DE376337C - Process and delivery table for the treatment of freshly pressed or tamped cinder blocks - Google Patents
Process and delivery table for the treatment of freshly pressed or tamped cinder blocksInfo
- Publication number
- DE376337C DE376337C DEI21186D DEI0021186D DE376337C DE 376337 C DE376337 C DE 376337C DE I21186 D DEI21186 D DE I21186D DE I0021186 D DEI0021186 D DE I0021186D DE 376337 C DE376337 C DE 376337C
- Authority
- DE
- Germany
- Prior art keywords
- stones
- same
- press
- tamped
- boards
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B28—WORKING CEMENT, CLAY, OR STONE
- B28B—SHAPING CLAY OR OTHER CERAMIC COMPOSITIONS; SHAPING SLAG; SHAPING MIXTURES CONTAINING CEMENTITIOUS MATERIAL, e.g. PLASTER
- B28B11/00—Apparatus or processes for treating or working the shaped or preshaped articles
- B28B11/24—Apparatus or processes for treating or working the shaped or preshaped articles for curing, setting or hardening
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B65—CONVEYING; PACKING; STORING; HANDLING THIN OR FILAMENTARY MATERIAL
- B65G—TRANSPORT OR STORAGE DEVICES, e.g. CONVEYORS FOR LOADING OR TIPPING, SHOP CONVEYOR SYSTEMS OR PNEUMATIC TUBE CONVEYORS
- B65G49/00—Conveying systems characterised by their application for specified purposes not otherwise provided for
- B65G49/05—Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles
- B65G49/08—Conveying systems characterised by their application for specified purposes not otherwise provided for for fragile or damageable materials or articles for ceramic mouldings
Landscapes
- Engineering & Computer Science (AREA)
- Ceramic Engineering (AREA)
- Structural Engineering (AREA)
- Chemical & Material Sciences (AREA)
- Mechanical Engineering (AREA)
- Stacking Of Articles And Auxiliary Devices (AREA)
Description
Verfahren undAblegetisch zur Behandlung frisch gepreßter oder gestampfterSchlackensteine. Infolge Kohlenmangels und zunehmender Höhe der Arbeitslöhne ist man dazu übergegangen, in erhöhtem Umfang aus dem beim Verbrennen der Steinkohle übrigbleibenden Schlackenabfall sogenannte Schlackensteine herzustellen. Auch aus der Müllverbrennungsschlacke und aus Hochofenschlacke werden solche Schlackensteine gewonnen. Bei der Herstellung von Schlackensteinen tritt der erwähnte Kohlenmangel nicht in die Erscheinung, jedoch haben bisher die hohen Arbeitslöhne auch bei der Schlackensteinherstellung stark auf die Preisbildung gedrückt, da die überreichliche Handarbeit nicht vermieden werden konnte. Dazu kommt, daß für eine wirtschaftliche Herstellung von Schlackensteinen in großem Umfang man bisher einen viel zu großen Platz zwecks Trocknens und Abbindens der aus den Pressen kommenden Steine benötigte. - Schließlich litt bisher die Wirtschaftlichkeit des Betriebes an der Unzulänglichkeit der Förderanlagen und der Handhabung derselben.Method and tray for handling freshly pressed or tamped cinder blocks. As a result of a lack of coal and increasing wages, there has been a shift towards producing so-called cinder blocks to a greater extent from the slag waste left over from the burning of coal. Such cinder blocks are also obtained from waste incineration slag and from blast furnace slag. In the manufacture of cinder blocks, the aforementioned lack of coal does not appear, but the high wages have so far put a lot of pressure on the price formation, even in the cinder block production, since the abundant manual labor could not be avoided. In addition, for an economical production of cinder blocks on a large scale, far too large a space has been required for drying and setting the blocks coming out of the presses. - Finally, the profitability of the company has suffered from the inadequacy of the conveyor systems and the handling of the same.
