DE597417C - Arrangement for hanging a bundle conductor formed from several parallel-connected partial conductors - Google Patents
Arrangement for hanging a bundle conductor formed from several parallel-connected partial conductorsInfo
- Publication number
- DE597417C DE597417C DES99993D DES0099993D DE597417C DE 597417 C DE597417 C DE 597417C DE S99993 D DES99993 D DE S99993D DE S0099993 D DES0099993 D DE S0099993D DE 597417 C DE597417 C DE 597417C
- Authority
- DE
- Germany
- Prior art keywords
- conductors
- sub
- arrangement
- bundle conductor
- tensioning
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
- 239000004020 conductor Substances 0.000 title claims description 64
- 239000012212 insulator Substances 0.000 claims description 5
- 239000000725 suspension Substances 0.000 description 11
- 125000006850 spacer group Chemical group 0.000 description 6
- 238000004873 anchoring Methods 0.000 description 1
- 230000007774 longterm Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02G—INSTALLATION OF ELECTRIC CABLES OR LINES, OR OF COMBINED OPTICAL AND ELECTRIC CABLES OR LINES
- H02G7/00—Overhead installations of electric lines or cables
- H02G7/12—Devices for maintaining distance between parallel conductors, e.g. spacer
Landscapes
- Suspension Of Electric Lines Or Cables (AREA)
Description
Die Erfindung bezieht sich auf das Aufhängen und Abspannen von Freileitungen, bei denen an Stelle von einzelnen Seilen sogenannte Bündelleiter angewendet sind, die aus mehreren parallel geschalteten, durch Abstandhalter getrennte Teilleiter bestehen.The invention relates to the hanging and tensioning of overhead lines, at where so-called bundle ladders are used instead of individual ropes consist of several sub-conductors connected in parallel and separated by spacers.
Es sind bereits Aufhängevorrichtungen für Bündelleiter bekanntgeworden, bei denen die einzelnen Teilleiter unmittelbar in ösen eines Abstandhalters starr eingespannt sind. Eine derartige starre Einspannung der Teilleiter hat den Nachteil, daß bei ungleicher Belastung der Teilleiter in diesen ungleiche Beanspruchungen auftreten. Da sich aber die Teilleiter lediglich unter Formänderung des Abstandhalters oder der Teilleiter selbst in den Klemmen des Abstandhalters in Richtung des Seilzuges bewegen können, ist ein abwechselnder Ausgleich von ungleichen Zugkräften in den Teilleitern auf die Dauer ausgeschlossen. There are already suspension devices for bundle conductors become known in which the individual sub-conductors are directly clamped rigidly in eyelets of a spacer. One Such rigid clamping of the sub-conductors has the disadvantage that when the load is uneven the sub-conductor occur in these unequal loads. But since the sub-ladder only by changing the shape of the spacer or the sub-conductor itself in the Clamping the spacer can move in the direction of the cable is an alternating one Compensation of unequal tensile forces in the partial ladders excluded in the long term.
Weiter ist es auch schon bekannt, derartige Aufhängevorrichtungen so auszubilden, daß zwei Teilleiter durch einen Abstandhalter in einem festen Abstand voneinander gehalten werden, während an diesem Abstandhalter ein den dritten Teilleiter tragender Arm so angelenkt ist, daß sie der dritte Teilleiter den anderen Teilleitern nähern kann. Aber auch hierbei ist ein Ausgleich von ungleichen Zugkräften in den Teilleitern nicht möglich.It is also already known to design such suspension devices so that two sub-conductors held at a fixed distance from each other by a spacer while at this spacer an arm carrying the third sub-conductor so is hinged so that the third sub-conductor can approach the other sub-conductors. But also In this case, it is not possible to compensate for unequal tensile forces in the sub-conductors.
