Swell-following apparatus

Info

Publication number
DE3717890A1
DE3717890A1 DE19873717890 DE3717890A DE3717890A1 DE 3717890 A1 DE3717890 A1 DE 3717890A1 DE 19873717890 DE19873717890 DE 19873717890 DE 3717890 A DE3717890 A DE 3717890A DE 3717890 A1 DE3717890 A1 DE 3717890A1
Authority
DE
Germany
Prior art keywords
mast
load
boom
swell
tension elements
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
DE19873717890
Other languages
German (de)
Inventor
Gunter Ing Grad Weingarten
Ernst-Helmuth Dipl In Sprengel
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SPRENGEL ERNST HELMUTH DIPL IN
Original Assignee
SPRENGEL ERNST HELMUTH DIPL IN
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SPRENGEL ERNST HELMUTH DIPL IN filed Critical SPRENGEL ERNST HELMUTH DIPL IN
Priority to DE19873717890 priority Critical patent/DE3717890A1/en
Publication of DE3717890A1 publication Critical patent/DE3717890A1/en
Withdrawn legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B66HOISTING; LIFTING; HAULING
    • B66CCRANES; LOAD-ENGAGING ELEMENTS OR DEVICES FOR CRANES, CAPSTANS, WINCHES, OR TACKLES
    • B66C13/00Other constructional features or details
    • B66C13/04Auxiliary devices for controlling movements of suspended loads, or preventing cable slack
    • B66C13/06Auxiliary devices for controlling movements of suspended loads, or preventing cable slack for minimising or preventing longitudinal or transverse swinging of loads

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Jib Cranes (AREA)

Abstract

A swell-following apparatus having at least three load cables which, extending from the load, lead, at approximately equal angular distances from one another, in a conical-envelope-like manner, to deflection rollers at the suspension points of the apparatus and, from there, to separately controllable winch drums of the apparatus, characterised in that two of the deflection rollers (8, 8') are provided at the ends of two cantilever arms (2, 2') fastened laterally and symmetrically on the periphery of a mast (1) which bears the entire apparatus, are spread by means of a spacer (4) and are connected to the mast (1) by means of tension elements (5, 5') and in that the third deflection roller (10) is provided at the upper end of the mast. <IMAGE>

Description

Bei einem normalen Kran ist eine Seegangs-Kompensation in der horizontalen Richtung nur theoretisch möglich, denn die Last kann durch die Aufhängung an nur einer Talje wegen der entstehenden Pendelbewegungen nicht kontrolliert geführt werden. Außerdem müßte ein solcher Kran Kompensa­ tionsbewegungen in der horizontalen Ebene durch Drehen und Auf- und Abbewegen des Auslegers durchführen, was wegen der dabei erforderlichen Beschleunigungskräfte schwierig ist.In a normal crane, swell compensation is in the horizontal direction is only theoretically possible, because the load can be suspended from only one valley not controlled due to the resulting pendulum movements be performed. In addition, such a crane would have to be compensated movement in the horizontal plane by turning and To move the boom up and down, what because the acceleration forces required are difficult is.

Der Erfindungsgegenstand betrifft daher einen Kran oder eine Hebevorrichtung für z. B. Offshore-Anlagen, die eine Seegangskompensation nicht nur in vertikaler Richtung, sondern auch in der horizontalen Ebene ermöglichen. Eine solche Seegangskompensation ist erforderlich z. B. beim Aufnehmen oder Absetzen von Lasten von Versorgungsschiffen auf Plattformen, weil die Versorgungsschiffe durch den Seegang nicht nur auf und nieder, sondern auch in der Quer- und Längsrichtung bewegt werden.The subject of the invention therefore relates to a crane or a lifting device for e.g. B. Offshore facilities, the one Swell compensation not only in the vertical direction, but also in the horizontal plane. A such swell compensation is required e.g. B. at Picking up or setting down loads on supply ships on platforms because the supply ships through the Swell not only up and down, but also in the Transverse and longitudinal directions are moved.