Die Erfindung bezweckt, diese Nachteile auszuschalten und die Herstellung der Schlackensteine sowohl hinsichtlich der Arbeitslöhne als auch des zur Lagerung benötigten Raumes und schließlich hinsichtlich der Förderung zu verbilligen. Man hat bereits vorgeschlagen, die aus den- Steinpressen kommenden Steine unter Benutzung von Unterlagen für jede Steinschicht und Einfügung von einen Abstand der Unterlagen voneinander aufrechterhaltenden Stützen reihenweise übereinander aufzuschichten und die so übereinandergeschichteten Steine mit ihren Unterlagsbrettern als Stapel zu den Trocken- und Verladestellen zu befördern. Bei diesen bekannten Fördervorrichtungen muß jedoch, wenn der Steinstapel von einer Stelle zu einer anderen versetzt wird, jeweils eine besondere Unterlage für den Stapel geschaffen werden.The invention aims to eliminate these disadvantages and the production of cinder blocks in terms of both wages and storage space required and finally in terms of funding. Man has already suggested using the stones coming from the stone presses of underlays for each stone layer and insertion of a spacing of the underlays Stack the supports that maintain each other in rows on top of each other and the stones stacked on top of each other with their boards as a stack to be transported to the drying and loading points. In these known conveying devices must, however, if the pile of stones is moved from one place to another, one each special base for the stack can be created.
Des weiteren hat man bereits vorgeschlagen, für die Beförderung von gebrannten Ziegelsteinen diese ohne Verwendung von Unterlagen auf einem gemeinsamen Tragboden übereinanderzustapeln und sie während der Beförderung durch Förderwagen, Hebezeuge usw. auf diesem Tragboden zu belassen, so daß die Ziegel auf dem Wege ihrer Beförderung nur ein einziges Mal von Hand aufgenommen und abgelegt zu werden brauchen. Hier fehlen jedoch die Tragbretter für die einzelnen Steine oder Steinreihen, welche gemäß der Erfindung gerade erforderlich sind, um das Anfassen der frischen Steine zu vermeiden.Furthermore, it has already been proposed for the transport of Burned bricks this without using any underlays on a joint To stack the trays on top of each other and to transport them by trolleys, Lifting equipment etc. to be left on this supporting floor so that the bricks are on the way to be picked up and put down by hand only once during their transport to need. However, the supporting boards for the individual stones or rows of stones are missing here, which according to the invention are just required to touch the fresh Avoid stones.
Von diesen bekannten Verfahren unterscheidet sich der Erfindungsgegenstand dadurch, daß die der Abbindung bedürftigen Steine mit den Tragbrettern, auf denen sie in bekannter Weise die Presse verlassen, auf einer gemeinsamen Unterlagsplatte unmittelbar übereinanderliegend aufgestapelt und auf der gleichen Unterlagsplatte ohne Umsetzen zu den Lagerstellen und von da nach Maßgabe der Erhärtung wiederum ohne Umsetzen zu den Verladestellen gefördert werden, so daß die mit ihren Tragbrettern unmittelbar aufeinandergestapelten Steine vom Verlassen der Presse an während der Erhärtung bis zum Verladen in der Fabrik auf der gleichen Unterlage ruhen und mit letzterer von der gleichen Fördervorrichtung bewegt werden.The subject matter of the invention differs from these known methods in that the stones in need of binding with the supporting boards on which they leave the press in a known manner, on a common platen Stacked directly on top of each other and on the same production plate without moving to the storage locations and from there again depending on the hardening be promoted without moving to the loading points, so that with their supporting boards stones stacked directly on top of each other from leaving the press during the Rest on the same surface until it is loaded in the factory and with the latter are moved by the same conveyor.
Eine zur Durchführung des den Gegenstand der Erfindung bildenden Verfahrens bestimmte Anlage ist auf der Zeichnung in einem Ausführungsbeispiel veranschaulicht.One for carrying out the method forming the subject of the invention certain system is illustrated in the drawing in an exemplary embodiment.
Abb, r ist die Seitenansicht der Anlage, Abb. 2 eine Vorderansicht derselben, Abb. 3 die Vorderansicht der Hebevorrichtung in Verbindung mit den aufgeschichteten Schlackensteinen, Abb. 4 die Seitenansicht zu Abb. 3.Fig, r is the side view of the plant, Fig. 2 is a front view same, fig. 3 the front view of the lifting device in connection with the stacked ones Cinder blocks, Fig. 4 the side view of Fig. 3.