Nach der Erfindung besteht die zum Aufhängen von Bündelleitern dienende Anordnung aus einem an der Isolatorenkette zu befestigenden Tragteil, an dem besondere Klemmvorrichtungen zur Aufnahme der Teilleiter gelenkig und in Richtung des Seilzuges beweglich angeordnet sind. In einer. derartigen Aufhängevorrichtung gleichen sich die in den Zügen der einzelnen Teilleiter auftretenden Differenzen von selbst aus. Infolgedessen stellen sich sämtliche Teilleiter des Bündelleiters auf gleichen Durchhang ein. Die auftretenden Beanspruchungen innerhalb der einzelnen Teilleiter eines Bündelleiters werden daher geringer gehalten als bei fester Abspannung und Aufhängung der Teilleiter.According to the invention, there is an arrangement used for hanging up bundle ladders from a supporting part to be attached to the insulator chain, on which special clamping devices for receiving the sub-conductors are articulated and movable in the direction of the cable. In a. Such a suspension device are the same as those occurring in the trains of the individual sub-conductors Differences by themselves. As a result, all sub-conductors of the bundle conductor adjust to the same sag. the occurring stresses within the individual sub-conductors of a bundle conductor therefore kept lower than with fixed bracing and suspension of the partial ladder.
In der Zeichnung sind mehrere Ausführungsbeispiele der Erfindung dargestellt.Several exemplary embodiments of the invention are shown in the drawing.
Die Fig. ι bis 8 zeigen Aufhängevorrichtungen, die an Isolatorenketten befestigt sind. In den Fig. 9 bis 19 sind Vorrichtungen zum Abspannen von Bündelleitern dargestellt.Figs. Ι to 8 show suspension devices that are attached to isolator chains. In FIGS. 9 to 19, devices for tensioning bundle conductors are shown.
Mit ι sind in den Fig. 1 und 2 die vier parallel geschalteten Teilleiter des Bündelleiters bezeichnet, die in besonderen Klemmenkörpern 2 gehalten werden. Die Klemmenkörper 2 sind an Hebelarmen 3 gelenkig befestigt, die ihrerseits schwenkbar an einem Tragteil 4 gelagert sind. Mittels des Tragteiles 4 wird der gesamte Bündelleiter an einer Isolatorenkette, die in der Figur nicht dargestellt ist,With ι in Figs. 1 and 2, the four are parallel switched sub-conductors of the bundle conductor, which are in special terminal bodies 2 are held. The clamp body 2 are hinged to lever arms 3, which are in turn pivotably mounted on a support part 4. By means of the support part 4 is the entire bundle conductor on an insulator chain, which is not shown in the figure,
aufgehängt. Die Beweglichkeit der einzelnen Bündelleiter untereinander wird durch die beweglichen Arme 3 erzielt, die die Klemmenkörper tragen.hung up. The mobility of the individual bundle conductors among each other is made possible by the movable ones Arms 3 achieved which carry the clamp body.
Bei der in Fig. 1 und 2 dargestellten Aufhängung sind die Ausgleichmöglichkeiten für alle vier Teilleiter des Bündelleiters gleich groß.In the suspension shown in Fig. 1 and 2, the compensation options for all four sub-conductors of the bundle conductor are the same size.
Bei der in Fig. 3 und 4 dargestellten Aufhängevorrichtung ist die Anordnung derartig getroffen, daß die unteren Teilleiter sich weiter in Richtung des Seilzuges bewegen können als die oberen. Die die Klemmenkörper 2 tragenden Arme 3 liegen unterhalb des die Arme tragenden Tragteiles.In the suspension device shown in FIGS the arrangement is made such that the lower sub-conductors Can move further in the direction of the cable than the upper ones. The the clamp body 2 supporting arms 3 are below the supporting part supporting the arms.
Die Anordnung kann auch so abgeändert werden, daß die zum Tragen der Klemmenkörper dienenden Arme je nur einen Klemmenkörper tragen, der von den anderen unabhängig beweglich ist.The arrangement can also be modified so that that for supporting the clamp body serving arms each carry only one clamp body, which is independent of the other is movable.
Eine solche Anordnung ist in den Fig. 5 und 6 dargestellt. Der Bündelleiter besteht aus drei parallel geschalteten Tragseilen 1, die in verschiedenen Ebenen so angeordnet sind, daß sie voneinander gleichen Abstand haben. Die Tragseile sind wieder in KlemmenkÖrpern 2 gelagert, die an verschieden langen Hebelarmen 3a und 3'' befestigt sind. Die Arme ihrerseits sind an dem oberhalb der Bündelleiter liegenden Tragteil 4 drehbar gelagert. Such an arrangement is shown in FIGS. The bundle conductor consists of three parallel-connected suspension cables 1, which are arranged in different planes so that they have the same distance from one another. The suspension ropes are again stored in clamp bodies 2, which are attached to lever arms 3 a and 3 ″ of different lengths. The arms for their part are rotatably mounted on the support part 4 located above the bundle ladder.
