[go: up one dir, main page]

DE760875C - Selective protection device - Google Patents

Selective protection device

Info

Publication number
DE760875C
DE760875C DES140500D DES0140500D DE760875C DE 760875 C DE760875 C DE 760875C DE S140500 D DES140500 D DE S140500D DE S0140500 D DES0140500 D DE S0140500D DE 760875 C DE760875 C DE 760875C
Authority
DE
Germany
Prior art keywords
resistance
line
selective protection
current
fault
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DES140500D
Other languages
German (de)
Inventor
Leopold Dipl-Ing Ferschl
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Siemens Schuckertwerke AG
Siemens Corp
Original Assignee
Siemens Schuckertwerke AG
Siemens Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Siemens Schuckertwerke AG, Siemens Corp filed Critical Siemens Schuckertwerke AG
Priority to DES140500D priority Critical patent/DE760875C/en
Application granted granted Critical
Publication of DE760875C publication Critical patent/DE760875C/en
Expired legal-status Critical Current

Links

Classifications

    • HELECTRICITY
    • H01ELECTRIC ELEMENTS
    • H01HELECTRIC SWITCHES; RELAYS; SELECTORS; EMERGENCY PROTECTIVE DEVICES
    • H01H71/00Details of the protective switches or relays covered by groups H01H73/00 - H01H83/00
    • H01H71/10Operating or release mechanisms
    • H01H71/1081Modifications for selective or back-up protection; Correlation between feeder and branch circuit breaker

Landscapes

  • Emergency Protection Circuit Devices (AREA)

Description

Selektivschutzeinrichtung Die Erfindung bezieht sich auf den Selektivschutz von elektrischen Leitungsnetzen mit an Stelle von Leistungsschaltern oder in Verbindung mit solchen angeordneten Schaltern regelbaren Widerständen, die bei einer Störung in den Leitungszug eingeschaltet werden.Selective protection device The invention relates to selective protection of electrical line networks with instead of circuit breakers or in connection with such arranged switches adjustable resistors, which in the event of a fault be switched on in the cable run.