Der in bekannter Weise aus Rohschlacke hergestellte Mörtel gelangt in den Füllkasten einer der Steinpressen z, die beliebig ausgebildet sein können. Die Presse, die vollständig selbsttätig arbeitet und z. B. in jedem Arbeitsgang acht Steine formt, bewegt ein entsprechend großes Brett 2 von einem in der Maschine befindlichen Brettstapel aus nach vorn; der Brettstapel wird von einem Mann, der gleichzeitig den Gang der Maschine zu beobachten hat, immer wieder ergänzt. Die auf je einem Brett 2 liegenden Steine (z. B. acht) werden selbsttätig durch ein umlaufendes endloses Förderband 3 zu dem Steinablegetische geleitet. Von dem endlosen Förderbande 3 werden die einzelnen Bretter mit ihren Steinen von Hand abgehoben.The mortar made in a known manner from raw slag arrives in the filling box one of the stone presses z, which can be designed as desired. The press, which works completely automatically and z. B. in every operation Forms eight stones, moves a correspondingly large board 2 from one in the machine the existing stack of boards from forward; the stack of boards is made by a man who at the same time has to watch the operation of the machine, added again and again. the 2 stones (e.g. eight) lying on each board are automatically activated by a circulating endless conveyor belt 3 led to the stone storage tables. From the endless Conveyor belt 3, the individual boards with their stones are lifted by hand.
Die Steine bleiben, da sie erdfeucht sind, auf den Brettern :2 liegen und werden mit diesen zu einem Stapel aufgeschichtet, und zwar so, daß in einer wagerechten Schicht z. B. sechs Bretter mit je acht Steinen zu liegen kommen, während in jeder senkrechten Schicht acht Bretter mit je acht Steinen übereinanderliegen, so daß der Stapel 6 - 8 # 8 - 38.1 Schlakkensteine enthält. Es ist praktisch erprobt, daß die Steine, und zwar auch die untersten, diese mit der Stapelung verbundenen Druckbeanspruchungen in frischem Zustand gut aushalten: Zur Erleichterung dieser Stapelarbeit dienen zwei vor jeder Presse gelagerte Ablegetische 4 und 5, die so elastisch unterstützt sind, etwa durch Federung oder mittels besonderer Tauchkörper, daß die wagerechte Oberfläche sich dauernd in der gleichen Höhe mit dem oberen Teil des Förderbandes 3 befindet, von dem die Bretter mit je acht Steinen in Abständen von etwa zwei Metern selbsttätig von der Presse weggeholt werden.The stones remain on the boards because they are damp: 2 lie and are piled up with these to form a stack in such a way that in one horizontal layer z. B. six boards with eight stones each come to rest while in each vertical layer eight boards with eight stones each lie on top of each other, so that the stack 6 - 8 # 8 - 38.1 contains slag stones. It has been tried and tested that the stones, including the lowest ones, connect them with the stacking Withstand pressure loads when fresh: To make it easier Two storage tables 4 and 5, which are stored in front of each press, are used for stacking work are elastically supported, for example by suspension or by means of special immersion bodies, that the horizontal surface is permanently level with the upper part of the conveyor belt 3 is from which the boards with eight stones each at intervals can be automatically picked up by the press from about two meters.