Bei dem in den Fig. 7 und 8 dargestellten Ausführungsbeispiel sind die Klemmenkörper 5 für die Teilleiter 1 des Bündelleiters nicht gelenkig mit dem Aufhängekörper verbunden, sondern zylinderförmig ausgebildet • und in Augen 7 eines Tragteiles 6 verschiebbar gelagert. Dieser Tragteil 6, der an der Isolatorenkette befestigt wird, besteht aus einem mehreckigen, beispielsweise bei Anwendung von vier Teilleitern für den Bündelleiter viereckigen Rahmen. Die Bewegung' der Teilleiter 1 gegenüber dem Tragteil in Richtung des Seilzuges ist bei dieser Anordnung durch Anschläge begrenzt, die von Flanschen 8 der zylindrischen Klemmenkörper 5 sowie von auf diese aufgeschraubten Muttern 9 gebildet sind. Der KlemmenkckjoerJ selbst ist durch Keile 10, die durch die Mutter 9 in den zylindrischen Klemmenkörper 5 eingepreßt werden, an dem Leitungsseil festgeklemmt. Die Länge des Weges, um die sich die einzelnen Teilleiter des Bündelleiters gegeneinander verschieben können, ist im wesentlichen durch den Abstand des Flansches 8 von der Mutter 9 begrenzt. In the embodiment shown in Figs. 7 and 8, the clamp bodies 5 for the sub-conductor 1 of the bundle conductor not articulated to the suspension body, but rather cylindrical • and displaceable in eyes 7 of a support part 6 stored. This support part 6, which is attached to the isolator chain, consists of a polygonal one, for example when using four partial conductors for the bundle conductor square frame. The movement 'of the sub-conductors 1 relative to the supporting part in In this arrangement, the direction of the cable is limited by stops made by flanges 8 of the cylindrical clamp body 5 and nuts screwed onto them 9 are formed. The KlemmkckjoerJ itself is by wedges 10, which through the nut 9 in the cylindrical clamp body 5 are pressed in, clamped to the cable. The length of the path to be taken the individual sub-conductors of the bundle conductor can move against each other is in the essentially limited by the distance between the flange 8 and the nut 9.
Die in den Fig. 7 und 8 dargestellte Anordnung zeichnet sich dadurch aus, daß auch bei Verschiebung der einzelnen Teilleiter gegeneinander der Abstand zwischen den Teilleitern nicht verändert wird.The arrangement shown in FIGS. 7 and 8 is characterized in that also if the individual sub-conductors are shifted relative to each other, the distance between the sub-conductors is not changed.
In den übrigen Figuren sind Anordnungen zum Abspannen der Teilleiter von Bündelleitern dargestellt, die ebenfalls eine Bewegung der Teilleiter eines Bündelleiters in Richtung des Seilzuges gestatten und den Ausgleich von mechanischen Spannungsdifferenzen ermöglichen.The remaining figures show arrangements for tensioning the sub-conductors of bundle conductors shown, which also allow a movement of the sub-conductors of a bundle conductor in the direction of the cable and the Enable compensation of mechanical stress differences.
In den Fig. 9 bis i 1 sind mit 11 die Abspannklemmen bezeichnet, an welche die Leitungsseile 12 angeschlossen sind. 13 bedeutet das Verbindungsseil zur nächsten Abspannkette oder zur Station. Die Abspannklemmen 11 sind an Hebelarmen 14 gelenkig gelagert, die ihrerseits wieder gelenkig an dem Tragteil TS befestigt sind. Durch den Tragteil 15 wird der Leitungszug auf die in der Zeichnung nicht enthaltene Abspannkette übertragen. Die Anordnung kann dabei so gewählt werden, daß entweder, wie in der Figur dargestellt ist, zwei übereinanderliegende Teilleiter an dem gleichen Hebelarm angeschlossen sind. Sie kann natürlich auch so abgeändert werden, . daß nicht die übereinanderliegenden, sondern die nebeneinanderliegenden Teilleiter an demselben Hebelarm befestigt sind.In FIGS. 9 to i 1, 11 is the anchoring clamps denotes to which the cables 12 are connected. 13 means the connecting rope to the next guy chain or to the station. The tension clamps 11 are articulated on lever arms 14, which in turn are articulated on the support part TS are attached. By the support part 15 is Transfer the cable run to the tensioning chain not included in the drawing. the Arrangement can be chosen so that either, as shown in the figure is, two superposed sub-conductors are connected to the same lever arm. It can of course also be modified as follows. that not the superimposed but the adjacent sub-conductors are attached to the same lever arm.
