[go: up one dir, main page]

DE399383C - Monitoring board for electrical systems, especially for railway safety systems - Google Patents

Monitoring board for electrical systems, especially for railway safety systems

Info

Publication number
DE399383C
DE399383C DEU8253D DEU0008253D DE399383C DE 399383 C DE399383 C DE 399383C DE U8253 D DEU8253 D DE U8253D DE U0008253 D DEU0008253 D DE U0008253D DE 399383 C DE399383 C DE 399383C
Authority
DE
Germany
Prior art keywords
circuits
lines
electrical
terminals
board
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired
Application number
DEU8253D
Other languages
German (de)
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
LUCIEN UBRIG
Original Assignee
LUCIEN UBRIG
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by LUCIEN UBRIG filed Critical LUCIEN UBRIG
Application granted granted Critical
Publication of DE399383C publication Critical patent/DE399383C/en
Expired legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B61RAILWAYS
    • B61LGUIDING RAILWAY TRAFFIC; ENSURING THE SAFETY OF RAILWAY TRAFFIC
    • B61L19/00Arrangements for interlocking between points and signals by means of a single interlocking device, e.g. central control
    • B61L19/06Interlocking devices having electrical operation
    • B61L19/14Interlocking devices having electrical operation with electrical locks

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Train Traffic Observation, Control, And Security (AREA)

Description

Es ist im Eisenbahnsicherungswesen bekannt, auf den Stellwerken optische Anzeigevorrichtungen anzubringen, auf denen die Lage und die Bewegung der verschiedenen Züge oder Maschinen auf den verschiedenen Gleisen oder die Stellung der Weichen und Signale verfolgt werden kann. Zu diesem Zweck sind schematische Darstellungen der verschiedenen Gleise mit verschiedenfarbigen Lampen versehen, die beim Niederdrücken der zum Betätigen der Weichen oder Signale dienenden Druckknöpfe eingeschaltet werden oder von Relais, die in den einzelnen Gleisabschnitten angeordnet sind und von in demIt is known in the railway safety system to use optical display devices on the signal boxes indicating the location and movement of the various trains or machines on the various Tracks or the position of points and signals can be tracked. To this Purpose are schematic representations of the different tracks with different colored ones Lamps are provided to operate the switches or signals when the switch is depressed used push buttons are switched on or by relays in the individual track sections are arranged and from in the

t5 betreffenden Abschnitt befindlichen Zügen oder Fahrzeugen kurzgeschlossen werden. Ferner ist eine Einrichtung zur Einstellung der Weichen und Signale bekannt, bei der in dem Stellwerktisch der Gleisanordnung entsprechende Nuten vorgesehen sind, in denen Läufer verschiebbar sind,, durch deren Verschiebung mittels dreiarmiger Stromschalter die Stromkreise der einzustellenden Weichen ; und Signale geschlossen werden.
Die Erfindung betrifft nun eine Überwachungstafel, die es ermöglicht, in jedem Augenblick die Stellung der verschiedenen Apparate und den Zustand der betreffenden Stromkreise festzustellen, ohne daß dadurch die Arbeit der betreffenden Anlage irgend-, wie gestört werden könnte. Zu diesem ■ Zweck sind auf der Überwachungstafel elek-, irische Stromkreise dargestellt, die durch metallische Klemmen derart in mehrere Abschnitte unterteilt sind, daß je zwei auf einanderfolgende Klemmen mit dem Stromkreis eines oder mehrere der zu überwachenden Apparate verbunden sind, so daß durch Verbindung dieser Klemmen mit einem Meßinstrument der Zustand des betreffenden Stromkreises festgestellt werden kann.
The trains or vehicles in the section concerned are short-circuited. Furthermore, a device for setting the switches and signals is known in which grooves are provided in the switchgear table of the track arrangement in which runners can be displaced; and signals are closed.
The invention now relates to a control panel which makes it possible at any moment to determine the position of the various devices and the status of the circuits concerned, without the operation of the system in question being disturbed in any way. For this ■ purpose electrical, Irish circuits are shown on the monitoring board, which are divided into several sections by metal clamps in such a way that two consecutive clamps are connected to the circuit of one or more of the apparatuses to be monitored, so that by connecting these Clamps with a measuring instrument the condition of the relevant circuit can be determined.