Die richtige Auswahl des abzuschaltenden Netzteiles wird erschwert, wenn, durch das Einschalten dieser Widerstände die Widerstandsverteitung im Netz sich wesentlich verschiebt und einen anderen Netzzustand vortäuscht als dar Wirklichkeit entspricht. Ein solcher Fall kann beispielsweise eintreten, wenn in einer Leitung mit Abzweigen bei einem nahe dem Leitungsende auftretenden Fehler (Kürz;schluß, Erdschluß od. dgl.) in die vom Fehlerstrom durchflossenen Leitungsabschnitte zusätzlich Widerstand eingeschaltet wird. Dieser Fall ist vereinfacht in Fig. r der Zeichnung dargestellt. In dieser bedeuten g und q Stromerzeuger, s eine Sammelschiene, l1, 12, 13 die Abschnitte einer Hauptleitung, a, b und c Verbraucherabzweige und d einen stromliefernden Abzweig. Der Kurzschl'uß möge im Abzweig c auftreten, und es werden hierbei die Widerstände r1, r2, r3 und r. in den Kurzschl.ußatromweg eingeschaltet. Die ungestörten Abzweige a und b haben dann meist einen kleineren Verbraucher- widerstand als die Zusatzwiderstände enthal- t°ndj Hauptleitung, und schon deren hinter dem ersten Abzweig li;g:nde Abschnitte 1, und 1, erhalten weniger Strom als ihnen nach der Lage des Fehlerortes zufließen sollte. Die daraus folgende -#',trornverteilung entspricht also eher einem Fehler in den ungestörten Ab- zweigen a oder F als dem Fehler an der wirk- lichen Störungsstelle im Abzweig c. Nach der Erfindung wird dieser -Nachteil beseitigt, indem bei Auftreten eines Fehlers nicht nur der Widerstand dar vom Fehler- strom durchflossenen Leitungsstrecken, son- dern vorübergehend auch der Widerstand jener anschließenden ungestörten Leitungs- strecken oder Abzcveigc erhöht wird, deren Stromaufnahme nach der Widerstands- erhöhung die Lage der Fehlerstelle verdecken oder unkenntlich machen würde, worauf die Auswahl der Endgültig abzuschaltenden oder weiterhin durch erhöhten Widerstand zu schützenden Leitungsstrecken erfolgt. Bei einer Leitung mit Abzweigen sollen daher im Störungsfall. z. B. bei Oberstrom, nicht nur die Widerstände r'1, r-.,. rl und r, im Fehler- strom«eg, sondern nach Fig. a der Zeichnung auch die Widerstände der ungestörten, also Betriebsstrom verbrauchenden Abzweige r,, und r1, ansprechen. In Abzweigen, die. wie beispielsweise Abzweig d. nicht nur Strom- verbraucher, sondern auch Stromquellen q enthalten und wenigstens bei Störungen in die Hauptleitungen rückspeixen, wird zweck- mäßig der Widerstand nicht erhöht. Die Widerstandseinheiten r-1, r1`, r2' usw. liegen nach Fig. 2 beispielsweise am Anfang und Ende eines jeden Leitungsabschnittes der Hauptleitung, und die Widerstandsein- heiten rQ, rb usw. am Anfang jedes Leitungs- abzweiges. Der Widerstandswert aller in der Hauptleitung liegenden Widrstandsabschnitte ist zweckmäßig gleich groß und der @@ ider- stands«ert der in die Abzweige eingeschal- teten Widerstandseinheiten ein Vielfaches da- I von. Wenn auf diese Weise der störende Einfluß der Verbraucherleitwerte beseitigt ist, kann die Fehlerstrecke leicht und sicher durch einfache Messung des Widerstands-,vertes oder des Verhältnisses von Strom und Spannung ermittelt werden. Da die am Anfang und Ende der Leitungsstrecken anzuordnenden Widerstandseinheiten überwiegend Ohmschen Widerstand enthalten, sind in den ungestörten Strecken Strom und Spannung im wesentlichen in Phase. Deren Spannungs-Strom-Verhältnis oder Widerstand ist daher stets größer als der doppelte Widerstandswert einer Einheit; im gestörten, z. B. kurzgeschlossenen oder geerdeten Leitungsabschnitt ist dagegen ! das Spannungs-Stroni-Verhältnis während d:; größten Teiles einer Halbwelle «-es-entlicr kleiner als dieser doppelte Widerstandswert, Nur in der Nähe des Stromnulldurchgangs übersteigt das Verhältnis der Augenblicks- werte von Spannung und Strom den ge- nannten Betrag. Dies hindert nicht die ge- wünschte Auslösung rh.#r Schutzeinrichtung, weil das auf Augenblickswerte ansprechende Meßgerät im weiteren Verlauf derselben Halb- , welle die Auslösebedingungen vorfindet. Es kann jedem Widerstandsgerät ein eigenes Anregerelais, z. B. ein Spannungs- rückgangsrelais, zugeordnet sein. Man kann aber auch mehrere gleichzeitig zu betätigende ;t'id@erstandsgeräte zusammenfassen und ihre Auslöse- oder Betätigungseinrichtungen (Aus- löse- oder Betädgungssp ulen) an eine gemein- same Steuerleitung, z. B. eine gemeinsame Steuersammelschiene des Unter-,verkes, an- schließen, die von jeder Fehleriiber,#vachungs- stelle geschaltet werden kann. Die Kontakte aller auf die Fehleriiberwachun-,sstel:en ver- teilten Anregerelais können parallel zwischen die Steuerstromqu-elie und die gemeinsame Steuerleitung der U"id:rstandsgerä te ge- schaltet sein. Spricht auch ruf eines dieser Anregerelais an, so erhalten die Auslöse- spulen aller Widerstandsgeräte des Netzes oder Netzteiles Strom. Die Schalt- oder Regeleinrichtungen der Zusatzwiderstände sind vorteilhaft so ein- gerichtet, daß sie in ihre Ausgangsstellung zu- rückkehren, wenn die Störung von- selbst vorübergeht. z. B. wenn ein Kurzschlußlicht- bogen wieder erlischt, oder wenn sie inner- halb einer gewissen Wartezeit in der Endstel- lung festgehalten oder in eine besondere Dauerstellung (Ausschaltstellung) übergeführt werden. Dieses Festhalten oder Umschalten auf die Dauerstellung wird nur bei den unmit- telbar den Fehler eingrenzenden Widerstands- geräten durch die selektive Meßeinrichtung veranlaßt, während die übrigen Geräte wieder die Ausgangslage einnehmen. Die Anregung für die Widerstandserhöhung kann auch zweckmäßig durch eine vom Fehlerstrom (Kurzschlußstrom, Erdschluß- strom) verschiedene Betriebsgröße, z. B. durch den Zusammenbruch der Spannung, bewirkt werden. Dagegen wird die Auswahl der