Die Fig. 12 bis 14 zeigen die Abspannung eines Bündelleiters, der aus drei Teilleitern besteht. Die Abspannklemmen 11 der im Dreieck angeordneten oberen Teilleiter sind gelenkig an dem von dem Tragteil 17 getragenen Joch 15 befestigt, während die Klemme des unteren Leiters unmittelbar gelenkig mit dem Tragteil 17 verbunden ist. Die Befestigung der Abspannisolatorenkette an dem Tragteil 17 ist derart vorgenommen, daß die Momente der Leitungszüge sich aufheben müssen.FIGS. 12 to 14 show the bracing a bundle conductor consisting of three sub-conductors. The tension clamps 11 of the im Upper subconductors arranged in a triangle are articulated on the one carried by the support part 17 Yoke 15 attached, while the terminal of the lower conductor is directly articulated with the support part 17 is connected. The attachment of the tensioning isolator chain to the Support part 17 is made in such a way that the moments of the lines cancel each other out have to.
Eine andere Anordnung zum Abspannen der vier Teilleiter eines Bündelleiters ist in den Fig. 15 bis 17 dargestellt. Bei dieser Anordnung werden je zwei Teilleiter 1 mit Hilfe einer Seilrolle 19 abgespannt. Die Seilrollen 19 sitzen an einem Tragteil 20, das mit der in der Zeichnung nicht enthaltenen Abspannkette verbunden ist. Um die Aufhängung von getrennten Teilleitern an den Seilrollen zu ermöglichen, werden die Teilleiter unter Verwendung von Klemmvorrichtungen, z. B. Kerbverbindern, miteinander verbunden, im Natürlich kann man die Anordnung auch so treffen, daß Zugdifferenzen zwischen den nebeneinanderliegenden Leitern ausgeglichen werden. In diesem Fall müssen die Rollen um 900 verdreht werden.Another arrangement for tensioning the four sub-conductors of a bundle conductor is shown in FIGS. In this arrangement, two sub-conductors 1 are tensioned with the aid of a pulley 19. The pulleys 19 sit on a support part 20 which is connected to the guy chain not included in the drawing. In order to enable the suspension of separate sub-conductors on the pulleys, the sub-conductors are using clamping devices, e.g. B. notch connectors, interconnected, in the course you can make the arrangement so that tension differences between the adjacent conductors are compensated. In this case, the rolls must be rotated by 90 0th
Sollen schließlich drei einen Bündelleiter bildende Teilleiter abgespannt werden, so wird gemäß Fig. 18 und 19 der mit der Isolatorenkette verbundene Tragteil 21 als Hebel ausgebildet. An dem einen Arm des Hebels wird eine Seilrolle 19 zum Abspannen von zwei Teilleitern angeordnet, während an demIf, finally, three sub-conductors forming a bundle conductor are to be braced, so 18 and 19 is the one with the isolator chain connected support part 21 designed as a lever. On one arm of the lever a pulley 19 is arranged for tensioning two sub-conductors, while on the
anderen Arm des Hebels eine Abspannklemme für das Abspannen des dritten Teilleiters gelenkig befestigt ist. Auch bei dieser Anordnung wird der Befestigungspunkt des Tragteiles 21 an der Abspannkette so gewählt, daß sich die Drehmomente der Seilzüge aufheben.the other arm of the lever is a tensioning clamp for tensioning the third sub-conductor is articulated. With this arrangement, too, the fastening point of the supporting part 21 selected on the guy chain so that the torques of the cables cancel each other out.