Im folgenden ist die Erfindung in ihrer Anwendung auf eine Signal- und Steliwerksanlage der Eisenbahn erläutert. Das WesenThe following is the application of the invention to a signaling and control system the railroad explained. The essence

Claims (1)

der Erfindung ist jedoch bei allen anderen elektrischen Anlagen gerade so anwendbar als wie im vorliegenden besonderen Ausführungsbeispiel. however, the invention is just as applicable to all other electrical systems than as in the present particular embodiment. In der Zeichnung zeigt Abb. ι ein erfindungsgemäß ausgestattetes Weichenstellwerk. Abb. 2 veranschaulicht die Gesamtheit der Schienen und Leitungen, und die Abb. 3 und 4 zeigen zur Überwachung dienende Streckenbilder.In the drawing, Fig. Ι shows an inventive equipped signal box. Fig. 2 shows the entirety of the rails and lines, and Fig. 3 4 and 4 show route images used for monitoring. In Abb. ι ist die Tafel im Untergeschoß des Stellwerkes zwischen zwei Pfosten angebracht. Auf ,der Tafel ist ein Schema der Einrichtung dargestellt, und zwar mit Bezug auf ein durch die Hebel L2 und L3 betätigtes Stellwerk und eine durch Hebel L4 bediente Weiche A zwischen den Gleisen I und II fs. Abb. ι und 2).In Fig. Ι the board is attached in the basement of the signal box between two posts. On the board is a diagram of the device, with reference to a signal box operated by levers L 2 and L 3 and a switch A operated by lever L 4 between tracks I and II fs. Fig. Ι and 2). Dieses 'Schema ist derart ersonnen, daß ein Bild mit möglichst geraden Strichen entsteht. Zu diesem Zweck sind die darzustellenden Apparate in ihre wichtigsten Bestandteile zerlegt, durch Symbole dargestellt und mit ! einer Ordnungsnummer in die Stromkreise eingeschaltet.This' scheme is devised in such a way that an image is created with lines that are as straight as possible. For this purpose, the devices to be represented are broken down into their most important components, represented by symbols and with ! a serial number switched into the circuits. In dieser Darstellung entsprechen oder entspricht R1, R2, R3 den bei den Schienen angeordneten Relaiskontakten R1, R2, f?3; B„ dem im Stellwerk gegenülx?r dem Hebel L2 angebrachten Kontrollzeiger für die Sperrung von Gleis II; Λ"4 und Λ"4 den Kontakten der durch den Hebel L4 betätigten elektrischen Verrie- j gelung F4; α'4 dem durch das im Untergeschoß des Stellwerks angebrachte Relais oc4 \ betätigten Kontakt; C2, C3 je einem der Kon- \ takte der im Stellwerk angeordneten Fußumschalter C2, C3; F2, F3 den Elektromagneten der durch die Hebel L2, L3 bedienten elektrischen Verriegelungen F2, F3; P1 den + - und —· - Klemmen der Energiequelle, die zur Speisung der Einrichtungen dient.In this illustration, R 1 , R 2 , R 3 correspond or correspond to the relay contacts R 1 , R 2 , f? 3 ; B " the control pointer in the signal box opposite the lever L 2 for the closure of track II; Λ "4 and Λ" 4 the contacts of the actuated by the lever L 4 j electrical Verrie- gelung F 4; α ' 4 the contact actuated by the relay oc 4 \ installed in the basement of the signal box; C 2, C 3 each one of the con- \ contacts of the spaced interlocking Fußumschalter C 2, C 3; F 2, F 3 of the electromagnet operated by the lever L 2, L 3 electrical interlocks F 2, F 3; P 1 the + - and - · - terminals of the energy source, which is used to supply the devices. Auf dieser Darstellung sind die im Innern ■ des Stellwerks zu verlegenden Stromkreise mit vollen Linien, die außen zu verlegenden mit gestrichelten Linien dargestellt.This diagram shows the circuits to be laid inside the ■ interlocking with full lines, those to be laid outside are shown with dashed lines. Durch diese Darstellungsweise erhält man im besonderen Fall ein Bild, das dem der Schienenwege ähnelt, wie dies leicht verständlich ist.In this particular case, this type of representation gives an image that resembles that of the Railroad tracks resembles, as this is easy to understand. Dieses Streckenbild ist alsdann durch metallische Klemmen a, b, c, d, e derart in mehrere Abschnitte unterteilt, daß zwei aufeinanderfolgende Klemmen einen oder mehrere Apparate oder Stromkreise umfassen, für die | eine dauernde Überwachung für notwendig erachtet wird.This route map is then subdivided into several sections by