Gemäß dem in Abb. z und 2 dargestellten Ausführungsbeispiel ist jeder der beiden Ablegetische 4 5 als Tauchkörper ausgebildet. Sein Querschnitt verjüngt sich nach unten, so daß sich beispielsweise in der Seitenansicht der Abb. z ein etwa dreieckiger Querschnitt ergibt. Die Größe der wagerechten Querschnitte ist hierbei unter Berücksichtigung des Schlackensteingewichtes derart bemessen, daß die Eintauchtiefe bei Auflage je eines weiteren, mit beispielsweise acht Steinen belasteten Brettes nur um die Höhe einer Steinschicht einschließlich der Brettdicke zunimmt. Auf diese Weise wird erreicht, daß die Oberfläche der obersten Steinschicht im wesentlichen in gleicher Höhe bleibt, so daß der Arbeiter, der das Brett mit den acht Steinen von dem Förderband 3 auf den Ablegetisch 4 überführt, immer nur eine Bewegung in der Horizontalebene zu vollziehen braucht, also keinerlei Hubarbeit leistet.According to the embodiment shown in Figs. Z and 2, each of the two storage tables 4 5 designed as immersion bodies. Its cross-section tapers down, so that, for example, in the side view of Fig. z approximately triangular cross-section results. The size of the horizontal cross-sections is here, taking into account the weight of the cinder block, dimensioned such that the immersion depth when placing another, for example, eight stones loaded board only by the height of a stone layer including the board thickness increases. In this way it is achieved that the surface of the topmost stone layer remains essentially at the same height, so that the worker using the board the eight stones transferred from the conveyor belt 3 to the delivery table 4, always only need to perform a movement in the horizontal plane, so no lifting work perform.
jeder der beiden Tauchkörper 4, 5 spielt in einen wassergefüllten Kanal 6, der, wenn die Gesamtanlage Wasseranschluß hat, von dem Hauptwasserlauf abzweigt.each of the two immersion bodies 4, 5 plays in a water-filled channel 6 which, if the entire system has a water connection, branches off from the main watercourse.
Die senkrechte Führung der Tauchkörper 4, 5 wird durch seitlich von ihnen ortsfest gelagerte Rollen 7 gewährleistet.The vertical guidance of the immersion bodies 4, 5 is through the side of them fixedly mounted rollers 7 guaranteed.
Der Vorgang der Stapelarbeit ist folgender: Auf jedem Ablegetisch 4, 5 liegt eine Unterlagsplatte 8 für je einen Steinstapel. Darauf werden die Bretter :2 mit je acht Steinen in der Reihenfolge aufgelegt, wie Abb. 3 und -angeben, bis die acht Schichten übereinandergestapelt sind und der Stapel 384 Steine enthält. Durch das Auflegen von je acht Steinen in regelmäßiger Aufeinanderfolge sinkt der Ablegetisch 4 bzw. 5 immer nur so weit, daß er, wie gesagt, dauernd in der gleichen Höhe mit dem Oberteil des Förderbandes?, bleibt. Dadurch ist die Stapelarbeit so erleichtert, daß selbst Kriegsbeschädigte mit künstlichen Gliedern sie bequem ausführen können.The process of batch work is as follows: On each filing table 4, 5 is a base plate 8 for a stack of stones each. The boards are on it : 2 with eight stones each placed in the order shown in Fig. 3 and -indicate, to the eight layers are stacked on top of each other and the stack contains 384 stones. By placing eight stones in regular succession, the will decrease Deposit table 4 or 5 only so far that, as I said, it is always in the same position Height with the top of the conveyor belt ?, remains. This is how the batch work is relieved that even war invalids with artificial limbs they can do comfortably.
Wird die oberste (achte) Schicht aufgelegt, so kommen seitliche Anschläge der gemeinsamen Unterlagsplatte 8 auf Rasten 9 des Fußbodens zu liegen, so daß ein weiteres Sinken des Tauchkörpers ausgeschlossen ist.If the top (eighth) layer is applied, there are lateral stops the common base plate 8 to lie on notches 9 of the floor, so that a further sinking of the immersion body is excluded.
Der Kran To, an dem die Tragvorrichtung =i hängt, hebt den ganzen Stapel von 384 Steinen mit den Auflagebrettern 2 und der gemeinsamen Tragplatte 8, nachdem diese von einem Mann eingehakt ist, in die Höhe und fährt damit zu den Lagerräumen, z. B. nach dem ersten Feld derselben. Dort läßt der Kran den Stapel auf den Fußboden nieder und fährt nach Aushakung durch den Lagerraum wieder nach Presse i zurück. An dieser hat sich unterdessen der beschriebene Stapelvorgang auf dem anderen zu der gleichen Presse gehörigen Ablegetisch 4 bzw. 5 wiederholt, so daß wieder 384 Steine zum Abholen bereit sind.The crane To, on which the carrying device = i hangs, lifts the whole Stack of 384 stones with the support boards 2 and the common support plate 8, after it is hooked in by a man, up and takes it to the Storage rooms, e.g. B. after the first field of the same. The crane leaves the pile there down on the floor and after unhooking drives through the storage room again Press i back. In the meantime, the stacking process described has been carried out on this the other tray 4 or 5 belonging to the same press is repeated, see above that again 384 stones are ready to be picked up.