Die Lösung dieser Aufgabe ist in den Ansprüchen beschrie­ ben. Demnach wird bei dem Erfindungsgegenstand die Last von drei unabhängig voneinander arbeitenden Taljen gehal­ ten und geführt. Die Taljen sind am unteren Ende miteinan­ der gekoppelt, die oberen Enden sind gespreizt angeordnet, so daß in dem Ladebereich in Deckshöhe des Versorgungsschif­ fes keine Talje senkrecht hängt, so daß jede Talje eine horizontale Kraft ausübt. Hierdurch wird ein Pendeln der Last vermieden. Durch eine Längenänderung der Talje kann die Last in der horizontalen Ebene im festgesetzten Ladebereich bewegt werden. Vertikale Kompensation kann der horizontalen überlagert werden. The solution to this problem is described in the claims ben. Accordingly, the load on the subject of the invention by three independently working taljes and led. The taljen are with each other at the lower end the coupled, the upper ends are spread apart, so that in the loading area at deck level of the supply ship no talje hangs vertically, so that each talje hangs one exerts horizontal force. This will make the pendulum Avoided load. By changing the length of the valley the load in the horizontal plane in the fixed Loading area to be moved. The vertical compensation can horizontal overlays.  

Zur Anwendung kommen Winden, die schnell unter Last ansprechen. Eine elektronische Regelung der Windenmotoren ist unerläßlich.Winches that are quickly under load are used speak to. Electronic control of the winch motors is essential.

Die Erfindung wird nachstehend anhand eines zeichnerisch dargestellten Beispiels erläutert. Die Zeichnungen zeigt inThe invention is illustrated below using a drawing illustrated example explained. The drawings show in

Fig. 1 eine perspektivische Ansicht der Vorrich­ tung gemäß der Erfindung und in Fig. 1 is a perspective view of the Vorrich device according to the invention and in

Fig. 2 den Arbeitsbereich, in dem Lasten bei be­ wegter See auf- oder abgenommen werden können. Fig. 2 shows the work area in which loads can be picked up or taken off when the lake is moving.

Gemäß Fig. 1 sind an dem um die senkrechte Achse drehbar angeordneten Mast 1 zwei Ausleger 2, 2′ mit Hilfe von Gelenken 3, 3' angeordnet. An dem anderen oberen Ausleger­ ende sind die Ausleger untereinander durch einen Abstands­ halter 4 miteinander verbunden. Der Abstand der Ausleger 2, 2′ voneinander ist an dem oberen Ende wesentlich größer als am unteren Ende, so daß eine große Spreizung zwischen ihnen entsteht. Jeder der Ausleger 2 bzw. 2′ wird an seinem oberen Ende durch ein Zugelement 5 bzw. 5′, welches mit seinem anderen Ende an dem Mast 1 befestigt ist, gehalten.According to Fig. 1, at the about the vertical axis rotatably mounted mast 1 two booms 2, 2 'by means of hinges 3, 3'. At the other upper boom end, the booms are interconnected by a spacer 4 . The distance between the arms 2, 2 ' from each other is much larger at the upper end than at the lower end, so that there is a large spread between them. Each of the boom 2 or 2 ' is held at its upper end by a tension element 5 or 5' , which is attached to the mast 1 at its other end.

Von jeder der beiden Winden 6 und 6′ ist je ein Seil 12 u. 12′ über eine Seilscheibe 7 bzw. 7′ am Mastkopf zur Leitrolle 8 bzw. 8′ an dem oberen Ende des Auslegers 2 bzw. 2′ und von dort nach unten geführt. Von der Winde 9 wird das Lastseil 13 an dem Mast 1 nach oben zu der Leitrolle 10 geführt und von da nach unten umgelenkt. Alle drei Seile 12, 12′ und 13 laufen in dem Punkt 11 zusammen, so daß über den Haken 14 eine Last aufgenommen werden kann. Of each of the two winches 6 and 6 ' is a rope 12 u. 12 ' via a rope pulley 7 or 7' on the mast head to the guide roller 8 or 8 ' at the upper end of the boom 2 or 2' and from there down. From the winch 9 , the load rope 13 on the mast 1 is guided upward to the guide roller 10 and from there deflected downward. All three ropes 12, 12 ' and 13 converge at point 11 , so that a load can be absorbed via the hook 14 .