metallic clamps a, b, c, d, e in such a way that two consecutive clamps encompass one or more apparatus or circuits for which | permanent monitoring is deemed necessary. Diese Metallklemmen dienen einerseits zur Verbindung mit den elektrischen Leitungen ι bis 11 der Anlage und anderseits zur \^ornahme von Probe- oder Prüfmessungen an letzteren.These metal clamps are used on the one hand to connect to the electrical lines ι to 11 of the system and on the other hand for taking sample or test measurements on the latter. Die zwischen jeder Klemme verlegten Leitungen ι bis 11 passen sich genau dem durch die Tafel dargestellten »Schema an.The lines ι to 11 laid between each terminal fit through exactly the table shown »Scheme. Bei der Anordnung der Tafel nach Abb. ι wird man die Rückseite zur Verbindung der Klemmen mit den Leitungen benutzen, während man die Messungen zur Prüfung und Überwachung auf der Vorderseite der Tafel vornehmen wird. Jedoch kann bei weniger verwickelter Anordnung die obige Verbindung auch vorne erfolgen, insbesondere wenn die örtlichen \7erhältnisse eine Anbringung der Tafel an einer Wand erfordern.When arranging the panel according to Fig. Ι, the rear side will be used to connect the terminals to the cables, while the measurements for testing and monitoring will be carried out on the front of the panel. However, in less complicated arrangement, the above compound can also be front, particularly when the local \ 7 erhältnisse attachment of the panel to a wall require. Um die Anlage zu prüfen oder einen belasteten Stromkreis zu überwachen, beispielsweise die auf Gleis II (Abb. 3) bezüglichen Apparate und Stromkreise, genügt es, eine Klemme eines Voltmeters W mit dem —-Pol fler Strommquelle P1 zu verbinden und mit der anderen Klemme nacheinander die in den Stromkreis eingeschalteten Klemmen a, c, d, c zu berühren.To test the system or to monitor a loaded circuit, for example the apparatus and circuits on track II (Fig. 3), it is sufficient to connect one terminal of a voltmeter W to the pole of the power source P 1 and to the other Terminal one after the other to touch terminals a, c, d, c that are switched on in the circuit. Schlägt hierbei das Voltmeter nicht aus, so folgt sofort daraus, daß in dem oder in den Leitungen und Apparaten, die zwischen die gerade berührte Klemme und die vorhergehende eingeschaltet sind, eine Störung vorhanden ist.If the voltmeter does not deflect, it immediately follows that in the or in the Lines and apparatus between the terminal just touched and the previous one are switched on, there is a fault. Zur Prüfung der auf Gleis I (Abb. 4) bezüglichen Stromkreise hat man nacheinander die Klemmen b, c, d, e zu berühren.To test the circuits relating to track I (Fig. 4), one after the other touch terminals b, c, d, e. Die Prüfungen sind also auf die auf der Tafel angegebenen und zwischen zwei bestimmten Punkten liegenden Einrichtungen beschränkt.The exams are therefore on the ones indicated on the board and between two specific ones Points lying facilities restricted. Patent-Ax S-PRU CH:Patent-Ax S-PRU CH: Überwachungstafel für elektrische An- iuo lagen, insbesondere für Eisenbahnsicherungswesen, bei der die elektrischen Stromkreise auf der Tafel dargestellt sind, dadurch gekennzeichnet, daß die dargestellten Stromkreise durch metallische Klemmen (a, b, c, d, c) derart in mehrere Abschnitte unterteilt sind, daß je zwei aufeinanderfolgende Klemmen mit dem Stromkreis eines oder mehrerer der zu überwachenden Apparate verbunden sind, n0 so daß durch Verbindung.dieser Klemmen mit einem Meßinstrument der Zustand des betreffenden Stromkreises festgestellt werden kann.Monitoring board for electrical systems, in particular for railway safety systems, in which the electrical circuits are shown on the board, characterized in that the circuits shown are divided into several sections by metal clamps (a, b, c, d, c) that two consecutive terminals are connected to the circuit of one or more of the apparatus to be monitored, n 0 so that by connecting these terminals to a measuring instrument, the state of the relevant circuit can be determined. Hierzu 1 Blatt Zeichnungen.1 sheet of drawings.
DEU8253D 1922-09-12 1923-08-15 Monitoring board for electrical systems, especially for railway safety systems Expired DE399383C (en)