Jede der Steinpressen i braucht bei etwa 15 ooo Schlackensteinen bei achtstündiger Tagesleistung etwa i2 Minuten zur Herstellung eines Stapels von 384 Steinen.Each of the stone presses needs about 15,000 cinder blocks eight-hour daily output about i2 minutes to produce a stack of 384 Stones.
In den Lagerräumen wird eine größere Anzahl von Stapeln, z. B. 4o Stapel, zu je einem Feld zusammengestellt, die auf diese Weise eine Tagesleistung einer der Pressen i darstellen. Hierbei macht der Kran =o nur fünf Fahrten in der Stunde und findet daher inzwischen genügend Zeit, die längere Zeit vorher angefertigten und unterdessen abgebundenen Steine in Waggons oder Schiffe zu verladen. Zu diesem Zweck braucht der Kran keinen Weg, so gering er auch sei, umsonst machen.A larger number of stacks, e.g. B. 4o Stacks, put together in one field each, which in this way represent a daily output represent one of the presses i. Here the crane only makes five trips in the Hour and therefore finds enough time in the meantime, the longer time previously made and meanwhile to load tied stones into wagons or ships. To this The crane does not need to make a path for free, however small it may be.
Wenn die Steine abgebunden haben, setzt derselbe Kran =o wiederum je einen Stapel mit 384 Steinen in die Waggons oder Schiffe ab; der Lagermann, der gleichzeitig das Aushaken der Tragplatten vom Kran am Lagerplatz besorgt, zumeist unter Hilfeleistung seines Lagerkollegen von den benachbarten Feldern, nimmt die Steine nun zum erstenmal in die Hand und schichtet sie auf. Die leeren Bretter 2 kommen wieder auf die Tragplatte 8, die der Kran =o bei der Rückfahrt zur Presse wieder mitnimmt, um sie in der Nähe derselben abzusetzen. Von dort aus bringt der Mann, der die Stapel am Ablegetisch 4 bzw. 5 einhakt, die Bretter zur Presse, von wo aus sie selbsttätig wieder, mit Steinen belastet, ausgestoßen werden. Die Lagerleute finden genügend Zeit, das Schiff oder den Waggon zu beladen, da sie nur alle i2 Minuten einen Stapel vom Kran auszuhaken brauchen. Die aus den Pressen kommenden Steine bleiben also auf den Unterlagsbrettern 2, auf denen sie die Maschine verlassen, liegen während der Beförderung zu den Ablegetischen 4, 5, de ferneren während der Beförderung von diesen Ablegetischen zu den Lagerräumen, wo die Steine erhärten, und schließlich während der Beförderung von diesen Lagerräumen zu den Fernbeförderungsmitteln, wie Eisenbahnwagen oder Schiff. Ebenso verbleiben die Steine, nachdem sie von dem endlosen Förderband 3 auf einen der Ablegetische 4 bzw. 5 gehoben worden sind, auf der unteren Tragplatte 8 in der aus Abb. 3 und 4 ersichtlichen Schichtung bis zum Verladen in die Eisenbahnwagen oder Schiffe.When the stones have set, the same crane places = o again Put a stack of 384 stones in each of the wagons or ships; the camp man who at the same time taking care of the unhooking of the support plates from the crane at the storage area, mostly with the help of his camp colleague from the neighboring fields, the Stones in hand for the first time and stacked them up. The empty boards 2 come back on the support plate 8, which the crane = o when returning to the press takes them back to drop them off near them. From there he brings Man who hooks the stacks on the delivery table 4 or 5, the boards to the press, from where they are automatically ejected again, loaded with stones. The warehouse people find enough time to load the ship or the wagon, as they only all i2 Minutes to unhook a stack from the crane. The ones coming out of the presses Stones therefore remain on the production boards 2 on which they leave the machine, lie during the transport to the delivery tables 4, 5, de ferneren during the Transport from these storage tables to the storage rooms where the stones harden, and finally during the transport from these storage rooms to the long-distance means of transport, like railroad car or ship. Likewise, the stones remain after they have been removed from the endless conveyor belt 3 have been lifted onto one of the delivery tables 4 and 5, respectively the lower support plate 8 in the layering shown in Fig. 3 and 4 up to Loading into the railroad cars or ships.
