DE368880C - Process for establishing dams - Google Patents
Process for establishing damsInfo
- Publication number
- DE368880C DE368880C DEW56831D DEW0056831D DE368880C DE 368880 C DE368880 C DE 368880C DE W56831 D DEW56831 D DE W56831D DE W0056831 D DEW0056831 D DE W0056831D DE 368880 C DE368880 C DE 368880C
- Authority
- DE
- Germany
- Prior art keywords
- dams
- masses
- filling
- walls
- sheet pile
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/32—Foundations for special purposes
- E02D27/36—Foundations formed in moors or bogs
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D27/00—Foundations as substructures
- E02D27/26—Compacting soil locally before forming foundations; Construction of foundation structures by forcing binding substances into gravel fillings
Landscapes
- Engineering & Computer Science (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Mining & Mineral Resources (AREA)
- Paleontology (AREA)
- Civil Engineering (AREA)
- General Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Bulkheads Adapted To Foundation Construction (AREA)
Description
Verfahren zum Gründen von Staudämmen. Die Erfindung betrifft ein Verfahren zum Gründen von Staudämmen im Schwimmsand, Lehm oder ähnlichen nicht betonierbaren Bodenschichten.Procedure for building dams. The invention relates to a method for the foundation of dams in swimming sand, clay or similar that cannot be concreted Layers of soil.
Das Neue besteht darin, daB nach Einrammen von Spundrvänden die Bodenmassen zwischen den Spundwänden ausgehoben werden und der entstandene Hohlraum mit Steinen, Geröll, Kies und ähnlichen Füllmassen unter _gleichzeitigem_Einsetzen von Ze_ment-_spritirohren ausgefüllt wird, alsdann in die Fitllnyässe flüssiger, Zementmörtel durch die Zernentspritzrohre eingespritzt wird und die .Spündwände hochgezogen werden.The novelty consists in the fact that the soil masses after ramming in the sheet pile edges are excavated between the sheet pile walls and the resulting cavity with stones, Rubble, gravel and similar fillings with the simultaneous use of ze_ment fuel pipes is filled, then into the Fitllnyaß liquid, cement mortar through the Zernentpritzrohre is injected and the bulkheads are pulled up.
In der Zeichnung ist das neue Verfahren beispielsweise in einer Ausführung veranschaulicht, und zwar zeigt Bild i einen GrundriB der Baustelle, Bild a einen senkrechten Schnitt durch die Baustelle.In the drawing, for example, the new method is implemented illustrates, namely picture i shows a plan of the construction site, picture a one vertical section through the construction site.
Zunächst werden eiserne Spundwände a und b in zwei gleichlaufenden Reihen eingerammt. Dann werden die von den beiden Spundwänden umschlossenen Schwimmsandmassen ausgehoben, worauf in der Mitte der Baugrube eine durchlaufende Wand 8 aus Holzbohlen aufgestellt wird. Darauf werden in der Nähe gesammelte Steine, Geröll, Kies und ähnliche Füllmassen in die beiden jetzt durch die Holzwand getrennten Baugruben d und e unter gleichzeitigem Einsetzen von Spritzrohren f eingefüllt, und flüssiger Zementmörtel in magerer Mischung wird in diese Steinpackungen unter Druck eingespritzt, während gleichzeitig oder auch schon vorher die beiden, eisernen Spundwände a und b hochgezogen und entfernt werden.First, iron sheet piles a and b are made in two parallel Rows rammed. Then the floating sand masses enclosed by the two sheet pile walls excavated, whereupon a continuous wall 8 made of wooden planks in the middle of the construction pit is set up. On it are stones, rubble, gravel and collected nearby similar filling masses in the two construction pits now separated by the wooden wall d and e filled in with the simultaneous insertion of spray tubes f, and more liquid Cement mortar in a lean mixture is injected into these stone packs under pressure, while at the same time or even before the two iron sheet piling a and b pulled up and removed.
Nachdem der Zementmörtel hinreichend abgebunden hat, werden die Holzbohlen der Zwischenwand c hochgezogen, und es wird in den hierdurch frei werdenden durchlaufenden Spalt eine geeignete Dichtungsmasse, z. B. Ton- oder Lehmschlag, Letten u. dgl., eingebracht.After the cement mortar has sufficiently set, the wooden planks are made the intermediate wall c is pulled up, and it is in the thereby freed continuous Gap a suitable sealant, e.g. B. clay or loam, Latvians and the like, brought in.
Claims (1)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEW56831D DE368880C (en) | Process for establishing dams |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
DEW56831D DE368880C (en) | Process for establishing dams |
Publications (1)
Publication Number | Publication Date |
---|---|
DE368880C true DE368880C (en) | 1923-04-19 |
Family
ID=7605140
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
DEW56831D Expired DE368880C (en) | Process for establishing dams |
Country Status (1)
Country | Link |
---|---|
DE (1) | DE368880C (en) |
-
0
- DE DEW56831D patent/DE368880C/en not_active Expired
Similar Documents
Publication | Publication Date | Title |
---|---|---|
DE2751972A1 (en) | METHOD OF MANUFACTURING REINFORCED UNDERGROUND BUILDING PANEL | |
DE368880C (en) | Process for establishing dams | |
DE3228198A1 (en) | Method of improving the keying of a reinforced-concrete root pile which forms a root pile wall preferably with other root piles of the same type | |
DE952787C (en) | Process for the production of a dike from lowerable concrete floating boxes | |
DE407615C (en) | Process for the production of site stakes in soil containing bog acid | |
US1409422A (en) | Process for producing composite piles | |
DE336452C (en) | Process for the foundation of buildings in load-bearing ground | |
DE579544C (en) | Process for the construction of tunnels, especially under urban roads | |
DE970760C (en) | Process for the production of concrete piles in the ground by pressing the sunk borehole filled with aggregate with cement milk or the like while gradually withdrawing the press pipe | |
DE1900097A1 (en) | Panel-shaped building element and method for using the building element | |
DE627752C (en) | Method and tool for compacting the subsoil of road surfaces | |
DE2022967A1 (en) | Process for deepening depressions lying in front of quays and embankment walls of sea and inland ports and thus strengthened quays | |
DE616706C (en) | Process for the production of plug-like concrete foundation bodies | |
CH90630A (en) | Process for sealing, securing and strengthening shafts and tunnels in loose rock layers. | |
AT217676B (en) | Method for the repair of soil mechanically stressed retaining walls, vaults and the like. like | |
DE628610C (en) | Process for the foundation of dams or similar structures on peatland | |
DE974948C (en) | Process to improve the load-bearing capacity of natural soil layers and artificial heaps by introducing load-bearing material under rocking | |
Osorio et al. | Rammed-earth construction in Southern Morocco: A reappraisal of the technology | |
DE689240C (en) | Process for the production of foot widening in the case of concrete stakes | |
DE206878C (en) | ||
DE204384C (en) | ||
DE640008C (en) | Process for the construction of tunnels, galleries and other underground structures in loose, possibly water-bearing mountains | |
CH670669A5 (en) | Concrete foundation constructing method - uses hollow perforated drill to inject binder into sloping holes to form anchorage cores for lining blocks | |
DE398627C (en) | Method for the production of site stakes from concrete by means of a driving pipe | |
DE2137417A1 (en) | LAYING OF PIPES FOR DRAINING GROUNDWATER AND Leachate |