endgültig abzuschaltenden Leitungsstrecke oder Leitungsstrecken durch den Fehlerstrom selbst ausgelöst. The correct selection of the power supply unit to be switched off is made more difficult if, when these resistors are switched on, the distribution of resistance in the network is significantly shifted and simulates a different network state than is actually the case. Such a case can occur, for example, if in a line with branches in the event of a fault occurring near the end of the line (short circuit, earth fault or the like) in the line sections through which the fault current flows, additional resistance is switched on. This case is shown in simplified form in FIG. 1 of the drawing. In this, g and q mean power generator, s a busbar, l1, 12, 13 the sections of a main line, a, b and c consumer branches and d a current-supplying branch. The short circuit may occur in branch c, and the resistors r1, r2, r3 and r. switched into the short-circuit current path. The undisturbed branches a and b then usually have a smaller consumer resistance as the additional resistances t ° ndj main line, and already their behind the first branch li; g: nde sections 1, and 1, receive less power than after them should flow to the location of the fault location. the the following - # ', corresponds to the trorn distribution so more of a mistake in the undisturbed branch a or F as the fault in the effective common fault point in the branch c. According to the invention, this disadvantage eliminated by when an error occurs not only the resistance from the error line sections through which current flows, but also temporarily change the resistance that subsequent undisturbed line stretch or Abzcveigc is increased whose Current consumption according to the resistance increase cover the location of the fault or obscure what the Selection of the or to be switched off permanently continues to increase due to increased resistance protective cable routes. at a line with branches should therefore be in Malfunction. z. B. at Oberstrom, not only the resistances r'1, r -.,. rl and r, in the error Strom «eg, but according to Fig. a of the drawing also the resistances of the undisturbed, so Operating current consuming branches r ,, and r1, address. In branches that. how for example branch d. not just electricity consumers, but also power sources q included and at least in the event of faults in the main lines are fed back, is moderately the resistance does not increase. the Resistance units r-1, r1`, r2 ' etc. lie according to Fig. 2, for example, at the beginning and End of each line section of the Main line, and the resistance input units rQ, rb etc. at the beginning of each line branch. The resistance value of all in the Main line lying resistance sections is expediently the same size and the @@ ider- if the one is encased in the branches resistance units were many times that- I from. If the disruptive influence of the consumer conductance is eliminated in this way, the fault path can be determined easily and reliably by simply measuring the resistance, the value or the ratio of current and voltage. Since the resistance units to be arranged at the beginning and end of the line sections predominantly contain ohmic resistance, current and voltage are essentially in phase in the undisturbed sections. Their voltage-current ratio or resistance is therefore always greater than twice the resistance value of a unit; in the disturbed, z. B. short-circuited or grounded line section is against it ! the stress-Stroni ratio during d :; for the greater part of a half-wave «-es-entlicr less than this double resistance value, Only near the current zero crossing exceeds the ratio of the momentary values of voltage and current correspond to the named amount. This does not prevent the overall Desired tripping rh. # r protective device, because that which responds to instantaneous values Measuring device in the further course of the same half , wave finds the triggering conditions. It can be any resistance device own trigger relay, e.g. B. a tension decrease relay, be assigned. One can but also several to be operated at the same time ; t'id @ first stand devices and their Release or actuation devices (release loosening or attachment coils) to a common same control line, e.g. B. a common Control busbar of the lower, verkes, an- close that of any error, # vachungs- position can be switched. The contacts all on the error monitoring, sstel: en shared start relays can be connected in parallel between the control current source and the common Control line of the U "id: stand-alone devices be switched. Also speaks call one of these Start relay on, the tripping rewind all resistance devices in the network or power supply's current. The switching or control devices of the Additional resistors are advantageous so directed that they return to their starting position return if the fault occurs by itself passes. z. B. if a short-circuit light arc goes out again, or if you half a certain waiting time in the final or in a special Permanent position (switch-off position) transferred will. This holding or switching permanent employment is only granted to the immediate the error isolating resistance devices through the selective measuring device prompted, while the remaining devices again take the starting position. The suggestion for the increase in resistance can also expediently by one of the Fault current (short circuit current, earth fault current) different company size, e.g. B. by the breakdown of tension, be effected. Against this is the choice the line section to be finally switched off or line sections through the fault current self triggered.