Claims (3)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEI21186D DE376337C (en) | 1921-01-27 | 1921-01-27 | Process and delivery table for the treatment of freshly pressed or tamped cinder blocks |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEI21186D DE376337C (en) | 1921-01-27 | 1921-01-27 | Process and delivery table for the treatment of freshly pressed or tamped cinder blocks |
Publications (1)
Publication Number | Publication Date |
---|---|
DE376337C true DE376337C (en) | 1923-05-26 |
Family
ID=7186184
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEI21186D Expired DE376337C (en) | 1921-01-27 | 1921-01-27 | Process and delivery table for the treatment of freshly pressed or tamped cinder blocks |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE376337C (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1037680B (en) * | 1953-02-23 | 1958-08-28 | Alfons Rimmele | Device for transporting building blocks |
EP0007852A1 (en) * | 1978-07-17 | 1980-02-06 | Mircéa Borcoman | Production line for the making of concrete elements |
-
1921
- 1921-01-27 DE DEI21186D patent/DE376337C/en not_active Expired
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
DE1037680B (en) * | 1953-02-23 | 1958-08-28 | Alfons Rimmele | Device for transporting building blocks |
EP0007852A1 (en) * | 1978-07-17 | 1980-02-06 | Mircéa Borcoman | Production line for the making of concrete elements |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2241968A1 (en) | PROCEDURE FOR ASSEMBLING DIFFERENT LAYERS OF GOODS FROM SEVERAL PRODUCT PALLETS ON A SHIPPING PALLET, AS WELL AS STACKING CRANE FOR PERFORMING THE PROCEDURE | |
DE376337C (en) | Process and delivery table for the treatment of freshly pressed or tamped cinder blocks | |
DE2030602A1 (en) | Method and device for the treatment of brick moldings from the strand cutter to the kiln car | |
DE504917C (en) | Device for loosening and spreading cut tobacco | |
AT94352B (en) | Process for the treatment of freshly pressed or tamped cinder blocks. | |
DE2330629C2 (en) | Depalletizing device | |
DE2925426A1 (en) | METHOD AND DEVICE FOR CONVEYING AND STORING PRODUCTS | |
EP0422600A1 (en) | Transporting device for plane work pieces | |
DE19602880C2 (en) | System for loading and unloading firing table assemblies with ceramic goods | |
DE1098425B (en) | Device for conveying and stacking pellets | |
EP0018356A1 (en) | Method of moist stacking shaped articles, apparatus for carrying out this method, and covering for the shaped articles to be stacked in this apparatus | |
AT252087B (en) | Method and device for arranging, lining up, layering and stacking of trapezoidal stones od. shaped stones | |
DE1948905C3 (en) | Plant for the production of laminated panels | |
DE2917998C2 (en) | Device for the prefabrication of large brick walls | |
DE864375C (en) | Device for the production of moldings from ceramic masses | |
AT214828B (en) | ||
DE1152246B (en) | Cooling and storage device for shaped sheets in plants for the production of chipboard or the like. | |
AT360421B (en) | METHOD AND DEVICE FOR REMOVING AN EMPTY PALLET FROM A PACK OF PALLETS | |
DE2424910C2 (en) | Device for placing moldings, in particular split tiles, on kiln cars | |
DE1937976C (en) | Method and device for the removal of pumice concrete blocks ejected on base boards from a block making machine | |
DE1806060C3 (en) | Device for the production of shaped stones | |
DE468195C (en) | Trolley for loading brick drying systems | |
DE888406C (en) | Loading table for ovens | |
DE1758846C (en) | Method for setting ceramic moldings in rectangular cross bracing stacks | |
DE1584713A1 (en) | Process for the continuous feeding of production plates to a concrete block molding machine |