Claims (5)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES99993D DE597417C (en) | 1931-07-25 | 1931-07-25 | Arrangement for hanging a bundle conductor formed from several parallel-connected partial conductors |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DES99993D DE597417C (en) | 1931-07-25 | 1931-07-25 | Arrangement for hanging a bundle conductor formed from several parallel-connected partial conductors |
Publications (1)
Publication Number | Publication Date |
---|---|
DE597417C true DE597417C (en) | 1934-05-24 |
Family
ID=7522735
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DES99993D Expired DE597417C (en) | 1931-07-25 | 1931-07-25 | Arrangement for hanging a bundle conductor formed from several parallel-connected partial conductors |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE597417C (en) |
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE939459C (en) * | 1942-01-21 | 1956-02-23 | Siemens Ag | Spacer for bundle ladder |
DE939824C (en) * | 1941-12-14 | 1956-03-01 | Siemens Ag | Three-phase high-voltage transmission line for voltages of around 220 kV |
DE965826C (en) * | 1942-02-05 | 1957-06-19 | Siemens Ag | Spacer for bundle ladder |
DE1026386B (en) * | 1956-03-28 | 1958-03-20 | Siemens Ag | Star-quad overhead line for carrier frequency transmission |
DE1032809B (en) * | 1953-04-23 | 1958-06-26 | Siemens Ag | Rigid, at the same time serving as a spacer suspension frame for bundle conductors with attached, in particular self-releasing pendulum clamps for the partial conductor ropes |
DE1035230B (en) * | 1955-07-19 | 1958-07-31 | Rudolf Koerber Dipl Ing | Field spacers made of plastic for high-voltage bundles |
DE970373C (en) * | 1941-12-02 | 1958-09-11 | Siemens Ag | Bundle ladder |
DE971606C (en) * | 1941-12-10 | 1959-02-26 | Aeg | Bundle conductor for overhead lines |
DE972702C (en) * | 1941-12-05 | 1959-09-10 | Siemens Ag | Equipment for carrying out installation, repair and inspection work on electrical high-voltage overhead lines with at least two sub-conductors per phase |
DE972918C (en) * | 1942-01-31 | 1959-11-05 | Siemens Ag | Spacer for bundle ladder |
US2934594A (en) * | 1958-05-15 | 1960-04-26 | Flower Archibald Thomas | Spreaders for conductor wires |
DE975880C (en) * | 1942-01-31 | 1962-11-15 | Bayerische Schrauben Und Feder | Spacer for bundle ladder |
US3076866A (en) * | 1960-04-21 | 1963-02-05 | Ohio Brass Co | Suspension apparatus for bundle conductors |
US3076863A (en) * | 1960-04-21 | 1963-02-05 | Ohio Brass Co | Suspension apparatus for bundle conductors |
US3076864A (en) * | 1960-07-13 | 1963-02-05 | Ohio Brass Co | Suspension apparatus for bundle conductors |
US3165284A (en) * | 1963-11-21 | 1965-01-12 | Gen Electric | Multiple conductor support |
US3234319A (en) * | 1962-11-12 | 1966-02-08 | Unidare Ltd | Overhead cable systems |
US3240870A (en) * | 1965-03-10 | 1966-03-15 | Ohio Brass Co | Suspension apparatus for bundle conductors |
-
1931
- 1931-07-25 DE DES99993D patent/DE597417C/en not_active Expired
Cited By (18)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE970373C (en) * | 1941-12-02 | 1958-09-11 | Siemens Ag | Bundle ladder |
DE972702C (en) * | 1941-12-05 | 1959-09-10 | Siemens Ag | Equipment for carrying out installation, repair and inspection work on electrical high-voltage overhead lines with at least two sub-conductors per phase |
DE971606C (en) * | 1941-12-10 | 1959-02-26 | Aeg | Bundle conductor for overhead lines |
DE939824C (en) * | 1941-12-14 | 1956-03-01 | Siemens Ag | Three-phase high-voltage transmission line for voltages of around 220 kV |
DE939459C (en) * | 1942-01-21 | 1956-02-23 | Siemens Ag | Spacer for bundle ladder |
DE975880C (en) * | 1942-01-31 | 1962-11-15 | Bayerische Schrauben Und Feder | Spacer for bundle ladder |