Claims (1)

PATENTANSPRÜCHE: r. Selektiv Schutzeinrichtung für elektrische Leitungsnetze mit selbsttätiger Erhöhung des Leitungswiderstandes, dadurch gekennzeichnet, daß bei Auftreten eines Fehlers nicht nur der Widerstand der vom Fehlerstrom durchflossenen Leitungsstrecken, söndern vorübergehend auch der Widerstand jener anschließenden ungestörtem:Leitungsstreckenerhöhtwird, deren Stromaufnahme nach der Widerstandserhöhung im Fehlerstromweg die Lage der Fehlerstelle verdecken oder unkenntlich machen würde, worauf die Auswahl der endgültig abzuschaltenden oder weiterhin durch erhöhten Widerstand zu schützen` den Leitungstreckeu erfolgt. z. Selektivschutzeinrichtung nach Anspruch i für Leitungen mit Abzweigen, dadurch gekennzeichnet, daß bei Auftreten eines Fehlers zusätzlicher Widerstand außer in der Hauptleitung auch in jenen gestörten und ungestörten Abzweigen eingeschaltet wird, die Strom verbrauchen, wogegen die Widerstände jener Abzweige unbeeinflußt bleiben, die im Fehlerfall in die Hauptleitung rückspeisende Stromquellen enthalten. 3. Selektivschutz nach den Ansprüchen i und 2, dadurch gekennzeichnet, d@aß die Zusatzwiderstände in den Hauptleitungsstrecken gleich groß und die Zusatzwiderstände in den Leitungsabzweigen ein Vielfaches davon sind. q.. Selektivschutz nach dien Ansprüchen i bis 3, dadurch gekennzeichnet, daß die abzuschaltende gestörte Leitungsstrecke nach dem Einschalten der Zusatzwiderstände durch Widerstandsmessung oder Messung des Verhältnisses von Spannung und Strom ausgewählt wird,. 5. Selektivschutz nach Anspruch q., dadurch gekennzeichnet, daß das Meßgerät auf Augenblickswerte des Verhältnisses von Spannung und Strom anspricht. 6.. Selektivschutz nach den Ansprüchen, i bis 5, dadurch gekennzeichnet, daß die Auslöse- oder Betätigungseinrichtungen mehrerer gleichzeitig zu betätigender Widerstandsgeräte an eine gemeinsame Steuerleitung angeschlossen; sind, die von verschiedenen Fehlerüberwachungsstellen aus geschaltet werden kann. 7. Selektivschutz nach Anspruch 6, d!aduirch gekennzeichnet, daß die Kontakte aller Anregerelais parallel zwischen die Steuerstromquelle und die gemeinsame Steuerleitung der Widerstandsgeräte geschaltet sind. B. Selektivschutz nach den Ansprüchen i bis 7, dadurch gekennzeichnet, d.aß die Anregung für die Widerstandserhöhung durch eine vom Fehlerstrom (Kurzschlu ßstrom, Erdschlußstram) verschiedene Betriebsgröße, die Auswahl der endgültig abzuschaltenden Leitungsstrecke oder Leitungsstrecken durch derer Fehlerstrom ausgelöst wird.PATENT CLAIMS: r. Selective protective device for electrical line networks with automatic increase in the line resistance, characterized in that if an error occurs, not only the resistance of the Fault current line sections flowed through, temporarily change the resistance of those Subsequent undisturbed: line sections are increased, their current consumption according to the increase in resistance in the fault current path conceal the location of the fault or would make unrecognizable, whereupon the selection of the final deactivation or continue to protect the line route through increased resistance. z. Selective protection device according to claim i for lines with branches, characterized in that that if an error occurs, additional resistance except in the main line the current is also switched on in those disturbed and undisturbed branches consume, whereas the resistances of those branches remain unaffected, which in the In the event of a fault, there are power sources that feed back into the main line. 3. Selective protection according to claims i and 2, characterized in that d @ aß the additional resistors the same size in the main line sections and the additional resistances in the line branches are multiples of that. q .. Selective protection according to claims i to 3, thereby characterized in that the faulty line to be switched off after switching on the additional resistances by measuring the resistance or measuring the ratio of Voltage and current is selected. 5. Selective protection according to claim q., Characterized characterized in that the measuring device is based on instantaneous values of the ratio of voltage and electricity responds. 6 .. Selective protection according to claims i to 5, characterized in that that the release or actuation devices of several to be actuated at the same time Resistance devices connected to a common control line; are those of various error monitoring points can be switched off. 7. Selective protection according to claim 6, characterized in that the contacts of all excitation relays are parallel between the control current source and the common control line of the resistance devices are switched. B. selective protection according to claims i to 7, characterized in that d.that the excitation for the increase in resistance by a fault current (short circuit ßstrom, earth fault current) different operating parameters, the selection of the final shutdown Line section or line sections through which fault current is triggered.
DES140500D 1940-03-18 1940-03-19 Selective protection device Expired DE760875C (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DES140500D DE760875C (en) 1940-03-18 1940-03-19 Selective protection device