Fig. 2 zeigt schematisch den sich bei dem Erfindungsge­ genstand ergebenden Arbeitsraum 15, in dem die Lastseile 12, 12′ und 13 noch eine horizontale Kraft bestimmter Größe aufbringen können, um eine Last innerhalb dieses Bereichs 15 mit den äußeren Bedingungen entsprechender Geschwindigkeit hin und her zu bewegen. Fig. 2 shows schematically the resultant working space 15 in the invention, in which the load cables 12, 12 ' and 13 can still apply a horizontal force of a certain size to a load within this area 15 with the external conditions corresponding speed back and forth to move.

  • Bezugszeichenliste  1 Mast
     2 u. 2′ Ausleger
     3 u. 3′ Gelenk
     4 Abstandshalter
     5 u. 5′ Zugelemente
     6 u. 6′ Winden und Windentrommeln
     7 u. 7′ Seilscheiben
     8 u. 8′ Leitrollen
     9 Winde
    10 Leitrolle
    11 Verbindungspunkt
    12 u. 12′ Lastseile
    13 Lastseil
    14 Haken
    15 Arbeitsbereich
    1 mast
    2 u. 2 ′ boom
    3 u. 3 ′ joint
    4 spacers
    5 u. 5 ′ tension elements
    6 u. 6 ′ winches and winch drums
    7 u. 7 ′ pulleys
    8 u. 8 ′ idlers
    9 winds
    10 idler
    11 connection point
    12 u. 12 ′ load ropes
    13 load rope
    14 hooks
    15 work area

Claims (4)

1. Seegangsfolge-Vorrichtung mit wenigstens drei Last­ seilen, die von der Last ausgehend, in etwa gleichen Winkelabständen voneinander kegelmantelartig zu Umlenk­ rollen an den Aufhängepunkten der Vorrichtung und von dort zu getrennt steuerbaren Windentrommeln der Vorrichtung führen, dadurch gekennzeichnet, daß zwei der Umlenkrollen (8, 8′) an den Enden von zwei seitlich symmetrisch an dem Umfang eines die gesamte Vorrichtung tragenden Mastes (1) befestigten, mittels eines Abstandshalters (4) gespreizten und durch Zugelemente (5, 5′) mit dem Mast (1) verbundenen Auslegern (2, 2′) und die dritte Umlenkrolle (10) an dem oberen Mastenende vorgesehen sind oder daß zwei der Umlenk­ rollen an den Enden von zwei seitlich symmetrisch am Mast fest angeordneten Trägern und die dritte Umlenkrolle am Ende eines am Mast gelenkig gelagerten, mittels gespreiz­ ten Zugelementen über Träger am Mast verbundenen Ausle­ gers, angeordnet ist.1. Rope tracking device with at least three load ropes that, starting from the load, roll at approximately equal angular intervals from one another to a deflecting cone to the suspension points of the device and from there lead to separately controllable winch drums of the device, characterized in that two of the deflecting rollers ( 8, 8 ' ) at the ends of two laterally symmetrically attached to the circumference of a mast carrying the entire device ( 1 ), by means of a spacer ( 4 ) spread and by tension elements ( 5, 5' ) connected to the mast ( 1 ) booms ( 2, 2 ' ) and the third guide roller ( 10 ) are provided at the top of the mast or that two of the guide rollers roll at the ends of two laterally symmetrically arranged supports on the mast and the third guide roller at the end of an articulated on the mast, by means of splayed tensile elements connected to the boom on the mast connected to the boom. 2. Vorrichtung nach Anspruch 1, dadurch gekennzeichnet, daß der Mast (1) einschließlich der gesamten Vorrichtung um seine Achse drehbar ist.2. Device according to claim 1, characterized in that the mast ( 1 ) including the entire device is rotatable about its axis. 3. Vorrichtung nach einem der Ansprüche 1 oder 2, dadurch gekennzeichnet, daß die Zugelemente (5, 5′) längenverän­ derlich sind und die Ausleger (2, 2′) gelenkig am Mast gelagert sind.3. Device according to one of claims 1 or 2, characterized in that the tension elements ( 5, 5 ' ) are variable in length and the boom ( 2, 2' ) are articulated on the mast. 4. Vorrichtung nach einem der Ansprüche 1-3, dadurch gekennzeichnet, daß die Steuerung der Windentrommeln (6, 6′ u. 9) zwecks Aufnahme oder Abgabe der Lastseile (12, 12′ u. 13) mit Hilfe einer elektronischen Regelung erfolgt.4. Device according to one of claims 1-3, characterized in that the control of the winch drums ( 6, 6 ' and 9 ) for the purpose of receiving or delivering the load cables ( 12, 12' and 13 ) is carried out with the aid of an electronic control.
DE19873717890 1987-05-27 1987-05-27 Swell-following apparatus Withdrawn DE3717890A1 (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
DE19873717890 DE3717890A1 (en) 1987-05-27 1987-05-27 Swell-following apparatus