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
FR399383X 1922-09-12

Publications (1)

Publication Number Publication Date
DE399383C true DE399383C (en) 1924-07-22

Family

ID=8896687

Family Applications (1)

Application Number Title Priority Date Filing Date
DEU8253D Expired DE399383C (en) 1922-09-12 1923-08-15 Monitoring board for electrical systems, especially for railway safety systems

Country Status (1)

Country Link
DE (1) DE399383C (en)

Similar Documents

Publication Publication Date Title
DE399383C (en) Monitoring board for electrical systems, especially for railway safety systems
EP1177962B1 (en) Device for monitoring the condition of an Eddy current brake at a railway vehicle
DE69012536T2 (en) GAS-INSULATED ELECTRICAL PANEL.
DE250718C (en)
DE967448C (en) Device for measuring the fault location distance in the event of short-circuiting of lines
DE1002385C2 (en) Signal box with electrical locks, in particular the track diagram signal box
DE2812362A1 (en) FASTENING DEVICE FOR CIRCUIT BOARDS
DE69836C (en) Locking device for block stations
DE962809C (en) Circuit for triggering key locks, road blocks or the like.
DE969111C (en) Circuit arrangement for substitute signals in railway security systems
DE362643C (en) Electrical signal reproducing apparatus
DE870428C (en) Electric railway vehicle, the switching devices of which are arranged in special protective boxes below the railway vehicle
DE507964C (en) Optical signaling device for electric railways
DE485379C (en) Device for triggering, actuating or blocking safety devices or control processes, in particular relays, by short-circuiting two isolated rail sections
DE1780226C3 (en) Device for monitoring electrical and mechanical systems in train sets
DE331404C (en) Device for signaling on moving trains
DE767104C (en) Light signal system, especially for brake test reporting systems in railway companies
DE962531C (en) Circuit arrangement for checking the route setting of points in electrical signal boxes
DE722708C (en) Circuit for electrical track vacancy detection systems with several insulating sections
DE80838C (en)
DE1605441C (en) Circuit arrangement for functional testing of track monitoring switchgear groups in railway safety systems
DE258110C (en)
DE1665639B2 (en) Switching fault protection device
DE592594C (en) Warning signal system for route workers
DE403385C (en) Way signal device