DE972918C (en) * | 1942-01-31 | 1959-11-05 | Siemens Ag | Spacer for bundle ladder |
DE965826C (en) * | 1942-02-05 | 1957-06-19 | Siemens Ag | Spacer for bundle ladder |
DE1032809B (en) * | 1953-04-23 | 1958-06-26 | Siemens Ag | Rigid, at the same time serving as a spacer suspension frame for bundle conductors with attached, in particular self-releasing pendulum clamps for the partial conductor ropes |
DE1035230B (en) * | 1955-07-19 | 1958-07-31 | Rudolf Koerber Dipl Ing | Field spacers made of plastic for high-voltage bundles |
DE1026386B (en) * | 1956-03-28 | 1958-03-20 | Siemens Ag | Star-quad overhead line for carrier frequency transmission |
US2934594A (en) * | 1958-05-15 | 1960-04-26 | Flower Archibald Thomas | Spreaders for conductor wires |
US3076866A (en) * | 1960-04-21 | 1963-02-05 | Ohio Brass Co | Suspension apparatus for bundle conductors |
US3076863A (en) * | 1960-04-21 | 1963-02-05 | Ohio Brass Co | Suspension apparatus for bundle conductors |
US3076864A (en) * | 1960-07-13 | 1963-02-05 | Ohio Brass Co | Suspension apparatus for bundle conductors |
US3234319A (en) * | 1962-11-12 | 1966-02-08 | Unidare Ltd | Overhead cable systems |
US3165284A (en) * | 1963-11-21 | 1965-01-12 | Gen Electric | Multiple conductor support |
US3240870A (en) * | 1965-03-10 | 1966-03-15 | Ohio Brass Co | Suspension apparatus for bundle conductors |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE597417C (en) | Arrangement for hanging a bundle conductor formed from several parallel-connected partial conductors | |
DE971606C (en) | Bundle conductor for overhead lines | |
DE2434179A1 (en) | CHARGING DEVICE | |
DE895014C (en) | Bracing with three or more insulator chains, especially in high-voltage overhead lines with bundled conductors | |
DE7827829U1 (en) | RoUenzug device for tensioning electrical lines with multiple conductors in a bundle | |
DE4430761C2 (en) | Method and device for replacing a mast head of a mast of a high-voltage overhead line | |
DE1059523B (en) | Procedure for pulling out overhead lines | |
DE1266468B (en) | Four-drum hoist, especially for casting cranes | |
DE2753544A1 (en) | Support of overhead lines from multiple isolator chain - has bracket capable of withstanding total load in the event of loss of one support | |
DE1506737A1 (en) | Device for rain or snow protection of a loading area, a hatch opening or the like. | |
DE2103192A1 (en) | Method and device for assembling a cable | |
DE2064622A1 (en) | Overhead line, especially high-voltage line | |
DE435746C (en) | Device built into a catenary system for the separation of the route or the tensioning of the contact wire with an additional wire branched off from the contact wire and led upwards | |
DE901068C (en) | Bracing device for stranded conductors in high-voltage overhead lines | |
DE893503C (en) | Contact wire suspension | |
EP0942119A2 (en) | Device for increasing the height of a high tension cable mast | |
DE1434335B1 (en) | Bracket detachable from bracket elements | |
DE967430C (en) | Cable excavator or cable crane with four carrying ropes for the trolley | |
DE577321C (en) | Pulley-like tensioning device for the catenary of electric railways | |
DE1515327B2 (en) | SWIVELING SUPPORT DEVICE FOR SUPPORT ROPE AND TRAVEL WIRE OF A CHAIN PLANT | |
DE821656C (en) | Cable attachment for suspension bridges | |
AT410997B (en) | SPACER FOR DOUBLE HANGING CHAINS | |
DE4430760C2 (en) | Method and device for replacing a mast head of a guy tower of a power transmission line | |
DD299938A7 (en) | METHOD AND DEVICE FOR REPLACING INSULATOR CHAINS ON HIGH VOLTAGE FREQUENCIES | |
DE705642C (en) | Device for regulating the tension of the contact wire in contact lines for electric railways |