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
DE19873717890 DE3717890A1 (en) 1987-05-27 1987-05-27 Swell-following apparatus

Publications (1)

Publication Number Publication Date
DE3717890A1 true DE3717890A1 (en) 1988-12-15

Family

ID=6328546

Family Applications (1)

Application Number Title Priority Date Filing Date
DE19873717890 Withdrawn DE3717890A1 (en) 1987-05-27 1987-05-27 Swell-following apparatus

Country Status (1)

Country Link
DE (1) DE3717890A1 (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0941959A1 (en) * 1998-03-13 1999-09-15 VOITH WERKE Ing. A. Fritz Voith Gesellschaft m.b.H. &amp; Co. KG. Crane draw work
CN109850758A (en) * 2018-12-11 2019-06-07 法兰泰克重工股份有限公司 A kind of reel bearing block of semi-underground hoisting trolley crossbeam
CN115611166A (en) * 2022-08-08 2023-01-17 维多利科技(江苏)有限公司 Hanging device for electric hoist and using method of hanging device
US20230150802A1 (en) * 2020-04-08 2023-05-18 Itrec B.V. Marine knuckle boom crane

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0941959A1 (en) * 1998-03-13 1999-09-15 VOITH WERKE Ing. A. Fritz Voith Gesellschaft m.b.H. &amp; Co. KG. Crane draw work
CN109850758A (en) * 2018-12-11 2019-06-07 法兰泰克重工股份有限公司 A kind of reel bearing block of semi-underground hoisting trolley crossbeam
US20230150802A1 (en) * 2020-04-08 2023-05-18 Itrec B.V. Marine knuckle boom crane
EP4442629A3 (en) * 2020-04-08 2025-01-15 Itrec B.V. Suspension mechanism for a crane
CN115611166A (en) * 2022-08-08 2023-01-17 维多利科技(江苏)有限公司 Hanging device for electric hoist and using method of hanging device

Similar Documents

Publication Publication Date Title
DE69203680T2 (en) Gripping, fastening and treatment device for underwater vehicles and the like.
DE3113763C2 (en)
DE3108454C2 (en) Mobile crane with split support ring
DE1918908A1 (en) Loading crane
DE2432581C3 (en) Device for distributing concrete
DE3108455A1 (en) CRANE
EP0132572B1 (en) Crane with a telescopic tower
DE3717890A1 (en) Swell-following apparatus
DE1276304B (en) Portal crane with foldable trolley jib
DE3315888A1 (en) Crane for transferring cargo from one ship to another
DE1556476A1 (en) Jib crane
DE2652543A1 (en) LIFTING DEVICE WITH AN EXTENSION ARM AND A COUNTERWEIGHT SUPPORT WITH EACH ADJUSTABLE POSITIONS
DE2659059A1 (en) Double jib tower crane - has jibs on two vertically spaced slewing platforms operating independently
DE2602745A1 (en) Hoist mechanism for rectangular shaped bodies - has swan:necked jib with two hooks working together from U:shaped section head arms
DE68910217T2 (en) Stabilization system for a remote manipulator.
DE3245511A1 (en) Crane, in particular a tower slewing crane
EP0152562A2 (en) Crane with telescopic tower
DE1956215B2 (en) Loading arm arrangement
DE2635387C2 (en) crane
DE3802509C2 (en) Vertical moving device for marine supply systems
DE1531606C (en) Device for raising and lowering platform decks in a transport ship
DE3438627A1 (en) Ship with at least one mast which can be swung out about a horizontal axis and serves as a crane jib
DE19906320C2 (en) Device for a container crane for positioning its spreader and for correcting the guidance of the hoisting rope strands
DE1260733B (en) Luffing crane, especially tower crane
DE1531273C3 (en) Container crane hoist with suspension points of two groups of hoist ropes that can be adjusted horizontally on the trolley

Legal Events

Date Code Title Description
8141 Disposal/no request for examination