vorsprung 50 versehen sein, um die Schicht zu verblenden. Wenn die äußere oder innere Seite von einer besonderen Beschaffenheit sein soll, wird eine Zwischenverschalung 51 benutzt. Bewehrungseinlagen 52 und Einschnitte 53 sowie vor dem Guß senkrecht gelegte Stahlbewehrungen können die Verbindung vervollständigen. Die Verbindung der Decken mit den darunter befindlichen tragenden Mauern, welche in senkrechter Richtung gegen die Deckenrippen stehen, geschieht mit der Mörtelfuge. Die Verbindung mit den anstoßenden Wänden, z. B. Zwischenwänden, erfolgt durch Guß, indem die Einbindestelle mit einem unterstützten Schalrohr 54 geschlossen wird. Gleichzeitig verbindet dieser Guß die Decke mit den tragenden Mauern. Die Verbindung der verschiedenen Teile des Daches wird in einer mehr oder weniger steifen Art ausgeführt, je nach der Größe und der besonderen Anordnung. Das Verfahren gemäß der Erfindung kann mit jedem anderen Bauverfahren kombiniert werden.The connection of the prefabricated and put in place parts with one another is carried out as usual. The connection of the outer walls is carried out with the help of outer cladding .I6 and inner cladding .47, which are held by pliers .48 (Fig. I8). The sides of the outer casings can be flat as at 49, or protruding 50 to veneer the sheet. If the outer or inner side is to be of a special nature, an intermediate cladding 51 is used. Reinforcement inserts 52 and incisions 53 as well as steel reinforcements placed vertically before casting can complete the connection. The connection of the ceilings with the underlying load-bearing walls, which stand in a vertical direction against the ceiling ribs, is done with the mortar joint. The connection with the abutting walls, e.g. B. partitions, is made by casting, in that the binding point is closed with a supported shuttering tube 54. At the same time, this cast connects the ceiling with the load-bearing walls. The connection of the different parts of the roof is carried out in a more or less rigid manner, depending on the size and the particular arrangement. The method according to the invention can be combined with any other construction method.
Claims (3)
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
FR877496X | 1950-06-16 |
Publications (1)
Publication Number | Publication Date |
---|---|
DE877496C true DE877496C (en) | 1953-05-26 |
Family
ID=9361032
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEB15379A Expired DE877496C (en) | 1950-06-16 | 1951-06-12 | Process for the production of buildings from prefabricated parts and prefabricated parts for the implementation of the process |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE877496C (en) |
-
1951
- 1951-06-12 DE DEB15379A patent/DE877496C/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE1658991A1 (en) | Building construction and methods and means for their manufacture | |
DE2241589A1 (en) | METHOD AND DEVICE FOR MANUFACTURING A CONCRETE BUILDING ON THE SITE | |
DE2700022A1 (en) | Large prefabricated wall element - has vertical concrete pillars extending through holes to link top and bottom concreted chords | |
DE816598C (en) | Assembly method for concrete houses | |
DE202023105377U1 (en) | Load-bearing modular formwork construction system for building high-rise buildings | |
DE877496C (en) | Process for the production of buildings from prefabricated parts and prefabricated parts for the implementation of the process | |
DE2428038A1 (en) | Flexible prefabricated-element building structural system - with connecting panel-shaped components between columns and overhead trusses | |
DE4121253C2 (en) | Process and prefabricated module for the production of structures and buildings | |
AT404950B (en) | PRECAST ELEMENTS FOR THE BUILDING OF BUILDINGS | |
DE19708689B4 (en) | Kit of wall elements for buildings | |
DE834446C (en) | Process for the production of walls from prefabricated components | |
DE921283C (en) | Construction element, in particular made of reinforced concrete, or auxiliary construction element made of another material with a joint that is resistant to bending, shear and torsion | |
DE1484067A1 (en) | Reinforced masonry | |
DE829660C (en) | Construction with precast concrete parts | |
DE804245C (en) | Method and apparatus for the manufacture of cast-in-place masonry | |
DE4239057C2 (en) | Process and prefabricated module for the production of structures and buildings | |
DE833554C (en) | Reinforced concrete house and formwork for making the same | |
DE828441C (en) | Quick construction for buildings, especially for residential buildings, and building panels for this | |
DE950689C (en) | Process for erecting reinforced concrete framework structures and device for carrying out the process | |
DE2422586A1 (en) | Underground or sunken wall prefabricated concrete component - comprises integral panel and ribs at equal intervals | |
DE2228967A1 (en) | CASED CONCRETE PRECAST AND CASED CONCRETE PRECAST CONSTRUCTION | |
EP0480295B1 (en) | Set for the construction of private or holiday homes | |
EP0863270B1 (en) | Set of wall elements for buildings | |
DE832203C (en) | Procedure for the creation of solid structures | |
AT230069B (en) | Building |