Applications Claiming Priority (2)

Application Number Priority Date Filing Date Title
DE227680X 1940-03-18
DES140500D DE760875C (en) 1940-03-18 1940-03-19 Selective protection device

Publications (1)

Publication Number Publication Date
DE760875C true DE760875C (en) 1954-01-11

Family

ID=25764364

Family Applications (1)

Application Number Title Priority Date Filing Date
DES140500D Expired DE760875C (en) 1940-03-18 1940-03-19 Selective protection device

Country Status (1)

Country Link
DE (1) DE760875C (en)

Similar Documents

Publication Publication Date Title
DE760875C (en) Selective protection device
DE624091C (en) Protective device for three-phase networks equipped with earth fault extinguishers, which are equipped with wattmetric earth fault relays that are dependent on the earth fault active power
DE677483C (en) Device for briefly increasing a fault current
DE1563825A1 (en) Residual current circuit breaker
DE690131C (en) Earth fault protection device
DE625598C (en) Overvoltage protection device with glow tube
DE491420C (en) Device for preventing or displaying electricity theft or earth faults in meter systems and local networks
DE469831C (en) Arrangement for selective protection for double lines
DE744098C (en) Protective circuit with a protective conductor against breakage of the protective conductor and line short circuit
DE495892C (en) Device for automatic reinsertion of automatic switches
DE949414C (en) Protection circuit, especially for underground operations
DE687258C (en) Mesh network with several supply lines that belong in groups to several feed systems
DE405960C (en) Circuit arrangement of the overcurrent protection of more than two parallel lines
DE675394C (en) Arrangement for the rapid protection of cables and switches against severe short circuits
DE734968C (en) Protection circuit against contact voltage
DE629702C (en) Protective device for electrical system parts
DE665332C (en) Resistance-dependent trip relay
DE677342C (en) Selective protection device for direct current systems
DE686970C (en) Safety device for electrical power plants
AT135613B (en) Protection and signaling device for monitoring electrical circuits.
DE491711C (en) Arrangement for the protection of electrical lines
DE957245C (en) Protection circuit, especially for underground operations
DE587792C (en) Protection device for electrical distribution systems
AT133840B (en) Protective device for electrical system parts.
DE975510C (en) Selective protection arrangement for connected networks